_id No. Funding Programme Local Authority Scheme/Project Name No. of Units Approved Housing Body Stage 1 Capital Appraisal Stage 2 Pre Planning Stage 3 Pre Tender design Stage 4 Tender Report or Final Turnkey/CALF approval On Site Completed 1 "" SHIP CONSTRUCTION TURNKEY Carlow Tullow Road, Carlow - Phase 1 24 *N/A "" "" "" "" Q4-2017 "" 2 "" SHIP CONSTRUCTION TURNKEY Carlow Tullow Road, Carlow - Phase 2 16 *N/A "" "" "" "" Q4-2017 "" 3 "" SHIP CONSTRUCTION TURNKEY Carlow Tullow Road, Carlow - Phase 3 23 *N/A "" "" "" "" Q4-2017 "" 4 "" SHIP CONSTRUCTION Carlow The Laurels, Carlow Town 5 *N/A "" "" "" "" Q3-2017 "" 5 "" SHIP CONSTRUCTION Carlow Ard na Greine, Tullow 16 *N/A "" "" "" "" Q4-2017 "" 6 "" SHIP CONSTRUCTION Carlow Dublin Road, Tullow 21 *N/A "" "" "" "" Q4-2017 "" 7 "" SHIP CONSTRUCTION Carlow Bagenalstown 42 *N/A "" "" "" "" Q4-2017 "" 8 "" SHIP CONSTRUCTION Carlow Bilboa 2 *N/A "" "" "" "" Q4-2017 "" 9 "" SHIP CONSTRUCTION Carlow Hacketstown 4 *N/A "" "" "" "" Q1-2018 "" 10 "" SHIP CONSTRUCTION Carlow Mount Leinster Park, Carlow 4 *N/A "" "" "" "" "" Q4-2017 11 "" SHIP CONSTRUCTION Carlow Myshall 4 *N/A "" "" "" "" "" Q1-2018 12 "" SHIP CONSTRUCTION Carlow Pound Lane, Borris 4 *N/A "" "" "" "" "" Q3-2017 13 "" SHIP CONSTRUCTION Carlow Rathvilly 10 *N/A "" "" "" "" "" Q2-2017 14 "" SHIP CONSTRUCTION Carlow Moneybeg, Bagenalstown 24 *N/A "" "" "" "" "" Q3-2017 15 "" SHIP CONSTRUCTION Carlow Paulville, Tullow (SRD) 1 *N/A "" "" "" "" "" Q3-2017 16 "" SHIP CONSTRUCTION Carlow Maryborough St., Carlow 5 *N/A "" "" "" "" "" Q1-2018 17 "" SHIP CONSTRUCTION Carlow Drumin, St. Mullins (SRD) 1 *N/A "" "" "" "" Q4-2017 "" 18 "" CAS CONSTRUCTION Carlow Mill Race Court, Carlow Town 14 Cluid Housing Association Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 19 "" CAS CONSTRUCTION Carlow Royal Oak Road, Bagenalstown 6 Respond "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 20 "" CAS CONSTRUCTION Carlow Ballincarrig, Wexford Road 6 Tintean Housing Association Ltd "" "" "" "" "" Q4-2016 21 "" CALF CONSTRUCTION TURNKEY Carlow Sleaty Street, Graigcullen, Carlow 26 Cluid Housing Association "" "" "" "" Q1-2018 "" 22 "" CALF CONSTRUCTION TURNKEY Carlow Barrett Street, Bagnalstown 10 Tintean Housing Association "" "" "" "" "" Q1-2018 23 "" CALF CONSTRUCTION TURNKEY Carlow River Court, Carlow 1/4* 10 Co-operative Housing Ireland "" "" "" Scheme approved for funding Q1 - 2018 "" "" 24 "" CALF CONSTRUCTION TURNKEY Carlow River Court, Carlow 2/4 16 Co-operative Housing Ireland "" "" "" Scheme approved for funding Q1 - 2018 "" "" 25 "" CALF CONSTRUCTION TURNKEY Carlow Browneshill Wood, Browneshill Road, Chapelstown, Carlow 1/1 59 Tath Housing Association Ltd "" "" "" "" Q1-2018 "" 26 "" CALF CONSTRUCTION TURNKEY Carlow River Court, Carlow 3/4 12 Co-operative Housing Ireland "" "" "" Scheme approved for funding Q1 - 2018 "" "" 27 "" CALF CONSTRUCTION TURNKEY Carlow River Court, Carlow 4/4 9 Co-operative Housing Ireland "" "" "" Scheme approved for funding Q1 - 2018 "" "" 28 "" SHIP CONSTRUCTION Cavan Rosehill, Mullagh (Phase 6) 8 *N/A "" "" "" "" Q1-2018 "" 29 "" SHIP CONSTRUCTION Cavan Butlersbridge (Phase 2) 4 *N/A "" "" "" "" "" Q1-2018 30 "" SHIP CONSTRUCTION Cavan Woodlands, Ballyhaise 8 *N/A "" "" "" "" Q4-2017 "" 31 "" SHIP CONSTRUCTION Cavan Butlersbridge (Phase 1) 2 *N/A "" "" "" "" "" Q2-2017 32 "" SHIP CONSTRUCTION Cavan Clones Road, Butlersbridge 2 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 33 "" SHIP CONSTRUCTION Cavan Corstruce, Ballinagh 4 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 34 "" CALF CONSTRUCTION TURNKEY Cavan Cluain Dara, Kingscourt 16 Cluid Housing Association "" "" "" "" "" Q4-2016 35 "" CALF CONSTRUCTION TURNKEY Cavan Drumalee Manor, Drumalee Phase 2 7 Tath Housing Association "" "" "" "" Q1-2017 "" 36 "" CALF CONSTRUCTION TURNKEY Cavan Drumalee Manor, Drumalee Phase 1 4 Tath Housing Association "" "" "" "" Q1-2017 "" 37 "" SHIP CONSTRUCTION TURNKEY Clare River View, School Road, Corofin 2 *N/A "" "" "" "" Q4-2017 "" 38 "" SHIP CONSTRUCTION Clare Roslevan, Ennis 8 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 39 "" SHIP CONSTRUCTION Clare Feakle 13 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 40 "" SHIP CONSTRUCTION Clare Glor Srutha, Knockbrack Lower, Clonlara 9 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 41 "" SHIP CONSTRUCTION Clare Seaview Park, Quilty 18 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 42 "" SHIP CONSTRUCTION Clare Tullyglass, Shannon 21 *N/A "" Stage 2 approved in Q2-2016, full design/tender being prepared. "" "" "" "" 43 "" SHIP CONSTRUCTION Clare Ashline, Kilrush Road, Ennis 40 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 44 "" CAS CONSTRUCTION Clare Cahercalla, Ennis (Phase 2) 14 Cuan an Chlair Ltd Stage 1 approved in Q4-2016, outline design and costs are now being prepared. "" "" "" "" "" 45 "" CAS CONSTRUCTION Clare Laurel Lodge, Clare Road, Ennis 3 Society of Saint Vincent de Paul "" "" "" "" "" Q4-2016 46 "" CAS CONSTRUCTION Clare Haggard View, Clarecastle (Phase 1) 2 Anvers Housing Association Ltd "" "" "" "" "" Q1-2018 47 "" CAS CONSTRUCTION Clare Haggard View, Clarecastle (Phase 2) 2 Anvers Housing Association Ltd "" "" "" "" Q3-2017 "" 48 "" CALF CONSTRUCTION TURNKEY Clare Lios Anama, Sixmilebridge 28 Co operative Ireland "" "" "" "" "" Q4-2017 49 "" CALF CONSTRUCTION TURNKEY Clare Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare 1/2 12 Cluid Housing Association "" "" "" "" Q1-2018 "" 50 "" CALF CONSTRUCTION TURNKEY Clare Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare 2/2 18 Cluid Housing Association "" "" "" "" Q1-2018 "" 51 "" CALF CONSTRUCTION Clare Bruachlan, Westbury 22 Co-operative Housing Ireland "" "" "" Scheme approved for CALF funding Q2-2016 "" "" 52 "" SHIP CONSTRUCTION TURNKEY Cork City Arus Mhuire 30 *N/A "" "" "" "" Q4-2017 "" 53 "" SHIP CONSTRUCTION TURNKEY Cork City 1-4 Marble Lane 4 *N/A "" "" "" "" "" Q4-2017 54 "" SHIP CONSTRUCTION TURNKEY Cork City Barack Street 32 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 55 "" SHIP CONSTRUCTION TURNKEY Cork City FaranFerris 5 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 56 "" SHIP CONSTRUCTION TURNKEY Cork City High Street 9 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 57 "" SHIP CONSTRUCTION TURNKEY Cork City Tramore Road 4 *N/A "" "" "" "" Q1-2018 "" 58 "" SHIP CONSTRUCTION TURNKEY Cork City Whites Street 43 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 59 "" SHIP CONSTRUCTION TURNKEY Cork City Woods Street 16 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 60 "" SHIP CONSTRUCTION TURNKEY Cork City Church Road 43 *N/A "" "" "" "" Q2-2017 "" 61 "" SHIP CONSTRUCTION TURNKEY Cork City Sheridan Park, Tramore Road 28 *N/A "" "" "" "" "" Q4-2016 62 "" SHIP CONSTRUCTION TURNKEY Cork City Ard Aoibhinn, Banduff, Mayfield 5 *N/A "" "" "" "" Q3-2017 "" 63 "" SHIP CONSTRUCTION TURNKEY Cork City Corcorans Quay 3 *N/A "" "" "" Stage 4 approved in Q1-2017, the scheme is now fully approved. "" "" 64 "" SHIP CONSTRUCTION TURNKEY Cork City Blarney Street 25 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 65 "" SHIP CONSTRUCTION TURNKEY Cork City 37-39 Dublin Street, Blackpool, Cork 5 *N/A "" "" "" "" Q2-2017 "" 66 "" SHIP CONSTRUCTION Cork City The Meadows, Knocknacullen 1 *N/A "" "" "" "" "" Q3-2016 67 "" SHIP CONSTRUCTION Cork City Boyces Street 51 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 68 "" SHIP CONSTRUCTION Cork City Shandon Street/John Philpott Curran Street 9 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 69 "" SHIP CONSTRUCTION Cork City St. Johns Well 6 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 70 "" SHIP CONSTRUCTION Cork City Churchfield Place East 3 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 71 "" SHIP CONSTRUCTION Cork City Deanrock, Togher 65 *N/A "" "" "" "" Q4-2016 "" 72 "" SHIP CONSTRUCTION Cork City Gerald Griffin Street 41 *N/A "" "" "" "" Q3-2017 "" 73 "" SHIP CONSTRUCTION Cork City Cappanoole 2 *N/A "" "" "" "" "" Q4-2016 74 "" SHIP CONSTRUCTION Cork City 258 & 259 Blarney Street 2 *N/A "" "" "" "" "" Q1-2018 75 "" REGENERATION Cork City Phase 1 B Knocknaheeny 29 *N/A "" "" "" "" "" Q4-2017 76 "" REGENERATION Cork City Phase 2 A Knocknaheeny 47 *N/A "" "" "" "" Q4-2017 "" 77 "" REGENERATION Cork City Phase 1 C Knocknaheeny 41 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 78 "" REGENERATION Cork City Phase 2 B Knocknaheeny 38 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 79 "" REGENERATION Cork City Phase 2C Knocknaheeny 24 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 80 "" CAS CONSTRUCTION Cork City Edel House, Grattan Street 33 Good Shepherd Services Ltd "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 81 "" CAS CONSTRUCTION Cork City Saint Vincent's Convent, Vincent's Ave/St. Mary's Street 25 Respond Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 82 "" CAS CONSTRUCTION Cork City Thomas Davis Street (Phase 1) 28 Respond "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 83 "" CAS CONSTRUCTION Cork City Ceanncora Lawn, Ballinlough 1 Cork Mental Health Voluntary Housing Association Ltd "" "" "" "" Q2-2017 "" 84 "" CAS CONSTRUCTION Cork City St. Joachim & Anne's, Anglesea Street 8 Simon Community : Cork Simon "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 85 "" CAS CONSTRUCTION Cork City 27-29 Dublin Street, Blackpool 10 Respond "" "" "" "" Q4-2016 "" 86 "" CALF CONSTRUCTION TURNKEY Cork City the Meadows, Knopckacullen Ease, Gurranabraher, Cork 1/3 16 Tath Housing Association "" "" "" "" Q1-2018 "" 87 "" CALF CONSTRUCTION TURNKEY Cork City the Meadows, Knopckacullen Ease, Gurranabraher, Cork 2/3 15 Tath Housing Association "" "" "" "" Q1-2018 "" 88 "" CALF CONSTRUCTION TURNKEY Cork City the Meadows, Knopckacullen Ease, Gurranabraher, Cork 3/3 21 Tath Housing Association "" "" "" "" Q1-2018 "" 89 "" CALF CONSTRUCTION TURNKEY Cork City Millfield Cottages, Blackpool 18 Respond! "" "" "" "" Q1-2017 "" 90 "" CALF CONSTRUCTION TURNKEY Cork City Leitrim Street, Cork City 18 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q3-2016 "" "" 91 "" CALF CONSTRUCTION TURNKEY Cork City Popes Road, Blackpool 7 Cluid Housing Association "" "" "" "" Q1-2017 "" 92 "" CALF CONSTRUCTION TURNKEY Cork City 11 North Abbey Street, Cork City /1/ 6 Respond! "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 93 "" CALF CONSTRUCTION Cork City Mile Stream, Shanakiel, Cork City 50 Co-operative Housing Ireland "" "" "" Scheme approved for CALF funding Q4-2017 "" "" 94 "" CALF CONSTRUCTION Cork City 124 Lr. Glanmire Road & 2 Breamer, Cork- Phase 2 3 Galtan Ltd "" "" "" "" Q1-2017 "" 95 "" CALF CONSTRUCTION Cork City 124 Lr. Glanmire Road & 2 Breamer, Cork Phase 1 3 Galtan Ltd "" "" "" "" "" Q1-2018 96 "" SHIP CONSTRUCTION TURNKEY Cork County Church Road/Station Road, Carrigtwohill 25 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 97 "" SHIP CONSTRUCTION TURNKEY Cork County Inis Alainn & Castleoaks, Bandon 11 *N/A "" "" "" "" "" Q4-2017 98 "" SHIP CONSTRUCTION TURNKEY Cork County Gleann Tuairigh, Youghal 2 *N/A "" "" "" "" Q4-2017 "" 99 "" SHIP CONSTRUCTION TURNKEY Cork County Clondulane, Fermoy 2 *N/A "" "" "" "" "" Q4-2017 100 "" SHIP CONSTRUCTION TURNKEY Cork County College Wood, Cobh 31 *N/A "" "" "" "" "" Q4-2017 101 "" SHIP CONSTRUCTION TURNKEY Cork County Castletreasure, Douglas (Phase 3) 12 *N/A "" "" "" "" "" Q4-2017 102 "" SHIP CONSTRUCTION TURNKEY Cork County Crann Ard, Fermoy 52 *N/A "" "" "" "" Q4-2017 "" 103 "" SHIP CONSTRUCTION TURNKEY Cork County CulAird Carraigtwohill 29 *N/A "" "" "" "" "" Q4-2017 104 "" SHIP CONSTRUCTION TURNKEY Cork County Castletreasure, Douglas (Phase 1) 12 *N/A "" "" "" "" "" Q1-2017 105 "" SHIP CONSTRUCTION TURNKEY Cork County Castletreasure, Douglas (Phase 2) 16 *N/A "" "" "" "" "" Q1-2017 106 "" SHIP CONSTRUCTION TURNKEY Cork County Claragh Road, Millstreet 6 *N/A "" "" "" "" Q1-2018 "" 107 "" SHIP CONSTRUCTION TURNKEY Cork County Downeen Cross, Rosscarbery 7 *N/A "" "" "" "" Q1-2018 "" 108 "" SHIP CONSTRUCTION TURNKEY Cork County Glanworth, Fermoy 14 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 109 "" SHIP CONSTRUCTION TURNKEY Cork County Quartertown, Mallow 6 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 110 "" SHIP CONSTRUCTION TURNKEY Cork County Beacon Point, Baltimore 6 *N/A "" "" "" "" Q1-2018 "" 111 "" SHIP CONSTRUCTION TURNKEY Cork County Corrin View, Fermoy 6 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 112 "" SHIP CONSTRUCTION TURNKEY Cork County Chapel Court, Skibereen 4 *N/A "" "" "" "" Q1-2018 "" 113 "" SHIP CONSTRUCTION TURNKEY Cork County Cul Na Smear, Bandon 14 *N/A "" "" "" "" Q2-2017 "" 114 "" SHIP CONSTRUCTION TURNKEY Cork County Glen Dara,Ard Cashel, watergrasshill 6 *N/A "" "" "" "" Q1-2018 "" 115 "" SHIP CONSTRUCTION RAPID Cork County Abbeywood, Middelton 70 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 116 "" SHIP CONSTRUCTION RAPID Cork County Station Road, Blarney 18 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 117 "" SHIP CONSTRUCTION RAPID Cork County Bluepool, Kanturk 12 *N/A "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 118 "" SHIP CONSTRUCTION Cork County Ard Na Greine, Cortmacsherry 15 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 119 "" SHIP CONSTRUCTION Cork County Tower View/Cirt na Siln, Cloyne, East Cork 9 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 120 "" SHIP CONSTRUCTION Cork County Beechgrove, Clonakilty 57 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 121 "" SHIP CONSTRUCTION Cork County Castletreasure Grove, Douglas 1 *N/A Stage 1 approved in Q3-2016, outline design and costs are now being prepared. "" "" "" "" "" 122 "" SHIP CONSTRUCTION Cork County Poulavone, Ballincollig 57 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 123 "" SHIP CONSTRUCTION Cork County Newtown, Bantry 1 *N/A Stage 1 approved in Q2-2016, outline design and costs are now being prepared. "" "" "" "" "" 124 "" SHIP CONSTRUCTION Cork County Fairfield, Masseytown, Macroom 7 *N/A "" "" "" "" Q4-2017 "" 125 "" SHIP CONSTRUCTION Cork County 12 & 14 Droum, Castletownbere 2 *N/A "" "" "" "" Q4-2017 "" 126 "" SHIP CONSTRUCTION Cork County Kilnagleary, Carrigaline (Phase 4) 15 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 127 "" SHIP CONSTRUCTION Cork County Oliver Plunkett Hill, Fermoy 10 *N/A "" "" "" "" "" Q2-2017 128 "" SHIP CONSTRUCTION Cork County Townsend Street, Skibbereen 6 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 129 "" SHIP CONSTRUCTION Cork County 11/10 Harbour Hill, Cobh 1 *N/A "" "" "" "" Q4-2016 "" 130 "" SHIP CONSTRUCTION Cork County Kilnagleary Carrigaline (phase 1A & 1B) 15 *N/A "" "" "" "" Q4-2017 "" 131 "" SHIP CONSTRUCTION Cork County Kilnagleary Carrigaline (Phase 2/C) 16 *N/A "" "" "" "" Q4-2017 "" 132 "" SHIP CONSTRUCTION Cork County Kilnagleary Carrigaline (Phase 3/D) 18 *N/A "" "" "" "" Q4-2017 "" 133 "" CAS CONSTRUCTION Cork County Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay 16 Cluid Housing Association Stage 1 approved in Q3-2016, outline design and costs are now being prepared. "" "" "" "" "" 134 "" CAS CONSTRUCTION Cork County Cuan Barra, Kilmore, Ballingeary 3 Coiste Tithe Uibh Laoire Teoranta "" "" "" "" Q4-2017 "" 135 "" CAS CONSTRUCTION Cork County Townlands, Rosscarbery 9 Rosscarbery Housing Association Ltd "" "" "" "" Q1-2018 "" 136 "" CAS CONSTRUCTION Cork County Avenue House, Bandon 9 Bandon Geriatric ? Community Council "" "" "" "" "" Q1-2018 137 "" CAS CONSTRUCTION Cork County Church View, Love Lane, Charleville 4 Charleville Care Project Ltd "" Stage 2 approved in Q3-2015, full design/tender being prepared. "" "" "" "" 138 "" CAS CONSTRUCTION Cork County Fellowship House, Togher 31 Tabor Lodge Addiction ? Housing Services Ltd "" "" "" "" Q1-2017 "" 139 "" CALF CONSTRUCTION TURNKEY Cork County Tanners Field, Bandon, Co Cork * 5 Tath Housing Association Ltd "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 140 "" CALF CONSTRUCTION TURNKEY Cork County Tanners Field, Bandon, Co Cork * 6 Tath Housing Association Ltd "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 141 "" CALF CONSTRUCTION TURNKEY Cork County College Manor, Cobh 10 Tath Housing Association "" "" "" "" "" Q4-2016 142 "" CALF CONSTRUCTION TURNKEY Cork County Ticknock, Cobh 8 Respond! "" "" "" "" Q1-2017 "" 143 "" CALF CONSTRUCTION TURNKEY Cork County Beach Road, Passage West 3 Cluid Housing Association "" "" "" "" "" Q4-2017 144 "" CALF CONSTRUCTION TURNKEY Cork County Lackaduff, Codrum, Macroom, Co Cork 1/1 5 Tuath Housing Association Ltd "" "" "" Q1 2018 "" "" 145 "" CALF CONSTRUCTION TURNKEY Cork County Weston, Carrigaline, Co. Cork * 7 Respond! "" "" "" Q1 2018 "" "" 146 "" CALF CONSTRUCTION Cork County Church View, Enniskeane 12 Cluid Housing Association "" "" "" "" Q1-2017 "" 147 "" CALF CONSTRUCTION Cork County Cappagh, Ballynacubby, Kinsale, Co. Cork 40 Cluid Housing Association "" "" "" Scheme approved for CALF Funding Q3-2017 "" "" 148 "" CALF CONSTRUCTION Cork County Firgrove Harrisons Lane Charleville 6 Co operative Ireland "" "" "" "" "" Q4-2017 149 "" SHIP CONSTRUCTION TURNKEY DLR Hazelbrook, Nutgrove, Churchtown 28 *N/A "" "" "" "" "" Q4-2017 150 "" SHIP CONSTRUCTION RAPID DLR Glenamuck/Stillorgan (Rockville Drive) 14 *N/A "" Stage 2 approved in Q4-2016, full design/tender being prepared. "" "" "" "" 151 "" SHIP CONSTRUCTION RAPID DLR George's Place 12 *N/A "" "" "" "" Q3-2017 "" 152 "" SHIP CONSTRUCTION DLR 66 George's Street, Dun Laoghaire 4 *N/A "" Stage 2 approved in Q4-2016, full design/tender being prepared. "" "" "" "" 153 "" SHIP CONSTRUCTION DLR 132 Pottery Road, Dun Laoghaire 4 *N/A "" "" "" "" Q4-2017 "" 154 "" SHIP CONSTRUCTION DLR 33,35, & 37 Temple Road 3 *N/A "" "" "" "" Q3-2017 "" 155 "" SHIP CONSTRUCTION DLR Assistant Harbour Master House 2 *N/A "" "" "" "" "" Q3-2017 156 "" SHIP CONSTRUCTION DLR The Brambles Park Close Sallynoggin 10 *N/A "" "" "" "" Q1-2017 "" 157 "" SHIP CONSTRUCTION DLR 49 The Mews Sallynoggin Park 4 *N/A "" "" "" "" "" Q4-2017 158 "" SHIP CONSTRUCTION DLR Shanganagh Park Lodge 1 *N/A "" "" "" "" "" Q2-2016 159 "" SHIP CONSTRUCTION DLR Rosemount Court 44 *N/A "" "" "" "" Q4-2016 "" 160 "" SHIP CONSTRUCTION DLR Broadford Rise 21 *N/A "" "" "" "" Q3-2017 "" 161 "" SHIP CONSTRUCTION DLR Fitzgerald Park 50 *N/A "" "" "" "" Q4-2016 "" 162 "" SHIP CONSTRUCTION DLR Rochestown House (Phase 3) 14 *N/A "" "" "" "" Q3-2016 "" 163 "" SHIP CONSTRUCTION DLR St Michael's Terrace 4 *N/A "" "" "" "" "" Q3-2017 164 "" SHIP CONSTRUCTION DLR Clontibret House 4 *N/A "" "" "" "" "" Q4-2016 165 "" SHIP CONSTRUCTION DLR Cromlech Close 15 *N/A "" "" "" "" "" Q3-2016 166 "" SHIP CONSTRUCTION DLR Rochestown House (Phase 2) 34 *N/A "" "" "" "" "" Q1-2016 167 "" SHIP CONSTRUCTION DLR 41 Ballyogan Ave., Ballyogan, Co. Dublin 2 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 168 "" CAS CONSTRUCTION DLR 30 Obelisk Walk, Blackrock 4 St. John of God Housing Association Ltd Stage 1 approved in Q4-2016, outline design and costs are now being prepared. "" "" "" "" "" 169 "" CALF CONSTRUCTION TURNKEY DLR Respond & Tuath Project Dublin 18 area. 49 Tath Housing Association "" "" "" Scheme approved for CALF funding Q1-2017 "" "" 170 "" CALF CONSTRUCTION TURNKEY DLR Hyde Road, Belmont, Stepaside 8 Respond! "" "" "" "" Q3-2016 "" 171 "" CALF CONSTRUCTION TURNKEY DLR Bishops Gate, Kilternan, Dublin 18 6 Cluid Housing Association "" "" "" "" Q3-2017 "" 172 "" CALF CONSTRUCTION TURNKEY DLR The Avenue, Glenside, Carrickmines Green, Dublin 18 * 5 Fold Ireland Housing Association "" "" "" "" Q3-2017 "" 173 "" CALF CONSTRUCTION TURNKEY DLR Woodbank, Dublin Rd, Shankill * 4 Cluid Housing Association "" "" "" "" "" Q3-2017 174 "" CALF CONSTRUCTION TURNKEY DLR Stillorgan Gate, Kilmacud Road Upper, Co. Dublin * 4 Cluid Housing Association "" "" "" "" "" Q4-2017 175 "" CALF CONSTRUCTION DLR Respond & Tuath Project Dublin 18 area. 56 Respond! "" "" "" Scheme approved for CALF funding Q1-2017 "" "" 176 "" CALF CONSTRUCTION DLR Clays Farm, Ballyogan Road (Phase 1)* 44 The Iveagh Trust "" "" "" "" Q4-2017 "" 177 "" CALF CONSTRUCTION DLR Abbeyview House, Monkstown 8 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2015 "" "" 178 "" SHIP CONSTRUCTION TURNKEY Donegal Gleann Na Greine, Mullindrait, Stranorlar 21 *N/A "" "" "" "" Q2-2017 "" 179 "" SHIP CONSTRUCTION TURNKEY Donegal Crievesmith, Letterkenny 34 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 180 "" SHIP CONSTRUCTION Donegal Carrigart (Phase 1) 17 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 181 "" SHIP CONSTRUCTION Donegal Meadow Hill, Raphoe 11 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 182 "" SHIP CONSTRUCTION Donegal Radharc na Tra Breige, Malin (Phase 3) 8 *N/A "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 183 "" SHIP CONSTRUCTION Donegal Cois Abhainn, St Johnston (Phase 2) 6 *N/A "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 184 "" SHIP CONSTRUCTION Donegal Emerald Drive, Killybegs (Phase 6) 9 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 185 "" SHIP CONSTRUCTION Donegal Long Lane, Letterkenny 29 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 186 "" SHIP CONSTRUCTION Donegal Rockytown, Buncrana (Phase 1) 21 *N/A "" Stage 2 approved in Q4-2016, full design/tender being prepared. "" "" "" "" 187 "" SHIP CONSTRUCTION Donegal Manorcunningham (Phase 2) 8 *N/A "" "" "" "" Q3-2017 "" 188 "" SHIP CONSTRUCTION Donegal Abbots Wood, Carndonagh (Phase 2) 4 *N/A "" "" "" "" Q3-2017 "" 189 "" SHIP CONSTRUCTION Donegal Ardara (Phase 3) 8 *N/A "" "" "" "" "" Q2-2017 190 "" SHIP CONSTRUCTION Donegal Newtoncunningham 7 *N/A "" "" "" "" Q1-2017 "" 191 "" SHIP CONSTRUCTION Donegal Railway Park, Drumrooske, Donegal Town 24 *N/A "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 192 "" SHIP CONSTRUCTION Donegal Ard Connell, Ardara (SRD) 1 *N/A "" "" "" "" "" Q1-2017 193 "" SHIP CONSTRUCTION Donegal Manorcunningham (Phase 1) 2 *N/A "" "" "" "" "" Q2-2017 194 "" CAS CONSTRUCTION Donegal Glenrowan House, Drumkeen, Stranorlar 6 Apex Housing Association "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 195 "" CAS CONSTRUCTION Donegal Willowbrook, Glencar, Letterkenny 40 Apex Housing Association Stage 1 approved in Q4-2016, outline design and costs are now being prepared. "" "" "" "" "" 196 "" CAS CONSTRUCTION Donegal Meenmore, Dungloe 15 County Donegal Parents and Friends Housing Association Ltd "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 197 "" CAS CONSTRUCTION Donegal Railway Park, Drumrooske, Donegal Town 10 Oaklee Housing Trust "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 198 "" CAS CONSTRUCTION Donegal Dunshenny House, Derry Road, Carndonagh 5 Apex Housing Association "" "" "" "" Q2-2017 "" 199 "" CAS CONSTRUCTION Donegal Raphoe Road, Castlefinn 20 Habinteg Housing Association (Ireland) Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 200 "" CALF CONSTRUCTION TURNKEY Donegal Ernedale Heights, Ballyshannon 11 Cluid Housing Association "" "" "" "" Q3-2017 "" 201 "" CALF CONSTRUCTION TURNKEY Donegal Forge Road, Donegal 4 Cluid Housing Association "" "" "" "" "" Q3-2016 202 "" CALF CONSTRUCTION TURNKEY Donegal 1-46 Ardrawer, Kiltoy, Letterkenny 46 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 203 "" CALF CONSTRUCTION Donegal Ballaghderg, Letterkenny, Co Donegal * 33 Respond! "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 204 "" SHIP CONSTRUCTION TURNKEY Dublin City Prospecthill 58 *N/A "" "" "" "" "" Q4-2017 205 "" SHIP CONSTRUCTION RAPID Dublin City Belcamp H, Dublin 17 38 *N/A "" "" "" "" "" Q4-2017 206 "" SHIP CONSTRUCTION RAPID Dublin City Cherry Orchard, Ballyfermot 24 *N/A "" "" "" "" "" Q4-2017 207 "" SHIP CONSTRUCTION RAPID Dublin City Mourne Road, Drimnagh 29 *N/A "" "" "" "" "" Q4-2017 208 "" SHIP CONSTRUCTION RAPID Dublin City St Helena's Drive, Finglas 39 *N/A "" "" "" "" "" Q3-2017 209 "" SHIP CONSTRUCTION RAPID Dublin City Poppintree, Ballymun 22 *N/A "" "" "" "" "" Q2-2016 210 "" SHIP CONSTRUCTION RAPID Dublin City Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas 70 *N/A "" "" "" "" Q4-2017 "" 211 "" SHIP CONSTRUCTION RAPID Dublin City Belcamp C, Dublin 17 16 *N/A "" Stage 2 approved in Q3-2015, full design/tender being prepared. "" "" "" "" 212 "" SHIP CONSTRUCTION Dublin City Hampton Wood 25 *N/A "" "" "" "" "" Q4-2016 213 "" SHIP CONSTRUCTION Dublin City Belcamp B, Dublin 17 12 *N/A "" Stage 2 approved in Q3-2015, full design/tender being prepared. "" "" "" "" 214 "" SHIP CONSTRUCTION Dublin City Bunratty Road Phase 1c, Dublin 17 78 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 215 "" SHIP CONSTRUCTION Dublin City Cornamona, Ballyfermot, Dublin 12 61 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 216 "" SHIP CONSTRUCTION Dublin City Infirmary Road, Dublin 7 38 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 217 "" SHIP CONSTRUCTION Dublin City North King Street, Dublin 7 30 *N/A "" "" Stage 3 approved in Q3-2017, the scheme is now being tendered. "" "" "" 218 "" SHIP CONSTRUCTION Dublin City Ballybough Road, Dublin 1 7 *N/A "" "" "" "" Q1-2017 "" 219 "" SHIP CONSTRUCTION Dublin City St. Finbar's Court, Kilkieran Road, Dublin 7 46 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 220 "" SHIP CONSTRUCTION Dublin City Priory Hall 9 *N/A "" "" "" "" "" Q1-2017 221 "" SHIP CONSTRUCTION Dublin City Priory Hall 26 *N/A "" "" "" "" Q2-2017 "" 222 "" REGENERATION Dublin City St. Teresa's Gardens 50 *N/A Stage 1 approved in Q3-2013, outline design and costs are now being prepared. "" "" "" "" "" 223 "" REGENERATION Dublin City Dolphin House, Dublin 8 (Phase 1) 100 *N/A "" "" "" "" Q4-2016 "" 224 "" REGENERATION Dublin City Dominick Street 72 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 225 "" REGENERATION Dublin City Sackville Avenue Cottages 12 *N/A Stage 1 approved in Q2-2016, outline design and costs are now being prepared. "" "" "" "" "" 226 "" REGENERATION Dublin City O'Devaney Gardens 56 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 227 "" REGENERATION Dublin City Charlemont 79 *N/A "" "" "" "" "" Q4-2017 228 "" REGENERATION Dublin City Maxwell Road 9 *N/A "" "" "" "" "" Q2-2016 229 "" REGENERATION Dublin City Buttercup, Darndale 19 *N/A "" "" "" "" "" Q4-2017 230 "" REGENERATION Dublin City Buttercup, Darndale 16 *N/A "" "" "" "" Q2-2017 "" 231 "" PUBLIC PRIVATE PARTNERSHIP (Bundle 1) Dublin City Ayrfield, Malahide Road 150 *N/A "" "" Q1 2018 "" "" "" 232 "" PUBLIC PRIVATE PARTNERSHIP (Bundle 1) Dublin City Scribblestown 70 *N/A "" "" Q1 2018 "" "" "" 233 "" CAS CONSTRUCTION Dublin City 38/39 Bolton Street, Dublin 1 8 Arlington Novas Ireland Ltd Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 234 "" CAS CONSTRUCTION Dublin City Beech Hill 19 Royal Hospital Donnybrook Voluntary Housing Association Ltd "" "" "" "" Q4-2017 "" 235 "" CAS CONSTRUCTION Dublin City Ellis Court, Dublin 23 Tath Housing Association "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 236 "" CAS CONSTRUCTION Dublin City """Martanna House"" High Park, Grace Park Road,Dublin 9" 8 Respond "" "" "" "" Q4-2017 "" 237 "" CAS CONSTRUCTION Dublin City 1 - 2 Rafter's Lane, Dublin 12 11 Walkinston Housing Association Ltd (WALK) "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 238 "" CAS CONSTRUCTION Dublin City 180-187 Townsend Street 18 Peter McVerry Trust Ltd "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 239 "" CAS CONSTRUCTION Dublin City Old Kilmainham Road, Dublin 8 11 Arlington Novas Ireland Ltd Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 240 "" CAS CONSTRUCTION Dublin City 26 New Street South, Dublin 8 8 Peter McVerry Trust Ltd "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 241 "" CAS CONSTRUCTION Dublin City Broome Lodge, Dunmanus, Dublin 7 10 Cluid Housing Association "" "" "" "" "" Q4-2017 242 "" CAS CONSTRUCTION Dublin City St Agatha's Court, North William Street, Dublin 1 11 Peter McVerry Trust Ltd "" "" "" "" "" Q2-2017 243 "" CAS CONSTRUCTION Dublin City 55B Arbour Hill, Dublin 7 18 Simon Community : Dublin Simon Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 244 "" CAS CONSTRUCTION Dublin City St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 52 Circle Voluntary Housing Association Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 245 "" CAS CONSTRUCTION Dublin City 61 & 63 Rathoath Avenue, Finglas, Dublin 11 6 Arlington Novas Ireland Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 246 "" CAS CONSTRUCTION Dublin City Debtor's Prison, Green Street, Dublin 7 12 Peter McVerry Trust Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 247 "" CAS CONSTRUCTION Dublin City Shaw Street, Dublin 2 12 Peter McVerry Trust Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 248 "" CALF CONSTRUCTION TURNKEY Dublin City St Agnes Convent, Armagh Road, Crumlin, Dublin 12 97 Fold Ireland Housing Association "" "" "" "" Q1-2017 "" 249 "" CALF CONSTRUCTION TURNKEY Dublin City Clongriffin, Dublin 13 84 The Iveagh Trust "" "" "" "" Q3-2017 "" 250 "" CALF CONSTRUCTION TURNKEY Dublin City Long Mile Road, Dublin 12 61 Respond! "" "" "" "" Q2-2017 "" 251 "" CALF CONSTRUCTION TURNKEY Dublin City Thornwood, Beaumont - Phase 1 46 Tath Housing Association "" "" "" "" "" Q3-2016 252 "" CALF CONSTRUCTION TURNKEY Dublin City Stormanstown Hall, Ballymun Road, (revised) 42 Oaklee Housing Trust "" "" "" "" Q4-2016 "" 253 "" CALF CONSTRUCTION TURNKEY Dublin City Thornwood, Beaumont - Final Phase 22 Tath Housing Association "" "" "" "" "" Q1-2017 254 "" CALF CONSTRUCTION TURNKEY Dublin City An Riasc, Farnham Drive, Finglas - Phase 2 21 Tath Housing Association "" "" "" "" "" Q1-2017 255 "" CALF CONSTRUCTION TURNKEY Dublin City Chanel College, Coolock Village, Malahide Road, Dublin 5 16 Respond! "" "" "" "" "" Q4-2017 256 "" CALF CONSTRUCTION TURNKEY Dublin City An Riasc, Farnham Drive, Finglas - Phase 1 14 Tath Housing Association "" "" "" "" "" Q4-2016 257 "" CALF CONSTRUCTION TURNKEY Dublin City An Riasc, Farnham Drive, Finglas - Phase 3 10 Tath Housing Association "" "" "" "" "" Q2-2017 258 "" CALF CONSTRUCTION TURNKEY Dublin City 175 176 North Strand Road, 5 Lamps, Dublin 1 10 Co-operative Housing Ireland "" "" "" "" Q1-2018 "" 259 "" CALF CONSTRUCTION TURNKEY Dublin City Milrose House, Bluebell Avenue, Dublin 12 8 Cluid Housing Association "" "" "" "" "" Q4-2017 260 "" CALF CONSTRUCTION TURNKEY Dublin City Merville Court, Merville Avenue, Fairview 5 Co operative Ireland "" "" "" "" "" Q1-2017 261 "" CALF CONSTRUCTION TURNKEY Dublin City Camac Place, Bluebell, Dublin 12 5 Oaklee Housing Trust "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 262 "" CALF CONSTRUCTION TURNKEY Dublin City An Riasc, Farnham Drive, Finglas - Final Phase 3 Tath Housing Association "" "" "" "" "" Q3-2017 263 "" CALF CONSTRUCTION TURNKEY Dublin City 11 13 Crumlin Village, Dublin 12 Phase 1 3 Cluid Housing Association "" "" "" "" "" Q2-2017 264 "" CALF CONSTRUCTION TURNKEY Dublin City 11 13 Crumlin Village, Dublin 12 Phase 2 2 Cluid Housing Association "" "" "" "" "" Q3-2017 265 "" CALF CONSTRUCTION Dublin City St Mary?s Mansions, Dublin 1 80 Cluid Housing Association "" "" "" "" Q4-2017 "" 266 "" CALF CONSTRUCTION Dublin City Orchard Lawns, Ballyfermot 72 Co-operative Housing Ireland "" "" "" "" Q4-2016 "" 267 "" CALF CONSTRUCTION Dublin City Annamore Court, Ballyfermot 70 The Iveagh Trust "" "" "" "" "" Q2-2017 268 "" CALF CONSTRUCTION Dublin City Tonlegee Road, Dublin 5 47 Fold Housing Association Ireland Ltd "" "" "" "" Q4-2017 "" 269 "" CALF CONSTRUCTION Dublin City Dolphin Park, Rialto, Dublin 8 43 Fold Ireland Housing Association "" "" "" Scheme approved for Revised CALF funding Q3-2017 "" "" 270 "" CALF CONSTRUCTION Dublin City Richmond Road, Dublin 9 39 Co-operative Housing Ireland "" "" "" "" Q2-2017 "" 271 "" CALF CONSTRUCTION Dublin City Raleigh Court, Crumlin 33 Tath Housing Association "" "" "" "" Q2-2017 "" 272 "" CALF CONSTRUCTION Dublin City Broome Lodge, Dunmanus Court, Cabra 33 Cluid Housing Association "" "" "" "" "" Q4-2017 273 "" CALF CONSTRUCTION Dublin City 5 6 Johns Lane West, Dublin 8 31 Focus Ireland "" "" "" "" Q2-2017 "" 274 "" CALF CONSTRUCTION Dublin City 84 North King Street, Dublin 7 30 Co-operative Housing Ireland "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 275 "" CALF CONSTRUCTION Dublin City Poplar Row, Dublin 3 29 Oaklee Housing Trust "" "" "" Scheme approved for revised CALF approval Q2-2017 "" "" 276 "" CALF CONSTRUCTION Dublin City Harolds Cross, Dublin 6 28 Focus Ireland "" "" "" "" "" Q4-2016 277 "" CALF CONSTRUCTION Dublin City Ballygall Road East - Phase 2 11 Fold Ireland Housing Association "" "" "" "" "" Q1-2016 278 "" CALF CONSTRUCTION Dublin City Wad River Close, Ballymun, Dublin 9 9 Cluid Housing Association "" "" "" Scheme re approved for approval Q3-2017 "" "" 279 "" CALF CONSTRUCTION Dublin City Dominic Place, Dublin 9 The Paddy McGrath Housing Project "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 280 "" SHIP CONSTRUCTION TURNKEY Fingal Blackmills Grove, Blakestown Road, Mulhuddard 10 *N/A "" "" "" "" "" Q2-2017 281 "" SHIP CONSTRUCTION TURNKEY Fingal Balgriffin Grove, Malahide Road, Balgriffin 6 *N/A "" "" "" "" "" Q1-2017 282 "" SHIP CONSTRUCTION TURNKEY Fingal Hansfield (Phase 1), Ongar, Dublin 15 16 *N/A "" "" "" "" "" Q1-2018 283 "" SHIP CONSTRUCTION TURNKEY Fingal Hansfield (Phase 2), Ongar, Dublin 15 16 *N/A "" "" "" "" Q4-2017 "" 284 "" SHIP CONSTRUCTION RAPID Fingal Avondale, Mulhuddart, Dublin 15 42 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 285 "" SHIP CONSTRUCTION RAPID Fingal Hansfield, Ongar, Dublin 15 36 *N/A "" "" "" "" "" Q3-2017 286 "" SHIP CONSTRUCTION RAPID Fingal Pinewood, Balbriggan 20 *N/A "" "" "" "" Q3-2017 "" 287 "" SHIP CONSTRUCTION RAPID Fingal Wellview, Mulhuddart 20 *N/A "" "" "" "" "" Q4-2017 288 "" SHIP CONSTRUCTION RAPID Fingal Church Road, Mulhuddart, Dublin 15 22 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 289 "" SHIP CONSTRUCTION Fingal Rivermeade, St. Margarets 2 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 290 "" SHIP CONSTRUCTION Fingal Rowlestown 20 *N/A "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 291 "" SHIP CONSTRUCTION Fingal Racecourse Common, Lusk (Phase 2.3) 34 *N/A "" "" "" "" Q4-2016 "" 292 "" SHIP CONSTRUCTION Fingal Cappaghfinn (Phase 2) 28 *N/A "" "" Stage 3 approved in Q4-2016. "" "" "" 293 "" SHIP CONSTRUCTION Fingal Castlelands Part View (Phase 3) 24 *N/A "" "" "" "" Q1-2017 "" 294 "" SHIP CONSTRUCTION Fingal Rathbeale Road, Swords 24 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 295 "" SHIP CONSTRUCTION Fingal The Grange, Ballyboughal (Part 1) 2 *N/A "" "" "" "" "" Q3-2017 296 "" SHIP CONSTRUCTION Fingal Cappaghfinn (Phase 1) 14 *N/A "" "" "" "" "" Q2-2016 297 "" SHIP CONSTRUCTION Fingal St. Cronan's Green, Swords 14 *N/A "" "" "" "" "" Q2-2016 298 "" SHIP CONSTRUCTION Fingal St. Conan's Cottages, Swords 1 *N/A "" "" "" "" "" Q2-2016 299 "" SHIP CONSTRUCTION Fingal Racecourse Common, Lusk (Phase 2.1) 25 *N/A "" "" "" "" "" Q4-2017 300 "" SHIP CONSTRUCTION Fingal The Grange, Ballyboughal (Part 2) 6 *N/A "" "" "" "" Q4-2016 "" 301 "" SHIP CONSTRUCTION Fingal Racecourse Commons, Lusk (Phase 2.2) 15 *N/A "" "" "" "" "" Q1-2018 302 "" CAS CONSTRUCTION Fingal Killhedge Lane Dun Emer 48 Tath Housing Association Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 303 "" CAS CONSTRUCTION Fingal Ravenswood, North Road, Finglas 6 Peter McVerry Trust Ltd "" "" "" "" Q1-2018 "" 304 "" CAS CONSTRUCTION Fingal 22 College Street, Baldoyle 4 Cluid Housing Association "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 305 "" CAS CONSTRUCTION Fingal Darcystown, Ringfort, Balrothery 9 North ? East Housing Association Ltd "" "" "" "" "" Q3-2017 306 "" CAS CONSTRUCTION Fingal Estuary Road, Malahide 8 Society of Saint Vincent de Paul "" "" "" "" Q2-2017 "" 307 "" CALF CONSTRUCTION TURNKEY Fingal The Hermitage, Balgriffin, Co. Dublin * 54 Cluid Housing Association "" "" "" "" "" Q4-2017 308 "" CALF CONSTRUCTION TURNKEY Fingal The Gallery, Donabate 43 Oaklee Housing Trust "" "" "" "" Q2-2017 "" 309 "" CALF CONSTRUCTION TURNKEY Fingal Weavers Walk, Clonsilla Road, Dublin 15 33 Co-operative Housing Ireland "" "" "" "" Q3-2017 "" 310 "" CALF CONSTRUCTION TURNKEY Fingal Millers Glen, Oldtown, Swords 28 The Iveagh Trust "" "" "" "" Q1-2018 "" 311 "" CALF CONSTRUCTION TURNKEY Fingal Castlegrange, Clonsilla - Phase 2 21 Tath Housing Association "" "" "" "" "" Q1-2017 312 "" CALF CONSTRUCTION TURNKEY Fingal Castlegrange, Clonsilla - Phase 1 19 Tath Housing Association "" "" "" "" "" Q4-2016 313 "" CALF CONSTRUCTION TURNKEY Fingal St Werburghs Court, Drynam Rd, Swords* 18 Tath Housing Association "" "" "" "" "" Q4-2017 314 "" CALF CONSTRUCTION TURNKEY Fingal St Marnock's Bay, Portmarnock * 10 Cluid Housing Association "" "" "" "" "" Q4-2017 315 "" CALF CONSTRUCTION TURNKEY Fingal Castlegrange, Clonsilla - Phase 3 8 Tath Housing Association "" "" "" "" "" Q2-2017 316 "" CALF CONSTRUCTION TURNKEY Fingal Ladyswell Road & Church Road, Mulhuddart, Dublin 15 43 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q4-2017 post tender proposal "" "" 317 "" CALF CONSTRUCTION TURNKEY Fingal Millers Glen, Phase 3, Oldtown, Swords 14 The Iveagh Trust "" "" "" Scheme approved for CALF funding Q1 2018 "" "" 318 "" SHIP CONSTRUCTION Galway City Ballymoneen Road (Phase 2) 78 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 319 "" SHIP CONSTRUCTION Galway City Ballymoneen Road (Phase 1) 14 *N/A "" "" "" "" Q2-2017 "" 320 "" SHIP CONSTRUCTION Galway City Ballinfoile Park, Headford Road (Infill Units) 10 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 321 "" SHIP CONSTRUCTION Galway City Corrib Park (Infill Units) 4 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 322 "" SHIP CONSTRUCTION Galway City Castlepark, Ballybane (Infill Units) 4 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 323 "" SHIP CONSTRUCTION Galway City Monivea Road, Ballybaan More, Galway 57 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 324 "" CAS CONSTRUCTION Galway City 97/98 Rockfield 4 Carraig Dubh Housing Association "" "" "" "" "" Q1-2018 325 "" CAS CONSTRUCTION Galway City Cul Garrai, Rahoon 6 Peter Triest Housing Association Ltd Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 326 "" CAS CONSTRUCTION Galway City 47 Forster Street 9 Cope Galway "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 327 "" CALF CONSTRUCTION TURNKEY Galway City Castlegar Road, Galway 81 Respond! "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 328 "" CALF CONSTRUCTION TURNKEY Galway City Maigh Rua, Doughiska, Galway 23 Co operative Ireland "" "" "" "" "" Q4-2017 329 "" CALF CONSTRUCTION TURNKEY Galway City Murrough, Renmore, Galway 20 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 330 "" CALF CONSTRUCTION TURNKEY Galway City Boireann Beag, Ros Cam, Galway 16 Cluid Housing Association "" "" "" "" "" Q4-2016 331 "" CALF CONSTRUCTION TURNKEY Galway City Reilean, Roscam, Block 5 Galway * 12 Tath Housing Association "" "" "" "" "" Q2-2017 332 "" CALF CONSTRUCTION TURNKEY Galway City Reilean, Roscam, Block 4 Galway * 12 Tath Housing Association "" "" "" "" "" Q2-2017 333 "" CALF CONSTRUCTION TURNKEY Galway City Maoilin, Ballymoneen Road, Galway - Phase 2 * 4 Tath Housing Association "" "" "" "" "" Q4-2017 334 "" CALF CONSTRUCTION TURNKEY Galway City Maoilin, Ballymoneen Road, Galway - Phase 1 * 2 Tath Housing Association "" "" "" "" "" Q1-2017 335 "" CALF CONSTRUCTION TURNKEY Galway City Cnoc na R, clybaun Road, Galway * 2 Cluid Housing Association "" "" "" "" "" Q3-2017 336 "" CALF CONSTRUCTION TURNKEY Galway City 77, 80 and 81 Maoilin, Ballymoneen Road, Knocknacarra, Galway City 3 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 337 "" SHIP CONSTRUCTION TURNKEY Galway County Kinvara 6 *N/A "" "" "" "" "" Q4-2017 338 "" SHIP CONSTRUCTION TURNKEY Galway County Athenry 14 *N/A "" "" "" "" "" Q4-2017 339 "" SHIP CONSTRUCTION TURNKEY Galway County Portumna 10 *N/A "" "" "" "" "" Q4-2017 340 "" SHIP CONSTRUCTION Galway County Esker Fields, Ballinasloe 2 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 341 "" SHIP CONSTRUCTION Galway County Garbally Drive, Ballinasloe 10 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 342 "" SHIP CONSTRUCTION Galway County Weir Road, Tuam 30 *N/A "" "" Stage 3 approved in Q3-2017, the scheme is now being tendered. "" "" "" 343 "" SHIP CONSTRUCTION Galway County Culleen, Carraroe, Connemara 6 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 344 "" SHIP CONSTRUCTION Galway County Ardrahan (SRD) 1 *N/A "" "" "" "" "" Q4-2017 345 "" SHIP CONSTRUCTION Galway County Callowfinish, Carna (SRD) 1 *N/A "" "" "" "" Q2-2017 "" 346 "" SHIP CONSTRUCTION Galway County Waterdale, Claregalway (SRD) 1 *N/A "" "" "" "" Q4-2017 "" 347 "" SHIP CONSTRUCTION Galway County Corndulla (SRD) 1 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 348 "" SHIP CONSTRUCTION Galway County Cill Ciarn (SRD) 1 *N/A "" "" "" "" Q3-2017 "" 349 "" SHIP CONSTRUCTION Galway County Kinvara (SRD) 1 *N/A "" "" "" "" Q2-2017 "" 350 "" SHIP CONSTRUCTION Galway County Roundstone 10 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 351 "" SHIP CONSTRUCTION Galway County Sruchain an Chlair, Oughterard 10 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 352 "" SHIP CONSTRUCTION Galway County St. Joseph's, Clifden 23 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 353 "" SHIP CONSTRUCTION Galway County Bridge Court, Ahascragh, Ballinasloe 16 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 354 "" SHIP CONSTRUCTION Galway County Gilmartin Road, Tuam 61 *N/A "" "" "" "" Q4-2017 "" 355 "" CAS CONSTRUCTION Galway County Letterfrack (Phase 2) 11 Cluid Housing Association Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 356 "" CAS CONSTRUCTION Galway County Rossaveal Cottages, Ros a Mhl, South Connemara 8 Tearmann Eanna Teoranta Stage 1 approved in Q4-2016, outline design and costs are now being prepared. "" "" "" "" "" 357 "" CAS CONSTRUCTION Galway County Cregboy, Claregalway 14 Claregalway and District Day Care Centre "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 358 "" CAS CONSTRUCTION Galway County Eanach Mheain, Carraroe 13 Tearmann Eanna Teoranta "" Stage 2 approved in Q2-2016, full design/tender being prepared. "" "" "" "" 359 "" CAS CONSTRUCTION Galway County Mountbellew 5 Mountbellew Voluntary Homes Association Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 360 "" CAS CONSTRUCTION Galway County Springfield, Parkmore 4 Peter Triest Housing Association Ltd Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 361 "" CAS CONSTRUCTION Galway County Letterfrack (Phase 1) 13 Cluid Housing Association "" "" "" "" "" Q2-2016 362 "" CAS CONSTRUCTION Galway County Dunlo Hill, Ballinasloe 17 Cluid Housing Association "" "" Stage 3 approved in Q1-2016, the scheme is now being tendered. "" "" "" 363 "" CAS CONSTRUCTION Galway County Caheroyn, Athenry 1 Peter Triest Housing Association Ltd Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 364 "" CAS CONSTRUCTION Galway County Aggard More, Craughwell 5 Peter Triest Housing Association Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 365 "" CAS CONSTRUCTION Galway County The Old Post Office, Inverin 4 Tearmann Eanna Teoranta "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 366 "" CALF CONSTRUCTION TURNKEY Galway County Cnoc na Si, Portumna 10 Co-operative Housing Ireland "" "" "" "" Q4-2016 "" 367 "" CALF CONSTRUCTION TURNKEY Galway County Vicars Choral, Tuam, Co Galway 13 Co-operative Housing Ireland "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 368 "" CALF CONSTRUCTION TURNKEY Galway County Cnoc na Si, Portumna 3 Co-operative Housing Ireland "" "" "" "" Q4-2016 "" 369 "" CALF CONSTRUCTION Galway County Spiddal Cottages, Co Galway - Phase 1 23 Cluid Housing Association "" "" "" "" "" Q3-2017 370 "" CALF CONSTRUCTION Galway County Spiddal Cottages, Co Galway - Phase 2 8 Cluid Housing Association "" "" "" "" Q1-2017 "" 371 "" SHIP CONSTRUCTION TURNKEY Kerry Ard Na Si, Lispole (Phase 2) 8 *N/A "" "" "" "" Q2-2017 "" 372 "" SHIP CONSTRUCTION TURNKEY Kerry Ard Na Si, Lispole (Phase 1) 2 *N/A "" "" "" "" "" Q1-2018 373 "" SHIP CONSTRUCTION TURNKEY Kerry Cahirdown Wood, Listowel 38 *N/A "" "" "" Stage 4 approved in Q3-2017, the scheme is now fully approved. "" "" 374 "" SHIP CONSTRUCTION TURNKEY Kerry 1-4 Steeple Meadow View, Milltown 4 *N/A "" "" "" "" "" Q4-2017 375 "" SHIP CONSTRUCTION TURNKEY Kerry 1-9 Meadow Park, Milltown (Phase 2) 7 *N/A "" "" "" "" Q4-2017 "" 376 "" SHIP CONSTRUCTION TURNKEY Kerry 1-9 Meadow Park, Milltown (Phase 1) 2 *N/A "" "" "" "" "" Q1-2018 377 "" SHIP CONSTRUCTION Kerry Ardmoneel, Killorglin 14 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 378 "" SHIP CONSTRUCTION Kerry Rathmore/Barraduff 20 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 379 "" SHIP CONSTRUCTION Kerry Ardbhearna, Kenmare 22 *N/A "" "" "" "" Q4-2017 "" 380 "" SHIP CONSTRUCTION Kerry Bill Kinnerk Road, Tralee 4 *N/A "" "" "" "" "" Q1-2018 381 "" SHIP CONSTRUCTION Kerry Milltown 8 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 382 "" SHIP CONSTRUCTION Kerry Killeen, Tralee 21 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 383 "" SHIP CONSTRUCTION Kerry Lixnaw 4 *N/A "" "" "" "" "" Q4-2017 384 "" SHIP CONSTRUCTION Kerry The Park, Killarney 20 *N/A "" "" "" "" "" Q1-2018 385 "" SHIP CONSTRUCTION Kerry Courthouse Lawn, Listowel 7 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 386 "" SHIP CONSTRUCTION Kerry Dreenagh, Ballyheigue (SRD) 1 *N/A "" "" "" "" "" Q1-2017 387 "" SHIP CONSTRUCTION Kerry Marconi Avenue, Ballybunion 20 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 388 "" SHIP CONSTRUCTION Kerry Callinafercy, Milltown 1 *N/A "" "" "" "" Q1-2018 "" 389 "" SHIP CONSTRUCTION Kerry Cahernaboshina, Ventry 1 *N/A "" "" "" "" Q4-2017 "" 390 "" SHIP CONSTRUCTION Kerry Balloonagh, Tralee 28 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 391 "" SHIP CONSTRUCTION Kerry Pinewood Estate, Killarney 1 *N/A "" "" "" "" Q1-2018 "" 392 "" SHIP CONSTRUCTION Kerry Drom West, Glenbeigh 1 *N/A "" "" "" "" Q1-2018 "" 393 "" SHIP CONSTRUCTION Kerry Meanus, Killorglin 1 *N/A "" "" Stage 3 approved in Q3-2017, the scheme is now being tendered. "" "" "" 394 "" SHIP CONSTRUCTION Kerry Tullig Beg, Killorglin 1 *N/A "" "" Stage 3 approved in Q3-2017, the scheme is now being tendered. "" "" "" 395 "" SHIP CONSTRUCTION Kerry Owngarry, killorglin 1 *N/A "" "" "" "" Q1-2018 "" 396 "" SHIP CONSTRUCTION Kerry Lohercannon, Tralee 56 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 397 "" SHIP CONSTRUCTION Kerry BallinaKilly Lower, Glenbeigh 1 *N/A "" "" "" "" Q1-2018 "" 398 "" SHIP CONSTRUCTION Kerry Ashgrove, Listowel 1 *N/A "" "" "" "" "" Q3-2017 399 "" SHIP CONSTRUCTION Kerry Cullenagh Upper, Beaufort 1 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 400 "" SHIP CONSTRUCTION Kerry Farranwilliam, Ardfert 24 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 401 "" REGENERATION Kerry Croilar Na Mistaelach, Tralee 11 *N/A "" "" "" "" Q2-2017 "" 402 "" REGENERATION Kerry Urban Terrace, Tralee 2 *N/A "" "" "" "" "" Q4-2016 403 "" REGENERATION Kerry Clonmore Road, Tralee 3 *N/A "" "" "" "" "" Q4-2016 404 "" REGENERATION Kerry St Martin's Park, Tralee 4 *N/A "" "" "" "" Q2-2017 "" 405 "" REGENERATION Kerry Dingle Road, Tralee 1 *N/A "" "" "" "" Q1-2017 "" 406 "" CAS CONSTRUCTION Kerry Armagh House, Killarney 6 Cluid Housing Association "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 407 "" CAS CONSTRUCTION Kerry 22 College Road, Castleisland 4 Kerry Emigrant Support Housing Association Ltd "" "" "" "" Q4-2017 "" 408 "" CAS CONSTRUCTION Kerry Mitchels-Boherbee 18 Cluid Housing Association "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 409 "" CAS CONSTRUCTION Kerry The Parsonage, Caherciveen 5 Caherciveen Social Services (Housing) Ltd "" "" "" "" Q4-2017 "" 410 "" CAS CONSTRUCTION Kerry Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee 15 Kingdom Voluntary Housing Association "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 411 "" CAS CONSTRUCTION Kerry The Presentation Convent, Rathmore 4 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 412 "" CALF CONSTRUCTION TURNKEY Kerry Cathair Lakes Farrantoreen Road, Killorglin 6 Cluid Housing Association "" "" "" "" "" Q2-2016 413 "" CALF CONSTRUCTION TURNKEY Kerry Derreen, Killarney, Co. Kerry 61 Cluid Housing Associatiion "" "" "" Q1 2018 "" "" 414 "" SHIP CONSTRUCTION TURNKEY Kildare Bodkin Place, Kilmeague 16 *N/A "" "" "" "" "" Q4-2017 415 "" SHIP CONSTRUCTION TURNKEY Kildare Drogheda Street (Cassidy's Court), Monasterevin 6 *N/A "" "" "" "" "" Q4-2017 416 "" SHIP CONSTRUCTION TURNKEY Kildare Oaktree, Tully Road, Kildare Town 8 *N/A "" "" "" "" Q1-2018 "" 417 "" SHIP CONSTRUCTION TURNKEY Kildare Mossbrook, Prosperous 2 *N/A "" "" "" "" "" Q1-2018 418 "" SHIP CONSTRUCTION TURNKEY Kildare Moore Abbey Court, Monasterevin 2 *N/A "" "" "" "" "" Q1-2018 419 "" SHIP CONSTRUCTION TURNKEY Kildare Kilcock (Phase 2.2) 13 *N/A "" "" "" "" "" Q1-2018 420 "" SHIP CONSTRUCTION TURNKEY Kildare Drogheda Street (Cassidy's Court), Monasterevin 7 *N/A "" "" "" "" "" Q1-2018 421 "" SHIP CONSTRUCTION RAPID Kildare Old Greenfield Road, Maynooth 47 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 422 "" SHIP CONSTRUCTION Kildare Hillview Terrace, Narraghmore 4 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 423 "" SHIP CONSTRUCTION Kildare Athgarvan Village 20 *N/A Stage 1 approved in Q3-2016, outline design and costs are now being prepared. "" "" "" "" "" 424 "" SHIP CONSTRUCTION Kildare Rathasker Road, Naas 48 *N/A Stage 1 approved in Q1-2016, outline design and costs are now being prepared. "" "" "" "" "" 425 "" SHIP CONSTRUCTION Kildare Dunmurry Rise, Bishopsland 32 *N/A "" "" "" "" Q1-2018 "" 426 "" SHIP CONSTRUCTION Kildare Anne Street, Prosperous 12 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 427 "" SHIP CONSTRUCTION Kildare Beechgrove, Rathangan 18 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 428 "" SHIP CONSTRUCTION Kildare Kilcock (Phase 2.1) 6 *N/A "" "" "" "" "" Q4-2017 429 "" SHIP CONSTRUCTION Kildare Athgarvan Road, Newbridge 13 *N/A "" "" "" "" Q2-2017 "" 430 "" SHIP CONSTRUCTION Kildare Dominican Church Site, Athy 30 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 431 "" SHIP CONSTRUCTION Kildare Newtown, Leixlip 4 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 432 "" SHIP CONSTRUCTION Kildare Coill Dubh, Co. Kildare 9 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 433 "" SHIP CONSTRUCTION Kildare Ardclough Road, Celbridge 36 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 434 "" PUBLIC PRIVATE PARTNERSHIP (Bundle 1) Kildare Craddockstown, Naas 74 *N/A "" "" Q1 2018 "" "" "" 435 "" CAS CONSTRUCTION Kildare Craddockstown, Naas 3 KARE Promoting Inclusion for People with Intellectual Disabilities Stage 1 approved in Q3-2016, outline design and costs are now being prepared. "" "" "" "" "" 436 "" CAS CONSTRUCTION Kildare Main St., Kilcullen 4 Camphill Communities of Ireland "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 437 "" CAS CONSTRUCTION Kildare El Kantara, Newbridge 2 KARE Promoting Inclusion for People with Intellectual Disabilities Stage 1 approved in Q1-2016, outline design and costs are now being prepared. "" "" "" "" "" 438 "" CAS CONSTRUCTION Kildare Mansfield Grove, Athy 4 KARE Promoting Inclusion for People with Intellectual Disabilities Stage 1 approved in Q1-2016, outline design and costs are now being prepared. "" "" "" "" "" 439 "" CAS CONSTRUCTION Kildare Jigginstown House, Naas 12 Homeless Care Ltd "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 440 "" CALF CONSTRUCTION TURNKEY Kildare Gallows Hill, Athy 24 Respond! "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 441 "" CALF CONSTRUCTION TURNKEY Kildare Roseberry Hill, Newbridge - Phase 3 16 Tath Housing Association "" "" "" "" "" Q1-2018 442 "" CALF CONSTRUCTION TURNKEY Kildare Roseberry Hill, Newbridge - Phase 2 16 Tath Housing Association "" "" "" "" "" Q4-2017 443 "" CALF CONSTRUCTION TURNKEY Kildare Roseberry Hill, Newbridge - Phase 1 13 Tath Housing Association "" "" "" "" "" Q2-2017 444 "" CALF CONSTRUCTION TURNKEY Kildare The Pike, Shenagun, Castledermot 6 Respond! "" "" "" Scheme approved for CALF funding Q1-2017 "" "" 445 "" CALF CONSTRUCTION TURNKEY Kildare Moorefield Road, Newbridge 2 Co-operative Housing Ireland "" "" "" "" Q2-2017 "" 446 "" CALF CONSTRUCTION TURNKEY Kildare Millfield Manor, Newbridge, Co. Kildare * 19 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 447 "" CALF CONSTRUCTION Kildare Rye Abbey, Kilcock, (Apts) 33 Cluid Housing Association "" "" "" "" "" Q4-2017 448 "" CALF CONSTRUCTION Kildare Morristown, Newbridge, Co Kildare 14 Cluid Housing Association "" "" "" "" "" Q1-2018 449 "" CALF CONSTRUCTION Kildare Rye Abbey, Kilcock, (houses) 4 Cluid Housing Association "" "" "" "" "" Q4-2017 450 "" SHIP CONSTRUCTION TURNKEY Kilkenny Togher Way, Urlingford 11 *N/A "" "" "" "" "" Q3-2017 451 "" SHIP CONSTRUCTION TURNKEY Kilkenny Newpark, Castlecomer Road, Kilkenny 7 *N/A "" "" "" "" "" Q1-2017 452 "" SHIP CONSTRUCTION TURNKEY Kilkenny Abbeygate, Ferrybank (Phase 1) 8 *N/A "" "" "" "" "" Q1-2018 453 "" SHIP CONSTRUCTION TURNKEY Kilkenny Togher Way, Urlingford 5 *N/A "" "" "" "" "" Q4-2017 454 "" SHIP CONSTRUCTION TURNKEY Kilkenny Abbeygate, Ferrybank (Phase 2) 3 *N/A "" "" "" "" Q2-2017 "" 455 "" SHIP CONSTRUCTION Kilkenny Blackstaff House, Callan 4 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 456 "" SHIP CONSTRUCTION Kilkenny Barna, Freshford 1 *N/A "" "" "" "" Q4-2017 "" 457 "" SHIP CONSTRUCTION Kilkenny 10 Golf Links Road, Kilkenny 7 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 458 "" SHIP CONSTRUCTION Kilkenny Crokers Hill, Pennyswell Road, Kilkenny 80 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 459 "" SHIP CONSTRUCTION Kilkenny Main Street, Piltown 17 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 460 "" SHIP CONSTRUCTION Kilkenny Station Road, Ballyragget 22 *N/A Stage 1 approved in Q4-2016, outline design and costs are now being prepared. "" "" "" "" "" 461 "" SHIP CONSTRUCTION Kilkenny Abbeyquarter Vicar Street (Sweeney's Orchard), Kilkenny 30 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 462 "" SHIP CONSTRUCTION Kilkenny Bolton, Callan 38 *N/A "" "" "" Stage 4 approved in Q3-2017, the scheme is now fully approved. "" "" 463 "" SHIP CONSTRUCTION Kilkenny Donaguile, Castlecomer 33 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 464 "" SHIP CONSTRUCTION Kilkenny Robertshill, Kilkenny 4 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 465 "" SHIP CONSTRUCTION Kilkenny The Butts, Kilkenny 22 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 466 "" SHIP CONSTRUCTION Kilkenny Rosehill, Kells Road, Kilkenny 6 *N/A "" "" "" "" "" Q1-2017 467 "" SHIP CONSTRUCTION Kilkenny Gaol Road, Kilkenny 10 *N/A "" "" "" "" "" Q3-2016 468 "" SHIP CONSTRUCTION Kilkenny Greensbridge House 5 *N/A "" "" "" "" Q1-2018 "" 469 "" SHIP CONSTRUCTION Kilkenny The Broguemaker, Kilkenny 15 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 470 "" CAS CONSTRUCTION Kilkenny Kingsriver, Ennisnag 2 Kingsriver Housing Association Limited "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 471 "" CAS CONSTRUCTION Kilkenny Garrin Green 6 SOS Kilkenny Housing Association Ltd "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 472 "" CAS CONSTRUCTION Kilkenny Hazelbrook, Newrath 2 Waterford Dove Housing Association "" "" "" "" "" Q1-2018 473 "" CAS CONSTRUCTION Kilkenny Golf Links Road, Kilkenny 15 Respond Stage 1 approved in Q2-2016, outline design and costs are now being prepared. "" "" "" "" "" 474 "" CAS CONSTRUCTION Kilkenny Ballytobin, Callan 4 Camphill Communities of Ireland "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 475 "" CAS CONSTRUCTION Kilkenny Good Shepherd Centre - Wing 1952 12 The Good Shepherd Centre (Kilkenny) Ltd "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 476 "" CAS CONSTRUCTION Kilkenny Nimble Spaces Project at Callan 15 Camphill Communities of Ireland "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 477 "" CAS CONSTRUCTION Kilkenny """Brooke House"", Thomastown" 5 Camphill Communities of Ireland "" "" "" "" "" Q3-2017 478 "" CAS CONSTRUCTION Kilkenny Friary Walk, Callan 12 Cluid Housing Association "" "" "" "" "" Q3-2016 479 "" CAS CONSTRUCTION Kilkenny Camphill ~Communities Garden Cottage, The Workhouse, Callan 1 Camphill Communities of Ireland "" "" "" "" "" Q4-2017 480 "" CAS CONSTRUCTION Kilkenny Kyle, Callan, Co. Kilkenny 4 Camphill Communities of Ireland Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 481 "" CAS CONSTRUCTION Kilkenny """Red Barn"" Patrick Street, Ballyragget" 16 Good Shepherd Services Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 482 "" CAS CONSTRUCTION Kilkenny Smith's Road, Ballyraggett Oaklee 4 Oaklee Housing Trust Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 483 "" CAS CONSTRUCTION Kilkenny Fennelly's Lane Jerpoint 5 Camphill Communities of Ireland Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 484 "" CALF CONSTRUCTION TURNKEY Kilkenny Logan Square, Thomastown, Co. Kilkenny* 16 Oaklee "" "" "" "" "" Q4-2017 485 "" CALF CONSTRUCTION TURNKEY Kilkenny Moneenview side Rd, Moneenroe 9 Oaklee Housing Trust "" "" "" "" Q1-2017 "" 486 "" CALF CONSTRUCTION TURNKEY Kilkenny Chapel St. and New Road, Mooncoin, Co. Kilkenny 6 Respond! "" "" "" Scheme approved for CALF Funding Q3-2017 "" "" 487 "" CALF CONSTRUCTION Kilkenny Golf Links Road, Kilkenny * 39 Respond! "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 488 "" CALF CONSTRUCTION Kilkenny Friary Walk, Callan 16 Cluid Housing Association "" "" "" "" Q1-2018 "" 489 "" SHIP CONSTRUCTION Laois Main Street, Rathdowney 6 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 490 "" SHIP CONSTRUCTION Laois Harpurs Lane, Portlaoise 1 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 491 "" SHIP CONSTRUCTION Laois Ballymorris Road, Portarlington 22 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 492 "" SHIP CONSTRUCTION Laois Gleann na Glaise, Ballyroan 10 *N/A Stage 1 approved in Q3-2016, outline design and costs are now being prepared. "" "" "" "" "" 493 "" SHIP CONSTRUCTION Laois Pattison Est. Mountmellick 10 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 494 "" SHIP CONSTRUCTION Laois Shannon Street, Mountrath 8 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 495 "" SHIP CONSTRUCTION Laois Conniberry Way, Old Knockmay Road, Portlaoise 33 *N/A "" "" "" "" Q4-2016 "" 496 "" CAS CONSTRUCTION Laois St. Fintan's Hospital, Dublin Road, Portlaoise 8 Oaklee Housing Trust "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 497 "" CALF CONSTRUCTION Laois Cluin Inn Mountrath 11 Oaklee Housing Trust "" "" "" "" "" Q1-2018 498 "" CALF CONSTRUCTION Laois 55/56 Kirwan Park, Mountmellick 2 Cluid Housing Association "" "" "" "" Q1-2018 "" 499 "" CALF CONSTRUCTION TURNKEY Laois 31 36 Droimnin, Stradbally 6 Cluid Housing Association "" "" "" "" Q4-2017 "" 500 "" SHIP CONSTRUCTION Leitrim Summerhill, Carrick on Shannon 28 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 501 "" SHIP CONSTRUCTION Leitrim Taobh Tire, Manorhamilton (Phase 2) 7 *N/A "" "" "" "" Q2-2017 "" 502 "" CAS CONSTRUCTION Leitrim Ballinamore 2 Society of Saint Vincent de Paul "" "" "" "" "" Q4-2017 503 "" SHIP CONSTRUCTION RAPID Limerick Deerpark, Adare 30 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 504 "" SHIP CONSTRUCTION RAPID Limerick Lisheen Park, Patrickswell 16 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 505 "" SHIP CONSTRUCTION RAPID Limerick Upper Carey's Road 11 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 506 "" SHIP CONSTRUCTION RAPID Limerick Old Christians Site, Rathbane 33 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 507 "" SHIP CONSTRUCTION RAPID Limerick Mountpelier 10 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 508 "" SHIP CONSTRUCTION RAPID Limerick Knocklong 10 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 509 "" SHIP CONSTRUCTION RAPID Limerick Patrickswell (Site 2) 28 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 510 "" SHIP CONSTRUCTION Limerick Patrick?s Villas, Castleconnell 4 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 511 "" SHIP CONSTRUCTION Limerick Ballysimon, Greenhill Road 14 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 512 "" SHIP CONSTRUCTION Limerick Gough Place, Rosbrien Road, Limerick 7 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 513 "" SHIP CONSTRUCTION Limerick 1-12 Burke Avenue, Limerick City 12 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 514 "" SHIP CONSTRUCTION Limerick Chas Flats, Limerick City 3 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 515 "" SHIP CONSTRUCTION Limerick Sexton Street North & Kileely Court 5 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 516 "" SHIP CONSTRUCTION Limerick Site Adj. to Athlunkard Boat Club, Limerick City 4 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 517 "" SHIP CONSTRUCTION Limerick Joseph Street, Limerick City 3 *N/A Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 518 "" SHIP CONSTRUCTION Limerick Wallers Well, Limerick City (Phase 2) 11 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 519 "" SHIP CONSTRUCTION Limerick Clonmacken, Limerick City 38 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 520 "" SHIP CONSTRUCTION Limerick Glenview Drive, Hospital 20 *N/A "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 521 "" SHIP CONSTRUCTION Limerick Clare Street, Limerick City 7 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 522 "" SHIP CONSTRUCTION Limerick Hasset Villas, Thomondgate 3 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 523 "" SHIP CONSTRUCTION Limerick Kilmurry Court, Garryowen 6 *N/A "" "" Stage 3 approved in Q3-2017, the scheme is now being tendered. "" "" "" 524 "" SHIP CONSTRUCTION Limerick Vance's Lands, Limerick City 37 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 525 "" SHIP CONSTRUCTION Limerick Rathbane Road, Limerick City 2 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 526 "" SHIP CONSTRUCTION Limerick Sycamore Avenue, Limerick City 5 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 527 "" SHIP CONSTRUCTION Limerick Lower Carey's Road, Limerick City 11 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 528 "" SHIP CONSTRUCTION Limerick Ballygrennan Road, Moyross 3 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 529 "" SHIP CONSTRUCTION Limerick Kileely Road, Moyross 5 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 530 "" SHIP CONSTRUCTION Limerick Ballygreannan Road, Limerick City 2 *N/A "" "" "" "" "" Q4-2017 531 "" SHIP CONSTRUCTION Limerick Clare Street, Limerick City 2 *N/A "" "" "" "" "" Q4-2017 532 "" SHIP CONSTRUCTION Limerick Ballyhahill 4 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 533 "" SHIP CONSTRUCTION Limerick Knockalisheen Road, Moyross 6 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 534 "" SHIP CONSTRUCTION Limerick Colbert Terrace, Abbeyfeale 9 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 535 "" SHIP CONSTRUCTION Limerick St. Michael's Court, Watergate Flats, 9 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 536 "" REGENERATION Limerick Lord Edward Street, P2: Main Contract 79 *N/A "" "" "" "" "" Q4-2017 537 "" REGENERATION Limerick Lord Edward Street, P2: Main Contract 2 *N/A "" "" "" "" "" Q1-2017 538 "" REGENERATION Limerick Gaol Lane 1 *N/A "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 539 "" REGENERATION Limerick Sheep / Athlunkards Street 8 *N/A "" Stage 2 approved in Q2-2014, full design/tender being prepared. "" "" "" "" 540 "" REGENERATION Limerick Churchfield (Phase 1A) 19 *N/A "" "" "" "" "" Q1-2018 541 "" REGENERATION Limerick Churchfield (Phase 1B) 23 *N/A "" "" "" "" Q3-2016 "" 542 "" REGENERATION Limerick Churchfield (Phase 2) 38 Circle Voluntary Housing Association Ltd "" Stage 2 approved in Q4-2014, full design/tender being prepared. "" "" "" "" 543 "" REGENERATION Limerick Cosgrave Park 30 Co-operative Housing Ireland (Formerly NABCo) "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 544 "" REGENERATION Limerick Palm Court 27 Respond "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 545 "" REGENERATION Limerick Orchard Site 26 Oaklee Housing Trust "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 546 "" REGENERATION Limerick 176 & 177 Cliona Park 2 *N/A "" "" "" "" "" Q2-2016 547 "" REGENERATION Limerick Cliona Park (Phase 2) 10 *N/A "" "" "" "" "" Q2-2017 548 "" REGENERATION Limerick 8-10 Gaol Lane 3 *N/A "" "" "" "" "" Q4-2016 549 "" REGENERATION Limerick 1 3 Weston Gardens 3 *N/A "" "" "" "" "" Q2-2016 550 "" REGENERATION Limerick 2016 Moyross Rebuild 6 *N/A "" "" "" "" "" Q4-2016 551 "" REGENERATION Limerick 2016 Southhill Rebuild 8 *N/A "" "" "" "" "" Q4-2016 552 "" REGENERATION Limerick 2016 St. Mary's Park Rebuild 9 *N/A "" "" "" "" "" Q4-2016 553 "" REGENERATION Limerick BCW Vacant Refurbs, Lot 1 & 2** 13 *N/A "" "" "" "" "" Q4-2016 554 "" REGENERATION Limerick St. Mary's Park Infills 19 Tath Housing Association "" "" "" "" Q3-2017 "" 555 "" REGENERATION Limerick Cliona Park (Phase 3) 18 Tath Housing Association "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 556 "" REGENERATION Limerick Carew Park 37 *N/A Stage 1 approved in Q1-2015, outline design and costs are now being prepared. "" "" "" "" "" 557 "" REGENERATION Limerick 45-46 Cliona Park 2 *N/A "" Stage 2 approved in Q1-2016, full design/tender being prepared. "" "" "" "" 558 "" REGENERATION Limerick Dalgaish Park 24 Cluid Housing Association Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 559 "" REGENERATION Limerick Markievicz Drive 13 *N/A Stage 1 approved in Q1-2015, outline design and costs are now being prepared. "" "" "" "" "" 560 "" REGENERATION Limerick 2017 St Mary's Park Rebuild 1 *N/A "" "" "" "" "" Q4-2017 561 "" REGENERATION Limerick 2017 Ballinacurra Weston Rebuild 1 *N/A "" "" "" "" "" Q4-2017 562 "" REGENERATION Limerick 2017 Southill Rebuilds 13 *N/A "" "" "" "" "" Q4-2017 563 "" REGENERATION Limerick 2017 Moyross Rebuild 1 *N/A "" "" "" "" "" Q4-2017 564 "" CAS CONSTRUCTION Limerick Towerfield Crescent, Croom 10 Croom Voluntary Housing Association Ltd "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 565 "" CAS CONSTRUCTION Limerick Cappamore 12 Cappamore Housing Association Ltd "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 566 "" CAS CONSTRUCTION Limerick Speakers Corner, Limerick City 4 Simon Community : Midwest Simon "" "" "" "" Q1-2018 "" 567 "" CAS CONSTRUCTION Limerick Cuan Mhuire, Bruree 6 Cuan Mhuire Teoranta "" "" "" "" Q3-2017 "" 568 "" CAS CONSTRUCTION Limerick Mirth, Thomondgate 12 Associated Charities Trust Ltd "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 569 "" CAS CONSTRUCTION Limerick Cois na Feile, Abbeyfeale 12 Cluid Housing Association "" "" "" "" "" Q4-2016 570 "" CAS CONSTRUCTION Limerick Convent Street, King's Island 2 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 571 "" CAS CONSTRUCTION Limerick 2/3 Mallow Street 6 Peter McVerry Trust Ltd Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 572 "" CALF CONSTRUCTION TURNKEY Limerick Cosgrave Park, Moyross, Limerick City (Regen)q2 21 Co-operative Housing Ireland "" "" "" Scheme approved for CALF Funding Q3-2017 "" "" 573 "" CALF CONSTRUCTION TURNKEY Limerick Woodlawn Park, Ballysimon Road, Limerick 11 Respond! "" "" "" "" Q4-2017 "" 574 "" CALF CONSTRUCTION TURNKEY Limerick Ard Aulin, Mungret Phase 1 7 Cluid Housing Association "" "" "" "" "" Q2-2017 575 "" CALF CONSTRUCTION TURNKEY Limerick Cluain Ard, Fedamore, 1/2 2 Co-operative Housing Ireland "" "" "" "" "" Q1-2018 576 "" CALF CONSTRUCTION TURNKEY Limerick Cluain Ard, Fedamore 2/2 2 Co-operative Housing Ireland "" "" "" "" Q2-2017 "" 577 "" CALF CONSTRUCTION TURNKEY Limerick Ard Aulin, Mungret Phase 2 1 Cluid Housing Association "" "" "" "" Q4-2016 "" 578 "" CALF CONSTRUCTION Limerick 1 20 Park View Row, Hyde Road, Limerick 20 Cluid Housing Association "" "" "" "" "" Q1-2018 579 "" SHIP CONSTRUCTION TURNKEY Longford Mill Race Park, Drumlish (Phase 1) 14 *N/A "" "" "" "" "" Q4-2017 580 "" SHIP CONSTRUCTION TURNKEY Longford Knock, Lanesborough 31 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 581 "" SHIP CONSTRUCTION TURNKEY Longford Mill Race Park, Drumlish (Phase 2) 2 *N/A "" "" "" "" "" Q1-2018 582 "" SHIP CONSTRUCTION Longford Church View, Lanesborough 13 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 583 "" SHIP CONSTRUCTION Longford Rathcline Road, Lanesborough 4 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 584 "" SHIP CONSTRUCTION Longford Edgeworthstown Road, Ballymahon 4 *N/A "" "" "" "" "" Q1-2018 585 "" SHIP CONSTRUCTION Longford Daroge, Ballymahon 1 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 586 "" SHIP CONSTRUCTION Longford Rose Cottage' Ballinalee 6 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 587 "" CALF CONSTRUCTION TURNKEY Longford Cartrun Breac, Lisbrack Rd, Longford 7 Cluid Housing Association "" "" "" "" "" Q1-2017 588 "" SHIP CONSTRUCTION Louth 55/57 Bothar Brugha, Drogheda 3 *N/A "" "" "" "" "" Q4-2017 589 "" SHIP CONSTRUCTION Louth Drogheda (Derelicts Project) Phase 1 4 *N/A "" "" "" "" "" Q1-2018 590 "" SHIP CONSTRUCTION Louth Drogheda (Derelicts Project) Phase 2 8 *N/A "" "" "" "" Q3-2017 "" 591 "" SHIP CONSTRUCTION Louth Dundalk B&R project (1) 7 *N/A "" "" "" "" "" Q4-2016 592 "" SHIP CONSTRUCTION Louth Dundalk B&R project (2) 7 *N/A "" "" "" "" "" Q2-2017 593 "" SHIP CONSTRUCTION Louth Dundalk B&R project (3) 9 *N/A "" "" "" "" "" Q3-2017 594 "" SHIP CONSTRUCTION Louth Woodlands, Dunleer 4 *N/A "" "" "" "" "" Q3-2016 595 "" SHIP CONSTRUCTION Louth Boice Court (Phase 2 - 4) 69 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 596 "" SHIP CONSTRUCTION Louth Father Finn Park (Phase 2) 17 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 597 "" SHIP CONSTRUCTION Louth Dundalk B&R project (4) 6 *N/A "" "" "" "" "" Q4-2017 598 "" SHIP CONSTRUCTION Louth Mount Avenue, Dundalk 75 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 599 "" REGENERATION Louth Cox's Demesne Phase 2a 14 *N/A "" "" "" "" "" Q4-2016 600 "" REGENERATION Louth Cox's Demesne Phase 2b 22 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 601 "" PUBLIC PRIVATE PARTNERSHIP (Bundle 1) Louth Ravel Ardee Road, Dunleer 80 *N/A "" "" Q1 2018 "" "" "" 602 "" CAS CONSTRUCTION Louth 5 Slieveroe Cresent, Dundalk 1 Cluid Housing Association Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 603 "" CAS CONSTRUCTION Louth Castletowncooley, Riverstown, Dundalk 1 Tath Housing Association "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 604 "" CAS CONSTRUCTION Louth Barrack Street, Dundalk 8 Simon Community : Dundalk Simon "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 605 "" CAS CONSTRUCTION Louth Saltown, Dundalk 7 North ? East Housing Association Ltd "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 606 "" CAS CONSTRUCTION Louth McArdle Green (Moneymore), Drogheda 1 North ? East Housing Association Ltd "" "" "" "" Q1-2018 "" 607 "" CAS CONSTRUCTION Louth Tierney Street, Ardee 7 Oaklee Housing Trust "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 608 "" CAS CONSTRUCTION Louth Tredagh View, Drogheda 1 Respond "" "" "" "" "" Q1-2017 609 "" CAS CONSTRUCTION Louth 36 Strand, Clogherhead 4 St. John of God Housing Association Ltd Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 610 "" CAS CONSTRUCTION Louth Coulter Park 6 Tath Housing Association Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 611 "" CALF CONSTRUCTION TURNKEY Louth Castleguard, Ardee 29 Tath Housing Association "" "" "" "" "" Q1-2018 612 "" CALF CONSTRUCTION TURNKEY Louth Caslteguard, Ardee 73 Tath Housing Association "" "" "" "" Q2-2017 "" 613 "" CALF CONSTRUCTION TURNKEY Louth Rathmullen Road, Drogheda 54 North ? East Housing Association Ltd "" "" "" "" Q4-2017 "" 614 "" CALF CONSTRUCTION TURNKEY Louth Rathmullen Road, Drogheda 51 Tath Housing Association "" "" "" "" Q4-2017 "" 615 "" CALF CONSTRUCTION TURNKEY Louth Avourwen Meadows, Drogheda 50 Oaklee Housing Trust "" "" "" Scheme approved for CALF funding Q1-2017 "" "" 616 "" CALF CONSTRUCTION TURNKEY Louth Liscorrie, Bog Lane, Drogheda 41 Tath Housing Association "" "" "" "" "" Q4-2017 617 "" CALF CONSTRUCTION TURNKEY Louth Mount Hamilton, Dundalk Phase 2 31 Cluid Housing Association "" "" "" "" Q4-2016 "" 618 "" CALF CONSTRUCTION TURNKEY Louth Mount Hamilton, Dundalk Phase 1 12 Cluid Housing Association "" "" "" "" "" Q4-2017 619 "" CALF CONSTRUCTION TURNKEY Louth Coulter Place Armagh Road Dundalk Phase 2 12 Cluid Housing Association "" "" "" "" "" Q3-2017 620 "" CALF CONSTRUCTION TURNKEY Louth Coulter Place Armagh Road Dundalk Phase 1 10 Cluid Housing Association "" "" "" "" "" Q1-2017 621 "" CALF CONSTRUCTION TURNKEY Louth Castle Court, Castlebellingham - Phase 2 10 Cluid Housing Association "" "" "" "" "" Q1-2017 622 "" CALF CONSTRUCTION TURNKEY Louth Aston Village 8 Respond! "" "" "" "" Q4-2017 "" 623 "" CALF CONSTRUCTION TURNKEY Louth Castle Court, Castlebellingham - Phase 1 4 Cluid Housing Association "" "" "" "" "" Q1-2017 624 "" CALF CONSTRUCTION TURNKEY Louth Knock Shee, Old Golf Links road, Blackrock, Co. Louth 3 Cluid Housing Association "" "" "" "" "" Q4-2017 625 "" CALF CONSTRUCTION Louth Scarlett Street, Drogheda 15 North East Housing Association Ltd "" "" "" "" Q1-2018 "" 626 "" CALF CONSTRUCTION Louth Clos na Manach, Carlingford 10 Tath Housing Association "" "" "" "" Q2-2017 "" 627 "" CALF CONSTRUCTION Louth Rath na Gloinne 3 Cluid Housing Association "" "" "" "" "" Q3-2016 628 "" CALF CONSTRUCTION Louth Bishops Court, Dundalk 2 Tath Housing Association "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 629 "" CALF CONSTRUCTION Louth 2 Slieve Row Crescent, Dundalk 1 Cluid Housing Association "" "" "" "" "" Q2-2016 630 "" SHIP CONSTRUCTION TURNKEY Mayo Slinaunroe, Clogher (SRD) 1 *N/A "" "" "" "" "" Q2-2017 631 "" SHIP CONSTRUCTION RAPID Mayo Kilkelly Road, Knock (Phase 3) 4 *N/A "" "" "" "" Q3-2017 "" 632 "" SHIP CONSTRUCTION Mayo Market Street, Swinford 2 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 633 "" SHIP CONSTRUCTION Mayo Knocknageeha, Newport 1 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 634 "" SHIP CONSTRUCTION Mayo Kilmeena (Phase 2) 4 *N/A "" "" "" "" Q3-2017 "" 635 "" SHIP CONSTRUCTION Mayo Knockmore, Ballina 8 *N/A "" "" "" "" Q4-2017 "" 636 "" SHIP CONSTRUCTION Mayo Radharc an tSaillin, Binghamstown, Belmullet (Phase 2) 4 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 637 "" SHIP CONSTRUCTION Mayo Sliabh Rua, Foxford - Phase 3 10 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 638 "" SHIP CONSTRUCTION Mayo Woodlands, Balla (Phase 3) 4 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 639 "" SHIP CONSTRUCTION Mayo Abbeyquarter, Ballyhaunis 18 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 640 "" SHIP CONSTRUCTION Mayo Tonragee West, Achill (Phase 2) 4 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 641 "" SHIP CONSTRUCTION Mayo Sli na Roba, Friarsquarter, Ballinrobe 16 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 642 "" SHIP CONSTRUCTION Mayo Single Rural Dwellings 7 *N/A Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 643 "" SHIP CONSTRUCTION Mayo Marian Crescent, Ballina 4 *N/A "" "" "" "" Q2-2017 "" 644 "" SHIP CONSTRUCTION Mayo Tubberhill, Westport (Phase 3) 21 *N/A "" "" "" "" "" Q1-2018 645 "" SHIP CONSTRUCTION Mayo 7 St. Patrick's Tce., Westport 1 *N/A "" "" "" "" "" Q2-2017 646 "" SHIP CONSTRUCTION Mayo Parke, Castlebar 8 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 647 "" SHIP CONSTRUCTION Mayo Killavally 8 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 648 "" SHIP CONSTRUCTION Mayo Lios na Circa, Saleen, Castlebar 22 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 649 "" SHIP CONSTRUCTION Mayo Kilkelly Road, Swinford 27 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 650 "" SHIP CONSTRUCTION Mayo Bothar Dubh, Claremorris 12 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 651 "" SHIP CONSTRUCTION Mayo Barhauve, Rossport (SRD) 1 *N/A "" "" "" "" Q4-2016 "" 652 "" SHIP CONSTRUCTION Mayo Glaggaun, Ballycroy (SRD) 1 *N/A "" "" "" "" "" Q4-2017 653 "" SHIP CONSTRUCTION Mayo Glengad, Pollatomish (SRD) 1 *N/A "" "" "" "" Q4-2016 "" 654 "" SHIP CONSTRUCTION Mayo Gorthbrack, Inver (SRD) 1 *N/A "" "" "" "" "" Q1-2018 655 "" CAS CONSTRUCTION Mayo Admiral Browne Road, Foxford (Phase 2) 4 Society of Saint Vincent de Paul "" "" "" "" "" Q1-2018 656 "" CAS CONSTRUCTION Mayo Killosheehan, Ballinrobe 6 Society of Saint Vincent de Paul "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 657 "" CAS CONSTRUCTION Mayo Admiral Browne Road, Foxford (Phase 1) 8 Society of Saint Vincent de Paul "" "" "" "" "" Q3-2016 658 "" CAS CONSTRUCTION Mayo Logmore, Belmullet 7 Irish Wheelchair Association Ltd "" "" "" "" "" Q2-2017 659 "" CALF CONSTRUCTION TURNKEY Mayo Ballina area 11 Cluid Housing Association "" "" "" Scheme given revised CALF approval Q1 2018 "" "" 660 "" CALF CONSTRUCTION TURNKEY Mayo Glenlara, Westport, Co Mayo 10 Co-operative Housing Ireland "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 661 "" SHIP CONSTRUCTION RAPID Meath Kilmainhamwood 4 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 662 "" SHIP CONSTRUCTION RAPID Meath Cortown 10 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 663 "" SHIP CONSTRUCTION RAPID Meath Oldcastle 15 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 664 "" SHIP CONSTRUCTION Meath Proudstown Road, Navan 4 *N/A "" "" "" Stage 4 approved in Q2-2017, the scheme is now fully approved. "" "" 665 "" SHIP CONSTRUCTION Meath Bettystown (Phase 2) 15 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 666 "" SHIP CONSTRUCTION Meath Ratoath 17 *N/A "" "" "" "" Q1-2018 "" 667 "" SHIP CONSTRUCTION Meath Riverside, Kells 40 *N/A "" "" "" Stage 4 approved in Q4-2017, the scheme is now being tendered. "" "" 668 "" SHIP CONSTRUCTION Meath Cherry Court, Summerhill 19 *N/A "" "" "" "" Q4-2017 "" 669 "" SHIP CONSTRUCTION Meath Connaught Grove, Athboy 32 *N/A "" "" "" "" Q3-2017 "" 670 "" SHIP CONSTRUCTION Meath Nobber 19 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 671 "" SHIP CONSTRUCTION Meath Carlanstown 13 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 672 "" SHIP CONSTRUCTION Meath Donore 20 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 673 "" SHIP CONSTRUCTION Meath Dunshaughlin 25 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 674 "" SHIP CONSTRUCTION Meath Bettystown (Phase 1) 16 *N/A "" "" "" "" "" Q3-2017 675 "" SHIP CONSTRUCTION Meath Farganstown 42 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 676 "" CAS CONSTRUCTION Meath Blackcastle, Slane Road, Navan 17 Tath Housing Association "" "" "" "" Q4-2017 "" 677 "" CALF CONSTRUCTION TURNKEY Meath Dunville, Athlumney, Co. Meath phase 1 10 Tath Housing Association "" "" "" "" "" Q1-2018 678 "" CALF CONSTRUCTION TURNKEY Meath Dunville, Athlumney, Co. Meath Phase 2 * 8 Tath Housing Association "" "" "" "" "" Q1-2018 679 "" CALF CONSTRUCTION TURNKEY Meath Dunville, Athlumney, Co. Meath Phase 3 6 Tath Housing Association "" "" "" "" Q3-2017 "" 680 "" CALF CONSTRUCTION TURNKEY Meath Dunville, Athlumney, Co. Meath Phase 4 * 40 Tath Housing Association "" "" "" "" Q3-2017 "" 681 "" CALF CONSTRUCTION TURNKEY Meath Fitzherbert Wood, Slane Rd., Navan, Co. Meath 44 Tath Housing Association "" "" "" Scheme approved for CALF Funding Q3-2017 "" "" 682 "" CALF CONSTRUCTION TURNKEY Meath Dun Eimear, Bettytown 30 Tath Housing Association "" "" "" "" Q3-2017 "" 683 "" CALF CONSTRUCTION TURNKEY Meath Seabury Lawns, Mornington 25 Cluid Housing Association "" "" "" "" "" Q3-2017 684 "" CALF CONSTRUCTION TURNKEY Meath Tubberclaire, Navan 23 Cluid Housing Association "" "" "" "" "" Q2-2016 685 "" CALF CONSTRUCTION TURNKEY Meath Mill Lane, Flower Hill, Navan 20 Oaklee Housing Trust "" "" "" "" "" Q1-2016 686 "" CALF CONSTRUCTION TURNKEY Meath Ashbourne area - Phase 4 20 Cluid Housing Association "" "" "" "" "" Q4-2017 687 "" CALF CONSTRUCTION TURNKEY Meath Ashbourne area - Phase 3 18 Cluid Housing Association "" "" "" "" "" Q4-2017 688 "" CALF CONSTRUCTION TURNKEY Meath Ashbourne area - Phase 2 18 Cluid Housing Association "" "" "" "" "" Q4-2017 689 "" CALF CONSTRUCTION TURNKEY Meath Ashbourne area - Phase 1 11 Cluid Housing Association "" "" "" "" "" Q1-2017 690 "" CALF CONSTRUCTION TURNKEY Meath Blackcastle, Slane Road, Navan 9 Tath Housing Association "" "" "" "" Q3-2017 "" 691 "" CALF CONSTRUCTION TURNKEY Meath Churchfields, Ashbourne * 8 Tath Housing Association "" "" "" "" "" Q2-2017 692 "" CALF CONSTRUCTION TURNKEY Meath Grangehall, Dunshaughlin 7 Tath Housing Association "" "" "" "" Q1-2017 "" 693 "" CALF CONSTRUCTION TURNKEY Meath Seabury Lawns, Mornington 6 Cluid Housing Association "" "" "" "" "" Q1-2018 694 "" CALF CONSTRUCTION TURNKEY Meath Royal Oaks, Enfield * 4 Cluid Housing Association "" "" "" "" "" Q2-2017 695 "" CALF CONSTRUCTION TURNKEY Meath 27 Ardmore Rise, Bettystown 1 North ? East Housing Association Ltd "" "" "" "" Q1-2017 "" 696 "" CALF CONSTRUCTION TURNKEY Meath Station Road, Dunboyne * 24 Respond! "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 697 "" CALF CONSTRUCTION TURNKEY Meath Ceamach Close, Donacarney, Co. Meath * 7 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 698 "" CALF CONSTRUCTION TURNKEY Meath Ceamach Close, Donacarney, Co. Meath 9 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 699 "" CALF CONSTRUCTION TURNKEY Meath Commons Road, Navan, Co. Meath 12 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 700 "" CALF CONSTRUCTION Meath Millrace Court, Emmet Street, Trim, Co Meath 11 North East Housing Association Ltd "" "" "" Scheme approved for CALF funding Q4-2017 "" "" 701 "" CALF CONSTRUCTION Meath Cherryvalley, Raghmoylan, Co. Meath 9 Cluid Housing Association "" "" "" "" "" Q4-2017 702 "" CALF CONSTRUCTION Meath Kellets Grove, Dunshauglin, Co Meath * 6 Tath Housing Association "" "" "" "" "" Q1-2018 703 "" SHIP CONSTRUCTION TURNKEY Monaghan Drumbear Wood, Monaghan Town 12 *N/A "" "" "" "" "" Q4-2017 704 "" SHIP CONSTRUCTION TURNKEY Monaghan Knockroe Glen, Monaghan Town (Phase 3) 6 *N/A "" "" "" "" "" Q4-2017 705 "" SHIP CONSTRUCTION TURNKEY Monaghan Knockroe Glen, Monaghan Town (Phase 2) 8 *N/A "" "" "" "" "" Q2-2017 706 "" SHIP CONSTRUCTION TURNKEY Monaghan Knockroe Glen, Monaghan Town (Phase 1) 8 *N/A "" "" "" "" "" Q2-2017 707 "" SHIP CONSTRUCTION TURNKEY Monaghan Killycard, Bree, Castleblaney 4 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 708 "" SHIP CONSTRUCTION TURNKEY Monaghan The Meadows, Smithborough 5 *N/A "" "" "" "" "" Q4-2017 709 "" SHIP CONSTRUCTION TURNKEY Monaghan Maple Grove, Smithborough 12 *N/A "" "" "" Stage 4 approved in Q3-2017, the scheme is now fully approved. "" "" 710 "" SHIP CONSTRUCTION Monaghan Bree, Castleblayney 8 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 711 "" SHIP CONSTRUCTION Monaghan Latlorcan, Monaghan Town 43 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 712 "" SHIP CONSTRUCTION Monaghan Davy's & Adjacent Porperty, Fermanagh St., Clones 3 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 713 "" SHIP CONSTRUCTION Monaghan Boyle Sports Site, Fermanagh St., Clones 3 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 714 "" SHIP CONSTRUCTION Monaghan 82 & 83 Fermanagh St., Clones 3 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 715 "" SHIP CONSTRUCTION Monaghan An Bonnan Bui & Flower Shop, Fermanagh St., Clones 6 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 716 "" SHIP CONSTRUCTION Monaghan 2a & 3 Analore St., Clones 3 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 717 "" SHIP CONSTRUCTION Monaghan Abbey Gatehouse, Analore St., Clones 3 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 718 "" CAS CONSTRUCTION Monaghan Drumillard, Castleblayney (Phase 2) 2 Castleblayney Care Housing Association Ltd "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 719 "" CAS CONSTRUCTION Monaghan Liseggerton, Clones 16 Oaklee Housing Trust "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 720 "" CAS CONSTRUCTION Monaghan Convent Lands, Carrickmacross 7 Respond "" "" "" "" "" Q2-2017 721 "" CALF CONSTRUCTION TURNKEY Monaghan Kingscourt Road, Carrickmacross, Co. Monaghan 50 Respond! "" "" "" "" Q3-2017 "" 722 "" CALF CONSTRUCTION TURNKEY Monaghan Magheross, Carrickmacross * 33 Tath Housing Association "" "" "" "" Q2-2017 "" 723 "" CALF CONSTRUCTION Monaghan Liseggerton Road, Clones 6 Oaklee Housing Trust "" "" "" "" Q2-2017 "" 724 "" SHIP CONSTRUCTION TURNKEY Offaly McGregol, Birr 12 *N/A "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 725 "" SHIP CONSTRUCTION TURNKEY Offaly Mill Race, Ferbane 5 *N/A "" "" "" "" "" Q4-2017 726 "" SHIP CONSTRUCTION TURNKEY Offaly Cluain na Spideoga, Cloghan 6 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 727 "" SHIP CONSTRUCTION TURNKEY Offaly Coolagarry, Walsh Island, 4 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 728 "" SHIP CONSTRUCTION Offaly Chancery Lane, Tullamore 18 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 729 "" SHIP CONSTRUCTION Offaly Circular Road, Daingean 7 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 730 "" SHIP CONSTRUCTION Offaly Kylebeg, Banagher (Phase 2) 18 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 731 "" SHIP CONSTRUCTION Offaly Blundell Wood, Edenderry 33 *N/A "" "" "" "" Q4-2017 "" 732 "" CAS CONSTRUCTION Offaly Mountbolus 4 Mid Offaly Housing Association Ltd "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 733 "" CAS CONSTRUCTION Offaly Killane Drive, Edenderry 2 Tath Housing Association "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 734 "" CAS CONSTRUCTION Offaly Scurragh, Birr 6 Cluid Housing Association "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 735 "" CAS CONSTRUCTION Offaly Clonminch, Tullamore 20 Oaklee Housing Trust Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 736 "" CALF CONSTRUCTION Offaly Kearney's Field, Tullamore 53 Oaklee Housing Trust "" "" "" Scheme approved for CALF funding Q1-2017 "" "" 737 "" CALF CONSTRUCTION Offaly Killane Drive, Edenderry 25 Tath Housing Association "" "" "" Scheme approved for CALF funding Q2-2017 "" "" 738 "" SHIP CONSTRUCTION TURNKEY Roscommon Monksland, Athlone 10 *N/A "" "" "" "" Q1-2017 "" 739 "" SHIP CONSTRUCTION TURNKEY Roscommon Station Road, Termon, Boyle 10 *N/A "" "" "" "" Q1-2018 "" 740 "" SHIP CONSTRUCTION TURNKEY Roscommon Silveroe Meadows, Boyle 12 *N/A Stage 1 approved in Q2-2017, outline design and costs are now being prepared. "" "" "" "" "" 741 "" SHIP CONSTRUCTION Roscommon Cloonfad 2 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 742 "" SHIP CONSTRUCTION Roscommon Greenfields, Blackstick Road, Roscommon Town 6 *N/A "" "" "" "" "" Q3-2017 743 "" SHIP CONSTRUCTION Roscommon River Oaks, Ballaghaderreen 10 *N/A "" "" "" "" "" Q4-2017 744 "" CALF CONSTRUCTION TURNKEY Roscommon Monksfield, Bealnamulla, Athlone 40 Cluid Housing Association "" "" "" "" Q3-2017 "" 745 "" CALF CONSTRUCTION TURNKEY Roscommon Monksfield Park, Tuam Road, Athlone 13 Cluid Housing Association "" "" "" "" Q1-2016 "" 746 "" CALF CONSTRUCTION TURNKEY Roscommon River Oaks, Kilcolman, Ballaghaderreen 12 Respond! "" "" "" "" "" Q1-2018 747 "" SHIP CONSTRUCTION Sligo Colloney 15 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 748 "" SHIP CONSTRUCTION Sligo Knappagh Road 28 *N/A "" Stage 2 approved in Q3-2016, full design/tender being prepared. "" "" "" "" 749 "" SHIP CONSTRUCTION Sligo Caltragh, Culleens 1 *N/A "" "" "" "" Q1-2018 "" 750 "" SHIP CONSTRUCTION Sligo Carrowbunnaun, Strandhill 20 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 751 "" SHIP CONSTRUCTION Sligo Fr. Flanagan Terrace (2) 14 *N/A "" "" "" "" Q1-2017 "" 752 "" SHIP CONSTRUCTION Sligo Daghloonagh, Keash - SRD 1 *N/A "" "" "" "" "" Q4-2016 753 "" SHIP CONSTRUCTION Sligo Rosses Point 14 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 754 "" SHIP CONSTRUCTION Sligo Fr. Flanagan Terrace (1) 8 *N/A "" "" "" "" "" Q4-2017 755 "" SHIP CONSTRUCTION Sligo Connolly Park, Tubbercurry 10 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 756 "" CAS CONSTRUCTION Sligo Cuan Iosa, Ballymote 8 Society of Saint Vincent de Paul "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 757 "" SHIP CONSTRUCTION RAPID South Dublin Killininny Road, Firhouse (Old Mill, Old Bawn) 24 *N/A "" "" "" "" Q1-2018 "" 758 "" SHIP CONSTRUCTION RAPID South Dublin St Cuthbert's, Clondalkin 63 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 759 "" SHIP CONSTRUCTION RAPID South Dublin St Aidan's, Brookfield, Tallaght (Phase 1) 47 *N/A "" "" "" "" Q3-2017 "" 760 "" SHIP CONSTRUCTION RAPID South Dublin St. Aidan's Brookfield, Tallaght (Phase 2) 38 *N/A "" "" "" "" Q3-2017 "" 761 "" SHIP CONSTRUCTION South Dublin Belgard Road, Tallaght 3 *N/A "" "" "" "" "" Q1-2016 762 "" SHIP CONSTRUCTION South Dublin Killinarden, Tallaght 27 *N/A "" "" "" "" Q3-2017 "" 763 "" SHIP CONSTRUCTION South Dublin Letts Field, Neilstown, Clondalkin 37 *N/A "" "" "" "" Q3-2017 "" 764 "" SHIP CONSTRUCTION South Dublin Ballyboden, Rathfarnham 40 *N/A "" "" "" "" Q3-2017 "" 765 "" SHIP CONSTRUCTION South Dublin Dromcarra, Tallaght 14 *N/A "" "" "" "" Q2-2017 "" 766 "" SHIP CONSTRUCTION South Dublin Fortunestown (MacUilliam) 28 *N/A "" "" "" "" Q2-2017 "" 767 "" SHIP CONSTRUCTION South Dublin Mayfield Estate, Clondalkin 17 *N/A "" "" "" "" Q1-2017 "" 768 "" SHIP CONSTRUCTION South Dublin St Marks Green, Clondalkin 11 *N/A "" "" "" "" Q2-2017 "" 769 "" SHIP CONSTRUCTION South Dublin Balgaddy F 50 *N/A Stage 1 approved in Q1-2015, outline design and costs are now being prepared. "" "" "" "" "" 770 "" SHIP CONSTRUCTION South Dublin St Finians 2 *N/A "" "" "" "" "" Q3-2016 771 "" SHIP CONSTRUCTION South Dublin Suncroft, Tallaght 10 *N/A "" "" "" "" "" Q4-2016 772 "" PUBLIC PRIVATE PARTNERSHIP (Bundle 1) South Dublin Corkage Grange (part of Kilcarbery) 109 *N/A "" "" Q1 2018 "" "" "" 773 "" CAS CONSTRUCTION South Dublin Collinstown Grove, Clondalkin 4 Tath Housing Association "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 774 "" CAS CONSTRUCTION South Dublin Old Nangor Road, Clondalkin 10 Simon Community : Dublin Simon "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 775 "" CALF CONSTRUCTION TURNKEY South Dublin Elder Heath, Kiltipper Road, Tallaght, Dublin 24 phase 1 * 18 Cluid Housing Association "" "" "" "" "" Q1-2018 776 "" CALF CONSTRUCTION TURNKEY South Dublin Elder Heath, Kiltipper Road, Tallaght, Dublin 24 phase 2 10 Cluid Housing Association "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 777 "" CALF CONSTRUCTION TURNKEY South Dublin Milford Manor, Clondalkin - Phase 1 25 Cluid Housing Association "" "" "" "" "" Q1-2017 778 "" CALF CONSTRUCTION TURNKEY South Dublin Milford Manor, Clondalkin 25 Cluid Housing Association "" "" "" "" Q1-2017 "" 779 "" CALF CONSTRUCTION TURNKEY South Dublin New Bancroft, Tallaght, Dublin 24* 16 Cluid Housing Association "" "" "" "" "" Q4-2017 780 "" CALF CONSTRUCTION TURNKEY South Dublin Milford Manor, Clondalkin - Final Phase 15 Cluid Housing Association "" "" "" "" "" Q3-2017 781 "" CALF CONSTRUCTION TURNKEY South Dublin Dodderbrook, Oldcourt Road, Ballycullen, Dublin 24 * 14 Cluid Housing Association "" "" "" "" "" Q1-2018 782 "" CALF CONSTRUCTION TURNKEY South Dublin Broadfield Grove, Rathcoole-phase 1 * 10 Oaklee Housing Trust "" "" "" "" "" Q3-2017 783 "" CALF CONSTRUCTION TURNKEY South Dublin Old Nangor Road, Clondalkin, Dublin 22 7 Clanmil Housing Association "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 784 "" CALF CONSTRUCTION TURNKEY South Dublin Scholarstown Wood (Houses) *Phase 2 5 Circle Voluntary Housing Association "" "" "" "" Q3-2017 "" 785 "" CALF CONSTRUCTION TURNKEY South Dublin Broadfield Grove, Rathcoole - final phase * 4 Oaklee Housing Trust "" "" "" "" "" Q3-2017 786 "" CALF CONSTRUCTION TURNKEY South Dublin Moyglas Glade, Lucan, Co Dublin* 1 Respond! "" "" "" "" "" Q2-2017 787 "" CALF CONSTRUCTION TURNKEY South Dublin Palmerstown Way, Clondalkin * 6 Circle Voluntary Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" "" 788 "" CALF CONSTRUCTION South Dublin Westpark, Garters Lane, Saggert, Co Dublin 84 Cluid Housing Association "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 789 "" CALF CONSTRUCTION South Dublin Scholarstown Wood (Apts) 6 Circle Voluntary Housing Association "" "" "" "" Q3-2017 "" 790 "" CALF CONSTRUCTION South Dublin Station Road, Clondalkin 5 Respond! "" "" "" "" "" Q3-2017 791 "" CALF CONSTRUCTION South Dublin Scholarstown Wood (Houses) * Phase 1 3 Circle Voluntary Housing Association "" "" "" "" "" Q4-2017 792 "" CALF CONSTRUCTION South Dublin Tullyhall, Lucan - Phase 1 * 2 Tath Housing Association "" "" "" "" "" Q3-2017 793 "" CALF CONSTRUCTION South Dublin Tullyhall, Lucan - Final Phase* 2 Tath Housing Association "" "" "" "" Q2-2017 "" 794 "" CALF CONSTRUCTION South Dublin 1 Hollyville Terrace, Palmerstown, Dublin 2 Cluid Housing Association "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 795 "" SHIP CONSTRUCTION Tipperary Ard na Greine, Clonmel 2 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 796 "" SHIP CONSTRUCTION Tipperary Knockanrawley 28 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 797 "" SHIP CONSTRUCTION Tipperary Mill Road, Thurles 27 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 798 "" SHIP CONSTRUCTION Tipperary Mulkear View, Newport 9 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 799 "" SHIP CONSTRUCTION Tipperary Treacy Park, Carrick on Suir 1 *N/A "" "" Stage 3 approved in Q1-2017, the scheme is now being tendered. "" "" "" 800 "" SHIP CONSTRUCTION Tipperary Templetouhy 6 *N/A Stage 1 approved in Q1-2016, outline design and costs are now being prepared. "" "" "" "" "" 801 "" SHIP CONSTRUCTION Tipperary Borrisoleigh 12 *N/A Stage 1 approved in Q1-2016, outline design and costs are now being prepared. "" "" "" "" "" 802 "" SHIP CONSTRUCTION Tipperary Killeanaule Road, Fethard 10 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 803 "" SHIP CONSTRUCTION Tipperary Abbey Street, Cahir 11 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 804 "" SHIP CONSTRUCTION Tipperary Borrisokane 16 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 805 "" SHIP CONSTRUCTION Tipperary Portroe, Nenagh 18 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 806 "" SHIP CONSTRUCTION Tipperary Cloughjordan 2 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 807 "" SHIP CONSTRUCTION Tipperary Glenconnor Road, Clonmel 26 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 808 "" SHIP CONSTRUCTION Tipperary Gortataggart, Thurles 2 *N/A "" "" Stage 3 approved in Q4-2015, the scheme is now being tendered. "" "" "" 809 "" SHIP CONSTRUCTION Tipperary Kilcooly Way, Gortnahoe 5 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 810 "" SHIP CONSTRUCTION Tipperary Lacey Avenue, Templemore 3 *N/A "" "" "" "" "" Q3-2016 811 "" SHIP CONSTRUCTION Tipperary Mitchel St., Thurles 1 *N/A "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 812 "" SHIP CONSTRUCTION Tipperary Glencarrick, Roscrea 30 *N/A Stage 1 approved in Q2-2015, outline design and costs are now being prepared. "" "" "" "" "" 813 "" SHIP CONSTRUCTION Tipperary Borrisoleigh 2 *N/A "" "" "" "" "" Q4-2016 814 "" SHIP CONSTRUCTION Tipperary Lower Ballingarry 1 *N/A "" "" "" "" "" Q2-2016 815 "" SHIP CONSTRUCTION Tipperary Poulamaleen, Faugheen 1 *N/A "" "" "" "" "" Q2-2016 816 "" SHIP CONSTRUCTION Tipperary Cormack Drive, Nenagh 19 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 817 "" SHIP CONSTRUCTION Tipperary Lacey Avenue, Templemore 1 *N/A "" "" "" "" "" Q3-2017 818 "" CAS CONSTRUCTION Tipperary Ballinagrana, Carrick on Suir 3 Camphill Communities of Ireland Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 819 "" CAS CONSTRUCTION Tipperary Castle Street, Carrick on Suir 1 Camphill Communities of Ireland Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 820 "" CAS CONSTRUCTION Tipperary The Strand, Carrick on Suir 3 Camphill Communities of Ireland Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 821 "" CAS CONSTRUCTION Tipperary Fethard 4 Belmont Park Housing Association Ltd Stage 1 approved in Q3-2015, outline design and costs are now being prepared. "" "" "" "" "" 822 "" CAS CONSTRUCTION Tipperary Glenconnor Road, Clonmel 9 Cluid Housing Association "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 823 "" CAS CONSTRUCTION Tipperary Stanwix House, Kickham Street, Thurles 19 Thurles Lions Trust Housing Assoc. Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 824 "" CALF CONSTRUCTION TURNKEY Tipperary Ashgrove, Monadreen, Thurles, Co Tipperary 19 Co-operative Housing Ireland "" "" "" Scheme approved for CALF funding Q4-2017 "" "" 825 "" CALF CONSTRUCTION Tipperary Ashbury, Roscrea 12 Cluid Housing Association "" "" "" "" "" Q2-2017 826 "" SHIP CONSTRUCTION TURNKEY Waterford Kilrush, Dungarvan 39 *N/A "" "" "" "" Q3-2017 "" 827 "" SHIP CONSTRUCTION TURNKEY Waterford Gibbethill, Gracedieu 5 *N/A "" "" "" "" Q3-2017 "" 828 "" SHIP CONSTRUCTION TURNKEY Waterford Carrickphierish, Gracedieu, Waterford 31 *N/A "" "" "" "" Q4-2017 "" 829 "" SHIP CONSTRUCTION TURNKEY Waterford Shandon, Dungarvan 5 *N/A "" "" "" "" Q4-2017 "" 830 "" SHIP CONSTRUCTION TURNKEY Waterford Airport Road, Waterford City 33 *N/A "" "" "" "" Q1-2018 "" 831 "" SHIP CONSTRUCTION Waterford An Garran, Crobally Upper, Tramore 50 *N/A "" "" "" "" Q4-2017 "" 832 "" SHIP CONSTRUCTION Waterford Alms Houses, Tallow 4 *N/A "" "" "" "" Q4-2017 "" 833 "" SHIP CONSTRUCTION Waterford Ballinroad, Dungarvan 21 *N/A "" "" "" "" Q4-2017 "" 834 "" SHIP CONSTRUCTION Waterford Barrack Street, Cappoquin 4 *N/A "" "" "" "" "" Q4-2017 835 "" SHIP CONSTRUCTION Waterford Coolfin Woods, Portlaw 12 *N/A "" "" "" "" Q4-2017 "" 836 "" SHIP CONSTRUCTION Waterford Larchville, Waterford City 5 *N/A "" "" "" Stage 4 approved in Q4-2017, the scheme is now fully approved. "" "" 837 "" SHIP CONSTRUCTION Waterford Patrick Street, Tramore 2 *N/A "" "" "" "" Q3-2017 "" 838 "" SHIP CONSTRUCTION Waterford Doyle Street, Waterford City 4 *N/A "" "" "" "" Q4-2017 "" 839 "" SHIP CONSTRUCTION Waterford Old Cinema Site, Dungarvan 15 *N/A "" "" "" "" "" Q4-2016 840 "" SHIP CONSTRUCTION Waterford Lower Yellow Road, Waterford 8 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 841 "" SHIP CONSTRUCTION Waterford The Glen, Bridge St, Waterford 11 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 842 "" SHIP CONSTRUCTION Waterford Clarendon Court, Penrose Lane, Waterford 24 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 843 "" CAS CONSTRUCTION Waterford Convent Hill, Tramore 10 Society of Saint Vincent de Paul "" "" "" "" "" Q1-2017 844 "" CAS CONSTRUCTION Waterford Powersfield, Hennessys Road, Waterford 3 Focus Ireland "" "" "" "" Q4-2017 "" 845 "" CAS CONSTRUCTION Waterford Wadding Manor, Ferrybank 10 Respond "" "" "" "" Q4-2017 "" 846 "" CAS CONSTRUCTION Waterford Gleann Ealach, Dunhill 8 Gleann Ealach Housing Association "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 847 "" CAS CONSTRUCTION Waterford Ballycarnane, Tramore 18 Tramore Voluntary Housing Association "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 848 "" CAS CONSTRUCTION Waterford The Paddocks, Williamstown Rd. Waterford 4 Anvers Housing Association Ltd "" "" "" "" Q4-2017 "" 849 "" CALF CONSTRUCTION TURNKEY Waterford Estuary Heights, Shandon Road, Dungarvan 20 Co-operative Housing Ireland "" "" "" "" Q1-2017 "" 850 "" CALF CONSTRUCTION Waterford St Johns College, Waterford 36 Respond! "" "" "" "" "" Q1-2016 851 "" SHIP CONSTRUCTION TURNKEY Westmeath Belvedere Hills, Mullingar 21 *N/A "" "" "" "" "" Q4-2017 852 "" SHIP CONSTRUCTION Westmeath St. Laurence's Terrace, Mullingar 9 *N/A "" "" "" "" Q2-2017 "" 853 "" SHIP CONSTRUCTION Westmeath 16 Ennell Court 1 *N/A "" "" "" "" "" Q1-2018 854 "" SHIP CONSTRUCTION Westmeath Clonbrusk, Athlone (Arcadia) - Site No. 2 33 *N/A "" "" Stage 3 approved in Q2-2017, the scheme is now being tendered. "" "" "" 855 "" SHIP CONSTRUCTION Westmeath Ennell Court (Phase 2) 3 *N/A "" "" "" "" "" Q2-2016 856 "" SHIP CONSTRUCTION Westmeath Grange Crescent, Mullingar 2 *N/A "" "" "" "" "" Q1-2016 857 "" SHIP CONSTRUCTION Westmeath Ennell Court (Phase 3) 32 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 858 "" SHIP CONSTRUCTION Westmeath Cloghanboy, Athlone 10 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 859 "" SHIP CONSTRUCTION Westmeath Bishopsgate, Mullingar 4 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 860 "" CAS CONSTRUCTION Westmeath Farran, Mullingar 4 Tath Housing Association "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 861 "" CALF CONSTRUCTION TURNKEY Westmeath Rahanine, Rochfortbridge, Co Westmeath* 12 Tath Housing Association "" "" "" Scheme approved for CALF funding Q4-2017 "" "" 862 "" CALF CONSTRUCTION TURNKEY Westmeath Cluain Mullen, Castlepollard 2 Tath Housing Association "" "" "" "" "" Q2-2017 863 "" SHIP CONSTRUCTION TURNKEY Wexford Madeira Oaks, Wexford 8 *N/A "" "" "" "" "" Q3-2017 864 "" SHIP CONSTRUCTION TURNKEY Wexford Gleann an Ghairdin (Phase 1), Ballytegan Road, Gorey 8 *N/A "" "" "" "" "" Q1-2018 865 "" SHIP CONSTRUCTION TURNKEY Wexford Gleann an Ghairdin (Phase 2), Ballytegan Road, Gorey 14 *N/A "" "" "" "" Q1-2018 "" 866 "" SHIP CONSTRUCTION TURNKEY Wexford Ard Uisce, Whiterock, Wexford 35 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 867 "" SHIP CONSTRUCTION Wexford Belvedere Road, Wexford 7 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 868 "" SHIP CONSTRUCTION Wexford SN Castlemoyle, New Ross 1 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 869 "" SHIP CONSTRUCTION Wexford King Street, Wexford 3 *N/A Stage 1 approved in Q3-2017, outline design and costs are now being prepared. "" "" "" "" "" 870 "" SHIP CONSTRUCTION Wexford Cloghultagh, Taghmon 18 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 871 "" SHIP CONSTRUCTION Wexford Carricklawn, Coolcots, Wexford 14 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 872 "" SHIP CONSTRUCTION Wexford Coolcotts, Clonard 7 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 873 "" SHIP CONSTRUCTION Wexford Creagh, Gorey 10 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 874 "" SHIP CONSTRUCTION Wexford Danescastle 12 *N/A "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 875 "" SHIP CONSTRUCTION Wexford Slippery Green, Wexford 10 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 876 "" SHIP CONSTRUCTION Wexford Whiterock Hill, Wexford 45 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 877 "" SHIP CONSTRUCTION Wexford Cois Mara 2 *N/A "" "" "" "" Q4-2017 "" 878 "" SHIP CONSTRUCTION Wexford Killeens, Wexford 34 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 879 "" SHIP CONSTRUCTION Wexford Oylegate 2 *N/A "" "" "" "" Q1-2017 "" 880 "" SHIP CONSTRUCTION Wexford Cherryorchard, Enniscorthy 8 *N/A "" "" "" "" Q3-2017 "" 881 "" SHIP CONSTRUCTION Wexford Clonard, Wexford 26 *N/A Stage 1 approved in Q1-2016, outline design and costs are now being prepared. "" "" "" "" "" 882 "" SHIP CONSTRUCTION Wexford Ross Road, Enniscorthy 1 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 883 "" SHIP CONSTRUCTION Wexford Baile Eoghain, Gorey 9 *N/A "" "" "" "" Q4-2017 "" 884 "" SHIP CONSTRUCTION Wexford Baile an Tr, Riverchapel (Courtown Ardamine) 10 *N/A "" "" "" "" "" Q2-2016 885 "" SHIP CONSTRUCTION Wexford Shanna Court, Coolcotts 8 *N/A "" "" "" "" "" Q1-2016 886 "" SHIP CONSTRUCTION Wexford Francis Street, Wexford 1 *N/A "" "" "" "" "" Q1-2017 887 "" SHIP CONSTRUCTION Wexford Commodore Barry 1 *N/A "" "" "" "" "" Q2-2016 888 "" SHIP CONSTRUCTION Wexford Glentire, The Ballagh, Enniscorthy 6 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 889 "" SHIP CONSTRUCTION Wexford Ballywish, Castlebridge 11 *N/A Stage 1 approved in Q4-2017, outline design and costs are now being prepared. "" "" "" "" "" 890 "" SHIP CONSTRUCTION Wexford Rosetown, Rosslare, Co Wexford 43 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 891 "" SHIP CONSTRUCTION Wexford Carley's Bridge, Enniscorthy, Co Wexford 17 *N/A Stage 1 approved in Q1-2018, outline design and costs are now being prepared. "" "" "" "" "" 892 "" CAS CONSTRUCTION Wexford Barrystown 16 Grantstown Voluntary Housing Association Ltd "" "" Stage 3 approved in Q4-2017, the scheme is now being tendered. "" "" "" 893 "" CAS CONSTRUCTION Wexford Westlands, Wexford 7 Respond "" "" "" "" Q4-2017 "" 894 "" CAS CONSTRUCTION Wexford Rathangan 7 Rathangan Senior Citizens Housing Association Ltd "" "" "" "" "" Q3-2017 895 "" CALF CONSTRUCTION TURNKEY Wexford Enniscorthy 40 Oaklee Housing Trust "" "" "" "" Q3-2017 "" 896 "" CALF CONSTRUCTION TURNKEY Wexford Wexford 28 Oaklee Housing Trust "" "" "" Scheme approved for CALF funding Q4-2016 "" "" 897 "" CALF CONSTRUCTION TURNKEY Wexford Hunters Green, Gorey - Phase 1 18 Co operative Ireland "" "" "" "" "" Q2-2016 898 "" CALF CONSTRUCTION TURNKEY Wexford Hunters Green, Gorey - Phase 2 11 Co operative Ireland "" "" "" "" "" Q1-2017 899 "" CALF CONSTRUCTION TURNKEY Wexford Ballyboggan, Castlebridge 10 Co-operative Housing Ireland "" "" "" "" Q4-2017 "" 900 "" CALF CONSTRUCTION TURNKEY Wexford Hunters Green, Gorey - Phase 3 9 Co operative Ireland "" "" "" "" "" Q4-2017 901 "" CALF CONSTRUCTION TURNKEY Wexford Ard Uisce, Whiterock, Wexford* 6 Tath Housing Association "" "" "" "" "" Q1-2017 902 "" CALF CONSTRUCTION TURNKEY Wexford 6 units Ard uisce, Whiterock, Wexford 6 Tath Housing Association "" "" "" "" "" Q1-2018 903 "" CALF CONSTRUCTION TURNKEY Wexford 5 units Ard Uisce, Whiterock 5 Tath Housing Association "" "" "" "" "" Q4-2017 904 "" CALF CONSTRUCTION TURNKEY Wexford 1 unit Ard Uisce, Whiterock, Wexford 1 Tath Housing Association "" "" "" "" "" Q1-2018 905 "" CALF CONSTRUCTION Wexford Meadowfields 12 Co operative Ireland "" "" "" "" "" Q3-2016 906 "" SHIP CONSTRUCTION TURNKEY Wicklow Mill Court, Tinahely 4 *N/A "" Stage 2 approved in Q1-2018, full design/tender being prepared. "" "" "" "" 907 "" SHIP CONSTRUCTION Wicklow Emoclew Road, Arklow (Phase 3) 21 *N/A "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 908 "" SHIP CONSTRUCTION Wicklow 10A Castle Villas, Greystones 1 *N/A "" "" Stage 3 approved in Q1-2018, the scheme is now being tendered. "" "" "" 909 "" SHIP CONSTRUCTION Wicklow Ard Na Mara, Kilcoole 2 *N/A "" "" Stage 3 approved in Q3-2017, the scheme is now being tendered. "" "" "" 910 "" SHIP CONSTRUCTION Wicklow Druids Brook, Kilcoole 2 *N/A "" Stage 2 approved in Q4-2016, full design/tender being prepared. "" "" "" "" 911 "" SHIP CONSTRUCTION Wicklow Emoclew Road, Arklow (Phase 1) 17 *N/A "" "" "" "" Q4-2017 "" 912 "" SHIP CONSTRUCTION Wicklow Emoclew Road, Arklow (Phase 2) 26 *N/A "" Stage 2 approved in Q2-2017, full design/tender being prepared. "" "" "" "" 913 "" SHIP CONSTRUCTION Wicklow FCA Hall, Wicklow Town 8 *N/A "" Stage 2 approved in Q4-2016, full design/tender being prepared. "" "" "" "" 914 "" SHIP CONSTRUCTION Wicklow Kilmantain Place, Bray 4 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 915 "" SHIP CONSTRUCTION Wicklow O'Byrne Road, Bray 1 *N/A "" "" "" "" Q4-2017 "" 916 "" SHIP CONSTRUCTION Wicklow Old Library, Arklow 7 *N/A "" "" "" "" Q1-2018 "" 917 "" SHIP CONSTRUCTION Wicklow Sugarloaf View, Kilmacanogue 20 *N/A "" Stage 2 approved in Q1-2017, full design/tender being prepared. "" "" "" "" 918 "" SHIP CONSTRUCTION Wicklow Avondale Heights, Rathdrum (Phase 2) 20 *N/A "" "" "" "" Q3-2017 "" 919 "" SHIP CONSTRUCTION Wicklow Kilbride Lane, Bray (Murphy's Lands) 42 *N/A "" "" "" Stage 4 approved in Q1-2018, the scheme is now fully approved. "" "" 920 "" SHIP CONSTRUCTION Wicklow 16A Oak Drive, Blessington 1 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 921 "" SHIP CONSTRUCTION Wicklow Carrig Eden,1 Marine Road, Greystones 30 *N/A Stage 1 approved in Q1-2017, outline design and costs are now being prepared. "" "" "" "" "" 922 "" SHIP CONSTRUCTION Wicklow Farrankelly, Greystones (Phase 2) 24 *N/A "" Stage 2 approved in Q4-2017, full design/tender being prepared. "" "" "" "" 923 "" PUBLIC PRIVATE PARTNERSHIP (Bundle 1) Wicklow Convent Lands 51 *N/A "" "" Q1 2018 "" "" "" 924 "" CAS CONSTRUCTION Wicklow Lathaleer, Baltinglass 5 KARE Promoting Inclusion for People with Intellectual Disabilities "" Stage 2 approved in Q3-2017, full design/tender being prepared. "" "" "" "" 925 "" CALF CONSTRUCTION TURNKEY Wicklow Bollarney North, Wicklow Town, Wicklow 32 Tath Housing Association "" "" "" Scheme approved for CALF Funding Q3-2017 "" "" 926 "" CALF CONSTRUCTION TURNKEY Wicklow The Meadows, Ballynerrin, Wicklow Town 7 Tath Housing Association "" "" "" Scheme approved for CALF Funding Q4-2017 "" "" 927 "" CALF CONSTRUCTION TURNKEY Wicklow Abbey St, Wicklow 6 Tath Housing Association "" "" "" "" Q2-2017 "" 928 "" CALF CONSTRUCTION TURNKEY Wicklow Vale Road, Arklow, Co. Wicklow 34 Co-operative Housing Ireland "" "" "" Scheme approved for CALF Funding Q1-2018 "" "" 929 "" CALF CONSTRUCTION TURNKEY Wicklow Glenheron, Greystones, Co. Wicklow 5 Tath Housing Association "" "" "" Scheme approved for CALF Funding Q1-2018 "" "" 930 "" CALF CONSTRUCTION Wicklow St Ernan's View, Merrymeeting, Rathnew 45 Cluid Housing Association "" "" "" Scheme approved for CALF funding Q1-2018 "" ""