﻿_id	No_	Funding Programme	LA	Scheme/Project Name	No_ of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report of Final Turnkey/CALF approval	On site	Completed
1	1	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 1)	3	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
2	2	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 2)	4	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
3	3	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 1)	27	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
4	4	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 2)	30	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
5	5	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
6	6	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
7	7	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	12	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
8	8	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 3)	32	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
9	9	CALF Turnkey	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
10	10	CALF Turnkey	Carlow	Laragh Beg, Ballon, Co. Carlow (Phase 1)	14	Co-operative Housing Ireland	""	""	""	Q3-2018	""	""
11	11	CALF Turnkey	Carlow	Laragh Beg, Ballon, Co. Carlow (Phase 2)	8	Co-operative Housing Ireland	""	""	""	Q3-2018	""	""
12	12	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 1)*	8	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
13	13	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 2)	8	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
14	14	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 3)	12	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
15	15	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 4)	9	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
16	16	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 5)	10	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
17	17	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing	""	""	""	""	""	Q1-2019
18	18	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 1)	8	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
19	19	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 2)	4	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
20	20	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 3)	5	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
21	21	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 4)	8	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
22	22	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
23	23	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
24	24	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
25	25	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
26	26	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 1)	8	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
27	27	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 2)	11	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
28	28	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2018
29	29	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	18	Cluid Housing	""	""	""	""	""	Q4-2018
30	30	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	3	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
31	31	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
32	32	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
33	33	CALF Construction	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Q1-2017	""	""
34	34	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	47	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
35	35	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 1)	72	Cluid Housing	""	""	""	""	""	Q4-2018
36	36	CALF Construction	Cork City	Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	""	Q1-2019	""
37	37	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
38	38	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	""	Q4-2018
39	39	CALF Turnkey	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	""	Q1-2019	""
40	40	CALF Turnkey	Cork City	North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
41	41	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)*	80	Respond	""	""	""	Q3-2018	""	""
42	42	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)	31	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
43	43	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)	21	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
44	44	CALF Turnkey	Cork City	The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)	17	T�ath Housing Association Ltd	""	""	""	""	Q1-2019	""
45	45	CALF Turnkey	Cork County	3 units, Mullavale, Castletownroche, Co. Cork (Phase 1)	3	Respond	""	""	""	""	Q1-2019	""
46	46	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
47	47	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
48	48	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 1)	44	Respond	""	""	""	Q4-2018	""	""
49	49	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	""	Q4-2018	""
50	50	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
51	51	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)*	42	Respond	""	""	""	""	Q4-2018	""
52	52	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
53	53	CALF Construction	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing	""	""	""	""	Q4-2018	""
54	54	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	""	Q4-2018
55	55	CALF Turnkey	Cork County	Togher Cross, Lehenaghmore, Co. Cork (Phase 1)	9	Cluid Housing	""	""	""	""	Q3-2018	""
56	56	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
57	57	CALF Construction	DLR	Abbeyview, Monkstown, Co. Dublin (Phase 1)	11	Cluid Housing	""	""	""	Q4-2018	""	""
58	58	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
59	59	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
60	60	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q3-2018
61	61	CALF Turnkey	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
62	62	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	Q3-2017	""
63	63	CALF Construction	DLR	Cromlech Fields, Loughlinstown, Ballybrack, Dublin (Phase 1)	34	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
64	64	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18, (Phase 1)	53	Respond	""	""	""	Q1-2019	""	""
65	65	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 1)	52	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
66	66	CALF Turnkey	DLR	Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)	1	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2018
67	67	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	""	Q4-2018
68	68	CALF Turnkey	DLR	Marine Walk, Marine Road, Dun Laoghaire (Phase 1)*	2	Oaklee Housing	""	""	""	""	Q1-2016	""
69	69	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	""	Q4-2018
70	70	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2017
71	71	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
72	72	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
73	73	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2017
74	74	CALF Turnkey	Donegal	Ardrawer, Kiltoy, Letterkenny, Co. Donegal (Phase 1)	46	Cluid Housing	""	""	""	Q1-2018	""	""
75	75	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	Q4-2017	""
76	76	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2016
77	77	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2018
78	78	CALF Construction	Donegal	Raphoe Road, Castlefinn, Co. Donegal (Phase 1)	10	Habinteg Housing Association (Ireland) Ltd	""	""	""	Q2-2018	""	""
79	79	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
80	80	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
81	81	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
82	82	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2017
83	83	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
84	84	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
85	85	CALF Turnkey	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2018
86	86	CALF Construction	Dublin City	Ballygall Road East Phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
87	87	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	23	Cluid Housing	""	""	""	Q2-2018	""	""
88	88	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 2)	39	Cluid Housing	""	""	""	Q2-2018	""	""
89	89	CALF Turnkey	Dublin City	Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
90	90	CALF Turnkey	Dublin City	Bluebell Avenue, Dublin 12 (Phase 1)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
91	91	CALF Construction	Dublin City	Broome Lodge,\r\nDunmanus Court, Cabra (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q4-2017
92	92	CALF Turnkey	Dublin City	Canal Meadows, Bluebell, Dublin 12 (Phase 1)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
93	93	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
94	94	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	Q1-2018	""
95	95	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2017
96	96	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing	""	""	""	""	""	Q3-2017
97	97	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Ireland	""	""	""	""	""	Q4-2016
98	98	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
99	99	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q4-2017
100	100	CALF Construction	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
101	101	CALF Turnkey	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
102	102	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
103	103	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
104	104	CALF Construction	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing	""	""	""	""	Q4-2018	""
105	105	CALF Construction	Dublin City	POST TENDER Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2018	""
106	106	CALF Construction	Dublin City	Post Tender Johns Lane West Dublin 8 (Phase 1)	31	Focus Ireland	""	""	""	""	""	Q4-2018
107	107	CALF Construction	Dublin City	POST TENDER, Poplar Row, Ballybough, Dublin 3 (Phase 1)	29	Oaklee Housing	""	""	""	""	Q3-2018	""
108	108	CALF Construction	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	Q3-2018	""	""
109	109	CALF Construction	Dublin City	Revised - St Mary�s Mansions, Dublin 1 (Phase 1)	80	Cluid Housing	""	""	""	""	Q4-2017	""
110	110	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	T�ath Housing Association Ltd	""	""	""	""	Q2-2017	""
111	111	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
112	112	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	97	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2018	""
113	113	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing	""	""	""	""	""	Q3-2018
114	114	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2016
115	115	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	28	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
116	116	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
117	117	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
118	118	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
119	119	CALF Turnkey	Fingal	4 units, Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
120	120	CALF Turnkey	Fingal	Allendale Square, Clonsilla, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	Q1-2019	""
121	121	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
122	122	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 2)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
123	123	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2016
124	124	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2016
125	125	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2016
126	126	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
127	127	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
128	128	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing	""	""	""	""	Q4-2018	""
129	129	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing	""	""	""	""	""	Q4-2018
130	130	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
131	131	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	10	The Iveagh Trust	""	""	""	""	Q3-2018	""
132	132	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 2)*	18	The Iveagh Trust	""	""	""	""	Q3-2018	""
133	133	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	Q3-2018	""
134	134	CALF Turnkey	Fingal	Northwood Green, Santry, Dublin 9 (Phase 1)*	6	Respond	""	""	""	""	""	Q4-2018
135	135	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 1)*	55	Respond	""	""	""	""	Q3-2018	""
136	136	CALF Construction	Fingal	Old Coolock Lane, Santry, Dublin 9 (Phase 1)	28	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2019	""	""
137	137	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	Q4-2018	""
138	138	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
139	139	CALF Turnkey	Fingal	Park House, Dublin Street, Baldoyle, Dublin 13 (Phase 1)*	1	Focus Ireland	""	""	""	""	Q2-2017	""
140	140	CALF Turnkey	Fingal	St Marnock�s Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q4-2017
141	141	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
142	142	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
143	143	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
144	144	CALF Turnkey	Fingal	Taylor Hill Crescent, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
145	145	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2018
146	146	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Cluid Housing	""	""	""	""	""	Q4-2017
147	147	CALF Turnkey	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
148	148	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
149	149	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
150	150	CALF Turnkey	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 1)*	15	Respond	""	""	""	Q1-2019	""	""
151	151	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 1)	15	Respond	""	""	""	""	Q2-2018	""
152	152	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 2)	66	Respond	""	""	""	""	Q2-2018	""
153	153	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q3-2017
154	154	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
155	155	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
156	156	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
157	157	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
158	158	CALF Turnkey	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
159	159	CALF Turnkey	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
160	160	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 1)*	20	Cluid Housing	""	""	""	""	""	Q1-2019
161	161	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q2-2018
162	162	CALF Turnkey	Galway County	Sliabh Carran, Gort, Co Galway  (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
163	163	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing	""	""	""	""	""	Q3-2017
164	164	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing	""	""	""	""	""	Q2-2016
165	165	CALF Turnkey	Kerry	Deerpark Avenue, Tralee, Co. Kerry (Phase 1)	4	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
166	166	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)	61	Cluid Housing	""	""	""	""	Q4-2018	""
167	167	CALF Turnkey	Kerry	Doon Road, Lisloose, Tralee, Co. Kerry (Phase 1)*	14	Co-operative Housing Ireland	""	""	""	""	Q4-2018	""
168	168	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 1)	14	Respond	""	""	""	""	""	Q4-2018
169	169	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 2)	2	Respond	""	""	""	""	Q3-2018	""
170	170	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 3)	6	Respond	""	""	""	""	Q3-2018	""
171	171	CALF Turnkey	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Cluid Housing	""	""	""	""	Q4-2018	""
172	172	CALF Turnkey	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Cluid Housing	""	""	""	""	Q1-2019	""
173	173	CALF Turnkey	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Cluid Housing	""	""	""	""	Q1-2019	""
174	174	CALF Turnkey	Kildare	Bellingsfield, Naas, Kildare (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2018
175	175	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2018
176	176	CALF Turnkey	Kildare	Castle Farm, Naas, Co. Kildare (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
177	177	CALF Construction	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
178	178	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 1)*	6	Cill Dara Housing Association	""	""	""	""	Q1-2018	""
179	179	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 2)*	11	Cill Dara Housing Association	""	""	""	""	Q1-2018	""
180	180	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
181	181	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 2)*	3	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
182	182	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
183	183	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 2)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
184	184	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 3)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
185	185	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 4)	10	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
186	186	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 5)	5	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
187	187	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 6)*	18	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
188	188	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing	""	""	""	""	""	Q3-2018
189	189	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing	""	""	""	""	""	Q1-2018
190	190	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2018
191	191	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
192	192	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
193	193	CALF Turnkey	Kildare	Revised Rye Abbey, Kilcock, Co Kildare (apts)\r\n (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q2-2017
194	194	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
195	195	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
196	196	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
197	197	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
198	198	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q2-2017
199	199	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	50	Respond	""	""	""	""	Q4-2018	""
200	200	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 1)*	14	Cluid Housing	""	""	""	""	""	Q4-2018
201	201	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 2)	24	Cluid Housing	""	""	""	""	""	Q4-2018
202	202	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q1-2019
203	203	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 4)	2	Cluid Housing	""	""	""	""	Q1-2018	""
204	204	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
205	205	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 2)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
206	206	CALF Construction	Kilkenny	Friary Walk, Callan, Co Kilkenny (Phase 1)	16	Cluid Housing	""	""	""	""	Q2-2018	""
207	207	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	Q2-2018	""
208	208	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q2-2017
209	209	CALF Turnkey	Kilkenny	Love Lane, Castlecomer, Co. Kilkenny (Phase 1)	4	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
210	210	CALF Turnkey	Kilkenny	Margaret�s Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	""	Q1-2019	""
211	211	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	11	Respond	""	""	""	""	Q4-2018	""
212	212	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 2)	17	Respond	""	""	""	""	Q4-2018	""
213	213	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 3)*	22	Respond	""	""	""	""	Q4-2018	""
214	214	CALF Turnkey	Kilkenny	O�Loughlin Court, Kilkenny  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
215	215	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing	""	""	""	""	""	Q3-2018
216	216	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing	""	""	""	""	Q3-2018	""
217	217	CALF Turnkey	Laois	Ballickmoyler, Graigcullen, Laois (Phase 1)*	20	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
218	218	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 1)	4	Cluid Housing	""	""	""	""	Q1-2017	""
219	219	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 2)	11	Cluid Housing	""	""	""	""	Q1-2017	""
220	220	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 3)*	9	Cluid Housing	""	""	""	""	Q1-2017	""
221	221	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 4)*	6	Cluid Housing	""	""	""	""	Q1-2017	""
222	222	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 1)*	17	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
223	223	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 2)	19	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
224	224	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
225	225	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
226	226	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
227	227	CALF Turnkey	Laois	Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q3-2018
228	228	CALF Construction	Laois	Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing	""	""	""	""	""	Q2-2018
229	229	CALF Turnkey	Laois	Main Street, Stradbally, Co. Laois (Phase 1)	16	North & East Housing Association Ltd	""	""	""	""	Q1-2019	""
230	230	CALF Construction	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing	""	""	""	""	""	Q1-2018
231	231	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
232	232	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 2)	2	Respond	""	""	""	""	""	Q4-2018
233	233	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 3)	2	Respond	""	""	""	""	""	Q4-2018
234	234	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co-operative Housing Ireland	""	""	""	""	""	Q1-2018
235	235	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
236	236	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q1-2018
237	237	CALF Turnkey	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2017
238	238	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q1-2017
239	239	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	T�ath Housing Association Ltd	""	""	""	Q2-2018	""	""
240	240	CALF Turnkey	Louth	2 units An Rian, Termonfeckin Rd., Drogheda, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	Q1-2017	""
241	241	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
242	242	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
243	243	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q1-2017
244	244	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing	""	""	""	""	""	Q1-2017
245	245	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
246	246	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
247	247	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
248	248	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
249	249	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
250	250	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	22	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
251	251	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 7)	22	T�ath Housing Association Ltd	""	""	""	""	Q2-2017	""
252	252	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
253	253	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	8	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
254	254	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	7	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
255	255	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q1-2017
256	256	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q3-2017
257	257	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)*	14	Respond	""	""	""	""	""	Q1-2019
258	258	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 2)	14	Respond	""	""	""	""	Q3-2017	""
259	259	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 3)	3	Respond	""	""	""	""	Q3-2017	""
260	260	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	12	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
261	261	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	14	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
262	262	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	19	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
263	263	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	30	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
264	264	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	37	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
265	265	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
266	266	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
267	267	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
268	268	CALF Turnkey	Louth	Mill Wharf, Constitution Hill, Drogheda, Co. Louth (Phase 1)	25	Respond	""	""	""	Q4-2016	""	""
269	269	CALF Construction	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
270	270	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q3-2016
271	271	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
272	272	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	6	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
273	273	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	17	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
274	274	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	12	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
275	275	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	16	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
276	276	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
277	277	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
278	278	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
279	279	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
280	280	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
281	281	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	12	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
282	282	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 7)	4	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
283	283	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2017
284	284	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	16	Cluid Housing	""	""	""	""	Q1-2017	""
285	285	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	15	Cluid Housing	""	""	""	""	Q1-2017	""
286	286	CALF Construction	Louth	Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing	""	""	""	""	""	Q2-2016
287	287	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	""	Q1-2018	""
288	288	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
289	289	CALF Turnkey	Mayo	Monamore, Lodge Road, Westport, Co. Mayo (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
290	290	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing	""	""	""	Q1-2019	""	""
291	291	CALF Turnkey	Meath	18 units Churchfields, Ashbourne, Co. Meath (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
292	292	CALF Turnkey	Meath	5 units Dunville, Athlumney, Navan, Co. Meath (Phase 1)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
293	293	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q1-2018
294	294	CALF Turnkey	Meath	Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
295	295	CALF Turnkey	Meath	BlackCastle,Slane Road, Navan, Co. Meath (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
296	296	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 1)*	1	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
297	297	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 2)*	1	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
298	298	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 3)*	10	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
299	299	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2018
300	300	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing	""	""	""	""	""	Q3-2018
301	301	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2017
302	302	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
303	303	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 1)*	10	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
304	304	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 2)*	15	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
305	305	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
306	306	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
307	307	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
308	308	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
309	309	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	12	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
310	310	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
311	311	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
312	312	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Cluid Housing	""	""	""	""	""	Q1-2019
313	313	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)*	1	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
314	314	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 1)	4	Cluid Housing	""	""	""	""	Q4-2017	""
315	315	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 2)	7	Cluid Housing	""	""	""	""	Q4-2017	""
316	316	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
317	317	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
318	318	CALF Turnkey	Meath	Maudelins Brook, Duleek, Co.Meath (Phase 1)	20	Respond	""	""	""	""	Q4-2018	""
319	319	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing	""	""	""	""	""	Q4-2016
320	320	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
321	321	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q1-2017
322	322	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing	""	""	""	""	""	Q4-2017
323	323	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q4-2017
324	324	CALF Turnkey	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
325	325	CALF Turnkey	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 2)	7	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
326	326	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	3	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
327	327	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 2)	6	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
328	328	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 3)	6	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
329	329	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 4)	15	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
330	330	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 5)	14	T�ath Housing Association Ltd	""	""	""	""	Q2-2018	""
331	331	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2017
332	332	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q3-2017
333	333	CALF Turnkey	Meath	Sl�n Duff, Kentstown, Co. Meath (Phase 1)	2	Cluid Housing	""	""	""	""	Q1-2018	""
334	334	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)	24	Respond	""	""	""	""	""	Q4-2018
335	335	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q2-2016
336	336	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 2)	7	Cluid Housing	""	""	""	""	""	Q3-2016
337	337	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 3)	8	Cluid Housing	""	""	""	""	""	Q4-2016
338	338	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 1)	8	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
339	339	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 2)	14	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
340	340	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 3)	8	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
341	341	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 4)	8	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
342	342	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 1)	18	Respond	""	""	""	""	Q2-2018	""
343	343	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 2)	12	Respond	""	""	""	""	Q2-2018	""
344	344	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 3)	20	Respond	""	""	""	""	Q2-2018	""
345	345	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	T�ath Housing Association Ltd	""	""	""	Q4-2017	""	""
346	346	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	12	T�ath Housing Association Ltd	""	""	""	Q4-2017	""	""
347	347	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	14	T�ath Housing Association Ltd	""	""	""	Q4-2017	""	""
348	348	CALF Construction	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing	""	""	""	""	""	Q4-2018
349	349	CALF Construction	Offaly	Kearney�s Field, Tullamore, Co. Offaly (Phase 1)	41	Oaklee Housing	""	""	""	Q1-2017	""	""
350	350	CALF Construction	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	T�ath Housing Association Ltd	""	""	""	Q4-2018	""	""
351	351	CALF Turnkey	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing	""	""	""	""	""	Q3-2018
352	352	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
353	353	CALF Turnkey	South Dublin	2 properties Tullyhall, Lucan, County Dublin (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	Q3-2018	""
354	354	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
355	355	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 2)	4	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2019
356	356	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q3-2017
357	357	CALF Turnkey	South Dublin	De Selby Lawns, Tallaght, Dublin 24 (Phase 1)	9	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
358	358	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q1-2018
359	359	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q1-2018
360	360	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
361	361	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing	""	""	""	""	""	Q1-2018
362	362	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing	""	""	""	""	""	Q2-2018
363	363	CALF Construction	South Dublin	Fernwood Park and Maplewood Road, Tallaght, Dublin  (Phase 1)	40	Cluid Housing	""	""	""	Q1-2019	""	""
364	364	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)*	94	Respond	""	""	""	""	Q4-2018	""
365	365	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q2-2018
366	366	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q4-2018
367	367	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q1-2017
368	368	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2017
369	369	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
370	370	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q3-2017
371	371	CALF Turnkey	South Dublin	Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	Q3-2018	""	""
372	372	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2018
373	373	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
374	374	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
375	375	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
376	376	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2016	""
377	377	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing	""	""	""	""	Q1-2018	""
378	378	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	Q2-2018	""
379	379	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
380	380	CALF Turnkey	South Dublin	Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
381	381	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 1)*	2	T�ath Housing Association Ltd	""	""	""	""	""	Q3-2017
382	382	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 2)*	2	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
383	383	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing	""	""	""	""	""	Q4-2018
384	384	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Cluid Housing	""	""	""	""	Q2-2018	""
385	385	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing	""	""	""	""	Q2-2018	""
386	386	CALF Construction	South Dublin	Whitestown Way, Tallaght, Dublin 24 (Phase 1)	81	Cluid Housing	""	""	""	Q1-2019	""	""
387	387	CALF Turnkey	South Dublin	Wilkins Court, Limekiln Lane, Dublin 12 (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2017	""
388	388	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
389	389	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2017
390	390	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
391	391	CALF Turnkey	Tipperary	Mill Street, Carrick on Suir, Co. Tipperary (Phase 1)	22	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
392	392	CALF Turnkey	Waterford	Kilbarry, Waterford (Phase 1)	69	Respond	""	""	""	""	Q4-2018	""
393	393	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
394	394	CALF Turnkey	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)	14	Oaklee Housing	""	""	""	Q3-2018	""	""
395	395	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Co. Westmeath (Phase 1)	8	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
396	396	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2017
397	397	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	10	T�ath Housing Association Ltd	""	""	""	Q3-2018	""	""
398	398	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
399	399	CALF Turnkey	Wexford	 Ard Uisce, Wexford Town (Phase 1)	5	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2017
400	400	CALF Turnkey	Wexford	 Ard Uisce, Whiterock, Wexford  (Phase 1)	1	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
401	401	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2018
402	402	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	T�ath Housing Association Ltd	""	""	""	""	""	Q1-2017
403	403	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
404	404	CALF Turnkey	Wexford	Clonard, Wexford (Phase 1)*	10	Co-operative Housing Ireland	""	""	""	""	Q4-2018	""
405	405	CALF Turnkey	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
406	406	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 1)	18	T�ath Housing Association Ltd	""	""	""	""	Q4-2018	""
407	407	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 1)	34	Oaklee Housing	""	""	""	""	""	Q4-2018
408	408	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 2)	6	Oaklee Housing	""	""	""	""	Q3-2017	""
409	409	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q2-2016
410	410	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	9	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
411	411	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
412	412	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
413	413	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
414	414	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
415	415	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
416	416	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)	19	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
417	417	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 2)	22	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
418	418	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)	18	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
419	419	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 1)	8	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
420	420	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 2)	11	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
421	421	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 3)	11	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
422	422	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 4)	26	T�ath Housing Association Ltd	""	""	""	Q1-2019	""	""
423	423	CALF Turnkey	Wicklow	Abbey St, Wicklow  (Phase 1)	6	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
424	424	CALF Turnkey	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	T�ath Housing Association Ltd	""	""	""	""	""	Q2-2018
425	425	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)*	8	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
426	426	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)*	11	T�ath Housing Association Ltd	""	""	""	""	Q1-2018	""
427	427	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 1)*	15	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
428	428	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 2)	73	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
429	429	CALF Turnkey	Wicklow	Ternlee, Cooldross Lane, Kilcoole, Co. Wicklow (Phase 1)*	4	Cluid Housing	""	""	""	""	Q4-2017	""
430	430	CALF Turnkey	Wicklow	Ternlee, Cooldross Lane, Kilcoole, Co. Wicklow (Phase 2)*	2	Cluid Housing	""	""	""	""	Q4-2017	""
431	431	CALF Turnkey	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)*	7	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
432	432	CALF Turnkey	Wicklow	Woodpark, Rathdrum, Co. Wicklow (Phase 1)*	4	T�ath Housing Association Ltd	""	""	""	""	Q4-2017	""
433	433	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
434	434	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	""	Q4-2018
435	435	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	""	""	Q1-2019	""
436	436	SHIP CONSTRUCTION	Carlow	Bagenalstown Phase 1	20	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
437	437	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
438	438	SHIP CONSTRUCTION	Carlow	Slate Row, Hacketstown	4	*N/A	""	""	""	""	""	Q4-2018
439	439	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
440	440	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
441	441	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
442	442	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
443	443	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
444	444	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
445	445	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
446	446	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
447	447	SHIP CONSTRUCTION	Carlow	Bagenalstown Phase 2	22	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
448	448	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	""	Q1-2019
449	449	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2018
450	450	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	""	Q4-2018
451	451	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
452	452	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
453	453	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
454	454	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
455	455	SHIP CONSTRUCTION	Cavan	Holborn Hill, Belturbet	6	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
456	456	SHIP CONSTRUCTION	Cavan	Elm Grove	13	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
457	457	SHIP CONSTRUCTION	Cavan	Cavan Road, Ballinagh	10	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
458	458	SHIP CONSTRUCTION	Cavan	Main St., Butlersbridge	6	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
459	459	SHIP CONSTRUCTION	Cavan	Cluain Dara, Kingscourt	3	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
460	460	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
461	461	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	""	Q4-2018	""
462	462	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	""	Q4-2018	""
463	463	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
464	464	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
465	465	SHIP CONSTRUCTION	Clare	Miltown Malbay	27	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
466	466	SHIP CONSTRUCTION	Clare	Doonaun, Tulla	22	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
467	467	SHIP CONSTRUCTION	Clare	Boheraroan, Newmarket-on-Fergus	18	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
468	468	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
469	469	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
470	470	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
471	471	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	""	Q4-2018	""
472	472	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	""	Q4-2018
473	473	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
474	474	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	41	*N/A	""	""	""	Stage 4 approved Q3-2017, the scheme is fully approved.	""	""
475	475	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
476	476	SHIP CONSTRUCTION	Cork City	Bramble Cottages	5	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
477	477	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	20	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
478	478	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
479	479	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 2)	7	*N/A	""	""	""	""	""	Q1-2019
480	480	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 3)	50	*N/A	""	""	""	""	Q1-2018	""
481	481	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	15	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
482	482	SHIP CONSTRUCTION	Cork County	Tower View/C�irt na Sil�n�, Cloyne, East Cork	9	*N/A	""	""	""	""	Q3-2018	""
483	483	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
484	484	SHIP CONSTRUCTION	Cork County	Poulavone, Ballincollig	57	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
485	485	SHIP CONSTRUCTION	Cork County	Newtown House , Bantry	1	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
486	486	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	""	Q4-2018
487	487	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	""	Q4-2018
488	488	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	14	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
489	489	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
490	490	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
491	491	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	10	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
492	492	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
493	493	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline phase 1A	10	*N/A	""	""	""	""	""	Q4-2018
494	494	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1A & 1B (ii))	16	*N/A	""	""	""	""	""	Q1-2019
495	495	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1C)	18	*N/A	""	""	""	""	""	Q1-2019
496	496	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	18	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
497	497	SHIP CONSTRUCTION	Cork County	Madonna House, Ballincollig	5	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
498	498	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	4	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
499	499	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
500	500	SHIP CONSTRUCTION	Cork County	Sleaveen Sleaveen East, Macroom	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
501	501	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline Phase 1B	5	*N/A	""	""	""	""	""	Q4-2018
502	502	SHIP CONSTRUCTION	Cork County	Madonna House, Ballincollig	16	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
503	503	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	""	""	""	Q1-2019	""
504	504	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
505	505	SHIP CONSTRUCTION	DLR	Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
506	506	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
507	507	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
508	508	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
509	509	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
510	510	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	""	Q4-2018
511	511	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
512	512	SHIP CONSTRUCTION	DLR	Fitzgerald Park - Phase 1	33	*N/A	""	""	""	""	""	Q4-2018
513	513	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
514	514	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
515	515	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
516	516	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
517	517	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
518	518	SHIP CONSTRUCTION	DLR	Ballyogan Avenue, Ballyogan	2	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
519	519	SHIP CONSTRUCTION	DLR	St. Laurence�s Park, Stillorgan	49	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
520	520	SHIP CONSTRUCTION	DLR	Fitzgerald Park - Phase 2	17	*N/A	""	""	""	""	""	Q1-2019
521	521	SHIP CONSTRUCTION	DLR	Ballyogan Court, Ballyogan	67	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
522	522	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	Stage 2 approved Q1-2017, full design/tender being prepared.	""	""	""	""
523	523	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
524	524	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	""	""	Q1-2019	""
525	525	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	""	Q4-2018	""
526	526	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
527	527	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
528	528	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	""	Q4-2018
529	529	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Ph 2)	4	*N/A	""	""	""	""	""	Q4-2018
530	530	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
531	531	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	""	Q4-2018
532	532	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
533	533	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
534	534	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
535	535	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
536	536	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2015, full design/tender being prepared.	""	""	""	""
537	537	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	70	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
538	538	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
539	539	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
540	540	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q1-2019	""
541	541	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1 - Phase 1	5	*N/A	""	""	""	""	""	Q4-2018
542	542	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
543	543	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 1	9	*N/A	""	""	""	""	""	Q1-2017
544	544	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 2	26	*N/A	""	""	""	""	Q2-2017	""
545	545	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1 - Phase 2	2	*N/A	""	""	""	""	Q1-2017	""
546	546	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	""	Q4-2018	""
547	547	SHIP CONSTRUCTION	Fingal	Rowlestown (Phase 1)	10	*N/A	""	""	""	""	Q2-2018	""
548	548	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.3)	5	*N/A	""	""	""	""	""	Q2-2018
549	549	SHIP CONSTRUCTION	Fingal	Castlelands, Park View, Balbriggan (Phase 3)	24	*N/A	""	""	""	""	""	Q1-2019
550	550	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	""	Q4-2018	""
551	551	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 1)	2	*N/A	""	""	""	""	""	Q3-2017
552	552	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
553	553	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
554	554	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
555	555	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.1)	25	*N/A	""	""	""	""	""	Q4-2017
556	556	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 2)	6	*N/A	""	""	""	""	""	Q4-2018
557	557	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.2) 	15	*N/A	""	""	""	""	""	Q1-2018
558	558	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	""	""	Q1-2019	""
559	559	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.4)	4	*N/A	""	""	""	""	""	Q3-2018
560	560	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.5)	25	*N/A	""	""	""	""	""	Q4-2018
561	561	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth, Co Dublin	8	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
562	562	SHIP CONSTRUCTION	Fingal	Wellview Infill	20	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
563	563	SHIP CONSTRUCTION	Fingal	Rowlestown (Phase 2)	10	*N/A	""	""	""	""	Q2-2018	""
564	564	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	78	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
565	565	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
566	566	SHIP CONSTRUCTION	Galway City	Ballinfoile Park, Headford Road (Infill Units)	9	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
567	567	SHIP CONSTRUCTION	Galway City	Corrib Park (Infill Units)	3	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
568	568	SHIP CONSTRUCTION	Galway City	Castlepark, Ballybane (Infill Units)	4	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
569	569	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway.	7	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
570	570	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway	58	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
571	571	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	69	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
572	572	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	Q2-2018	""
573	573	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	Q2-2018	""
574	574	SHIP CONSTRUCTION	Galway County	Na Clocha Rua, An Cheathr� Rua, Co. Galway	4	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
575	575	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
576	576	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
577	577	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	""	Q4-2018
578	578	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
579	579	SHIP CONSTRUCTION	Galway County	Cill Ciar�n (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
580	580	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
581	581	SHIP CONSTRUCTION	Galway County	Roundstone	14	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
582	582	SHIP CONSTRUCTION	Galway County	Sruchain an Chlair, Oughterard	13	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
583	583	SHIP CONSTRUCTION	Galway County	St. Joseph's, Clifden	23	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
584	584	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	16	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
585	585	SHIP CONSTRUCTION	Galway County	Caisle�n Raithl�n, Ardrahan	10	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
586	586	SHIP CONSTRUCTION	Galway County	Old Area Engineer's Office, Barrack Street, Loughrea	5	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
587	587	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam. Phase 2	45	*N/A	""	""	""	""	Q4-2017	""
588	588	SHIP CONSTRUCTION	Galway County	Cartron, Kinvarra	10	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
589	589	SHIP CONSTRUCTION	Galway County	Gort U� Lochlainn, Moycullen	30	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
590	590	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam. Phase 1	16	*N/A	""	""	""	""	""	Q4-2018
591	591	SHIP CONSTRUCTION	Kerry	Cois Gallain, Killorglin	14	*N/A	""	""	""	""	Q1-2019	""
592	592	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
593	593	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	""	Q4-2018
594	594	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
595	595	SHIP CONSTRUCTION	Kerry	Cuirt Eaglaise, Milltown	8	*N/A	""	""	""	""	Q4-2018	""
596	596	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	Q2-2018	""
597	597	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
598	598	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
599	599	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	""	Q4-2018	""
600	600	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
601	601	SHIP CONSTRUCTION	Kerry	Glenach, Ballybunion	20	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
602	602	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	""	Q4-2018
603	603	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	""	Q4-2018
604	604	SHIP CONSTRUCTION	Kerry	An Carrigin, Tralee	28	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
605	605	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	""	Q4-2018
606	606	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
607	607	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
608	608	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
609	609	SHIP CONSTRUCTION	Kerry	Owngarry, killorglin	1	*N/A	""	""	""	""	Q1-2019	""
610	610	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	56	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
611	611	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
612	612	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
613	613	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
614	614	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	22	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
615	615	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee	8	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
616	616	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	20	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
617	617	SHIP CONSTRUCTION	Kerry	Crogorts, Tralee, Co Kerry	26	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
618	618	SHIP CONSTRUCTION	Kerry	Rock Rd., Killarney	10	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
619	619	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase4)	14	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
620	620	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
621	621	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
622	622	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
623	623	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	""	""	Q1-2018	""
624	624	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	""	""	Q1-2019	""
625	625	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	""	""	Q4-2018	""
626	626	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
627	627	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
628	628	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
629	629	SHIP CONSTRUCTION	Kildare	Coill Dubh, Co. Kildare	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
630	630	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
631	631	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
632	632	SHIP CONSTRUCTION	Kildare	Skenagun, Castledermot	2	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
633	633	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	""	""	Q1-2019	""
634	634	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
635	635	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	6	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
636	636	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Pennyswell Road, Kilkenny	80	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
637	637	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	""	""	Q1-2019	""
638	638	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
639	639	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	Q2-2018	""
640	640	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	Q1-2019	""
641	641	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
642	642	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
643	643	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	""	Q4-2018
644	644	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	15	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
645	645	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown	15	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
646	646	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
647	647	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
648	648	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
649	649	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
650	650	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
651	651	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
652	652	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	8	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
653	653	SHIP CONSTRUCTION	Laois	Coolroe, Ballybrittas	1	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
654	654	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
655	655	SHIP CONSTRUCTION	Laois	St Kieran's Park, Errill	14	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
656	656	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
657	657	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	""	Q4-2018
658	658	SHIP CONSTRUCTION	Limerick	Patrick�s Villas, Castleconnell	4	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
659	659	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
660	660	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
661	661	SHIP CONSTRUCTION	Limerick	1-12 Burke Avenue, Limerick City	12	*N/A	""	""	""	""	Q1-2019	""
662	662	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
663	663	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
664	664	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
665	665	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
666	666	SHIP CONSTRUCTION	Limerick	Deerpark, Adare	30	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
667	667	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
668	668	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
669	669	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	""	Q4-2018
670	670	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	7	*N/A	""	""	""	""	Q3-2018	""
671	671	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	""	Q1-2019
672	672	SHIP CONSTRUCTION	Limerick	Ballygreannan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
673	673	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	Q3-2018	""
674	674	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
675	675	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
676	676	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
677	677	SHIP CONSTRUCTION	Limerick	Mountpelier	12	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
678	678	SHIP CONSTRUCTION	Limerick	Knocklong	12	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
679	679	SHIP CONSTRUCTION	Limerick	Convent Street, King's Island	2	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
680	680	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	3	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
681	681	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	Q3-2018	""
682	682	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
683	683	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
684	684	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
685	685	SHIP CONSTRUCTION	Longford	St.Rita's, Park Road, Longford	8	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
686	686	SHIP CONSTRUCTION	Longford	Fairgreen View, Longford Town	1	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
687	687	SHIP CONSTRUCTION	Longford	Cranleymore, Abbeylara	3	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
688	688	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 1	4	*N/A	""	""	""	""	""	Q1-2018
689	689	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 1	7	*N/A	""	""	""	""	""	Q4-2016
690	690	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 2	5	*N/A	""	""	""	""	""	Q2-2017
691	691	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 3	3	*N/A	""	""	""	""	""	Q3-2017
692	692	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
693	693	SHIP CONSTRUCTION	Louth	Boice Court, Drogheda (Phase 2 - 4)	69	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
694	694	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
695	695	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 4	7	*N/A	""	""	""	""	""	Q4-2017
696	696	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	75	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
697	697	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2018
698	698	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2018
699	699	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 5	5	*N/A	""	""	""	""	Q3-2017	""
700	700	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 1	2	*N/A	""	""	""	""	""	Q2-2017
701	701	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2017
702	702	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 3	4	*N/A	""	""	""	""	""	Q4-2017
703	703	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 7	3	*N/A	""	""	""	""	""	Q1-2019
704	704	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 1	1	*N/A	""	""	""	""	""	Q3-2018
705	705	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 6	1	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
706	706	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 3	5	*N/A	""	""	""	""	""	Q1-2019
707	707	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 4	1	*N/A	""	""	""	""	""	Q2-2018
708	708	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 5	4	*N/A	""	""	""	""	""	Q3-2018
709	709	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 3	1	*N/A	""	""	""	""	""	Q1-2019
710	710	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
711	711	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 2	4	*N/A	""	""	""	""	""	Q4-2018
712	712	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 6	5	*N/A	""	""	""	""	""	Q4-2018
713	713	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
714	714	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 8	2	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
715	715	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	Q2-2018	""
716	716	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
717	717	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
718	718	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	""	Q1-2019
719	719	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	Q3-2018	""
720	720	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	""	Q4-2018	""
721	721	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	""	Q4-2018	""
722	722	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
723	723	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	""	""	Q1-2019	""
724	724	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	5	*N/A	""	""	""	""	Q1-2019	""
725	725	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	""	Q4-2018	""
726	726	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
727	727	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
728	728	SHIP CONSTRUCTION	Mayo	St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
729	729	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	""	""	Q4-2018	""
730	730	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	""	""	Q4-2018	""
731	731	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	""	""	Q1-2019	""
732	732	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
733	733	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
734	734	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
735	735	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
736	736	SHIP CONSTRUCTION	Mayo	Cross, Co-Mayo	15	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
737	737	SHIP CONSTRUCTION	Mayo	Bonniconlon	5	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
738	738	SHIP CONSTRUCTION	Mayo	Cloonkeadagh Road, Kiltimagh, Co-Mayo	23	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
739	739	SHIP CONSTRUCTION	Mayo	50 Units @ Rehins Fort, Ballina, Co-Mayo	50	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
740	740	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	Q1-2019	""
741	741	SHIP CONSTRUCTION	Meath	St. Oliver's, Ratoath	17	*N/A	""	""	""	""	Q1-2018	""
742	742	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	""	""	Q4-2018	""
743	743	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	""	Q1-2019
744	744	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
745	745	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
746	746	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
747	747	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
748	748	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
749	749	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
750	750	SHIP CONSTRUCTION	Meath	Farganstown	42	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
751	751	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
752	752	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
753	753	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
754	754	SHIP CONSTRUCTION	Meath	Castle Street, Ashbourne	55	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
755	755	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	9	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
756	756	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	Q3-2018	""
757	757	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	Q3-2018	""
758	758	SHIP CONSTRUCTION	Monaghan	Davy's & Adjacent Porperty, Fermanagh St., Clones	3	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
759	759	SHIP CONSTRUCTION	Monaghan	Boyle Sports Site, Fermanagh St., Clones	3	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
760	760	SHIP CONSTRUCTION	Monaghan	82 & 83 Fermanagh St., Clones	3	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
761	761	SHIP CONSTRUCTION	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
762	762	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
763	763	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
764	764	SHIP CONSTRUCTION	Monaghan	Bothar na Mullen, Scotstown	32	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
765	765	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan	16	*N/A	""	""	""	""	""	Q4-2018
766	766	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	Q3-2018	""
767	767	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
768	768	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
769	769	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	Q4-2017	""
770	770	SHIP CONSTRUCTION	Roscommon	Cloonfad	3	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
771	771	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
772	772	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
773	773	SHIP CONSTRUCTION	Roscommon	Silveroe Meadows, Boyle	12	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
774	774	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
775	775	SHIP CONSTRUCTION	Roscommon	Monksland, Athlone	2	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
776	776	SHIP CONSTRUCTION	Roscommon	Longford TD, Castlerea	6	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
777	777	SHIP CONSTRUCTION	Roscommon	Monksland, Athlone, Co-Roscommon	50	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
778	778	SHIP CONSTRUCTION	Roscommon	Meadowbrook, Ballyclare Td., ballyleague, Co. Roscommon	18	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
779	779	SHIP CONSTRUCTION	Roscommon	Lisroyne Td., Strokestown	8	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
780	780	SHIP CONSTRUCTION	Sligo	Collooney	15	*N/A	""	""	""	""	Q4-2018	""
781	781	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	""	""	""	Q4-2018	""
782	782	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	""	Q4-2018
783	783	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (2)	14	*N/A	""	""	""	""	""	Q3-2018
784	784	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
785	785	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	""	""	Q4-2018	""
786	786	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (1)	8	*N/A	""	""	""	""	""	Q4-2017
787	787	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
788	788	SHIP CONSTRUCTION	Sligo	Dromore West	10	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
789	789	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
790	790	SHIP CONSTRUCTION	Sligo	House at Ballinode	1	*N/A	""	""	""	""	""	Q4-2018
791	791	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght (Phase 1)	17	*N/A	""	""	""	""	""	Q4-2018
792	792	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	""	Q4-2018
793	793	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	""	Q1-2019
794	794	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	""	Q4-2018
795	795	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	""	Q4-2018
796	796	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
797	797	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
798	798	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
799	799	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
800	800	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
801	801	SHIP CONSTRUCTION	South Dublin	St. Catherine�s, Knockmore Avenue, Killinarden, Tallaght	13	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
802	802	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
803	803	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght (Phase 2)	9	*N/A	""	""	""	""	""	Q1-2019
804	804	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
805	805	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
806	806	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	28	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
807	807	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	11	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
808	808	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
809	809	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
810	810	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
811	811	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
812	812	SHIP CONSTRUCTION	Tipperary	Borrisokane	17	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
813	813	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
814	814	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	Stage 2 approved Q1-2017, full design/tender being prepared.	""	""	""	""
815	815	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	""	Q4-2018	""
816	816	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	""	Q4-2018
817	817	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	""	""	Q1-2019	""
818	818	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
819	819	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
820	820	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
821	821	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
822	822	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
823	823	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	12	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
824	824	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
825	825	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2018
826	826	SHIP CONSTRUCTION	Tipperary	Bansha	14	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
827	827	SHIP CONSTRUCTION	Tipperary	Twomileborris, Thurles	21	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
828	828	SHIP CONSTRUCTION	Tipperary	Donohill, 	4	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
829	829	SHIP CONSTRUCTION	Tipperary	Mullinahone	10	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
830	830	SHIP CONSTRUCTION	Tipperary	Ballyclerahan	14	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
831	831	SHIP CONSTRUCTION	Tipperary	Ard Alainn, Moyne	7	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
832	832	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
833	833	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	""	Q4-2018
834	834	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City	5	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
835	835	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
836	836	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
837	837	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
838	838	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
839	839	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
840	840	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	Stage 1 approved Q1-2014, outline design and costs being prepared.	""	""	""	""	""
841	841	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
842	842	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	11	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
843	843	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
844	844	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
845	845	SHIP CONSTRUCTION	Waterford	Rough Sleeper Emerg Accom, Bath St, Waterford City	4	*N/A	""	""	""	""	Q1-2019	""
846	846	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
847	847	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	""	Q4-2018
848	848	SHIP CONSTRUCTION	Westmeath	16 Ennell Court	1	*N/A	""	""	""	""	""	Q1-2018
849	849	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone  Phase 1	33	*N/A	""	""	""	""	Q2-2018	""
850	850	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
851	851	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
852	852	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	31	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
853	853	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
854	854	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
855	855	SHIP CONSTRUCTION	Westmeath	St. Brigid's Green, Mullingar	14	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
856	856	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone Phase 2	18	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
857	857	SHIP CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	23	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
858	858	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
859	859	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
860	860	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
861	861	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	""	Q1-2019
862	862	SHIP CONSTRUCTION	Wexford	Danescastle	10	*N/A	""	""	""	""	""	Q1-2019
863	863	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	Q2-2018	""
864	864	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	45	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
865	865	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
866	866	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	34	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
867	867	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	""	Q2-2018
868	868	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
869	869	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
870	870	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 1)	5	*N/A	""	""	""	""	""	Q4-2018
871	871	SHIP CONSTRUCTION	Wexford	Baile an Tr�, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
872	872	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
873	873	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
874	874	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
875	875	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	6	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
876	876	SHIP CONSTRUCTION	Wexford	Ballywish, Castlebridge	11	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
877	877	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford	43	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
878	878	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy, Co Wexford	17	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
879	879	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	12	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
880	880	SHIP CONSTRUCTION	Wexford	Rosbercon, New Ross	28	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
881	881	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 2)	4	*N/A	""	""	""	""	""	Q4-2018
882	882	SHIP CONSTRUCTION	Wexford	Wexford Street, Gorey, Co. Wexford	20	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
883	883	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 3)	21	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
884	884	SHIP CONSTRUCTION	Wicklow	Ard Na Mara, Kilcoole	2	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
885	885	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	""	""	Q4-2018	""
886	886	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 1)	17	*N/A	""	""	""	""	Q4-2017	""
887	887	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 2)	26	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
888	888	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
889	889	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
890	890	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	""	Q4-2018
891	891	SHIP CONSTRUCTION	Wicklow	St Mary's Rd., Arklow (Old Library Site)	7	*N/A	""	""	""	""	""	Q4-2018
892	892	SHIP CONSTRUCTION	Wicklow	Sugarloaf View,Jameson Heights,  Kilmacanogue	20	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
893	893	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum (Phase 2)	20	*N/A	""	""	""	""	""	Q4-2018
894	894	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
895	895	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	""	""	""	Q4-2018	""
896	896	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	30	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
897	897	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
898	898	CAS CONSTRUCTION	Carlow	Gleann na Bearu	6	Respond	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
899	899	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
900	900	CAS CONSTRUCTION TURNKEY	Carlow	Pollerton Big, Carlow	6	Tintean Housing Association Ltd	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
901	901	SHIP CONSTRUCTION	Carlow	Father Flood Avenue, Rathvilly	8	*N/A	""	""	""	""	Q1-2019	""
902	902	SHIP CONSTRUCTION	Carlow	St. Oliver's Crescent, Myshall	4	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
903	903	SHIP CONSTRUCTION	Carlow	St. Mary's Court & Dereen Heights	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
904	904	SHIP CONSTRUCTION	Carlow	Crowsgrove, Kildavin	1	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
905	905	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 1	6	*N/A	""	""	""	""	Q4-2017	""
906	906	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 2	6	*N/A	""	""	""	""	Q4-2017	""
907	907	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 3	8	*N/A	""	""	""	""	Q4-2017	""
908	908	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 4	12	*N/A	""	""	""	""	Q4-2017	""
909	909	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 5	12	*N/A	""	""	""	""	Q4-2017	""
910	910	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 6	19	*N/A	""	""	""	""	Q4-2017	""
911	911	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 1)	3	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
912	912	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 2)	4	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
913	913	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduffy (Phase 1)	7	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
914	914	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	15	Cuan an Chlair Ltd	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
915	915	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
916	916	CAS CONSTRUCTION	Clare	Monaskeha Heights	4	Newgrove Housing Association Ltd	""	""	""	""	Q4-2018	""
917	917	CAS CONSTRUCTION	Clare	Roo East	4	Thomond Housing Association Ltd	""	""	""	""	""	Q4-2018
918	918	CAS CONSTRUCTION	Clare	9 Elmwood	4	Thomond Housing Association Ltd	""	""	""	""	""	Q1-2019
919	919	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
920	920	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
921	921	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	""	Q4-2018
922	922	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	37	Good Shepherd Services Ltd	""	""	""	""	Q1-2019	""
923	923	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
924	924	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
925	925	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
926	926	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
927	927	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
928	928	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
929	929	REGENERATION	Cork City	Phase 2A Knocknaheeny (Phase 1)	16	*N/A	""	""	""	""	Q2-2018	""
930	930	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
931	931	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
932	932	REGENERATION	Cork City	Phase 2C Knocknaheeny	24	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
933	933	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Foyle Avenue, Knocknaheeny, Cork	2	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
934	934	REGENERATION	Cork City	Ardmore Avenue, Knocknaheeny, Cork	1	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
935	935	REGENERATION	Cork City	Phase 2A Knocknaheeny (Phase 2)	31	*N/A	""	""	""	""	Q2-2018	""
936	936	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
937	937	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
938	938	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
939	939	SHIP CONSTRUCTION TURNKEY	Cork City	6-10, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q4-2018
940	940	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	""	Q4-2018
941	941	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
942	942	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
943	943	SHIP CONSTRUCTION TURNKEY	Cork City	3B & 9B South Terrace Court, South Terrace, Cork	2	*N/A	""	""	""	""	""	Q4-2018
944	944	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinlough Road / Knockrea Lawn, Ballinlough, Cork	6	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
945	945	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	""	Q4-2018
946	946	SHIP CONSTRUCTION TURNKEY	Cork City	Barack Street	32	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
947	947	SHIP CONSTRUCTION TURNKEY	Cork City	FaranFerris	5	*N/A	""	""	""	""	Q2-2018	""
948	948	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	""	Q4-2018	""
949	949	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	""	""	Q4-2018
950	950	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	""	Q3-2018	""
951	951	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
952	952	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road, Tramore	43	*N/A	""	""	""	""	""	Q3-2018
953	953	SHIP CONSTRUCTION TURNKEY	Cork City	1-5, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
954	954	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
955	955	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street	25	*N/A	""	""	""	""	Q2-2018	""
956	956	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinure Road, Cork City	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
957	957	SHIP CONSTRUCTION TURNKEY	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
958	958	SHIP CONSTRUCTION TURNKEY	Cork City	7-11 Gerald Griffin Street, Cork	13	*N/A	""	""	""	""	Q1-2019	""
959	959	SHIP CONSTRUCTION TURNKEY	Cork City	29/30 Lower John Street, Cork	17	*N/A	""	""	""	""	Q1-2019	""
960	960	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	18	Cluid Housing Association	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
961	961	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	""	Q3-2018
962	962	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	""	Q1-2019
963	963	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
964	964	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	""	Q1-2019	""
965	965	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
966	966	CAS CONSTRUCTION	Cork County	Care Home Facility, Masseytown, Macroom, Co. Cork	1	T�ath Housing Association Ltd	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
967	967	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
968	968	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	8	Charleville Care Project Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
969	969	SHIP CONSTRUCTION RAPID	Cork County	Abbeywood, Midleton	70	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
970	970	SHIP CONSTRUCTION RAPID	Cork County	Station Road, Blarney	18	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
971	971	SHIP CONSTRUCTION RAPID	Cork County	Bluepool, Kanturk	12	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
972	972	SHIP CONSTRUCTION	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
973	973	SHIP CONSTRUCTION	Cork County	49 & 50 Castletreasure Grove, Douglas	2	*N/A	""	""	""	""	Q1-2019	""
974	974	SHIP CONSTRUCTION	Cork County	No. 2,3 & 5 Seaview Cottages, Derrymiha, Castletownbere, Co. Cork	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
975	975	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (1)	18	*N/A	""	""	""	""	""	Q2-2018
976	976	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
977	977	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	""	Q4-2018
978	978	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	25	*N/A	""	""	""	""	Q3-2018	""
979	979	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
980	980	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
981	981	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	""	Q4-2017
982	982	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	10	*N/A	""	""	""	""	Q4-2017	""
983	983	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
984	984	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
985	985	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
986	986	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	5	*N/A	""	""	""	""	Q1-2019	""
987	987	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary�s Road, Dunmanway Phase 1	14	*N/A	""	""	""	""	Q3-2018	""
988	988	SHIP CONSTRUCTION TURNKEY	Cork County	No 6-12 Downeen Cross, Rosscarbery	7	*N/A	""	""	""	Stage 4 approved Q3-2017, the scheme is fully approved.	""	""
989	989	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	14	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
990	990	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	5	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
991	991	SHIP CONSTRUCTION TURNKEY	Cork County	HazelBrook, Ballyvinter, Mallow	16	*N/A	""	""	""	""	Q1-2019	""
992	992	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	Q1-2018	""
993	993	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	""	Q1-2019	""
994	994	SHIP CONSTRUCTION TURNKEY	Cork County	No. 43 and No. 50 Chapel Court, Skibbereen (Phase 1)	2	*N/A	""	""	""	""	""	Q3-2018
995	995	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	""	Q4-2018
996	996	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara, Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q4-2018
997	997	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal, Phase 1	15	*N/A	""	""	""	""	Q1-2019	""
998	998	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire	4	*N/A	""	""	""	""	""	Q4-2018
999	999	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mont Rivers, Co. Cork.	3	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
1000	1000	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 2	35	*N/A	""	""	""	""	Q1-2019	""
1001	1001	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
1002	1002	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1003	1003	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal - Phase 1	13	*N/A	""	""	""	""	""	Q4-2018
1004	1004	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	6	*N/A	""	""	""	""	Q3-2018	""
1005	1005	SHIP CONSTRUCTION TURNKEY	Cork County	No.9 and No.10  Chapel Court, Skibbereen, (Phase 2)	2	*N/A	""	""	""	""	""	Q4-2018
1006	1006	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midelton (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
1007	1007	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	""	Q4-2018
1008	1008	SHIP CONSTRUCTION TURNKEY	Cork County	Milleenacola, Bantry	51	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1009	1009	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac Phase 1	4	*N/A	""	""	""	""	""	Q4-2018
1010	1010	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow	12	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1011	1011	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midelton (Phase 2)	14	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1012	1012	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (2)	7	*N/A	""	""	""	""	""	Q3-2018
1013	1013	SHIP CONSTRUCTION TURNKEY	Cork County	Canon St, Rathcormac	3	*N/A	""	""	""	""	Q1-2019	""
1014	1014	SHIP CONSTRUCTION TURNKEY	Cork County	Percival St, Kanturk	2	*N/A	""	""	""	""	""	Q4-2018
1015	1015	SHIP CONSTRUCTION TURNKEY	Cork County	9 & 9a Main Street, Boherbue	2	*N/A	""	""	""	""	""	Q4-2018
1016	1016	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal - Phase 2	6	*N/A	""	""	""	""	Q3-2018	""
1017	1017	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac Phase 2	4	*N/A	""	""	""	""	Q1-2019	""
1018	1018	SHIP CONSTRUCTION TURNKEY	Cork County	Inis F�il, Curraclough, Bandon	30	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1019	1019	SHIP CONSTRUCTION TURNKEY	Cork County	Maple Woods, Midleton	6	*N/A	""	""	""	""	""	Q4-2018
1020	1020	SHIP CONSTRUCTION TURNKEY	Cork County	No. 46 and No. 47  Chapel Court, Skibereen (Phase 3)	2	*N/A	""	""	""	""	Q1-2018	""
1021	1021	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	42	*N/A	""	""	""	""	Q4-2017	""
1022	1022	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary's Road, Dunmanway Phase 2	6	*N/A	""	""	""	""	Q4-2018	""
1023	1023	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal, Phase 2	20	*N/A	""	""	""	""	Q1-2019	""
1024	1024	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull, Co. Cork	7	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1025	1025	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Bloomfield, Midleton, Co. Cork  Phase 1	6	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1026	1026	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Broomfield, Midleton, Co. Cork - Phase 2	10	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1027	1027	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Bloomfield, Midleton, Co. Cork - Phase 3	22	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1028	1028	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Carin, Carrigtwohill	21	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
1029	1029	SHIP CONSTRUCTION TURNKEY	Cork County	HazelBrook, Ballyvinter, Mallow	52	*N/A	""	""	""	""	Q1-2019	""
1030	1030	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1031	1031	SHIP CONSTRUCTION RAPID	DLR	Rockville Drive (Glenamuck Cottages)	13	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
1032	1032	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
1033	1033	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
1034	1034	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace, Monkstown	14	*N/A	""	""	""	""	""	Q4-2018
1035	1035	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1036	1036	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
1037	1037	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1038	1038	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1039	1039	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
1040	1040	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	20	Habinteg Housing Association (Ireland) Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1041	1041	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
1042	1042	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 1)	18	*N/A	""	""	""	""	""	Q4-2018
1043	1043	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	18	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
1044	1044	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 2)	8	*N/A	""	""	""	""	""	Q1-2019
1045	1045	SHIP CONSTRUCTION TURNKEY	Donegal	Carnamuggagh, Letterkenny	30	*N/A	""	""	""	""	Q1-2019	""
1046	1046	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	19	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1047	1047	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 3)	12	*N/A	""	""	""	""	Q2-2018	""
1048	1048	CAS CONSTRUCTION	Dublin City	38/39 Bolton Street, Dublin 1	8	Arlington Novas Ireland Ltd	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1049	1049	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2018
1050	1050	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	T�ath Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1051	1051	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	""	Q4-2018
1052	1052	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	Q3-2018	""
1053	1053	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	18	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1054	1054	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
1055	1055	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1056	1056	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
1057	1057	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
1058	1058	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	18	Simon Community : Dublin Simon	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1059	1059	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1060	1060	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1061	1061	CAS CONSTRUCTION TURNKEY	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
1062	1062	REGENERATION	Dublin City	St. Teresa's Gardens	54	*N/A	""	""	""	""	Q4-2018	""
1063	1063	REGENERATION	Dublin City	Dolphin House, Dublin 8 (Phase 1)	100	*N/A	""	""	""	""	""	Q3-2018
1064	1064	REGENERATION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q1-2019	""
1065	1065	REGENERATION	Dublin City	Sackville Avenue Cottages	11	*N/A	Stage 1 approved Q2-2016, outline design and costs being prepared.	""	""	""	""	""
1066	1066	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	""	""	""	""	Q3-2018	""
1067	1067	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
1068	1068	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
1069	1069	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
1070	1070	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
1071	1071	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
1072	1072	REGENERATION	Dublin City	St. Bricins Park	11	*N/A	""	""	""	""	""	Q4-2018
1073	1073	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
1074	1074	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
1075	1075	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
1076	1076	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
1077	1077	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
1078	1078	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard Site Ph1	53	*N/A	""	""	""	""	""	Q4-2018
1079	1079	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	Stage 2 approved Q3-2015, full design/tender being prepared.	""	""	""	""
1080	1080	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Rathvilly Drive site	13	*N/A	""	""	""	""	""	Q3-2018
1081	1081	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Woodbank Drive site	3	*N/A	""	""	""	""	""	Q3-2018
1082	1082	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard site Ph 2	19	*N/A	""	""	""	""	Q3-2018	""
1083	1083	SHIP CONSTRUCTION RAPID	Dublin City	Bonham Street Dublin  8	57	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1084	1084	SHIP CONSTRUCTION RAPID	Dublin City	Cork Street / Chamber Street Dublin 8	55	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1085	1085	SHIP CONSTRUCTION RAPID	Dublin City	Springvale Chapelizod Dublin 8	73	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1086	1086	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospecthill	58	*N/A	""	""	""	""	""	Q4-2017
1087	1087	SHIP CONSTRUCTION TURNKEY	Dublin City	Parkside, Balgriffin, Dublin 13	16	*N/A	""	""	""	""	""	Q4-2018
1088	1088	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	47	*N/A	""	""	""	""	""	Q4-2018
1089	1089	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	45	*N/A	""	""	""	""	Q4-2018	""
1090	1090	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	T�ath Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
1091	1091	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 1)	6	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
1092	1092	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1093	1093	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
1094	1094	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
1095	1095	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	Q3-2018	""
1096	1096	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
1097	1097	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
1098	1098	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
1099	1099	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	""	Q4-2018	""
1100	1100	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
1101	1101	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
1102	1102	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 1), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
1103	1103	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 2), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
1104	1104	SHIP CONSTRUCTION TURNKEY	Fingal	Ravenswood, North Road, Finglas (Phase 2)	2	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
1105	1105	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
1106	1106	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
1107	1107	SHIP CONSTRUCTION TURNKEY	Fingal	Kenure Gate, Park Road, Rush	4	*N/A	""	""	""	""	""	Q4-2018
1108	1108	SHIP CONSTRUCTION TURNKEY	Fingal	Glaslinn, Donabate	3	*N/A	""	""	""	""	""	Q4-2018
1109	1109	SHIP CONSTRUCTION TURNKEY	Fingal	Bremore Pastures Park, Balbriggan	4	*N/A	""	""	""	""	""	Q4-2018
1110	1110	SHIP CONSTRUCTION TURNKEY	Fingal	Northwood Green, Santry, Dublin 9	37	*N/A	""	""	""	""	""	Q4-2018
1111	1111	SHIP CONSTRUCTION TURNKEY	Fingal	Hollytown Cottages	4	*N/A	""	""	""	""	Q1-2019	""
1112	1112	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
1113	1113	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1114	1114	CAS CONSTRUCTION	Galway City	47 Forster Street	9	Cope Galway	""	""	""	""	Q4-2018	""
1115	1115	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine, (Glasshouse Site) Monivea Road - (Phase 1)	6	*N/A	""	""	""	""	Q4-2018	""
1116	1116	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine (Glasshouse Site), Monivea Road - (Phase 2)	12	*N/A	""	""	""	""	Q4-2018	""
1117	1117	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine (Glasshouse Site), Monivea Road - (Phase 3)	14	*N/A	""	""	""	""	Q4-2018	""
1118	1118	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine (Glasshouse Site), Monivea Road - (Phase 4)	18	*N/A	""	""	""	""	Q4-2018	""
1119	1119	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Gr�ine (Glasshouse Site), Monivea Road - (Phase 5)	2	*N/A	""	""	""	""	Q4-2018	""
1120	1120	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1121	1121	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mh�l, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
1122	1122	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	Q2-2018	""
1123	1123	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1124	1124	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1125	1125	CAS CONSTRUCTION	Galway County	Springfield, Parkmore (Ballinasloe)	4	Peter Triest Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1126	1126	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
1127	1127	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	17	Cluid Housing Association	""	""	""	""	Q4-2018	""
1128	1128	CAS CONSTRUCTION	Galway County	Caheroyn, Athenry	4	Peter Triest Housing Association Ltd	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1129	1129	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	5	Peter Triest Housing Association Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1130	1130	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1131	1131	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
1132	1132	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
1133	1133	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
1134	1134	SHIP CONSTRUCTION TURNKEY	Galway County	Ashthorn Avenue, Headford	10	*N/A	""	""	""	""	""	Q4-2018
1135	1135	SHIP CONSTRUCTION TURNKEY	Galway County	Cuirt na hAbhann, Claregalway 	8	*N/A	""	""	""	""	""	Q4-2018
1136	1136	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1137	1137	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	""	Q4-2018
1138	1138	CAS CONSTRUCTION	Kerry	Chamfers Place	18	Cluid Housing Association	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1139	1139	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	""	Q4-2018
1140	1140	CAS CONSTRUCTION	Kerry	Hawley Park Apartments, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1141	1141	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	Social Action Group Rathmore	""	""	""	""	Q4-2018	""
1142	1142	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	""	Q4-2018
1143	1143	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
1144	1144	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
1145	1145	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	""	Q4-2018
1146	1146	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
1147	1147	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	6	*N/A	""	""	""	""	Q1-2019	""
1148	1148	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 1	2	*N/A	""	""	""	""	""	Q1-2018
1149	1149	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
1150	1150	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
1151	1151	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	5	*N/A	""	""	""	""	""	Q3-2018
1152	1152	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 1	3	*N/A	""	""	""	""	""	Q4-2018
1153	1153	SHIP CONSTRUCTION TURNKEY	Kerry	47 Woodview, Cahirdown, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
1154	1154	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 3	3	*N/A	""	""	""	""	""	Q4-2018
1155	1155	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 2	1	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1156	1156	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1157	1157	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1158	1158	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
1159	1159	CAS CONSTRUCTION	Kildare	Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	""	""	""	""	Q1-2019	""
1160	1160	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1161	1161	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1162	1162	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
1163	1163	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
1164	1164	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
1165	1165	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
1166	1166	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
1167	1167	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
1168	1168	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	""	Q4-2018
1169	1169	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
1170	1170	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot	6	*N/A	""	""	""	""	""	Q4-2018
1171	1171	SHIP CONSTRUCTION TURNKEY	Kildare	Grove Lane, Robertstown	3	*N/A	""	""	""	""	Q1-2017	""
1172	1172	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill, Prosperous	5	*N/A	""	""	""	""	""	Q4-2018
1173	1173	SHIP CONSTRUCTION TURNKEY	Kildare	The Green, Elsmore Naas	5	*N/A	""	""	""	""	""	Q4-2018
1174	1174	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn (Phase 1.1)	10	*N/A	""	""	""	""	""	Q1-2019
1175	1175	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn (Phase 2)	19	*N/A	""	""	""	""	Q4-2018	""
1176	1176	SHIP CONSTRUCTION TURNKEY	Kildare	Beech Park Wood, Leixlip	4	*N/A	""	""	""	""	Q1-2019	""
1177	1177	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn (Phase 1.2)	10	*N/A	""	""	""	""	Q1-2018	""
1178	1178	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1179	1179	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	""	Q4-2018
1180	1180	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
1181	1181	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	""	Q4-2018
1182	1182	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
1183	1183	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
1184	1184	CAS CONSTRUCTION	Kilkenny	Camphill ~Communities Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
1185	1185	CAS CONSTRUCTION	Kilkenny	"""Red Barn"" Patrick Street, Ballyragget"	16	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1186	1186	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett	4	Oaklee Housing Trust	""	""	""	""	""	Q4-2018
1187	1187	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	5	Camphill Communities of Ireland	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1188	1188	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	4	Good Shepherd Services Ltd	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1189	1189	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1190	1190	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, kilkenny	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1191	1191	CAS CONSTRUCTION	Kilkenny	Bridge Street, Callan, Co. Kilkenny	6	Good Shepherd Services Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1192	1192	CAS CONSTRUCTION	Kilkenny	Grennan Villa, Thomastown	5	Camphill Communities of Ireland	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1193	1193	CAS CONSTRUCTION TURNKEY	Kilkenny	Golf Links Road, Kilkenny	15	Respond	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1194	1194	SHIP CONSTRUCTION	Kilkenny	Group Home Cloghabrody, Thomastown	1	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1195	1195	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
1196	1196	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
1197	1197	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 1)	8	*N/A	""	""	""	""	""	Q1-2018
1198	1198	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
1199	1199	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	1	*N/A	""	""	""	""	""	Q3-2018
1200	1200	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford (Phase 3)	18	*N/A	""	""	""	""	""	Q4-2018
1201	1201	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	""	Q3-2018	""
1202	1202	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
1203	1203	SHIP CONSTRUCTION TURNKEY	Kilkenny	Ogenty, Gowran	12	*N/A	""	""	""	""	""	Q4-2018
1204	1204	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	47	Sophia Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1205	1205	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	""	""	""	""	Q1-2019	""
1206	1206	SHIP CONSTRUCTION	Laois	54a & 54b Hillview, Portlaoise	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1207	1207	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1208	1208	SHIP CONSTRUCTION	Laois	The Orchard, Stardbally	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1209	1209	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
1210	1210	SHIP CONSTRUCTION TURNKEY	Leitrim	Roosky	7	*N/A	""	""	""	""	Q1-2019	""
1211	1211	SHIP CONSTRUCTION TURNKEY	Leitrim	Drumshanbo	9	*N/A	""	""	""	""	Q1-2019	""
1212	1212	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	13	Croom Voluntary Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
1213	1213	CAS CONSTRUCTION	Limerick	Cappamore	10	Cappamore Housing Association Ltd	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1214	1214	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
1215	1215	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
1216	1216	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	""	Q2-2018	""
1217	1217	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
1218	1218	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	6	Peter McVerry Trust Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1219	1219	CAS CONSTRUCTION	Limerick	Pinewood, Mulcaire Drive, Garraunykee	1	Daughters Of Charity Of St Vincent De Paul	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1220	1220	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1221	1221	CAS CONSTRUCTION TURNKEY	Limerick	Carebright Community, Ardykeohane, Bruff	6	Carebright Ltd	""	""	""	""	""	Q1-2019
1222	1222	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
1223	1223	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
1224	1224	REGENERATION	Limerick	Gaol Lane	1	*N/A	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
1225	1225	REGENERATION	Limerick	Sheep / Athlunkards Street	8	T�ath Housing Association Ltd	""	Stage 2 approved Q2-2014, full design/tender being prepared.	""	""	""	""
1226	1226	REGENERATION	Limerick	Churchfield (Phase 1.2)	19	*N/A	""	""	""	""	""	Q1-2018
1227	1227	REGENERATION	Limerick	Churchfield (Phase 2)	38	Cluid Housing Association	""	Stage 2 approved Q4-2014, full design/tender being prepared.	""	""	""	""
1228	1228	REGENERATION	Limerick	Cosgrave Park	9	Co-operative Housing Ireland (Formerly NABCo)	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1229	1229	REGENERATION	Limerick	Palm Close	27	Cluid Housing Association	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
1230	1230	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
1231	1231	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
1232	1232	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
1233	1233	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
1234	1234	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
1235	1235	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
1236	1236	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
1237	1237	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
1238	1238	REGENERATION	Limerick	BCW Vacant Refurbs, Lot 1 & 2**	14	*N/A	""	""	""	""	""	Q4-2016
1239	1239	REGENERATION	Limerick	St. Mary's Park Infills (Phase 1)	15	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
1240	1240	REGENERATION	Limerick	Cliona Park (Phase 3)	18	T�ath Housing Association Ltd	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
1241	1241	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved Q1-2015, outline design and costs being prepared.	""	""	""	""	""
1242	1242	REGENERATION	Limerick	45A-46A Cliona Park	2	*N/A	""	Stage 2 approved Q1-2016, full design/tender being prepared.	""	""	""	""
1243	1243	REGENERATION	Limerick	Dalgaish Park	27	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
1244	1244	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved Q1-2015, outline design and costs being prepared.	""	""	""	""	""
1245	1245	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1246	1246	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1247	1247	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
1248	1248	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1249	1249	REGENERATION	Limerick	Churchfield (Phase 1.1)	23	*N/A	""	""	""	""	""	Q2-2018
1250	1250	REGENERATION	Limerick	St. Mary's Park Infills (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2019
1251	1251	SHIP CONSTRUCTION RAPID	Limerick	Faha View, Patrickswell	16	*N/A	""	""	""	""	Q4-2018	""
1252	1252	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	43	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1253	1253	SHIP CONSTRUCTION RAPID	Limerick	Barnakyle, Patrickswell 	24	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1254	1254	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	11	*N/A	""	""	""	""	Q1-2019	""
1255	1255	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 1)	14	*N/A	""	""	""	""	""	Q4-2017
1256	1256	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 1)	4	*N/A	""	""	""	""	""	Q3-2018
1257	1257	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
1258	1258	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 1)	7	*N/A	""	""	""	""	""	Q4-2018
1259	1259	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 2)	7	*N/A	""	""	""	""	Q3-2018	""
1260	1260	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 3)	3	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1261	1261	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara	5	*N/A	""	""	""	""	""	Q4-2018
1262	1262	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard	14	*N/A	""	""	""	""	Q3-2018	""
1263	1263	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	29	*N/A	""	""	""	""	""	Q4-2018
1264	1264	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	12	*N/A	""	""	""	""	Q1-2019	""
1265	1265	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	22	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1266	1266	SHIP CONSTRUCTION TURNKEY	Longford	Church Street, Edgeworthstown	5	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1267	1267	CAS CONSTRUCTION	Louth	5 Slieveroe Cresent, Dundalk	1	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1268	1268	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	T�ath Housing Association Ltd	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1269	1269	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1270	1270	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1271	1271	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	""	Q4-2018
1272	1272	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1273	1273	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
1274	1274	CAS CONSTRUCTION	Louth	36 Strand Hill, Clogherhead	4	St. John of God Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1275	1275	CAS CONSTRUCTION	Louth	Coulter Park	6	T�ath Housing Association Ltd	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1276	1276	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1277	1277	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda, Co. Louth	4	North ? East Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1278	1278	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
1279	1279	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1280	1280	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
1281	1281	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
1282	1282	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2018
1283	1283	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
1284	1284	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
1285	1285	SHIP CONSTRUCTION	Mayo	Pound Road, Castlebar	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1286	1286	SHIP CONSTRUCTION	Mayo	3 Infill Units @ The Boreen, Crossmolina, Co-Mayo	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1287	1287	SHIP CONSTRUCTION	Mayo	3 Infill Units @ Deel Court, Crossmolina, Co-Mayo	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1288	1288	SHIP CONSTRUCTION	Mayo	3 Infill Units @Knockroe, Moygownagh, Co-Mayo	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1289	1289	SHIP CONSTRUCTION TURNKEY	Mayo	Carrabeg, Newport Road, Castlebar	2	*N/A	""	""	""	""	""	Q4-2018
1290	1290	SHIP CONSTRUCTION TURNKEY	Mayo	Cois Abhainn, Bonniconlon	2	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1291	1291	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	T�ath Housing Association Ltd	""	""	""	""	""	Q4-2018
1292	1292	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	""	""	""	Q1-2019	""
1293	1293	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	""	""	""	Q1-2019	""
1294	1294	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	""	""	""	Q1-2019	""
1295	1295	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	""	Q4-2018
1296	1296	SHIP CONSTRUCTION	Meath	The Belfry, Trim	3	*N/A	""	""	""	""	Q1-2019	""
1297	1297	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Navan	24	*N/A	""	""	""	""	""	Q4-2018
1298	1298	SHIP CONSTRUCTION TURNKEY	Meath	Clonmagadden, Navan	16	*N/A	""	""	""	""	""	Q4-2018
1299	1299	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1300	1300	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1301	1301	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
1302	1302	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
1303	1303	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2017
1304	1304	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
1305	1305	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
1306	1306	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	Q3-2018	""
1307	1307	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
1308	1308	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	""	Q4-2018
1309	1309	SHIP CONSTRUCTION TURNKEY	Monaghan	Rosevale, Bree, Castleblayney	26	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1310	1310	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	Q4-2018	""
1311	1311	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	Q3-2018	""
1312	1312	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	T�ath Housing Association Ltd	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1313	1313	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	""	""	Q1-2019	""
1314	1314	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1315	1315	CAS CONSTRUCTION	Offaly	Presentation Convent, Portarlington	32	Sophia Housing Association Ltd	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1316	1316	SHIP CONSTRUCTION	Offaly	Church Street, Clara	3	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1317	1317	SHIP CONSTRUCTION	Offaly	Beechgrove, Belmont	7	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1318	1318	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr	12	*N/A	""	""	""	""	Q1-2019	""
1319	1319	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
1320	1320	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	Q2-2018	""
1321	1321	SHIP CONSTRUCTION TURNKEY	Offaly	Coolagarry, Walsh Island, 	4	*N/A	""	""	""	""	Q1-2019	""
1322	1322	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	""	""	Q4-2018
1323	1323	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
1324	1324	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	""	Q1-2019
1325	1325	SHIP CONSTRUCTION TURNKEY	Roscommon	Lisroyne Court, Strokestown	10	*N/A	""	""	""	""	Q3-2018	""
1326	1326	SHIP CONSTRUCTION TURNKEY	Roscommon	Warren Grove, Boyle	4	*N/A	""	""	""	""	""	Q4-2018
1327	1327	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	""	Q4-2018	""
1328	1328	SHIP CONSTRUCTION	Sligo	94 St Joseph's Terrace	1	*N/A	""	""	""	""	Q4-2018	""
1329	1329	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	T�ath Housing Association Ltd	""	""	""	""	Q1-2019	""
1330	1330	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1331	1331	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	""	Q4-2018
1332	1332	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	Q3-2018	""
1333	1333	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 1)	47	*N/A	""	""	""	""	""	Q2-2018
1334	1334	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 2)	22	*N/A	""	""	""	""	""	Q3-2018
1335	1335	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Sheehy Skeffington)	21	*N/A	""	""	""	""	""	Q4-2018
1336	1336	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale, Clondalkin, Dublin 22	44	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1337	1337	SHIP CONSTRUCTION RAPID	South Dublin	Riverside Cottages, Templeogue	11	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1338	1338	SHIP CONSTRUCTION TURNKEY	South Dublin	Ardsolus, Kingswood, Dublin 24	2	*N/A	""	""	""	""	""	Q4-2018
1339	1339	SHIP CONSTRUCTION TURNKEY	South Dublin	White Pines, Stocking Avenue, Rathfarnham, Dublin 16	26	*N/A	""	""	""	""	""	Q4-2018
1340	1340	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1341	1341	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1342	1342	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1343	1343	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1344	1344	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1345	1345	CAS CONSTRUCTION TURNKEY	Tipperary	Monastery Close, Templemore Road, Thurles	15	Thurles Lions Trust Housing Assoc.	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1346	1346	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport, Tipperary	3	*N/A	""	""	""	""	""	Q4-2018
1347	1347	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	21	*N/A	""	""	""	""	Q4-2018	""
1348	1348	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	""	Q4-2018	""
1349	1349	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 1)	9	*N/A	""	""	""	""	""	Q4-2018
1350	1350	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 1)	4	*N/A	""	""	""	""	""	Q4-2018
1351	1351	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 2)	4	*N/A	""	""	""	""	Q4-2018	""
1352	1352	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 2)	10	*N/A	""	""	""	""	Q4-2018	""
1353	1353	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
1354	1354	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
1355	1355	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1356	1356	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1357	1357	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
1358	1358	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	4	Anvers Housing Association Ltd	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1359	1359	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	65	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1360	1360	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	20	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1361	1361	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	8	*N/A	""	""	""	""	""	Q3-2018
1362	1362	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
1363	1363	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	""	Q4-2018
1364	1364	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
1365	1365	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	""	Q4-2018
1366	1366	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	10	*N/A	""	""	""	""	""	Q4-2018
1367	1367	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	21	*N/A	""	""	""	""	""	Q4-2018
1368	1368	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	18	*N/A	""	""	""	""	Q4-2018	""
1369	1369	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	12	*N/A	""	""	""	""	Q4-2018	""
1370	1370	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	25	*N/A	""	""	""	""	Q4-2018	""
1371	1371	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	T�ath Housing Association Ltd	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
1372	1372	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
1373	1373	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	Q3-2018	""
1374	1374	SHIP CONSTRUCTION TURNKEY	Westmeath	Abbeybrook, Kilbeggan	7	*N/A	""	""	""	""	""	Q1-2019
1375	1375	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1376	1376	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
1377	1377	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown, Co Wexford	12	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1378	1378	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
1379	1379	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1a)	8	*N/A	""	""	""	""	""	Q1-2018
1380	1380	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford - Phase 1	11	*N/A	""	""	""	""	""	Q4-2018
1381	1381	SHIP CONSTRUCTION TURNKEY	Wexford	Castlebridge, Co Wexford	3	*N/A	""	""	""	""	""	Q3-2018
1382	1382	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2)	4	*N/A	""	""	""	""	Q1-2018	""
1383	1383	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford - Phase 2	10	*N/A	""	""	""	""	""	Q1-2019
1384	1384	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1b)	10	*N/A	""	""	""	""	""	Q4-2018
1385	1385	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 1	5	*N/A	""	""	""	""	""	Q4-2018
1386	1386	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 2	2	*N/A	""	""	""	""	""	Q1-2019
1387	1387	SHIP CONSTRUCTION TURNKEY	Wexford	Whitewater Estuary, Ballyhack, Co. Wexford	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1388	1388	SHIP CONSTRUCTION TURNKEY	Wexford	Riverchapel Lane	4	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1389	1389	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford-Phase 3	8	*N/A	""	""	""	""	Q1-2018	""
1390	1390	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 3	3	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1391	1391	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford Phase 4	6	*N/A	""	""	""	""	Q1-2018	""
1392	1392	SHIP CONSTRUCTION RAPID	Wicklow	Whitehall, Baltinglass	34	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1393	1393	SHIP CONSTRUCTION RAPID	Wicklow	Rathnew	46	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1394	1394	SHIP CONSTRUCTION RAPID	Wicklow	Carnew Phase 4	30	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1395	1395	SHIP CONSTRUCTION RAPID	Wicklow	Shillelagh Phase 4	22	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1396	1396	SHIP CONSTRUCTION TURNKEY	Wicklow	Nos. 5 & 6 Mill Court, Tinahely 	2	*N/A	""	""	""	""	""	Q2-2018
1397	1397	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 7 Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q4-2018
1398	1398	SHIP CONSTRUCTION TURNKEY	Wicklow	Vale Road, Arklow	34	*N/A	""	""	""	""	Q3-2018	""
1399	1399	SHIP CONSTRUCTION TURNKEY	Wicklow	Fernhill, Arklow	1	*N/A	""	""	""	""	""	Q3-2018
1400	1400	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 8 Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q1-2019
1401	1401	SHIP CONSTRUCTION TURNKEY	Wicklow	Merrymeeting, Rathnew	2	*N/A	""	""	""	""	Q4-2018	""
1402	1402	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 9 Mill Court, Tinahely 	1	*N/A	""	""	""	""	Q2-2018	""
1403	1403	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	51	*N/A	""	""	Q1-2018	Q2-2019	""	""
1404	1404	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty	52	*N/A	""	""	Q1-2018	Q2-2019	""	""
1405	1405	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen	50	*N/A	""	""	Q1-2018	Q2-2019	""	""
1406	1406	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom	50	*N/A	""	""	Q1-2018	Q2-2019	""	""
1407	1407	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	Q3-2018	Q1-2019	""
1408	1408	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	Q3-2018	Q1-2019	""
1409	1409	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke	74	*N/A	""	""	Q1-2018	Q2-2019	""	""
1410	1410	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas	74	*N/A	""	""	""	Q3-2018	Q1-2019	""
1411	1411	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	Q1-2018	Q2-2019	""	""
1412	1412	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	Q3-2018	Q1-2019	""
1413	1413	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	Q1-2018	Q2-2019	""	""
1414	1414	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	Q3-2018	Q1-2019	""
1415	1415	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	58	*N/A	""	""	Q1-2018	Q2-2019	""	""
1416	1416	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Wicklow	Convent Lands	51	*N/A	""	""	Q1-2018	Q3-2018	Q1-2019	""