<row _id="1"><No.>1</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Carrigbrook, Tullow Road, Carlow</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="2"><No.>2</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Carrigbrook, Tullow Road, Carlow</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="3"><No.>3</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Granville Court, Granby Row,Carlow</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="4"><No.>4</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Ardattin, Co Carlow</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="5"><No.>5</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Brownbog, Hackettstown</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="6"><No.>6</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>St. Mary’s Court, Carlow</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="7"><No.>7</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Drumphea, Garryhill, Bagenalstown</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="8"><No.>8</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Constable Hill, Hackettstown</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="9"><No.>9</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Old Leighlin Road, Carlow</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="10"><No.>10</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>5 &amp; 6 Staplestown Road, Carlow</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="11"><No.>11</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Bahana, Glynn</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="12"><No.>12</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Barrack Street, Carlow</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="13"><No.>13</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Carlow</LA><Scheme/Project Name>2a Chapel Street, Graiguecullen, Carlow</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="14"><No.>14</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Carlow</LA><Scheme/Project Name>24 Church Street, Graiguecullen, Carlow </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="15"><No.>15</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Breens Shop Units, Main Street, Borris, Co. Carlow</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="16"><No.>16</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Pound Lane, Borris</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="17"><No.>17</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Gleann na Bearu, Bagenalstown</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="18"><No.>18</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>41-42 Dublin Street &amp; Cox's Lane, Carlow </Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="19"><No.>19</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Gleann na Bearu, Bagenalstown</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="20"><No.>20</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Gleann na Bearu, Bagenalstown</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="21"><No.>21</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Gleann na Bearu, Royal Oak Road, Bagenalstown</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="22"><No.>22</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Homefield, Blackbog Road, Carlow</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Carlow Voluntary Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="23"><No.>23</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Bog Lane, Borris</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="24"><No.>24</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Ballickmoyler, Graigcullen, Carlow (Phase 1)</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="25"><No.>25</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Ballickmoyler, Graigcullen, Carlow (Phase 2)</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="26"><No.>26</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="27"><No.>27</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 2)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="28"><No.>28</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 3)*</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="29"><No.>29</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 4)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="30"><No.>30</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Granite Court, Ballyknockan, Fenagh, Co Carlow (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="31"><No.>31</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 2)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="32"><No.>32</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Rivercourt,  Carlow  (Phase 2)*</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="33"><No.>33</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 1)</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="34"><No.>34</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 2)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="35"><No.>35</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Carlow</LA><Scheme/Project Name>The Millrace, Burrin, Co. Carlow (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="36"><No.>36</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Ashgrove, Derrylurgan, Ballyjamesduff</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="37"><No.>37</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Woodlands, Killyfinla, Ballyjamesduff</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="38"><No.>38</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Woodlands, Killyfinla, Ballyjamesduff</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="39"><No.>39</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Woodlands, Killyfinla, Ballyjamesduff</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="40"><No.>40</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Woodlands, Killyfinla, Ballyjamesduff</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="41"><No.>41</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Mullaghduff, Ballyconnell</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="42"><No.>42</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Mullaghduff, Ballyconnell</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="43"><No.>43</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Mullaghduff, Ballyconnell</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="44"><No.>44</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Abhainn Dubh, Rosehill, Mullagh</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="45"><No.>45</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Kilnavara Heights, Cavan Town</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="46"><No.>46</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Derrylurgan, Ballyjamesduff</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="47"><No.>47</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Corstruce, Ballinagh</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="48"><No.>48</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Main Street, Mullagh</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="49"><No.>49</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Elm Grove, Main St, Cavan Town</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="50"><No.>50</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Cavan Road, Ballinagh</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="51"><No.>51</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Main St., Butlersbridge</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="52"><No.>52</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Cluain Dara, Kingscourt</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="53"><No.>53</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Fairymount Close, Kingscourt, Co. Cavan</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="54"><No.>54</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>St. Bridgets Terrace, Cavan Town (Infill)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="55"><No.>55</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Lime Park, Bailieborough</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="56"><No.>56</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Duckin Stool, Main Street, Belturbet</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="57"><No.>57</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>The Widow's Row, Widow's House Lane, Belturbet</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="58"><No.>58</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>8 Units @ Ashgrove, Derrylurgan, Ballyjamesduff</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="59"><No.>59</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Dunaree, Kingscourt Town Centre</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="60"><No.>60</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Lime Park, Bailieborough</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="61"><No.>61</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Lime Park, Bailieborough</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="62"><No.>62</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Main St Lower, Kilnaleck, Co Cavan</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="63"><No.>63</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>157 Barrack Road, Kilnaleck</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="64"><No.>64</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Main St., Kilnaleck</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="65"><No.>65</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Cavan</LA><Scheme/Project Name>16 River St., Cavan</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Society of Saint Vincent de Paul</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="66"><No.>66</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cavan</LA><Scheme/Project Name>St. Killian's Housing Association Ltd., Mullagh, Co. Cavan</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>St. Killian's Housing Association, Mullagh, Co. Cavan</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="67"><No.>67</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Mullaghduff, Ballyconnell</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="68"><No.>68</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>16 Units, Fairgreen Park, Mullagh, Co. Cavan (Phase 1)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="69"><No.>69</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Drumalee Manor, Drumalee, Co. Cavan (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="70"><No.>70</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Drumalee Manor, Drumalee, Co. Cavan (Phase 2)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="71"><No.>71</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Drumalee Manor, Drumalee, Co. Cavan (Phase 3)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="72"><No.>72</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Rampart View, Virginia, Co. Cavan (Phase 1)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="73"><No.>73</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>Rampart View, Virginia, Co. Cavan (Phase 3)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="74"><No.>74</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>The Gallops, Cavan Town, Co. Cavan (Phase 2)</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="75"><No.>75</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cavan</LA><Scheme/Project Name>The Gallops, Cavan Town, Co. Cavan (Phase 3)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="76"><No.>76</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Ashline, Kilrush Road, Ennis</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="77"><No.>77</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Doonaun, Tulla</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="78"><No.>78</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Clare</LA><Scheme/Project Name>Shantraud Woods, Killaloe</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="79"><No.>79</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Clare</LA><Scheme/Project Name>Cluain Greine, Drumcliff Rd., Ennis </Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="80"><No.>80</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Clare</LA><Scheme/Project Name>Main St., Mountshannon</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="81"><No.>81</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Clare</LA><Scheme/Project Name>Cluain Greine, Drumcliff Rd., Ennis </Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="82"><No.>82</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Clare</LA><Scheme/Project Name>Madden's Terrace, Clarecastle</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="83"><No.>83</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Clare</LA><Scheme/Project Name>Dun na Mara, Doonbeg</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="84"><No.>84</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Clare</LA><Scheme/Project Name>St Senan’s Terrace, Kilrush -No5-No 6</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="85"><No.>85</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Clare</LA><Scheme/Project Name>Nagles Terrace, Kilrush</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="86"><No.>86</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Ballard Rd,Miltown Malbay</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="87"><No.>87</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Boheraroan, Newmarket-on-Fergus</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="88"><No.>88</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Ballyminogue,Feakle Rd., Scariff</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="89"><No.>89</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Kilkee Road, Doonbeg</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="90"><No.>90</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Tulla Road, Roslevan, Ennis (Fannings site)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="91"><No.>91</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Drumcliffe Road, Ennis</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="92"><No.>92</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Deerpark, Ennistymon</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="93"><No.>93</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Ballyliddan West, Sixmilebridge</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="94"><No.>94</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Gort Road Ennis</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="95"><No.>95</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Clare</LA><Scheme/Project Name>Market Sq., Ennis</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="96"><No.>96</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Clare</LA><Scheme/Project Name>Teach Rua, Edenvale Ennis</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Newgrove Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="97"><No.>97</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Clare</LA><Scheme/Project Name>Cluain Greine, Drumcliff Rd., Ennis </Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="98"><No.>98</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Abbey View, Limerick Road, Ennis, Co. Clare (Phase 1)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="99"><No.>99</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Abbey View, Limerick Road, Ennis, Co. Clare (Phase 2)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="100"><No.>100</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 2)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="101"><No.>101</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Cluain Na Laoi, Kilkishen, Co. Clare (Phase 1)*</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="102"><No.>102</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Cluain Na Laoi, Kilkishen, Co. Clare (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="103"><No.>103</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 2)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="104"><No.>104</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Limerick Rd, Ennis, Co. Clare (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Inis Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="105"><No.>105</No.><Funding Programme>CALF Construction</Funding Programme><LA>Clare</LA><Scheme/Project Name>Revised - Bruachlan, Westbury, Co Clare (Phase 1)</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="106"><No.>106</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Roslevan, Tulla Road, Ennis, County Clare (Phase 1)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="107"><No.>107</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Roslevan, Tulla Road, Ennis, County Clare (Phase 2)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="108"><No.>108</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Roslevan, Tulla Road, Ennis, County Clare (Phase 3)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="109"><No.>109</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Clare</LA><Scheme/Project Name>Roslevan, Tulla Road, Ennis, County Clare (Phase 4)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="110"><No.>110</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Clare</LA><Scheme/Project Name>Shannon East (Phase 1)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="111"><No.>111</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Clare</LA><Scheme/Project Name>Shannon East (Phase 2)</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="112"><No.>112</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Barrack Street</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="113"><No.>113</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Woods Street</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="114"><No.>114</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Corkeran's Quay</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2018</On Site><Completed /></row>
<row _id="115"><No.>115</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Coach Street, Cork</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="116"><No.>116</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Shanakiel Road, Cork</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="117"><No.>117</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Spring Lane, Blackpool, Cork</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="118"><No.>118</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Glen Ryan Road, Cork</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="119"><No.>119</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Watercourse Road, Blackpool, Cork</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="120"><No.>120</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Denroche's Cross, Glasheen Road, Cork</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="121"><No.>121</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Wolsey Court, Blackpool, Cork</Scheme/Project Name><No. of Units>49</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="122"><No.>122</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Sunview, South Douglas Road, Douglas, Cork</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="123"><No.>123</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Former Bolands Mill, Old Mallow Road</Scheme/Project Name><No. of Units>54</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="124"><No.>124</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>KILLEENS, CO CORK</Scheme/Project Name><No. of Units>44</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="125"><No.>125</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Church Road, Black Rock, Cork</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="126"><No.>126</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>East Cliff Road, Glanmire, Farranferris</Scheme/Project Name><No. of Units>81</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="127"><No.>127</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Kinsale road Cork City</Scheme/Project Name><No. of Units>47</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="128"><No.>128</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Ballincrokig, Ballyvolane</Scheme/Project Name><No. of Units>72</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="129"><No.>129</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Greenvalley, Douglas, Cork City</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="130"><No.>130</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Farranferris Cork City</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="131"><No.>131</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Grange Scairt Cross</Scheme/Project Name><No. of Units>59</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="132"><No.>132</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>21-22 Dominick Street, Shandon, Cork City</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="133"><No.>133</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Hawkes Road, Bishopstown Road, Bishopstown, Cork City</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="134"><No.>134</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Lower John Street</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="135"><No.>135</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>38 Gould Street</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="136"><No.>136</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>1 Evenus Ville, Albert Road, Cork City</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="137"><No.>137</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Ard na Ri, Pouladuff Road, Cork City</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="138"><No.>138</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Mount Eden Road, Cork City</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="139"><No.>139</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>21 St Anthony's Road</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="140"><No.>140</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>26 Watercourse Road </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="141"><No.>141</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>22 Summerstown Grove</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="142"><No.>142</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>2A Fairhill</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="143"><No.>143</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Cork City</LA><Scheme/Project Name>99 Ballinderry Park</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="144"><No.>144</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Clover Hill Court, Bessboro Road, Mahon, Cork</Scheme/Project Name><No. of Units>88</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="145"><No.>145</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Poulavone, Ballincollig</Scheme/Project Name><No. of Units>64</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="146"><No.>146</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Boyces Street</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="147"><No.>147</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Madonna House, Ballincollig</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="148"><No.>148</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Bramble Cottages</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="149"><No.>149</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Errigal Heights, The Glen, Cork City</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="150"><No.>150</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Glenamoy Lawn, Mayfield, Cork</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="151"><No.>151</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Hollywood Estate Infill Housing, Blarney Road, Cork</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="152"><No.>152</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Westside, Model Farm Road, Cork</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="153"><No.>153</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>16A Kerry Road (former Slí Gartan), Mayfield, Cork </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="154"><No.>154</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Boyces street</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2018, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="155"><No.>155</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>15 Loughview terrace, The Lough, Glasheen Cork City</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="156"><No.>156</No.><Funding Programme>REGENERATION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>CNWQR Knocknaheeny Phase 1C</Scheme/Project Name><No. of Units>41</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="157"><No.>157</No.><Funding Programme>REGENERATION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>CNWQR Knocknaheeny Phase 2B</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="158"><No.>158</No.><Funding Programme>REGENERATION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Foyle Avenue Infill Housing Development, Knocknaheeny, Cork</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="159"><No.>159</No.><Funding Programme>REGENERATION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>CNWQR Knocknaheeny Phase 3B</Scheme/Project Name><No. of Units>62</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="160"><No.>160</No.><Funding Programme>REGENERATION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>CNWQR Knocknaheeny Phase 4A</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="161"><No.>161</No.><Funding Programme>CAS CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Eastville, Albert Road, Cork</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Galtan Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="162"><No.>162</No.><Funding Programme>CAS CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork City</LA><Scheme/Project Name>14 Glanmire Road Cork</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Galtan Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="163"><No.>163</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Ard na Ri, Closes Green, Farranree, Cork</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Farranree Sheltered Housing Association</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="164"><No.>164</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Apts 2 &amp; 3 Cois Coille, Tivoli, Cork</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Galtan Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="165"><No.>165</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Aras Lean, Murphy’s Farm, Bishopstown, Co. Cork</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>Citizens Housing Association</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="166"><No.>166</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Gardiners Hill, St Lukes, Cork </Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Focus Ireland</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="167"><No.>167</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork City</LA><Scheme/Project Name>88 Sundays Well</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Galtan Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="168"><No.>168</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Skehard Road, Blackrock, Cork</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="169"><No.>169</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Pouladuff Road, Cork </Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="170"><No.>170</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>12,14,15 Model Quarters, Tower, Blarney, Co Cork  (Phase 1)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="171"><No.>171</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>20 and 21 Kyle Street  (Phase 1)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="172"><No.>172</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>40-42 Grand Parade, Cork City (Phase 1)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="173"><No.>173</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Baker Street, Ballincollig, Co Cork (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="174"><No.>174</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Barters Wood, Tower, Cork (Phase 1)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="175"><No.>175</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Barters Wood, Tower, Cork (Phase 2)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="176"><No.>176</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Block 10 Jacobs Island, Mahon, Cork (Phase 1)</Scheme/Project Name><No. of Units>69</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="177"><No.>177</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Boherboy Road, Silversprings Hill, Cork City  (Phase 1)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="178"><No.>178</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Brocklesby Street, Blackpool, Cork City (Phase 1)*</Scheme/Project Name><No. of Units>42</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="179"><No.>179</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Evergreen Road, Turners Cross, Cork  (Phase 1)*</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="180"><No.>180</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Fairfield Meadows, Upper Fair Hill, Cork (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="181"><No.>181</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Glanmire Village, Glanmire, Cork
 (Phase 1)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="182"><No.>182</No.><Funding Programme>CALF Construction</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Green Lane, Blackpool, Cork City (Phase 1)</Scheme/Project Name><No. of Units>112</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="183"><No.>183</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Haig Gardens, Boreenamanna Road and Wallace Avenue, Ballintemple (Phase 1)*</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="184"><No.>184</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="185"><No.>185</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Lancaster Gate, Western Road, Cork (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="186"><No.>186</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Link Road, Ballincollig, Cork (Phase 1)*</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="187"><No.>187</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Miles Stream, Shanakiel, Cork (Phase 1)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="188"><No.>188</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Miles Stream, Shanakiel, Cork (Phase 2)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="189"><No.>189</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Miles Stream, Shanakiel, Cork (Phase 3)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="190"><No.>190</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Millfield Cottages, Blackpool, Cork City (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="191"><No.>191</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Redforge Road, Blackpool, Cork City (Phase 2)</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="192"><No.>192</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Redforge Road, Blackpool, Cork City (Phase 3)*</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="193"><No.>193</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Redforge Road, Blackpool, Cork City (Phase 4)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="194"><No.>194</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Riverside Farm, Model Farm Road, Bishopstown, Cork (Phase 1)*</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q4-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="195"><No.>195</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="196"><No.>196</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 2)*</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="197"><No.>197</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 3)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="198"><No.>198</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Sarsfield Road, Doughcloyne, Wilton, Cork City (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="199"><No.>199</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Springville House, Bulls Lane, Blackrock Road, Cork (Phase 1)</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="200"><No.>200</No.><Funding Programme>CALF Construction</Funding Programme><LA>Cork City</LA><Scheme/Project Name>St Dominics, Middle Glanmire Road, Montenotte, Cork (Phase 1)</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="201"><No.>201</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Strawberry Hill, Blarney Street, Cork (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="202"><No.>202</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>Summerville Place, Sunday’s Well, Cork (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="203"><No.>203</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork City</LA><Scheme/Project Name>The Oaks, Frankfield, Douglas, Cork City (Phase 1)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="204"><No.>204</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Townsend Street, Skibbereen</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="205"><No.>205</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Beechgrove, Clonakilty</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="206"><No.>206</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Claragh Road, Millstreet</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="207"><No.>207</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Seafield, Bantry, </Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2018</On Site><Completed /></row>
<row _id="208"><No.>208</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Crann Ard, Fermoy</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2017</On Site><Completed /></row>
<row _id="209"><No.>209</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Sweetfields, Youghal</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="210"><No.>210</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Mill Road, Avoncore, Bloomfield, Midleton</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="211"><No.>211</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Mill Road, Avoncore, Bloomfield, Midleton</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="212"><No.>212</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Copper Point, Schull</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="213"><No.>213</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Millview Road, Kanturk</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="214"><No.>214</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Ard an Bhaile, Creggane, Buttevant</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="215"><No.>215</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Ballymacmoy, Killavullen, Co. Cork</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="216"><No.>216</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Meenane, Watergrasshill</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="217"><No.>217</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Crann Ard, Fermoy</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2017</On Site><Completed /></row>
<row _id="218"><No.>218</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Caherdaniel, Bantry</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="219"><No.>219</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>An Goritin Rua, Millstreet Road, Macroom</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="220"><No.>220</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lyraneag, Rockchapel,</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="221"><No.>221</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Eyeries, Castletownbere</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="222"><No.>222</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lios Ard, Ballyhooly</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="223"><No.>223</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Spa Glen,Ballyviniter, Mallow</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="224"><No.>224</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Drakes Point, Knocknagore, Crosshaven</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="225"><No.>225</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Caherdaniel, Bantry</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="226"><No.>226</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Caherdaniel, Bantry</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="227"><No.>227</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Abbeyfort, Kinsale</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="228"><No.>228</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Clarendon Brooks, Carrs Hill, Douglas</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="229"><No.>229</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Abbeyfort, Kinsale, Phase 2, Co. Cork</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="230"><No.>230</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Ard Cashel, Watergrasshill</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="231"><No.>231</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lios Ard, Ballyhooly</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="232"><No.>232</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Courtbrack, Tower</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="233"><No.>233</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Sweetfields, Youghal</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="234"><No.>234</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Crann Ard, Fermoy</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2017</On Site><Completed /></row>
<row _id="235"><No.>235</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>The Pastures, Charleville</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="236"><No.>236</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Meenane, Watergrasshill</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="237"><No.>237</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Meenane, Watergrasshill</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="238"><No.>238</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kilmoney, Carrigaline</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="239"><No.>239</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kilmoney, Carrigaline</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="240"><No.>240</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kilmoney, Carrigaline</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="241"><No.>241</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Meenane, Watergrasshill</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="242"><No.>242</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>The Meadows, Dunmanway, Co. Cork</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="243"><No.>243</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Sweetfields, Youghal</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="244"><No.>244</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Caherdaniel, Bantry</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="245"><No.>245</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Dromdiah Park, Killeagh Gardens, Killeagh</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="246"><No.>246</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Reanrour East, Bantry </Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="247"><No.>247</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>2A Glenview, Lyre, Banteer</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="248"><No.>248</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Cuirt Na Slini, Cloyne, East Cork </Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="249"><No.>249</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>81 Belmont Place, Cobh,</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="250"><No.>250</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Main St. Dunmanway</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="251"><No.>251</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Croke Place, Garranmacgarrett, Kilbrin, kanturk</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="252"><No.>252</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>High St., Sleaveen Hill, Macroom</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="253"><No.>253</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Aisling Gheal, Hospital Hill, Kanturk</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="254"><No.>254</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Carrig Rossa Phase 2, Rossmore</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="255"><No.>255</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Fana Na gCann, Co. Cork</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="256"><No.>256</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>3 Knockbrogan Park, Bandon</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="257"><No.>257</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>87 Belmont, Cobh</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="258"><No.>258</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Ard Na Greine, Cortmacsherry</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="259"><No.>259</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Beechgrove, Clonakilty</Scheme/Project Name><No. of Units>51</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="260"><No.>260</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Newtown House , Bantry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="261"><No.>261</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kilnagleary, Carrigaline (Phase 4)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="262"><No.>262</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Cork County</LA><Scheme/Project Name>49 Masseytown, Macroom</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="263"><No.>263</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kearney's field Dunmanway</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="264"><No.>264</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Richmond Court, Bandon</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="265"><No.>265</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Brigown Road, Mitchelstown</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="266"><No.>266</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Sleaveen East, Macroom</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="267"><No.>267</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Pound Lane, Kilworth </Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="268"><No.>268</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Knocknagown, Rylane</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="269"><No.>269</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Uplands (Phase 2), College Road,  Fermoy</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="270"><No.>270</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lissoran, Ballinspittle</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="271"><No.>271</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Convent Road, Doneraile</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="272"><No.>272</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kearney's field Dunmanway</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="273"><No.>273</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Chapel Lane, Ballydehob, Co. Cork</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="274"><No.>274</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Sleaveen East, Macroom</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="275"><No.>275</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Plás an Iarnróid (Railway Place), Old Barrack Road, Bantry, Co. Cork</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="276"><No.>276</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Coastguard Cottages, Lower Roads, Crosshaven, Co. Cork</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="277"><No.>277</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Ardmanagh, Schull</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="278"><No.>278</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>1-10 Vickerys Inn, New Street Bantry</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="279"><No.>279</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Main Street, Charleville, Co. Cork</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="280"><No.>280</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Mullavale, Castletownroche</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="281"><No.>281</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="282"><No.>282</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Masseytown, Macroom</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="283"><No.>283</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Baile Bhuire, Macroom</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Comhlacht Tithe Soisialta Agus ? Forbairt An Tsulain Teoranta</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="284"><No.>284</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Charleville, Church View, Love Lane, Charleville</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Charleville Care Project Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="285"><No.>285</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>St. Michaels, 36 Main Street, Bandon, Co. Cork</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Bandon Geriatric ? Community Council</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="286"><No.>286</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Distillery Lane, Distillery Walk, Midleton</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Midleton Lions Clubs Housing Association Limited</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="287"><No.>287</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Mardyke, Skibbereen</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="288"><No.>288</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Daniel O’Brien Terrace, Buttevant</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="289"><No.>289</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lisheen Field, Kilbarry Road, Dunmanway, Co. Cork</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="290"><No.>290</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Cork County</LA><Scheme/Project Name>8 Harbour Row, Cobh</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Óglaigh Náisiúnta na hÉireann (O.N.E.)</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="291"><No.>291</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Copper Point, Schull</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="292"><No.>292</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Kilmoney, Carrigaline</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="293"><No.>293</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lisgoold, An Tui </Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="294"><No.>294</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>The Pastures, Charleville</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="295"><No.>295</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Meenane, Watergrasshill</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="296"><No.>296</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Cork County</LA><Scheme/Project Name>The Pastures, Charleville</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="297"><No.>297</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Cascade Apartments, Castlelake, Carrigtwohill, Cork (Phase 1)</Scheme/Project Name><No. of Units>95</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="298"><No.>298</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="299"><No.>299</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 2)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="300"><No.>300</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Church Hill, Carrigaline, Co Cork (Phase 1)*</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="301"><No.>301</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Harbour Heights, Passage West, Co Cork (Phase 1)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="302"><No.>302</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Harbour Heights, Passage West, Co Cork (Phase 2)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="303"><No.>303</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Hazel View, Hazel Brooke, Spa Glen, Mallow, Co Cork (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="304"><No.>304</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Lough Beg, Loughbeg, Ringaskiddy, Cork (Phase 1)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="305"><No.>305</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Shambles Lane, Thomas Davis Street, Mallow, Co Cork (Phase 1)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="306"><No.>306</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Westview, Coolroe, Ballincollig, Co. Cork (Phase 2)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="307"><No.>307</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Cork County</LA><Scheme/Project Name>The Miles, Clonakilty (Phase 1)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="308"><No.>308</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Cork County</LA><Scheme/Project Name>The Miles, Clonakilty (Phase 2)</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="309"><No.>309</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Poundhill, Skibbereen (Phase 1)</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="310"><No.>310</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Poundhill, Skibbereen (Phase 2)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="311"><No.>311</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Oakwood, Macroom (Phase 1)</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="312"><No.>312</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Cork County</LA><Scheme/Project Name>Oakwood, Macroom (Phase 2)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="313"><No.>313</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>DLR</LA><Scheme/Project Name>Kilternan Close</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="314"><No.>314</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>DLR</LA><Scheme/Project Name>Kilternan Close</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="315"><No.>315</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>DLR</LA><Scheme/Project Name>George's Street Upper, Dun Laoghaire</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="316"><No.>316</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>DLR</LA><Scheme/Project Name>HazelBrook Square, Nutgrove, Churchtown</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="317"><No.>317</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>DLR</LA><Scheme/Project Name>Kilternan Close</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="318"><No.>318</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>DLR</LA><Scheme/Project Name>Dun Gaoithe, Sandyford, Dublin 18</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="319"><No.>319</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>DLR</LA><Scheme/Project Name>Ballyogan Square, Ballyogan</Scheme/Project Name><No. of Units>67</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="320"><No.>320</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>DLR</LA><Scheme/Project Name>Shanganagh Castle</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="321"><No.>321</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>DLR</LA><Scheme/Project Name>Shanganagh Castle</Scheme/Project Name><No. of Units>104</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="322"><No.>322</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>DLR</LA><Scheme/Project Name>Shanganagh Castle</Scheme/Project Name><No. of Units>61</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="323"><No.>323</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Park House, 66 George's Street, Dun Laoghaire</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="324"><No.>324</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Broadford Rise</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="325"><No.>325</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Ballyogan Avenue, Ballyogan</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="326"><No.>326</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>St. Laurence’s Park, Stillorgan, Co. Dublin</Scheme/Project Name><No. of Units>88</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="327"><No.>327</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Moyola Court, Churchtown Lower, Dublin 14</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="328"><No.>328</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Site at Roebuck Road, Clonskeagh, Dublin 14</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="329"><No.>329</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>37A Rollins Villas, Sallynoggin, Co. Dublin </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="330"><No.>330</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Old Coastguard Cottages, Coal Harbour, Harbour Road</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="331"><No.>331</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Cross Avenue, Dún Laoghaire, Co. Dublin</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="332"><No.>332</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>Infill Site Adjacent to 4 Rockville Drive, Glenamuck, Co. Dublin</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="333"><No.>333</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>DLR</LA><Scheme/Project Name>30 Obelisk Walk, Blackrock</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>St. John of God Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="334"><No.>334</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Ardilea Crescent, Ardilea, Clonskeagh, Dublin 14, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="335"><No.>335</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Ballybetagh Road, Kilternan, Co Dublin (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="336"><No.>336</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Cherrywood Town Centre, Dublin 18 (Phase 1)*</Scheme/Project Name><No. of Units>80</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="337"><No.>337</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Cherrywood Town Centre, Dublin 18 (Phase 2)*</Scheme/Project Name><No. of Units>61</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="338"><No.>338</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Egremont, Church Road, Killiney, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="339"><No.>339</No.><Funding Programme>CALF Construction</Funding Programme><LA>DLR</LA><Scheme/Project Name>Enniskerry Road, Sandyford, Dublin 18 (Phase 1)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="340"><No.>340</No.><Funding Programme>CALF Construction</Funding Programme><LA>DLR</LA><Scheme/Project Name>Enniskerry Road, Sandyford, Dublin 18 (Phase 2)</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="341"><No.>341</No.><Funding Programme>CALF Construction</Funding Programme><LA>DLR</LA><Scheme/Project Name>Enniskerry Road, Sandyford, Dublin 18 (Phase 3)</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="342"><No.>342</No.><Funding Programme>CALF Construction</Funding Programme><LA>DLR</LA><Scheme/Project Name>Enniskerry Road, Sandyford, Dublin 19 (Phase 1)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="343"><No.>343</No.><Funding Programme>CALF Construction</Funding Programme><LA>DLR</LA><Scheme/Project Name>Enniskerry Road, Sandyford, Dublin 19 (Phase 2)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="344"><No.>344</No.><Funding Programme>CALF Construction</Funding Programme><LA>DLR</LA><Scheme/Project Name>Enniskerry Road, Sandyford, Dublin 19 (Phase 3)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="345"><No.>345</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Johnstown Place,Johnstown Road, Cabinteely, Dublin 18 (Formerly Johnstown Court) (Phase 1)*</Scheme/Project Name><No. of Units>51</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="346"><No.>346</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Kiln View, Clay Farm Way, Leopardstown, Co Dublin (Phase 1)*</Scheme/Project Name><No. of Units>55</No. of Units><Approved Housing Body>The Iveagh Trust</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="347"><No.>347</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="348"><No.>348</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 2)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="349"><No.>349</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Oakton Court, Ballybrack, Co. Dublin (Phase 1)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="350"><No.>350</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Phase 2, Elmwood, Johnstown Road, Cabinteely, Dun Laoghaire, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>58</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="351"><No.>351</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>The Glen, Glenamuck Road, Carrickmines, Dublin 18 (Phase 1)*</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="352"><No.>352</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Whinsfield, Sandyford Road, Dublin 18 (Phase 1)</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="353"><No.>353</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Whinsfield, Sandyford Road, Dublin 18 (Phase 1)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="354"><No.>354</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Whinsfield, Sandyford Road, Dublin 18 (Phase 2)</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="355"><No.>355</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>DLR</LA><Scheme/Project Name>Whinsfield, Sandyford Road, Dublin 18 (Phase 2)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="356"><No.>356</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Rockytown, Buncrana (Phase 1)</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="357"><No.>357</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Drumrooske West</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="358"><No.>358</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Brookfield, Donegal Town</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="359"><No.>359</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Meadowfield, Convoy</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="360"><No.>360</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Donegal Road, Ballybofey</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="361"><No.>361</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Admiran, Stranorlar</Scheme/Project Name><No. of Units>52</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="362"><No.>362</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Rockview, Carrickboy, Ballyshannon</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="363"><No.>363</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Glencrow, Moville</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="364"><No.>364</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Ballyraine, Letterkenny</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="365"><No.>365</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Lough Fern Heights, Milford</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="366"><No.>366</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Brookfield, Donegal Town</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="367"><No.>367</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Brookfield, Donegal Town</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="368"><No.>368</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Meadowfield, Convoy</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="369"><No.>369</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Cnoc Ard, Carnamuggagh, Letterkenny</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="370"><No.>370</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Donegal</LA><Scheme/Project Name>SRD Loughanure Annagry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="371"><No.>371</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Donegal</LA><Scheme/Project Name>SRD Meenderrynasloe, Annagry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="372"><No.>372</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Knockamany Malin</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="373"><No.>373</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Largymore, Kilcar</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="374"><No.>374</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Donegal</LA><Scheme/Project Name>The Meadows, Buncrana</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="375"><No.>375</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Meadow Hill, Raphoe</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="376"><No.>376</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Long Lane, Letterkenny</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="377"><No.>377</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Pound Street, Dunfanaghy</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="378"><No.>378</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Railway Park, Drumrooske, Donegal Town</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="379"><No.>379</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Railway Park, Drumrooske, Donegal Town</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="380"><No.>380</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Trusk Road, Ballybofey</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="381"><No.>381</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Crana Crescent, Buncrana</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="382"><No.>382</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Drumacrin, Bundoran</Scheme/Project Name><No. of Units>42</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="383"><No.>383</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Gallow's Lane, Lifford</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="384"><No.>384</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Chapel Road, Dungloe</Scheme/Project Name><No. of Units>45</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="385"><No.>385</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Kilmacrennan, Letterkenny</Scheme/Project Name><No. of Units>34</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="386"><No.>386</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Glenrowan House, Drumkeen, Stranorlar</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Apex Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="387"><No.>387</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Cois Locha, Meenmore, Dungloe</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>County Donegal Parents and Friends Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="388"><No.>388</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Raphoe Road, Castlefinn</Scheme/Project Name><No. of Units>34</No. of Units><Approved Housing Body>Habinteg Housing Association (Ireland) Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="389"><No.>389</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Ard na Gréine, Glencar Scotch, Letterkenny, Co. Donegal  (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="390"><No.>390</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Donegal</LA><Scheme/Project Name>Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="391"><No.>391</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>O'Devaney Gardens - SH from Mixed Tenure Project</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="392"><No.>392</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>O'Devaney Gardens - SH from Mixed Tenure Project</Scheme/Project Name><No. of Units>115</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="393"><No.>393</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>O'Devaney Gardens - SH from Mixed Tenure Project</Scheme/Project Name><No. of Units>124</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="394"><No.>394</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>88-89 Drimnagh Road Dublin 12</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="395"><No.>395</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>St. Pancras, Harolds Cross, Dublin 6</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="396"><No.>396</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Belcamp B, Dublin 17</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="397"><No.>397</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Bunratty Road</Scheme/Project Name><No. of Units>78</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="398"><No.>398</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Bonham Street Dublin  8 </Scheme/Project Name><No. of Units>57</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="399"><No.>399</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Cork Street/Chamber Street Dublin 8</Scheme/Project Name><No. of Units>55</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="400"><No.>400</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Springvale Chapelizod Dublin 8</Scheme/Project Name><No. of Units>71</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="401"><No.>401</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Cromcastle &amp; Woodville, Coolock, Dublin 5</Scheme/Project Name><No. of Units>156</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="402"><No.>402</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Crumlin Road - Rafters Lane, Dublin 12</Scheme/Project Name><No. of Units>47</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="403"><No.>403</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>St. Andrews Court, Dublin 2</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="404"><No.>404</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Cornamona, Ballyfermot, Dublin 12</Scheme/Project Name><No. of Units>61</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="405"><No.>405</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Infirmary Road, Dublin 7</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="406"><No.>406</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>North King Street, - Sean Foster Place, Dublin 7</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="407"><No.>407</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>St. Finbar's Court, Kilkieran Road, Dublin 7</Scheme/Project Name><No. of Units>46</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="408"><No.>408</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Dominick Street (East side)</Scheme/Project Name><No. of Units>72</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2018</On Site><Completed /></row>
<row _id="409"><No.>409</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>O'Devaney Gardens - Phase 1A</Scheme/Project Name><No. of Units>56</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2018</On Site><Completed /></row>
<row _id="410"><No.>410</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Glin Court, Coolock, Dublin 17</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="411"><No.>411</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Kildonan Road</Scheme/Project Name><No. of Units>75</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="412"><No.>412</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Lands at Emmet Road</Scheme/Project Name><No. of Units>117</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="413"><No.>413</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>St. Anne's Court, All Saints Drive, Raheny, Dublin 5</Scheme/Project Name><No. of Units>102</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="414"><No.>414</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Dolphin House Phase 1b</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="415"><No.>415</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Dorset Street, Dublin 7</Scheme/Project Name><No. of Units>163</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="416"><No.>416</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Matt Talbot Court</Scheme/Project Name><No. of Units>92</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="417"><No.>417</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Constitution Hill Dublin 7</Scheme/Project Name><No. of Units>130</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="418"><No.>418</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Pearse House, Sandwith Street Lower, Dublin 2 (Blocks L,M,N &amp;P)</Scheme/Project Name><No. of Units>75</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="419"><No.>419</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Bluebell Phase 1A</Scheme/Project Name><No. of Units>140</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="420"><No.>420</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Liberties Cluster Phase 1, School Street, The Liberties, Dublin 8</Scheme/Project Name><No. of Units>115</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="421"><No.>421</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Oliver Bond House, Oliver Bond Street, Dublin 8</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="422"><No.>422</No.><Funding Programme>REGENERATION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Glovers Court, York Street, Dublin 2</Scheme/Project Name><No. of Units>49</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="423"><No.>423</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Block 70, The Plaza, Parkwest, Dublin 12 </Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="424"><No.>424</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Abbottstown Avenue, Finglas West, Dublin 11 </Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>North ? East Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="425"><No.>425</No.><Funding Programme>CAS CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>61 &amp; 63 Rathoath Avenue, Finglas, Dublin 11</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="426"><No.>426</No.><Funding Programme>CAS CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>88 Lower Drumcondra Road, Dublin 9 </Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="427"><No.>427</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>8 North Frederick Street, Dublin 1</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="428"><No.>428</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>190 -192 Moore Haven, Drumcondra Road Upper, Dublin 9.</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>DePaul Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="429"><No.>429</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Ellis Court, Dublin</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="430"><No.>430</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>180-187 Townsend Street, Dublin 2</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="431"><No.>431</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>26 New Street South, Dublin 8</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="432"><No.>432</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>55B Arbour Hill, Dublin 7</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Simon Community : Dublin Simon</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="433"><No.>433</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project </Scheme/Project Name><No. of Units>52</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="434"><No.>434</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Shaw Street, Dublin 2</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="435"><No.>435</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>13A Casement Drive, Finglas, Dublin 11</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="436"><No.>436</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Sarsfield Road, Ballyfermot, Dublin 10</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="437"><No.>437</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>25-26 Ushers Island Ushers Quay Dublin 8</Scheme/Project Name><No. of Units>0</No. of Units><Approved Housing Body>Simon Community : Dublin Simon</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="438"><No.>438</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Barnamore Grove, Finglas, Dublin 11</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="439"><No.>439</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>5-7 Halston Street, Dublin 7</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="440"><No.>440</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>307a Casement Road, Finglas, Co. Dublin </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="441"><No.>441</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Core 4, Block 4 Charlemont Square, Dublin 2</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="442"><No.>442</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>15 Richmond Avenue, Dublin 3 (Phase 1)</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="443"><No.>443</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>25-27 Bow Lane West, Dublin 8 (Phase 1)</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="444"><No.>444</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Aughrim Street, Stoneybatter, Dublin 7 (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="445"><No.>445</No.><Funding Programme>CALF Construction</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)</Scheme/Project Name><No. of Units>62</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="446"><No.>446</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Blackbanks Vie5w, 754 Howth Road, Raheny, Dublin  (Phase 1)*</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="447"><No.>447</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Bluebell Avenue, Bluebell, Dublin 12 (Phase 1)*</Scheme/Project Name><No. of Units>52</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="448"><No.>448</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Camac Park, Bluebell, Dublin 12 (Phase 1)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="449"><No.>449</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*</Scheme/Project Name><No. of Units>65</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="450"><No.>450</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Chanel Manor, Coolock, Dublin 5 (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="451"><No.>451</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Charlemont Gate, Griffith Avenue, Dublin 9 (Phase 1)*</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="452"><No.>452</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Clonshaugh Road, Clonshaugh, Dublin 17 (Phase 1)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>North and East Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="453"><No.>453</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Connaught Street, Phibsborough, Dublin 7 (Phase 1)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="454"><No.>454</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Donnybrook Gardens, Lands of Greenfield Park, Donnybrook, Dublin 4 (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>RHD Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="455"><No.>455</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Elanora Court, Long Mile Road, Walkinstown, Dublin 12 (Phase 1)*</Scheme/Project Name><No. of Units>153</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="456"><No.>456</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Newtown Cottages Malahide Road Coolock Dublin 17 (Phase 1)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="457"><No.>457</No.><Funding Programme>CALF Construction</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>North Great Charles Street, Dublin 1 (Phase 1)</Scheme/Project Name><No. of Units>52</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q4-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="458"><No.>458</No.><Funding Programme>CALF Construction</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>North King Street, Dublin 7  (Phase 1)</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="459"><No.>459</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Park West Campus, Kileen Road, Dublin 12 (Phase 1)</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="460"><No.>460</No.><Funding Programme>CALF Construction</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Railway Street, Dublin 1
 (Phase 1)</Scheme/Project Name><No. of Units>47</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="461"><No.>461</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Ravensdale Court, Kimmage, Dublin 12. (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="462"><No.>462</No.><Funding Programme>CALF Construction</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Sean Mc Dermott Street, Dublin 1 (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Simon Community: Dublin Simon</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="463"><No.>463</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>St Canice’s Hall, Ballygall Road West, Finglas, Dublin 11 (Phase 1)*</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="464"><No.>464</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 1)</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Ayrfield, Malahide Road</Scheme/Project Name><No. of Units>150</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="465"><No.>465</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 3)</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Ready Mix Site, East Wall, Dublin 3</Scheme/Project Name><No. of Units>68</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Q4-2021</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="466"><No.>466</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 3)</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Shangan Road, Ballymun, Dublin 9*</Scheme/Project Name><No. of Units>93</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Q4-2021</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="467"><No.>467</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 3)</Funding Programme><LA>Dublin City</LA><Scheme/Project Name>Collins Avenue, Whitehall, Dublin 9</Scheme/Project Name><No. of Units>83</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Q4-2021</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="468"><No.>468</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Killhedge Lane, Dun Emer, Lusk</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="469"><No.>469</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Ballymastone, Donabate</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="470"><No.>470</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Ballymastone, Donabate</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="471"><No.>471</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Ballymastone, Donabate</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="472"><No.>472</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Ballymastone, Donabate</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="473"><No.>473</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Outlands, Rathbeale Road, Swords</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="474"><No.>474</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Tucketts Lane, Howth</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="475"><No.>475</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Wellview</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="476"><No.>476</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Cappaghfinn, Cappagh Road Finglas - Phase 3</Scheme/Project Name><No. of Units>69</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="477"><No.>477</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Church Fields, Phase 2B, Mulhuddart, Dublin 15.</Scheme/Project Name><No. of Units>67</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="478"><No.>478</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Ballough PLace (Leonards Garage), Lusk</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="479"><No.>479</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Katie Hunt's Cottage, Church Road, Lusk</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="480"><No.>480</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>North Street, Swords</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="481"><No.>481</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>St Ita's, Portrane Avenue, Protrane, Co. Dublin</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="482"><No.>482</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Fingal</LA><Scheme/Project Name>44 Alderwood, Hollystown Dublin 15</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Marillac Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="483"><No.>483</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Abbeyglen, 47 Dublin Road, Swords</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Praxis Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="484"><No.>484</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Killhedge Lane Dun Emer</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="485"><No.>485</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>22 College Street, Baldoyle</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="486"><No.>486</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Fingal</LA><Scheme/Project Name>63 Hollystown Park, Holystown, Dublin 15</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Daughters Of Charity Of St Vincent De Paul</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="487"><No.>487</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Bellingsmore, Hollywoodrath, Dublin 15  (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="488"><No.>488</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Bellingsmore, Hollywoodrath, Dublin 15  (Phase 2)</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="489"><No.>489</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Beresford, Oakstown, Donabate, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="490"><No.>490</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Beresford, Oakstown, Donabate, Co. Dublin (Phase 2)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="491"><No.>491</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Blackwood Square, Northwood Avenue, Santry Dublin 9 (Phase 1)*</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="492"><No.>492</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Carrs Lane, Malahide Road, Dublin 17 (Phase 1)*</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="493"><No.>493</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Carrs Lane, Malahide Road, Dublin 17 (Phase 2)*</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="494"><No.>494</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Charlestown Centre, Charlestown Place &amp; St., Margarets Road, Dublin 11 (Phase 1)*</Scheme/Project Name><No. of Units>90</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="495"><No.>495</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Charlestown Centre, Charlestown Place &amp; St., Margarets Road, Dublin 11 (Phase 2)*</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="496"><No.>496</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 2)*</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="497"><No.>497</No.><Funding Programme>CALF Construction</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Ladyswell Road &amp; Church Road, Mulhuddart, Dublin 15  (Phase 1)</Scheme/Project Name><No. of Units>65</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="498"><No.>498</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Lusk Village, Lusk, Co. Dublin, Phase 2  (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="499"><No.>499</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Lusk Village, Lusk, Co. Dublin, Phase 2  (Phase 2)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="500"><No.>500</No.><Funding Programme>CALF Construction</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Old Coolock Lane, Santry, Dublin 9 (Phase 1)</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2019</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="501"><No.>501</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Old Corduff Road, Blanchardstown, Dublin 15 (Phase 2)*</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="502"><No.>502</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Oldtown, Swords, Co Dublin (Phase 1)</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="503"><No.>503</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Oldtown, Swords, Co Dublin (Phase 2)</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="504"><No.>504</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Oldtown, Swords, Co Dublin (Phase 3)</Scheme/Project Name><No. of Units>39</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="505"><No.>505</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Riverwood Square, Porterstown, Dublin 15 (Phase 1)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="506"><No.>506</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Semple Woods, Donabate, Co. Dublin (Phase 2)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="507"><No.>507</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>St Josephs, Clonsilla, Dublin 15 (Phase 1)*</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="508"><No.>508</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="509"><No.>509</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Fingal</LA><Scheme/Project Name>Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="510"><No.>510</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Garraí Caol, (Coast Road Site) Dublin Road</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="511"><No.>511</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Garraí Caol, (Coast Road Site) Dublin Road</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="512"><No.>512</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>An Cliathán, Old Monivea Road, Ballybaan Mór</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="513"><No.>513</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Garraí Beag, Monivea Road, Ballybaan More</Scheme/Project Name><No. of Units>58</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="514"><No.>514</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Headford Road, Castlegar</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="515"><No.>515</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Keeraun, Ballymoneen Road</Scheme/Project Name><No. of Units>63</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="516"><No.>516</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Tirellan Heights, Headford Road</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="517"><No.>517</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Merlin Park Lands, Galway City</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="518"><No.>518</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>1 Munster Avenue, Galway city</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="519"><No.>519</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Clybaun Road, Knocknacarra</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="520"><No.>520</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Cul Garrai, Rahoon</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Peter Triest Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="521"><No.>521</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Doughiska, Galway City</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="522"><No.>522</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway City</LA><Scheme/Project Name>111 Upper Newcastle Road, Galway City</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Simon Community : North West Simon</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="523"><No.>523</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Ballybanemor Road, Ballybrit, Galway (Phase 1)*</Scheme/Project Name><No. of Units>52</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="524"><No.>524</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Ballybanemor Road, Ballybrit, Galway (Phase 2)</Scheme/Project Name><No. of Units>49</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="525"><No.>525</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Briar Hill, Old Monivea Road, Ballybrit, Galway (Phase 1)</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="526"><No.>526</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Creig Ard, Roscam, Galway City  (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="527"><No.>527</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Creig Ard, Roscam, Galway City, Co. Galway (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="528"><No.>528</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Cuirt Bhoirne, Roscam, Co Galway (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="529"><No.>529</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Fanan, Letteragh Road, Galway (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="530"><No.>530</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Fanan, Letteragh Road, Galway (Phase 2)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="531"><No.>531</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Fanan, Letteragh Road, Galway (Phase 3)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="532"><No.>532</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Gaelcarrig, Letteragh, Galway City (Phase 1)*</Scheme/Project Name><No. of Units>83</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="533"><No.>533</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Garrai Sheain, Roscam, Galway (Phase 1)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="534"><No.>534</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Glenn Na Mona, Ballymoneen Road, Kncoknacarra, Galway (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="535"><No.>535</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Leana Mor, Cappagh Road, Galway (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="536"><No.>536</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Leana Mor, Cappagh Road, Galway (Phase 2)*</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="537"><No.>537</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Letteragh Road, Rahoon, Galway City (Phase 1)*</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="538"><No.>538</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Letteragh Road, Rahoon, Galway City (Phase 2)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="539"><No.>539</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Ballyburke (Phase 1)</Scheme/Project Name><No. of Units>56</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="540"><No.>540</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Galway City</LA><Scheme/Project Name>Ballyburke (Phase 2)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="541"><No.>541</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Kylebroughlan, Moycullen </Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="542"><No.>542</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Kylebroughlan, Moycullen </Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="543"><No.>543</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Garraí Mhic Aodha, Tubber Road, Gort</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="544"><No.>544</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Tullahill, Loughrea</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="545"><No.>545</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Limehill, Dunlo, Ballinasloe (Corrán Eiscir Riada)</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="546"><No.>546</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Garraí Mhic Aodha, Tubber Road, Gort</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="547"><No.>547</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cullairbaun, Athenry</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="548"><No.>548</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Limehill, Dunlo, Ballinasloe (Corrán Eiscir Riada)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="549"><No.>549</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Garraí Glas, Ballydavid South, Athenry</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="550"><No.>550</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cullairbaun, Athenry</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="551"><No.>551</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Circular Road &amp; Dublin Road, Tuam</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="552"><No.>552</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cullairbaun, Athenry</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="553"><No.>553</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cullairbaun, Athenry</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="554"><No.>554</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Kilgarve, Ballinasloe</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="555"><No.>555</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Claremount, Oughterard</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="556"><No.>556</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Corralough, Williamstown (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="557"><No.>557</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Dunlo Hill, Ballinasloe</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="558"><No.>558</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Weir Road, Tuam</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="559"><No.>559</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Gort na gCloch, Hospital Road, Clifden</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="560"><No.>560</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Bridge Court, Ahascragh, Ballinasloe</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="561"><No.>561</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Caisleán Raithlín, Ardrahan</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="562"><No.>562</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Barrack Street, Loughrea</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="563"><No.>563</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Garraí Ghuaire, Cartron, Kinvara</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="564"><No.>564</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Fana Bhuí, Tuam</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="565"><No.>565</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cnoc na Carraige, Roundstone</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="566"><No.>566</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Ballyglass, Ardrahan (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="567"><No.>567</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Woodpark, Portumna (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="568"><No.>568</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Carrowmore West, Clontuskert, Ballinasloe (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="569"><No.>569</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Woodfield, Dunmore (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="570"><No.>570</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Knockaloura West, Brownsgrove, Tuam (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="571"><No.>571</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Creggaturlough, Craughwell (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="572"><No.>572</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Gort na gCloch, Hospital Road, Clifden</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="573"><No.>573</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Fana Bhuí, Tuam</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="574"><No.>574</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Fana Bhuí, Tuam</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="575"><No.>575</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Ballymoe</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="576"><No.>576</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Droim na Gaoithe, Baile Chláir (Claregalway)</Scheme/Project Name><No. of Units>45</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="577"><No.>577</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cosmona, Loughrea</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="578"><No.>578</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Barkhill, Woodford</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="579"><No.>579</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>St. Joseph's, Ballinasloe</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="580"><No.>580</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Letterfrack (Phase 2)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="581"><No.>581</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Rossaveal Cottages, Ros a Mhíl, South Connemara</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tearmann Eanna Teoranta</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2016, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="582"><No.>582</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Eanach Mheain, Carraroe</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Tearmann Eanna Teoranta</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2018, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="583"><No.>583</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Mountbellew</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="584"><No.>584</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Springfield, Parkmore, Ballinasloe</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Peter Triest Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="585"><No.>585</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Shannon Road, Portumna</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Carraig Dubh Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="586"><No.>586</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Gort an Choirce, Tubber Road, Gort</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="587"><No.>587</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cuirt Dun Leo, Dunlo, Ballinasloe, Co Galway (Phase 1)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="588"><No.>588</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Cuirt Dun Leo, Dunlo, Ballinasloe, Co Galway (Phase 2)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="589"><No.>589</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Gort na Fuinse, Headford, Co. Galway (Phase 1)*</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="590"><No.>590</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Gort na Fuinse, Headford, Co. Galway (Phase 2)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="591"><No.>591</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Oranhill, Oranmore, Co. Galway (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="592"><No.>592</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Riveroaks, Claregalway, Co Galway  (Phase 2)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="593"><No.>593</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Riveroaks, Claregalway, Co Galway  (Phase 3)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="594"><No.>594</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Galway County</LA><Scheme/Project Name>Weir road, Tuam, Co. Galway (Phase 1)*</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="595"><No.>595</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Rock Rd., Killarney</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="596"><No.>596</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Glannagilliagh, Caragh Lake, Killorglin (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="597"><No.>597</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Cnoc an Cairn, Chapel Lane, Dingle</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="598"><No.>598</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kerry</LA><Scheme/Project Name>The Green, Ballinageragh, Lixnaw, Co Kerry</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="599"><No.>599</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Carrigcannon, Lyreacrumpane (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="600"><No.>600</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Rahinnane, Ventry (SRD)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="601"><No.>601</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Rathmore/Barraduff</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="602"><No.>602</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Glenach, Ballybunion</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="603"><No.>603</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Lohercannon, Tralee</Scheme/Project Name><No. of Units>61</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="604"><No.>604</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Cullenagh Upper, Beaufort</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="605"><No.>605</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Farranwilliam, Ardfert</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="606"><No.>606</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Ballyrickard, Tralee</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="607"><No.>607</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Croogorts, Tralee (Cruaghoirt)</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="608"><No.>608</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Gortamullin, Kenmare (Phase 4)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="609"><No.>609</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Baile an Gharraí, Lixnaw (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="610"><No.>610</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Woodview Place, Tarbert</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="611"><No.>611</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Marconi South, Ballybunion (Glór na Toinne)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="612"><No.>612</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Rahoonane, Tralee (New Site)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="613"><No.>613</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Rusheen, Ballylongford (Carraig an Phoill)</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="614"><No.>614</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Gortamullin, Kenmare (Phase 5) (Ard Bhearna)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="615"><No.>615</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Matt Talbot Road, Tralee</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="616"><No.>616</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Locke's Shop, Mitchel's Rd, Tralee</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="617"><No.>617</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Marian Terrace, Ballyheigue</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="618"><No.>618</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Bridge Rd, Abbeydorney</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="619"><No.>619</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Hawley Park Apartments, Tralee</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="620"><No.>620</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Garryruth, Tralee, Co Kerry</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="621"><No.>621</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>SRD at Emlaghmore, Caherciveen, Co Kerry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="622"><No.>622</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>SRD at Garfinny, Dingle, Co Kerry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="623"><No.>623</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>SRD at Gortadrislig, Lixnaw, Co Kerry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="624"><No.>624</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>SRD at Kells, Caherciveen, Co Kerry</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="625"><No.>625</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Ballybeg, Dingle, Co Kerry</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="626"><No.>626</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Firies Hall, Firies</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="627"><No.>627</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Firies Hall, Firies</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="628"><No.>628</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Ardmoneel, Killorglin, Co. Kerry</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>St. John of God Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="629"><No.>629</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Armagh House, Killarney</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="630"><No.>630</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Chamfers Place (Mitchels road, Tralee)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="631"><No.>631</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Apts 52-66 Fels Point, Dan Spring Road, Tralee, Co Kerry (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="632"><No.>632</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 1)</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="633"><No.>633</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 2)*</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="634"><No.>634</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Barraduff, Killarney, Co Kerry (Phase 1)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="635"><No.>635</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Barraduff, Killarney, Co. Kerry (Phase 4)*</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="636"><No.>636</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Cahirdown Wood, Listowel, Co. Kerry (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="637"><No.>637</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Cahirdown Wood, Listowel, Co. Kerry (Phase 2)</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="638"><No.>638</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 1)</Scheme/Project Name><No. of Units>39</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="639"><No.>639</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Dun Alainn, Listowel, Co. Kerry (Phase 1)*</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="640"><No.>640</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name> Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 4)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="641"><No.>641</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Hunters Lodge, Hunters Wood, Ballyseedy, Tralee, Co. Kerry (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="642"><No.>642</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="643"><No.>643</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 2)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="644"><No.>644</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 3)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="645"><No.>645</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Lios Ard, Lisloose, Tralee, Co. Kerry (Phase 1)</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="646"><No.>646</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Moanmore, Pound Road, Castleisland, Co. Kerry (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="647"><No.>647</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kerry</LA><Scheme/Project Name>Orglan Heights, Ardmoneel, Killorglin (Phase 1)*</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="648"><No.>648</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Willows, Allenwood</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="649"><No.>649</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Fitzgerald Close, Greenfield, Maynooth</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="650"><No.>650</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Coolaghknock Green, Kildare Town</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="651"><No.>651</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Abbotsfield, Clane</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="652"><No.>652</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Old Mill Race, Monasterevin</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="653"><No.>653</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Hemmingway Park, Clane</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="654"><No.>654</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Hemmingway Park, Clane</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="655"><No.>655</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Coolaghknock Green, Kildare Town</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="656"><No.>656</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Newtown, Ardclough Rd, Celbridge</Scheme/Project Name><No. of Units>49</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="657"><No.>657</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Kildare Road, Rathangan</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="658"><No.>658</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Abbotsfield, Clane</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="659"><No.>659</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Willows, Allenwood</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="660"><No.>660</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Fitzgerald Close, Greenfield, Maynooth</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="661"><No.>661</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Williams Grove, Ardclough</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="662"><No.>662</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Millstream Court, Kilcullen</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="663"><No.>663</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Patrician Avenue, Naas</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="664"><No.>664</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Kildare</LA><Scheme/Project Name>25 St. Corbans Place, Naas </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="665"><No.>665</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Old Greenfield Road, Maynooth</Scheme/Project Name><No. of Units>65</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="666"><No.>666</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Athgarvan Village</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="667"><No.>667</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Newtown House, Leixlip</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="668"><No.>668</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Coill Dubh</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="669"><No.>669</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Ardclough Road, Celbridge</Scheme/Project Name><No. of Units>39</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="670"><No.>670</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Ambassador Site, Kill</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="671"><No.>671</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Carbury</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="672"><No.>672</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>St. Evins Park Monasterevin</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="673"><No.>673</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Castle Park, Athy</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="674"><No.>674</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Old Caragh Road, Nass</Scheme/Project Name><No. of Units>58</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="675"><No.>675</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Craddockstown, Naas</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>KARE Promoting Inclusion for People with Intellectual Disabilities</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2018, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="676"><No.>676</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>El Kantara, Newbridge</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>KARE Promoting Inclusion for People with Intellectual Disabilities</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="677"><No.>677</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Jigginstown House, Naas</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Homeless Care Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="678"><No.>678</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>St. John's Convent, New Street, Rathangan</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="679"><No.>679</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Dominican Lands, Athy</Scheme/Project Name><No. of Units>34</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="680"><No.>680</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>1 unit, Loughlion Green, Kildare Town (Phase 1)</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="681"><No.>681</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>15 units, Ledwill Park, Kilcock, Co. Kildare (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="682"><No.>682</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>2 units, Ledwill Park, Kilcock, Co. Kildare (Phase 1)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="683"><No.>683</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Belin Woods, Newbridge, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="684"><No.>684</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Belin Woods, Newbridge, Co. Kildare (Phase 2)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="685"><No.>685</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Belin Woods, Newbridge, Co. Kildare (Phase 3)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="686"><No.>686</No.><Funding Programme>CALF Construction</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="687"><No.>687</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 2)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="688"><No.>688</No.><Funding Programme>CALF Construction</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="689"><No.>689</No.><Funding Programme>CALF Construction</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Flinters Field (Phase 2), Athy, Co. Kildare (Phase 2)</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="690"><No.>690</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Grand Canal Wood, Allenwood, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="691"><No.>691</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Grand Canal Wood, Allenwood, Co. Kildare (Phase 2)</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="692"><No.>692</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Kilbelin Abbey, Kildare, Phase 1 (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="693"><No.>693</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Kilbelin Abbey, Kildare, Phase 2 (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="694"><No.>694</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Ledwill Park, Kilcock, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="695"><No.>695</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Ledwill Park, Kilcock, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="696"><No.>696</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Leinster Square, Dublin Street, Kildare Town, Co Kildare (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="697"><No.>697</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Loughlion, Kildare Town, Kildare (Phase 3)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="698"><No.>698</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Loughlion, Kildare Town, Kildare (Phase 4)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="699"><No.>699</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Loughlion, Kildare Town, Kildare (Phase 5)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="700"><No.>700</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Main Street, Prosperous, Clane, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="701"><No.>701</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Mariavilla, Maynooth, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="702"><No.>702</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Melitta Road, Co. Kildare (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="703"><No.>703</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="704"><No.>704</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 2)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="705"><No.>705</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Newtown, Kill, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="706"><No.>706</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Newtown, Kill, Co. Kildare (Phase 2)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="707"><No.>707</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Old Dublin Road, Celbridge, Co. Kildare (Phase 1)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="708"><No.>708</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>64</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="709"><No.>709</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Paddocks, Morristown, Newbridge, Kildare (Phase 3)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="710"><No.>710</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Paddocks, Newbridge, Kildare  (Phase 1)</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="711"><No.>711</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Paddocks, Newbridge, Kildare  (Phase 2)</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="712"><No.>712</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="713"><No.>713</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>The Vestry, Glebelands, Athy, Co. Kildare (Phase 3) (Phase 1)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="714"><No.>714</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Westfield, Leixlip, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="715"><No.>715</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Whitethorn, Naas, Co. Kildare (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="716"><No.>716</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Whitethorn, Naas, Co. Kildare (Phase 2)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="717"><No.>717</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Whitethorn, Naas, Co. Kildare (Phase 3)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="718"><No.>718</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Butterstream, Clane</Scheme/Project Name><No. of Units>77</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="719"><No.>719</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 3)</Funding Programme><LA>Kildare</LA><Scheme/Project Name>Ardrew, Athy, Co. Kildare</Scheme/Project Name><No. of Units>73</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Q4-2021</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="720"><No.>720</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Shanganny, Jenkinstown</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="721"><No.>721</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>New Road, Mooncoin</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="722"><No.>722</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Chapel Street, Mooncoin</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="723"><No.>723</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Pennefeather Court, Hebron Road, Kilkenny</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="724"><No.>724</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Pennefeather Green, Hebron Road, Kilkenny</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="725"><No.>725</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Blackwater Grove, Kilmacow</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="726"><No.>726</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Limegrove, Ferrybank</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="727"><No.>727</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Piltown, Kilkenny</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="728"><No.>728</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Limegrove, Ferrybank</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="729"><No.>729</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Marnellsmeadows, Callan Road, Kilkenny</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="730"><No.>730</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Abbeygate, Ferrybank, Co. Kilkenny</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="731"><No.>731</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Inchacarron, Mullinavat</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="732"><No.>732</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Ayrfield, Granges Road, Kilkenny</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="733"><No.>733</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Old Fire Station, Graiguenamanagh</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="734"><No.>734</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Ayrfield, Granges Road, Kilkenny</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="735"><No.>735</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Haggardsgreen, Callan</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="736"><No.>736</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>18 Wolfe Tone Street, Kilkenny</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="737"><No.>737</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>10 Golf Links Road, Kilkenny</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="738"><No.>738</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Station Road, Ballyragget</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="739"><No.>739</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Donaguile, Castlecomer</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="740"><No.>740</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>The Broguemaker, Kilkenny</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="741"><No.>741</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Ladywell, Thomastown, Co. Kilkenny</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="742"><No.>742</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Crokers Hill, Kennyswell Road, Kilkenny</Scheme/Project Name><No. of Units>88</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="743"><No.>743</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Canal Road, Johnstown, Co. Kilkenny Project 1</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="744"><No.>744</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Canal Road Johnstown Project 2</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="745"><No.>745</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Canal Road Johnstown Project 3</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="746"><No.>746</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Ladywell, Newtown, Thomastown</Scheme/Project Name><No. of Units>33</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="747"><No.>747</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Weather Station, Granges Road, Kilkenny</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="748"><No.>748</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Tinnypark, Callan Road, Kilkenny</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>SOS Kilkenny Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="749"><No.>749</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>70-71 Upper Patrick Street, Kilkenny</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clanmill Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="750"><No.>750</No.><Funding Programme>CAS CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Miltown Lodge Phase 2, Johnswell Road, Kilkenny</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>SOS Kilkenny Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="751"><No.>751</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>The Round House, Kells, Co. Kilkenny</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>SOS Kilkenny Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="752"><No.>752</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Kingsriver, Ennisnag</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Kingsriver Housing Association Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="753"><No.>753</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>8/9 Kilkenny Street, Castlecomer</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Good Shepherd Services Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="754"><No.>754</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>19/21 Blackmill Street, Kilkenny</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Good Shepherd Services Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="755"><No.>755</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Brother Thomas Place, Church Lane, Kilkenny</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Good Shepherd Services Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="756"><No.>756</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Grennan Villa, Thomastown</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Camphill Communities of Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="757"><No.>757</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Prague House Hall, Freshford, Co. Kilkenny</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Kilkenny Voluntary Housing Association</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="758"><No.>758</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Pennefeather Green, Hebron Road, Kilkenny</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="759"><No.>759</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Cois Na Bearu, Graiguenemanagh, Kilkenny (Phase 1)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="760"><No.>760</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Margaret’s Field, Callan Road, Kilkenny City (Phase 1)</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="761"><No.>761</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Nuncio Road, Kilkenny (Phase 2)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2018</On Site><Completed /></row>
<row _id="762"><No.>762</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Kilkenny</LA><Scheme/Project Name>Orchard Close, Kilkenny (Phase 1)*</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="763"><No.>763</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Laois</LA><Scheme/Project Name>Coolroe, Ballybrittas</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="764"><No.>764</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>Priory, Borris in Ossory</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="765"><No.>765</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>Church Avenue, Stradbally</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="766"><No.>766</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>Bruach Na Habhainn, Killeen, Maganey</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="767"><No.>767</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Orchard, Ballylynan</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="768"><No.>768</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>Market Square, Portarlington</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="769"><No.>769</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Orchard, Ballylynan</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="770"><No.>770</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>Church Avenue, Stradbally</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="771"><No.>771</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>Bruach Na Habhainn, Killeen, Maganey</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="772"><No.>772</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Orchard, Ballylynan</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="773"><No.>773</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Laois</LA><Scheme/Project Name>Ballyadams</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="774"><No.>774</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Laois</LA><Scheme/Project Name>Oldcourt Ballylynan</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="775"><No.>775</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Moore Street, Rathdowney</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="776"><No.>776</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Ballymorris Road, Portarlington</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="777"><No.>777</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Gleann na Glaise, Ballyroan</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="778"><No.>778</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Pattison Est. Mountmellick</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="779"><No.>779</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Shannon Street, Mountrath</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="780"><No.>780</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Harbour Court, Mountmellick</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="781"><No.>781</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Mooreville, Rathdowney</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="782"><No.>782</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Sean Doire, Cork Road, Durrow</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="783"><No.>783</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>St Kieran's Park, Errill</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="784"><No.>784</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Clonrooske, Knockmay</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="785"><No.>785</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Carraig Glas, Stradbally</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="786"><No.>786</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Iona,Abbeyleix Rd., Portlaoise</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="787"><No.>787</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Doonane</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="788"><No.>788</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Durrow</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="789"><No.>789</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>Presentation Convent &amp; Lands, Portlaoise, </Scheme/Project Name><No. of Units>51</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="790"><No.>790</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Laois</LA><Scheme/Project Name>County Hotel, Portlaoise</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="791"><No.>791</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Ballymorris Green, Portarlington, Co Laois (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="792"><No.>792</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Ballymorris Green, Portarlington, Co Laois (Phase 2)</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="793"><No.>793</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Ballymorris Green, Portarlington, Co Laois (Phase 3)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="794"><No.>794</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Bellingham, Portlaoise
 (Phase 4)*</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="795"><No.>795</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Bellingham, Portlaoise
 (Phase 5)*</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="796"><No.>796</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Borris Road, Portlaoise, Co. Laois (Phase 4)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="797"><No.>797</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Clonroosk Abbey, Portlaoise, Co. Laois (Phase 1)*</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2018</On Site><Completed /></row>
<row _id="798"><No.>798</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Clonroosk Abbey, Portlaoise, Co. Laois (Phase 2)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2018</On Site><Completed /></row>
<row _id="799"><No.>799</No.><Funding Programme>CALF Construction</Funding Programme><LA>Laois</LA><Scheme/Project Name>Curragh na Mona, Abbeyleix Rd, Portlaoise, Co. Laois (Phase 1)</Scheme/Project Name><No. of Units>39</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="800"><No.>800</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Doirinn Alainn, Ballylynan, Co. Laois (Phase 3)*</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>North and East Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="801"><No.>801</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Droughill Lawn, Portarlington, Co. Laois (Phase 1)*</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Oaklee Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="802"><No.>802</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Goldencroft, Portlaoise, Co. Laois (Phase 1)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="803"><No.>803</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Goldencroft, Portlaoise, Co. Laois (Phase 2)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="804"><No.>804</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Goldencroft, Portlaoise, Co. Laois (Phase 3)</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="805"><No.>805</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Harpurs Lane, Portlaoise, Co. Laois (Phase 1)*</Scheme/Project Name><No. of Units>44</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="806"><No.>806</No.><Funding Programme>CALF Construction</Funding Programme><LA>Laois</LA><Scheme/Project Name>Hepburn Court, Ballyfin Rd, Maryborough, Portlaoise, Co. Laois (Phase 1)</Scheme/Project Name><No. of Units>54</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="807"><No.>807</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Holdbrook, Portlaoise, Co. Laois (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="808"><No.>808</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Holdbrook, Portlaoise, Co. Laois (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2018</On Site><Completed /></row>
<row _id="809"><No.>809</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="810"><No.>810</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Phase 2 The Glen, Kilnacourt, Portarlington, Co Laois (Phase 1)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="811"><No.>811</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Phase 3 The Glen, Kilnacourt, Portarlington, Co Laois. (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="812"><No.>812</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>Rathillion, Killeshin, Co. Laois (Phase 1)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="813"><No.>813</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>South Dublin Road, Portlaoise, Co. Laois (Phase 1)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="814"><No.>814</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>South Dublin Road, Portlaoise, Co. Laois (Phase 2)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="815"><No.>815</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>South Dublin Road, Portlaoise, Co. Laois (Phase 3)*</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="816"><No.>816</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 1)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="817"><No.>817</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 2)*</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="818"><No.>818</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Meadows, Mountrath Road, Portlaoise, Co. Laois (Phase 1)*</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="819"><No.>819</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Laois</LA><Scheme/Project Name>The Springs, Kilminchy, Portlaoise, Co Laois (Phase 1)*</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="820"><No.>820</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Church Lane, Ballinamore</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="821"><No.>821</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Druminshingore, Newtowngore</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="822"><No.>822</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Carraig Breac, Drumshanbo</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="823"><No.>823</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Ard na Drise, Mohill</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="824"><No.>824</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Lough Meen Estate, Drumkeerin</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="825"><No.>825</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Commons Lane, Manorhamilton</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="826"><No.>826</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Cluain Oir, Liscara, Carrick on Shannon</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="827"><No.>827</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Manorhamilton &amp; Carrigallen</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="828"><No.>828</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Lisnagot, Carrick on Shannon, Co. Leitrim</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="829"><No.>829</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Breffni Cres., 53 St. Patricks Park Site, Carrick on Shannon</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="830"><No.>830</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Dromahair Td., Dromahair</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="831"><No.>831</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Sean McDermott St., Manorhamilton</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="832"><No.>832</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Autumn View, Summerhill, Carrick on Shannon</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="833"><No.>833</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Taobh Tire, Manorhamilton (Phase 3)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="834"><No.>834</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Pairceanna an Bhaile, Townparks, Carrick on Shannon</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="835"><No.>835</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Lahard, Ballinamore</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="836"><No.>836</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Kilboderry Td., Carrick on Shannon</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="837"><No.>837</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Pairceanna an Bhaile, Townparks, Carrick on Shannon</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="838"><No.>838</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Leitrim</LA><Scheme/Project Name>Druminshingore Td., Newtowngore</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="839"><No.>839</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Redgate Close, Old Cratloe Road, Limerick City</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="840"><No.>840</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Gortboy, Charleville Road, KiImallock</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="841"><No.>841</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Knocklong</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="842"><No.>842</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Gortboy, Charleville Road, KiImallock</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="843"><No.>843</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Broad Street, Limerick</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="844"><No.>844</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Laurelville, Mill Rd, Corbally, Limerick</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="845"><No.>845</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Woodfield Manor, Cloonyscrehane, Newcastlewest, Co Limerick</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="846"><No.>846</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Lot 2 Derelict Sites, Limerick</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="847"><No.>847</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Old Christians Site, Rathbane</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="848"><No.>848</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Barnakyle, Patrickswell (Site 2)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2018, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="849"><No.>849</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Ballysimon, Greenhill Road </Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="850"><No.>850</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Gough Place, Rosbrien Road, Limerick</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="851"><No.>851</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clonmacken, Limerick City</Scheme/Project Name><No. of Units>43</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="852"><No.>852</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Deerpark, Adare</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2015, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="853"><No.>853</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Glenview Drive, Hospital</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="854"><No.>854</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clare Street, Limerick City</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="855"><No.>855</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Lower Carey's Road, Limerick City</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="856"><No.>856</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Kileely Road, Moyross</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="857"><No.>857</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Station Close, Knocklong</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="858"><No.>858</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Colbert Terrace, Abbeyfeale</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="859"><No.>859</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>St. Michael's Court, Watergate Flats, </Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2018, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="860"><No.>860</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Ballysimon, Greenhills Road</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="861"><No.>861</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clueing Dara, Broadford</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="862"><No.>862</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Sycamore Crescent, Newcastle West, Co Limerick</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="863"><No.>863</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Radharc an Ghleanna, Mountcollins</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="864"><No.>864</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>O’Connor Park, Ardagh, Co. Limerick</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="865"><No.>865</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Church Glen, Ballylanders, Co. Limerick</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="866"><No.>866</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Radharc Cillin, Kilfinane, Co. Limerick</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="867"><No.>867</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Ballycummin Road, Raheen, Co. Limerick</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="868"><No.>868</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Brugh na Deise, Bruff, Co Limerick</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="869"><No.>869</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Quinns Cross, Skehacreggaun, Mungret, Limerik.</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="870"><No.>870</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>(Formerly Whelan's Pub), 52 New Road, Thomandgate, Limerick</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="871"><No.>871</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Deerpark, Adare</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="872"><No.>872</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Sycamore Crescent, Newcastle West, Co Limerick</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="873"><No.>873</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clueing Dara, Broadford</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="874"><No.>874</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Sheep / Athlunkards Street</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="875"><No.>875</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Churchfield</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="876"><No.>876</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Cosgrave Park</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="877"><No.>877</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Orchard Site</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Oaklee Housing Trust</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="878"><No.>878</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Cliona Park Phase 3</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="879"><No.>879</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>45A-46A Cliona Park</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="880"><No.>880</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Dalgaish Park</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="881"><No.>881</No.><Funding Programme>REGENERATION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Cliona Park Phase 4</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="882"><No.>882</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Towerfield Crescent, Croom</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Croom Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="883"><No.>883</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Cappamore (Creamery Site)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Cappamore Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="884"><No.>884</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Mirth, Thomondgate</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Associated Charities Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="885"><No.>885</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>2/3 Mallow Street</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="886"><No.>886</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>St. Pauls Convent, Kilfinane</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="887"><No.>887</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>McGarry House, 7 Alphonsus Street</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="888"><No.>888</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>47 &amp; 48 Main Street, Croom, Limerick</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Croom Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="889"><No.>889</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>58 Henry Street, Limerick</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Simon Community : Midwest Simon</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="890"><No.>890</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Infills Carew Park, Southhill and Moyross</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="891"><No.>891</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>28/29 Lower Gerald Griffin Street, Limerick</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="892"><No.>892</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>42 St Joseph's Street, Limerick</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="893"><No.>893</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Nunan's Corner, Tullaha, Broadford, Co Limerick</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Broadford Voluntary Housing and Community Childcare CLG</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="894"><No.>894</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Infills Carew Park, Southhill and Moyross</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="895"><No.>895</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>19 and 20 Castleview Shopping Centre Castleconnell  Limerick (Phase 1)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="896"><No.>896</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 2)*</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="897"><No.>897</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Bloodmill Road, Singland, Limerick (Phase 1)*</Scheme/Project Name><No. of Units>52</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="898"><No.>898</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Bloodmill Road, Singland, Limerick (Phase 2)</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="899"><No.>899</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Bloodmill Road, Singland, Limerick (Phase 3)*</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="900"><No.>900</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Bloodmill Road, Singland, Limerick (Phase 4)*</Scheme/Project Name><No. of Units>34</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="901"><No.>901</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clonmacken, Condell Road, Limerick (Phase 1)*</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="902"><No.>902</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clonmacken, Condell Road, Limerick (Phase 2)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="903"><No.>903</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clonmacken, Condell Road, Limerick (Phase 3)*</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="904"><No.>904</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clonmacken, Condell Road, Limerick (Phase 4)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="905"><No.>905</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Clonmacken, Condell Road, Limerick (Phase 5)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="906"><No.>906</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Dromsally Woods, Cappamore, Co. Limerick (Phase 1)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="907"><No.>907</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Mungret Gate, Baunacloka, Mungret, Limerick (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="908"><No.>908</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Mungret Gate, Baunacloka, Mungret, Limerick (Phase 2)*</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="909"><No.>909</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Newtown, Castletroy, Limerick (Phase 1)*</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="910"><No.>910</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Old Dublin Road, Rhebogue, Limerick (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="911"><No.>911</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Phase 2 Newtown Meadows, Castletroy, Limerick (Phase 1)*</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q4-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="912"><No.>912</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Toormore, Main Street, Bruree, Co. Limerick (Phase 1)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="913"><No.>913</No.><Funding Programme>CALF Construction</Funding Programme><LA>Limerick</LA><Scheme/Project Name>Turragh Crescent, Cappamore, Limerick (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="914"><No.>914</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Slí Corglass, Legga</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="915"><No.>915</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Farnagh Hill, Longford Town</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="916"><No.>916</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Campbell’s Lane</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="917"><No.>917</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>O'Hara Site, Connaught Rd.,Longford</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="918"><No.>918</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Alder Field, Farnagh Hill</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="919"><No.>919</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Slí Corglass, Legga</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="920"><No.>920</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Campbell’s Lane</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="921"><No.>921</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Slí Corglass, Legga</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="922"><No.>922</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Campbell’s Lane</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="923"><No.>923</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>St. Patricks Ct., Ballinamuck</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="924"><No.>924</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Alder Field, Farnagh Hill</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="925"><No.>925</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Campbell’s Lane</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="926"><No.>926</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Alder Field, Farnagh Hill</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="927"><No.>927</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Alder Field, Farnagh Hill</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="928"><No.>928</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Alder Field, Farnagh Hill</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="929"><No.>929</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Campbell’s Lane</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="930"><No.>930</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Caislean Breac, Newtownforbes</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="931"><No.>931</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Longford</LA><Scheme/Project Name>Forthill, Aughnacliffe</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="932"><No.>932</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>'Rose Cottage', Ballinalee</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="933"><No.>933</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>St.Rita's, Park Road, Longford</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="934"><No.>934</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Fairgreen View, Longford Town</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="935"><No.>935</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Cranleymore, Abbeylara</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="936"><No.>936</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Cloonahard, Edgeworthstown</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="937"><No.>937</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Woodlands Path, Keenagh</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="938"><No.>938</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Clough Dillons, Keenagh</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="939"><No.>939</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Radharc Na Muileann, Lanesborough</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="940"><No.>940</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>24B Congress Terrace, Longford</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="941"><No.>941</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Cnoc Na Gréine, Granard</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="942"><No.>942</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Radharc Na Muileann, Lanesborough</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="943"><No.>943</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Longford</LA><Scheme/Project Name>Comcille Terrace, Granard </Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="944"><No.>944</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>‘Gort Bui’, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="945"><No.>945</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>‘Gort Bui’, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="946"><No.>946</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>‘Gort Bui’, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="947"><No.>947</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Glyde View, Tallanstown</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="948"><No.>948</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Termon River, Termonfeckin</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="949"><No.>949</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Ellwood, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="950"><No.>950</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Ellwood, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="951"><No.>951</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Ellwood, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="952"><No.>952</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Ellwood, Ballymakenny Road, Drogheda</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="953"><No.>953</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Louth</LA><Scheme/Project Name>Moneymore, Drogheda</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="954"><No.>954</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Louth</LA><Scheme/Project Name>Gort Uaine, Clogherhead</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="955"><No.>955</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Louth</LA><Scheme/Project Name>School Lane, Dunleer</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="956"><No.>956</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Louth</LA><Scheme/Project Name>Doire Beag, Collon</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="957"><No.>957</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Louth</LA><Scheme/Project Name>CPO Bundle 5 - 26 Castle Road, Dundalk</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="958"><No.>958</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Louth</LA><Scheme/Project Name>CPO Bundle 6 - 6 Moorehall, Ardee</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="959"><No.>959</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Boice Court (Phase 2), Drogheda</Scheme/Project Name><No. of Units>72</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="960"><No.>960</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Father Finn Park (Phase 2)</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="961"><No.>961</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Mount Avenue, Dundalk</Scheme/Project Name><No. of Units>93</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="962"><No.>962</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Muirhevnamor, Dundalk (Phase 1)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="963"><No.>963</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Rathmullen Park, Drogheda</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="964"><No.>964</No.><Funding Programme>REGENERATION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Cox's Demesne Phase 2b</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="965"><No.>965</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Louth</LA><Scheme/Project Name>Liscorrie, Bog Road, Drogheda</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="966"><No.>966</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Louth</LA><Scheme/Project Name>Kincora House</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="967"><No.>967</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>5 Slieveroe Crescent, Dundalk</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="968"><No.>968</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Barrack Street, Dundalk</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Simon Community : Dundalk Simon</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2018, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="969"><No.>969</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Tierney Street, Ardee</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Oaklee Housing Trust</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="970"><No.>970</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Coulter Place, Dundalk</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="971"><No.>971</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Four Winds, Mullacapple, Collon</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>St. John of God Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="972"><No.>972</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>St. John's Home, Peter's Hill, Drogheda</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>North ? East Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="973"><No.>973</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Riverwell Close, Dundalk</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="974"><No.>974</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>Highfield, Newry Road, Dundalk (Domestic Violence Refuge)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="975"><No.>975</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Louth</LA><Scheme/Project Name>10-16 The Alleys, St. Peter's Place, Drogheda</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="976"><No.>976</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="977"><No.>977</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="978"><No.>978</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 3)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="979"><No.>979</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 4)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="980"><No.>980</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 5)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="981"><No.>981</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Clonmore Close, Ardee, Co. Louth (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="982"><No.>982</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Clonmore Close, Ardee, Co. Louth (Phase 2)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="983"><No.>983</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Clonmore Close, Ardee, Co. Louth (Phase 3)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="984"><No.>984</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Clonmore Close, Ardee, Co. Louth (Phase 4)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="985"><No.>985</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Connolly Field, Dundalk, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Fold Housing Association Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="986"><No.>986</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Connolly Field, Dundalk, Co. Louth (Phase 2)</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Fold Housing Association Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="987"><No.>987</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Donore Road, Drogheda, Co. Louth (Phase 1)</Scheme/Project Name><No. of Units>66</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="988"><No.>988</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Dublin Road, Dundalk, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>65</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="989"><No.>989</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>47</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="990"><No.>990</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 2)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="991"><No.>991</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 3)</Scheme/Project Name><No. of Units>59</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="992"><No.>992</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Fairways Gardens, Dundalk Co Louth (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="993"><No.>993</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Halliday Mills, Quay Street, Dundalk, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>85</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="994"><No.>994</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Harbour View, Coulter Place, Dundalk (Phase 1)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="995"><No.>995</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Lismullen Grove, Dundalk, Co. Louth (Phase 2)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="996"><No.>996</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Newfoundwell Road, Drogheda, Co Louth (Phase 1)*</Scheme/Project Name><No. of Units>55</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="997"><No.>997</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Newfoundwell Road, Drogheda, Co Louth (Phase 2)</Scheme/Project Name><No. of Units>39</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="998"><No.>998</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Newtown, Marsh Road, Drogheda, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="999"><No.>999</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Newtown, Marsh Road, Drogheda, Co. Louth (Phase 2)*</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1000"><No.>1000</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Newtown, Marsh Road, Drogheda, Co. Louth (Phase 3)*</Scheme/Project Name><No. of Units>46</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1001"><No.>1001</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Newtown, Marsh Road, Drogheda, Co. Louth (Phase 4)*</Scheme/Project Name><No. of Units>47</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1002"><No.>1002</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Oriel Heights, Collon, Co. Louth (Phase 1)*</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>North and East Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1003"><No.>1003</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 1)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1004"><No.>1004</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 2)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1005"><No.>1005</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 3)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1006"><No.>1006</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 4)*</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1007"><No.>1007</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 5)*</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1008"><No.>1008</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 6)*</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1009"><No.>1009</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1010"><No.>1010</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 3)*</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1011"><No.>1011</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 4)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2019</On Site><Completed /></row>
<row _id="1012"><No.>1012</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Scotch Hall, Drogheda, Co Louth  (Phase 1)</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1013"><No.>1013</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Tierney Street, Ardee, Co. Louth (Phase 1)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1014"><No.>1014</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Louth</LA><Scheme/Project Name>Tullybrook, Drogheda, Co. Louth  (Phase 1)*</Scheme/Project Name><No. of Units>85</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1015"><No.>1015</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Bunree, Ballina</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="1016"><No.>1016</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Silver Springs, Claremorris</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1017"><No.>1017</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Main St., Charlestown</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1018"><No.>1018</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Mayo</LA><Scheme/Project Name>The Boreen, Crossmolina</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1019"><No.>1019</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Deel Court, Crossmolina</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1020"><No.>1020</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Knockroe, Moygownagh</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1021"><No.>1021</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Low Park, Charlestown</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1022"><No.>1022</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Main St., Hollymount</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1023"><No.>1023</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Murrevagh, Mulranney</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1024"><No.>1024</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Lios na Circa, Saleen, Castlebar - Phase 2</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1025"><No.>1025</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Cross</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1026"><No.>1026</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Bonniconlon</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1027"><No.>1027</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Cloonkeadagh Road, Kiltimagh</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1028"><No.>1028</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Rehins Fort, Ballina</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1029"><No.>1029</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>50 Units @ Golf Course Rd., Westport</Scheme/Project Name><No. of Units>50</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1030"><No.>1030</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Ballyglass, Carnacon, Claremorris</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1031"><No.>1031</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Lios na Circe, Saleen, Castlebar - Phase 3</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1032"><No.>1032</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Atlantic Drive ,Belmullet</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1033"><No.>1033</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Liskilleen, Ballinrobe,</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1034"><No.>1034</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Walsh St., Ballina</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1035"><No.>1035</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Main Street, Ballyvary</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1036"><No.>1036</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Rehins Fort, Ballina</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1037"><No.>1037</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>AchilL Sound</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1038"><No.>1038</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Black Oak Rise, Newport</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1039"><No.>1039</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Mayo</LA><Scheme/Project Name>20 NewLine , Castlebar</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Mayo Mental Health Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1040"><No.>1040</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Kilbride, Swinford</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1041"><No.>1041</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Mount St Mary's Convent, Westport</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1042"><No.>1042</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Ellison House, Ellison St., Castlebar</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1043"><No.>1043</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Chestnut Grove, Castlebar, Co. Mayo (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1044"><No.>1044</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Chestnut Grove, Castlebar, Co. Mayo (Phase 2)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1045"><No.>1045</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Mayo</LA><Scheme/Project Name>Humbert Way, Castlebar, Co. Mayo (Phase 1)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="1046"><No.>1046</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Mayo</LA><Scheme/Project Name>The Sycamores, Ballina (Phase 1)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1047"><No.>1047</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Meath</LA><Scheme/Project Name>The Brambles, Longford rd., Duleek</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1048"><No.>1048</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Meath</LA><Scheme/Project Name>Connaught Street, Athboy</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1049"><No.>1049</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Meath</LA><Scheme/Project Name>Carrick St., Kells</Scheme/Project Name><No. of Units>47</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1050"><No.>1050</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Meath</LA><Scheme/Project Name>Broville, Corballis, Laytown</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1051"><No.>1051</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Meath</LA><Scheme/Project Name>11 Glenidan Court, Enfield</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1052"><No.>1052</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Meath</LA><Scheme/Project Name>25 Carrick Street, Kells</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1053"><No.>1053</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Staleen Park, Donore</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1054"><No.>1054</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Dunshaughlin</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1055"><No.>1055</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Farganstown, Navan</Scheme/Project Name><No. of Units>84</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1056"><No.>1056</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Blackhill Crescent, Donacarney</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1057"><No.>1057</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Archdeaconary Glebe, Kells</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1058"><No.>1058</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Nangle Court, Navan</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1059"><No.>1059</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Castle Street, Ashbourne - Dept of Education Site</Scheme/Project Name><No. of Units>74</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1060"><No.>1060</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Church View, Rathmolyon</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1061"><No.>1061</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Haggard Street, Trim, Co. Meath</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1062"><No.>1062</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Pitcher Lane, Kells, Co. Meath</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1063"><No.>1063</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Swan Lane, Balreask</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2019, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1064"><No.>1064</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Lagore, Dunshaughlin</Scheme/Project Name><No. of Units>42</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1065"><No.>1065</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Convent Lands, Kildalkey, Athboy</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1066"><No.>1066</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Ratholdren Court, Navan</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1067"><No.>1067</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Brews Hill, Navan</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1068"><No.>1068</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Newtown, Drumconrath</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1069"><No.>1069</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>New Lane, Abbey Lands, Navan, Co. Meath</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1070"><No.>1070</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gainsfield, (Gort Fionnbarra) Commons Road, Navan Co. Meath</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1071"><No.>1071</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Meath</LA><Scheme/Project Name>6-7 Knightsbrook Close, Iffernock, Trim</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1072"><No.>1072</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Women's Refuge, Tailteann Drive, Windtown, Navan</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Meath Women’s Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1073"><No.>1073</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Meath</LA><Scheme/Project Name>Park Avenue, Church Street, Oldcastle</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Society of Saint Vincent de Paul</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1074"><No.>1074</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Meath</LA><Scheme/Project Name>Connaught Street, Athboy</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1075"><No.>1075</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1076"><No.>1076</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Ashewood, Ashbourne, Co Meath (Phase 1)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1077"><No.>1077</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Athboy Road, Navan, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>34</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="1078"><No.>1078</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Athboy Road, Navan, Co. Meath (Phase 2)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="1079"><No.>1079</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Athboy Road, Navan, Co. Meath (Phase 3)*</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="1080"><No.>1080</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1081"><No.>1081</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 2)*</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1082"><No.>1082</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Colliers Place, Abbey Road, Commons, Duleek, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>North and East Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1083"><No.>1083</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Colliers Place, Abbey Road, Commons, Duleek, Co. Meath (Phase 2)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>North and East Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1084"><No.>1084</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Frederick Manor, Ashbourne, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1085"><No.>1085</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1086"><No.>1086</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gainsfield, Commons Road, Navan, Co. Meath (Phase 4)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1087"><No.>1087</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1088"><No.>1088</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 2)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1089"><No.>1089</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 3)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1090"><No.>1090</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Gort Fionnbarra, Commons Road, Navan, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1091"><No.>1091</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1092"><No.>1092</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 2)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1093"><No.>1093</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 3)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1094"><No.>1094</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1095"><No.>1095</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 2)*</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1096"><No.>1096</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 3)</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1097"><No.>1097</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Maudlin Vale,  Trim, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1098"><No.>1098</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Maudlin Vale,  Trim, Co. Meath (Phase 2)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1099"><No.>1099</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Maudlin Vale,  Trim, Co. Meath (Phase 3)</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1100"><No.>1100</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Maydenhayes, Donacarney, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1101"><No.>1101</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Narrow Ways, Bettystown, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1102"><No.>1102</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Narrow Ways, Bettystown, Co. Meath (Phase 2)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1103"><No.>1103</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Oak Hall, Ardee Road, Carlanstown, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1104"><No.>1104</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 2)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1105"><No.>1105</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 3)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1106"><No.>1106</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Ruxton Oaks, Navan, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1107"><No.>1107</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>St Marys Dunboyne, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1108"><No.>1108</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>The Maudlins, Trim, Co. Meath (Phase 1)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1109"><No.>1109</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>The Willows, Dunshaughlin, Co. Meath (Phase 1)*</Scheme/Project Name><No. of Units>96</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1110"><No.>1110</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Meath</LA><Scheme/Project Name>Whitefield Hall, Bettystown, Co. Meath (Phase 3)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1111"><No.>1111</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Lui na Greine, Scotstown</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1112"><No.>1112</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Lui na Greine, Scotstown</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1113"><No.>1113</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>An Bonnan Bui &amp; Flower Shop, Fermanagh St., Clones</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1114"><No.>1114</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>63 Fermanagh St., Clones</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1115"><No.>1115</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Ard na Radhairc, Carrickmacross</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1116"><No.>1116</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Coill Darach, Bree, Castleblayney</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1117"><No.>1117</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Coill an Ri, Carrickmacross</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1118"><No.>1118</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Knockcarrick, Annyalla</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1119"><No.>1119</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Ard na Radhairc, Carrickmacross</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1120"><No.>1120</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Folly Court, Ballybay</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1121"><No.>1121</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>82 &amp; 83 Fermanagh St., Clones</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1122"><No.>1122</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>2a &amp; 3 Analore St., Clones</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1123"><No.>1123</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Abbey Gatehouse, Analore St., Clones</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1124"><No.>1124</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Lui Na Greine, Scotstown</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1125"><No.>1125</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>12 Church St., Ballybay</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1126"><No.>1126</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Church Hill, Clones</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1127"><No.>1127</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>13 McCurtain Street, Clones</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1128"><No.>1128</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>An Clós, Cornamucklaglass, Ballybay </Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1129"><No.>1129</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Lui na Greine, Scotstown</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2020</On Site><Completed /></row>
<row _id="1130"><No.>1130</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Drumillard, Castleblayney (Phase 2)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Castleblayney Care Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1131"><No.>1131</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Liseggerton, Clones</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Oaklee Housing Trust</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1132"><No.>1132</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Birch Court Apts., 34 Main Street, Ballybay</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>North ? East Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1133"><No.>1133</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Bree, Castleblayney 
 (Phase 2)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1134"><No.>1134</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Bree, Castleblayney 
 (Phase 3)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1135"><No.>1135</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Bree, Castleblayney 
 (Phase 4)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1136"><No.>1136</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Bree, Castleblayney 
 (Phase 5)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1137"><No.>1137</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Bree, Castleblayney 
 (Phase 6)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="1138"><No.>1138</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Drumbear Wood, Monaghan, Co. Monaghan  (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1139"><No.>1139</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Lakeview Apartments, Drummond Radhairc, Carrickmacross, Co Monaghan (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>North and East Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1140"><No.>1140</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 1)*</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1141"><No.>1141</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 2)*</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1142"><No.>1142</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Magheross, Carrickmacross, Co Monaghan (Phase 1)</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1143"><No.>1143</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Magheross, Carrickmacross, Co Monaghan (Phase 2)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1144"><No.>1144</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Magheross, Carrickmacross, Co Monaghan (Phase 3)</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1145"><No.>1145</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Magheross, Carrickmacross, Co Monaghan (Phase 4)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2019</On Site><Completed /></row>
<row _id="1146"><No.>1146</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Part 2, Radharc An Bhri, Bree, Castleblayney, Co. Monaghan (Phase 1)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1147"><No.>1147</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Part 2, Radharc An Bhri, Bree, Castleblayney, Co. Monaghan (Phase 2)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1148"><No.>1148</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 1)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1149"><No.>1149</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 2)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1150"><No.>1150</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Monaghan</LA><Scheme/Project Name>The Meadows, Emy, Emyvale, Co. Monaghan (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1151"><No.>1151</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Main Street, Daingean</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1152"><No.>1152</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Woodfield, Birr</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1153"><No.>1153</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Cluain na Greine, Clonygowan</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1154"><No.>1154</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Coolgarry, Walsh Island </Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1155"><No.>1155</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>MacRegol Pairc, Birr</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1156"><No.>1156</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Bog Road, Portarlington</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1157"><No.>1157</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>MacRegol Pairc, Birr</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1158"><No.>1158</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Castle View, Mucklagh, Tullamore</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1159"><No.>1159</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Woodfield, Birr</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1160"><No.>1160</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Woodfield, Birr</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1161"><No.>1161</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Offaly</LA><Scheme/Project Name>1 Newbridge St., Birr</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1162"><No.>1162</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Offaly</LA><Scheme/Project Name>78 &amp; 110 Church Hill, Tullamore</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1163"><No.>1163</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Beechwood Drive, Circular Road, Daingean</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1164"><No.>1164</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Kylebeg, Banagher (Phase 2)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1165"><No.>1165</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Beechgrove, Belmont</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1166"><No.>1166</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Raheen ,Clara</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1167"><No.>1167</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Elderberry Drive, Moneygall</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1168"><No.>1168</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Sr. Senan Avenue, Edenderry</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1169"><No.>1169</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Dargan Drive, Chancery Lane, Tullamore (Phase 2)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1170"><No.>1170</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Sycamore Drive, Ballycumber</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1171"><No.>1171</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Circular Road, Daingean Phase 2</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1172"><No.>1172</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Killane Court, Edenderry</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1173"><No.>1173</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Clonminch, Tullamore</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Oaklee Housing Trust</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1174"><No.>1174</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Presentation Lands, Portarlington</Scheme/Project Name><No. of Units>39</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1175"><No.>1175</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Clonamore Hotel, Tullamore</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1176"><No.>1176</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Woodfield, Birr</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1177"><No.>1177</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Offaly</LA><Scheme/Project Name>3 units, An Corran, Crinkle, Birr, Co. Offaly (Phase 1)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1178"><No.>1178</No.><Funding Programme>CALF Construction</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Kearney’s Field, Tullamore, Co. Offaly (Phase 1)</Scheme/Project Name><No. of Units>41</No. of Units><Approved Housing Body>Oaklee Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1179"><No.>1179</No.><Funding Programme>CALF Construction</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Killane Drive, Edenderry, Co Offaly (Phase 1)</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1180"><No.>1180</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Offaly</LA><Scheme/Project Name>Rahan Road, Tullamore, Co. Offaly (Phase 1)*</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1181"><No.>1181</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Offaly</LA><Scheme/Project Name>The Hawthorns, Arden Road, Tullamore, Co. Offaly (Phase 1)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1182"><No.>1182</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Esker Lawns, Old Tuam Rd, Monksland,</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1183"><No.>1183</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Esker Lawns, Old Tuam Rd, Monksland,</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1184"><No.>1184</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Esker Lawns, Old Tuam Rd, Monksland,</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1185"><No.>1185</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>The Meadows, Castlerea </Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1186"><No.>1186</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Ardnanagh ,Roscommon Town</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1187"><No.>1187</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Elphin Courthouse, Elphin</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1188"><No.>1188</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Pound St., Ballaghaderreen</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1189"><No.>1189</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Cloonfad</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1190"><No.>1190</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Cluain Fraoigh, Cloonbeirne</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1191"><No.>1191</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Meadowbrook, Ballyclare Td., Ballyleague</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1192"><No.>1192</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Lisroyne Td., Strokestown</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1193"><No.>1193</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Windmill Road, Elphin Road</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1194"><No.>1194</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Lakeview Heights, Bellspark Td., Boyle</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1195"><No.>1195</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Lisnamult, Ardnanagh Td., Roscommon Town</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1196"><No.>1196</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Station Rd., Cortober, Ck on Shannon, Co Roscommon</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1197"><No.>1197</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Curlew View, Boyle, Co Roscommon</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1198"><No.>1198</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>Monksland, Athlone, Co. Roscommon (Phase 1)*</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="1199"><No.>1199</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Roscommon</LA><Scheme/Project Name>The Walk, Roscommon Town</Scheme/Project Name><No. of Units>53</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1200"><No.>1200</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Seaville, Ursuline Convent</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1201"><No.>1201</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Seaville, Ursuline Convent</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1202"><No.>1202</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Seaville, Ursuline Convent</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1203"><No.>1203</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Seaville, Ursuline Convent</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1204"><No.>1204</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Connolly Park, Tubbercurry (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1205"><No.>1205</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Dromore West </Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1206"><No.>1206</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Robbers' Lane, Maugheraboy, Sligo</Scheme/Project Name><No. of Units>62</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1207"><No.>1207</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>SRD at Crowagh, Dromore West</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1208"><No.>1208</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Gormley Park, Bunnanadden</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1209"><No.>1209</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Connolly Park, Tubbercurry (Phase 2) &amp; The Green Rd,</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1210"><No.>1210</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Geldof Drive &amp; Centre Park, Cranmore, Sligo</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1211"><No.>1211</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Avena, Ballisodare, Co Sligo</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1212"><No.>1212</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Killeshin, First Sea Road, Sligo</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Newgrove Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1213"><No.>1213</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Summerhill, Tubbercurry, Co Sligo</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1214"><No.>1214</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 3)</Funding Programme><LA>Sligo</LA><Scheme/Project Name>Rathellen, Finisklin, Co. Sligo</Scheme/Project Name><No. of Units>63</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Q4-2021</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1215"><No.>1215</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1216"><No.>1216</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1217"><No.>1217</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1218"><No.>1218</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1219"><No.>1219</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Clonburris 1</Scheme/Project Name><No. of Units>89</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1220"><No.>1220</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Clonburris 2</Scheme/Project Name><No. of Units>56</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1221"><No.>1221</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1222"><No.>1222</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1223"><No.>1223</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1224"><No.>1224</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1225"><No.>1225</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1226"><No.>1226</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1227"><No.>1227</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1228"><No.>1228</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1229"><No.>1229</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>28</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1230"><No.>1230</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1231"><No.>1231</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1232"><No.>1232</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1233"><No.>1233</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1234"><No.>1234</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1235"><No.>1235</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1236"><No.>1236</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1237"><No.>1237</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1238"><No.>1238</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1239"><No.>1239</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1240"><No.>1240</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kilcarbery JV Social</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1241"><No.>1241</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>37 Greenfort Gardens, Clondalkin</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1242"><No.>1242</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>St. Marks Avenue, Clondalkin</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1243"><No.>1243</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Balgaddy F, Griffeen Avenue, Lucan Co. Dublin</Scheme/Project Name><No. of Units>69</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1244"><No.>1244</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Riversdale, Clondalkin, Dublin 22</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1245"><No.>1245</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Riverside Cottages, Templeogue</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1246"><No.>1246</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Riversdale, Clondalkin, Dublin 22</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1247"><No.>1247</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Grand Canal, Lindisfarne, Clondalkin,</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1248"><No.>1248</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>St. Catherine’s, Knockmore Avenue, Killinarden, Tallaght</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1249"><No.>1249</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Homeville, Knocklyon, Dublin 16</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1250"><No.>1250</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Nangor Road, Clondalkin, Dublin 22</Scheme/Project Name><No. of Units>93</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1251"><No.>1251</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Oakridge, Ballynakelly,Edge, Newcastle, Co. Dublin</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1252"><No.>1252</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>3 Cornerpark Rise</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1253"><No.>1253</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Old Nangor Road, Clondalkin</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Simon Community : Dublin Simon</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2016, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1254"><No.>1254</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Ballynakelly Rise, Newcastle Boulevard and Graydon Park, Newcastle, County Dublin (Phase 1)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1255"><No.>1255</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Ballynakelly Rise, Newcastle Boulevard and Graydon Park, Newcastle, County Dublin (Phase 2)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2020</On Site><Completed /></row>
<row _id="1256"><No.>1256</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Citywest Quarter, Citywest, Dublin 24 (Phase 1)*</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1257"><No.>1257</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Citywest Village House, Citywest Village, D24 (Phase 1)*</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>Fold Housing Association Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1258"><No.>1258</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Cloverhill Lodge, Cloverhill Rd, Clondalkin, D22 (Phase 1)*</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Oaklee Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1259"><No.>1259</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 2)*</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1260"><No.>1260</No.><Funding Programme>CALF Construction</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1261"><No.>1261</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Finians Way, Newcastle South, Newcastle, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1262"><No.>1262</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Finnstown, Lucan, Co. Dublin (Phase 1)</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1263"><No.>1263</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Finnstown, Lucan, Co. Dublin (Phase 2)</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1264"><No.>1264</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Finnstown, Lucan, Co. Dublin (Phase 3)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1265"><No.>1265</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Graydon, Newcastle, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1266"><No.>1266</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Hallwell, Tubber Lane, Adamstown, Co Dublin (Phase 1)*</Scheme/Project Name><No. of Units>45</No. of Units><Approved Housing Body>The Iveagh Trust</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1267"><No.>1267</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1268"><No.>1268</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Mountain Gate, Kiltipper Rd., Dublin 24 (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1269"><No.>1269</No.><Funding Programme>CALF Construction</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Old Lucan Road, Palmerstown, Dublin 20 (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1270"><No.>1270</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Phase 2, Aylmer Drive, Aylmer Heath, Newcastle, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1271"><No.>1271</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Sallypark, Clondalkin, Dublin 22 (Phase 1)*</Scheme/Project Name><No. of Units>85</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1272"><No.>1272</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>San Guida, New Road, Clondalkin, Dublin 22 (Phase 1)*</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1273"><No.>1273</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Scholarstown Road, Rathfarnham, Dublin 16


 (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1274"><No.>1274</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Somerton Gate, Adamstown, Lucan, Co. Dublin (Phase 1)*</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1275"><No.>1275</No.><Funding Programme>CALF Construction</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>St. Catherine’s, Knockmore Avenue, Killinarden, Tallaght, Dublin 24 (Phase 1)</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Sophia Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1276"><No.>1276</No.><Funding Programme>CALF Construction</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>The Weir, Whitestown Way, Tallaght, Dublin 24 (Phase 1)</Scheme/Project Name><No. of Units>81</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1277"><No.>1277</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>South Dublin</LA><Scheme/Project Name>Willowview, Ballyboden Road, Rathfarnham, Dublin 14 (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1278"><No.>1278</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mill Road, Thurles</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1279"><No.>1279</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Prior Park, Clonmel</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1280"><No.>1280</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ma Charoin, Manna South, Templemore</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1281"><No.>1281</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Prior Park, Clonmel</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1282"><No.>1282</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glenconnor Road, Clonmel</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1283"><No.>1283</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Rosanna Close, Tipperary Town</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1284"><No.>1284</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Hazel Close, Carrick on Suir</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1285"><No.>1285</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glenconnor Road, Clonmel</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1286"><No.>1286</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Cois Abhainn, Mullinahone</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1287"><No.>1287</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glentara, Roscrea</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1288"><No.>1288</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glenconnor Road, Clonmel</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1289"><No.>1289</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Carrick Beg, Carrick on Suir</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1290"><No.>1290</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glenconnor Road, Clonmel </Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1291"><No.>1291</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Clogheen Road, Ardfinnan</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1292"><No.>1292</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glenoir, Cullen</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1293"><No.>1293</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ard na Sidhe, Clonmel</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1294"><No.>1294</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Springfort Meadows, Nenagh</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1295"><No.>1295</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Kilsheelan, Clonmel</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1296"><No.>1296</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ard na Greine, Clonmel</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1297"><No.>1297</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Boherclough Street, Cashel</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1298"><No.>1298</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Knockanrawley</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1299"><No.>1299</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mill Road, Thurles</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1300"><No.>1300</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mulkear View, Newport</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1301"><No.>1301</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Templetouhy</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1302"><No.>1302</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Abbey Street, Cahir</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1303"><No.>1303</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Borrisokane</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1304"><No.>1304</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Portroe, Nenagh</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1305"><No.>1305</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Cloughjordan</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1306"><No.>1306</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mitchel St., Thurles</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1307"><No.>1307</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Cormack Drive, Nenagh</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1308"><No.>1308</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Bansha</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1309"><No.>1309</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ned Hayes Drive, Twomileborris, Thurles</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1310"><No.>1310</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Donohill</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1311"><No.>1311</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mullinahone</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1312"><No.>1312</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ballyclerihan</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1313"><No.>1313</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ard Alainn, Moyne</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1314"><No.>1314</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ardcroney</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1315"><No.>1315</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Comeragh Drive, Clonmel</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1316"><No.>1316</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Church Street, Templemore</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1317"><No.>1317</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Woodview Close, Castle Crescent,  Nenagh</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1318"><No.>1318</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Grove Street. Roscrea</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1319"><No.>1319</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>William Street, Clonmel</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1320"><No.>1320</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glencarrick, Roscrea</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1321"><No.>1321</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Knockanrawley</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1322"><No.>1322</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mulkear View, Newport</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1323"><No.>1323</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Mountain View, Cahir</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1324"><No.>1324</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glencarrick, Roscrea</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1325"><No.>1325</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>William Street, Nenagh</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1326"><No.>1326</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Borrisokane</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1327"><No.>1327</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ashbury, Roscrea</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1328"><No.>1328</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Fr. Mathew Street, Tipperary Town</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1329"><No.>1329</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Kichham Street, Carrick en Suir</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1330"><No.>1330</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>7 Stradavoher Court, Thurles</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Arlington Novas Ireland Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1331"><No.>1331</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>1 and 1A Limerick Road</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>Thurles Lions Trust Housing Assoc.</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1332"><No.>1332</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Glenconnor Road, Clonmel</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Cluid Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1333"><No.>1333</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Stanwix House, Kickham Street, Thurles</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Thurles Lions Trust Housing Assoc.</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1334"><No.>1334</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Main Street, Templemore</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Templemore Voluntary Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1335"><No.>1335</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Deerpark Road, Ashwell's Lot</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>SPADE – St. Patrick’s Dwellings for the Elderly</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1336"><No.>1336</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Gort an Oir, Fethard</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Belmont Park Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1337"><No.>1337</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Abbey Court Lodges, Old Dublin Road, Nenagh, Co Tipperary (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1338"><No.>1338</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Abbey Court Lodges, Old Dublin Road, Nenagh, Co Tipperary (Phase 2)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Focus Housing Association CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1339"><No.>1339</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Ballygraigue Court, Ballygraigue Road, Nenagh (Phase 1)</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1340"><No.>1340</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Coopers Lot, Cashel, Co. Tipperary (Phase 1)*</Scheme/Project Name><No. of Units>44</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q1-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1341"><No.>1341</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Farranlahassery, Cahir, Co. Tipperary (Phase 1)*</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1342"><No.>1342</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Tipperary</LA><Scheme/Project Name>Wallers Lot, East Cashel, Co. Tipperary (Phase 1)*</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1343"><No.>1343</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Mount William, Williamstown, Waterford City</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1344"><No.>1344</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Mount William, Williamstown, Waterford City</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1345"><No.>1345</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Mount William, Williamstown, Waterford City</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1346"><No.>1346</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>The Courtyard, Morrissons Road, Waterford City</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1347"><No.>1347</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Bounds Court, Airport Road, Waterford</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1348"><No.>1348</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Brideview Close, Tallow; Main St., Aglish; Bye Lane, Kilmacthomas</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1349"><No.>1349</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Brideview Close, Tallow; Main St., Aglish; Bye Lane, Kilmacthomas</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1350"><No.>1350</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Radharc na Siuire, Knockboy</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1351"><No.>1351</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Radharc na Siuire, Knockboy</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1352"><No.>1352</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Clarendon Court, Penrose Lane, Waterford</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2018, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1353"><No.>1353</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Apt 1 and Apt 2 Rivercourt, Grattan Quay, Waterford City</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1354"><No.>1354</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Meeting House Lane, Waterford City</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1355"><No.>1355</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>29 The Glen, Waterford City</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1356"><No.>1356</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>22 and 23 Thomas Hill, Waterford</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1357"><No.>1357</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Apts 1-6, The Old Convent, Kilmacthomas</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1358"><No.>1358</No.><Funding Programme>SHIP CONSTRUCTION RENEWAL</Funding Programme><LA>Waterford</LA><Scheme/Project Name>70 and 71 O'Connell Street, Waterford</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1359"><No.>1359</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Ballygunner, Waterford City</Scheme/Project Name><No. of Units>49</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1360"><No.>1360</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Ballynaneashagh, Waterford City</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1361"><No.>1361</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>An Garrán, Crobally Upper, Tramore</Scheme/Project Name><No. of Units>50</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1362"><No.>1362</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Larchville, Waterford City</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1363"><No.>1363</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Doyles Street, Waterford City</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1364"><No.>1364</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>The Glen, Bridge St, Waterford</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2018, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1365"><No.>1365</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Summerland Square, Waterford</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1366"><No.>1366</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Graigueshoneen, Kilmacthomas</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1367"><No.>1367</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Mount Esker, Ballytruckle Road, Waterford City</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1368"><No.>1368</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Newgate Street, Waterford City</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2020, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1369"><No.>1369</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Fountain Street, Ferrybank, Waterford</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1370"><No.>1370</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>50-53 Ballytruckle Road, Waterford</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1371"><No.>1371</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Wadding Manor, Ferrybank</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1372"><No.>1372</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Ballycarnane, Tramore</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Oaklee Housing Trust</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1373"><No.>1373</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 1)</Scheme/Project Name><No. of Units>26</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1374"><No.>1374</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 2)</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1375"><No.>1375</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Slí na Coille, Tramore, Co Waterford (Phase 1)*</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2021</On Site><Completed /></row>
<row _id="1376"><No.>1376</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Slievekeale, Waterford City (Phase 1)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1377"><No.>1377</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 2)</Funding Programme><LA>Waterford</LA><Scheme/Project Name>Slievekeale, Waterford City (Phase 2)</Scheme/Project Name><No. of Units>34</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1378"><No.>1378</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Lissywollen, Athlone</Scheme/Project Name><No. of Units>55</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1379"><No.>1379</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Lissywollen, Athlone</Scheme/Project Name><No. of Units>55</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1380"><No.>1380</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Lissywollen, Athlone</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1381"><No.>1381</No.><Funding Programme>SHIP DIALOG</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Lissywollen, Athlone</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1382"><No.>1382</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Austin Friars Street, Mullingar</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1383"><No.>1383</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Oakcrest, Ballinderry, Mullingar</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1384"><No.>1384</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>St. Marys Place, Athlone</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1385"><No.>1385</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Rathgarve Green, Castlepollard</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1386"><No.>1386</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Bellaugh, Athlone</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1387"><No.>1387</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>The Cedars, Lakepoint, Mullingar</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1388"><No.>1388</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>The Cedars, Lakepoint, Mullingar</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1389"><No.>1389</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>The Cedars, Lakepoint, Mullingar</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1390"><No.>1390</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Austin Friar Street, Mullingar</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1391"><No.>1391</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Athboy Rd, Delvin</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1392"><No.>1392</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Kileenboylegan, Moate</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1393"><No.>1393</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Mount Carmel Drive, Moate, Westmeath</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1394"><No.>1394</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Austin Friar Street, Mullingar</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1395"><No.>1395</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>O'Growney Green, Mullingar</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1396"><No.>1396</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Dalton Park, Mullingar</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1397"><No.>1397</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Water Street, Castlepollard</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1398"><No.>1398</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Ennell Court, Mullingar (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1399"><No.>1399</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Bun Daire, Kinnegad (Phase 3)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1400"><No.>1400</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Ennell Court, Mullingar</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1401"><No.>1401</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Quinlan Park, Athlone</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1402"><No.>1402</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Bishopsgate, Mullingar</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1403"><No.>1403</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Arcadia, Athlone (Phase 2)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1404"><No.>1404</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Canal Avenue, Mullingar</Scheme/Project Name><No. of Units>32</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2020, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1405"><No.>1405</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Bun Daire, Kinnegad (Phase 3)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1406"><No.>1406</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Bishopsgate, Mullingar</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1407"><No.>1407</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Kilmacaugh Rd, Athlone</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1408"><No.>1408</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Cornamaddy, Athlone</Scheme/Project Name><No. of Units>50</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1409"><No.>1409</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Water Street, Castlepollard </Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1410"><No.>1410</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Belvedere Orphanage, Tyrellspass</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1411"><No.>1411</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Cornamaddy, Athlone</Scheme/Project Name><No. of Units>58</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1412"><No.>1412</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Elm Row, Royal Canal, Mullingar</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1413"><No.>1413</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Elm Row, Royal Canal, Mullingar</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="1414"><No.>1414</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Elm Row, Royal Canal, Mullingar</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2019</On Site><Completed /></row>
<row _id="1415"><No.>1415</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>The Hermitage Building, Retreat Road, Athlone</Scheme/Project Name><No. of Units>55</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1416"><No.>1416</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Farran, Mullingar</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1417"><No.>1417</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Ashe Road, Mullingar, Co. Westmeath (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1418"><No.>1418</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Athlone Road, Moate, Co. Westmeath (Phase 1)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Oaklee Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1419"><No.>1419</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Bower Hill, Lower Road, Athlone, Co. Westmeath (Phase 1)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q3-2021</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1420"><No.>1420</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Charlestown, Mullingar (Phase 1)*</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1421"><No.>1421</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Charlestown, Mullingar (Phase 2)*</Scheme/Project Name><No. of Units>62</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1422"><No.>1422</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Coill Rua, Mullingar, Co. Westmeath (Phase 2)*</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1423"><No.>1423</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Coill Rua, Mullingar, Co. Westmeath (Phase 3)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1424"><No.>1424</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 1)*</Scheme/Project Name><No. of Units>35</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1425"><No.>1425</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 2)*</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1426"><No.>1426</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 3)*</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1427"><No.>1427</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 4)*</Scheme/Project Name><No. of Units>49</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1428"><No.>1428</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 5)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1429"><No.>1429</No.><Funding Programme>CALF Construction</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Farran, Mullingar, Co. Westmeath (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1430"><No.>1430</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Garran Geal, Kinnegad, Westmeath (Phase 1)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1431"><No.>1431</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Rahanine, Rochfortbridge, Co Westmeath (Phase 1)*</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1432"><No.>1432</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1433"><No.>1433</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 2)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1434"><No.>1434</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Westmeath</LA><Scheme/Project Name>Springfield Cottages, Mullingar, Co. Westmeath (Phase 1)*</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1435"><No.>1435</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Airhill, Belvedere Rd, Wexford</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1436"><No.>1436</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Michael Street, New Ross </Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1437"><No.>1437</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ballynaglough, Blackwater</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1438"><No.>1438</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Tobar Muire, Creagh Gorey</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1439"><No.>1439</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Gleann an Ghairdin, Gorey - Phase 2</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1440"><No.>1440</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard Uisce, Whiterock Hill, Wexford</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1441"><No.>1441</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Cluain Beag, Clonard, Wexford</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1442"><No.>1442</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Cluain Beag, Clonard, Wexford</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1443"><No.>1443</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard Uisce, Whiterock, Wexford</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1444"><No.>1444</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard an Bhile, Healysland, New Ross, Co. Wexford</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1445"><No.>1445</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Tobar Muire, Creagh Gorey</Scheme/Project Name><No. of Units>29</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1446"><No.>1446</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ballynaglough, Blackwater</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1447"><No.>1447</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Roxborough Manor, Mulgannon</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1448"><No.>1448</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Roxborough Manor, Mulgannon</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1449"><No.>1449</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Roxborough Manor, Mulgannon</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1450"><No.>1450</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Roxborough Manor, Mulgannon</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1451"><No.>1451</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard Uisce, Whiterock, Wexford</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1452"><No.>1452</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Clonard Little, Wexford </Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1453"><No.>1453</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard an Bhile, Healysland, New Ross, Co. Wexford</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1454"><No.>1454</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Cluain Beag, Clonard, Wexford</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1455"><No.>1455</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard Uisce, Whiterock Hill, Wexford</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1456"><No.>1456</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Castlelands, Ferns, Co. Wexford</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1457"><No.>1457</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Cluain Beag, Clonard, Wexford</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1458"><No.>1458</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard Uisce, Whiterock Hill, Wexford</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q4-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1459"><No.>1459</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Whiterock Hill Phase 1, Wexford</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1460"><No.>1460</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Killeens, Wexford</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2018, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1461"><No.>1461</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ross Road, Enniscorthy</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1462"><No.>1462</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Glentire, The Ballagh, Enniscorthy</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2019</On Site><Completed /></row>
<row _id="1463"><No.>1463</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Rosetown Phase 1, Rosslare</Scheme/Project Name><No. of Units>23</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1464"><No.>1464</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Carley's Bridge, Enniscorthy</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1465"><No.>1465</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Creagh, Gorey</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2018, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1466"><No.>1466</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Rosbercon, New Ross</Scheme/Project Name><No. of Units>38</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1467"><No.>1467</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Wexford Street, Gorey</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1468"><No.>1468</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ballyhine, Barntown, Co. Wexford</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1469"><No.>1469</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Whiterock Hill Phase 2, Wexford</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1470"><No.>1470</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Rosetown Phase 2, Rosslare</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2019, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1471"><No.>1471</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Doire Moling, Monamolin, Gorey, Co. Wexford</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q3-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1472"><No.>1472</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>20 Francis Street, Wexford</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1473"><No.>1473</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ballygillane Big, Rosslare Harbour, Co. Wexford</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1474"><No.>1474</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Grogan’s Road, Wexford Town </Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q4-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1475"><No.>1475</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Clonattin, Gorey</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Túath Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1476"><No.>1476</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Wexford</LA><Scheme/Project Name>2&amp;3 The Quay, New Ross, Co. Wexford</Scheme/Project Name><No. of Units>6</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1477"><No.>1477</No.><Funding Programme>CAS CONSTRUCTION RENEWAL</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ard na Naoimh, Gorey Hill</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>St. Aidan's Day Care Centre CLG</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q1-2022, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1478"><No.>1478</No.><Funding Programme>CAS CONSTRUCTION</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Wexford Women's Refuge, Maudlintown</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Wexford Womens’ Refuge CLG</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q2-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1479"><No.>1479</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>67 units, Coolcotts, Wexford (Barr An Aird, Coolcotts) (Phase 1)*</Scheme/Project Name><No. of Units>67</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1480"><No.>1480</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>9 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)</Scheme/Project Name><No. of Units>9</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1481"><No.>1481</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Cuil na Dara, Coolcotts, Wexford  (Phase 1)*</Scheme/Project Name><No. of Units>25</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1482"><No.>1482</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Forgelands, Enniscorthy Co. Wexford. (Phase 1)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1483"><No.>1483</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Forgelands, Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1484"><No.>1484</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Gleann an Ghairdin, Gorey, Co Wexford (Phase 1)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1485"><No.>1485</No.><Funding Programme>CALF Construction</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Hewitsland, New Ross, County Wexford (Phase 1)</Scheme/Project Name><No. of Units>48</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1486"><No.>1486</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 3)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1487"><No.>1487</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 4)*</Scheme/Project Name><No. of Units>27</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1488"><No.>1488</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Mill Heights, Castlebridge, Wexford (Phase 1)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1489"><No.>1489</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Mill Heights, Castlebridge, Wexford (Phase 2)*</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1490"><No.>1490</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Moongate, Townspark, Co Wexford (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1491"><No.>1491</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Moongate, Townspark, Co Wexford (Phase 2)*</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2022</On Site><Completed /></row>
<row _id="1492"><No.>1492</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1493"><No.>1493</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 4)*</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1494"><No.>1494</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 1)*</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1495"><No.>1495</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 2)</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1496"><No.>1496</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1497"><No.>1497</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 2)*</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1498"><No.>1498</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 3)</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1499"><No.>1499</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ramstown, Gorey, Wexford (Phase 1)</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1500"><No.>1500</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ramstown, Gorey, Wexford (Phase 2)</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1501"><No.>1501</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Ramstown, Gorey, Wexford (Phase 3)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1502"><No.>1502</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wexford</LA><Scheme/Project Name>Tobar Mhuire, Creagh, Gorey, Wexford (Phase 1)*</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1503"><No.>1503</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Ashtown Lane, Wicklow Town</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1504"><No.>1504</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Mountainview, Moneycarroll, Newtownmountkennedy</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1505"><No.>1505</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Weaver Square, Baltinglass, Co. Wicklow</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2020, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1506"><No.>1506</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>The Birches, Ballinaclash</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1507"><No.>1507</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Bramble Hill, Lugduff, Tinahely</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1508"><No.>1508</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Vartry Heights, Roundwood, Co. Wicklow</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1509"><No.>1509</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Avonmore View, Rathdrum</Scheme/Project Name><No. of Units>13</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1510"><No.>1510</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Bramble Hill, Lugduff, Tinahely</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1511"><No.>1511</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>95 Waverley Drive, Broomhall, Rathnew</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1512"><No.>1512</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Waverley Drive, Broomhall, Rathnew</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1513"><No.>1513</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Waverley Drive, Broomhall, Rathnew</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1514"><No.>1514</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Waverley Drive, Broomhall, Rathnew</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1515"><No.>1515</No.><Funding Programme>SHIP CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Waverley Drive, Broomhall, Rathnew</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1516"><No.>1516</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Church Lane, Newcastle</Scheme/Project Name><No. of Units>1</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2021, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1517"><No.>1517</No.><Funding Programme>SHIP CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Ballynerrin Upper, Wicklow Town</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1518"><No.>1518</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Merrymeeting View, Rathnew</Scheme/Project Name><No. of Units>46</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1519"><No.>1519</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Shillelagh Phase 4</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q2-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1520"><No.>1520</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Ard na Greine, West Ward, Bray</Scheme/Project Name><No. of Units>31</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1521"><No.>1521</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Avondale Heights, Rathdrum</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2021</On Site><Completed /></row>
<row _id="1522"><No.>1522</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Sheehan Court, Back Street, Arklow</Scheme/Project Name><No. of Units>7</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1523"><No.>1523</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Three Trouts, Greystones</Scheme/Project Name><No. of Units>41</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1524"><No.>1524</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Greenhill Road, Wicklow Town</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1525"><No.>1525</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Cedar Court, Schools Road, Bray</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q1-2022</On Site><Completed /></row>
<row _id="1526"><No.>1526</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Coolattin Oaks, Carnew (Phase 4)</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2021</Completed></row>
<row _id="1527"><No.>1527</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Rathnew, Merrymeeting, Co. Wicklow (Phase 2)</Scheme/Project Name><No. of Units>21</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q1-2022, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1528"><No.>1528</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Tinahely, Lugduff, Co Wicklow</Scheme/Project Name><No. of Units>20</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1529"><No.>1529</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Carrigoona, Bray</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1530"><No.>1530</No.><Funding Programme>SHIP CONSTRUCTION DESIGN BUILD</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Lott Lane, Kilcoole</Scheme/Project Name><No. of Units>80</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q2-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1531"><No.>1531</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Delaney Park, Emoclew Road, Arklow (Phase 3)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1532"><No.>1532</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>10A &amp; 10 B Castle Villas, Greystones</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1533"><No.>1533</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Delaney Park, Emoclew Road, Arklow (Phase 2)</Scheme/Project Name><No. of Units>37</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1534"><No.>1534</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Blackhills, Glenealy, Co. Wicklow</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2021</On Site><Completed /></row>
<row _id="1535"><No.>1535</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Age Friendly Apartments at Main St, Kilcoole, Greystones</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q3-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1536"><No.>1536</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Mill Road, Killincarrig, Greystones</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design>Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.</Stage 3 Pre Tender design><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1537"><No.>1537</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Carraig Eden, Greysones (Phase 3)</Scheme/Project Name><No. of Units>14</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q4-2021, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1538"><No.>1538</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Kilbride Lane, Bray (Murphy's Lands)</Scheme/Project Name><No. of Units>19</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1539"><No.>1539</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Knockroe, Delgany, Co. Wicklow</Scheme/Project Name><No. of Units>2</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Stage 2 approved Q1-2022, full design/tender being prepared.</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1540"><No.>1540</No.><Funding Programme>SHIP CONSTRUCTION</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Ard Rua, Barndarraig, Arklow, Co. Wicklow</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal>Stage 1 approved Q2-2021, outline design and costs being prepared.</Stage 1 Capital Appraisal><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>
<row _id="1541"><No.>1541</No.><Funding Programme>CAS CONSTRUCTION TURNKEY</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Rathcoran Square, Baltinglass</Scheme/Project Name><No. of Units>8</No. of Units><Approved Housing Body>Peter McVerry Trust Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1542"><No.>1542</No.><Funding Programme>CAS CONSTRUCTION SINGLE STAGE</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Hollybrook Park, Bray, Co. Wicklow</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>St. John of God Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Stage 4 approved Q3-2019, the scheme is fully approved.</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1543"><No.>1543</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Adelaide Apartments, St Laurence’s Terrace, Bray, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1544"><No.>1544</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Avondale Grange, Ballygannon, Rathdrum, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1545"><No.>1545</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>40</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1546"><No.>1546</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow (Phase 1)</Scheme/Project Name><No. of Units>11</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1547"><No.>1547</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow (Phase 2)</Scheme/Project Name><No. of Units>12</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1548"><No.>1548</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow (Phase 3)</Scheme/Project Name><No. of Units>17</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1549"><No.>1549</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow (Phase 4)</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1550"><No.>1550</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow (Phase 5)*</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1551"><No.>1551</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)</Scheme/Project Name><No. of Units>15</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q4-2021</Completed></row>
<row _id="1552"><No.>1552</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)</Scheme/Project Name><No. of Units>10</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q1-2022</Completed></row>
<row _id="1553"><No.>1553</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 3)</Scheme/Project Name><No. of Units>3</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1554"><No.>1554</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Lower Main Street, Arklow, Co. Wicklow (Phase 1)</Scheme/Project Name><No. of Units>4</No. of Units><Approved Housing Body>Clanmil Housing Association Ireland</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1555"><No.>1555</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Main Street, Blessington, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>22</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1556"><No.>1556</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Main Street, Blessington, Co. Wicklow (Phase 2)*</Scheme/Project Name><No. of Units>36</No. of Units><Approved Housing Body>Circle Voluntary Housing Association Ltd</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval>Q2-2022</Stage 4 Tender Report or Final Turnkey/CALF approval><On Site /><Completed /></row>
<row _id="1557"><No.>1557</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Oak Springs, Rathdrum, County Wicklow  (Phase 1)*</Scheme/Project Name><No. of Units>5</No. of Units><Approved Housing Body>Tuath Housing Association</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1558"><No.>1558</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Phase 2, Southern Cross, Bray, Co. Wicklow (Phase 1)</Scheme/Project Name><No. of Units>80</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1559"><No.>1559</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Phase 3, Southern Cross, Bray, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>80</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q4-2020</On Site><Completed /></row>
<row _id="1560"><No.>1560</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Rathcoran House, Baltinglass, Co. Wicklow (Phase 2)*</Scheme/Project Name><No. of Units>24</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2021</Completed></row>
<row _id="1561"><No.>1561</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Rathcoran House, Baltinglass, Co. Wicklow (Phase 3)</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Respond</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q3-2021</Completed></row>
<row _id="1562"><No.>1562</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Southern Cross, Bray, Co. Wicklow
 (Phase 1)*</Scheme/Project Name><No. of Units>30</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed>Q2-2022</Completed></row>
<row _id="1563"><No.>1563</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Southern Cross, Bray, Co. Wicklow
 (Phase 2)*</Scheme/Project Name><No. of Units>18</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1564"><No.>1564</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>The Old Rectory, Blessington, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>45</No. of Units><Approved Housing Body>Co - Operative Housing Ireland Society Limited</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q3-2020</On Site><Completed /></row>
<row _id="1565"><No.>1565</No.><Funding Programme>CALF Turnkey</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Vartry Wood, Ashford, Co. Wicklow (Phase 1)*</Scheme/Project Name><No. of Units>16</No. of Units><Approved Housing Body>Clúid Housing</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning /><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site>Q2-2021</On Site><Completed /></row>
<row _id="1566"><No.>1566</No.><Funding Programme>PUBLIC PRIVATE PARTNERSHIP (Bundle 3)</Funding Programme><LA>Wicklow</LA><Scheme/Project Name>Burgage More, Blessington, Co. Wicklow</Scheme/Project Name><No. of Units>106</No. of Units><Approved Housing Body>*N/A</Approved Housing Body><Stage 1 Capital Appraisal /><Stage 2 Pre Planning>Q4-2021</Stage 2 Pre Planning><Stage 3 Pre Tender design /><Stage 4 Tender Report or Final Turnkey/CALF approval /><On Site /><Completed /></row>