﻿_id	No_	Funding Programme	LA	Scheme/Project Name	No_ of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report of Final Turnkey/CALF approval	On site	Completed
1	1	CALF Turnkey	Carlow	Laragh Beg, Ballon, Co. Carlow (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Q3-2018	""	""
2	2	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	44	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
3	3	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing	""	""	""	""	Q1-2018	""
4	4	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 1)*	7	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
5	5	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 2)	15	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
6	6	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 3)	25	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
7	7	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
8	8	CALF Turnkey	Carlow	14 units Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
9	9	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
10	10	SHIP CONSTRUCTION TURNKEY	Carlow	The Laurels, Tullow Road, Carlow - Phase 1	18	*N/A	""	""	""	""	Q4-2017	""
11	11	SHIP CONSTRUCTION TURNKEY	Carlow	The Laurels, Tullow Road, Carlow - Phase 2	22	*N/A	""	""	""	""	Q4-2017	""
12	12	SHIP CONSTRUCTION TURNKEY	Carlow	The Laurels, Tullow Road, Carlow - Phase 3	23	*N/A	""	""	""	""	Q4-2017	""
13	13	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Father Flood Avenue, Rathvilly	8	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
14	14	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Oliver's Crescent, Myshall	4	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
15	15	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Mary's Court & Dereen Heights	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
16	16	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
17	17	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	""	Q4-2018
18	18	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
19	19	SHIP CONSTRUCTION	Carlow	Bagenalstown Phase 1	20	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
20	20	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
21	21	SHIP CONSTRUCTION	Carlow	Slate Row, Hacketstown	4	*N/A	""	""	""	""	""	Q4-2018
22	22	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
23	23	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
24	24	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
25	25	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
26	26	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
27	27	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
28	28	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
29	29	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
30	30	SHIP CONSTRUCTION	Carlow	St. Mary's court & Derreen Heights	6	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
31	31	SHIP CONSTRUCTION	Carlow	Bagenalstown Phase 2	22	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
32	32	CAS CONSTRUCTION	Carlow	Mill Race Court, Carlow Town	14	Cluid Housing Association	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
33	33	CAS CONSTRUCTION	Carlow	Royal Oak Road, Bagenalstown	6	Respond	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
34	34	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
35	35	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
36	36	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
37	37	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
38	38	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
39	39	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	14	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
40	40	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	Q1-2018	""
41	41	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2018
42	42	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	""	Q4-2018
43	43	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
44	44	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
45	45	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
46	46	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
47	47	SHIP CONSTRUCTION	Cavan	Holborn Hill, Belturbet	6	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
48	48	SHIP CONSTRUCTION	Cavan	Elm Grove	13	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
49	49	CALF Construction	Clare	 Bruachlan, Westbury, Co Clare (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Q1-2017	""	""
50	50	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	47	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
51	51	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
52	52	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2018
53	53	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	18	Cluid Housing	""	""	""	""	""	Q4-2018
54	54	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	3	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
55	55	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
56	56	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	""	Q4-2018
57	57	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
58	58	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	""	Q4-2018	""
59	59	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	""	Q4-2018	""
60	60	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
61	61	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
62	62	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	14	Cuan an Chlair Ltd	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
63	63	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
64	64	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
65	65	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
66	66	CAS CONSTRUCTION	Clare	Monaskeha Heights	4	Newgrove Housing Association Ltd	""	""	""	""	Q4-2018	""
67	67	CAS CONSTRUCTION	Clare	Roo East	4	Thomond Housing Association Ltd	""	""	""	""	""	Q4-2018
68	68	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	50	*N/A	""	""	Q1-2018	""	""	""
69	69	CALF Construction	Cork City	8 units  Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	Q3-2018	""	""
70	70	CALF Turnkey	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	Q3-2018	""	""
71	71	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)*	80	Respond	""	""	""	Q3-2018	""	""
72	72	CALF Turnkey	Cork City	The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)	17	T�ath Housing Association Ltd	""	""	""	Q4-2018	""	""
73	73	CALF Construction	Cork City	Mile Stream, Shanakiel, Cork City  (Phase 1)	50	Co-operative Housing Ireland	""	""	""	Q4-2017	""	""
74	74	CALF Turnkey	Cork City	The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)	21	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
75	75	CALF Construction	Cork City	Lr. Glanmire Road &  Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
76	76	CALF Turnkey	Cork City	 North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
77	77	CALF Construction	Cork City	Lr. Glanmire Road &  Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	""	Q4-2018
78	78	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 1)	72	Cluid Housing	""	""	""	""	""	Q4-2018
79	79	CALF Turnkey	Cork City	The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)	31	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
80	80	SHIP CONSTRUCTION TURNKEY	Cork City	Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
81	81	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
82	82	SHIP CONSTRUCTION TURNKEY	Cork City	Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
83	83	SHIP CONSTRUCTION TURNKEY	Cork City	Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q4-2018
84	84	SHIP CONSTRUCTION TURNKEY	Cork City	Deanrock Cottages, Togher	4	*N/A	""	""	""	""	""	Q4-2018
85	85	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
86	86	SHIP CONSTRUCTION TURNKEY	Cork City	The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
87	87	SHIP CONSTRUCTION TURNKEY	Cork City	South Terrace Court, South Terrace, Cork	2	*N/A	""	""	""	""	""	Q4-2018
88	88	SHIP CONSTRUCTION	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	""	Q4-2018
89	89	SHIP CONSTRUCTION	Cork City	Barack Street	32	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
90	90	SHIP CONSTRUCTION	Cork City	FaranFerris	5	*N/A	""	""	""	""	Q2-2018	""
91	91	SHIP CONSTRUCTION	Cork City	High Street	9	*N/A	""	""	""	""	Q2-2018	""
92	92	SHIP CONSTRUCTION	Cork City	Tramore Road	4	*N/A	""	""	""	""	""	Q4-2018
93	93	SHIP CONSTRUCTION	Cork City	Whites Street	43	*N/A	""	""	""	""	Q3-2018	""
94	94	SHIP CONSTRUCTION	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
95	95	SHIP CONSTRUCTION	Cork City	Church Road, Tramore	43	*N/A	""	""	""	""	""	Q3-2018
96	96	SHIP CONSTRUCTION	Cork City	Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
97	97	SHIP CONSTRUCTION	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
98	98	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
99	99	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
100	100	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
101	101	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	""	Q4-2018	""
102	102	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	""	Q4-2018
103	103	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
104	104	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	41	*N/A	""	""	""	""	Q3-2017	""
105	105	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
106	106	SHIP CONSTRUCTION	Cork City	Blarney Street	25	*N/A	""	""	""	""	Q2-2018	""
107	107	SHIP CONSTRUCTION	Cork City	Bramble Cottages	5	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
108	108	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	20	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
109	109	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
110	110	SHIP CONSTRUCTION	Cork City	Ballinure Road, Cork City	5	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
111	111	SHIP CONSTRUCTION	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
112	112	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street, Cork	13	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
113	113	SHIP CONSTRUCTION	Cork City	Lower John Street, Cork	17	*N/A	""	""	""	""	Q4-2018	""
114	114	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 2)	57	*N/A	""	""	""	""	Q1-2018	""
115	115	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
116	116	REGENERATION	Cork City	Phase 2 A Knocknaheeny	47	*N/A	""	""	""	""	Q2-2018	""
117	117	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
118	118	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
119	119	REGENERATION	Cork City	Phase 2C Knocknaheeny	24	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
120	120	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Foyle Avenue, Knocknaheeny, Cork	2	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
121	121	REGENERATION	Cork City	Ardmore Avenue, Knocknaheeny, Cork	1	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
122	122	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	37	Good Shepherd Services Ltd	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
123	123	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
124	124	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
125	125	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
126	126	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
127	127	CAS CONSTRUCTION	Cork City	Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
128	128	CALF Turnkey	Cork County	Lackaduff, Codrum, Macroom, Co Cork  (Phase 1)	5	T�ath Housing Association Ltd	""	""	""	Q1-2018	""	""
129	129	CALF Turnkey	Cork County	Lackaduff, Codrum, Macroom, Co. Cork - Phase 2 (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	Q1-2018	""	""
130	130	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 1)	44	Respond	""	""	""	Q4-2018	""	""
131	131	CALF Turnkey	Cork County	Togher Cross, Lehenaghmore, Co. Cork (Phase 1)	9	Cluid Housing	""	""	""	""	Q3-2018	""
132	132	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	""	Q4-2018	""
133	133	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)*	42	Respond	""	""	""	""	Q4-2018	""
134	134	CALF Construction	Cork County	 Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing	""	""	""	""	Q4-2018	""
135	135	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)	6	T�ath Housing Association Ltd	""	""	""	""	Q4-2016	""
136	136	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 2)	5	T�ath Housing Association Ltd	""	""	""	""	Q4-2016	""
137	137	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
138	138	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
139	139	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	""	Q4-2018
140	140	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
141	141	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
142	142	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
143	143	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (1)	18	*N/A	""	""	""	""	""	Q2-2018
144	144	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
145	145	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	""	Q4-2018
146	146	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	25	*N/A	""	""	""	""	Q3-2018	""
147	147	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
148	148	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
149	149	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	""	Q4-2017
150	150	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	52	*N/A	""	""	""	""	Q4-2017	""
151	151	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
152	152	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
153	153	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
154	154	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	6	*N/A	""	""	""	""	Q1-2018	""
155	155	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary�s Road, Dunmanway	20	*N/A	""	""	""	""	Q3-2018	""
156	156	SHIP CONSTRUCTION TURNKEY	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	Q1-2018	""
157	157	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	14	*N/A	""	""	""	""	Q4-2018	""
158	158	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	6	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
159	159	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	Q1-2018	""
160	160	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	Stage 4 approved Q4-2017, the scheme is fully approved.	""	""
161	161	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	2	*N/A	""	""	""	""	""	Q3-2018
162	162	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	""	Q4-2018
163	163	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara, Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q4-2018
164	164	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 1	12	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
165	165	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	35	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
166	166	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire	4	*N/A	""	""	""	""	""	Q4-2018
167	167	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mont Rivers, Co. Cork.	3	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
168	168	SHIP CONSTRUCTION TURNKEY	Cork County	Claredon Brooks, Carrs Hill, Douglas Phase 2	33	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
169	169	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
170	170	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
171	171	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	13	*N/A	""	""	""	""	""	Q4-2018
172	172	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	6	*N/A	""	""	""	""	Q3-2018	""
173	173	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen, (Phase 2)	2	*N/A	""	""	""	""	""	Q4-2018
174	174	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
175	175	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	""	Q4-2018
176	176	SHIP CONSTRUCTION TURNKEY	Cork County	Milleenacola, Bantry	51	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
177	177	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac	4	*N/A	""	""	""	""	""	Q4-2018
178	178	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow	12	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
179	179	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midelton (Phase 2)	14	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
180	180	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (2)	7	*N/A	""	""	""	""	""	Q3-2018
181	181	SHIP CONSTRUCTION TURNKEY	Cork County	Canon St, Rathcormac	3	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
182	182	SHIP CONSTRUCTION TURNKEY	Cork County	Percival St, Kanturk	2	*N/A	""	""	""	""	""	Q4-2018
183	183	SHIP CONSTRUCTION TURNKEY	Cork County	Main Street, Boherbue	2	*N/A	""	""	""	""	""	Q4-2018
184	184	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	6	*N/A	""	""	""	""	Q3-2018	""
185	185	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac	4	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
186	186	SHIP CONSTRUCTION TURNKEY	Cork County	Maple Woods, Midleton	6	*N/A	""	""	""	""	""	Q4-2018
187	187	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
188	188	SHIP CONSTRUCTION RAPID	Cork County	Abbeywood, Midleton	70	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
189	189	SHIP CONSTRUCTION RAPID	Cork County	Station Road, Blarney	18	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
190	190	SHIP CONSTRUCTION RAPID	Cork County	Bluepool, Kanturk	12	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
191	191	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	15	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
192	192	SHIP CONSTRUCTION	Cork County	Tower View/C�irt na Sil�n�, Cloyne, East Cork	9	*N/A	""	""	""	""	Q3-2018	""
193	193	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
194	194	SHIP CONSTRUCTION	Cork County	Castletreasure Grove, Douglas	1	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
195	195	SHIP CONSTRUCTION	Cork County	Poulavone, Ballincollig	57	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
196	196	SHIP CONSTRUCTION	Cork County	Newtown, Bantry	1	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
197	197	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	""	Q4-2018
198	198	SHIP CONSTRUCTION	Cork County	Droum, Castletownbere	2	*N/A	""	""	""	""	""	Q4-2018
199	199	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
200	200	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
201	201	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
202	202	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
203	203	SHIP CONSTRUCTION	Cork County	Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
204	204	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline phase 1A	10	*N/A	""	""	""	""	""	Q4-2018
205	205	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1/C)	16	*N/A	""	""	""	""	Q1-2018	""
206	206	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1/D)	18	*N/A	""	""	""	""	Q1-2018	""
207	207	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	18	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
208	208	SHIP CONSTRUCTION	Cork County	Madonna House, Ballincollig	20	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
209	209	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	4	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
210	210	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
211	211	SHIP CONSTRUCTION	Cork County	Sleaveen Sleaveen East, Macroom	8	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
212	212	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline Phase 1B	5	*N/A	""	""	""	""	""	Q4-2018
213	213	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	Stage 1 approved Q3-2016, outline design and costs being prepared.	""	""	""	""	""
214	214	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	""	Q4-2018
215	215	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	Q1-2018	""
216	216	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
217	217	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	""	Q4-2018	""
218	218	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
219	219	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
220	220	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	8	Charleville Care Project Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
221	221	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty	54	*N/A	""	""	Q1-2018	""	""	""
222	222	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen	50	*N/A	""	""	Q1-2018	""	""	""
223	223	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom	50	*N/A	""	""	Q1-2018	""	""	""
224	224	CALF Construction	DLR	Abbeyview, Monkstown, Co. Dublin (Phase 1)	11	Cluid Housing	""	""	""	Q4-2018	""	""
225	225	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	105	T�ath Housing Association Ltd	""	""	""	Q1-2017	""	""
226	226	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	Q3-2017	""
227	227	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2017
228	228	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
229	229	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q3-2018
230	230	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
231	231	CALF Turnkey	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
232	232	CALF Turnkey	DLR	Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)	1	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2018
233	233	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	""	Q4-2018
234	234	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	""	Q4-2018
235	235	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
236	236	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
237	237	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2017
238	238	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
239	239	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace., Monkstown, Co. Dublin	14	*N/A	""	""	""	""	""	Q4-2018
240	240	SHIP CONSTRUCTION RAPID	DLR	Glenamuck/Stillorgan (Rockville Drive)	14	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
241	241	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
242	242	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
243	243	SHIP CONSTRUCTION	DLR	Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
244	244	SHIP CONSTRUCTION	DLR	Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
245	245	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
246	246	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
247	247	SHIP CONSTRUCTION	DLR	The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
248	248	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
249	249	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	""	Q4-2018
250	250	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
251	251	SHIP CONSTRUCTION	DLR	Fitzgerald Park	33	*N/A	""	""	""	""	""	Q4-2018
252	252	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
253	253	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
254	254	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
255	255	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
256	256	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
257	257	SHIP CONSTRUCTION	DLR	Ballyogan Ave., Ballyogan, Co. Dublin	2	*N/A	""	""	""	""	Q4-2018	""
258	258	SHIP CONSTRUCTION	DLR	St. Laurence�s Park, Stillorgan, Co. Dublin	77	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
259	259	SHIP CONSTRUCTION	DLR	Fitzgerald Park	17	*N/A	""	""	""	""	Q4-2016	""
260	260	CAS CONSTRUCTION	DLR	Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
261	261	CALF Turnkey	Donegal	Ardrawer, Kiltoy, Letterkenny, Co. Donegal (Phase 1)	46	Cluid Housing	""	""	""	Q1-2018	""	""
262	262	CALF Construction	Donegal	Raphoe Road, Castlefinn, Co. Donegal (Phase 1)	10	Habinteg Housing Association (Ireland) Ltd	""	""	""	Q2-2018	""	""
263	263	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	Q4-2017	""
264	264	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2016
265	265	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2018
266	266	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
267	267	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 1)	18	*N/A	""	""	""	""	""	Q4-2018
268	268	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	20	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
269	269	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 2)	20	*N/A	""	""	""	""	Q2-2018	""
270	270	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	Stage 2 approved Q1-2017, full design/tender being prepared.	""	""	""	""
271	271	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
272	272	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
273	273	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	""	Q4-2018	""
274	274	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
275	275	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
276	276	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	""	Q4-2018
277	277	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Ph 2)	4	*N/A	""	""	""	""	""	Q4-2018
278	278	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
279	279	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	""	Q4-2018
280	280	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
281	281	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
282	282	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
283	283	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
284	284	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
285	285	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
286	286	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
287	287	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
288	288	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	20	Habinteg Housing Association (Ireland) Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
289	289	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	23	Cluid Housing	""	""	""	Q2-2018	""	""
290	290	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 2)	39	Cluid Housing	""	""	""	Q2-2018	""	""
291	291	CALF Construction	Dublin City	Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	Q2-2018	""	""
292	292	CALF Construction	Dublin City	 Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	Q3-2018	""	""
293	293	CALF Construction	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co-operative Housing Ireland	""	""	""	Q4-2017	""	""
294	294	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	T�ath Housing Association Ltd	""	""	""	""	Q2-2017	""
295	295	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	Q1-2018	""
296	296	CALF Construction	Dublin City	Revised - St Mary�s Mansions, Dublin 1 (Phase 1)	80	Cluid Housing	""	""	""	""	Q1-2018	""
297	297	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	97	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2018	""
298	298	CALF Turnkey	Dublin City	 Mountjoy Square North, Dublin 1 (Phase 1)	31	Respond	""	""	""	""	Q2-2018	""
299	299	CALF Turnkey	Dublin City	Canal Meadows, Bluebell, Dublin 12 (Phase 1)	4	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
300	300	CALF Construction	Dublin City	 Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2018	""
301	301	CALF Construction	Dublin City	 Poplar Row, Ballybough, Dublin 3\n (Phase 1)	29	Oaklee Housing	""	""	""	""	Q3-2018	""
302	302	CALF Turnkey	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
303	303	CALF Construction	Dublin City	 Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing	""	""	""	""	Q4-2018	""
304	304	CALF Construction	Dublin City	Ballygall Road East phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
305	305	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2016
306	306	CALF Turnkey	Dublin City	 Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2017
307	307	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
308	308	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
309	309	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing	""	""	""	""	""	Q3-2017
310	310	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2017
311	311	CALF Turnkey	Dublin City	Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
312	312	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
313	313	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing	""	""	""	""	""	Q3-2018
314	314	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
315	315	CALF Turnkey	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2018
316	316	CALF Turnkey	Dublin City	Bluebell Avenue, Dublin 12 (Phase 1)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
317	317	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
318	318	CALF Construction	Dublin City	Johns Lane West Dublin 8 (Phase 1)	31	Focus Ireland	""	""	""	""	""	Q4-2018
319	319	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
320	320	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
321	321	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
322	322	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
323	323	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
324	324	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
325	325	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
326	326	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Ireland	""	""	""	""	""	Q4-2016
327	327	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	28	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
328	328	CALF Construction	Dublin City	Broome Lodge,\nDunmanus Court, Cabra (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q4-2017
329	329	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
330	330	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q4-2017
331	331	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospecthill	58	*N/A	""	""	""	""	""	Q4-2017
332	332	SHIP CONSTRUCTION TURNKEY	Dublin City	Parkside, Balgriffin, Dublin 13	16	*N/A	""	""	""	""	""	Q4-2018
333	333	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	47	*N/A	""	""	""	""	""	Q4-2018
334	334	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	45	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
335	335	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
336	336	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
337	337	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
338	338	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
339	339	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
340	340	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard Site Ph1	53	*N/A	""	""	""	""	""	Q4-2018
341	341	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	""	""	""	Q4-2018	""
342	342	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Rathvilly Drive site	13	*N/A	""	""	""	""	""	Q3-2018
343	343	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Woodbank Drive site	3	*N/A	""	""	""	""	""	Q3-2018
344	344	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard site Ph 2	19	*N/A	""	""	""	""	Q3-2018	""
345	345	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
346	346	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	""	""	""	Q4-2018	""
347	347	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	70	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
348	348	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	""	Q4-2018	""
349	349	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
350	350	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
351	351	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1 - Phase 1	5	*N/A	""	""	""	""	""	Q4-2018
352	352	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
353	353	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 1	9	*N/A	""	""	""	""	""	Q1-2017
354	354	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 2	26	*N/A	""	""	""	""	Q2-2017	""
355	355	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1 - Phase 2	2	*N/A	""	""	""	""	Q1-2017	""
356	356	REGENERATION	Dublin City	St. Teresa's Gardens	54	*N/A	""	""	""	""	Q4-2018	""
357	357	REGENERATION	Dublin City	Dolphin House, Dublin 8 (Phase 1)	100	*N/A	""	""	""	""	""	Q3-2018
358	358	REGENERATION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q4-2018	""
359	359	REGENERATION	Dublin City	Sackville Avenue Cottages	12	*N/A	Stage 1 approved Q2-2016, outline design and costs being prepared.	""	""	""	""	""
360	360	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	""	""	""	""	Q3-2018	""
361	361	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
362	362	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
363	363	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
364	364	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
365	365	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
366	366	REGENERATION	Dublin City	St. Bricins Park	11	*N/A	""	""	""	""	""	Q4-2018
367	367	CAS CONSTRUCTION	Dublin City	Bolton Street, Dublin 1	8	Arlington Novas Ireland Ltd	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
368	368	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2018
369	369	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	T�ath Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
370	370	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	""	Q4-2018
371	371	CAS CONSTRUCTION	Dublin City	Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	Q3-2018	""
372	372	CAS CONSTRUCTION	Dublin City	Townsend Street	18	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
373	373	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	""	""	""	""	Q4-2018	""
374	374	CAS CONSTRUCTION	Dublin City	New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
375	375	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
376	376	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
377	377	CAS CONSTRUCTION	Dublin City	Arbour Hill, Dublin 7	18	Simon Community : Dublin Simon	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
378	378	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
379	379	CAS CONSTRUCTION	Dublin City	Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	""	Q4-2018	""
380	380	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
381	381	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	Q3-2018	""	""
382	382	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	Q3-2018	""	""
383	383	CALF Turnkey	Fingal	Allendale Square, Clonsilla, Dublin 15 (Phase 1)*	28	Respond	""	""	""	Q4-2018	""	""
384	384	CALF Turnkey	Fingal	Property  Park House, Dublin Street, Baldoyle, Dublin 13 (Phase 1)*	1	Focus Ireland	""	""	""	""	Q2-2017	""
385	385	CALF Turnkey	Fingal	The Gallery, Turvey Avenue, Donabate (Phase 1)	43	Oaklee Housing	""	""	""	""	Q2-2017	""
386	386	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
387	387	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	28	The Iveagh Trust	""	""	""	""	Q3-2018	""
388	388	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	Q3-2018	""
389	389	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 1)	55	Respond	""	""	""	""	Q3-2018	""
390	390	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing	""	""	""	""	Q4-2018	""
391	391	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	Q4-2018	""
392	392	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2016
393	393	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2016
394	394	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
395	395	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
396	396	CALF Turnkey	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
397	397	CALF Turnkey	Fingal	4 units, Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
398	398	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
399	399	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 2)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
400	400	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing	""	""	""	""	""	Q4-2018
401	401	CALF Turnkey	Fingal	Northwood Green, Santry, Dublin 9 (Phase 1)*	6	Respond	""	""	""	""	""	Q4-2018
402	402	CALF Turnkey	Fingal	Taylor Hill Crescent, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
403	403	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2018
404	404	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
405	405	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
406	406	CALF Turnkey	Fingal	St Marnock�s Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q4-2017
407	407	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
408	408	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Cluid Housing	""	""	""	""	""	Q4-2017
409	409	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
410	410	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
411	411	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 1), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
412	412	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 2), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
413	413	SHIP CONSTRUCTION TURNKEY	Fingal	Ravenswood, North Road, Finglas (Phase 2)	2	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
414	414	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
415	415	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
416	416	SHIP CONSTRUCTION TURNKEY	Fingal	Kenure Gate, Park Road, Rush	4	*N/A	""	""	""	""	""	Q4-2018
417	417	SHIP CONSTRUCTION TURNKEY	Fingal	Glaslinn, Donabate	3	*N/A	""	""	""	""	""	Q4-2018
418	418	SHIP CONSTRUCTION TURNKEY	Fingal	Bremore Pastures Park, Balbriggan	4	*N/A	""	""	""	""	""	Q4-2018
419	419	SHIP CONSTRUCTION TURNKEY	Fingal	Northwood Green, Santry, Dublin 9	37	*N/A	""	""	""	""	""	Q4-2018
420	420	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	Q3-2018	""
421	421	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
422	422	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
423	423	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
424	424	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	""	Q4-2018	""
425	425	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	""	Q4-2018	""
426	426	SHIP CONSTRUCTION	Fingal	Rowlestown	20	*N/A	""	""	""	""	Q2-2018	""
427	427	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.3)	5	*N/A	""	""	""	""	""	Q2-2018
428	428	SHIP CONSTRUCTION	Fingal	Castlelands, Park View, Balbriggan (Phase 3)	24	*N/A	""	""	""	""	Q1-2017	""
429	429	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	""	Q4-2018	""
430	430	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 1)	2	*N/A	""	""	""	""	""	Q3-2017
431	431	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
432	432	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
433	433	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
434	434	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.1)	25	*N/A	""	""	""	""	""	Q4-2017
435	435	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 2)	6	*N/A	""	""	""	""	""	Q4-2018
436	436	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.2) 	15	*N/A	""	""	""	""	""	Q1-2018
437	437	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
438	438	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.4)	4	*N/A	""	""	""	""	""	Q3-2018
439	439	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.5)	25	*N/A	""	""	""	""	""	Q4-2018
440	440	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth, Co Dublin	8	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
441	441	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	T�ath Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
442	442	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 1)	6	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
443	443	CAS CONSTRUCTION	Fingal	College Street, Baldoyle	4	Cluid Housing Association	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
444	444	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
445	445	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
446	446	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
447	447	CALF Turnkey	Galway City	 Murrough, Renmore, Galway  (Phase 1)	8	Cluid Housing	""	""	""	""	Q1-2018	""
448	448	CALF Turnkey	Galway City	 Murrough, Renmore, Galway  (Phase 2)	8	Cluid Housing	""	""	""	""	Q1-2018	""
449	449	CALF Turnkey	Galway City	 Murrough, Renmore, Galway  (Phase 3)*	4	Cluid Housing	""	""	""	""	Q1-2018	""
450	450	CALF Turnkey	Galway City	Castlegar Road, Galway (Phase 1)	81	Respond	""	""	""	""	Q2-2018	""
451	451	CALF Turnkey	Galway City	Sraith Fhada, Doughiska, Galway City (Phase 1)	14	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
452	452	CALF Turnkey	Galway City	Reilean, Roscam, Galway (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
453	453	CALF Turnkey	Galway City	Reilean, Roscam, Galway (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
454	454	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q3-2017
455	455	CALF Turnkey	Galway City	 Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
456	456	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
457	457	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
458	458	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
459	459	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
460	460	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine, (Glasshouse Site) Monivea Road - (Phase 1)	32	*N/A	""	""	""	""	Q3-2018	""
461	461	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine (Glasshouse Site), Monivea Road - (Phase 2)	20	*N/A	""	""	""	""	Q3-2018	""
462	462	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	78	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
463	463	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
464	464	SHIP CONSTRUCTION	Galway City	Ballinfoile Park, Headford Road (Infill Units)	9	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
465	465	SHIP CONSTRUCTION	Galway City	Corrib Park (Infill Units)	3	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
466	466	SHIP CONSTRUCTION	Galway City	Castlepark, Ballybane (Infill Units)	4	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
467	467	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway.	7	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
468	468	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway	58	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
469	469	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	69	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
470	470	CAS CONSTRUCTION	Galway City	Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
471	471	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
472	472	CAS CONSTRUCTION	Galway City	Forster Street	9	Cope Galway	""	""	""	""	Q4-2018	""
473	473	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke	74	*N/A	""	""	Q1-2018	""	""	""
474	474	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 2)	3	Co-operative Housing Ireland	""	""	""	""	Q1-2017	""
475	475	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing	""	""	""	""	""	Q3-2017
476	476	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q2-2018
477	477	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
478	478	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
479	479	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
480	480	SHIP CONSTRUCTION TURNKEY	Galway County	Ashthorn Avenue, Headford	10	*N/A	""	""	""	""	""	Q4-2018
481	481	SHIP CONSTRUCTION TURNKEY	Galway County	Cuirt na hAbhann, Claregalway 	8	*N/A	""	""	""	""	""	Q4-2018
482	482	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	Q2-2018	""
483	483	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	Q2-2018	""
484	484	SHIP CONSTRUCTION	Galway County	Culleen, Carraroe, Connemara	6	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
485	485	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
486	486	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
487	487	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	""	Q4-2018
488	488	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	Q2-2018	""
489	489	SHIP CONSTRUCTION	Galway County	Cill Ciar�n (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
490	490	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
491	491	SHIP CONSTRUCTION	Galway County	Roundstone	10	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
492	492	SHIP CONSTRUCTION	Galway County	Sruchain an Chlair, Oughterard	13	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
493	493	SHIP CONSTRUCTION	Galway County	St. Joseph's, Clifden	23	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
494	494	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	16	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
495	495	SHIP CONSTRUCTION	Galway County	Caisle�n Raithl�n, Ardrahan	10	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
496	496	SHIP CONSTRUCTION	Galway County	Old Area Engineer's Office, Barrack Street, Loughrea	5	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
497	497	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam. Phase 2	45	*N/A	""	""	""	""	Q4-2017	""
498	498	SHIP CONSTRUCTION	Galway County	Cartron, Kinvarra	10	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
499	499	SHIP CONSTRUCTION	Galway County	Gort U� Lochlainn, Moycullen	30	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
500	500	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam. Phase 1	16	*N/A	""	""	""	""	""	Q4-2018
501	501	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
502	502	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mh�l, South Connemara	8	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
503	503	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	Q2-2018	""
504	504	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
505	505	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
506	506	CAS CONSTRUCTION	Galway County	Springfield, Parkmore (Ballinasloe)	4	Peter Triest Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
507	507	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
508	508	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	17	Cluid Housing Association	""	""	""	""	Q4-2018	""
509	509	CAS CONSTRUCTION	Galway County	Caheroyn, Athenry	4	Peter Triest Housing Association Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
510	510	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	5	Peter Triest Housing Association Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
511	511	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
512	512	CALF Turnkey	Kerry	Oakwood, Coolegrean, Killarney, Co. Kerry (Phase 1)	59	Cluid Housing	""	""	""	Q1-2018	""	""
513	513	CALF Turnkey	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Cluid Housing	""	""	""	Q3-2018	""	""
514	514	CALF Turnkey	Kerry	Doon Road, Lisloose, Tralee, Co. Kerry (Phase 1)*	14	Co-operative Housing Ireland	""	""	""	Q4-2018	""	""
515	515	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 2)	2	Respond	""	""	""	""	Q3-2018	""
516	516	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 3)	6	Respond	""	""	""	""	Q3-2018	""
517	517	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)	61	Cluid Housing	""	""	""	""	Q4-2018	""
518	518	CALF Turnkey	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Cluid Housing	""	""	""	""	Q4-2018	""
519	519	CALF Turnkey	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Cluid Housing	""	""	""	""	Q1-2019	""
520	520	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing	""	""	""	""	""	Q2-2016
521	521	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 1)	14	Respond	""	""	""	""	""	Q4-2018
522	522	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 1	2	*N/A	""	""	""	""	""	Q1-2018
523	523	SHIP CONSTRUCTION TURNKEY	Kerry	Cahirdown Wood, Listowel	38	*N/A	""	""	""	""	Q4-2018	""
524	524	SHIP CONSTRUCTION TURNKEY	Kerry	Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
525	525	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
526	526	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	5	*N/A	""	""	""	""	""	Q3-2018
527	527	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 1	3	*N/A	""	""	""	""	""	Q4-2018
528	528	SHIP CONSTRUCTION TURNKEY	Kerry	Woodview, Cahirdown, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
529	529	SHIP CONSTRUCTION TURNKEY	Kerry	Dromin Upper, Listowel	8	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
530	530	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 3	3	*N/A	""	""	""	""	""	Q4-2018
531	531	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Pinewood Estate, Killarney	6	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
532	532	SHIP CONSTRUCTION	Kerry	Ardmoneel, Killorglin	14	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
533	533	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
534	534	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	""	Q4-2018
535	535	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
536	536	SHIP CONSTRUCTION	Kerry	Milltown	8	*N/A	""	""	""	""	Q4-2018	""
537	537	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	Q2-2018	""
538	538	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
539	539	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
540	540	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	""	Q4-2018	""
541	541	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
542	542	SHIP CONSTRUCTION	Kerry	Marconi Avenue, Ballybunion	20	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
543	543	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	""	Q4-2018
544	544	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	""	Q4-2018
545	545	SHIP CONSTRUCTION	Kerry	Balloonagh, Tralee	28	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
546	546	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	""	Q4-2018
547	547	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
548	548	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
549	549	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
550	550	SHIP CONSTRUCTION	Kerry	Owngarry, killorglin	1	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
551	551	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	56	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
552	552	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
553	553	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
554	554	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
555	555	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	24	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
556	556	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee	8	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
557	557	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	20	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
558	558	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	""	Q4-2018
559	559	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
560	560	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
561	561	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	""	Q4-2018
562	562	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
563	563	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
564	564	CAS CONSTRUCTION	Kerry	College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	""	Q4-2018
565	565	CAS CONSTRUCTION	Kerry	Mitchels-Boherbee	18	Cluid Housing Association	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
566	566	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	""	Q4-2018
567	567	CAS CONSTRUCTION	Kerry	Hawley Park Apartments, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
568	568	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	*N/A	""	""	""	""	Q4-2018	""
569	569	CALF Construction	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
570	570	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 3)	20	Cluid Housing	""	""	""	""	Q1-2018	""
571	571	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 4)	2	Cluid Housing	""	""	""	""	Q1-2018	""
572	572	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 1)*	18	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
573	573	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 2)	27	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
574	574	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 3)	18	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
575	575	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
576	576	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	50	Respond	""	""	""	""	Q4-2018	""
577	577	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 2)*	3	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
578	578	CALF Turnkey	Kildare	Revised Rye Abbey, Kilcock, Co Kildare (apts)\n (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q2-2017
579	579	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
580	580	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q2-2017
581	581	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing	""	""	""	""	""	Q1-2018
582	582	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
583	583	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2018
584	584	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
585	585	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing	""	""	""	""	""	Q3-2018
586	586	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
587	587	CALF Turnkey	Kildare	Bellingsfield, Naas, Kildare (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2018
588	588	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2018
589	589	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
590	590	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 1)*	14	Cluid Housing	""	""	""	""	""	Q4-2018
591	591	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 2)	24	Cluid Housing	""	""	""	""	""	Q4-2018
592	592	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
593	593	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
594	594	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
595	595	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
596	596	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
597	597	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
598	598	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
599	599	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	""	Q4-2018
600	600	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
601	601	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot	6	*N/A	""	""	""	""	""	Q4-2018
602	602	SHIP CONSTRUCTION TURNKEY	Kildare	Grove Lane, Robertstown	3	*N/A	""	""	""	""	Q1-2017	""
603	603	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill, Prosperous	5	*N/A	""	""	""	""	""	Q4-2018
604	604	SHIP CONSTRUCTION TURNKEY	Kildare	The Green, Elsmore Naas	5	*N/A	""	""	""	""	""	Q4-2018
605	605	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
606	606	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
607	607	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
608	608	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
609	609	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	""	""	Q1-2018	""
610	610	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
611	611	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	""	""	Q4-2018	""
612	612	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
613	613	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
614	614	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
615	615	SHIP CONSTRUCTION	Kildare	Coill Dubh, Co. Kildare	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
616	616	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
617	617	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
618	618	SHIP CONSTRUCTION	Kildare	Skenagun, Castledermot	2	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
619	619	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
620	620	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
621	621	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
622	622	CAS CONSTRUCTION	Kildare	Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
623	623	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
624	624	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas	74	*N/A	""	""	""	Q3-2018	""	""
625	625	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	Q1-2018	""	""	""
626	626	CALF Turnkey	Kilkenny	Margaret�s Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	Q3-2018	""	""
627	627	CALF Turnkey	Kilkenny	Love Lane, Castlecomer, Co. Kilkenny (Phase 1)	4	Co-operative Housing Ireland	""	""	""	Q2-2018	""	""
628	628	CALF Construction	Kilkenny	Friary Walk, Callan, Co Kilkenny (Phase 1)	16	Cluid Housing	""	""	""	""	Q1-2018	""
629	629	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	Q2-2018	""
630	630	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing	""	""	""	""	Q3-2018	""
631	631	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	11	Respond	""	""	""	""	Q4-2018	""
632	632	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 2)	17	Respond	""	""	""	""	Q4-2018	""
633	633	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 3)*	22	Respond	""	""	""	""	Q4-2018	""
634	634	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q2-2017
635	635	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing	""	""	""	""	""	Q3-2018
636	636	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
637	637	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 2)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
638	638	CALF Turnkey	Kilkenny	O�Loughlin Court, Kilkenny  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
639	639	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
640	640	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
641	641	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 1)	8	*N/A	""	""	""	""	""	Q1-2018
642	642	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
643	643	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	1	*N/A	""	""	""	""	""	Q3-2018
644	644	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford (Phase 3)	18	*N/A	""	""	""	""	""	Q4-2018
645	645	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	""	Q3-2018	""
646	646	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
647	647	SHIP CONSTRUCTION TURNKEY	Kilkenny	Ogenty, Gowran	12	*N/A	""	""	""	""	""	Q4-2018
648	648	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Group Home Cloghabrody, Thomastown	1	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
649	649	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	""	""	Q4-2018	""
650	650	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
651	651	SHIP CONSTRUCTION	Kilkenny	Golf Links Road, Kilkenny	7	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
652	652	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Pennyswell Road, Kilkenny	80	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
653	653	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
654	654	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
655	655	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	Q2-2018	""
656	656	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	Q4-2018	""
657	657	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
658	658	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
659	659	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	""	Q4-2018
660	660	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	15	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
661	661	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown	15	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
662	662	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	""	""	""	""	Q4-2018	""
663	663	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	""	Q4-2018
664	664	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
665	665	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	""	Q4-2018
666	666	CAS CONSTRUCTION	Kilkenny	Nimble Spaces Project at Callan	15	Camphill Communities of Ireland	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
667	667	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
668	668	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
669	669	CAS CONSTRUCTION	Kilkenny	Camphill ~Communities Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
670	670	CAS CONSTRUCTION	Kilkenny	Kyle, Callan, Co. Kilkenny	4	Camphill Communities of Ireland	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
671	671	CAS CONSTRUCTION	Kilkenny	"""Red Barn"" Patrick Street, Ballyragget"	16	Good Shepherd Services Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
672	672	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett	4	Oaklee Housing Trust	""	""	""	""	""	Q4-2018
673	673	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	5	Camphill Communities of Ireland	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
674	674	CAS CONSTRUCTION	Kilkenny	Kilkenny Street, Castlecomer	4	Good Shepherd Services Ltd	""	""	""	""	Q4-2018	""
675	675	CAS CONSTRUCTION	Kilkenny	Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
676	676	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, kilkenny	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
677	677	CALF Turnkey	Laois	Main Street, Stradbally, Co. Laois (Phase 1)	16	North & East Housing Association Ltd	""	""	""	Q4-2018	""	""
678	678	CALF Construction	Laois	 Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing	""	""	""	""	""	Q1-2018
679	679	CALF Construction	Laois	Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing	""	""	""	""	""	Q2-2018
680	680	CALF Turnkey	Laois	 Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q3-2018
681	681	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
682	682	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
683	683	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
684	684	SHIP CONSTRUCTION SINGLE STAGE	Laois	Harpurs Lane, Portlaoise	1	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
685	685	SHIP CONSTRUCTION SINGLE STAGE	Laois	Hillview, Portlaoise	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
686	686	SHIP CONSTRUCTION SINGLE STAGE	Laois	Harbour Court, Mountmellick	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
687	687	SHIP CONSTRUCTION SINGLE STAGE	Laois	The Orchard, Stardbally	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
688	688	SHIP CONSTRUCTION	Laois	Main Street, Rathdowney	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
689	689	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
690	690	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
691	691	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
692	692	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
693	693	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
694	694	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	8	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
695	695	SHIP CONSTRUCTION	Laois	Coolroe, Ballybrittas	1	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
696	696	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
697	697	CAS CONSTRUCTION	Laois	Abbeyleix Road, Portlaoise	16	Respond	""	Stage 2 approved Q1-2017, full design/tender being prepared.	""	""	""	""
698	698	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	47	Sophia Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
699	699	SHIP CONSTRUCTION TURNKEY	Leitrim	Roosky	7	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
700	700	SHIP CONSTRUCTION TURNKEY	Leitrim	Drumshanbo	9	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
701	701	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
702	702	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	""	Q4-2018
703	703	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
704	704	CALF Turnkey	Limerick	Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2017
705	705	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co-operative Housing Ireland	""	""	""	""	""	Q1-2018
706	706	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q1-2018
707	707	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
708	708	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
709	709	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 2)	2	Respond	""	""	""	""	""	Q4-2018
710	710	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 3)	2	Respond	""	""	""	""	""	Q4-2018
711	711	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	11	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
712	712	SHIP CONSTRUCTION RAPID	Limerick	Deerpark, Adare	30	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
713	713	SHIP CONSTRUCTION RAPID	Limerick	Lisheen Park, Patrickswell	16	*N/A	""	""	""	""	Q4-2018	""
714	714	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	43	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
715	715	SHIP CONSTRUCTION RAPID	Limerick	Patrickswell (Site 2)	24	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
716	716	SHIP CONSTRUCTION	Limerick	Patrick�s Villas, Castleconnell	4	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
717	717	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	""	""	Q4-2018	""
718	718	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
719	719	SHIP CONSTRUCTION	Limerick	Burke Avenue, Limerick City	12	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
720	720	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
721	721	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
722	722	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
723	723	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
724	724	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
725	725	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	""	""	""	Q3-2018	""
726	726	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	""	Q4-2018
727	727	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	7	*N/A	""	""	""	""	Q3-2018	""
728	728	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	Q3-2018	""
729	729	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	Q3-2018	""
730	730	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
731	731	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
732	732	SHIP CONSTRUCTION	Limerick	Ballygreannan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
733	733	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
734	734	SHIP CONSTRUCTION	Limerick	Mountpelier	10	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
735	735	SHIP CONSTRUCTION	Limerick	Knocklong	10	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
736	736	SHIP CONSTRUCTION	Limerick	Convent Street, King's Island	2	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
737	737	SHIP CONSTRUCTION	Limerick	Knockalisheen Road, Moyross	5	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
738	738	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	9	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
739	739	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
740	740	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
741	741	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
742	742	REGENERATION	Limerick	Gaol Lane	1	*N/A	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
743	743	REGENERATION	Limerick	Sheep / Athlunkards Street	8	*N/A	""	Stage 2 approved Q2-2014, full design/tender being prepared.	""	""	""	""
744	744	REGENERATION	Limerick	Churchfield (Phase 1.2)	19	*N/A	""	""	""	""	""	Q1-2018
745	745	REGENERATION	Limerick	Churchfield (Phase 2)	38	Circle Voluntary Housing Association Ltd	""	Stage 2 approved Q4-2014, full design/tender being prepared.	""	""	""	""
746	746	REGENERATION	Limerick	Cosgrave Park	30	Co-operative Housing Ireland (Formerly NABCo)	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
747	747	REGENERATION	Limerick	Palm Court	27	Respond	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
748	748	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
749	749	REGENERATION	Limerick	Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
750	750	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
751	751	REGENERATION	Limerick	Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
752	752	REGENERATION	Limerick	Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
753	753	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
754	754	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
755	755	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
756	756	REGENERATION	Limerick	BCW Vacant Refurbs	14	*N/A	""	""	""	""	""	Q4-2016
757	757	REGENERATION	Limerick	St. Mary's Park Infills (Phase 1)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
758	758	REGENERATION	Limerick	Cliona Park (Phase 3)	18	T�ath Housing Association Ltd	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
759	759	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved Q1-2015, outline design and costs being prepared.	""	""	""	""	""
760	760	REGENERATION	Limerick	Cliona Park	2	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
761	761	REGENERATION	Limerick	Dalgaish Park	24	Cluid Housing Association	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
762	762	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved Q1-2015, outline design and costs being prepared.	""	""	""	""	""
763	763	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
764	764	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
765	765	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
766	766	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
767	767	REGENERATION	Limerick	Churchfield (Phase 1.1)	23	*N/A	""	""	""	""	""	Q2-2018
768	768	REGENERATION	Limerick	St. Mary's Park Infills (Phase 2)	4	T�ath Housing Association Ltd	""	""	""	""	Q3-2017	""
769	769	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	10	Croom Voluntary Housing Association Ltd	""	""	""	""	Q2-2018	""
770	770	CAS CONSTRUCTION	Limerick	Cappamore	12	Cappamore Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
771	771	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
772	772	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
773	773	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	""	Q2-2018	""
774	774	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
775	775	CAS CONSTRUCTION	Limerick	Mallow Street	6	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
776	776	CAS CONSTRUCTION	Limerick	Pinewood, Mulcaire drive, Garraunykee	1	Daughters Of Charity Of St Vincent De Paul	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
777	777	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
778	778	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	T�ath Housing Association Ltd	""	""	""	Q2-2018	""	""
779	779	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q1-2017
780	780	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 1)	14	*N/A	""	""	""	""	""	Q4-2017
781	781	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 1)	4	*N/A	""	""	""	""	""	Q3-2018
782	782	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
783	783	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 1)	7	*N/A	""	""	""	""	""	Q4-2018
784	784	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 2)	8	*N/A	""	""	""	""	Q3-2018	""
785	785	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 3)	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
786	786	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara	5	*N/A	""	""	""	""	""	Q4-2018
787	787	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard, Co. Longford	14	*N/A	""	""	""	""	Q3-2018	""
788	788	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	29	*N/A	""	""	""	""	""	Q4-2018
789	789	SHIP CONSTRUCTION	Longford	Church View, Lanesborough	14	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
790	790	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	Q3-2018	""
791	791	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
792	792	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
793	793	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
794	794	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 7)	22	T�ath Housing Association Ltd	""	""	""	""	Q2-2017	""
795	795	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)	15	Respond	""	""	""	""	Q3-2017	""
796	796	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	""	Q1-2018	""
797	797	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	10	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
798	798	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	5	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
799	799	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
800	800	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	18	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
801	801	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	15	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
802	802	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	30	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
803	803	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	37	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
804	804	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
805	805	CALF Turnkey	Louth	Harbour Grove, Dundalk, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	Q3-2018	""
806	806	CALF Turnkey	Louth	Harbour Grove, Dundalk, Co. Louth (Phase 2)	6	North & East Housing Association Ltd	""	""	""	""	Q3-2018	""
807	807	CALF Turnkey	Louth	The Loakers, Blackrock, Co. Louth (Phase 1)*	16	Cluid Housing	""	""	""	""	Q3-2018	""
808	808	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
809	809	CALF Turnkey	Louth	2 units An Rian, Termonfeckin Rd., Drogheda, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	Q1-2017	""
810	810	CALF Turnkey	Louth	 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	16	Cluid Housing	""	""	""	""	Q1-2017	""
811	811	CALF Turnkey	Louth	 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	15	Cluid Housing	""	""	""	""	Q1-2017	""
812	812	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	14	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
813	813	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	9	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
814	814	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	12	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
815	815	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	16	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
816	816	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
817	817	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	4	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
818	818	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 7)	12	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
819	819	CALF Construction	Louth	Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing	""	""	""	""	""	Q2-2016
820	820	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q3-2016
821	821	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q3-2017
822	822	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
823	823	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
824	824	CALF Construction	Louth	 Clos na Manach, Carlingford, Co Louth (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
825	825	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
826	826	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
827	827	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
828	828	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
829	829	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
830	830	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
831	831	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
832	832	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	22	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
833	833	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
834	834	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
835	835	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
836	836	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q1-2017
837	837	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing	""	""	""	""	""	Q1-2017
838	838	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q1-2017
839	839	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
840	840	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
841	841	CALF Turnkey	Louth	 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2017
842	842	SHIP CONSTRUCTION SINGLE STAGE	Louth	Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
843	843	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 1	4	*N/A	""	""	""	""	""	Q1-2018
844	844	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 1	7	*N/A	""	""	""	""	""	Q4-2016
845	845	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 2	5	*N/A	""	""	""	""	""	Q2-2017
846	846	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 3	3	*N/A	""	""	""	""	""	Q3-2017
847	847	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
848	848	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2 - 4)	69	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
849	849	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
850	850	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 4	7	*N/A	""	""	""	""	""	Q4-2017
851	851	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	75	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
852	852	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2018
853	853	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2018
854	854	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 5	5	*N/A	""	""	""	""	Q3-2017	""
855	855	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 1	2	*N/A	""	""	""	""	""	Q2-2017
856	856	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2017
857	857	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 3	4	*N/A	""	""	""	""	""	Q4-2017
858	858	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 1	1	*N/A	""	""	""	""	""	Q3-2018
859	859	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 6	1	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
860	860	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 4	1	*N/A	""	""	""	""	""	Q2-2018
861	861	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 5	4	*N/A	""	""	""	""	""	Q3-2018
862	862	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 3	1	*N/A	""	""	""	""	Q3-2017	""
863	863	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
864	864	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 2	4	*N/A	""	""	""	""	""	Q4-2018
865	865	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 6	5	*N/A	""	""	""	""	""	Q4-2018
866	866	SHIP CONSTRUCTION	Louth	CPO Bundle	1	*N/A	""	""	""	""	""	Q4-2018
867	867	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
868	868	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
869	869	CAS CONSTRUCTION	Louth	Slieveroe Cresent, Dundalk	1	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
870	870	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	T�ath Housing Association Ltd	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
871	871	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
872	872	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
873	873	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	""	Q4-2018
874	874	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
875	875	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
876	876	CAS CONSTRUCTION	Louth	Strand Hill, Clogherhead	4	St. John of God Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
877	877	CAS CONSTRUCTION	Louth	Coulter Park	6	T�ath Housing Association Ltd	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
878	878	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
879	879	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda, Co. Louth	4	North ? East Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
880	880	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	Q3-2018	""	""
881	881	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing	""	""	""	Q1-2018	""	""
882	882	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
883	883	CALF Turnkey	Mayo	Monamore, Lodge Road, Westport, Co. Mayo (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
884	884	SHIP CONSTRUCTION TURNKEY	Mayo	Carrabeg, Newport Road, Castlebar	2	*N/A	""	""	""	""	""	Q4-2018
885	885	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Pound Road, Castlebar	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
886	886	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	Q2-2018	""
887	887	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
888	888	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
889	889	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	Q4-2017	""
890	890	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	Q3-2018	""
891	891	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	""	Q4-2018	""
892	892	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	""	Q4-2018	""
893	893	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
894	894	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
895	895	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	5	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
896	896	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	""	Q4-2018	""
897	897	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
898	898	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
899	899	SHIP CONSTRUCTION	Mayo	St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
900	900	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	""	""	Q4-2018	""
901	901	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	""	""	Q4-2018	""
902	902	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar	22	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
903	903	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
904	904	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
905	905	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
906	906	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
907	907	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
908	908	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
909	909	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2018
910	910	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
911	911	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
912	912	CALF Turnkey	Meath	Sl�n Duff, Kentstown, Co. Meath (Phase 1)	2	Cluid Housing	""	""	""	""	Q1-2018	""
913	913	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
914	914	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Cluid Housing	""	""	""	""	Q2-2018	""
915	915	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 2)	12	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
916	916	CALF Turnkey	Meath	 Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 3)	15	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
917	917	CALF Turnkey	Meath	 Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 4)	14	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
918	918	CALF Turnkey	Meath	Commons Road, Navan, Co. Meath (Phase 1)	20	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
919	919	CALF Turnkey	Meath	Commons Road, Navan, Co. Meath (Phase 2)	19	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
920	920	CALF Turnkey	Meath	Commons Road, Navan, Co. Meath (Phase 3)	15	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
921	921	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 2)*	15	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
922	922	CALF Turnkey	Meath	Maudelins Brook, Duleek, Co.Meath (Phase 1)	20	Respond	""	""	""	""	Q4-2018	""
923	923	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 1)*	1	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
924	924	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 2)*	1	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
925	925	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 3)*	10	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
926	926	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 1)	4	Cluid Housing	""	""	""	""	Q4-2017	""
927	927	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 2)	7	Cluid Housing	""	""	""	""	Q4-2017	""
928	928	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing	""	""	""	""	""	Q1-2016
929	929	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	23	Cluid Housing	""	""	""	""	""	Q2-2016
930	930	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
931	931	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2017
932	932	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q3-2017
933	933	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q1-2018
934	934	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
935	935	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
936	936	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
937	937	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2018
938	938	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
939	939	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
940	940	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
941	941	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
942	942	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
943	943	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing	""	""	""	""	""	Q3-2018
944	944	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
945	945	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)*	1	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
946	946	CALF Turnkey	Meath	18 units Churchfields, Ashbourne, Co. Meath (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
947	947	CALF Turnkey	Meath	Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
948	948	CALF Turnkey	Meath	BlackCastle,Slane Road, Navan, Co. Meath (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
949	949	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 1)*	10	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
950	950	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	3	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
951	951	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)	24	Respond	""	""	""	""	""	Q4-2018
952	952	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q1-2017
953	953	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2017
954	954	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing	""	""	""	""	""	Q4-2017
955	955	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q4-2017
956	956	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Navan	24	*N/A	""	""	""	""	""	Q4-2018
957	957	SHIP CONSTRUCTION TURNKEY	Meath	Clonmagadden, Navan	16	*N/A	""	""	""	""	""	Q4-2018
958	958	SHIP CONSTRUCTION SINGLE STAGE	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	""	Q4-2018
959	959	SHIP CONSTRUCTION SINGLE STAGE	Meath	The Belfry, Trim	3	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
960	960	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	""	""	""	Q4-2018	""
961	961	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	""	""	""	Q4-2018	""
962	962	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	""	""	""	Q4-2018	""
963	963	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	Q3-2018	""
964	964	SHIP CONSTRUCTION	Meath	St. Oliver's, Ratoath	17	*N/A	""	""	""	""	Q1-2018	""
965	965	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	""	""	Q4-2018	""
966	966	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	Q4-2017	""
967	967	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
968	968	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
969	969	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
970	970	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
971	971	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
972	972	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
973	973	SHIP CONSTRUCTION	Meath	Farganstown	42	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
974	974	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
975	975	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
976	976	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	6	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
977	977	SHIP CONSTRUCTION	Meath	Dept of Education site, Castle Street, Ashbourne	55	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
978	978	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	9	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
979	979	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
980	980	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 1)	11	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
981	981	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 2)	8	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
982	982	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 3)	11	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
983	983	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 4)	8	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
984	984	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	T�ath Housing Association Ltd	""	""	""	Q4-2017	""	""
985	985	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	14	T�ath Housing Association Ltd	""	""	""	Q4-2017	""	""
986	986	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	12	T�ath Housing Association Ltd	""	""	""	Q4-2017	""	""
987	987	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 1)	50	Respond	""	""	""	""	Q2-2018	""
988	988	CALF Construction	Monaghan	 Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing	""	""	""	""	""	Q4-2018
989	989	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
990	990	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2017
991	991	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
992	992	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan  Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
993	993	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	Q3-2018	""
994	994	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
995	995	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	""	Q4-2018
996	996	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	Q3-2018	""
997	997	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	Q3-2018	""
998	998	SHIP CONSTRUCTION	Monaghan	Davy's & Adjacent Porperty, Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
999	999	SHIP CONSTRUCTION	Monaghan	Boyle Sports Site, Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1000	1000	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1001	1001	SHIP CONSTRUCTION	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1002	1002	SHIP CONSTRUCTION	Monaghan	Analore St., Clones	2	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1003	1003	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1004	1004	SHIP CONSTRUCTION	Monaghan	Bothar na Mullen, Scotstown	31	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1005	1005	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan	16	*N/A	""	""	""	""	""	Q4-2018
1006	1006	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1007	1007	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1008	1008	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
1009	1009	CALF Turnkey	Offaly	Frankford Park, Kilcormac, Co. Offaly (Phase 1)	12	T�ath Housing Association Ltd	""	""	""	Q2-2018	""	""
1010	1010	CALF Construction	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	T�ath Housing Association Ltd	""	""	""	Q4-2018	""	""
1011	1011	CALF Construction	Offaly	Kearney�s Field, Tullamore, Co. Offaly (Phase 1)	53	Oaklee Housing	""	""	""	Q1-2017	""	""
1012	1012	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr	12	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1013	1013	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
1014	1014	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	Q2-2018	""
1015	1015	SHIP CONSTRUCTION TURNKEY	Offaly	Coolagarry, Walsh Island, 	4	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
1016	1016	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	""	""	Q4-2018
1017	1017	SHIP CONSTRUCTION SINGLE STAGE	Offaly	Church Street, Clara	3	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1018	1018	SHIP CONSTRUCTION SINGLE STAGE	Offaly	Beechgrove, Belmont	7	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1019	1019	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	Q3-2018	""
1020	1020	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1021	1021	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1022	1022	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	Q4-2017	""
1023	1023	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	Q3-2018	""
1024	1024	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	T�ath Housing Association Ltd	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1025	1025	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1026	1026	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1027	1027	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
1028	1028	CALF Turnkey	Roscommon	 Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing	""	""	""	""	""	Q3-2018
1029	1029	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
1030	1030	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	Q1-2018	""
1031	1031	SHIP CONSTRUCTION TURNKEY	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1032	1032	SHIP CONSTRUCTION TURNKEY	Roscommon	Lisroyne Court, Strokestown, Co. Roscommon	10	*N/A	""	""	""	""	Q3-2018	""
1033	1033	SHIP CONSTRUCTION TURNKEY	Roscommon	Warren Grove, Boyle	4	*N/A	""	""	""	""	""	Q4-2018
1034	1034	SHIP CONSTRUCTION	Roscommon	Cloonfad	1	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1035	1035	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
1036	1036	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
1037	1037	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1038	1038	SHIP CONSTRUCTION	Roscommon	Monksland, Athlone	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1039	1039	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	Q1-2018	""	""	""
1040	1040	SHIP CONSTRUCTION SINGLE STAGE	Sligo	St Joseph's Terrace	1	*N/A	""	""	""	""	Q4-2018	""
1041	1041	SHIP CONSTRUCTION	Sligo	Colloney	15	*N/A	""	""	""	""	Q4-2018	""
1042	1042	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	""	""	""	Q4-2018	""
1043	1043	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	""	Q4-2018
1044	1044	SHIP CONSTRUCTION	Sligo	Carrowbunnaun, Strandhill	20	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
1045	1045	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (2)	14	*N/A	""	""	""	""	""	Q3-2018
1046	1046	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
1047	1047	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	""	""	Q4-2018	""
1048	1048	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (1)	8	*N/A	""	""	""	""	""	Q4-2017
1049	1049	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1050	1050	SHIP CONSTRUCTION	Sligo	Dromore West	10	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1051	1051	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1052	1052	SHIP CONSTRUCTION	Sligo	House at Ballinode	1	*N/A	""	""	""	""	""	Q4-2018
1053	1053	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	""	Q4-2018	""
1054	1054	CALF Turnkey	South Dublin	 Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	Q3-2018	""	""
1055	1055	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)*	94	Respond	""	""	""	Q4-2018	""	""
1056	1056	CALF Construction	South Dublin	Hollyville Terrace, Palmerstown, Dublin (Phase 1)	2	Cluid Housing	""	""	""	Q4-2017	""	""
1057	1057	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2016	""
1058	1058	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 2)	4	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
1059	1059	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing	""	""	""	""	Q1-2018	""
1060	1060	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	Q2-2018	""
1061	1061	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Cluid Housing	""	""	""	""	Q2-2018	""
1062	1062	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing	""	""	""	""	Q2-2018	""
1063	1063	CALF Turnkey	South Dublin	2 properties Tullyhall, Lucan, County Dublin (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
1064	1064	CALF Turnkey	South Dublin	2 units at Tullyhall Drive, Lucan, Co. Dublin (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
1065	1065	CALF Turnkey	South Dublin	De Selby Lawns, Tallaght, Dublin 24 (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
1066	1066	CALF Turnkey	South Dublin	Stone Masons Court, Fortunestown Lane, Citywest Dublin (Phase 1)*	12	Cluid Housing	""	""	""	""	Q4-2018	""
1067	1067	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q3-2017
1068	1068	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2017
1069	1069	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q3-2017
1070	1070	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
1071	1071	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin\t\t\t (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2017
1072	1072	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q1-2018
1073	1073	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q1-2018
1074	1074	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing	""	""	""	""	""	Q1-2018
1075	1075	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing	""	""	""	""	""	Q2-2018
1076	1076	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q2-2018
1077	1077	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1078	1078	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1079	1079	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1080	1080	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
1081	1081	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
1082	1082	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
1083	1083	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q4-2018
1084	1084	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
1085	1085	CALF Turnkey	South Dublin	Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
1086	1086	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin\t\t\t (Phase 2)*	2	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
1087	1087	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing	""	""	""	""	""	Q4-2018
1088	1088	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q1-2017
1089	1089	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
1090	1090	SHIP CONSTRUCTION TURNKEY	South Dublin	Ardsolus, Kingswood, Dublin 24	2	*N/A	""	""	""	""	""	Q4-2018
1091	1091	SHIP CONSTRUCTION TURNKEY	South Dublin	White Pines, Stocking Avenue, Rathfarnham, Dublin 16	26	*N/A	""	""	""	""	""	Q4-2018
1092	1092	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	""	Q4-2018
1093	1093	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	Q3-2018	""
1094	1094	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 1)	47	*N/A	""	""	""	""	""	Q2-2018
1095	1095	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 2)	22	*N/A	""	""	""	""	""	Q3-2018
1096	1096	SHIP CONSTRUCTION RAPID	South Dublin	St. Catherine�s, Knockmore Avenue, Killinarden, Tallaght	13	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1097	1097	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Sheehy Skeffington)	21	*N/A	""	""	""	""	""	Q4-2018
1098	1098	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale, Clondalkin, Dublin 22	44	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1099	1099	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght (Phase 1)	17	*N/A	""	""	""	""	""	Q4-2018
1100	1100	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	""	Q4-2018
1101	1101	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	Q3-2017	""
1102	1102	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	""	Q4-2018
1103	1103	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	""	Q4-2018
1104	1104	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
1105	1105	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
1106	1106	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
1107	1107	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
1108	1108	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
1109	1109	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1110	1110	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght (Phase 2)	9	*N/A	""	""	""	""	Q3-2018	""
1111	1111	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
1112	1112	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1113	1113	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	Q3-2018	""	""
1114	1114	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 2)	10	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1115	1115	CALF Turnkey	Tipperary	Mill Street, Carrick on Suir, Co. Tipperary (Phase 1)	22	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
1116	1116	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2017
1117	1117	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
1118	1118	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	21	*N/A	""	""	""	""	Q4-2018	""
1119	1119	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	""	Q4-2018	""
1120	1120	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 1)	9	*N/A	""	""	""	""	""	Q4-2018
1121	1121	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 1)	4	*N/A	""	""	""	""	""	Q4-2018
1122	1122	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 2)	4	*N/A	""	""	""	""	Q4-2018	""
1123	1123	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 2)	10	*N/A	""	""	""	""	Q4-2018	""
1124	1124	SHIP CONSTRUCTION SINGLE STAGE	Tipperary	Mulkear View, Newport, Tipperary	3	*N/A	""	""	""	""	""	Q4-2018
1125	1125	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1126	1126	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
1127	1127	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	28	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1128	1128	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	11	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1129	1129	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
1130	1130	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1131	1131	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1132	1132	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1133	1133	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1134	1134	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1135	1135	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1136	1136	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	""	Q4-2018	""
1137	1137	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	""	Q4-2018
1138	1138	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1139	1139	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
1140	1140	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
1141	1141	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
1142	1142	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
1143	1143	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
1144	1144	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	19	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1145	1145	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
1146	1146	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2018
1147	1147	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1148	1148	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1149	1149	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1150	1150	CAS CONSTRUCTION	Tipperary	Fethard	4	Belmont Park Housing Association Ltd	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1151	1151	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1152	1152	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1153	1153	CAS CONSTRUCTION	Tipperary	Monastery Close, Templemore Road, Thurles	15	Thurles Lions Trust Housing Assoc.	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1154	1154	CALF Turnkey	Waterford	Kilbarry, Waterford (Phase 1)	69	Respond	""	""	""	""	Q4-2018	""
1155	1155	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
1156	1156	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	8	*N/A	""	""	""	""	""	Q3-2018
1157	1157	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
1158	1158	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	""	Q4-2018
1159	1159	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
1160	1160	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	""	Q4-2018
1161	1161	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	10	*N/A	""	""	""	""	""	Q4-2018
1162	1162	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	21	*N/A	""	""	""	""	""	Q4-2018
1163	1163	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	55	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1164	1164	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	65	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1165	1165	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	20	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1166	1166	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	""	""	""	Q4-2018	""
1167	1167	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	""	Q4-2018
1168	1168	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City	5	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1169	1169	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	""	Q4-2018	""
1170	1170	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
1171	1171	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	Q1-2018	""
1172	1172	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	""	""	Q4-2018	""
1173	1173	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
1174	1174	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	""	""	""	""	Q4-2018	""
1175	1175	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
1176	1176	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	11	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1177	1177	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1178	1178	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1179	1179	SHIP CONSTRUCTION	Waterford	Rough Sleeper Emerg Accom, Bath St, Waterford City	4	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1180	1180	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
1181	1181	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1182	1182	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	""	Q4-2018	""
1183	1183	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1184	1184	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1185	1185	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	4	Anvers Housing Association Ltd	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1186	1186	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	57	*N/A	""	""	Q1-2018	""	""	""
1187	1187	CALF Turnkey	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)	14	Oaklee Housing	""	""	""	Q3-2018	""	""
1188	1188	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
1189	1189	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 2)	2	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
1190	1190	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 3)	6	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
1191	1191	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
1192	1192	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
1193	1193	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
1194	1194	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	Q3-2018	""
1195	1195	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1196	1196	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	""	Q4-2018
1197	1197	SHIP CONSTRUCTION	Westmeath	Ennell Court	1	*N/A	""	""	""	""	""	Q1-2018
1198	1198	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone  Phase 1	33	*N/A	""	""	""	""	Q2-2018	""
1199	1199	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
1200	1200	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
1201	1201	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	31	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1202	1202	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1203	1203	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1204	1204	SHIP CONSTRUCTION	Westmeath	St. Brigid's Green, Mullingar	14	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1205	1205	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone Phase 2	18	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1206	1206	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	T�ath Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1207	1207	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 1)	30	T�ath Housing Association Ltd	""	""	""	Q4-2018	""	""
1208	1208	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 2)	16	T�ath Housing Association Ltd	""	""	""	Q4-2018	""	""
1209	1209	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 3)	10	T�ath Housing Association Ltd	""	""	""	Q4-2018	""	""
1210	1210	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 2)	6	Oaklee Housing	""	""	""	""	Q3-2017	""
1211	1211	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1212	1212	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1213	1213	CALF Turnkey	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
1214	1214	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
1215	1215	CALF Turnkey	Wexford	Clonard, Wexford (Phase 1)*	10	Co-operative Housing Ireland	""	""	""	""	Q4-2018	""
1216	1216	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1217	1217	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 2)*	13	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1218	1218	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q2-2016
1219	1219	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	9	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1220	1220	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1221	1221	CALF Turnkey	Wexford	1 property at  Ard Uisce, Whiterock, Wexford  (Phase 1)	1	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
1222	1222	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
1223	1223	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
1224	1224	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 1)	34	Oaklee Housing	""	""	""	""	""	Q4-2018
1225	1225	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
1226	1226	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
1227	1227	CALF Turnkey	Wexford	 Ard Uisce, Wexford Town (Phase 1)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
1228	1228	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
1229	1229	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
1230	1230	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1a)	8	*N/A	""	""	""	""	""	Q1-2018
1231	1231	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	11	*N/A	""	""	""	""	""	Q4-2018
1232	1232	SHIP CONSTRUCTION TURNKEY	Wexford	Castlebridge, Co Wexford	3	*N/A	""	""	""	""	""	Q3-2018
1233	1233	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2)	4	*N/A	""	""	""	""	Q1-2018	""
1234	1234	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock,Wexford	24	*N/A	""	""	""	""	Q1-2018	""
1235	1235	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1b)	10	*N/A	""	""	""	""	""	Q4-2018
1236	1236	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 1	5	*N/A	""	""	""	""	""	Q4-2018
1237	1237	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 2	5	*N/A	""	""	""	""	Q4-2018	""
1238	1238	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	""	Q4-2018	""
1239	1239	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	""	""	""	Q4-2018	""
1240	1240	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	""	Q3-2018	""
1241	1241	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	Q2-2018	""
1242	1242	SHIP CONSTRUCTION	Wexford	Danescastle	10	*N/A	""	""	""	""	Q3-2018	""
1243	1243	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	Q2-2018	""
1244	1244	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	45	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1245	1245	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
1246	1246	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	34	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1247	1247	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	""	Q2-2018
1248	1248	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
1249	1249	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
1250	1250	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 1)	5	*N/A	""	""	""	""	""	Q4-2018
