﻿_id	No.	Funding Programme	LA	Scheme/Project Name	No. of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	On Site	Completed
1	""	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow - Phase 1	18	*N/A	""	""	""	""	Q4-2017	""
2	""	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow - Phase 2	22	*N/A	""	""	""	""	Q4-2017	""
3	""	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow - Phase 3	23	*N/A	""	""	""	""	Q4-2017	""
4	""	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
5	""	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	Q1-2018	""
6	""	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
7	""	SHIP CONSTRUCTION	Carlow	Bagenalstown	42	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
8	""	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	Q1-2018	""
9	""	SHIP CONSTRUCTION	Carlow	Hacketstown	4	*N/A	""	""	""	""	Q1-2018	""
10	""	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
11	""	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
12	""	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
13	""	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
14	""	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
15	""	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
16	""	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
17	""	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
18	""	CAS CONSTRUCTION	Carlow	Mill Race Court, Carlow Town	14	Cluid Housing Association	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
19	""	CAS CONSTRUCTION	Carlow	Royal Oak Road, Bagenalstown	6	Respond	""	""	Stage 3 approved in Q4-2017, the scheme is being tendered.	""	""	""
20	""	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
21	""	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
22	""	CALF Turnkey	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	59	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
23	""	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 1)*	10	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
24	""	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 2)	26	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
25	""	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 3)	11	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
26	""	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 4)	9	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
27	""	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing 	""	""	""	""	Q1-2018	""
28	""	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	Q1-2018	""
29	""	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2018
30	""	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	Q4-2017	""
31	""	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
32	""	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
33	""	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
34	""	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
35	""	SHIP CONSTRUCTION	Cavan	Holborn Hill, Belturbet	6	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
36	""	SHIP CONSTRUCTION	Cavan	Elm Grove	13	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
37	""	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing 	""	""	""	""	""	Q4-2016
38	""	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
39	""	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	Tath Housing Association Ltd	""	""	""	""	Q1-2017	""
40	""	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	Tath Housing Association Ltd	""	""	""	""	Q1-2017	""
41	""	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	Q4-2017	""
42	""	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
43	""	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
44	""	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
45	""	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
46	""	SHIP CONSTRUCTION	Clare	Tullyglass, Shannon	21	*N/A	""	Stage 2 approved in Q2-2016, full design/tender being prepared.	""	""	""	""
47	""	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
48	""	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	14	Cuan an Chlair Ltd	Stage 1 approved in Q4-2016, outline design and costs being prepared.	""	""	""	""	""
49	""	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
50	""	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
51	""	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
52	""	CAS CONSTRUCTION	Clare	Monaskeha Heights	2	Newgrove Housing Association Ltd	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
53	""	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing 	""	""	""	""	""	Q2-2018
54	""	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	19	Cluid Housing 	""	""	""	""	Q1-2018	""
55	""	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
56	""	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
57	""	CALF Construction	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
58	""	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	47	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
59	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	50	*N/A	""	""	Q1-2018	""	""	""
60	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork	The Miles, Clonakilty	54	*N/A	""	""	Q1-2018	""	""	""
61	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork	Poundhill, Skibbereen	50	*N/A	""	""	Q1-2018	""	""	""
62	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork	Oakwood, Macroom	50	*N/A	""	""	Q1-2018	""	""	""
63	""	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	Q4-2017	""
64	""	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
65	""	SHIP CONSTRUCTION TURNKEY	Cork City	Barack Street	32	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
66	""	SHIP CONSTRUCTION TURNKEY	Cork City	FaranFerris	5	*N/A	""	""	""	""	Q2-2018	""
67	""	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	""	Q2-2018	""
68	""	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	""	Q1-2018	""
69	""	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
70	""	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
71	""	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road	43	*N/A	""	""	""	""	Q2-2017	""
72	""	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
73	""	SHIP CONSTRUCTION TURNKEY	Cork City	1-5 Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	Q3-2017	""
74	""	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
75	""	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street	25	*N/A	""	""	""	""	Q2-2018	""
76	""	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
77	""	SHIP CONSTRUCTION TURNKEY	Cork City	6-10 Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	Q2-2018	""
78	""	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	Q2-2018	""
79	""	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
80	""	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
81	""	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
82	""	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
83	""	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
84	""	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
85	""	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	Q2-2018	""
86	""	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	65	*N/A	""	""	""	""	Q4-2016	""
87	""	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	41	*N/A	""	""	""	""	Q3-2017	""
88	""	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
89	""	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
90	""	REGENERATION	Cork City	Phase 2 A Knocknaheeny	47	*N/A	""	""	""	""	Q2-2018	""
91	""	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
92	""	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
93	""	REGENERATION	Cork City	Phase 2C Knocknaheeny	24	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
94	""	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	33	Good Shepherd Services Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
95	""	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
96	""	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
97	""	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	Q2-2017	""
98	""	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
99	""	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	Q4-2016	""
100	""	CALF Construction	Cork City	124 Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
101	""	CALF Construction	Cork City	124 Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	Q1-2017	""
102	""	CALF Construction	Cork City	Mile Stream, Shanakiel, Cork City  (Phase 1)	50	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
103	""	CALF Turnkey	Cork City	Popes Road, Blackpool, Cork City (Phase 1)	7	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
104	""	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
105	""	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 2)	9	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
106	""	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 3)	9	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
107	""	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 4)	9	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
108	""	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 5)	9	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
109	""	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 6)	10	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
110	""	CALF Turnkey	Cork City	11 North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
111	""	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	18	*N/A	""	""	""	""	""	Q2-2018
112	""	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	7	*N/A	""	""	""	""	Q1-2018	""
113	""	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
114	""	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	Q4-2017	""
115	""	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	25	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
116	""	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
117	""	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
118	""	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	""	Q4-2017
119	""	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	52	*N/A	""	""	""	""	Q4-2017	""
120	""	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
121	""	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
122	""	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
123	""	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	6	*N/A	""	""	""	""	Q1-2018	""
124	""	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary?s Road, Dunmanway	20	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
125	""	SHIP CONSTRUCTION TURNKEY	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	Q1-2018	""
126	""	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	14	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
127	""	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	6	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
128	""	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	Q1-2018	""
129	""	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
130	""	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibereen	4	*N/A	""	""	""	""	Q1-2018	""
131	""	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	Q2-2017	""
132	""	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara,Ard Cashel, watergrasshill	6	*N/A	""	""	""	""	Q1-2018	""
133	""	SHIP CONSTRUCTION TURNKEY	Cork County	Claredon Brooks, Carrs Hill, Douglas Phase 1	12	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
134	""	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	35	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
135	""	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire Co. Cork	4	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
136	""	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mont Rivers, Co. Cork.	3	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
137	""	SHIP CONSTRUCTION TURNKEY	Cork County	Claredon Brooks, Carrs Hill, Douglas Phase 2	33	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
138	""	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
139	""	SHIP CONSTRUCTION RAPID	Cork County	Abbeywood, Midleton	70	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
140	""	SHIP CONSTRUCTION RAPID	Cork County	Station Road, Blarney	18	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
141	""	SHIP CONSTRUCTION RAPID	Cork County	Bluepool, Kanturk	12	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
142	""	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	15	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
143	""	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork	9	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
144	""	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
145	""	SHIP CONSTRUCTION	Cork County	Castletreasure Grove, Douglas	1	*N/A	Stage 1 approved in Q3-2016, outline design and costs being prepared.	""	""	""	""	""
146	""	SHIP CONSTRUCTION	Cork County	Poulavone, Ballincollig	57	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
147	""	SHIP CONSTRUCTION	Cork County	Newtown, Bantry	1	*N/A	Stage 1 approved in Q2-2016, outline design and costs being prepared.	""	""	""	""	""
148	""	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	Q4-2017	""
149	""	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	Q2-2018	""
150	""	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
151	""	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
152	""	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
153	""	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	8	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
154	""	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
155	""	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (phase 1A & 1B)	15	*N/A	""	""	""	""	Q1-2018	""
156	""	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 2/C)	16	*N/A	""	""	""	""	Q1-2018	""
157	""	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 3/D)	18	*N/A	""	""	""	""	Q1-2018	""
158	""	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	18	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
159	""	SHIP CONSTRUCTION	Cork County	Madonna House, Ballincollig	20	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
160	""	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	4	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
161	""	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	Stage 1 approved in Q3-2016, outline design and costs being prepared.	""	""	""	""	""
162	""	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	Q1-2018	""
163	""	CAS CONSTRUCTION	Cork County	Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	Q1-2018	""
164	""	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
165	""	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
166	""	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
167	""	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q4-2017
168	""	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
169	""	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
170	""	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
171	""	CALF Turnkey	Cork County	Lackaduff, Codrum, Macroom, Co Cork  (Phase 1)	5	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
172	""	CALF Turnkey	Cork County	Lackaduff, Codrum, Macroom, Co. Cork - Phase 2 (Phase 1)	2	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
173	""	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	Q2-2018	""
174	""	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	Q4-2016	""
175	""	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 2)*	5	Tath Housing Association Ltd	""	""	""	""	Q4-2016	""
176	""	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	Q1-2017	""
177	""	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)*	7	Respond	""	""	""	""	""	Q2-2018
178	""	CALF Construction	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q3-2017	""	""
179	""	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
180	""	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace., Monkstown, Co. Dublin	14	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
181	""	SHIP CONSTRUCTION RAPID	DLR	Glenamuck/Stillorgan (Rockville Drive)	14	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
182	""	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
183	""	SHIP CONSTRUCTION	DLR	66 George's Street, Dun Laoghaire	4	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
184	""	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	Q4-2017	""
185	""	SHIP CONSTRUCTION	DLR	33,35, & 37 Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
186	""	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
187	""	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
188	""	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
189	""	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
190	""	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	Q4-2016	""
191	""	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
192	""	SHIP CONSTRUCTION	DLR	Fitzgerald Park	50	*N/A	""	""	""	""	Q4-2016	""
193	""	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	Q3-2016	""
194	""	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
195	""	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
196	""	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
197	""	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q1-2016
198	""	SHIP CONSTRUCTION	DLR	41 Ballyogan Ave., Ballyogan, Co. Dublin	2	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
199	""	SHIP CONSTRUCTION	DLR	St. Laurence?s Park, Stillorgan, Co. Dublin	77	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
200	""	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
201	""	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	Tath Housing Association Ltd	""	""	""	""	Q3-2017	""
202	""	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)	6	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q3-2017	""	""
203	""	CALF Turnkey	DLR	Block C, Abbey road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
204	""	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	Q3-2017	""
205	""	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	105	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
206	""	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)	8	Respond	""	""	""	""	Q1-2016	""
207	""	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	Q1-2018	""
208	""	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q4-2017
209	""	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing 	""	""	""	""	Q1-2017	""
210	""	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)	5	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2017	""
211	""	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q3-2017
212	""	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
213	""	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	36	*N/A	""	""	""	""	Q2-2018	""
214	""	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	20	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
215	""	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
216	""	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
217	""	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
218	""	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
219	""	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
220	""	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
221	""	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	Q3-2017	""
222	""	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
223	""	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
224	""	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	Q1-2017	""
225	""	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
226	""	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
227	""	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
228	""	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	6	Apex Housing Association	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
229	""	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
230	""	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
231	""	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
232	""	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
233	""	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	20	Habinteg Housing Association (Ireland) Ltd	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
234	""	CALF Turnkey	Donegal	1-46 Ardrawer, Kiltoy, Letterkenny, Co. Donegal (Phase 1)	46	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
235	""	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	Scheme approved for CALF funding Q3-2017	""	""
236	""	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q3-2016
237	""	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing 	""	""	""	""	Q3-2017	""
238	""	CALF Construction	Donegal	Raphoe Road, Castlefinn, Co. Donegal (Phase 1)	10	Habinteg Housing Association (Ireland) Ltd	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
239	""	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospecthill	58	*N/A	""	""	""	""	""	Q4-2017
240	""	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
241	""	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
242	""	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
243	""	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
244	""	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
245	""	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard Site Ph1	54	*N/A	""	""	""	""	Q4-2017	""
246	""	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	Stage 2 approved in Q3-2015, full design/tender being prepared.	""	""	""	""
247	""	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Rathvilly Drive site	13	*N/A	""	""	""	""	Q4-2017	""
248	""	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Woodbank Drive site	3	*N/A	""	""	""	""	Q4-2017	""
249	""	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
250	""	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved in Q3-2015, full design/tender being prepared.	""	""	""	""
251	""	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	70	*N/A	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
252	""	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
253	""	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
254	""	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q2-2018	""
255	""	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	7	*N/A	""	""	""	""	Q1-2017	""
256	""	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
257	""	SHIP CONSTRUCTION	Dublin City	Priory Hall	26	*N/A	""	""	""	""	Q2-2017	""
258	""	SHIP CONSTRUCTION	Dublin City	Priory Hall	9	*N/A	""	""	""	""	""	Q1-2017
259	""	REGENERATION	Dublin City	St. Teresa's Gardens	50	*N/A	Stage 1 approved in Q3-2013, outline design and costs being prepared.	""	""	""	""	""
260	""	REGENERATION	Dublin City	Dolphin House, Dublin 8 (Phase 1)	100	*N/A	""	""	""	""	Q4-2016	""
261	""	REGENERATION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
262	""	REGENERATION	Dublin City	Sackville Avenue Cottages	12	*N/A	Stage 1 approved in Q2-2016, outline design and costs being prepared.	""	""	""	""	""
263	""	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
264	""	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
265	""	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
266	""	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
267	""	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
268	""	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
269	""	CAS CONSTRUCTION	Dublin City	38/39 Bolton Street, Dublin 1	8	Arlington Novas Ireland Ltd	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
270	""	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
271	""	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	Tath Housing Association Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
272	""	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	Q4-2017	""
273	""	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	Q2-2018	""
274	""	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	18	Peter McVerry Trust Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
275	""	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved in Q1-2017, outline design and costs being prepared.	""	""	""	""	""
276	""	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
277	""	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
278	""	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
279	""	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	18	Simon Community : Dublin Simon	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
280	""	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
281	""	CAS CONSTRUCTION	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
282	""	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
283	""	CALF Turnkey	Dublin City	11 - 13 Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q2-2017
284	""	CALF Turnkey	Dublin City	11 - 13 Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing 	""	""	""	""	""	Q3-2017
285	""	CALF Turnkey	Dublin City	175-176 North Strand Road, Five Lamps, Dublin 1 (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
286	""	CALF Construction	Dublin City	84 North King Street, Dublin 7  (Phase 1)	30	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
287	""	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
288	""	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
289	""	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
290	""	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	Tath Housing Association Ltd	""	""	""	""	""	Q3-2017
291	""	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	Tath Housing Association Ltd	""	""	""	""	Q3 2015	""
292	""	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
293	""	CALF Construction	Dublin City	 Ballygall Road East phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
294	""	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	62	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
295	""	CALF Construction	Dublin City	Block A, Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
296	""	CALF Construction	Dublin City	"Broome Lodge,
Dunmanus Court, Cabra (Phase 1)"	33	Cluid Housing 	""	""	""	""	""	Q4-2017
297	""	CALF Turnkey	Dublin City	Camac Place, Bluebell, Dublin 12  (Phase 1)	5	Oaklee Housing 	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
298	""	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)	16	Respond	""	""	""	""	""	Q4-2017
299	""	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	Q3-2017	""
300	""	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Ireland	""	""	""	""	""	Q4-2016
301	""	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
302	""	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing 	""	""	""	""	""	Q4-2017
303	""	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	24	Co-operative Housing Ireland	""	""	""	""	Q4-2016	""
304	""	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	48	Co-operative Housing Ireland	""	""	""	""	Q4-2016	""
305	""	CALF Construction	Dublin City	Post Tender - 5-6 Johns Lane West Dublin 8 (Phase 1)	31	Focus Ireland	""	""	""	""	Q2-2017	""
306	""	CALF Construction	Dublin City	"POST TENDER - Poplar Row, Ballybough, Dublin 3
 (Phase 1)"	29	Oaklee Housing 	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
307	""	CALF Construction	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
308	""	CALF Construction	Dublin City	POST TENDER Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2018	""
309	""	CALF Construction	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
310	""	CALF Construction	Dublin City	Revised - St Mary?s Mansions, Dublin 1 (Phase 1)	80	Cluid Housing 	""	""	""	""	Q4-2017	""
311	""	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
312	""	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
313	""	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	97	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2017	""
314	""	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing 	""	""	""	""	Q4-2016	""
315	""	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	18	Tath Housing Association Ltd	""	""	""	""	""	Q2-2016
316	""	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	28	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
317	""	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
318	""	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
319	""	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	Q4-2017	""
320	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	Q1-2018	""	""	""
321	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	Q1-2018	""	""	""
322	""	CALF Turnkey	Dublin City	Block A Northbank, Castleforbes, Dublin 1 (Phase 1)*	26	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
323	""	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
324	""	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
325	""	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 1), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
326	""	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 2), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
327	""	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
328	""	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
329	""	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
330	""	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
331	""	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
332	""	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
333	""	SHIP CONSTRUCTION	Fingal	Rowlestown	20	*N/A	""	""	""	""	Q2-2018	""
334	""	SHIP CONSTRUCTION	Fingal	Racecourse Common, Lusk (Phase 2.3)	5	*N/A	""	""	""	""	""	Q2-2018
335	""	SHIP CONSTRUCTION	Fingal	Racecourse Common, Lusk (Phase 2.3)	29	*N/A	""	""	""	""	Q4-2016	""
336	""	SHIP CONSTRUCTION	Fingal	Castlelands Part View (Phase 3)	24	*N/A	""	""	""	""	Q1-2017	""
337	""	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
338	""	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 1)	2	*N/A	""	""	""	""	""	Q3-2017
339	""	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
340	""	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
341	""	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
342	""	SHIP CONSTRUCTION	Fingal	Racecourse Common, Lusk (Phase 2.1)	25	*N/A	""	""	""	""	""	Q4-2017
343	""	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 2)	6	*N/A	""	""	""	""	Q4-2016	""
344	""	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.2) 	15	*N/A	""	""	""	""	""	Q1-2018
345	""	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
346	""	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Tath Housing Association Ltd	Stage 1 approved in Q1-2017, outline design and costs being prepared.	""	""	""	""	""
347	""	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 1)	6	Peter McVerry Trust Ltd	""	""	""	""	Q1-2018	""
348	""	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
349	""	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North East Housing Association Ltd	""	""	""	""	""	Q3-2017
350	""	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
351	""	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 2)	2	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved in Q4-2017, the scheme is fully approved.	""	""
352	""	CALF Turnkey	Fingal	19, 20, 21 and 24 Hampton Gardens, Balbriggan, Co. Dublin (Phase 1)*	4	Respond	""	""	""	""	Q2-2016	""
353	""	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	24	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
354	""	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	Tath Housing Association Ltd	""	""	""	""	""	Q2-2016
355	""	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	Tath Housing Association Ltd	""	""	""	""	""	Q3-2016
356	""	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
357	""	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
358	""	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
359	""	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
360	""	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing 	""	""	""	""	Q1-2018	""
361	""	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	Q3-2017	""
362	""	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)	28	The Iveagh Trust	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
363	""	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)	14	The Iveagh Trust	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
364	""	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
365	""	CALF Turnkey	Fingal	St Marnock?s Bay, Portmarnock, Co Dublin   (Phase 1)	10	Cluid Housing 	""	""	""	""	""	Q4-2017
366	""	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)	18	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
367	""	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing 	""	""	""	""	Q1-2018	""
368	""	CALF Turnkey	Fingal	The Gallery, Donabate (Phase 1)	43	Oaklee Housing 	""	""	""	""	Q2-2017	""
369	""	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)	54	Cluid Housing 	""	""	""	""	""	Q4-2017
370	""	CALF Turnkey	Fingal	Weavers Walk, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)	33	Co-operative Housing Ireland	""	""	""	""	Q1-2017	""
371	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway	Ballyburke	74	*N/A	""	""	Q1-2018	""	""	""
372	""	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	78	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
373	""	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
374	""	SHIP CONSTRUCTION	Galway City	Ballinfoile Park, Headford Road (Infill Units)	9	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
375	""	SHIP CONSTRUCTION	Galway City	Corrib Park (Infill Units)	3	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
376	""	SHIP CONSTRUCTION	Galway City	Castlepark, Ballybane (Infill Units)	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
377	""	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway.	7	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
378	""	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway	59	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
379	""	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
380	""	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
381	""	CAS CONSTRUCTION	Galway City	47 Forster Street	9	Cope Galway	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
382	""	CALF Turnkey	Galway City	77, 80 and 81 Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	Tath Housing Association Ltd	""	""	""	""	Q3-2017	""
383	""	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)	16	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
384	""	CALF Turnkey	Galway City	Block E, Sraith Fhada, Doughiska, Galway City (Phase 1)	14	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
385	""	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing 	""	""	""	""	""	Q4-2016
386	""	CALF Turnkey	Galway City	Castlegar Road, Galway (Phase 1)	81	Respond	""	""	""	""	Q2-2018	""
387	""	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)	2	Cluid Housing 	""	""	""	""	""	Q3-2017
388	""	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
389	""	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
390	""	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
391	""	CALF Turnkey	Galway City	Murrough, Renmore, Galway  (Phase 1)	8	Cluid Housing 	""	""	""	""	Q1-2018	""
392	""	CALF Turnkey	Galway City	Murrough, Renmore, Galway  (Phase 2)	8	Cluid Housing 	""	""	""	""	Q1-2018	""
393	""	CALF Turnkey	Galway City	Murrough, Renmore, Galway  (Phase 3)	4	Cluid Housing 	""	""	""	""	Q1-2018	""
394	""	CALF Turnkey	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)	12	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
395	""	CALF Turnkey	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)	12	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
396	""	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	Q2-2018	""
397	""	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	Q2-2018	""
398	""	SHIP CONSTRUCTION	Galway County	Weir Road, Tuam	30	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is being tendered.	""	""	""
399	""	SHIP CONSTRUCTION	Galway County	Culleen, Carraroe, Connemara	6	*N/A	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
400	""	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
401	""	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
402	""	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
403	""	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	Q2-2018	""
404	""	SHIP CONSTRUCTION	Galway County	Cill Ciarn (SRD)	1	*N/A	""	""	""	""	Q3-2017	""
405	""	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	Q2-2017	""
406	""	SHIP CONSTRUCTION	Galway County	Roundstone	10	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
407	""	SHIP CONSTRUCTION	Galway County	Sruchain an Chlair, Oughterard	10	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
408	""	SHIP CONSTRUCTION	Galway County	St. Joseph's, Clifden	23	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
409	""	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	16	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
410	""	SHIP CONSTRUCTION	Galway County	Caislen Raithln, Ardrahan	10	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
411	""	SHIP CONSTRUCTION	Galway County	Old Area Engineer's Office, Barrack Street, Loughrea	5	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
412	""	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	61	*N/A	""	""	""	""	Q4-2017	""
413	""	SHIP CONSTRUCTION	Galway County	Cartron, Kinvarra	10	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
414	""	SHIP CONSTRUCTION TURNKEY	Galway County	Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
415	""	SHIP CONSTRUCTION TURNKEY	Galway County	Athenry	14	*N/A	""	""	""	""	""	Q4-2017
416	""	SHIP CONSTRUCTION TURNKEY	Galway County	Portumna	10	*N/A	""	""	""	""	""	Q4-2017
417	""	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
418	""	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved in Q4-2016, outline design and costs being prepared.	""	""	""	""	""
419	""	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	Q2-2018	""
420	""	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
421	""	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
422	""	CAS CONSTRUCTION	Galway County	Springfield, Parkmore	4	Peter Triest Housing Association Ltd	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
423	""	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
424	""	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	17	Cluid Housing Association	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
425	""	CAS CONSTRUCTION	Galway County	Caheroyn, Athenry	1	Peter Triest Housing Association Ltd	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
426	""	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	5	Peter Triest Housing Association Ltd	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
427	""	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
428	""	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q2-2018
429	""	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 2)	3	Co-operative Housing Ireland	""	""	""	""	Q1-2017	""
430	""	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing 	""	""	""	""	""	Q3-2017
431	""	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole (Phase 1)	2	*N/A	""	""	""	""	""	Q1-2018
432	""	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole (Phase 2)	8	*N/A	""	""	""	""	Q2-2017	""
433	""	SHIP CONSTRUCTION TURNKEY	Kerry	Cahirdown Wood, Listowel	38	*N/A	""	""	""	Stage 4 approved in Q3-2017, the scheme is fully approved.	""	""
434	""	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
435	""	SHIP CONSTRUCTION TURNKEY	Kerry	Woodview, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
436	""	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
437	""	SHIP CONSTRUCTION	Kerry	Ardmoneel, Killorglin	14	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
438	""	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
439	""	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	Q4-2017	""
440	""	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
441	""	SHIP CONSTRUCTION	Kerry	Milltown	8	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
442	""	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	Q2-2018	""
443	""	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
444	""	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
445	""	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
446	""	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
447	""	SHIP CONSTRUCTION	Kerry	Marconi Avenue, Ballybunion	20	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
448	""	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	Q1-2018	""
449	""	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	Q4-2017	""
450	""	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	6	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
451	""	SHIP CONSTRUCTION	Kerry	Balloonagh, Tralee	28	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
452	""	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	Q1-2018	""
453	""	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
454	""	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
455	""	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	Q2-2018	""
456	""	SHIP CONSTRUCTION	Kerry	Owngarry, killorglin	1	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is being tendered.	""	""	""
457	""	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	56	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
458	""	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
459	""	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
460	""	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is being tendered.	""	""	""
461	""	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	24	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
462	""	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee	8	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
463	""	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	20	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
464	""	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	Q2-2017	""
465	""	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
466	""	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
467	""	REGENERATION	Kerry	St Martin's Park, Tralerr	4	*N/A	""	""	""	""	Q2-2017	""
468	""	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
469	""	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
470	""	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	Q4-2017	""
471	""	CAS CONSTRUCTION	Kerry	Mitchels-Boherbee	18	Cluid Housing Association	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
472	""	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	Q4-2017	""
473	""	CAS CONSTRUCTION	Kerry	Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
474	""	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
475	""	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing 	""	""	""	""	""	Q2-2016
476	""	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)	61	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
477	""	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
478	""	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
479	""	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	Q1-2018	""
480	""	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
481	""	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot, Co. Kildare	6	*N/A	""	""	""	""	Q2-2018	""
482	""	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
483	""	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
484	""	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
485	""	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	Stage 1 approved in Q1-2017, outline design and costs being prepared.	""	""	""	""	""
486	""	SHIP CONSTRUCTION	Kildare	Athgarvan Village	20	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
487	""	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
488	""	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	""	""	Q1-2018	""
489	""	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is being tendered.	""	""	""
490	""	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
491	""	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
492	""	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	Q2-2017	""
493	""	SHIP CONSTRUCTION	Kildare	Dominican Church Site, Athy	30	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
494	""	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
495	""	SHIP CONSTRUCTION	Kildare	Coill Dubh, Co. Kildare	10	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
496	""	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
497	""	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
498	""	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
499	""	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
500	""	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q1-2016, outline design and costs being prepared.	""	""	""	""	""
501	""	CAS CONSTRUCTION	Kildare	Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
502	""	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
503	""	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland 	""	""	""	""	Q4-2016	""
504	""	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing 	""	""	""	""	Q3-2017	""
505	""	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing 	""	""	""	""	""	Q1-2018
506	""	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q2-2018
507	""	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
508	""	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
509	""	CALF Turnkey	Kildare	"Revised Rye Abbey, Kilcock, Co Kildare (apts)
 (Phase 1)"	33	Cluid Housing 	""	""	""	""	""	Q2-2017
510	""	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
511	""	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
512	""	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
513	""	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
514	""	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q2-2017
515	""	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 1)	14	Cluid Housing 	""	""	""	""	Q1-2018	""
516	""	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 2)	28	Cluid Housing 	""	""	""	""	Q1-2018	""
517	""	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 3)	18	Cluid Housing 	""	""	""	""	Q1-2018	""
518	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas	74	*N/A	""	""	Q1-2018	""	""	""
519	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	Q1-2018	""	""	""
520	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
521	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
522	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 1)	8	*N/A	""	""	""	""	""	Q1-2018
523	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
524	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	3	*N/A	""	""	""	""	Q2-2017	""
525	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford Phase 3	18	*N/A	""	""	""	""	Q1-2018	""
526	""	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
527	""	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
528	""	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	7	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
529	""	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Pennyswell Road, Kilkenny	80	*N/A	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
530	""	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
531	""	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
532	""	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	Q2-2018	""
533	""	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
534	""	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
535	""	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
536	""	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	Q1-2018	""
537	""	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	15	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
538	""	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
539	""	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
540	""	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
541	""	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	Q2-2018	""
542	""	CAS CONSTRUCTION	Kilkenny	Nimble Spaces Project at Callan	15	Camphill Communities of Ireland	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
543	""	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
544	""	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
545	""	CAS CONSTRUCTION	Kilkenny	Camphill ~Communities Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
546	""	CAS CONSTRUCTION	Kilkenny	Kyle, Callan, Co. Kilkenny	4	Camphill Communities of Ireland	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
547	""	CAS CONSTRUCTION	Kilkenny	"""Red Barn"" Patrick Street, Ballyragget"	16	Good Shepherd Services Ltd	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
548	""	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett Oaklee	4	Oaklee Housing Trust	""	""	""	""	Q2-2018	""
549	""	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	5	Camphill Communities of Ireland	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
550	""	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	4	Good Shepherd Services Ltd	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
551	""	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
552	""	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, kilkenny	12	Good Shepherd Services Ltd	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
553	""	CALF Turnkey	Kilkenny	Callan Manor, Callan, Co. Kilkenny (Phase 1)	15	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
554	""	CALF Construction	Kilkenny	Friary Walk, Callan, Co Kilkenny (Phase 1)	16	Cluid Housing 	""	""	""	""	Q1-2018	""
555	""	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)	39	Respond	""	""	""	""	Q2-2018	""
556	""	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing 	""	""	""	""	""	Q2-2017
557	""	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing 	""	""	""	""	Q1-2017	""
558	""	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing 	""	""	""	""	Q2-2018	""
559	""	CAS CONSTRUCTION	Laois	Abbeyleix Road, Portlaoise	16	Respond	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
560	""	SHIP CONSTRUCTION	Laois	Main Street, Rathdowney	6	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
561	""	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
562	""	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
563	""	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	Stage 1 approved in Q3-2016, outline design and costs being prepared.	""	""	""	""	""
564	""	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
565	""	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	Stage 2 approved in Q1-2016, full design/tender being prepared.	""	""	""	""
566	""	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
567	""	CALF Turnkey	Laois	31-36 Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing 	""	""	""	""	Q4-2017	""
568	""	CALF Construction	Laois	55 56 Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing 	""	""	""	""	""	Q2-2018
569	""	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
570	""	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
571	""	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
572	""	CALF Construction	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing 	""	""	""	""	""	Q1-2018
573	""	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	28	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
574	""	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	Q2-2017	""
575	""	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
576	""	SHIP CONSTRUCTION RAPID	Limerick	Deerpark, Adare	30	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
577	""	SHIP CONSTRUCTION RAPID	Limerick	Lisheen Park, Patrickswell	16	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
578	""	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	33	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
579	""	SHIP CONSTRUCTION RAPID	Limerick	Mountpelier	10	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
580	""	SHIP CONSTRUCTION RAPID	Limerick	Knocklong	10	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
581	""	SHIP CONSTRUCTION RAPID	Limerick	Patrickswell (Site 2)	24	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
582	""	SHIP CONSTRUCTION	Limerick	Patrick?s Villas, Castleconnell	4	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
583	""	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
584	""	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	7	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
585	""	SHIP CONSTRUCTION	Limerick	1-12 Burke Avenue, Limerick City	12	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
586	""	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
587	""	SHIP CONSTRUCTION	Limerick	Sexton Street North & Kileely Court	5	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
588	""	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	3	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
589	""	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	11	*N/A	""	""	""	""	Q1-2018	""
590	""	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	38	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
591	""	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
592	""	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
593	""	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	Q2-2018	""
594	""	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	6	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
595	""	SHIP CONSTRUCTION	Limerick	Vance's Lands, Limerick City	37	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
596	""	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	Q2-2018	""
597	""	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
598	""	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
599	""	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Moyross	3	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
600	""	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
601	""	SHIP CONSTRUCTION	Limerick	Ballygreannan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
602	""	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
603	""	SHIP CONSTRUCTION	Limerick	Ballyhahill	4	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
604	""	SHIP CONSTRUCTION	Limerick	Knockalisheen Road, Moyross	5	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
605	""	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	9	*N/A	""	""	""	""	Q2-2018	""
606	""	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
607	""	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
608	""	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
609	""	REGENERATION	Limerick	Gaol Lane	1	*N/A	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
610	""	REGENERATION	Limerick	Sheep / Athlunkards Street	8	*N/A	""	Stage 2 approved in Q2-2014, full design/tender being prepared.	""	""	""	""
611	""	REGENERATION	Limerick	Churchfield (Phase 1.1)	19	*N/A	""	""	""	""	""	Q1-2018
612	""	REGENERATION	Limerick	Churchfield (Phase 1.2)	23	*N/A	""	""	""	""	""	Q2-2018
613	""	REGENERATION	Limerick	Churchfield (Phase 2)	38	Circle Voluntary Housing Association Ltd	""	Stage 2 approved in Q4-2014, full design/tender being prepared.	""	""	""	""
614	""	REGENERATION	Limerick	Cosgrave Park	30	Co-operative Housing Ireland (Formerly NABCo)	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
615	""	REGENERATION	Limerick	Palm Court	27	Respond	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
616	""	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
617	""	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
618	""	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
619	""	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
620	""	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
621	""	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
622	""	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
623	""	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
624	""	REGENERATION	Limerick	BCW Vacant Refurbs, Lot 1 & 2**	13	*N/A	""	""	""	""	""	Q4-2016
625	""	REGENERATION	Limerick	St. Mary's Park Infills	19	Tath Housing Association Ltd	""	""	""	""	Q3-2017	""
626	""	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Tath Housing Association Ltd	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
627	""	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved in Q1-2015, outline design and costs being prepared.	""	""	""	""	""
628	""	REGENERATION	Limerick	45-46 Cliona Park	2	*N/A	""	Stage 2 approved in Q1-2016, full design/tender being prepared.	""	""	""	""
629	""	REGENERATION	Limerick	Dalgaish Park	24	Cluid Housing Association	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
630	""	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved in Q1-2015, outline design and costs being prepared.	""	""	""	""	""
631	""	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
632	""	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
633	""	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
634	""	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
635	""	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	10	Croom Voluntary Housing Association Ltd	""	""	""	""	Q2-2018	""
636	""	CAS CONSTRUCTION	Limerick	Cappamore	12	Cappamore Housing Association Ltd	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
637	""	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	Q1-2018	""
638	""	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	Q1-2018	""
639	""	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	12	Associated Charities Trust Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
640	""	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
641	""	CAS CONSTRUCTION	Limerick	Convent Street, King's Island	2	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
642	""	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	6	Peter McVerry Trust Ltd	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
643	""	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co-operative Housing Ireland	""	""	""	""	""	Q1-2018
644	""	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
645	""	CALF Construction	Limerick	Cosgrave Park, Moyross, Limerick City  (Phase 1)	21	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
646	""	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing 	""	""	""	""	""	Q1-2018
647	""	CALF Turnkey	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing 	""	""	""	""	""	Q2-2017
648	""	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 1)	14	*N/A	""	""	""	""	""	Q4-2017
649	""	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 1)	4	*N/A	""	""	""	""	Q2-2018	""
650	""	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
651	""	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	27	*N/A	""	""	""	""	Q2-2018	""
652	""	SHIP CONSTRUCTION	Longford	Church View, Lanesborough	14	*N/A	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
653	""	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
654	""	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
655	""	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
656	""	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
657	""	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing 	""	""	""	""	""	Q1-2017
658	""	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
659	""	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
660	""	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project - Phase 1)	4	*N/A	""	""	""	""	""	Q1-2018
661	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (1)	7	*N/A	""	""	""	""	""	Q4-2016
662	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (2)	7	*N/A	""	""	""	""	""	Q2-2017
663	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (3)	4	*N/A	""	""	""	""	""	Q3-2017
664	""	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q3-2016
665	""	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2 - 4)	69	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
666	""	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
667	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (4)	6	*N/A	""	""	""	""	""	Q4-2017
668	""	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	75	*N/A	Stage 1 approved in Q4-2017, outline design and costs being prepared.	""	""	""	""	""
669	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (5)	5	*N/A	""	""	""	""	""	Q4-2017
670	""	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project - Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
671	""	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project - Phase 3)	4	*N/A	""	""	""	""	Q3-2017	""
672	""	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
673	""	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
674	""	CAS CONSTRUCTION	Louth	5 Slieveroe Cresent, Dundalk	1	Cluid Housing Association	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
675	""	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	Tath Housing Association Ltd	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
676	""	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	Stage 1 approved in Q1-2016, outline design and costs being prepared.	""	""	""	""	""
677	""	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North East Housing Association Ltd	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
678	""	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North East Housing Association Ltd	""	""	""	""	Q1-2018	""
679	""	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
680	""	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
681	""	CAS CONSTRUCTION	Louth	36 Strand, Clogherhead	4	St. John of God Housing Association Ltd	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
682	""	CAS CONSTRUCTION	Louth	Coulter Park	6	Tath Housing Association Ltd	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
683	""	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
684	""	CALF Construction	Louth	2 Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing 	""	""	""	""	""	Q2-2016
685	""	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)	8	Respond	""	""	""	""	Q1-2018	""
686	""	CALF Turnkey	Louth	Avourwen Meadows, Drogheda, Co. Louth (Phase 1)	50	Oaklee Housing 	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
687	""	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
688	""	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q1-2017
689	""	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing 	""	""	""	""	""	Q1-2017
690	""	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	29	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
691	""	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)	8	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
692	""	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	65	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
693	""	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
694	""	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	10	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
695	""	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	5	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
696	""	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing 	""	""	""	""	""	Q1-2017
697	""	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing 	""	""	""	""	""	Q3-2017
698	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	12	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
699	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 10)	10	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
700	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	12	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
701	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	8	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
702	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	11	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
703	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	15	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
704	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 6)*	10	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
705	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 7)	12	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
706	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 8)	8	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
707	""	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 9)	14	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
708	""	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	Q1-2018	""
709	""	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q4-2017
710	""	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
711	""	CALF Construction	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
712	""	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q3-2016
713	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	6	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
714	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	8	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
715	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	6	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
716	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
717	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
718	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	7	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
719	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	12	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
720	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
721	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	16	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
722	""	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing 	""	""	""	""	""	Q4-2017
723	""	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	31	Cluid Housing 	""	""	""	""	Q4-2016	""
724	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	7	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
725	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	2	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
726	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 6)	1	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
727	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 7)	4	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
728	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 8)	4	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
729	""	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 9)	16	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
730	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	Q1-2018	""	""	""
731	""	SHIP CONSTRUCTION TURNKEY	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
732	""	SHIP CONSTRUCTION	Mayo	Market Street, Swinford	2	*N/A	Stage 1 approved in Q1-2017, outline design and costs being prepared.	""	""	""	""	""
733	""	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	Q2-2018	""
734	""	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	Q3-2017	""
735	""	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
736	""	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	Q4-2017	""
737	""	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
738	""	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
739	""	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
740	""	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
741	""	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	4	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
742	""	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
743	""	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
744	""	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
745	""	SHIP CONSTRUCTION	Mayo	St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
746	""	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
747	""	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
748	""	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar	22	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
749	""	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
750	""	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
751	""	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
752	""	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
753	""	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
754	""	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
755	""	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	Q2-2018	""
756	""	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
757	""	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
758	""	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
759	""	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
760	""	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
761	""	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
762	""	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
763	""	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	Q2-2018	""
764	""	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
765	""	SHIP CONSTRUCTION	Meath	St. Oliver's, Ratoath	17	*N/A	""	""	""	""	Q1-2018	""
766	""	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
767	""	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	Q4-2017	""
768	""	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
769	""	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
770	""	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
771	""	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
772	""	SHIP CONSTRUCTION	Meath	Dunshaughlin	25	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
773	""	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
774	""	SHIP CONSTRUCTION	Meath	Farganstown	42	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
775	""	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
776	""	CALF Turnkey	Meath	27 Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	Q2-2017	""
777	""	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing 	""	""	""	""	""	Q1-2018
778	""	CALF Turnkey	Meath	BlackCastle,Slane Road, Navan, Co. Meath (Phase 1)	9	Tath Housing Association Ltd	""	""	""	""	Q3-2017	""
779	""	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing 	""	""	""	""	""	Q2-2018
780	""	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing 	""	""	""	""	Q4-2017	""
781	""	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing 	""	""	""	""	""	Q4-2017
782	""	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)	8	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
783	""	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	Q1-2018	""
784	""	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
785	""	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
786	""	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)	4	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
787	""	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)	12	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
788	""	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)	18	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
789	""	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	Tath Housing Association Ltd	""	""	""	""	Q3-2017	""
790	""	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)	5	Cluid Housing 	""	""	""	""	Q2-2018	""
791	""	CALF Turnkey	Meath	Frederick Manor, Ashbourne, Co. Meath (Phase 1)	4	Cluid Housing 	""	""	""	""	Q4-2017	""
792	""	CALF Turnkey	Meath	Frederick Manor, Ashbourne, Co. Meath (Phase 2)	7	Cluid Housing 	""	""	""	""	Q4-2017	""
793	""	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
794	""	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
795	""	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing 	""	""	""	""	""	Q1-2016
796	""	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
797	""	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing 	""	""	""	""	""	Q1-2017
798	""	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing 	""	""	""	""	""	Q4-2017
799	""	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing 	""	""	""	""	""	Q4-2017
800	""	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	44	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
801	""	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q2-2017
802	""	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing 	""	""	""	""	""	Q3-2017
803	""	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)*	24	Respond	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
804	""	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	23	Cluid Housing 	""	""	""	""	""	Q2-2016
805	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
806	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2017
807	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
808	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan  Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
809	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
810	""	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
811	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	12	*N/A	""	""	""	Stage 4 approved in Q3-2017, the scheme is fully approved.	""	""
812	""	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
813	""	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
814	""	SHIP CONSTRUCTION	Monaghan	Davy's & Adjacent Porperty, Fermanagh St., Clones	3	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
815	""	SHIP CONSTRUCTION	Monaghan	Boyle Sports Site, Fermanagh St., Clones	3	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
816	""	SHIP CONSTRUCTION	Monaghan	82 & 83 Fermanagh St., Clones	3	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
817	""	SHIP CONSTRUCTION	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
818	""	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
819	""	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
820	""	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
821	""	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
822	""	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
823	""	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 1)	50	Respond	""	""	""	""	Q2-2018	""
824	""	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
825	""	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	14	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
826	""	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	12	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
827	""	CALF Construction	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing 	""	""	""	""	Q2-2017	""
828	""	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr	12	*N/A	""	""	""	Stage 4 approved in Q4-2017, the scheme is fully approved.	""	""
829	""	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
830	""	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	Q2-2018	""
831	""	SHIP CONSTRUCTION TURNKEY	Offaly	Coolagarry, Walsh Island, 	4	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
832	""	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
833	""	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
834	""	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
835	""	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	Q4-2017	""
836	""	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
837	""	CAS CONSTRUCTION	Offaly	Killane Drive, Edenderry	2	Tath Housing Association Ltd	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
838	""	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
839	""	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	20	Oaklee Housing Trust	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
840	""	CALF Turnkey	Offaly	Frankford Park, Kilcormac, Co. Offaly (Phase 1)	12	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
841	""	CALF Construction	Offaly	Kearney?s Field, Tullamore, Co. Offaly (Phase 1)	35	Oaklee Housing 	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
842	""	CALF Construction	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
843	""	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	Q1-2017	""
844	""	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	Q1-2018	""
845	""	SHIP CONSTRUCTION TURNKEY	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
846	""	SHIP CONSTRUCTION	Roscommon	Cloonfad	1	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
847	""	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
848	""	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
849	""	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
850	""	CALF Turnkey	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing 	""	""	""	""	Q1-2016	""
851	""	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
852	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	Q1-2018	""	""	""
853	""	SHIP CONSTRUCTION	Sligo	Colloney	15	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
854	""	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
855	""	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	Q1-2018	""
856	""	SHIP CONSTRUCTION	Sligo	Carrowbunnaun, Strandhill	20	*N/A	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
857	""	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (2)	14	*N/A	""	""	""	""	Q1-2017	""
858	""	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
859	""	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
860	""	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (1)	8	*N/A	""	""	""	""	""	Q4-2017
861	""	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
862	""	SHIP CONSTRUCTION	Sligo	94 St Joseph's Terrace	1	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
863	""	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
864	""	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	Q1-2018	""
865	""	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	20	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
866	""	SHIP CONSTRUCTION RAPID	South Dublin	St Aidan's,  Brookfield, Tallaght (Phase 1)	47	*N/A	""	""	""	""	""	Q2-2018
867	""	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 2)	38	*N/A	""	""	""	""	Q3-2017	""
868	""	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthberts, Clondalkin (Phase 2)	43	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
869	""	SHIP CONSTRUCTION RAPID	South Dublin	St. Catherine?s, Knockmore Avenue, Killinarden, Tallaght	13	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
870	""	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	26	*N/A	""	""	""	""	Q3-2017	""
871	""	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	Q3-2017	""
872	""	SHIP CONSTRUCTION	South Dublin	Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	Q3-2017	""
873	""	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	Q2-2017	""
874	""	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	Q2-2017	""
875	""	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
876	""	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	Q1-2017	""
877	""	SHIP CONSTRUCTION	South Dublin	Balgaddy F	50	*N/A	Stage 1 approved in Q1-2015, outline design and costs being prepared.	""	""	""	""	""
878	""	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
879	""	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
880	""	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
881	""	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tath Housing Association Ltd	""	""	Stage 3 approved in Q4-2017, the scheme is being tendered.	""	""	""
882	""	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
883	""	CALF Construction	South Dublin	1 Hollyville Terrace, Palmerstown, Dublin (Phase 1)	2	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
884	""	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	10	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
885	""	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)	14	Oaklee Housing 	""	""	""	""	""	Q3-2017
886	""	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing 	""	""	""	""	""	Q1-2018
887	""	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing 	""	""	""	""	""	Q1-2018
888	""	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing 	""	""	""	""	Q4-2016	""
889	""	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing 	""	""	""	""	""	Q1-2018
890	""	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing 	""	""	""	""	""	Q2-2018
891	""	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)	13	Cluid Housing 	""	""	""	""	""	Q2-2018
892	""	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)*	12	Cluid Housing 	""	""	""	""	Q1-2017	""
893	""	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing 	""	""	""	""	""	Q1-2017
894	""	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing 	""	""	""	""	""	Q3-2017
895	""	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing 	""	""	""	""	Q1-2018	""
896	""	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)	16	Cluid Housing 	""	""	""	""	""	Q3-2017
897	""	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
898	""	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
899	""	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
900	""	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
901	""	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2016	""
902	""	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing 	""	""	""	""	Q1-2018	""
903	""	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)	10	Respond	""	""	""	""	Q2-2018	""
904	""	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
905	""	CALF Turnkey	South Dublin	"Tullyhall, Lucan, Co Dublin			 (Phase 1)*"	2	Tath Housing Association Ltd	""	""	""	""	""	Q3-2017
906	""	CALF Turnkey	South Dublin	"Tullyhall, Lucan, Co Dublin			 (Phase 2)*"	2	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
907	""	CALF Construction	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing 	""	""	""	""	Q2-2018	""
908	""	CALF Construction	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	14	Cluid Housing 	""	""	""	""	Q2-2018	""
909	""	CALF Construction	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing 	""	""	""	""	Q2-2018	""
910	""	CALF Construction	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 4)	14	Cluid Housing 	""	""	""	""	Q2-2018	""
911	""	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
912	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	Q1-2018	""	""	""
913	""	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
914	""	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
915	""	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	27	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
916	""	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	9	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
917	""	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	Q3-2017	""
918	""	SHIP CONSTRUCTION	Tipperary	Templetouhy	6	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
919	""	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	Stage 1 approved in Q1-2016, outline design and costs being prepared.	""	""	""	""	""
920	""	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	11	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
921	""	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
922	""	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	18	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
923	""	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
924	""	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
925	""	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
926	""	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is being tendered.	""	""	""
927	""	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
928	""	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
929	""	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	30	*N/A	Stage 1 approved in Q2-2015, outline design and costs being prepared.	""	""	""	""	""
930	""	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	2	*N/A	""	""	""	""	""	Q4-2016
931	""	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
932	""	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
933	""	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	19	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
934	""	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
935	""	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
936	""	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
937	""	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
938	""	CAS CONSTRUCTION	Tipperary	Fethard	4	Belmont Park Housing Association Ltd	Stage 1 approved in Q3-2015, outline design and costs being prepared.	""	""	""	""	""
939	""	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
940	""	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
941	""	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing 	""	""	""	""	""	Q2-2017
942	""	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
943	""	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 2)	10	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
944	""	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	39	*N/A	""	""	""	""	Q4-2017	""
945	""	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	Q3-2017	""
946	""	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	Q4-2017	""
947	""	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	Q4-2017	""
948	""	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	Q1-2018	""
949	""	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	65	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
950	""	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	20	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
951	""	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
952	""	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	Q2-2018	""
953	""	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City	5	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
954	""	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
955	""	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
956	""	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	Q1-2018	""
957	""	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
958	""	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	Q3-2017	""
959	""	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	Stage 1 approved in Q1-2014, outline design and costs being prepared.	""	""	""	""	""
960	""	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
961	""	SHIP CONSTRUCTION	Waterford	Lower Yellow Road, Waterford	8	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
962	""	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	11	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
963	""	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
964	""	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
965	""	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
966	""	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved in Q2-2016, full design/tender being prepared.	""	""	""	""
967	""	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	Stage 3 approved in Q3-2017, the scheme is being tendered.	""	""	""
968	""	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
969	""	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	Stage 1 approved in Q4-2016, outline design and costs being prepared.	""	""	""	""	""
970	""	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	4	Anvers Housing Association Ltd	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
971	""	CALF Turnkey	Waterford	Estuary Heights, Shandon Road, Dungarvan (Phase 1)	20	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q3-2016	""	""
972	""	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
973	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	57	*N/A	""	""	Q1-2018	""	""	""
974	""	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
975	""	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	Stage 1 approved in Q1-2016, outline design and costs being prepared.	""	""	""	""	""
976	""	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	Q2-2017	""
977	""	SHIP CONSTRUCTION	Westmeath	16 Ennell Court	1	*N/A	""	""	""	""	""	Q1-2018
978	""	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone  Phase 1	33	*N/A	""	""	""	""	Q2-2018	""
979	""	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
980	""	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
981	""	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	32	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
982	""	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
983	""	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
984	""	SHIP CONSTRUCTION	Westmeath	St. Brigid's Green, Mullingar	14	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
985	""	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Tath Housing Association Ltd	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
986	""	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
987	""	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q4-2017	""	""
988	""	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin (Phase 1), Ballytegan Road, Gorey	8	*N/A	""	""	""	""	""	Q1-2018
989	""	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
990	""	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey. Phase 1.	18	*N/A	""	""	""	""	Q1-2018	""
991	""	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	9	*N/A	""	""	""	""	Q1-2018	""
992	""	SHIP CONSTRUCTION TURNKEY	Wexford	Castlebridge, Co Wexford	3	*N/A	""	""	""	""	Q2-2018	""
993	""	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann and Ghairdin, Ballytegan Road, Gorey, Phase 2	4	*N/A	""	""	""	""	Q1-2018	""
994	""	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock,Wexford	26	*N/A	""	""	""	""	Q1-2018	""
995	""	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
996	""	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
997	""	SHIP CONSTRUCTION	Wexford	Carricklawn, Coolcots, Wexford	14	*N/A	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
998	""	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
999	""	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	Q2-2018	""
1000	""	SHIP CONSTRUCTION	Wexford	Danescastle	12	*N/A	""	""	""	Stage 4 approved in Q2-2018, the scheme is fully approved.	""	""
1001	""	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	Q2-2018	""
1002	""	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	45	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
1003	""	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	Q4-2017	""
1004	""	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	34	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1005	""	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	""	Q2-2018
1006	""	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	Q3-2017	""
1007	""	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is fully approved.	""	""
1008	""	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	9	*N/A	""	""	""	""	Q4-2017	""
1009	""	SHIP CONSTRUCTION	Wexford	Baile an Tr, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
1010	""	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
1011	""	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
1012	""	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
1013	""	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	6	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
1014	""	SHIP CONSTRUCTION	Wexford	Ballywish, Castlebridge	11	*N/A	""	Stage 2 approved in Q2-2018, full design/tender being prepared.	""	""	""	""
1015	""	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford	43	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1016	""	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy, Co Wexford	17	*N/A	Stage 1 approved in Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1017	""	SHIP CONSTRUCTION	Wexford	Creagh, Gorey, Co Wexford	12	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1018	""	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
1019	""	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
1020	""	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown, Co Wexford	12	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1021	""	CALF Turnkey	Wexford	 233, 234, 248, 249,252,253 Ard Uisce, Whiterock, Wexford (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1022	""	CALF Turnkey	Wexford	238,239,240,241,245 Ard Uisce, Wexford Town (Phase 1)	5	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
1023	""	CALF Turnkey	Wexford	247 Ard Uisce, Whiterock, Wexford  (Phase 1)	1	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1024	""	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
1025	""	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1026	""	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 2)	6	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1027	""	CALF Turnkey	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
1028	""	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	9	Tath Housing Association Ltd	""	""	""	""	Q1-2017	""
1029	""	CALF Turnkey	Wexford	Glen Aoibhinn, Ardamine, Courtown Harbour, Gorey (Phase 1)*	10	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1030	""	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 1)	40	Oaklee Housing 	""	""	""	""	Q3-2017	""
1031	""	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q2-2016
1032	""	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	9	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1033	""	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
1034	""	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
1035	""	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 1)	13	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1036	""	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 2)	13	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1037	""	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 3)	10	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1038	""	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1039	""	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)	28	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
1040	""	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely	4	*N/A	""	""	""	""	Q2-2018	""
1041	""	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely	2	*N/A	""	""	""	""	""	Q2-2018
1042	""	SHIP CONSTRUCTION RAPID	Wicklow	Whitehall, Baltinglass	34	*N/A	Stage 1 approved in Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1043	""	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 3)	21	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
1044	""	SHIP CONSTRUCTION	Wicklow	10A Castle Villas, Greystones	1	*N/A	Stage 1 approved in Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1045	""	SHIP CONSTRUCTION	Wicklow	Ard Na Mara, Kilcoole	2	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
1046	""	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
1047	""	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 1)	17	*N/A	""	""	""	""	Q4-2017	""
1048	""	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 2)	26	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
1049	""	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
1050	""	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
1051	""	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	Q3-2017	""
1052	""	SHIP CONSTRUCTION	Wicklow	Old Library, Arklow	7	*N/A	""	""	""	""	Q1-2018	""
1053	""	SHIP CONSTRUCTION	Wicklow	Sugarloaf View, Kilmacanogue	20	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
1054	""	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum (Phase 2)	20	*N/A	""	""	""	""	Q3-2017	""
1055	""	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	""	""	Q2-2018	""
1056	""	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	""	Stage 3 approved in Q2-2018, the scheme is being tendered.	""	""	""
1057	""	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	30	*N/A	Stage 1 approved in Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1058	""	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
1059	""	CAS CONSTRUCTION	Wicklow	Lathaleer, Baltinglass	5	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q1-2017, outline design and costs being prepared.	""	""	""	""	""
1060	""	CALF Turnkey	Wicklow	Abbey St, Wicklow  (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	Q4-2016	""
1061	""	CALF Turnkey	Wicklow	Bollarney North, Wicklow (Phase 1)*	32	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q2-2018	""	""
1062	""	CALF Turnkey	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1063	""	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)	13	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
1064	""	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)	6	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
1065	""	CALF Construction	Wicklow	St Ernans View, Merrymeeting, Rathnew, Co Wicklow  (Phase 1)	45	Cluid Housing 	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
1066	""	CALF Turnkey	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)	7	Tath Housing Association Ltd	""	""	""	""	Q3-2017	""
1067	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Wicklow	Convent Lands	51	*N/A	""	""	Q1-2018	""	""	""