﻿_id	No_	Funding Programme	LA	Scheme/Project Name	No_ of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	On Site	Completed
1	1	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	6	*N/A	""	""	""	""	""	Q3-2019
2	2	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	6	*N/A	""	""	""	""	""	Q3-2019
3	3	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	12	*N/A	""	""	""	""	""	Q3-2020
4	4	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	10	*N/A	""	""	""	""	""	Q4-2020
5	5	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	16	*N/A	""	""	""	""	Q4-2017	""
6	6	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	13	*N/A	""	""	""	""	""	Q2-2021
7	7	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Father Flood Avenue, Rathvilly	8	*N/A	""	""	""	""	""	Q4-2019
8	8	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Oliver's Crescent, Myshall	4	*N/A	""	""	""	""	""	Q4-2019
9	9	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Mary's Court & Dereen Heights, Tullow	6	*N/A	""	""	""	""	""	Q4-2020
10	10	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Crowsgrove, Kildavin	1	*N/A	""	""	""	""	""	Q1-2020
11	11	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Ardattin	6	*N/A	""	""	""	""	Q1-2020	""
12	12	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Brownbog, Hackettstown	1	*N/A	""	""	""	""	Q1-2020	""
13	13	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Spahill, Borris	1	*N/A	""	""	""	""	""	Q4-2020
14	14	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Maryï¿½s Court, Carlow	4	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
15	15	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Drumphea, Garryhill, Bagenalstown	1	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
16	16	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Lackabeg, Kildavin	3	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
17	17	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
18	18	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	""	Q4-2018
19	19	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	""	""	""	Q3-2019
20	20	SHIP CONSTRUCTION	Carlow	Bagenalstown	20	*N/A	""	""	""	""	""	Q3-2020
21	21	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
22	22	SHIP CONSTRUCTION	Carlow	Slate Row, Hacketstown	4	*N/A	""	""	""	""	""	Q4-2018
23	23	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
24	24	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
25	25	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
26	26	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
27	27	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
28	28	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
29	29	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
30	30	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
31	31	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	9	*N/A	""	""	""	""	""	Q2-2021
32	32	SHIP CONSTRUCTION	Carlow	Barrack Street, Carlow	7	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
33	33	SHIP CONSTRUCTION	Carlow	Gleann na Bearu, Bagenalstown	22	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
34	34	CAS CONSTRUCTION TURNKEY	Carlow	Pollerton Big, Carlow	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2020
35	35	CAS CONSTRUCTION	Carlow	Gleann na Bearu, Royal Oak Road, Bagenalstown	6	Respond	""	""	""	""	Q4-2020	""
36	36	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
37	37	CAS CONSTRUCTION	Carlow	Homefield, Blackbog Road, Carlow	3	Carlow Voluntary Housing Association	""	""	""	""	""	Q2-2021
38	38	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
39	39	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 2)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
40	40	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
41	41	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 2)	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
42	42	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
43	43	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	Tuath Housing Association	""	""	""	""	""	Q4-2018
44	44	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	12	Tuath Housing Association	""	""	""	""	""	Q2-2019
45	45	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 3)	10	Tuath Housing Association	""	""	""	""	""	Q2-2019
46	46	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 4)	6	Tuath Housing Association	""	""	""	""	""	Q3-2019
47	47	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 5)	16	Tuath Housing Association	""	""	""	""	""	Q4-2019
48	48	CALF Turnkey	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	Tuath Housing Association	""	""	""	""	""	Q4-2018
49	49	CALF Turnkey	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 1)*	17	Tuath Housing Association	""	""	""	""	""	Q3-2021
50	50	CALF Turnkey	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 2)*	12	Tuath Housing Association	""	""	""	""	Q2-2019	""
51	51	CALF Turnkey	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 3)*	34	Tuath Housing Association	""	""	""	""	Q2-2019	""
52	52	CALF Turnkey	Carlow	Greenhills, Leighlin Road, Graiguecullen, Carlow (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
53	53	CALF Turnkey	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 1)	3	Tuath Housing Association	""	""	""	""	""	Q4-2020
54	54	CALF Turnkey	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q2-2021
55	55	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 1)	28	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
56	56	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 2)*	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
57	57	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Clï¿½id Housing	""	""	""	""	""	Q1-2019
58	58	CALF Turnkey	Carlow	Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 1)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
59	59	CALF Turnkey	Carlow	Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 2)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
60	60	CALF Turnkey	Carlow	Tanner Hall, Athy Road, Carlow (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
61	61	CALF Turnkey	Carlow	The Millrace, Burrin, Co. Carlow (Phase 1)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
62	62	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	3	*N/A	""	""	""	""	""	Q4-2019
63	63	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	4	*N/A	""	""	""	""	""	Q3-2020
64	64	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	3	*N/A	""	""	""	""	""	Q4-2020
65	65	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	4	*N/A	""	""	""	""	Q2-2019	""
66	66	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff 	4	*N/A	""	""	""	""	Q1-2021	""
67	67	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	8	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
68	68	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
69	69	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
70	70	SHIP CONSTRUCTION TURNKEY	Cavan	Lakeland Close, Swellan, Cavan Town	2	*N/A	""	""	""	""	""	Q4-2020
71	71	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	8	*N/A	""	""	""	""	Q2-2021	""
72	72	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	12	*N/A	""	""	""	""	Q2-2021	""
73	73	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	11	*N/A	""	""	""	""	Q2-2021	""
74	74	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	12	*N/A	""	""	""	""	Q2-2021	""
75	75	SHIP CONSTRUCTION TURNKEY	Cavan	Clankee Court, Lisdrumskea, Shercock	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
76	76	SHIP CONSTRUCTION TURNKEY	Cavan	Abhainn Dubh, Rosehill, Mullagh	4	*N/A	""	""	""	""	Q3-2021	""
77	77	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	""	Q1-2019
78	78	SHIP CONSTRUCTION	Cavan	Butlersbridge	4	*N/A	""	""	""	""	""	Q1-2018
79	79	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	""	Q4-2018
80	80	SHIP CONSTRUCTION	Cavan	Butlersbridge	2	*N/A	""	""	""	""	""	Q2-2017
81	81	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	""	""	""	Q3-2020
82	82	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	""	""	""	""	Q2-2021
83	83	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	""	""	""	""	Q4-2020	""
84	84	SHIP CONSTRUCTION	Cavan	Elm Grove, Main St, Cavan Town	13	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
85	85	SHIP CONSTRUCTION	Cavan	Cavan Road, Ballinagh	15	*N/A	""	""	""	""	Q2-2021	""
86	86	SHIP CONSTRUCTION	Cavan	Main St., Butlersbridge	6	*N/A	""	""	""	""	Q2-2021	""
87	87	SHIP CONSTRUCTION	Cavan	Cluain Dara, Kingscourt	3	*N/A	""	""	""	""	Q1-2021	""
88	88	SHIP CONSTRUCTION	Cavan	Fairymount Close, Kingscourt, Co. Cavan	3	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
89	89	SHIP CONSTRUCTION	Cavan	St. Bridgets Terrace, Cavan Town (Infill)	12	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
90	90	SHIP CONSTRUCTION	Cavan	Beckscourt, Eastboro, Bailieborough	47	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
91	91	SHIP CONSTRUCTION	Cavan	Duckin Stool, Main Street, Belturbet	3	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
92	92	SHIP CONSTRUCTION	Cavan	The Widow's Row, Widow's House Lane, Belturbet	8	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
93	93	CAS CONSTRUCTION TURNKEY	Cavan	Castlemanor Village, Cavan Town	29	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q3-2019
94	94	CAS CONSTRUCTION	Cavan	St. Killian's Housing Association Ltd., Mullagh, Co. Cavan	4	St. Killian's Housing Association, Mullagh, Co. Cavan	""	""	""	""	Q1-2021	""
95	95	CALF Turnkey	Cavan	16 Units, Fairgreen Park, Mullagh, Co. Cavan (Phase 1)	16	Clanmil Housing Association Ireland	""	""	""	""	Q1-2020	""
96	96	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Clï¿½id Housing	""	""	""	""	""	Q4-2016
97	97	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q2-2018
98	98	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	Tuath Housing Association	""	""	""	""	""	Q3-2018
99	99	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	Tuath Housing Association	""	""	""	""	""	Q4-2018
100	100	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Co. Cavan (Phase 1)	12	Tuath Housing Association	""	""	""	""	Q2-2021	""
101	101	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Co. Cavan (Phase 2)	13	Tuath Housing Association	""	""	""	""	Q2-2021	""
102	102	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 1)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
103	103	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 2)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
104	104	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 3)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
105	105	CALF Turnkey	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 1)	12	Clï¿½id Housing	""	""	""	""	""	Q4-2020
106	106	CALF Turnkey	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 2)*	22	Clï¿½id Housing	""	""	""	""	Q4-2019	""
107	107	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	""	Q4-2018
108	108	SHIP CONSTRUCTION TURNKEY	Clare	Cloughleigh Road + Shallee Drive, Ennis	4	*N/A	""	""	""	""	""	Q4-2020
109	109	SHIP CONSTRUCTION TURNKEY	Clare	Shantraud Woods, Killaloe	4	*N/A	""	""	""	""	Q3-2020	""
110	110	SHIP CONSTRUCTION SINGLE STAGE	Clare	Cappagh Lodge, Sixmilebridge	2	*N/A	""	""	""	""	""	Q4-2020
111	111	SHIP CONSTRUCTION SINGLE STAGE	Clare	St. Michaels Place, Kilmihil	2	*N/A	""	""	""	""	""	Q4-2020
112	112	SHIP CONSTRUCTION SINGLE STAGE	Clare	Madden's Terrace, Clarecastle	2	*N/A	""	""	""	""	Q2-2021	""
113	113	SHIP CONSTRUCTION SINGLE STAGE	Clare	Dun na Mara, Doonbeg	2	*N/A	""	""	""	""	""	Q2-2021
114	114	SHIP CONSTRUCTION SINGLE STAGE	Clare	St Senanï¿½s Terrace, Kilrush	2	*N/A	""	""	""	""	""	Q3-2021
115	115	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	""	""	""	Q2-2020
116	116	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	""	""	Q4-2019
117	117	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	""	""	Q4-2019
118	118	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	""	""	""	Q4-2020
119	119	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	""	""	""	""	Q3-2020	""
120	120	SHIP CONSTRUCTION	Clare	Miltown Malbay	27	*N/A	""	""	""	""	Q3-2020	""
121	121	SHIP CONSTRUCTION	Clare	Doonaun, Tulla	25	*N/A	""	""	""	""	Q4-2020	""
122	122	SHIP CONSTRUCTION	Clare	Boheraroan, Newmarket-on-Fergus	18	*N/A	""	""	""	""	Q4-2020	""
123	123	SHIP CONSTRUCTION	Clare	Feakle Rd., Scariff	18	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
124	124	SHIP CONSTRUCTION	Clare	Kilkee Road, Doonbeg	8	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
125	125	SHIP CONSTRUCTION	Clare	Tulla Road, Roslevan, Ennis	8	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
126	126	SHIP CONSTRUCTION	Clare	7, 8, 17 St Senan's Terrace, Kilrush 	3	*N/A	""	""	""	""	""	Q4-2019
127	127	SHIP CONSTRUCTION	Clare	Drumcliffe Road, Ennis	26	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
128	128	SHIP CONSTRUCTION	Clare	Deerpark, Ennistymon	30	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
129	129	SHIP CONSTRUCTION	Clare	Ballyliddan West, Sixmilebridge	16	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
130	130	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
131	131	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
132	132	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	15	Cuan an Chlair Ltd	""	""	""	""	""	Q4-2020
133	133	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
134	134	CAS CONSTRUCTION	Clare	Monaskeha Heights	4	Newgrove Housing Association Ltd	""	""	""	""	""	Q3-2019
135	135	CAS CONSTRUCTION	Clare	Roo East	4	Thomond Housing Association Ltd	""	""	""	""	""	Q4-2018
136	136	CAS CONSTRUCTION	Clare	9 Elmwood, Ballycannon Heights, Meelick	4	Thomond Housing Association Ltd	""	""	""	""	""	Q1-2019
137	137	CAS CONSTRUCTION	Clare	Teach Rua, Edenvale Ennis	4	Newgrove Housing Association Ltd	""	""	""	""	""	Q2-2021
138	138	CALF Turnkey	Clare	Abbey View, Limerick Road, Ennis, Co. Clare (Phase 1)	9	Clï¿½id Housing	""	""	""	Q3-2021	""	""
139	139	CALF Turnkey	Clare	Abbey View, Limerick Road, Ennis, Co. Clare (Phase 2)*	15	Clï¿½id Housing	""	""	""	Q3-2021	""	""
140	140	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Clï¿½id Housing	""	""	""	""	""	Q2-2018
141	141	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	18	Clï¿½id Housing	""	""	""	""	""	Q4-2018
142	142	CALF Turnkey	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 1)*	2	Clï¿½id Housing	""	""	""	""	""	Q4-2020
143	143	CALF Turnkey	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 2)*	2	Clï¿½id Housing	""	""	""	""	Q2-2019	""
144	144	CALF Turnkey	Clare	Cluain Fia, Crusheen, Co. Clare (Phase 1)*	2	Clï¿½id Housing	""	""	""	""	""	Q2-2020
145	145	CALF Turnkey	Clare	Cluain Fia, Crusheen, Co. Clare (Phase 2)*	2	Clï¿½id Housing	""	""	""	""	""	Q4-2020
146	146	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
147	147	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2019
148	148	CALF Turnkey	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 1)*	29	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
149	149	CALF Turnkey	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 2)*	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
150	150	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
151	151	CALF Construction	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	Q2-2021	""	""
152	152	CALF Turnkey	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
153	153	CALF Turnkey	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 2)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
154	154	CALF Turnkey	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 3)*	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
155	155	CALF Turnkey	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 4)*	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
156	156	CALF Turnkey	Clare	Sycamore Drive, Ennis, Co. Clare (Phase 1)*	3	Clï¿½id Housing	""	""	""	""	""	Q4-2019
157	157	CALF Turnkey	Clare	Sycamore Drive, Ennis, Co. Clare (Phase 2)*	2	Clï¿½id Housing	""	""	""	""	""	Q4-2020
158	158	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
159	159	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 2)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
160	160	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East (Phase 1)	20	*N/A	""	""	""	""	""	Q2-2021
161	161	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East (Phase 2)	31	*N/A	""	""	""	""	""	Q3-2021
162	162	SHIP DIALOG	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	""	Q4-2018
163	163	SHIP DIALOG	Cork City	Barrack Street	32	*N/A	""	""	""	""	Q1-2019	""
164	164	SHIP DIALOG	Cork City	FaranFerris	5	*N/A	""	""	""	""	""	Q4-2019
165	165	SHIP DIALOG	Cork City	High Street	9	*N/A	""	""	""	""	""	Q4-2019
166	166	SHIP DIALOG	Cork City	Tramore Road	4	*N/A	""	""	""	""	""	Q4-2018
167	167	SHIP DIALOG	Cork City	Whites Street	43	*N/A	""	""	""	""	""	Q4-2019
168	168	SHIP DIALOG	Cork City	Woods Street	16	*N/A	""	""	""	""	Q1-2019	""
169	169	SHIP DIALOG	Cork City	Church Road, Blackrock	43	*N/A	""	""	""	""	""	Q3-2018
170	170	SHIP DIALOG	Cork City	1-5, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
171	171	SHIP DIALOG	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
172	172	SHIP DIALOG	Cork City	Blarney Street	25	*N/A	""	""	""	""	""	Q4-2019
173	173	SHIP DIALOG	Cork City	Ballinure Road, Cork City	5	*N/A	""	""	""	""	""	Q4-2020
174	174	SHIP DIALOG	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	""	Q1-2019	""
175	175	SHIP DIALOG	Cork City	Gerald Griffin Street, Cork	13	*N/A	""	""	""	""	""	Q4-2020
176	176	SHIP DIALOG	Cork City	Lower John Street, Cork	17	*N/A	""	""	""	""	""	Q4-2020
177	177	SHIP DIALOG	Cork City	Skehard Road, Blackrock, Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
178	178	SHIP DIALOG	Cork City	Coach Street, Cork	13	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
179	179	SHIP DIALOG	Cork City	Shanakiel Road, Cork	20	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
180	180	SHIP DIALOG	Cork City	Spring Lane, Blackpool, Cork	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
181	181	SHIP DIALOG	Cork City	Glen Ryan Road, Cork	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
182	182	SHIP DIALOG	Cork City	Pouladuff Road, Cork 	11	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
183	183	SHIP DIALOG	Cork City	Watercourse Road, Blackpool, Cork	37	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
184	184	SHIP DIALOG	Cork City	Denroche's Cross, Glasheen Road, Cork	43	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
185	185	SHIP DIALOG	Cork City	Wolsey Court, Blackpool, Cork	49	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
186	186	SHIP DIALOG	Cork City	Sunview, South Douglas Road, Douglas, Cork	25	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
187	187	SHIP DIALOG	Cork City	Former Bolands Mill, Old Mallow Road	57	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
188	188	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
189	189	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
190	190	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
191	191	SHIP CONSTRUCTION TURNKEY	Cork City	6-10, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q4-2018
192	192	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	""	Q4-2018
193	193	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
194	194	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
195	195	SHIP CONSTRUCTION TURNKEY	Cork City	3B & 9B South Terrace Court, South Terrace, Cork	2	*N/A	""	""	""	""	""	Q4-2018
196	196	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinlough Road / Knockrea Lawn, Ballinlough, Cork	6	*N/A	""	""	""	""	""	Q2-2019
197	197	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork	10	*N/A	""	""	""	""	""	Q4-2019
198	198	SHIP CONSTRUCTION TURNKEY	Cork City	Gearney's Boreen, Commons Road, Cork	3	*N/A	""	""	""	""	""	Q4-2019
199	199	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork	10	*N/A	""	""	""	""	""	Q4-2019
200	200	SHIP CONSTRUCTION TURNKEY	Cork City	Eagle Valley, Sarsfield Road	1	*N/A	""	""	""	""	""	Q4-2019
201	201	SHIP CONSTRUCTION TURNKEY	Cork City	Knockfree Avenue, Glengarriff Road, Fairhill, Cork	2	*N/A	""	""	""	""	""	Q4-2019
202	202	SHIP CONSTRUCTION TURNKEY	Cork City	3-10 Herbert Lawn, Belmont, Rochestown, Cork	8	*N/A	""	""	""	""	""	Q4-2019
203	203	SHIP CONSTRUCTION TURNKEY	Cork City	Elton Wood & Herbert Lawn, Rochestown, Cork 	8	*N/A	""	""	""	""	""	Q4-2019
204	204	SHIP CONSTRUCTION TURNKEY	Cork City	Aspen Drive, Maryborough Hill, Cork 	29	*N/A	""	""	""	""	""	Q4-2019
205	205	SHIP CONSTRUCTION TURNKEY	Cork City	5 Fairfield Heights, Upper Fairhill, Cork 	3	*N/A	""	""	""	""	""	Q4-2020
206	206	SHIP CONSTRUCTION TURNKEY	Cork City	Ringcroft Avenue, Ringmahon Road, Mahon	2	*N/A	""	""	""	""	""	Q4-2020
207	207	SHIP CONSTRUCTION TURNKEY	Cork City	Cluain Ard, Waterloo Road, Blarney, Cork	3	*N/A	""	""	""	""	""	Q4-2020
208	208	SHIP CONSTRUCTION RAPID VOLUMETRIC	Cork City	Clover Hill Court, Bessboro Road, Mahon, Cork	51	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
209	209	SHIP CONSTRUCTION RAPID VOLUMETRIC	Cork City	Westside, Model Farm Road, Cork	32	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
210	210	SHIP CONSTRUCTION	Cork City	Poulavone, Ballincollig	64	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
211	211	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
212	212	SHIP CONSTRUCTION	Cork City	Boyces Street	14	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
213	213	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	""	""	""	Q4-2020
214	214	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	""	""	Q4-2019
215	215	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	""	Q4-2018
216	216	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	8	*N/A	""	""	""	""	""	Q4-2018
217	217	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	43	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
218	218	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
219	219	SHIP CONSTRUCTION	Cork City	Madonna House, Ballincollig (Phase 2)	6	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
220	220	SHIP CONSTRUCTION	Cork City	Bramble Cottages	4	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
221	221	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	28	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
222	222	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	3	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
223	223	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	7	*N/A	""	""	""	""	""	Q1-2019
224	224	SHIP CONSTRUCTION	Cork City	Hollywood Estate Infill Housing, Blarney Road, Cork	7	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
225	225	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	50	*N/A	""	""	""	""	""	Q3-2019
226	226	SHIP CONSTRUCTION	Cork City	Gerald Griffin Apartments - Block 7, North Monastery Road / St. Vincent's Road, Cork	6	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
227	227	SHIP CONSTRUCTION	Cork City	16A Kerry Road (former Slï¿½ Gartan), Mayfield, Cork 	1	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
228	228	SHIP CONSTRUCTION	Cork City	21A Carrigmore Park, Ballinlough, Cork	1	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
229	229	SHIP CONSTRUCTION	Cork City	Boyces street	37	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
230	230	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 1B	29	*N/A	""	""	""	""	""	Q4-2017
231	231	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 2A	47	*N/A	""	""	""	""	""	Q4-2019
232	232	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 1C	41	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
233	233	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 2B	38	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
234	234	REGENERATION	Cork City	CNWQR Knocknaheeney Phase 2C	24	*N/A	""	""	""	""	""	Q4-2020
235	235	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Knocknaheeny, Cork	2	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
236	236	REGENERATION	Cork City	Ardmore Avenue, Knocknaheeny, Cork	1	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
237	237	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 3B	62	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
238	238	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 4A	43	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
239	239	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	37	Good Shepherd Services Ltd	""	""	""	""	""	Q4-2020
240	240	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
241	241	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	""	Stage 3 approved Q4-2019, the scheme is now approved to proceed to tender.	""	""	""
242	242	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
243	243	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	""	""	""	Q4-2020
244	244	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
245	245	CAS CONSTRUCTION	Cork City	Ard na Ri, Closes Green, Farranree, Cork	20	Farranree Sheltered Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
246	246	CAS CONSTRUCTION	Cork City	Apts 2 & 3 Cois Coille, Tivoli, Cork	2	Galtan Ltd	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
247	247	CAS CONSTRUCTION	Cork City	Aras Lean, Murphyï¿½s Farm, Bishopstown, Co. Cork	25	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
248	248	CALF Turnkey	Cork City	12,14,15 Model Quarters, Tower, Blarney, Co Cork  (Phase 1)	3	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2019	""
249	249	CALF Turnkey	Cork City	20 and 21 Kyle Street  (Phase 1)	6	Focus Housing Association CLG	""	""	""	Q2-2021	""	""
250	250	CALF Turnkey	Cork City	40-41 Grand Parade, Cork City (Phase 1)	7	Focus Housing Association CLG	""	""	""	""	Q2-2021	""
251	251	CALF Turnkey	Cork City	5 units, Shandon Street, Cork (Phase 1)	5	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2019
252	252	CALF Turnkey	Cork City	Barters Wood, Tower, Cork (Phase 1)*	2	Tuath Housing Association	""	""	""	""	Q1-2020	""
253	253	CALF Turnkey	Cork City	Barters Wood, Tower, Cork (Phase 2)*	2	Tuath Housing Association	""	""	""	""	Q1-2020	""
254	254	CALF Turnkey	Cork City	Barters Wood, Tower, Cork (Phase 3)*	2	Tuath Housing Association	""	""	""	""	Q1-2020	""
255	255	CALF Turnkey	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 1)*	37	Tuath Housing Association	""	""	""	""	""	Q4-2019
256	256	CALF Turnkey	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 2)*	49	Tuath Housing Association	""	""	""	""	""	Q4-2020
257	257	CALF Turnkey	Cork City	Block 10 Jacobs Island, Mahon, Cork (Phase 1)	59	Respond	""	""	""	Q2-2021	""	""
258	258	CALF Turnkey	Cork City	Boherboy Road, Silversprings Hill, Cork City  (Phase 1)*	15	Respond	""	""	""	Q1-2021	""	""
259	259	CALF Turnkey	Cork City	Convent Gardens, Blackrock Villas, Blackrock, Co. Cork (Phase 1)	1	Tuath Housing Association	""	""	""	""	""	Q4-2019
260	260	CALF Turnkey	Cork City	Crawford Gate, Bessboro, Blackrock, Co. Cork (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q4-2020
261	261	CALF Turnkey	Cork City	Crawford Gate, Bessboro, Blackrock, Co. Cork (Phase 2)	2	Tuath Housing Association	""	""	""	""	""	Q4-2020
262	262	CALF Turnkey	Cork City	Croppy Boy, Fairhill, Cork (Phase 1)	7	Tuath Housing Association	""	""	""	""	""	Q3-2020
263	263	CALF Turnkey	Cork City	Croppy Boy, Fairhill, Cork (Phase 2)*	14	Tuath Housing Association	""	""	""	""	""	Q4-2020
264	264	CALF Turnkey	Cork City	Emerald View, Old Mallow Road, Cork City (Phase 1)	6	Focus Housing Association CLG	""	""	""	""	Q1-2021	""
265	265	CALF Turnkey	Cork City	Evergreen Road, Turners Cross, Cork  (Phase 1)*	28	Respond	""	""	""	""	Q1-2021	""
266	266	CALF Turnkey	Cork City	Fairfield Meadows, Upper Fair Hill, Cork (Phase 1)*	18	Focus Housing Association CLG	""	""	""	Q3-2021	""	""
267	267	CALF Turnkey	Cork City	Glanmire Village, Glanmire, Cork (Phase 1)	3	Focus Housing Association CLG	""	""	""	""	Q2-2020	""
268	268	CALF Construction	Cork City	Green Lane, Blackpool, Cork City (Phase 1)	112	Clï¿½id Housing	""	""	""	Q1-2021	""	""
269	269	CALF Turnkey	Cork City	Haig Gardens, Boreenamanna Road and Wallace Avenue, Ballintemple (Phase 1)*	27	Respond	""	""	""	""	Q2-2021	""
270	270	CALF Turnkey	Cork City	Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*	19	Respond	""	""	""	""	Q1-2020	""
271	271	CALF Turnkey	Cork City	Lancaster Gate, Western Road, Cork (Phase 1)	15	Clï¿½id Housing	""	""	""	""	Q3-2021	""
272	272	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 1)	72	Clï¿½id Housing	""	""	""	""	""	Q4-2018
273	273	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 2)	6	Clï¿½id Housing	""	""	""	""	""	Q3-2019
274	274	CALF Turnkey	Cork City	Lios Cara, Rathpeacon, Killeens, Cork (Phase 1)	12	Clï¿½id Housing	""	""	""	Q2-2021	""	""
275	275	CALF Construction	Cork City	Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	""	""	Q4-2019
276	276	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
277	277	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	""	Q4-2018
278	278	CALF Turnkey	Cork City	Maryborough Ridge & Blackrock  Villas\n (Phase 1)*	57	Tuath Housing Association	""	""	""	""	""	Q4-2019
279	279	CALF Turnkey	Cork City	Miles Stream, Shanakiel, Cork (Phase 1)	14	Tuath Housing Association	""	""	""	""	Q3-2021	""
280	280	CALF Turnkey	Cork City	Miles Stream, Shanakiel, Cork (Phase 2)	14	Tuath Housing Association	""	""	""	""	Q3-2021	""
281	281	CALF Turnkey	Cork City	Miles Stream, Shanakiel, Cork (Phase 3)	14	Tuath Housing Association	""	""	""	""	Q3-2021	""
282	282	CALF Turnkey	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	""	""	Q4-2020
283	283	CALF Turnkey	Cork City	North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
284	284	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)	18	Respond	""	""	""	""	""	Q4-2020
285	285	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 2)*	62	Respond	""	""	""	""	Q1-2020	""
286	286	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)	31	Tuath Housing Association	""	""	""	""	""	Q4-2018
287	287	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)	21	Tuath Housing Association	""	""	""	""	""	Q4-2019
288	288	CALF Turnkey	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 1)*	22	Respond	""	""	""	""	Q4-2020	""
289	289	CALF Turnkey	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 2)*	19	Respond	""	""	""	""	Q4-2020	""
290	290	CALF Turnkey	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 3)	24	Respond	""	""	""	""	Q4-2020	""
291	291	CALF Turnkey	Cork City	Springville House, Bulls Lane, Blackrock Road, Cork (Phase 1)	35	Tuath Housing Association	""	""	""	""	Q4-2020	""
292	292	CALF Turnkey	Cork City	The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)	17	Tuath Housing Association	""	""	""	""	""	Q4-2019
293	293	CALF Turnkey	Cork City	The Oaks, Frankfield, Douglas, Cork City (Phase 1)*	2	Tuath Housing Association	""	""	""	""	Q4-2019	""
294	294	CALF Turnkey	Cork City	 Tower Street, Cork City (Phase 1)	2	Threshold Ltd	""	""	""	Q2-2021	""	""
295	295	CALF Turnkey	Cork City	Woodside, Kerry Pike, Cork (Phase 1)*	22	Clï¿½id Housing	""	""	""	""	""	Q4-2020
296	296	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	18	*N/A	""	""	""	""	""	Q2-2018
297	297	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
298	298	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	""	Q4-2018
299	299	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	11	*N/A	""	""	""	""	""	Q4-2019
300	300	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
301	301	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
302	302	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	12	*N/A	""	""	""	""	""	Q4-2017
303	303	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	4	*N/A	""	""	""	""	""	Q4-2019
304	304	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
305	305	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	12	*N/A	""	""	""	""	""	Q1-2017
306	306	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	16	*N/A	""	""	""	""	""	Q1-2017
307	307	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	5	*N/A	""	""	""	""	""	Q2-2021
308	308	SHIP CONSTRUCTION TURNKEY	Cork County	St. Maryï¿½s Road, Dunmanway	7	*N/A	""	""	""	""	""	Q3-2020
309	309	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	13	*N/A	""	""	""	""	Q1-2020	""
310	310	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	5	*N/A	""	""	""	""	""	Q4-2019
311	311	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q4-2019
312	312	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	""	Q2-2019
313	313	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	""	""	Q2-2019
314	314	SHIP CONSTRUCTION TURNKEY	Cork County	No. 43 & No. 50 Chapel Court, Skibbereen 	2	*N/A	""	""	""	""	""	Q3-2018
315	315	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	""	Q4-2018
316	316	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara, Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q4-2018
317	317	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	9	*N/A	""	""	""	""	""	Q2-2019
318	318	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	15	*N/A	""	""	""	""	""	Q4-2020
319	319	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire	4	*N/A	""	""	""	""	""	Q4-2018
320	320	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mount Rivers	3	*N/A	""	""	""	""	""	Q4-2020
321	321	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	17	*N/A	""	""	""	""	""	Q4-2020
322	322	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
323	323	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	13	*N/A	""	""	""	""	""	Q4-2018
324	324	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	2	*N/A	""	""	""	""	""	Q4-2019
325	325	SHIP CONSTRUCTION TURNKEY	Cork County	No.9 and No.10  Chapel Court, Skibbereen,	2	*N/A	""	""	""	""	""	Q4-2018
326	326	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton	8	*N/A	""	""	""	""	""	Q4-2018
327	327	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	""	Q4-2018
328	328	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac	4	*N/A	""	""	""	""	""	Q4-2018
329	329	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow	10	*N/A	""	""	""	""	""	Q4-2019
330	330	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton	14	*N/A	""	""	""	""	""	Q3-2019
331	331	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	7	*N/A	""	""	""	""	""	Q3-2018
332	332	SHIP CONSTRUCTION TURNKEY	Cork County	Canon St, Rathcormac	3	*N/A	""	""	""	""	Q1-2019	""
333	333	SHIP CONSTRUCTION TURNKEY	Cork County	Percival St, Kanturk	2	*N/A	""	""	""	""	""	Q4-2018
334	334	SHIP CONSTRUCTION TURNKEY	Cork County	9 & 9a Main Street, Boherbue	2	*N/A	""	""	""	""	""	Q4-2018
335	335	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	6	*N/A	""	""	""	""	""	Q2-2019
336	336	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac	4	*N/A	""	""	""	""	""	Q2-2019
337	337	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fï¿½il, Curraclough, Bandon	13	*N/A	""	""	""	""	""	Q4-2019
338	338	SHIP CONSTRUCTION TURNKEY	Cork County	Maple Woods, Midleton	6	*N/A	""	""	""	""	""	Q4-2018
339	339	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	8	*N/A	""	""	""	""	Q4-2017	""
340	340	SHIP CONSTRUCTION TURNKEY	Cork County	St. Maryï¿½s Road, Dunmanway	6	*N/A	""	""	""	""	""	Q3-2020
341	341	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	10	*N/A	""	""	""	""	Q1-2019	""
342	342	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull	7	*N/A	""	""	""	""	Q2-2019	""
343	343	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	12	*N/A	""	""	""	""	""	Q4-2020
344	344	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	11	*N/A	""	""	""	""	""	Q1-2021
345	345	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	17	*N/A	""	""	""	""	""	Q2-2021
346	346	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	2	*N/A	""	""	""	""	""	Q3-2019
347	347	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	6	*N/A	""	""	""	""	""	Q2-2020
348	348	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Orga, Ballinhassig	4	*N/A	""	""	""	""	""	Q4-2019
349	349	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard, Ballyhooly	8	*N/A	""	""	""	""	""	Q4-2020
350	350	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Ard, Cobh	6	*N/A	""	""	""	""	""	Q3-2019
351	351	SHIP CONSTRUCTION TURNKEY	Cork County	Baltimore, West Cork	12	*N/A	""	""	""	""	""	Q4-2019
352	352	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	2	*N/A	""	""	""	""	""	Q4-2019
353	353	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Ard, Freemount	4	*N/A	""	""	""	""	""	Q4-2019
354	354	SHIP CONSTRUCTION TURNKEY	Cork County	Glengarriff	5	*N/A	""	""	""	""	""	Q4-2019
355	355	SHIP CONSTRUCTION TURNKEY	Cork County	The Cove, Glandore	4	*N/A	""	""	""	""	""	Q4-2019
356	356	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull	7	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
357	357	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Lisgoold, Leamlara	3	*N/A	""	""	""	""	""	Q4-2019
358	358	SHIP CONSTRUCTION TURNKEY	Cork County	Millstreet Road, Macroom	12	*N/A	""	""	""	""	""	Q4-2020
359	359	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	14	*N/A	""	""	""	""	""	Q4-2019
360	360	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	12	*N/A	""	""	""	""	""	Q4-2020
361	361	SHIP CONSTRUCTION TURNKEY	Cork County	Glenbeg The Beeches, Boherbue	4	*N/A	""	""	""	""	""	Q4-2019
362	362	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	3	*N/A	""	""	""	""	""	Q4-2019
363	363	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	4	*N/A	""	""	""	""	""	Q1-2021
364	364	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Lisgoold, Leamlara	1	*N/A	""	""	""	""	""	Q2-2020
365	365	SHIP CONSTRUCTION TURNKEY	Cork County	Bruhenny, Churchtown	6	*N/A	""	""	""	""	""	Q4-2019
366	366	SHIP CONSTRUCTION TURNKEY	Cork County	Ard Bhaile, Buttevant	6	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
367	367	SHIP CONSTRUCTION TURNKEY	Cork County	Cecilstown, Mallow	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
368	368	SHIP CONSTRUCTION TURNKEY	Cork County	Ballymacmoy, Killavullen, Co. Cork	13	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
369	369	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	4	*N/A	""	""	""	""	""	Q2-2021
370	370	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q3-2019
371	371	SHIP CONSTRUCTION TURNKEY	Cork County	Gortnaclohy, Skibbereen, Co. Cork	34	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
372	372	SHIP CONSTRUCTION TURNKEY	Cork County	Castle Heights, Carrigaline	3	*N/A	""	""	""	""	""	Q4-2020
373	373	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	7	*N/A	""	""	""	""	""	Q4-2019
374	374	SHIP CONSTRUCTION TURNKEY	Cork County	The Court, Ard Cashel, Watergrasshill	4	*N/A	""	""	""	""	""	Q4-2019
375	375	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	12	*N/A	""	""	""	""	Q1-2021	""
376	376	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	10	*N/A	""	""	""	""	""	Q4-2020
377	377	SHIP CONSTRUCTION TURNKEY	Cork County	Glenbeg, The Beeches, Boherbue	8	*N/A	""	""	""	""	""	Q4-2020
378	378	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	3	*N/A	""	""	""	""	""	Q4-2020
379	379	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	14	*N/A	""	""	""	""	Q4-2017	""
380	380	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fï¿½il, Curraclough, Bandon	17	*N/A	""	""	""	""	""	Q3-2020
381	381	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	10	*N/A	""	""	""	""	Q1-2020	""
382	382	SHIP CONSTRUCTION TURNKEY	Cork County	St. Maryï¿½s Road, Dunmanway	7	*N/A	""	""	""	""	""	Q4-2019
383	383	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	7	*N/A	""	""	""	""	""	Q4-2020
384	384	SHIP CONSTRUCTION TURNKEY	Cork County	An Goritin Rua, Millstreet Road, Macroom	14	*N/A	""	""	""	""	""	Q2-2021
385	385	SHIP CONSTRUCTION TURNKEY	Cork County	King St, Mitchelstown	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
386	386	SHIP CONSTRUCTION TURNKEY	Cork County	Lyraneag, Rockchapel,	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
387	387	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Reidh, Ballyvourney	1	*N/A	""	""	""	""	""	Q4-2019
388	388	SHIP CONSTRUCTION TURNKEY	Cork County	Curragh, Upper Aghada	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
389	389	SHIP CONSTRUCTION TURNKEY	Cork County	Glebe Manor, Whitegate	12	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
390	390	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	""	Q4-2020	""
391	391	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmorna, Mallow	1	*N/A	""	""	""	""	""	Q4-2020
392	392	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard, Ballyhooly	6	*N/A	""	""	""	""	""	Q1-2021
393	393	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	20	*N/A	""	""	""	""	""	Q4-2020
394	394	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	18	*N/A	""	""	""	""	""	Q2-2021
395	395	SHIP CONSTRUCTION TURNKEY	Cork County	Drakes Point, Knocknagore, Crosshaven	5	*N/A	""	""	""	""	""	Q3-2021
396	396	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale	14	*N/A	""	""	""	""	""	Q4-2020
397	397	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	6	*N/A	""	""	""	""	Q1-2020	""
398	398	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	18	*N/A	""	""	""	""	Q1-2020	""
399	399	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale	19	*N/A	""	""	""	""	Q4-2019	""
400	400	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	1	*N/A	""	""	""	""	""	Q3-2020
401	401	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q3-2020
402	402	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	4	*N/A	""	""	""	""	""	Q1-2021
403	403	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale, Phase 2, Co. Cork	17	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
404	404	SHIP CONSTRUCTION TURNKEY	Cork County	Ard Cashel, Watergrasshill, Co. Cork	6	*N/A	""	""	""	""	Q3-2021	""
405	405	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard, Ballyhooly	6	*N/A	""	""	""	""	""	Q2-2021
406	406	SHIP CONSTRUCTION TURNKEY	Cork County	Courtbrack, Tower	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
407	407	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	10	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
408	408	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Liosgoold	2	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
409	409	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	26	*N/A	""	""	""	Stage 4 approved Q3-2016, the scheme is fully approved.	""	""
410	410	SHIP CONSTRUCTION TURNKEY	Cork County	The Pastures, Charleville, Co. Cork	4	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
411	411	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	7	*N/A	""	""	""	""	""	Q2-2021
412	412	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	10	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
413	413	SHIP CONSTRUCTION TURNKEY	Cork County	The Pastures, Charleville, Co. Cork	12	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
414	414	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	21	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
415	415	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	11	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
416	416	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	14	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
417	417	SHIP CONSTRUCTION TURNKEY	Cork County	Derrymihin, Castletownbere, Co. Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
418	418	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	4	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
419	419	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	""	""	Q4-2020
420	420	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Castletreasure Grove, Douglas	2	*N/A	""	""	""	""	""	Q4-2019
421	421	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Seaview Cottages, Derrymihan, Castletownbere	3	*N/A	""	""	""	""	""	Q4-2020
422	422	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Curraleigh, Inniscarra	1	*N/A	""	""	""	""	""	Q3-2019
423	423	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Cuirt Na Slini, Cloyne, East Cork 	2	*N/A	""	""	""	""	Q3-2021	""
424	424	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Main St. Dunmanway	1	*N/A	""	""	""	""	Q4-2020	""
425	425	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Thomas Kent Street, Cobh	1	*N/A	""	""	""	""	""	Q4-2020
426	426	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Croke Place, Garranmacgarrett, Kilbrin, kanturk	2	*N/A	""	""	""	""	Q3-2020	""
427	427	SHIP CONSTRUCTION SINGLE STAGE	Cork County	High St., Sleaveen Hill, Macroom, Co. Cork	1	*N/A	""	""	""	""	Q2-2021	""
428	428	SHIP CONSTRUCTION SINGLE STAGE	Cork County	49 Masseytown, Macroom, Co. Cork 	1	*N/A	""	""	""	""	Q2-2021	""
429	429	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Fana Na gCann, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
430	430	SHIP CONSTRUCTION SINGLE STAGE	Cork County	3 Knockbrogan Park, Bandon	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
431	431	SHIP CONSTRUCTION	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	""	Q4-2019
432	432	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	17	*N/A	""	""	""	""	Q3-2019	""
433	433	SHIP CONSTRUCTION	Cork County	Station Road, Blarney	18	*N/A	""	""	""	""	""	Q4-2020
434	434	SHIP CONSTRUCTION	Cork County	Bluepool, Kanturk	12	*N/A	""	""	""	""	""	Q4-2020
435	435	SHIP CONSTRUCTION	Cork County	Tower View/Cï¿½irt na Silï¿½nï¿½, Cloyne, East Cork	7	*N/A	""	""	""	""	""	Q3-2019
436	436	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	""	""	Q3-2019	""
437	437	SHIP CONSTRUCTION	Cork County	Newtown House , Bantry	1	*N/A	""	""	""	""	Q3-2020	""
438	438	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	""	Q4-2018
439	439	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	""	Q4-2018
440	440	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	""	""	""	""	Q4-2019	""
441	441	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
442	442	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	""	""	""	Q3-2019	""
443	443	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	10	*N/A	""	""	""	""	""	Q4-2020
444	444	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
445	445	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline	10	*N/A	""	""	""	""	""	Q4-2018
446	446	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline	16	*N/A	""	""	""	""	""	Q1-2019
447	447	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline	18	*N/A	""	""	""	""	""	Q1-2019
448	448	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	5	*N/A	""	""	""	""	Q3-2020	""
449	449	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	6	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
450	450	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
451	451	SHIP CONSTRUCTION	Cork County	Sleaveen East, Macroom	8	*N/A	""	""	""	""	Q4-2019	""
452	452	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline	5	*N/A	""	""	""	""	""	Q4-2018
453	453	SHIP CONSTRUCTION	Cork County	Tudor Grove, Ballincollig	16	*N/A	""	""	""	""	""	Q4-2019
454	454	SHIP CONSTRUCTION	Cork County	Pound Lane, Kilworth 	7	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
455	455	SHIP CONSTRUCTION	Cork County	24 Glenview Terrace Lyre Co Cork	1	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
456	456	SHIP CONSTRUCTION	Cork County	Knocknagown, Rylane	1	*N/A	""	""	""	""	""	Q3-2021
457	457	SHIP CONSTRUCTION	Cork County	Uplands (Phase 2), College Road,  Fermoy	11	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
458	458	SHIP CONSTRUCTION	Cork County	Lissoran, Ballinspittle	4	*N/A	""	""	""	""	Q4-2020	""
459	459	SHIP CONSTRUCTION	Cork County	Convent Road, Doneraile	17	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
460	460	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	13	*N/A	""	""	""	""	Q3-2020	""
461	461	SHIP CONSTRUCTION	Cork County	Carrig Rossa Phase 2, Rossmore	2	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
462	462	SHIP CONSTRUCTION	Cork County	Chapel Lane, Ballydehob, Co. Cork	12	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
463	463	SHIP CONSTRUCTION	Cork County	Sleaveen East, Macroom	16	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
464	464	SHIP CONSTRUCTION	Cork County	Coastguard Cottages, Lower Roads, Crosshaven, Co. Cork	27	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
465	465	CAS CONSTRUCTION TURNKEY	Cork County	Ardmanagh, Schull	12	Tï¿½ath Housing Association Ltd	""	""	""	""	Q1-2021	""
466	466	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	18	Cluid Housing Association	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
467	467	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	""	Q3-2018
468	468	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	""	Q1-2019
469	469	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
470	470	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	""	""	Q4-2019
471	471	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
472	472	CAS CONSTRUCTION	Cork County	Masseytown, Macroom	14	Tï¿½ath Housing Association Ltd	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
473	473	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	""	""	""	Q2-2020	""
474	474	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	9	Charleville Care Project Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
475	475	CAS CONSTRUCTION	Cork County	St. Michaels, 36 Main Street, Bandon, Co. Cork	6	Bandon Geriatric ? Community Council	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
476	476	CAS CONSTRUCTION	Cork County	Distillery Lane, Distillery Walk, Midleton	7	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
477	477	CAS CONSTRUCTION	Cork County	Mardyke, Skibbereen	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
478	478	CAS CONSTRUCTION	Cork County	Daniel Oï¿½Brien Terrace, Buttevant	7	Tï¿½ath Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
479	479	CAS CONSTRUCTION	Cork County	Lisheen Field, Kilbarry Road, Dunmanway, Co. Cork	16	Cluid Housing Association	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
480	480	CALF Turnkey	Cork County	21 units, Brookhill, Carrigaline, Cork (Phase 1)	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
481	481	CALF Turnkey	Cork County	3 units, Mullavale, Castletownroche, Co. Cork (Phase 1)	3	Respond	""	""	""	""	""	Q2-2019
482	482	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Clï¿½id Housing	""	""	""	""	""	Q4-2017
483	483	CALF Turnkey	Cork County	Brookhill (5 Units), Carrigaline, Cork (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
484	484	CALF Turnkey	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
485	485	CALF Turnkey	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
486	486	CALF Turnkey	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 2)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
487	487	CALF Turnkey	Cork County	Cascade Apartments, Castlelake, Carrigtwohill, Cork (Phase 1)	95	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2021	""
488	488	CALF Turnkey	Cork County	Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 1)	12	Clï¿½id Housing	""	""	""	""	Q2-2021	""
489	489	CALF Turnkey	Cork County	Chapel Court, Skibbereen, Cork (Phase 1)	8	Clï¿½id Housing	""	""	""	""	Q3-2021	""
490	490	CALF Turnkey	Cork County	Chapel Court, Skibbereen, Cork (Phase 2)	8	Clï¿½id Housing	""	""	""	""	Q3-2021	""
491	491	CALF Turnkey	Cork County	Church Hill, Carrigaline, Co Cork (Phase 1)*	37	Respond	""	""	""	""	Q3-2021	""
492	492	CALF Turnkey	Cork County	Cluain Reidh, Ballymakeera, Co. Cork (Phase 1)	10	Clï¿½id Housing	""	""	""	""	""	Q3-2020
493	493	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	Tuath Housing Association	""	""	""	""	""	Q4-2016
494	494	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 1)*	24	Respond	""	""	""	""	""	Q4-2020
495	495	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 2)	20	Respond	""	""	""	""	""	Q1-2021
496	496	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	""	""	Q4-2020
497	497	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
498	498	CALF Turnkey	Cork County	Harbour Heights, Passage West, Co Cork (Phase 1)	14	Clï¿½id Housing	""	""	""	""	Q4-2020	""
499	499	CALF Turnkey	Cork County	Harbour Heights, Passage West, Co Cork (Phase 2)	13	Clï¿½id Housing	""	""	""	""	Q4-2020	""
500	500	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)	20	Respond	""	""	""	""	""	Q4-2019
501	501	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 2)*	22	Respond	""	""	""	""	""	Q4-2020
502	502	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
503	503	CALF Construction	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Clï¿½id Housing	""	""	""	""	""	Q3-2020
504	504	CALF Turnkey	Cork County	Radharc Na Tuaithe, Knockraha, Cork (Phase 1)*	7	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
505	505	CALF Turnkey	Cork County	Sunville, Church Road, Carrigaline, Co. Cork (Phase 1)	6	Focus Housing Association CLG	""	""	""	""	""	Q4-2020
506	506	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q3-2019
507	507	CALF Turnkey	Cork County	The Miles, Clonakilty, Co Cork  (Phase 1)	38	Clï¿½id Housing	""	""	""	Q3-2021	""	""
508	508	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	""	Q4-2018
509	509	CALF Turnkey	Cork County	Togher Cross, Lehenaghmore, Co. Cork (Phase 1)	9	Clï¿½id Housing	""	""	""	""	""	Q4-2019
510	510	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
511	511	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty (Phase 1)	20	*N/A	""	""	""	""	""	Q2-2021
512	512	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty (Phase 2)	32	*N/A	""	""	""	""	Q4-2019	""
513	513	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen (Phase 1)	35	*N/A	""	""	""	""	""	Q2-2021
514	514	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen (Phase 2)	15	*N/A	""	""	""	""	Q4-2019	""
515	515	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom (Phase 1)	37	*N/A	""	""	""	""	""	Q2-2021
516	516	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom (Phase 2)	13	*N/A	""	""	""	""	""	Q3-2021
517	517	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
518	518	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace, Monkstown	14	*N/A	""	""	""	""	""	Q4-2018
519	519	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	22	*N/A	""	""	""	""	""	Q1-2021
520	520	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	16	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
521	521	SHIP CONSTRUCTION TURNKEY	DLR	George's Street Upper, Dun Laoghaire	5	*N/A	""	""	""	""	""	Q1-2021
522	522	SHIP CONSTRUCTION TURNKEY	DLR	HazelBrook Square, Nutgrove, Churchtown	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
523	523	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	17	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
524	524	SHIP CONSTRUCTION RAPID	DLR	Rockville Green (Glenamuck Cottages)	13	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
525	525	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
526	526	SHIP CONSTRUCTION RAPID	DLR	Ballyogan Square, Ballyogan	67	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
527	527	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
528	528	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
529	529	SHIP CONSTRUCTION	DLR	Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
530	530	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
531	531	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
532	532	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
533	533	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
534	534	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	""	Q4-2018
535	535	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
536	536	SHIP CONSTRUCTION	DLR	Fitzgerald Park	33	*N/A	""	""	""	""	""	Q4-2018
537	537	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
538	538	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
539	539	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
540	540	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
541	541	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
542	542	SHIP CONSTRUCTION	DLR	Ballyogan Avenue, Ballyogan	2	*N/A	""	""	""	""	""	Q2-2021
543	543	SHIP CONSTRUCTION	DLR	St. Laurenceï¿½s Park, Stillorgan	89	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
544	544	SHIP CONSTRUCTION	DLR	Fitzgerald Park	17	*N/A	""	""	""	""	""	Q1-2019
545	545	SHIP CONSTRUCTION	DLR	Moyola Court, Churchtown Lower, Dublin 14	4	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
546	546	SHIP CONSTRUCTION	DLR	Shanganagh Castle	200	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
547	547	SHIP CONSTRUCTION	DLR	37A Rollins Villas, Sallynoggin, Co. Dublin 	1	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
548	548	SHIP CONSTRUCTION	DLR	Old Coastguard Cottages, Coal Harbour, Harbour Road	4	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
549	549	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	""	""	Q2-2021	""
550	550	CALF Construction	DLR	Abbeyview House, Monkstown, Dublin (Phase 1)	11	Clï¿½id Housing	""	""	""	""	""	Q4-2020
551	551	CALF Turnkey	DLR	Ardilea Crescent, Ardilea, Clonskeagh, Dublin 14, Co. Dublin (Phase 1)*	2	Tuath Housing Association	""	""	""	""	Q3-2019	""
552	552	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	Tuath Housing Association	""	""	""	""	""	Q4-2018
553	553	CALF Turnkey	DLR	Ballybetagh Road, Kilternan, Co Dublin (Phase 1)*	22	Clanmil Housing Association Ireland	""	""	""	""	Q3-2021	""
554	554	CALF Turnkey	DLR	Belarmine Drive, Belarmine, Stepaside, Dublin 18 (Phase 1)*	6	Clï¿½id Housing	""	""	""	""	""	Q4-2019
555	555	CALF Turnkey	DLR	Bishops Gate, Enniskerry Rd., Dublin 18 (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q4-2019
556	556	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q3-2018
557	557	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Clï¿½id Housing	""	""	""	""	""	Q3-2018
558	558	CALF Turnkey	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
559	559	CALF Turnkey	DLR	Cherrywood Town Centre, Dublin 18 (Phase 1)*	80	Clï¿½id Housing	""	""	""	""	Q4-2019	""
560	560	CALF Turnkey	DLR	Cherrywood Town Centre, Dublin 18 (Phase 2)*	61	Clï¿½id Housing	""	""	""	""	Q4-2019	""
561	561	CALF Turnkey	DLR	Clay Farm (Block E3), Ballyogan Road, Leopardstown, Dublin 18 (Phase 1)*	24	The Iveagh Trust	""	""	""	""	""	Q4-2019
562	562	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	""	Q2-2019
563	563	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	9	Respond	""	""	""	""	Q3-2019	""
564	564	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 2)	22	Respond	""	""	""	""	Q3-2019	""
565	565	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 3)	22	Respond	""	""	""	""	Q3-2019	""
566	566	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 1)	18	Tuath Housing Association	""	""	""	""	Q3-2019	""
567	567	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 2)	16	Tuath Housing Association	""	""	""	""	Q3-2019	""
568	568	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 3)	18	Tuath Housing Association	""	""	""	""	Q3-2019	""
569	569	CALF Turnkey	DLR	Eustace Court, Upper Glenageary Road, Dun Laoghaire, Rathdown, Co. Dublin (Phase 1)	4	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2019
570	570	CALF Turnkey	DLR	Garrison Mews, The Ramparts, Cabinteely, Co. Dublin (Phase 1)*	5	Focus Housing Association CLG	""	""	""	""	""	Q4-2020
571	571	CALF Turnkey	DLR	Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)	1	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2018
572	572	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	""	Q4-2018
573	573	CALF Turnkey	DLR	Johnstown Court, Cabinteely, Dublin 18 (Phase 1)*	51	Clï¿½id Housing	""	""	""	""	""	Q2-2021
574	574	CALF Turnkey	DLR	Johnstown Court, Cabinteely, Dublin 18 (Phase 2)*	50	Clï¿½id Housing	""	""	""	""	Q2-2019	""
575	575	CALF Turnkey	DLR	Knockrabo, Mount Anville Road, Goatstown, Dublin 14 (Phase 1)*	6	Oaklee Housing	""	""	""	""	""	Q4-2020
576	576	CALF Construction	DLR	Loughlinstown View(formerly Cromlech Fields) Loughlinstown, Ballybrack, Dublin (Phase 1)	34	Co - Operative Housing Ireland Society Limited	""	""	""	Q2-2021	""	""
577	577	CALF Turnkey	DLR	Marine Walk, Marine Road, Dun Laoghaire (Phase 1)*	2	Oaklee Housing	""	""	""	""	""	Q4-2020
578	578	CALF Turnkey	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 1)*	14	Tuath Housing Association	""	""	""	""	""	Q1-2021
579	579	CALF Turnkey	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 2)*	18	Tuath Housing Association	""	""	""	""	""	Q2-2021
580	580	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	""	Q4-2018
581	581	CALF Turnkey	DLR	Rockville Hall, Glenamuck Road, Dunlaoghaire, Dublin 18 (Phase 1)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
582	582	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q4-2017
583	583	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Clï¿½id Housing	""	""	""	""	""	Q4-2018
584	584	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
585	585	CALF Turnkey	DLR	The Glen, Glenamuck Road, Carrickmines, Dublin 18 (Phase 1)*	48	Respond	""	""	""	""	Q1-2021	""
586	586	CALF Turnkey	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)	59	Respond	""	""	""	""	Q3-2020	""
587	587	CALF Turnkey	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)*	6	Respond	""	""	""	""	Q3-2020	""
588	588	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q3-2017
589	589	SHIP DIALOG	Donegal	Drumrooske West	36	*N/A	""	""	""	""	Q2-2021	""
590	590	SHIP DIALOG	Donegal	Convent Road, Carndonagh	21	*N/A	""	""	""	""	Q1-2021	""
591	591	SHIP DIALOG	Donegal	Meadowfield, Convoy	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
592	592	SHIP DIALOG	Donegal	Donegal Road, Ballybofey	14	*N/A	""	""	""	""	Q1-2021	""
593	593	SHIP DIALOG	Donegal	Admiran, Stranorlar	52	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
594	594	SHIP DIALOG	Donegal	Rockview, Carrickboy, Ballyshannon	5	*N/A	""	""	""	""	Q1-2021	""
595	595	SHIP DIALOG	Donegal	Ardaravan, Buncrana	4	*N/A	""	""	""	""	Q4-2020	""
596	596	SHIP DIALOG	Donegal	Glencrow, Moville	35	*N/A	""	""	""	""	Q2-2021	""
597	597	SHIP DIALOG	Donegal	Ballyraine, Letterkenny	25	*N/A	""	""	""	""	Q3-2021	""
598	598	SHIP DIALOG	Donegal	Lough Fern Heights, Milford	17	*N/A	""	""	""	""	Q1-2021	""
599	599	SHIP DIALOG	Donegal	Convent Road, Carndonagh	18	N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
600	600	SHIP DIALOG	Donegal	Convent Road, Carndonagh	14	N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
601	601	SHIP DIALOG	Donegal	Meadowfield, Convoy	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
602	602	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
603	603	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	18	*N/A	""	""	""	""	""	Q4-2018
604	604	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	8	*N/A	""	""	""	""	""	Q1-2019
605	605	SHIP CONSTRUCTION TURNKEY	Donegal	Carnamuggagh, Letterkenny	30	*N/A	""	""	""	""	""	Q4-2020
606	606	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	10	*N/A	""	""	""	""	""	Q4-2019
607	607	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	10	*N/A	""	""	""	""	""	Q2-2019
608	608	SHIP CONSTRUCTION TURNKEY	Donegal	Hattersly Park, Carndonagh	21	*N/A	""	""	""	""	Q3-2021	""
609	609	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	8	*N/A	""	""	""	""	Q4-2020	""
610	610	SHIP CONSTRUCTION TURNKEY	Donegal	Stï¿½isiï¿½n an Chï¿½irt, Falcarragh	6	*N/A	""	""	""	""	""	Q4-2019
611	611	SHIP CONSTRUCTION TURNKEY	Donegal	Stï¿½isiï¿½n an Chï¿½irt, Falcarragh	6	*N/A	""	""	""	""	""	Q4-2020
612	612	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	7	*N/A	""	""	""	""	""	Q3-2020
613	613	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	12	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
614	614	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	14	*N/A	""	""	""	""	Q4-2020	""
615	615	SHIP CONSTRUCTION SINGLE STAGE	Donegal	Figart, Dunfanaghy	8	*N/A	""	""	""	""	""	Q4-2019
616	616	SHIP CONSTRUCTION SINGLE STAGE	Donegal	SRD Loughanure Annagry	1	*N/A	""	""	""	""	Q1-2021	""
617	617	SHIP CONSTRUCTION SINGLE STAGE	Donegal	SRD Meenderrynasloe, Annagry	1	*N/A	""	""	""	""	Q1-2021	""
618	618	SHIP CONSTRUCTION SINGLE STAGE	Donegal	Knockamany Malin	1	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
619	619	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	""	""	Q3-2020	""
620	620	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	""	""	""	""	Q4-2019
621	621	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	""	""	""	Q4-2020
622	622	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	""	""	Q4-2019
623	623	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	""	""	""	Q2-2021
624	624	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	""	""	""	Q4-2019	""
625	625	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	""	Q4-2018
626	626	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Ph 2)	4	*N/A	""	""	""	""	""	Q4-2018
627	627	SHIP CONSTRUCTION	Donegal	Pound Street, Dunfanaghy	4	*N/A	""	""	""	""	Q3-2020	""
628	628	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
629	629	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	""	Q4-2018
630	630	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	""	""	""	Q2-2021
631	631	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
632	632	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
633	633	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
634	634	SHIP CONSTRUCTION	Donegal	Trusk Road, Ballybofey	19	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
635	635	SHIP CONSTRUCTION	Donegal	Crana Crescent, Buncrana	16	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
636	636	SHIP CONSTRUCTION	Donegal	Drumacrin, Bundoran	42	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
637	637	SHIP CONSTRUCTION	Donegal	Gallow's Lane, Lifford	29	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
638	638	SHIP CONSTRUCTION	Donegal	Chapel Road, Dungloe	45	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
639	639	SHIP CONSTRUCTION	Donegal	Kilmacrennan, Letterkenny	34	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
640	640	CAS CONSTRUCTION TURNKEY	Donegal	Ballaghderg, Letterkenny	14	Respond	""	""	""	""	""	Q4-2020
641	641	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	""	""	Q4-2020	""
642	642	CAS CONSTRUCTION	Donegal	Cois Locha, Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	""	""	Q3-2020	""
643	643	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	""	""	""	""	Q4-2020
644	644	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
645	645	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	34	Habinteg Housing Association (Ireland) Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
646	646	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	""	Q1-2021
647	647	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Clï¿½id Housing	""	""	""	""	""	Q3-2016
648	648	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Clï¿½id Housing	""	""	""	""	""	Q4-2018
649	649	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospect Hill	58	*N/A	""	""	""	""	""	Q4-2017
650	650	SHIP CONSTRUCTION TURNKEY	Dublin City	Parkside, Balgriffin, Dublin 13	16	*N/A	""	""	""	""	""	Q4-2018
651	651	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	47	*N/A	""	""	""	""	""	Q4-2018
652	652	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	45	*N/A	""	""	""	""	""	Q4-2019
653	653	SHIP CONSTRUCTION TURNKEY	Dublin City	88-89 Drimnagh Road Dublin 12	24	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
654	654	SHIP CONSTRUCTION TURNKEY	Dublin City	St. Pancras, Harolds Cross, Dublin 6	4	*N/A	""	""	""	""	""	Q2-2021
655	655	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
656	656	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Bunratty Road	78	*N/A	""	""	""	""	Q4-2019	""
657	657	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Bonham Street Dublin  8	57	*N/A	""	""	""	""	Q4-2019	""
658	658	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Cork Street/Chamber Street Dublin 8	55	*N/A	""	""	""	""	Q1-2020	""
659	659	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Springvale Chapelizod Dublin 8	71	*N/A	""	""	""	""	Q1-2020	""
660	660	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Cromcastle & Woodville, Coolock, Dublin 5	156	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
661	661	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Crumlin Road - Rafters Lane, Dublin 12	47	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
662	662	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	St. Andrews Court, Dublin 2	37	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
663	663	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
664	664	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
665	665	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
666	666	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
667	667	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
668	668	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	53	*N/A	""	""	""	""	""	Q4-2018
669	669	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	13	*N/A	""	""	""	""	""	Q3-2018
670	670	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	3	*N/A	""	""	""	""	""	Q3-2018
671	671	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	19	*N/A	""	""	""	""	""	Q4-2019
672	672	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
673	673	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	""	Q2-2019	""
674	674	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
675	675	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q2-2019	""
676	676	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	5	*N/A	""	""	""	""	""	Q4-2018
677	677	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
678	678	SHIP CONSTRUCTION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q1-2018	""
679	679	SHIP CONSTRUCTION	Dublin City	Sackville Avenue Cottages	14	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
680	680	SHIP CONSTRUCTION	Dublin City	O'Devaney Gardens - Phase 1A	56	*N/A	""	""	""	""	Q3-2018	""
681	681	SHIP CONSTRUCTION	Dublin City	Priory Hall	9	*N/A	""	""	""	""	""	Q1-2017
682	682	SHIP CONSTRUCTION	Dublin City	Priory Hall	24	*N/A	""	""	""	""	""	Q4-2019
683	683	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	2	*N/A	""	""	""	""	""	Q4-2019
684	684	SHIP CONSTRUCTION	Dublin City	Glin Court, Coolock, Dublin 17	32	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
685	685	SHIP CONSTRUCTION	Dublin City	Kildonan Road	75	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
686	686	SHIP CONSTRUCTION	Dublin City	Lands at Emmet Road	109	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
687	687	SHIP CONSTRUCTION	Dublin City	Slademore Avenue, Ayrfield, Dublin 13	39	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
688	688	SHIP CONSTRUCTION	Dublin City	Bluebell Phase 1A	140	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
689	689	SHIP CONSTRUCTION	Dublin City	Liberties Cluster Phase 1, School Street, The Liberties, Dublin 8	115	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
690	690	SHIP CONSTRUCTION	Dublin City	St. Anne's Court, All Saints Drive, Raheny, Dublin 5	102	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
691	691	REGENERATION	Dublin City	St Teresa's Gardens Margaret Kennedy Road Project	54	*N/A	""	""	""	""	""	Q4-2020
692	692	REGENERATION	Dublin City	Dolphin House, Dublin 8	100	*N/A	""	""	""	""	""	Q3-2018
693	693	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
694	694	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
695	695	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
696	696	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
697	697	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
698	698	REGENERATION	Dublin City	St. Bricins Park	11	*N/A	""	""	""	""	""	Q4-2018
699	699	REGENERATION	Dublin City	Dorset Street, Dublin 7	97	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
700	700	REGENERATION	Dublin City	Matt Talbot Court	92	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
701	701	REGENERATION	Dublin City	Constitution Hill Dublin 7	130	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
702	702	REGENERATION	Dublin City	Pearse House, Sandwith Street Lower, Dublin 2 (Blocks L,M,N &P)	75	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
703	703	CAS CONSTRUCTION TURNKEY	Dublin City	Block 70, The Plaza, Parkwest, Dublin 12 	43	Tï¿½ath Housing Association Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
704	704	CAS CONSTRUCTION TURNKEY	Dublin City	Apartments 1-3, 42 North Strand Road, Dublin 3	3	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2020
705	705	CAS CONSTRUCTION TURNKEY	Dublin City	5A & 5B Willow Park Crescent	2	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q3-2020
706	706	CAS CONSTRUCTION SINGLE STAGE	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	""	Q4-2020	""
707	707	CAS CONSTRUCTION SINGLE STAGE	Dublin City	13A Casement Drive / 307A Casement Road, Finglas, Dublin 11	4	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
708	708	CAS CONSTRUCTION SINGLE STAGE	Dublin City	88 Lower Drumcondra Road, Dublin 9 	6	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
709	709	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2018
710	710	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	22	Tï¿½ath Housing Association Ltd	""	""	""	""	Q3-2019	""
711	711	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	""	Q4-2018
712	712	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	""	Q4-2019
713	713	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street, Dublin 2	18	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
714	714	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	""	""	""	""	Q1-2021
715	715	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
716	716	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
717	717	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	14	Simon Community : Dublin Simon	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
718	718	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
719	719	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
720	720	CAS CONSTRUCTION	Dublin City	Sarsfield Road, Ballyfermot, Dublin 10	6	Respond	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
721	721	CAS CONSTRUCTION	Dublin City	25-26 Ushers Island Ushers Quay Dublin 8	0	Simon Community : Dublin Simon	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
722	722	CAS CONSTRUCTION	Dublin City	53a Keeper Road, Drimnagh, Dublin 12	9	Respond	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
723	723	CALF Construction	Dublin City	3 units, Block A Jamestown Court, Dublin 8 (Phase 1)	3	ALONE	""	""	""	""	""	Q4-2020
724	724	CALF Turnkey	Dublin City	9 units Dorset Street, Dublin 1 (Phase 1)	9	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2020
725	725	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	Tuath Housing Association	""	""	""	""	""	Q4-2016
726	726	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	Tuath Housing Association	""	""	""	""	""	Q1-2017
727	727	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	Tuath Housing Association	""	""	""	""	""	Q2-2017
728	728	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	Tuath Housing Association	""	""	""	""	""	Q3-2017
729	729	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	Tuath Housing Association	""	""	""	""	""	Q4-2018
730	730	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
731	731	CALF Turnkey	Dublin City	Aughrim Street, Stoneybatter, Dublin 7 (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	""	""	Q2-2021
732	732	CALF Turnkey	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2018
733	733	CALF Construction	Dublin City	Ballygall Road East Phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
734	734	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	62	Clï¿½id Housing	""	""	""	Q2-2021	""	""
735	735	CALF Turnkey	Dublin City	Blackbanks View, 754 Howth Road, Raheny, Dublin 5 (Phase 1)*	40	Clï¿½id Housing	""	""	""	""	""	Q1-2021
736	736	CALF Turnkey	Dublin City	Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	Tuath Housing Association	""	""	""	""	""	Q2-2018
737	737	CALF Construction	Dublin City	Block A, Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	""	""	Q4-2020
738	738	CALF Turnkey	Dublin City	Bluebell Avenue, Bluebell, Dublin 12 (Phase 1)*	52	Respond	""	""	""	""	Q4-2019	""
739	739	CALF Turnkey	Dublin City	Bluebell Avenue, Dublin 12 (Phase 1)	7	Tuath Housing Association	""	""	""	""	""	Q4-2018
740	740	CALF Construction	Dublin City	Broome Lodge,\nDunmanus Court, Cabra (Phase 1)	33	Clï¿½id Housing	""	""	""	""	""	Q4-2017
741	741	CALF Turnkey	Dublin City	Camac Park, Bluebell, Dublin 12 (Phase 1)	5	Tuath Housing Association	""	""	""	""	""	Q2-2020
742	742	CALF Turnkey	Dublin City	Camac Park, Bluebell, Dublin 12 (Phase 1)	3	Tuath Housing Association	""	""	""	""	Q1-2021	""
743	743	CALF Turnkey	Dublin City	Canal Meadows, Bluebell, Dublin 12 (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q1-2019
744	744	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
745	745	CALF Turnkey	Dublin City	Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*	65	Respond	""	""	""	""	Q2-2019	""
746	746	CALF Turnkey	Dublin City	Chanel Manor, Coolock, Dublin 5 (Phase 1)*	22	Respond	""	""	""	""	Q4-2020	""
747	747	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	""	Q2-2019
748	748	CALF Turnkey	Dublin City	Connaught Street, Phibsborough, Dublin 7 (Phase 1)	20	Focus Housing Association CLG	""	""	""	""	Q2-2021	""
749	749	CALF Turnkey	Dublin City	Cromwellsfort Court, Cromwellsfort Road, Walkinstown, Dublin 12 (Phase 1)*	12	Oaklee Housing	""	""	""	""	""	Q3-2020
750	750	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 1)	3	Clï¿½id Housing	""	""	""	""	""	Q2-2017
751	751	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 2)	2	Clï¿½id Housing	""	""	""	""	""	Q3-2017
752	752	CALF Construction	Dublin City	Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
753	753	CALF Turnkey	Dublin City	Donnybrook Gardens, Lands of Greenfield Park, Donnybrook, Dublin 4 (Phase 1)*	4	RHD Housing	""	""	""	""	""	Q2-2021
754	754	CALF Turnkey	Dublin City	Elanora Court, Long Mile Road, Walkinstown, Dublin 12 (Phase 1)*	153	Respond	""	""	""	""	Q3-2020	""
755	755	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Housing Association CLG	""	""	""	""	""	Q4-2016
756	756	CALF Turnkey	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 1)	1	Tuath Housing Association	""	""	""	""	""	Q4-2019
757	757	CALF Turnkey	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 2)	4	Tuath Housing Association	""	""	""	""	""	Q4-2020
758	758	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2017
759	759	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Clï¿½id Housing	""	""	""	""	""	Q4-2017
760	760	CALF Turnkey	Dublin City	Mountjoy Square North, Dublin 1 (Phase 1)	31	Respond	""	""	""	""	""	Q4-2019
761	761	CALF Turnkey	Dublin City	Newtown Cottages Malahide Road Coolock Dublin 17 (Phase 1)	3	Clanmil Housing Association Ireland	""	""	""	""	Q3-2020	""
762	762	CALF Construction	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
763	763	CALF Turnkey	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	Tuath Housing Association	""	""	""	""	""	Q4-2019
764	764	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
765	765	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
766	766	CALF Turnkey	Dublin City	Park West Campus, Kileen Road, Dublin 12 (Phase 1)	41	Tuath Housing Association	""	""	""	""	Q4-2020	""
767	767	CALF Construction	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Clï¿½id Housing	""	""	""	""	""	Q4-2019
768	768	CALF Construction	Dublin City	Post Tender Johns Lane West Dublin 8 (Phase 1)	31	Focus Housing Association CLG	""	""	""	""	""	Q4-2018
769	769	CALF Construction	Dublin City	POST TENDER, Poplar Row, Ballybough, Dublin 3 (Phase 1)	29	Oaklee Housing	""	""	""	""	""	Q4-2019
770	770	CALF Turnkey	Dublin City	Ravensdale Court, Kimmage, Dublin 12. (Phase 1)	12	Tuath Housing Association	""	""	""	""	Q4-2020	""
771	771	CALF Construction	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	""	""	Q3-2020
772	772	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	Tuath Housing Association	""	""	""	""	""	Q4-2019
773	773	CALF Construction	Dublin City	Revised, St Maryï¿½s Mansions, Dublin 1 (Phase 1)	80	Clï¿½id Housing	""	""	""	""	""	Q4-2019
774	774	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
775	775	CALF Turnkey	Dublin City	Royal Canal Crescent, Rathborne Park, Rathborne, Dublin15 (Phase 1)*	16	Clï¿½id Housing	""	""	""	""	""	Q4-2020
776	776	CALF Turnkey	Dublin City	Royal Canal Park, Ashtown, Dublin 15 (Phase 1)*	46	Respond	""	""	""	""	""	Q4-2020
777	777	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	44	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
778	778	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	6	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
779	779	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 2)	42	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q2-2020
780	780	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 3)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
781	781	CALF Turnkey	Dublin City	St Caniceï¿½s Hall, Ballygall Road West, Finglas, Dublin 11 (Phase 1)*	32	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
782	782	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing	""	""	""	""	""	Q3-2018
783	783	CALF Turnkey	Dublin City	Sundrive Mews, Kimmage, Dublin 12 (Phase 1)	9	Clï¿½id Housing	""	""	""	""	""	Q4-2019
784	784	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	28	Tuath Housing Association	""	""	""	""	""	Q2-2016
785	785	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	18	Tuath Housing Association	""	""	""	""	""	Q4-2016
786	786	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	Tuath Housing Association	""	""	""	""	""	Q1-2017
787	787	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	Tuath Housing Association	""	""	""	""	""	Q1-2017
788	788	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
789	789	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	""	""	Q2-2021
790	790	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	""	""	Q4-2020
791	791	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
792	792	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
793	793	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
794	794	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
795	795	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
796	796	SHIP CONSTRUCTION TURNKEY	Fingal	Ravenswood, North Road, Finglas	2	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
797	797	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
798	798	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
799	799	SHIP CONSTRUCTION TURNKEY	Fingal	Kenure Gate, Park Road, Rush	4	*N/A	""	""	""	""	""	Q4-2018
800	800	SHIP CONSTRUCTION TURNKEY	Fingal	Glaslinn, Donabate	3	*N/A	""	""	""	""	""	Q4-2018
801	801	SHIP CONSTRUCTION TURNKEY	Fingal	Bremore Pastures Park, Balbriggan	4	*N/A	""	""	""	""	""	Q4-2018
802	802	SHIP CONSTRUCTION TURNKEY	Fingal	Northwood Green, Santry, Dublin 9	37	*N/A	""	""	""	""	""	Q4-2018
803	803	SHIP CONSTRUCTION TURNKEY	Fingal	Hollytown Cottages	4	*N/A	""	""	""	""	""	Q4-2019
804	804	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh Ballyboughal Co. Dublin	5	*N/A	""	""	""	""	""	Q3-2019
805	805	SHIP CONSTRUCTION TURNKEY	Fingal	Rahillion, Donabate	1	*N/A	""	""	""	""	""	Q4-2019
806	806	SHIP CONSTRUCTION TURNKEY	Fingal	Bay Meadows Avenue/Square, Hollystown Dublin 15	12	*N/A	""	""	""	""	""	Q4-2020
807	807	SHIP CONSTRUCTION TURNKEY	Fingal	Bay Meadows, Hollystown, Dublin 15	10	*N/A	""	""	""	""	""	Q3-2020
808	808	SHIP CONSTRUCTION TURNKEY	Fingal	Killhedge Lane, Dun Emer, Lusk	7	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
809	809	SHIP CONSTRUCTION SINGLE STAGE	Fingal	Outlands, Rathbeale Road, Swords	11	*N/A	""	""	""	""	Q3-2021	""
810	810	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	""	Q4-2019
811	811	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
812	812	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
813	813	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	""	""	Q4-2019
814	814	SHIP CONSTRUCTION RAPID	Fingal	Church Fields, Phase 2B, Mulhuddart, Dublin 15.	67	*N/A	""	""	""	""	Q1-2021	""
815	815	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	""	""	Q2-2019
816	816	SHIP CONSTRUCTION	Fingal	Rowlestown	10	*N/A	""	""	""	""	""	Q2-2019
817	817	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	5	*N/A	""	""	""	""	""	Q2-2018
818	818	SHIP CONSTRUCTION	Fingal	Castlelands, Park View, Balbriggan (Phase 3)	24	*N/A	""	""	""	""	""	Q1-2019
819	819	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	""	""	Q2-2020
820	820	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	2	*N/A	""	""	""	""	""	Q3-2017
821	821	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
822	822	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
823	823	SHIP CONSTRUCTION	Fingal	St. Cronan's Cottages, Swords - Infill	1	*N/A	""	""	""	""	""	Q2-2016
824	824	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	25	*N/A	""	""	""	""	""	Q4-2017
825	825	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
826	826	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	15	*N/A	""	""	""	""	""	Q1-2018
827	827	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	""	""	""	Q3-2019
828	828	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	4	*N/A	""	""	""	""	""	Q3-2018
829	829	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	25	*N/A	""	""	""	""	""	Q4-2018
830	830	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth	8	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
831	831	SHIP CONSTRUCTION	Fingal	Wellview	20	*N/A	""	""	""	""	Q3-2020	""
832	832	SHIP CONSTRUCTION	Fingal	Rowlestown	6	*N/A	""	""	""	""	""	Q4-2019
833	833	SHIP CONSTRUCTION	Fingal	Rowlestown	6	*N/A	""	""	""	""	""	Q4-2019
834	834	SHIP CONSTRUCTION	Fingal	Cappaghfinn, Cappagh Road Finglas - Phase 3	69	*N/A	""	""	""	""	Q4-2020	""
835	835	SHIP CONSTRUCTION	Fingal	Rowlestown	4	*N/A	""	""	""	""	""	Q3-2019
836	836	SHIP CONSTRUCTION	Fingal	Leonards Garage, Lusk	10	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
837	837	SHIP CONSTRUCTION	Fingal	Katie Hunt's Cottage, Church Road, Lusk	5	*N/A	""	""	""	""	Q3-2021	""
838	838	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	31	Tï¿½ath Housing Association Ltd	""	""	""	""	Q3-2021	""
839	839	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas	6	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
840	840	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	""	""	Q3-2020	""
841	841	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
842	842	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
843	843	CAS CONSTRUCTION	Fingal	Garristown	6	North ? East Housing Association Ltd	""	""	""	""	Q3-2021	""
844	844	CALF Turnkey	Fingal	4 units, Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	4	Clï¿½id Housing	""	""	""	""	""	Q4-2018
845	845	CALF Turnkey	Fingal	Allendale Square, Clonsilla, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	""	Q2-2020
846	846	CALF Turnkey	Fingal	An Muileann, Kettles Lane, Swords, Dublin (Phase 1)	24	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
847	847	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q4-2018
848	848	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 2)*	12	Tuath Housing Association	""	""	""	""	""	Q4-2018
849	849	CALF Turnkey	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 1)	10	Tuath Housing Association	""	""	""	""	Q4-2019	""
850	850	CALF Turnkey	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 2)	10	Tuath Housing Association	""	""	""	""	Q4-2019	""
851	851	CALF Turnkey	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 3)	29	Tuath Housing Association	""	""	""	""	Q4-2019	""
852	852	CALF Turnkey	Fingal	Bellingsmore, Hollywoodrath, Dubin 15 (Phase 1)	29	Tuath Housing Association	""	""	""	""	""	Q4-2020
853	853	CALF Turnkey	Fingal	Bellingsmore, Hollywoodrath, Dubin 15 (Phase 2)	12	Tuath Housing Association	""	""	""	""	""	Q4-2020
854	854	CALF Turnkey	Fingal	Bellingsmore, Hollywoodrath, Dublin 15  (Phase 1)*	17	Tuath Housing Association	""	""	""	""	""	Q2-2021
855	855	CALF Turnkey	Fingal	Bellingsmore, Hollywoodrath, Dublin 15  (Phase 2)	21	Tuath Housing Association	""	""	""	""	Q4-2019	""
856	856	CALF Turnkey	Fingal	Beresford, Oakstown, Donabate, Co. Dublin (Phase 1)*	36	Tuath Housing Association	""	""	""	""	Q3-2020	""
857	857	CALF Turnkey	Fingal	Beresford, Oakstown, Donabate, Co. Dublin (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q3-2020	""
858	858	CALF Turnkey	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 1)*	29	Respond	""	""	""	""	""	Q2-2021
859	859	CALF Turnkey	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 2)*	30	Respond	""	""	""	""	Q4-2019	""
860	860	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	Tuath Housing Association	""	""	""	""	""	Q2-2016
861	861	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	Tuath Housing Association	""	""	""	""	""	Q3-2016
862	862	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	Tuath Housing Association	""	""	""	""	""	Q4-2016
863	863	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	Tuath Housing Association	""	""	""	""	""	Q1-2017
864	864	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	Tuath Housing Association	""	""	""	""	""	Q2-2017
865	865	CALF Turnkey	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 1)*	90	Respond	""	""	""	""	Q3-2019	""
866	866	CALF Turnkey	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 2)*	48	Respond	""	""	""	""	Q3-2019	""
867	867	CALF Turnkey	Fingal	Cois Sruthan, Ballyboughal, Co.Dublin (Phase 1)*	17	Oaklee Housing	""	""	""	""	""	Q3-2020
868	868	CALF Turnkey	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q4-2019
869	869	CALF Turnkey	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 2)*	6	Tuath Housing Association	""	""	""	""	""	Q2-2021
870	870	CALF Turnkey	Fingal	Dun Si, St. Marnock Bay, Station Road, Portmarnock, Co. Dublin\n\n (Phase 1)*	10	Clï¿½id Housing	""	""	""	""	""	Q2-2020
871	871	CALF Turnkey	Fingal	Dun Si, St. Marnock Bay, Station Road, Portmarnock, Co. Dublin\n\n (Phase 2)*	5	Clï¿½id Housing	""	""	""	""	""	Q4-2020
872	872	CALF Turnkey	Fingal	Dunsoghly, Dublin 11 (Phase 1)*	19	Clï¿½id Housing	""	""	""	""	""	Q4-2020
873	873	CALF Turnkey	Fingal	Knightsgate, Rush, Co. Dublin (Phase 1)*	38	Clï¿½id Housing	""	""	""	""	""	Q4-2019
874	874	CALF Turnkey	Fingal	Knightsgate, Rush, Co. Dublin (phase 2) (Phase 1)	19	Clï¿½id Housing	""	""	""	""	""	Q3-2020
875	875	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Clï¿½id Housing	""	""	""	""	Q4-2018	""
876	876	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Clï¿½id Housing	""	""	""	""	""	Q4-2018
877	877	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
878	878	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	28	The Iveagh Trust	""	""	""	""	""	Q4-2020
879	879	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	""	Q4-2019
880	880	CALF Turnkey	Fingal	Norseman's Court, Norseman's Walk, Lusk Village, Lusk, Co. Dublin (Phase 1)*	18	Clï¿½id Housing	""	""	""	""	""	Q4-2020
881	881	CALF Turnkey	Fingal	Northwood Avenue, Ballymun Cross, Santry, Dublin 9 (Phase 1)*	12	Respond	""	""	""	Q2-2021	""	""
882	882	CALF Turnkey	Fingal	Northwood Green, Santry, Dublin 9 (Phase 1)*	6	Respond	""	""	""	""	""	Q4-2018
883	883	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 1)	48	Respond	""	""	""	""	""	Q4-2019
884	884	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 2)*	7	Respond	""	""	""	""	""	Q2-2020
885	885	CALF Construction	Fingal	Old Coolock Lane, Santry, Dublin 9 (Phase 1)	28	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2019	""	""
886	886	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)	17	Respond	""	""	""	""	""	Q4-2020
887	887	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 2)*	10	Respond	""	""	""	""	""	Q2-2021
888	888	CALF Turnkey	Fingal	Oldtown, Swords, Co Dublin (Phase 1)	30	Respond	""	""	""	Q3-2021	""	""
889	889	CALF Turnkey	Fingal	Oldtown, Swords, Co Dublin (Phase 2)	30	Respond	""	""	""	Q3-2021	""	""
890	890	CALF Turnkey	Fingal	Oldtown, Swords, Co Dublin (Phase 3)	39	Respond	""	""	""	Q3-2021	""	""
891	891	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	Tuath Housing Association	""	""	""	""	""	Q3-2019
892	892	CALF Turnkey	Fingal	Phoenix Park Avenue, Castleknock, Dublin 15 (Phase 1)*	31	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
893	893	CALF Turnkey	Fingal	Riverwood Square, Porterstown, Dublin 15 (Phase 1)*	24	Clï¿½id Housing	""	""	""	""	""	Q3-2021
894	894	CALF Turnkey	Fingal	Semple Woods, Donabate, Co. Dublin (Phase 1)*	7	Tuath Housing Association	""	""	""	""	""	Q4-2020
895	895	CALF Turnkey	Fingal	Semple Woods, Donabate, Co. Dublin (Phase 2)*	3	Tuath Housing Association	""	""	""	""	Q4-2019	""
896	896	CALF Turnkey	Fingal	Semple Woods, Donabate, North County Dublin (Phase 1)*	30	Tuath Housing Association	""	""	""	""	""	Q4-2019
897	897	CALF Turnkey	Fingal	St Josephs, Clonsilla, Dublin 15 (Phase 1)*	28	Clï¿½id Housing	""	""	""	""	Q2-2019	""
898	898	CALF Turnkey	Fingal	St Marnockï¿½s Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Clï¿½id Housing	""	""	""	""	""	Q4-2017
899	899	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	Tuath Housing Association	""	""	""	""	""	Q4-2017
900	900	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
901	901	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
902	902	CALF Turnkey	Fingal	Taylor Hill Crescent, Balbriggan, Co. Dublin (Phase 1)	4	Clï¿½id Housing	""	""	""	""	""	Q4-2018
903	903	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	21	Clï¿½id Housing	""	""	""	""	""	Q2-2020
904	904	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Clï¿½id Housing	""	""	""	""	""	Q4-2018
905	905	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	24	Clï¿½id Housing	""	""	""	""	""	Q4-2019
906	906	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	7	Clï¿½id Housing	""	""	""	""	Q3-2020	""
907	907	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 2)	1	Clï¿½id Housing	""	""	""	""	""	Q4-2020
908	908	CALF Turnkey	Fingal	The Forge, Lusk, Co. Dublin (Phase 1)	8	Oaklee Housing	""	""	""	""	""	Q4-2019
909	909	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Clï¿½id Housing	""	""	""	""	""	Q4-2017
910	910	CALF Turnkey	Fingal	Waterside, Malahide, Dublin (Phase 1)	5	Clï¿½id Housing	""	""	""	""	""	Q4-2020
911	911	CALF Turnkey	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
912	912	CALF Turnkey	Fingal	Weston, Feltrim Road, Swords, North County Dublin (Phase 1)	24	Oaklee Housing	""	""	""	""	""	Q4-2019
913	913	CALF Turnkey	Fingal	Weston, Feltrim Road, Swords, North County Dublin (Phase 2)*	10	Oaklee Housing	""	""	""	""	""	Q3-2020
914	914	CALF Turnkey	Fingal	 Wrens Hill, (Formerly The Galleries),  Donabate, Co. Dublin (Phase 1)	43	Oaklee Housing	""	""	""	""	""	Q4-2019
915	915	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grï¿½ine, (Glasshouse Site) Monivea Road	6	*N/A	""	""	""	""	""	Q3-2019
916	916	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grï¿½ine, (Glasshouse Site) Monivea Road	16	*N/A	""	""	""	""	""	Q4-2019
917	917	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grï¿½ine, (Glasshouse Site) Monivea Road	7	*N/A	""	""	""	""	""	Q4-2019
918	918	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grï¿½ine, (Glasshouse Site) Monivea Road	13	*N/A	""	""	""	""	""	Q3-2020
919	919	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grï¿½ine, (Glasshouse Site) Monivea Road	8	*N/A	""	""	""	""	""	Q4-2020
920	920	SHIP CONSTRUCTION TURNKEY	Galway City	Garraï¿½ Caol, (Coast Road Site) Dublin Road	26	*N/A	""	""	""	""	Q1-2020	""
921	921	SHIP CONSTRUCTION TURNKEY	Galway City	Garraï¿½ Caol, (Coast Road Site) Dublin Road	22	*N/A	""	""	""	""	Q1-2020	""
922	922	SHIP CONSTRUCTION	Galway City	Ard Crï¿½, Ballymoneen Road (Phase 2)	78	*N/A	""	""	""	""	""	Q4-2020
923	923	SHIP CONSTRUCTION	Galway City	Ard Crï¿½, Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
924	924	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More	15	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
925	925	SHIP CONSTRUCTION	Galway City	Garraï¿½ Beag, Monivea Road, Ballybaan More	58	*N/A	""	""	""	""	Q1-2020	""
926	926	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	24	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
927	927	SHIP CONSTRUCTION	Galway City	Keeraun, Ballymoneen Road	63	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
928	928	SHIP CONSTRUCTION	Galway City	Tirellan Heights, Headford Road	1	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
929	929	SHIP CONSTRUCTION	Galway City	Merlin Park Lands, Galway City	18	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
930	930	SHIP CONSTRUCTION	Galway City	1 Munster Avenue, Galway city	4	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
931	931	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
932	932	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
933	933	CAS CONSTRUCTION	Galway City	47 Forster Street, Galway City (Domestic Violence Refuge)	9	Cope Galway	""	""	""	""	""	Q4-2019
934	934	CAS CONSTRUCTION	Galway City	Doughiska, Galway City	7	Respond	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
935	935	CAS CONSTRUCTION	Galway City	111 Upper Newcastle Road, Galway City	10	Simon Community : North West Simon	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
936	936	CALF Turnkey	Galway City	Ballybanemor Road, Ballybrit, Galway (Phase 1)*	52	Respond	""	""	""	""	Q2-2021	""
937	937	CALF Turnkey	Galway City	Ballybanemor Road, Ballybrit, Galway (Phase 2)	49	Respond	""	""	""	""	Q2-2021	""
938	938	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
939	939	CALF Turnkey	Galway City	Block C, Sraith Fhada, Doughiska, Galway (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q4-2020
940	940	CALF Turnkey	Galway City	Block D, Sraith Fhada, Doughiska, Galway (Phase 1)	14	Tuath Housing Association	""	""	""	""	""	Q4-2019
941	941	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Clï¿½id Housing	""	""	""	""	""	Q4-2016
942	942	CALF Turnkey	Galway City	Breacan, Letteragh Road, Galway City (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q4-2019
943	943	CALF Turnkey	Galway City	Briar Hill, Old Monivea Road, Ballybrit, Galway (Phase 1)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
944	944	CALF Turnkey	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 1)	7	Respond	""	""	""	""	""	Q4-2019
945	945	CALF Turnkey	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 2)*	8	Respond	""	""	""	""	""	Q3-2020
946	946	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 1)	10	Respond	""	""	""	""	""	Q4-2019
947	947	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 2)	71	Respond	""	""	""	""	""	Q4-2020
948	948	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Clï¿½id Housing	""	""	""	""	""	Q3-2017
949	949	CALF Turnkey	Galway City	Creig Ard, Roscam, Galway City  (Phase 1)	9	Clï¿½id Housing	""	""	""	""	""	Q4-2020
950	950	CALF Turnkey	Galway City	Creig Ard, Roscam, Galway City  (Phase 2)	10	Clï¿½id Housing	""	""	""	""	""	Q2-2021
951	951	CALF Turnkey	Galway City	Creig Ard, Roscam, Galway City, Co. Galway (Phase 1)*	17	Clï¿½id Housing	""	""	""	""	Q4-2019	""
952	952	CALF Turnkey	Galway City	Cuirt Bhoirne, Roscam, Co Galway (Phase 1)*	12	Clï¿½id Housing	""	""	""	""	Q3-2020	""
953	953	CALF Turnkey	Galway City	Fanan, Letteragh Road, Galway (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q3-2021
954	954	CALF Turnkey	Galway City	Fanan, Letteragh Road, Galway (Phase 2)*	2	Tuath Housing Association	""	""	""	""	Q4-2019	""
955	955	CALF Turnkey	Galway City	Fanan, Letteragh Road, Galway (Phase 3)*	6	Tuath Housing Association	""	""	""	""	Q4-2019	""
956	956	CALF Turnkey	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 1)	43	Respond	""	""	""	""	Q3-2020	""
957	957	CALF Turnkey	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 2)*	40	Respond	""	""	""	""	Q3-2020	""
958	958	CALF Turnkey	Galway City	Leana Theas, Cappagh Road, Galway City (Phase 1)*	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
959	959	CALF Turnkey	Galway City	Letteragh Road, Rahoon, Galway City (Phase 1)*	10	Clï¿½id Housing	""	""	""	""	""	Q3-2021
960	960	CALF Turnkey	Galway City	Letteragh Road, Rahoon, Galway City (Phase 2)	13	Clï¿½id Housing	""	""	""	""	Q3-2020	""
961	961	CALF Turnkey	Galway City	Letteragh Road, Rahoon, Galway City (Phase 3)*	41	Clï¿½id Housing	""	""	""	""	Q3-2020	""
962	962	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
963	963	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q1-2017
964	964	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	Tuath Housing Association	""	""	""	""	""	Q4-2017
965	965	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	Tuath Housing Association	""	""	""	""	""	Q3-2018
966	966	CALF Turnkey	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q2-2017
967	967	CALF Turnkey	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q2-2017
968	968	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 1)*	20	Clï¿½id Housing	""	""	""	""	""	Q1-2019
969	969	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke (Phase 1)	56	*N/A	""	""	""	""	""	Q2-2021
970	970	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke (Phase 2)	18	*N/A	""	""	""	""	""	Q3-2021
971	971	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro Gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
972	972	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
973	973	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
974	974	SHIP CONSTRUCTION TURNKEY	Galway County	Ashthorn Avenue, Headford	10	*N/A	""	""	""	""	""	Q4-2018
975	975	SHIP CONSTRUCTION TURNKEY	Galway County	Cuirt na hAbhann, Claregalway 	8	*N/A	""	""	""	""	""	Q4-2018
976	976	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loughrea	19	*N/A	""	""	""	""	""	Q4-2019
977	977	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loughrea	17	*N/A	""	""	""	""	""	Q4-2019
978	978	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	4	*N/A	""	""	""	""	""	Q4-2019
979	979	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loughrea	10	*N/A	""	""	""	""	""	Q4-2020
980	980	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loughrea	15	*N/A	""	""	""	""	""	Q4-2020
981	981	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	8	*N/A	""	""	""	""	""	Q4-2020
982	982	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	""	Q4-2020
983	983	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	7	*N/A	""	""	""	""	""	Q4-2020
984	984	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	9	*N/A	""	""	""	""	""	Q1-2021
985	985	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	""	Q1-2021
986	986	SHIP CONSTRUCTION TURNKEY	Galway County	Garraï¿½ Mhic Aodha, Tubber Road, Gort (Phase 1)	9	*N/A	""	""	""	""	Q2-2020	""
987	987	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loughrea	9	*N/A	""	""	""	""	Q3-2018	""
988	988	SHIP CONSTRUCTION TURNKEY	Galway County	Limehill, Dunlo, Ballinasloe	17	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
989	989	SHIP CONSTRUCTION TURNKEY	Galway County	Garraï¿½ Mhic Aodha, Tubber Road, Gort (Phase 2)	18	*N/A	""	""	""	""	Q2-2020	""
990	990	SHIP CONSTRUCTION TURNKEY	Galway County	Cullairbaun, Athenry	58	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
991	991	SHIP CONSTRUCTION TURNKEY	Galway County	Limehill, Dunlo, Ballinasloe	15	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
992	992	SHIP CONSTRUCTION TURNKEY	Galway County	Garraï¿½ Mhic Aodha, Tubber Road, Gort  (Phase 3)	4	*N/A	""	""	""	""	Q2-2020	""
993	993	SHIP CONSTRUCTION SINGLE STAGE	Galway County	Corralough, Williamstown (SRD)	1	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
994	994	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	""	Q4-2019
995	995	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	""	Q3-2019
996	996	SHIP CONSTRUCTION	Galway County	Weir Road, Tuam	30	*N/A	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
997	997	SHIP CONSTRUCTION	Galway County	Na Clocha Rua, An Cheathrï¿½ Rua	4	*N/A	""	""	""	""	""	Q4-2019
998	998	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
999	999	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1000	1000	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	""	Q4-2018
1001	1001	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
1002	1002	SHIP CONSTRUCTION	Galway County	Cill Ciarï¿½n (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
1003	1003	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
1004	1004	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige, Roundstone	8	*N/A	""	""	""	""	""	Q4-2020
1005	1005	SHIP CONSTRUCTION	Galway County	Gort na gCloch, Hospital Road, Clifden	16	*N/A	""	""	""	""	Q4-2020	""
1006	1006	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	18	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1007	1007	SHIP CONSTRUCTION	Galway County	Caisleï¿½n Raithlï¿½n, Ardrahan	12	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1008	1008	SHIP CONSTRUCTION	Galway County	Barrack Street, Loughrea	5	*N/A	""	""	""	""	""	Q3-2021
1009	1009	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	24	*N/A	""	""	""	""	""	Q3-2019
1010	1010	SHIP CONSTRUCTION	Galway County	Cartron, Kinvara	10	*N/A	""	""	""	""	Q3-2021	""
1011	1011	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	16	*N/A	""	""	""	""	""	Q4-2018
1012	1012	SHIP CONSTRUCTION	Galway County	Fï¿½na Bhuï¿½, Tuam (Phase 1 )	16	*N/A	""	""	""	""	Q4-2020	""
1013	1013	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	19	*N/A	""	""	""	""	""	Q4-2019
1014	1014	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige, Roundstone	6	*N/A	""	""	""	""	""	Q1-2021
1015	1015	SHIP CONSTRUCTION	Galway County	Ballyglass, Ardrahan (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1016	1016	SHIP CONSTRUCTION	Galway County	Woodpark, Portumna (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1017	1017	SHIP CONSTRUCTION	Galway County	Carrowmore West, Clontuskert, Ballinasloe (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1018	1018	SHIP CONSTRUCTION	Galway County	Woodfield, Dunmore (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1019	1019	SHIP CONSTRUCTION	Galway County	Knockaloura West, Brownsgrove, Tuam (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1020	1020	SHIP CONSTRUCTION	Galway County	Creggaturlough, Craughwell (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1021	1021	SHIP CONSTRUCTION	Galway County	Gort na gCloch, Hospital Road, Clifden	10	*N/A	""	""	""	""	Q4-2020	""
1022	1022	SHIP CONSTRUCTION	Galway County	Fï¿½na Bhuï¿½, Tuam (Phase 2)	11	*N/A	""	""	""	""	Q4-2020	""
1023	1023	SHIP CONSTRUCTION	Galway County	Fï¿½na Bhuï¿½, Tuam (Phase 3)	22	*N/A	""	""	""	""	Q4-2020	""
1024	1024	SHIP CONSTRUCTION	Galway County	Ballymoe	8	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1025	1025	SHIP CONSTRUCTION	Galway County	Droim na Gaoithe, Baile Chlï¿½ir (Claregalway)	45	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1026	1026	SHIP CONSTRUCTION	Galway County	Cosmona, Loughrea	60	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1027	1027	SHIP CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	11	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1028	1028	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	""	""	""	Q4-2020	""
1029	1029	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhï¿½l, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
1030	1030	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	""	Q3-2019
1031	1031	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1032	1032	CAS CONSTRUCTION	Galway County	Mountbellew	5	Tï¿½ath Housing Association Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1033	1033	CAS CONSTRUCTION	Galway County	Springfield, Parkmore, Ballinasloe	4	Peter Triest Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1034	1034	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
1035	1035	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	18	Cluid Housing Association	""	""	""	""	""	Q3-2020
1036	1036	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	4	Peter Triest Housing Association Ltd	""	""	""	""	""	Q4-2019
1037	1037	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	""	""	""	""	Q4-2020
1038	1038	CAS CONSTRUCTION	Galway County	Shannon Road, Portumna	4	Carraig Dubh Housing Association	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1039	1039	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2018
1040	1040	CALF Turnkey	Galway County	Dunloe Street, Ballinasloe, Co. Galway (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1041	1041	CALF Turnkey	Galway County	Oranhill, Oranmore, Co. Galway (Phase 1)*	22	Clï¿½id Housing	""	""	""	Q1-2021	""	""
1042	1042	CALF Turnkey	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 1)	11	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1043	1043	CALF Turnkey	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 2)	12	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1044	1044	CALF Turnkey	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 3)*	16	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1045	1045	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Clï¿½id Housing	""	""	""	""	""	Q3-2017
1046	1046	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole	2	*N/A	""	""	""	""	""	Q1-2018
1047	1047	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
1048	1048	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
1049	1049	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole	5	*N/A	""	""	""	""	""	Q3-2018
1050	1050	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin	3	*N/A	""	""	""	""	""	Q4-2018
1051	1051	SHIP CONSTRUCTION TURNKEY	Kerry	47 Woodview, Cahirdown, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
1052	1052	SHIP CONSTRUCTION TURNKEY	Kerry	Dromin Upper, Listowel	8	*N/A	""	""	""	""	""	Q4-2020
1053	1053	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole	3	*N/A	""	""	""	""	""	Q4-2018
1054	1054	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 2	1	*N/A	""	""	""	""	""	Q2-2019
1055	1055	SHIP CONSTRUCTION TURNKEY	Kerry	Ballygologue, Road, Listowel	2	*N/A	""	""	""	""	""	Q4-2019
1056	1056	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Pinewood Estate, Killarney	6	*N/A	""	""	""	""	""	Q4-2019
1057	1057	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Glannagilliagh, Caragh Lake, Killorglin (SRD)	1	*N/A	""	""	""	""	Q2-2021	""
1058	1058	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Carrigcannon, Lyreacrumpane (SRD)	1	*N/A	""	""	""	""	Q2-2021	""
1059	1059	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Rahinnane, Ventry (SRD)	1	*N/A	""	""	""	""	Q2-2021	""
1060	1060	SHIP CONSTRUCTION RAPID	Kerry	Rathmore/Barraduff	20	*N/A	""	""	""	""	""	Q2-2021
1061	1061	SHIP CONSTRUCTION	Kerry	Cois Gallain, Killorglin	14	*N/A	""	""	""	""	""	Q4-2019
1062	1062	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	""	Q4-2018
1063	1063	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
1064	1064	SHIP CONSTRUCTION	Kerry	Cuirt Eaglaise, Milltown	8	*N/A	""	""	""	""	""	Q4-2019
1065	1065	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	""	Q3-2019
1066	1066	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
1067	1067	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
1068	1068	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	""	""	Q4-2019
1069	1069	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
1070	1070	SHIP CONSTRUCTION	Kerry	Glenach, Ballybunion	20	*N/A	""	""	""	""	""	Q1-2021
1071	1071	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	""	Q4-2018
1072	1072	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	""	Q4-2018
1073	1073	SHIP CONSTRUCTION	Kerry	An Carrigin, Tralee	28	*N/A	""	""	""	""	""	Q4-2020
1074	1074	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	""	Q4-2018
1075	1075	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	""	""	""	Q4-2020
1076	1076	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	""	Q3-2019
1077	1077	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	""	Q3-2019
1078	1078	SHIP CONSTRUCTION	Kerry	Owngarry, Killorglin	1	*N/A	""	""	""	""	""	Q4-2019
1079	1079	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	61	*N/A	""	""	""	""	Q3-2020	""
1080	1080	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	""	""	""	Q4-2020
1081	1081	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
1082	1082	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	""	""	""	Q1-2021
1083	1083	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	22	*N/A	""	""	""	""	""	Q3-2021
1084	1084	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	21	*N/A	""	""	""	""	Q3-2020	""
1085	1085	SHIP CONSTRUCTION	Kerry	Croogorts, Tralee	30	*N/A	""	""	""	""	Q3-2020	""
1086	1086	SHIP CONSTRUCTION	Kerry	Rock Rd., Killarney	10	*N/A	""	""	""	""	Q3-2020	""
1087	1087	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 4)	14	*N/A	""	""	""	""	""	Q1-2021
1088	1088	SHIP CONSTRUCTION	Kerry	Baile an Gharraï¿½, Lixnaw (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2021
1089	1089	SHIP CONSTRUCTION	Kerry	Woodview Place, Tarbert	22	*N/A	""	""	""	""	Q2-2021	""
1090	1090	SHIP CONSTRUCTION	Kerry	Marconi South, Ballybunion	14	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1091	1091	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee (New Site)	8	*N/A	""	""	""	""	Q2-2021	""
1092	1092	SHIP CONSTRUCTION	Kerry	Rusheen, Ballylongford	7	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1093	1093	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 5)	14	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
1094	1094	SHIP CONSTRUCTION	Kerry	Matt Talbot Road, Tralee	27	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1095	1095	SHIP CONSTRUCTION	Kerry	Locke's Shop, Mitchel's Rd, Tralee	8	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1096	1096	SHIP CONSTRUCTION	Kerry	Marian Terrace, Ballyheigue	9	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1097	1097	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	""	Q4-2018
1098	1098	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
1099	1099	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
1100	1100	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	""	Q4-2018
1101	1101	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
1102	1102	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	""	""	""	Q1-2021
1103	1103	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	""	Q4-2018
1104	1104	CAS CONSTRUCTION	Kerry	Chamfers Place (Mitchels road, Tralee)	18	Cluid Housing Association	""	""	""	""	Q2-2021	""
1105	1105	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	""	Q4-2018
1106	1106	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	Social Action Group Rathmore	""	""	""	""	""	Q3-2020
1107	1107	CALF Turnkey	Kerry	Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 1)*	54	Clï¿½id Housing	""	""	""	""	Q4-2020	""
1108	1108	CALF Turnkey	Kerry	Barraduff, Killarney, Co Kerry (Phase 1)*	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2021	""
1109	1109	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1110	1110	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 2)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1111	1111	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 3)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1112	1112	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 4)*	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1113	1113	CALF Turnkey	Kerry	Cahirdown Wood, Listowel, Co. Kerry (Phase 1)*	12	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1114	1114	CALF Turnkey	Kerry	Cahirdown Wood, Listowel, Co. Kerry (Phase 2)	26	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1115	1115	CALF Turnkey	Kerry	Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 1)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2021	""
1116	1116	CALF Turnkey	Kerry	Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 2)	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2021	""
1117	1117	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Clï¿½id Housing	""	""	""	""	""	Q2-2016
1118	1118	CALF Turnkey	Kerry	Deerpark Avenue, Tralee, Co. Kerry (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
1119	1119	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)*	61	Clï¿½id Housing	""	""	""	""	""	Q3-2020
1120	1120	CALF Turnkey	Kerry	Doon Road, Lisloose, Tralee, Co. Kerry (Phase 1)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
1121	1121	CALF Turnkey	Kerry	Dromcairn, Tralee, Co. Kerry (Phase 1)	12	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1122	1122	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 1)	14	Respond	""	""	""	""	""	Q4-2018
1123	1123	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 2)	2	Respond	""	""	""	""	""	Q4-2019
1124	1124	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 3)	5	Respond	""	""	""	""	""	Q2-2020
1125	1125	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 4)	1	Respond	""	""	""	""	""	Q2-2021
1126	1126	CALF Turnkey	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1127	1127	CALF Turnkey	Kerry	Hunters Lodge, Hunters Wood, Ballyseedy, Tralee, Co. Kerry (Phase 1)	10	Clï¿½id Housing	""	""	""	Q2-2021	""	""
1128	1128	CALF Turnkey	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1129	1129	CALF Turnkey	Kerry	Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 1)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
1130	1130	CALF Turnkey	Kerry	Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 2)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1131	1131	CALF Turnkey	Kerry	Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 3)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1132	1132	CALF Turnkey	Kerry	Lios Ard, Lisloose, Tralee, Co. Kerry (Phase 1)	28	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1133	1133	CALF Turnkey	Kerry	Moanmore, Pound Road, Castleisland, Co. Kerry (Phase 1)*	14	Clï¿½id Housing	""	""	""	""	Q2-2020	""
1134	1134	CALF Turnkey	Kerry	Oakwood, Coolegrean, Killarney, Co. Kerry (Coill na Darach) (Phase 1)	59	Clï¿½id Housing	""	""	""	""	""	Q3-2019
1135	1135	CALF Turnkey	Kerry	Orglan Heights, Ardmoneel, Killorglin (Phase 1)*	30	Clï¿½id Housing	""	""	""	Q3-2021	""	""
1136	1136	CALF Turnkey	Kerry	Sruthan na Saili, Derreen, Co. Kerry (Phase 1)*	22	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1137	1137	CALF Turnkey	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Clï¿½id Housing	""	""	""	""	""	Q3-2020
1138	1138	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
1139	1139	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
1140	1140	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
1141	1141	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
1142	1142	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
1143	1143	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
1144	1144	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	""	Q4-2018
1145	1145	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
1146	1146	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot	6	*N/A	""	""	""	""	""	Q4-2018
1147	1147	SHIP CONSTRUCTION TURNKEY	Kildare	Grove Lane, Robertstown	3	*N/A	""	""	""	""	""	Q1-2020
1148	1148	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill, Prosperous	5	*N/A	""	""	""	""	""	Q4-2018
1149	1149	SHIP CONSTRUCTION TURNKEY	Kildare	The Green, Elsmore Naas	5	*N/A	""	""	""	""	""	Q4-2018
1150	1150	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	10	*N/A	""	""	""	""	""	Q1-2019
1151	1151	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	16	*N/A	""	""	""	""	""	Q3-2020
1152	1152	SHIP CONSTRUCTION TURNKEY	Kildare	Beech Park Wood, Leixlip	4	*N/A	""	""	""	""	""	Q3-2019
1153	1153	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	18	*N/A	""	""	""	""	""	Q2-2019
1154	1154	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	10	*N/A	""	""	""	""	""	Q3-2019
1155	1155	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	20	*N/A	""	""	""	""	""	Q3-2019
1156	1156	SHIP CONSTRUCTION TURNKEY	Kildare	Cluain Dara, Derrinturn, Kildare	1	*N/A	""	""	""	""	""	Q2-2019
1157	1157	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	3	*N/A	""	""	""	""	""	Q4-2019
1158	1158	SHIP CONSTRUCTION TURNKEY	Kildare	School Walk, Allenwood	4	*N/A	""	""	""	""	""	Q4-2019
1159	1159	SHIP CONSTRUCTION TURNKEY	Kildare	Stoneleigh, Naas	6	*N/A	""	""	""	""	""	Q4-2019
1160	1160	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q1-2020
1161	1161	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q3-2020
1162	1162	SHIP CONSTRUCTION TURNKEY	Kildare	Barrack Close, Ballymore Eustace	2	*N/A	""	""	""	""	""	Q2-2020
1163	1163	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	6	*N/A	""	""	""	""	""	Q2-2020
1164	1164	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill Prosperous	1	*N/A	""	""	""	""	""	Q4-2019
1165	1165	SHIP CONSTRUCTION TURNKEY	Kildare	Greenfield House, Maynooth	1	*N/A	""	""	""	""	""	Q4-2019
1166	1166	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	10	*N/A	""	""	""	""	""	Q4-2020
1167	1167	SHIP CONSTRUCTION TURNKEY	Kildare	Railway House, Dublin Road, Naas 	3	*N/A	""	""	""	""	""	Q3-2020
1168	1168	SHIP CONSTRUCTION TURNKEY	Kildare	Loughminane Green, Kildare Town 	2	*N/A	""	""	""	""	""	Q4-2020
1169	1169	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	26	*N/A	""	""	""	""	""	Q4-2020
1170	1170	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	9	*N/A	""	""	""	""	""	Q4-2020
1171	1171	SHIP CONSTRUCTION TURNKEY	Kildare	Barrack Close, Ballymore Eustace	2	*N/A	""	""	""	""	""	Q3-2020
1172	1172	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	9	*N/A	""	""	""	""	""	Q3-2020
1173	1173	SHIP CONSTRUCTION TURNKEY	Kildare	Temple Mills, Rathangan	2	*N/A	""	""	""	""	""	Q4-2020
1174	1174	SHIP CONSTRUCTION TURNKEY	Kildare	Longstone, Craddockstown, Naas	5	*N/A	""	""	""	""	""	Q4-2020
1175	1175	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	4	*N/A	""	""	""	""	""	Q4-2020
1176	1176	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	6	*N/A	""	""	""	""	""	Q4-2020
1177	1177	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn	3	*N/A	""	""	""	""	""	Q4-2020
1178	1178	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	2	*N/A	""	""	""	""	""	Q4-2020
1179	1179	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q2-2021
1180	1180	SHIP CONSTRUCTION TURNKEY	Kildare	Fitzgerald Close, Greenfield, Maynooth	1	*N/A	""	""	""	""	""	Q2-2021
1181	1181	SHIP CONSTRUCTION TURNKEY	Kildare	Main Street, Robertstown	2	*N/A	""	""	""	""	""	Q4-2020
1182	1182	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	2	*N/A	""	""	""	""	""	Q1-2021
1183	1183	SHIP CONSTRUCTION TURNKEY	Kildare	Abbotsfield Clane	1	*N/A	""	""	""	""	""	Q2-2021
1184	1184	SHIP CONSTRUCTION TURNKEY	Kildare	Old Mill Race, Monasterevin	9	*N/A	""	""	""	""	Q4-2019	""
1185	1185	SHIP CONSTRUCTION TURNKEY	Kildare	Hemmingway Park, Clane	13	*N/A	""	""	""	""	""	Q3-2021
1186	1186	SHIP CONSTRUCTION TURNKEY	Kildare	Hemmingway Park, Clane	10	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1187	1187	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	2	*N/A	""	""	""	""	""	Q2-2021
1188	1188	SHIP CONSTRUCTION TURNKEY	Kildare	Newtown, Ardclough Rd, Celbridge	49	*N/A	""	""	""	""	Q2-2021	""
1189	1189	SHIP CONSTRUCTION TURNKEY	Kildare	Kildare Road, Rathangan	9	*N/A	""	""	""	""	Q1-2021	""
1190	1190	SHIP CONSTRUCTION TURNKEY	Kildare	Abbotsfield, Clane	2	*N/A	""	""	""	""	""	Q3-2021
1191	1191	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	Q4-2019	""
1192	1192	SHIP CONSTRUCTION TURNKEY	Kildare	Fitzgerald Close, Greenfield, Maynooth	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1193	1193	SHIP CONSTRUCTION SINGLE STAGE	Kildare	Patrician Avenue, Naas	3	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1194	1194	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1195	1195	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	""	""	""	Q3-2021	""
1196	1196	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
1197	1197	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland, Kildare Town	32	*N/A	""	""	""	""	""	Q3-2019
1198	1198	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	""	""	""	Q3-2020
1199	1199	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	""	""	""	Q4-2019
1200	1200	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
1201	1201	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
1202	1202	SHIP CONSTRUCTION	Kildare	Newtown House, Leixlip	4	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1203	1203	SHIP CONSTRUCTION	Kildare	Coill Dubh	10	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1204	1204	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	39	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1205	1205	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
1206	1206	SHIP CONSTRUCTION	Kildare	Ambassador Site, Kill	33	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1207	1207	SHIP CONSTRUCTION	Kildare	Carbury	5	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1208	1208	SHIP CONSTRUCTION	Kildare	St. Evins Park Monasterevin	16	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1209	1209	SHIP CONSTRUCTION	Kildare	Castle Park, Athy	4	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1210	1210	SHIP CONSTRUCTION	Kildare	Oldtown Mill, Celbridge	57	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1211	1211	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1212	1212	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1213	1213	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	""	""	""	Q2-2021
1214	1214	CAS CONSTRUCTION	Kildare	St. John's Convent, New Street, Rathangan	27	Sophia Housing Association Ltd	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1215	1215	CAS CONSTRUCTION	Kildare	Dominican Lands, Athy	30	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1216	1216	CALF Turnkey	Kildare	1 unit, Loughlion Green, Kildare Town (Phase 1)	1	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
1217	1217	CALF Turnkey	Kildare	Belin Woods, Newbridge, Co. Kildare (Phase 1)*	30	Tuath Housing Association	""	""	""	""	Q3-2021	""
1218	1218	CALF Turnkey	Kildare	Belin Woods, Newbridge, Co. Kildare (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q3-2021	""
1219	1219	CALF Turnkey	Kildare	Bellingsfield, Naas, Kildare (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2018
1220	1220	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2018
1221	1221	CALF Turnkey	Kildare	Castle Farm, Jigginstown, Naas, Co. Kildare (Phase 1)	8	Tuath Housing Association	""	""	""	""	""	Q4-2019
1222	1222	CALF Turnkey	Kildare	Castle Farm, Naas, Co. Kildare (Phase 1)*	8	Tuath Housing Association	""	""	""	""	""	Q2-2019
1223	1223	CALF Construction	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	Tuath Housing Association	""	""	""	""	Q1-2020	""
1224	1224	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 1)*	6	Cill Dara Housing Association	""	""	""	""	""	Q4-2019
1225	1225	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 2)*	11	Cill Dara Housing Association	""	""	""	""	""	Q4-2019
1226	1226	CALF Turnkey	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 1)*	26	Tuath Housing Association	""	""	""	""	""	Q4-2019
1227	1227	CALF Turnkey	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 2)*	17	Tuath Housing Association	""	""	""	""	Q2-2018	""
1228	1228	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 1)*	8	Tuath Housing Association	""	""	""	""	""	Q4-2018
1229	1229	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 2)*	3	Tuath Housing Association	""	""	""	""	""	Q3-2019
1230	1230	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 1)	18	Tuath Housing Association	""	""	""	""	""	Q1-2019
1231	1231	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q1-2019
1232	1232	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 3)	6	Tuath Housing Association	""	""	""	""	""	Q1-2019
1233	1233	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 4)	6	Tuath Housing Association	""	""	""	""	""	Q2-2019
1234	1234	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 5)	4	Tuath Housing Association	""	""	""	""	""	Q2-2019
1235	1235	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 6)	5	Tuath Housing Association	""	""	""	""	""	Q3-2019
1236	1236	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 7)*	18	Tuath Housing Association	""	""	""	""	""	Q4-2019
1237	1237	CALF Construction	Kildare	Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)	35	Respond	""	""	""	""	Q1-2021	""
1238	1238	CALF Turnkey	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 1)*	21	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1239	1239	CALF Turnkey	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 2)	19	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1240	1240	CALF Turnkey	Kildare	Hawthorn Manor, Brockagh, Coill Dubh, Co. Kildare (Phase 1)*	5	Oaklee Housing	""	""	""	""	""	Q4-2019
1241	1241	CALF Turnkey	Kildare	Kilbelin Abbey, Kildare, Phase 1 (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1242	1242	CALF Turnkey	Kildare	Kilbelin Abbey, Kildare, Phase 2 (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	Q2-2019	""
1243	1243	CALF Turnkey	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	31	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1244	1244	CALF Turnkey	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	27	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1245	1245	CALF Turnkey	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	3	Clï¿½id Housing	""	""	""	""	Q4-2020	""
1246	1246	CALF Turnkey	Kildare	Leinster Square, Dublin Street, Kildare Town, Co Kildare (Phase 1)*	4	Clanmil Housing Association Ireland	""	""	""	""	""	Q3-2021
1247	1247	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1248	1248	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 2)*	17	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1249	1249	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 3)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1250	1250	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 4)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1251	1251	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 5)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
1252	1252	CALF Turnkey	Kildare	Main Street, Prosperous, Clane, Co. Kildare (Phase 1)*	16	Clanmil Housing Association Ireland	""	""	""	""	Q4-2020	""
1253	1253	CALF Turnkey	Kildare	Mariavilla and Elsmore, Kildare (Phase 1)*	15	Tuath Housing Association	""	""	""	""	""	Q4-2019
1254	1254	CALF Turnkey	Kildare	Mariavilla, Maynooth, Co. Kildare (Phase 1)*	11	Tuath Housing Association	""	""	""	""	Q3-2019	""
1255	1255	CALF Turnkey	Kildare	Melitta Road, Co. Kildare (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	Q2-2021	""	""
1256	1256	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Clï¿½id Housing	""	""	""	""	""	Q3-2018
1257	1257	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Clï¿½id Housing	""	""	""	""	""	Q1-2018
1258	1258	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q2-2018
1259	1259	CALF Turnkey	Kildare	Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 1)*	9	Tuath Housing Association	""	""	""	""	Q4-2019	""
1260	1260	CALF Turnkey	Kildare	Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 2)*	18	Tuath Housing Association	""	""	""	""	Q4-2019	""
1261	1261	CALF Turnkey	Kildare	Newtown, Kill, Co. Kildare (Phase 1)*	4	Tuath Housing Association	""	""	""	Q2-2021	""	""
1262	1262	CALF Turnkey	Kildare	Newtown, Kill, Co. Kildare (Phase 2)*	9	Tuath Housing Association	""	""	""	Q2-2021	""	""
1263	1263	CALF Turnkey	Kildare	Newtown, Kill, Co. Kildare (Phase 3)	24	Tuath Housing Association	""	""	""	Q2-2021	""	""
1264	1264	CALF Turnkey	Kildare	Newtown, Kill, Co. Kildare (Phase 4)*	2	Tuath Housing Association	""	""	""	Q2-2021	""	""
1265	1265	CALF Turnkey	Kildare	Oakpark, Craddockstown, Kildare (Phase 1)	6	Tuath Housing Association	""	""	""	""	""	Q4-2020
1266	1266	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	Tuath Housing Association	""	""	""	""	""	Q2-2018
1267	1267	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	Tuath Housing Association	""	""	""	""	""	Q3-2018
1268	1268	CALF Turnkey	Kildare	Phase 2, White Oaks, Newbridge, Kildare (Phase 1)	36	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1269	1269	CALF Turnkey	Kildare	Revised Rye Abbey, Kilcock, Co Kildare (apts)\n (Phase 1)	33	Clï¿½id Housing	""	""	""	""	""	Q2-2017
1270	1270	CALF Turnkey	Kildare	Riverside Green, Riverside Manor, Kilcullen, Co. Kildare (Phase 1)*	32	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1271	1271	CALF Turnkey	Kildare	Riverside Green, Riverside Manor, Kilcullen, Co. Kildare (Phase 2)*	16	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1272	1272	CALF Turnkey	Kildare	Riverside Green, Riverside Manor, Kilcullen, Co. Kildare (Phase 3)	16	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1273	1273	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
1274	1274	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	Tuath Housing Association	""	""	""	""	""	Q2-2017
1275	1275	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	Tuath Housing Association	""	""	""	""	""	Q4-2017
1276	1276	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	Tuath Housing Association	""	""	""	""	""	Q1-2018
1277	1277	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Clï¿½id Housing	""	""	""	""	""	Q2-2017
1278	1278	CALF Turnkey	Kildare	The Arches, Castlefarm, Naas, Co. Kildare (Phase 1)*	4	Tuath Housing Association	""	""	""	""	""	Q4-2020
1279	1279	CALF Turnkey	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 1)*	5	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1280	1280	CALF Turnkey	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 2)*	3	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1281	1281	CALF Turnkey	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 3)*	16	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1282	1282	CALF Turnkey	Kildare	The Paddocks, Newbridge, Co Kildare (Phase 1)	18	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1283	1283	CALF Turnkey	Kildare	The Paddocks, Newbridge, Kildare  (Phase 1)	26	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1284	1284	CALF Turnkey	Kildare	The Paddocks, Newbridge, Kildare  (Phase 2)	33	Clï¿½id Housing	""	""	""	""	Q2-2020	""
1285	1285	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	18	Respond	""	""	""	""	""	Q4-2019
1286	1286	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)*	18	Respond	""	""	""	""	""	Q2-2021
1287	1287	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 2)	32	Respond	""	""	""	""	""	Q2-2020
1288	1288	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 3) (Phase 1)	20	Respond	""	""	""	""	Q4-2019	""
1289	1289	CALF Turnkey	Kildare	Westfield, Leixlip, Co. Kildare (Phase 1)*	20	Respond	""	""	""	""	Q3-2020	""
1290	1290	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 1)*	14	Clï¿½id Housing	""	""	""	""	""	Q4-2018
1291	1291	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 2)	24	Clï¿½id Housing	""	""	""	""	""	Q4-2018
1292	1292	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 3)	20	Clï¿½id Housing	""	""	""	""	""	Q1-2019
1293	1293	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 4)	2	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1294	1294	CALF Turnkey	Kildare	Whitethorn, Naas, Co. Kildare (Phase 1)*	12	Tuath Housing Association	""	""	""	""	Q2-2020	""
1295	1295	CALF Turnkey	Kildare	Whitethorn, Naas, Co. Kildare (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q2-2020	""
1296	1296	CALF Turnkey	Kildare	Whitethorn, Naas, Co. Kildare (Phase 3)*	4	Tuath Housing Association	""	""	""	""	Q2-2020	""
1297	1297	CALF Turnkey	Kildare	Willouise, Sallins, Kildare (Phase 1)	31	Tuath Housing Association	""	""	""	""	""	Q4-2020
1298	1298	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas (Phase 1)	36	*N/A	""	""	""	""	""	Q2-2020
1299	1299	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas (Phase 2)	38	*N/A	""	""	""	""	""	Q3-2020
1300	1300	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	""	""	Q4-2019	""
1301	1301	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
1302	1302	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
1303	1303	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank	8	*N/A	""	""	""	""	""	Q1-2018
1304	1304	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
1305	1305	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank	1	*N/A	""	""	""	""	""	Q3-2018
1306	1306	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford (Phase 3)	18	*N/A	""	""	""	""	""	Q4-2018
1307	1307	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1308	1308	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
1309	1309	SHIP CONSTRUCTION TURNKEY	Kilkenny	Ogenty, Gowran	12	*N/A	""	""	""	""	""	Q4-2018
1310	1310	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Court, Hebron Road, Kilkenny	8	*N/A	""	""	""	""	Q3-2020	""
1311	1311	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Oakridge, Ferrybank, Co. Kilkenny	4	*N/A	""	""	""	""	""	Q2-2020
1312	1312	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Green, Hebron Road, Kilkenny	52	*N/A	""	""	""	""	Q3-2020	""
1313	1313	SHIP CONSTRUCTION TURNKEY	Kilkenny	Blackwater Grove, Kilmacow	14	*N/A	""	""	""	""	""	Q2-2021
1314	1314	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Ferrybank, Co. Kilkenny	15	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1315	1315	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Group Home Cloghabrody, Thomastown	4	*N/A	""	""	""	""	""	Q3-2020
1316	1316	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Inchacarron, Mullinavat	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1317	1317	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Shanganny, Jenkinstown	2	*N/A	""	""	""	""	Q4-2020	""
1318	1318	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Ayrfield, Granges Road, Kilkenny	6	*N/A	""	""	""	""	""	Q2-2021
1319	1319	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Old Fire Station, Graiguenamanagh	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1320	1320	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Ayrfield, Granges Road, Kilkenny	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1321	1321	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Haggardsgreen, Callan	1	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1322	1322	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	""	""	""	Q4-2019
1323	1323	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
1324	1324	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	6	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1325	1325	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	""	""	""	Q4-2020
1326	1326	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	""	""	""	Q2-2021
1327	1327	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	""	Q3-2020
1328	1328	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	""	Q2-2021
1329	1329	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
1330	1330	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
1331	1331	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	""	Q4-2018
1332	1332	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	18	*N/A	""	""	""	""	""	Q2-2021
1333	1333	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown, Co. Kilkenny	25	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1334	1334	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Kennyswell Road, Kilkenny	88	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1335	1335	SHIP CONSTRUCTION	Kilkenny	Canal Road, Johnstown, Co. Kilkenny Project 1	5	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1336	1336	SHIP CONSTRUCTION	Kilkenny	Canal Road Johnstown Project 2	2	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1337	1337	SHIP CONSTRUCTION	Kilkenny	Canal Road Johnstown Project 3	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1338	1338	CAS CONSTRUCTION TURNKEY	Kilkenny	Golf Links Road, Kilkenny	15	Respond	""	""	""	""	""	Q3-2019
1339	1339	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	4	Kingsriver Housing Association Limited	""	""	""	""	Q2-2021	""
1340	1340	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	""	Q4-2018
1341	1341	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
1342	1342	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	""	Q4-2018
1343	1343	CAS CONSTRUCTION	Kilkenny	Brooke House, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
1344	1344	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
1345	1345	CAS CONSTRUCTION	Kilkenny	Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
1346	1346	CAS CONSTRUCTION	Kilkenny	Red Barn, Patrick Street, Ballyragget	11	Good Shepherd Services Ltd	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1347	1347	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett	4	Oaklee Housing Trust	""	""	""	""	""	Q4-2018
1348	1348	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	3	Good Shepherd Services Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1349	1349	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1350	1350	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, Kilkenny	12	Good Shepherd Services Ltd	""	""	""	""	Q2-2021	""
1351	1351	CAS CONSTRUCTION	Kilkenny	Bridge Street, Callan	6	Good Shepherd Services Ltd	""	""	""	""	""	Q4-2019
1352	1352	CAS CONSTRUCTION	Kilkenny	Grennan Villa, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	Q3-2020	""
1353	1353	CAS CONSTRUCTION	Kilkenny	Fiennes Court, William Street, Kilkenny	7	Good Shepherd Services Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1354	1354	CAS CONSTRUCTION	Kilkenny	St. John of god Convent, College Road, Kilkenny	12	Sophia Housing Association Ltd	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1355	1355	CAS CONSTRUCTION	Kilkenny	The Round House, Kells, Co. Kilkenny	4	SOS Kilkenny Housing Association Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1356	1356	CAS CONSTRUCTION	Kilkenny	Ladywell Street, Thomastown, Co. Kilkenny	6	Good Shepherd Services Ltd	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
1357	1357	CAS CONSTRUCTION	Kilkenny	Dinan lodge,Suttonsrath, Jenkinstown, Co. Kilkenny	4	Kilkenny Voluntary Housing Association	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1358	1358	CAS CONSTRUCTION	Kilkenny	Maudlin Street, Thomastown, Co. Kilkenny	10	Kilkenny Voluntary Housing Association	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1359	1359	CAS CONSTRUCTION	Kilkenny	Mill Street, Callan, Co. Kilkenny	12	Kilkenny Voluntary Housing Association	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1360	1360	CAS CONSTRUCTION	Kilkenny	Prague House Hall, Freshford, co. Kilkenny	8	Kilkenny Voluntary Housing Association	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1361	1361	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
1362	1362	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 2)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
1363	1363	CALF Turnkey	Kilkenny	Cois Na Bearu, Graiguenemanagh, Kilkenny (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1364	1364	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	""	Q4-2019
1365	1365	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q2-2017
1366	1366	CALF Turnkey	Kilkenny	Love Lane, Castlecomer, Co. Kilkenny (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
1367	1367	CALF Turnkey	Kilkenny	Margaretï¿½s Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	""	""	Q2-2021
1368	1368	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	28	Respond	""	""	""	""	""	Q4-2020
1369	1369	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 2)*	22	Respond	""	""	""	""	Q4-2018	""
1370	1370	CALF Turnkey	Kilkenny	Oï¿½Loughlin Court, Kilkenny  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
1371	1371	CALF Turnkey	Kilkenny	Orchard Close, Kilkenny (Phase 1)*	23	Clï¿½id Housing	""	""	""	""	Q4-2020	""
1372	1372	CALF Construction	Kilkenny	Park Lane, Friary Walk, Callan, Co Kilkenny (Phase 1)*	16	Clï¿½id Housing	""	""	""	""	""	Q2-2019
1373	1373	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing	""	""	""	""	""	Q3-2018
1374	1374	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing	""	""	""	""	""	Q4-2019
1375	1375	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	6	*N/A	""	""	""	""	""	Q4-2020
1376	1376	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	5	*N/A	""	""	""	""	Q2-2020	""
1377	1377	SHIP CONSTRUCTION TURNKEY	Laois	Clonaslee	7	*N/A	""	""	""	""	""	Q4-2020
1378	1378	SHIP CONSTRUCTION TURNKEY	Laois	Bruach Na Habhainn, Killeen, Maganey	4	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1379	1379	SHIP CONSTRUCTION SINGLE STAGE	Laois	Harpurs Lane, Portlaoise	1	*N/A	""	""	""	""	""	Q4-2019
1380	1380	SHIP CONSTRUCTION SINGLE STAGE	Laois	Hillview, Portlaoise	2	*N/A	""	""	""	""	""	Q4-2020
1381	1381	SHIP CONSTRUCTION SINGLE STAGE	Laois	Coolroe, Ballybrittas	1	*N/A	""	""	""	""	Q4-2020	""
1382	1382	SHIP CONSTRUCTION SINGLE STAGE	Laois	The Orchard, Stradbally	6	*N/A	""	""	""	""	""	Q1-2020
1383	1383	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	""	""	""	Q3-2020	""
1384	1384	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	""	""	""	""	Q2-2021
1385	1385	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	""	""	""	Q4-2020	""
1386	1386	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	""	""	""	Q4-2020	""
1387	1387	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	""	""	""	Q2-2021
1388	1388	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
1389	1389	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1390	1390	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	7	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1391	1391	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	""	""	""	""	Q4-2020	""
1392	1392	SHIP CONSTRUCTION	Laois	St Kieran's Park, Errill	14	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1393	1393	SHIP CONSTRUCTION	Laois	Clonrooske, Knockmay	11	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1394	1394	SHIP CONSTRUCTION	Laois	Carraig Glas, Stradbally	26	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
1395	1395	SHIP CONSTRUCTION	Laois	Stradbally Road, Portlaoise	50	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1396	1396	SHIP CONSTRUCTION	Laois	Iona,Abbeyleix Rd., Portlaoise	9	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1397	1397	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	51	Sophia Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1398	1398	CAS CONSTRUCTION	Laois	County Hotel, Portlaoise	10	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1399	1399	CALF Turnkey	Laois	Ballickmoyler, Graiguecullen, Laois (Phase 1)*	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1400	1400	CALF Turnkey	Laois	Ballymorris Green, Portarlington, Co Laois (Phase 1)	12	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1401	1401	CALF Turnkey	Laois	Ballymorris Green, Portarlington, Co Laois (Phase 2)	20	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1402	1402	CALF Turnkey	Laois	Ballymorris Green, Portarlington, Co Laois (Phase 3)	14	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1403	1403	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 1)	4	Clï¿½id Housing	""	""	""	""	""	Q3-2019
1404	1404	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 2)	6	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1405	1405	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 3)	5	Clï¿½id Housing	""	""	""	""	""	Q2-2020
1406	1406	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 4)*	9	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1407	1407	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 5)*	6	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1408	1408	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 1)*	9	Tuath Housing Association	""	""	""	""	""	Q3-2020
1409	1409	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 2)*	8	Tuath Housing Association	""	""	""	""	""	Q3-2020
1410	1410	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 3)	10	Tuath Housing Association	""	""	""	""	""	Q4-2020
1411	1411	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 4)	9	Tuath Housing Association	""	""	""	""	""	Q1-2021
1412	1412	CALF Turnkey	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 1)	14	Clï¿½id Housing	""	""	""	""	Q4-2018	""
1413	1413	CALF Turnkey	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 2)*	6	Clï¿½id Housing	""	""	""	""	Q4-2018	""
1414	1414	CALF Turnkey	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 3)	12	Clï¿½id Housing	""	""	""	""	Q4-2018	""
1415	1415	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	Tuath Housing Association	""	""	""	""	""	Q3-2018
1416	1416	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	Tuath Housing Association	""	""	""	""	""	Q4-2018
1417	1417	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	Tuath Housing Association	""	""	""	""	""	Q4-2018
1418	1418	CALF Turnkey	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1419	1419	CALF Turnkey	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 2)	4	North & East Housing Association Ltd	""	""	""	""	""	Q4-2020
1420	1420	CALF Turnkey	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 3)*	6	North & East Housing Association Ltd	""	""	""	""	""	Q2-2021
1421	1421	CALF Turnkey	Laois	Droimnin, Stradbally, Co Laois  (Phase 1)	6	Clï¿½id Housing	""	""	""	""	""	Q3-2018
1422	1422	CALF Turnkey	Laois	Harpurs Lane, Portlaoise, Co. Laois (Phase 1)*	44	Respond	""	""	""	""	Q2-2021	""
1423	1423	CALF Turnkey	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 1)	10	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1424	1424	CALF Turnkey	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 2)	10	Clï¿½id Housing	""	""	""	""	Q3-2018	""
1425	1425	CALF Construction	Laois	Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Clï¿½id Housing	""	""	""	""	""	Q2-2018
1426	1426	CALF Turnkey	Laois	Knockmay Mews, Old Knockmay Road, Portlaoise, Co. Laois (Phase 1)	3	Tuath Housing Association	""	""	""	""	""	Q3-2020
1427	1427	CALF Turnkey	Laois	Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1428	1428	CALF Turnkey	Laois	Main Street, Stradbally, Co. Laois (Phase 1)	16	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1429	1429	CALF Turnkey	Laois	Phase 2 The Glen, Kilnacourt, Portarlington, Co Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1430	1430	CALF Turnkey	Laois	Phase 3 The Glen, Kilnacourt, Portarlington, Co Laois. (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
1431	1431	CALF Construction	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing	""	""	""	""	""	Q1-2018
1432	1432	CALF Turnkey	Laois	Rathillion, Killeshin, Co. Laois (Phase 1)*	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1433	1433	CALF Turnkey	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 1)	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1434	1434	CALF Turnkey	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 2)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1435	1435	CALF Turnkey	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 3)*	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1436	1436	CALF Turnkey	Laois	Spa Street, Droughill, Portarlington, Co. Laois (Phase 1)*	26	Oaklee Housing	""	""	""	""	Q4-2020	""
1437	1437	CALF Turnkey	Laois	The Glen, Kilnacourt, Portarlington, Co. Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
1438	1438	CALF Turnkey	Laois	The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 1)*	15	Clï¿½id Housing	""	""	""	""	Q1-2020	""
1439	1439	CALF Turnkey	Laois	The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 2)*	40	Clï¿½id Housing	""	""	""	""	Q1-2020	""
1440	1440	CALF Turnkey	Laois	The Meadows, Mountrath Road, Portlaoise, Co. Laois (Phase 1)*	48	Clï¿½id Housing	""	""	""	Q3-2021	""	""
1441	1441	CALF Turnkey	Laois	Wilton Lawns, Portarlington, Co. Laois (Phase 1)	2	Respond	""	""	""	""	Q2-2021	""
1442	1442	SHIP CONSTRUCTION TURNKEY	Leitrim	Roosky	7	*N/A	""	""	""	""	""	Q4-2019
1443	1443	SHIP CONSTRUCTION TURNKEY	Leitrim	Drumshanbo	9	*N/A	""	""	""	""	""	Q3-2019
1444	1444	SHIP CONSTRUCTION TURNKEY	Leitrim	Church Lane, Ballinamore	9	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1445	1445	SHIP CONSTRUCTION TURNKEY	Leitrim	Druminshingore, Newtowngore	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1446	1446	SHIP CONSTRUCTION TURNKEY	Leitrim	Carraig Breac, Drumshanbo	5	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1447	1447	SHIP CONSTRUCTION TURNKEY	Leitrim	Oakgrove, Kinlough	5	*N/A	""	""	""	""	""	Q4-2020
1448	1448	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Mohill	3	*N/A	""	""	""	""	""	Q4-2020
1449	1449	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Mohill	2	*N/A	""	""	""	""	""	Q1-2021
1450	1450	SHIP CONSTRUCTION TURNKEY	Leitrim	Lough Meen Estate, Drumkeerin	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1451	1451	SHIP CONSTRUCTION TURNKEY	Leitrim	Commons Lane, Manorhamilton	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1452	1452	SHIP CONSTRUCTION TURNKEY	Leitrim	Cluain Oir, Liscara, Carrick on Shannon	2	*N/A	""	""	""	""	""	Q2-2021
1453	1453	SHIP CONSTRUCTION TURNKEY	Leitrim	Manorhamilton & Carrigallen	2	*N/A	""	""	""	""	""	Q3-2021
1454	1454	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	St. Patricks Park Site, Carrick on Shannon	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1455	1455	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	Druminshingore Td., Newtowngore	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1456	1456	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	Dromahair Td., Dromahair	4	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1457	1457	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	""	""	Q4-2019	""
1458	1458	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	""	Q4-2018
1459	1459	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 3)	5	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1460	1460	SHIP CONSTRUCTION	Leitrim	Townparks, Carrick on Shannon	12	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1461	1461	SHIP CONSTRUCTION	Leitrim	Lahard, Ballinamore	10	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1462	1462	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
1463	1463	CALF Turnkey	Leitrim	Cnoc an Luir, Drumshanbo, Co. Leitrim (Phase 1)	10	Tuath Housing Association	""	""	""	""	""	Q4-2019
1464	1464	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	9	*N/A	""	""	""	""	""	Q4-2019
1465	1465	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	1	*N/A	""	""	""	""	""	Q4-2019
1466	1466	SHIP CONSTRUCTION TURNKEY	Limerick	Carraig Desmond, Newcastle West	8	*N/A	""	""	""	""	""	Q4-2019
1467	1467	SHIP CONSTRUCTION TURNKEY	Limerick	Knocklong	2	*N/A	""	""	""	""	""	Q4-2020
1468	1468	SHIP CONSTRUCTION TURNKEY	Limerick	Carraig Desmond, Newcastle West	2	*N/A	""	""	""	""	""	Q4-2019
1469	1469	SHIP CONSTRUCTION TURNKEY	Limerick	Redgate Close, Old Cratloe Road, Limerick City	14	*N/A	""	""	""	""	Q1-2020	""
1470	1470	SHIP CONSTRUCTION TURNKEY	Limerick	The Orchard, Main Street, Pallaskenry	8	*N/A	""	""	""	""	Q1-2020	""
1471	1471	SHIP CONSTRUCTION TURNKEY	Limerick	Gortboy, Charleville Road, kiImallock	33	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1472	1472	SHIP CONSTRUCTION TURNKEY	Limerick	The Orchard, Main Street, Pallaskenry	8	*N/A	""	""	""	""	Q1-2020	""
1473	1473	SHIP CONSTRUCTION TURNKEY	Limerick	Knocklong	5	*N/A	""	""	""	""	Q2-2021	""
1474	1474	SHIP CONSTRUCTION RAPID	Limerick	Faha View, Patrickswell	16	*N/A	""	""	""	""	""	Q4-2019
1475	1475	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	43	*N/A	""	""	""	""	""	Q2-2021
1476	1476	SHIP CONSTRUCTION	Limerick	Patrickï¿½s Villas, Castleconnell	4	*N/A	""	""	""	""	""	Q4-2020
1477	1477	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	""	""	Q1-2020	""
1478	1478	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	""	""	""	Q4-2020	""
1479	1479	SHIP CONSTRUCTION	Limerick	Burke Avenue, Limerick City	12	*N/A	""	""	""	""	""	Q4-2019
1480	1480	SHIP CONSTRUCTION	Limerick	Fannings Corner, Limerick City	3	*N/A	""	""	""	""	""	Q4-2019
1481	1481	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	""	""	""	""	Q4-2020
1482	1482	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	""	""	""	Q3-2019	""
1483	1483	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	""	""	Q3-2020	""
1484	1484	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1485	1485	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	""	Q4-2018
1486	1486	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	7	*N/A	""	""	""	""	""	Q4-2019
1487	1487	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	""	Q1-2019
1488	1488	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	""	Q3-2019
1489	1489	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	""	""	""	""	Q1-2021
1490	1490	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	""	""	""	""	Q2-2021
1491	1491	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
1492	1492	SHIP CONSTRUCTION	Limerick	Knocklong	12	*N/A	""	""	""	""	Q3-2021	""
1493	1493	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	4	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
1494	1494	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1495	1495	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
1496	1496	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhills Road	3	*N/A	""	""	""	""	Q2-2020	""
1497	1497	SHIP CONSTRUCTION	Limerick	Clueing Dara, Broadford, Limerick	18	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1498	1498	SHIP CONSTRUCTION	Limerick	Radharc an Ghleanna, Mountcollins	4	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1499	1499	SHIP CONSTRUCTION	Limerick	Oï¿½Connor Park, Ardagh, Co. Limerick	8	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1500	1500	SHIP CONSTRUCTION	Limerick	Church Glen, Ballylanders, Co. Limerick	9	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1501	1501	SHIP CONSTRUCTION	Limerick	Radharc Cillin, Kilfinane, Co. Limerick	10	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1502	1502	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
1503	1503	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
1504	1504	REGENERATION	Limerick	Sheep / Athlunkards Street	8	Tï¿½ath Housing Association Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1505	1505	REGENERATION	Limerick	Churchfield	19	*N/A	""	""	""	""	""	Q1-2018
1506	1506	REGENERATION	Limerick	Churchfield	38	Cluid Housing Association	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1507	1507	REGENERATION	Limerick	Cosgrave Park	30	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1508	1508	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1509	1509	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
1510	1510	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
1511	1511	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
1512	1512	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
1513	1513	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
1514	1514	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
1515	1515	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
1516	1516	REGENERATION	Limerick	Ballinacurra Weston Vacant Refurbs, Lot 1 & 2**	14	*N/A	""	""	""	""	""	Q4-2016
1517	1517	REGENERATION	Limerick	St. Mary's Park Infills	15	*N/A	""	""	""	""	""	Q4-2018
1518	1518	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Tï¿½ath Housing Association Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1519	1519	REGENERATION	Limerick	45A-46A Cliona Park	2	*N/A	""	""	""	""	""	Q3-2021
1520	1520	REGENERATION	Limerick	Dalgaish Park	27	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1521	1521	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1522	1522	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1523	1523	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
1524	1524	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1525	1525	REGENERATION	Limerick	Churchfield	23	*N/A	""	""	""	""	""	Q2-2018
1526	1526	REGENERATION	Limerick	St. Mary's Park Infills	4	*N/A	""	""	""	""	""	Q1-2019
1527	1527	REGENERATION	Limerick	Infill developments at Carew Park and Moyross	38	Peter McVerry Trust Ltd	""	""	""	""	Q1-2021	""
1528	1528	REGENERATION	Limerick	2019 Rebuilds (Southill, Moyross, St Mary's Park and Ballinacurra Weston)	8	*N/A	""	""	""	""	""	Q4-2019
1529	1529	CAS CONSTRUCTION TURNKEY	Limerick	Carebright Community, Ardykeohane, Bruff	6	Carebright Ltd	""	""	""	""	""	Q1-2019
1530	1530	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral Place	2	Arlington Novas Ireland Ltd	""	""	""	""	""	Q4-2019
1531	1531	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral place	3	Arlington Novas Ireland Ltd	""	""	""	""	""	Q1-2020
1532	1532	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral place	1	Arlington Novas Ireland Ltd	""	""	""	""	""	Q2-2020
1533	1533	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	16	Croom Voluntary Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1534	1534	CAS CONSTRUCTION	Limerick	Cappamore	10	Cappamore Housing Association Ltd	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1535	1535	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
1536	1536	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
1537	1537	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1538	1538	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
1539	1539	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	12	Peter McVerry Trust Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1540	1540	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1541	1541	CAS CONSTRUCTION	Limerick	McGarry House, 7 Alphonsus Street	8	Arlington Novas Ireland Ltd	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
1542	1542	CAS CONSTRUCTION	Limerick	47 & 48 Main Street, Croom, Limerick	4	Croom Voluntary Housing Association Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1543	1543	CAS CONSTRUCTION	Limerick	58 Henry Street	5	Simon Community : Midwest Simon	""	""	""	""	Q1-2021	""
1544	1544	CAS CONSTRUCTION	Limerick	28/29 Lower Gerald Griffin Street, Limerick	4	Peter McVerry Trust Ltd	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1545	1545	CAS CONSTRUCTION	Limerick	42 St Joseph's Street, Limerick	3	Peter McVerry Trust Ltd	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1546	1546	CALF Turnkey	Limerick	19 and 20 Castleview Shopping Centre Castleconnell  Limerick (Phase 1)	2	Focus Housing Association CLG	""	""	""	""	Q4-2019	""
1547	1547	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
1548	1548	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 2)	2	Respond	""	""	""	""	""	Q4-2018
1549	1549	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 3)	2	Respond	""	""	""	""	""	Q4-2018
1550	1550	CALF Turnkey	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 1)	46	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1551	1551	CALF Turnkey	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 2)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1552	1552	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 1)*	52	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1553	1553	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 2)	28	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1554	1554	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 3)*	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1555	1555	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 4)*	34	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1556	1556	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 1)*	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1557	1557	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 2)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1558	1558	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 3)*	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1559	1559	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 4)*	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1560	1560	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 5)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1561	1561	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2018
1562	1562	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
1563	1563	CALF Turnkey	Limerick	Cois Carraig, Clarina Village, Clarina, Co. Limerick (Phase 1)	18	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1564	1564	CALF Turnkey	Limerick	Dromsally Woods, Cappamore, Co. Limerick (Phase 1)	5	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
1565	1565	CALF Turnkey	Limerick	Glendale Lawn, Bloodmill Road, Limerick (Phase 1)	4	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1566	1566	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Clï¿½id Housing	""	""	""	""	""	Q1-2018
1567	1567	CALF Turnkey	Limerick	Laurelville, Mill Road, Corbally, Limerick (Phase 1)	4	Clï¿½id Housing	""	""	""	""	Q3-2018	""
1568	1568	CALF Turnkey	Limerick	Laurelville, Mill Road, Corbally, Limerick (Phase 2)*	9	Clï¿½id Housing	""	""	""	""	Q3-2018	""
1569	1569	CALF Turnkey	Limerick	Mungret Gate, Baunacloka, Mungret, Limerick (Phase 1)	8	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1570	1570	CALF Turnkey	Limerick	Mungret Gate, Baunacloka, Mungret, Limerick (Phase 2)*	23	Clï¿½id Housing	""	""	""	""	Q3-2018	""
1571	1571	CALF Turnkey	Limerick	Newtown, Castletroy, Limerick (Phase 1)*	31	Clï¿½id Housing	""	""	""	Q2-2021	""	""
1572	1572	CALF Turnkey	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Clï¿½id Housing	""	""	""	""	""	Q2-2017
1573	1573	CALF Turnkey	Limerick	Toormore, Main Street, Bruree, Co. Limerick (Phase 1)	16	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1574	1574	CALF Construction	Limerick	Turragh Crescent, Cappamore, Limerick (Phase 1)	15	Clï¿½id Housing	""	""	""	Q3-2021	""	""
1575	1575	CALF Turnkey	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 1)*	19	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1576	1576	CALF Turnkey	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 2)	11	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1577	1577	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	14	*N/A	""	""	""	""	""	Q4-2017
1578	1578	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough	4	*N/A	""	""	""	""	""	Q3-2018
1579	1579	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q1-2018
1580	1580	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck	7	*N/A	""	""	""	""	""	Q4-2018
1581	1581	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck	4	*N/A	""	""	""	""	""	Q3-2019
1582	1582	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck	6	*N/A	""	""	""	""	""	Q4-2019
1583	1583	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara	5	*N/A	""	""	""	""	""	Q4-2018
1584	1584	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard	14	*N/A	""	""	""	""	""	Q4-2019
1585	1585	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough	29	*N/A	""	""	""	""	""	Q4-2018
1586	1586	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q4-2019
1587	1587	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	4	*N/A	""	""	""	""	""	Q3-2019
1588	1588	SHIP CONSTRUCTION TURNKEY	Longford	Church Street, Edgeworthstown	5	*N/A	""	""	""	""	""	Q3-2020
1589	1589	SHIP CONSTRUCTION TURNKEY	Longford	Smithfield, Legan	18	*N/A	""	""	""	""	""	Q3-2020
1590	1590	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q4-2019
1591	1591	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q2-2019
1592	1592	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	6	*N/A	""	""	""	""	""	Q4-2019
1593	1593	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	4	*N/A	""	""	""	""	""	Q2-2019
1594	1594	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q3-2019
1595	1595	SHIP CONSTRUCTION TURNKEY	Longford	 Abhainn Glas, Edgeworthstown	4	*N/A	""	""	""	""	""	Q4-2019
1596	1596	SHIP CONSTRUCTION TURNKEY	Longford	Caislean Breac, Newtownforbes	2	*N/A	""	""	""	""	""	Q4-2019
1597	1597	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	4	*N/A	""	""	""	""	""	Q1-2020
1598	1598	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	4	*N/A	""	""	""	""	""	Q4-2019
1599	1599	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q4-2019
1600	1600	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	6	*N/A	""	""	""	""	""	Q4-2020
1601	1601	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	7	*N/A	""	""	""	""	""	Q4-2019
1602	1602	SHIP CONSTRUCTION TURNKEY	Longford	Slï¿½ Corglass, Legga	4	*N/A	""	""	""	""	""	Q1-2021
1603	1603	SHIP CONSTRUCTION TURNKEY	Longford	Radharc Na Muileann, Knock, Lanesborough	2	*N/A	""	""	""	""	""	Q4-2019
1604	1604	SHIP CONSTRUCTION TURNKEY	Longford	Pearse Drive, Longford Town	1	*N/A	""	""	""	""	""	Q4-2019
1605	1605	SHIP CONSTRUCTION TURNKEY	Longford	Cartrons, Kenagh	5	*N/A	""	""	""	""	""	Q4-2020
1606	1606	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	4	*N/A	""	""	""	""	""	Q3-2020
1607	1607	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	8	*N/A	""	""	""	""	""	Q1-2021
1608	1608	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	1	*N/A	""	""	""	""	""	Q4-2020
1609	1609	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane, Longford	6	*N/A	""	""	""	""	""	Q3-2021
1610	1610	SHIP CONSTRUCTION TURNKEY	Longford	O'Hara Site, Connaught Rd.,Longford	14	*N/A	""	""	""	""	Q1-2021	""
1611	1611	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	2	*N/A	""	""	""	""	""	Q4-2020
1612	1612	SHIP CONSTRUCTION TURNKEY	Longford	Alder Field, Farnagh Hill (Phase 2)	11	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1613	1613	SHIP CONSTRUCTION TURNKEY	Longford	Slï¿½ Corglass, Legga	4	*N/A	""	""	""	""	""	Q2-2021
1614	1614	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane, Longford	4	*N/A	""	""	""	""	""	Q2-2021
1615	1615	SHIP CONSTRUCTION TURNKEY	Longford	Slï¿½ Corglass, Legga 	1	*N/A	""	""	""	""	""	Q3-2021
1616	1616	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Lane, Longford	5	*N/A	""	""	""	""	""	Q2-2021
1617	1617	SHIP CONSTRUCTION TURNKEY	Longford	St. Patricks Ct., Ballinamuck	8	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1618	1618	SHIP CONSTRUCTION TURNKEY	Longford	Alder Field, Farnagh Hill	12	N/A	""	""	""	""	""	Q3-2021
1619	1619	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane, Longford	6	N/A	""	""	""	""	Q2-2021	""
1620	1620	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	""	Q3-2019
1621	1621	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
1622	1622	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	""	""	""	""	Q4-2019
1623	1623	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	""	""	""	Q3-2020	""
1624	1624	SHIP CONSTRUCTION	Longford	St.Rita's, Park Road, Longford	14	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1625	1625	SHIP CONSTRUCTION	Longford	Fairgreen View, Longford Town	1	*N/A	""	""	""	""	""	Q2-2021
1626	1626	SHIP CONSTRUCTION	Longford	Cranleymore, Abbeylara	3	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1627	1627	SHIP CONSTRUCTION	Longford	Cloonahard, Edgeworthstown	1	*N/A	""	""	""	""	""	Q2-2021
1628	1628	SHIP CONSTRUCTION	Longford	Woodlands Path, Keenagh	4	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1629	1629	SHIP CONSTRUCTION	Longford	Clough Dillons, Keenagh	4	N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1630	1630	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Clï¿½id Housing	""	""	""	""	""	Q1-2017
1631	1631	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Tuath Housing Association	""	""	""	Q2-2018	""	""
1632	1632	SHIP CONSTRUCTION TURNKEY	Louth	Brabazon Hall, Termonfeckin, Drogheda	5	*N/A	""	""	""	""	""	Q4-2019
1633	1633	SHIP CONSTRUCTION TURNKEY	Louth	ï¿½Gort Buiï¿½, Ballymakenny Road, Drogheda	13	*N/A	""	""	""	""	""	Q4-2020
1634	1634	SHIP CONSTRUCTION TURNKEY	Louth	Green Gates Manor, Haynestown, Dundalk	44	*N/A	""	""	""	""	""	Q2-2020
1635	1635	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk	16	*N/A	""	""	""	""	""	Q3-2020
1636	1636	SHIP CONSTRUCTION TURNKEY	Louth	ï¿½Gort Buiï¿½, Ballymakenny Road, Drogheda	9	*N/A	""	""	""	""	""	Q4-2020
1637	1637	SHIP CONSTRUCTION TURNKEY	Louth	ï¿½Gort Buiï¿½, Ballymakenny Road, Drogheda	10	*N/A	""	""	""	""	""	Q1-2021
1638	1638	SHIP CONSTRUCTION TURNKEY	Louth	ï¿½Gort Buiï¿½, Ballymakenny Road, Drogheda	9	*N/A	""	""	""	""	""	Q2-2021
1639	1639	SHIP CONSTRUCTION TURNKEY	Louth	ï¿½Gort Buiï¿½, Ballymakenny Road, Drogheda	8	*N/A	""	""	""	""	""	Q2-2021
1640	1640	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk	17	*N/A	""	""	""	""	""	Q4-2020
1641	1641	SHIP CONSTRUCTION TURNKEY	Louth	Bridgegate Close, Bridgegate, Ardee	1	*N/A	""	""	""	""	""	Q4-2020
1642	1642	SHIP CONSTRUCTION TURNKEY	Louth	Termon River, Termonfeckin	2	*N/A	""	""	""	""	""	Q4-2020
1643	1643	SHIP CONSTRUCTION TURNKEY	Louth	Glyde View, Tallanstown	2	*N/A	""	""	""	""	""	Q2-2021
1644	1644	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk	29	*N/A	""	""	""	""	""	Q4-2020
1645	1645	SHIP CONSTRUCTION TURNKEY	Louth	Termon River, Termonfeckin	1	*N/A	""	""	""	""	Q1-2018	""
1646	1646	SHIP CONSTRUCTION SINGLE STAGE	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
1647	1647	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2	4	*N/A	""	""	""	""	""	Q1-2018
1648	1648	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	7	*N/A	""	""	""	""	""	Q4-2016
1649	1649	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	5	*N/A	""	""	""	""	""	Q2-2017
1650	1650	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	3	*N/A	""	""	""	""	""	Q3-2017
1651	1651	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	7	*N/A	""	""	""	""	""	Q4-2017
1652	1652	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	1	*N/A	""	""	""	""	""	Q3-2018
1653	1653	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2	1	*N/A	""	""	""	""	""	Q3-2018
1654	1654	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2	2	*N/A	""	""	""	""	""	Q4-2019
1655	1655	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	2	*N/A	""	""	""	""	""	Q2-2017
1656	1656	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	1	*N/A	""	""	""	""	""	Q3-2017
1657	1657	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	4	*N/A	""	""	""	""	""	Q4-2017
1658	1658	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	2	*N/A	""	""	""	""	""	Q1-2019
1659	1659	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4	1	*N/A	""	""	""	""	""	Q3-2018
1660	1660	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	1	*N/A	""	""	""	""	""	Q1-2020
1661	1661	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4	5	*N/A	""	""	""	""	""	Q1-2019
1662	1662	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	1	*N/A	""	""	""	""	""	Q2-2018
1663	1663	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	4	*N/A	""	""	""	""	""	Q3-2018
1664	1664	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2	1	*N/A	""	""	""	""	""	Q1-2019
1665	1665	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2	1	*N/A	""	""	""	""	""	Q4-2018
1666	1666	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4	4	*N/A	""	""	""	""	""	Q4-2018
1667	1667	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	5	*N/A	""	""	""	""	""	Q4-2018
1668	1668	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4	1	*N/A	""	""	""	""	""	Q4-2018
1669	1669	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	2	*N/A	""	""	""	""	""	Q2-2019
1670	1670	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	2	*N/A	""	""	""	""	""	Q2-2019
1671	1671	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q1-2019
1672	1672	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	3	*N/A	""	""	""	""	""	Q4-2019
1673	1673	SHIP CONSTRUCTION SINGLE STAGE	Louth	Moneymore, Drogheda	1	*N/A	""	""	""	""	Q2-2020	""
1674	1674	SHIP CONSTRUCTION SINGLE STAGE	Louth	Gort Uaine, Clogherhead	1	*N/A	""	""	""	""	Q3-2020	""
1675	1675	SHIP CONSTRUCTION SINGLE STAGE	Louth	School Lane, Dunleer	1	*N/A	""	""	""	""	Q3-2020	""
1676	1676	SHIP CONSTRUCTION SINGLE STAGE	Louth	Doire Beag, Collon	6	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1677	1677	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2	1	*N/A	""	""	""	""	""	Q3-2019
1678	1678	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6	1	*N/A	""	""	""	""	""	Q3-2019
1679	1679	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	4	*N/A	""	""	""	""	""	Q3-2019
1680	1680	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6	2	*N/A	""	""	""	""	""	Q4-2019
1681	1681	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q1-2020
1682	1682	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1683	1683	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1684	1684	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1685	1685	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q4-2020
1686	1686	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6	1	*N/A	""	""	""	""	""	Q3-2020
1687	1687	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
1688	1688	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2), Drogheda	72	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1689	1689	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	""	""	""	""	Q2-2021
1690	1690	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	93	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1691	1691	SHIP CONSTRUCTION	Louth	Muirhevnamor, Dundalk (Phase 1)	11	*N/A	""	""	""	""	Q1-2021	""
1692	1692	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
1693	1693	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	""	""	""	Q1-2020	""
1694	1694	CAS CONSTRUCTION TURNKEY	Louth	Liscorrie, Bog Road, Drogheda	12	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q2-2021
1695	1695	CAS CONSTRUCTION	Louth	5 Slieveroe Crescent, Dundalk	1	Cluid Housing Association	""	""	""	""	Q1-2021	""
1696	1696	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1697	1697	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	""	Q4-2018
1698	1698	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1699	1699	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
1700	1700	CAS CONSTRUCTION	Louth	Coulter Park, Dundalk	7	Tï¿½ath Housing Association Ltd	""	""	""	""	Q3-2021	""
1701	1701	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1702	1702	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda	4	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1703	1703	CAS CONSTRUCTION	Louth	Riverwell Close, Dundalk	1	Respond	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1704	1704	CAS CONSTRUCTION	Louth	Highfield, Newry Road, Dundalk (Domestic Violence Refuge)	12	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1705	1705	CAS CONSTRUCTION	Louth	10-16 The Alleys, St. Peter's Place, Drogheda	14	Peter McVerry Trust Ltd	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1706	1706	CALF Turnkey	Louth	2 units An Rian, Termonfeckin Rd., Drogheda, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1707	1707	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
1708	1708	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	Tuath Housing Association	""	""	""	""	""	Q3-2020
1709	1709	CALF Turnkey	Louth	Carlinn Drive, Mullaharlin Road, Dundalk, Co. Louth (Phase 1)	6	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1710	1710	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Clï¿½id Housing	""	""	""	""	""	Q1-2017
1711	1711	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Clï¿½id Housing	""	""	""	""	""	Q1-2017
1712	1712	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	Tuath Housing Association	""	""	""	""	""	Q1-2018
1713	1713	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	Tuath Housing Association	""	""	""	""	""	Q1-2018
1714	1714	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	Tuath Housing Association	""	""	""	""	""	Q3-2018
1715	1715	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	Tuath Housing Association	""	""	""	""	""	Q3-2018
1716	1716	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	Tuath Housing Association	""	""	""	""	""	Q4-2018
1717	1717	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	22	Tuath Housing Association	""	""	""	""	""	Q4-2018
1718	1718	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 7)	22	Tuath Housing Association	""	""	""	""	""	Q2-2019
1719	1719	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 1)*	16	Tuath Housing Association	""	""	""	""	""	Q1-2021
1720	1720	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 2)	10	Tuath Housing Association	""	""	""	""	""	Q2-2021
1721	1721	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 3)	16	Tuath Housing Association	""	""	""	""	Q1-2020	""
1722	1722	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 4)	11	Tuath Housing Association	""	""	""	""	Q1-2020	""
1723	1723	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 5)	12	Tuath Housing Association	""	""	""	""	Q1-2020	""
1724	1724	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 1)	12	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1725	1725	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 2)*	15	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1726	1726	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 3)	15	Clï¿½id Housing	""	""	""	""	Q3-2019	""
1727	1727	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 4)	13	Clï¿½id Housing	""	""	""	""	Q3-2019	""
1728	1728	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	Tuath Housing Association	""	""	""	""	""	Q4-2018
1729	1729	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	8	Tuath Housing Association	""	""	""	""	""	Q1-2019
1730	1730	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	7	Tuath Housing Association	""	""	""	""	""	Q2-2019
1731	1731	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Clï¿½id Housing	""	""	""	""	""	Q1-2017
1732	1732	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Clï¿½id Housing	""	""	""	""	""	Q3-2017
1733	1733	CALF Turnkey	Louth	Donore Road, Drogheda, Co. Louth (Phase 1)	66	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1734	1734	CALF Turnkey	Louth	Dowdallshill, Dundalk, Co. Louth (Phase 1)*	13	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1735	1735	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)*	65	Respond	""	""	""	""	Q4-2020	""
1736	1736	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 1)*	14	Respond	""	""	""	""	""	Q1-2019
1737	1737	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 2)*	14	Respond	""	""	""	""	""	Q4-2019
1738	1738	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 3)	3	Respond	""	""	""	""	Q3-2017	""
1739	1739	CALF Turnkey	Louth	Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 1)*	87	Clï¿½id Housing	""	""	""	""	Q4-2020	""
1740	1740	CALF Turnkey	Louth	Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 2)	43	Clï¿½id Housing	""	""	""	""	Q4-2020	""
1741	1741	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	11	Tuath Housing Association	""	""	""	""	""	Q2-2019
1742	1742	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	14	Tuath Housing Association	""	""	""	""	""	Q2-2019
1743	1743	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	15	Tuath Housing Association	""	""	""	""	""	Q2-2019
1744	1744	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	47	Tuath Housing Association	""	""	""	""	""	Q3-2019
1745	1745	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	24	Tuath Housing Association	""	""	""	""	""	Q4-2019
1746	1746	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 6)*	1	Tuath Housing Association	""	""	""	""	""	Q4-2020
1747	1747	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1748	1748	CALF Turnkey	Louth	Haliday Mills, Quay Street, Dundalk, Co. Louth (Phase 1)*	85	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1749	1749	CALF Turnkey	Louth	Harbour Grove, Dundalk, Co. Louth (Phase 1)	8	North & East Housing Association Ltd	""	""	""	""	""	Q2-2020
1750	1750	CALF Turnkey	Louth	Harbour View, Coulter Place, Dundalk (Phase 1)	24	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1751	1751	CALF Turnkey	Louth	Knock Shee Close, Blackrock, Co. Louth (Phase 1)	1	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1752	1752	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Clï¿½id Housing	""	""	""	""	""	Q4-2017
1753	1753	CALF Turnkey	Louth	Knockshee Close, Blackrock, Co. Louth (Phase 1)	3	Clï¿½id Housing	""	""	""	""	""	Q2-2020
1754	1754	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	Tuath Housing Association	""	""	""	""	""	Q4-2017
1755	1755	CALF Turnkey	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 1)*	15	Tuath Housing Association	""	""	""	""	""	Q4-2020
1756	1756	CALF Turnkey	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 2)	8	Tuath Housing Association	""	""	""	""	""	Q1-2021
1757	1757	CALF Turnkey	Louth	Mount Hamilton, Dundalk, Co. Louth (Phase 1)	20	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1758	1758	CALF Turnkey	Louth	Newfoundwell Road, Drogheda, Co Louth (Phase 1)*	55	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1759	1759	CALF Turnkey	Louth	Newfoundwell Road, Drogheda, Co Louth (Phase 2)	39	Clï¿½id Housing	""	""	""	""	Q3-2020	""
1760	1760	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 1)*	17	Respond	""	""	""	""	Q4-2020	""
1761	1761	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 2)*	23	Respond	""	""	""	""	Q4-2020	""
1762	1762	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 3)*	46	Respond	""	""	""	""	Q4-2020	""
1763	1763	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 4)*	47	Respond	""	""	""	""	Q4-2020	""
1764	1764	CALF Turnkey	Louth	Oriel Heights, Collon, Co. Louth (Phase 1)*	13	North & East Housing Association Ltd	""	""	""	Q3-2021	""	""
1765	1765	CALF Construction	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	Tuath Housing Association	""	""	""	""	""	Q2-2018
1766	1766	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 1)	20	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1767	1767	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 2)*	25	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1768	1768	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q4-2019
1769	1769	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 2)*	16	Tuath Housing Association	""	""	""	""	Q1-2019	""
1770	1770	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 3)*	19	Tuath Housing Association	""	""	""	""	Q1-2019	""
1771	1771	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Clï¿½id Housing	""	""	""	""	""	Q3-2016
1772	1772	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1773	1773	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	6	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1774	1774	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	3	North & East Housing Association Ltd	""	""	""	""	""	Q3-2019
1775	1775	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	14	North & East Housing Association Ltd	""	""	""	""	""	Q3-2019
1776	1776	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	12	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1777	1777	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 6)	16	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1778	1778	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q2-2018
1779	1779	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q3-2018
1780	1780	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	Tuath Housing Association	""	""	""	""	""	Q3-2018
1781	1781	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	Tuath Housing Association	""	""	""	""	""	Q4-2018
1782	1782	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	Tuath Housing Association	""	""	""	""	""	Q2-2019
1783	1783	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	4	Tuath Housing Association	""	""	""	""	""	Q4-2019
1784	1784	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 7)	12	Tuath Housing Association	""	""	""	""	""	Q3-2020
1785	1785	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Clï¿½id Housing	""	""	""	""	""	Q4-2017
1786	1786	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	15	Clï¿½id Housing	""	""	""	""	""	Q3-2019
1787	1787	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	16	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1788	1788	CALF Turnkey	Louth	Scotch Hall, Drogheda, Co Louth  (Phase 1)	21	Respond	""	""	""	Q3-2021	""	""
1789	1789	CALF Construction	Louth	Slieve Row Crescent, Dundalk (Phase 1)	1	Clï¿½id Housing	""	""	""	""	""	Q2-2016
1790	1790	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Co. Louth (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1791	1791	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1792	1792	CALF Turnkey	Louth	Tullybrook, Drogheda, Co. Louth  (Phase 1)*	85	Clï¿½id Housing	""	""	""	""	Q1-2021	""
1793	1793	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	""	""	Q2-2020
1794	1794	SHIP CONSTRUCTION TURNKEY	Mayo	Carrabeg, Newport Road, Castlebar	2	*N/A	""	""	""	""	""	Q4-2018
1795	1795	SHIP CONSTRUCTION TURNKEY	Mayo	Cois Abhainn, Bonniconlon	2	*N/A	""	""	""	""	""	Q2-2019
1796	1796	SHIP CONSTRUCTION TURNKEY	Mayo	Chapel Street, Louisburgh	3	*N/A	""	""	""	""	""	Q4-2019
1797	1797	SHIP CONSTRUCTION TURNKEY	Mayo	Bunree, Ballina	3	*N/A	""	""	""	""	Q4-2019	""
1798	1798	SHIP CONSTRUCTION TURNKEY	Mayo	Heathervale, Castlebar - Phase 2	9	*N/A	""	""	""	""	""	Q4-2020
1799	1799	SHIP CONSTRUCTION TURNKEY	Mayo	Friars Court, Ballina	2	*N/A	""	""	""	""	""	Q4-2019
1800	1800	SHIP CONSTRUCTION TURNKEY	Mayo	Riverside Drive, Ballina	3	*N/A	""	""	""	""	""	Q4-2019
1801	1801	SHIP CONSTRUCTION TURNKEY	Mayo	Davitt Terrace, Castlebar	4	*N/A	""	""	""	""	""	Q4-2019
1802	1802	SHIP CONSTRUCTION TURNKEY	Mayo	Chapel St., Louisburgh	2	*N/A	""	""	""	""	""	Q4-2020
1803	1803	SHIP CONSTRUCTION TURNKEY	Mayo	Ard Rua, Claremorris	7	*N/A	""	""	""	""	""	Q4-2019
1804	1804	SHIP CONSTRUCTION TURNKEY	Mayo	Silver Springs, Claremorris	20	*N/A	""	""	""	""	Q3-2020	""
1805	1805	SHIP CONSTRUCTION TURNKEY	Mayo	Barley Hill, Bohola	3	*N/A	""	""	""	""	""	Q4-2020
1806	1806	SHIP CONSTRUCTION TURNKEY	Mayo	Main St., Charlestown	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1807	1807	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Pound Road, Castlebar	6	*N/A	""	""	""	""	""	Q4-2019
1808	1808	SHIP CONSTRUCTION SINGLE STAGE	Mayo	The Boreen, Crossmolina	3	*N/A	""	""	""	""	Q1-2020	""
1809	1809	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Deel Court, Crossmolina	3	*N/A	""	""	""	""	Q1-2020	""
1810	1810	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Kilmaine	6	*N/A	""	""	""	""	""	Q4-2019
1811	1811	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Knockroe, Moygownagh	3	*N/A	""	""	""	""	Q1-2020	""
1812	1812	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Low Park, Charlestown	3	*N/A	""	""	""	""	Q3-2020	""
1813	1813	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	""	Q2-2019
1814	1814	SHIP CONSTRUCTION	Mayo	ï¿½it Aoibhinn, Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
1815	1815	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
1816	1816	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	""	Q1-2019
1817	1817	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1818	1818	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	""	""	Q4-2019
1819	1819	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	""	""	Q4-2019
1820	1820	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
1821	1821	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	""	""	""	Q4-2020
1822	1822	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	5	*N/A	""	""	""	""	""	Q4-2019
1823	1823	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	""	""	Q4-2020
1824	1824	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
1825	1825	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
1826	1826	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	""	""	""	Q4-2019
1827	1827	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	""	""	""	Q4-2019
1828	1828	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar - Phase 2	22	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
1829	1829	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	""	""	""	Q4-2020
1830	1830	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1831	1831	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
1832	1832	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1833	1833	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
1834	1834	SHIP CONSTRUCTION	Mayo	Cross	15	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
1835	1835	SHIP CONSTRUCTION	Mayo	Bonniconlon	5	*N/A	""	""	""	""	Q2-2020	""
1836	1836	SHIP CONSTRUCTION	Mayo	Cloonkeadagh Road, Kiltimagh	21	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1837	1837	SHIP CONSTRUCTION	Mayo	Rehins Fort, Ballina	20	*N/A	""	""	""	""	Q3-2021	""
1838	1838	SHIP CONSTRUCTION	Mayo	Murrevagh, Mulranney	14	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1839	1839	SHIP CONSTRUCTION	Mayo	50 Units @ Golf Course Rd., Westport	50	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
1840	1840	SHIP CONSTRUCTION	Mayo	Ballyglass, Carnacon, Claremorris	6	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1841	1841	SHIP CONSTRUCTION	Mayo	Lios na Circe, Saleen, Castlebar - Phase 3	14	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1842	1842	SHIP CONSTRUCTION	Mayo	7 St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
1843	1843	SHIP CONSTRUCTION	Mayo	Atlantic Drive ,Belmullet	4	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1844	1844	SHIP CONSTRUCTION	Mayo	Liskilleen, Ballinrobe,	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1845	1845	SHIP CONSTRUCTION	Mayo	Walsh St., Ballina	8	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1846	1846	SHIP CONSTRUCTION	Mayo	Main Street, Ballyvary	10	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1847	1847	SHIP CONSTRUCTION	Mayo	Rehins Fort, Foxford Rd., Ballina	30	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1848	1848	SHIP CONSTRUCTION	Mayo	AchilL Sound	20	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1849	1849	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
1850	1850	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2018
1851	1851	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
1852	1852	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
1853	1853	CAS CONSTRUCTION	Mayo	Ellison House, Ellison St., Castlebar	8	Peter McVerry Trust Ltd	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1854	1854	CALF Turnkey	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 1)	4	Tuath Housing Association	""	""	""	""	Q3-2020	""
1855	1855	CALF Turnkey	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 2)	4	Tuath Housing Association	""	""	""	""	Q3-2020	""
1856	1856	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
1857	1857	CALF Turnkey	Mayo	Humbert Way, Castlebar, Co. Mayo (Phase 1)	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1858	1858	CALF Turnkey	Mayo	Monamore, Lodge Road, Westport, Co. Mayo (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q4-2019
1859	1859	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1860	1860	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	19	*N/A	""	""	""	""	""	Q4-2018
1861	1861	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	16	*N/A	""	""	""	""	""	Q4-2018
1862	1862	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	8	*N/A	""	""	""	""	""	Q3-2019
1863	1863	SHIP CONSTRUCTION TURNKEY	Meath	Bracken Hill, Kilmessan	3	*N/A	""	""	""	""	""	Q4-2019
1864	1864	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	4	*N/A	""	""	""	""	""	Q3-2019
1865	1865	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	5	*N/A	""	""	""	""	""	Q4-2018
1866	1866	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	4	*N/A	""	""	""	""	""	Q3-2019
1867	1867	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan 	8	*N/A	""	""	""	""	""	Q2-2019
1868	1868	SHIP CONSTRUCTION TURNKEY	Meath	Cois na Mara, Bettystown	2	*N/A	""	""	""	""	""	Q3-2019
1869	1869	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	14	*N/A	""	""	""	""	""	Q4-2019
1870	1870	SHIP CONSTRUCTION TURNKEY	Meath	Cherry Hill Court, Kells	2	*N/A	""	""	""	""	""	Q4-2019
1871	1871	SHIP CONSTRUCTION TURNKEY	Meath	Broadmeadow Vale, Rathoath	2	*N/A	""	""	""	""	""	Q4-2019
1872	1872	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	11	*N/A	""	""	""	""	""	Q4-2020
1873	1873	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	15	*N/A	""	""	""	""	""	Q4-2020
1874	1874	SHIP CONSTRUCTION TURNKEY	Meath	The Brambles, Longford rd., Duleek	16	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1875	1875	SHIP CONSTRUCTION TURNKEY	Meath	26 Willow Green, Dunshaughlin	1	*N/A	""	""	""	""	""	Q3-2020
1876	1876	SHIP CONSTRUCTION TURNKEY	Meath	Seoid na Tra, Bettytown	2	*N/A	""	""	""	""	""	Q3-2020
1877	1877	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	1	*N/A	""	""	""	""	""	Q4-2020
1878	1878	SHIP CONSTRUCTION TURNKEY	Meath	Connaught Street, Athboy	7	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1879	1879	SHIP CONSTRUCTION SINGLE STAGE	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	""	Q4-2018
1880	1880	SHIP CONSTRUCTION SINGLE STAGE	Meath	The Belfry, Trim	3	*N/A	""	""	""	""	""	Q4-2019
1881	1881	SHIP CONSTRUCTION SINGLE STAGE	Meath	Broville, Corballis, Laytown	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1882	1882	SHIP CONSTRUCTION SINGLE STAGE	Meath	11 Glenidan Court, Enfield	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1883	1883	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	""	""	""	""	Q4-2019
1884	1884	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	""	""	""	""	Q4-2019
1885	1885	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	""	""	""	""	Q4-2019
1886	1886	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	""	Q4-2020
1887	1887	SHIP CONSTRUCTION	Meath	St. Oliver's Park, Ratoath	17	*N/A	""	""	""	""	""	Q4-2019
1888	1888	SHIP CONSTRUCTION	Meath	Riverside (Townparks), Kells	40	*N/A	""	""	""	""	""	Q4-2020
1889	1889	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	""	Q1-2019
1890	1890	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
1891	1891	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	""	""	""	Q4-2020
1892	1892	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	""	""	""	Q4-2020	""
1893	1893	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	""	""	""	Q1-2020	""
1894	1894	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
1895	1895	SHIP CONSTRUCTION	Meath	Farganstown, Navan	84	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1896	1896	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1897	1897	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1898	1898	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	15	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1899	1899	SHIP CONSTRUCTION	Meath	Castle Street, Ashbourne - Dept of Education Site	74	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1900	1900	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	22	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1901	1901	SHIP CONSTRUCTION	Meath	Church Street, Kells, Co. Meath	3	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1902	1902	SHIP CONSTRUCTION	Meath	Haggard Street, Trim, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1903	1903	SHIP CONSTRUCTION	Meath	Pitcher Lane, Kells, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1904	1904	SHIP CONSTRUCTION	Meath	Swan Lane, Balreask	6	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1905	1905	SHIP CONSTRUCTION	Meath	Carrick St., Kells	43	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1906	1906	SHIP CONSTRUCTION	Meath	Lagore, Dunshaughlin	34	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1907	1907	SHIP CONSTRUCTION	Meath	Convent Lands, Kildalkey, Athboy	20	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1908	1908	SHIP CONSTRUCTION	Meath	Ratholdren Court, Navan	26	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1909	1909	CAS CONSTRUCTION TURNKEY	Meath	Bridge Street, Ashbourne, Co Meath  	20	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1910	1910	CAS CONSTRUCTION TURNKEY	Meath	Gainsfield, Commons Road, Navan Co. Meath	6	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q2-2021
1911	1911	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q4-2018
1912	1912	CAS CONSTRUCTION	Meath	Women's Refuge, Tailteann Drive, Windtown, Navan	8	Meath Womenï¿½s Housing Association CLG	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1913	1913	CAS CONSTRUCTION	Meath	Park Avenue, Oldcastle	5	Society of Saint Vincent de Paul	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1914	1914	CALF Turnkey	Meath	18 units Churchfields, Ashbourne, Co. Meath (Phase 1)	18	Tuath Housing Association	""	""	""	""	""	Q4-2018
1915	1915	CALF Turnkey	Meath	5 units Dunville, Athlumney, Navan, Co. Meath (Phase 1)	5	Tuath Housing Association	""	""	""	""	""	Q1-2019
1916	1916	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Clï¿½id Housing	""	""	""	""	""	Q1-2018
1917	1917	CALF Turnkey	Meath	Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 1)	6	Tuath Housing Association	""	""	""	""	Q3-2020	""
1918	1918	CALF Turnkey	Meath	Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 2)*	15	Tuath Housing Association	""	""	""	""	Q3-2020	""
1919	1919	CALF Turnkey	Meath	Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1920	1920	CALF Turnkey	Meath	Ashewood, Ashbourne, Co Meath (Phase 1)	11	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1921	1921	CALF Turnkey	Meath	Athboy Road, Navan, Co. Meath (Phase 1)*	63	Respond	""	""	""	""	Q1-2020	""
1922	1922	CALF Turnkey	Meath	Blackcastle, Slane Road, Navan, Co. Meath (Phase 1)	9	Tuath Housing Association	""	""	""	""	""	Q4-2018
1923	1923	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 1)*	1	Tuath Housing Association	""	""	""	""	""	Q2-2019
1924	1924	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 2)*	1	Tuath Housing Association	""	""	""	""	""	Q2-2019
1925	1925	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 3)*	10	Tuath Housing Association	""	""	""	""	""	Q4-2019
1926	1926	CALF Turnkey	Meath	Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 1)*	24	Tuath Housing Association	""	""	""	""	Q1-2021	""
1927	1927	CALF Turnkey	Meath	Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q1-2021	""
1928	1928	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Clï¿½id Housing	""	""	""	""	""	Q2-2018
1929	1929	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Clï¿½id Housing	""	""	""	""	""	Q3-2018
1930	1930	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Clï¿½id Housing	""	""	""	""	""	Q4-2017
1931	1931	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	Tuath Housing Association	""	""	""	""	""	Q2-2017
1932	1932	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 1)*	10	Tuath Housing Association	""	""	""	""	""	Q4-2018
1933	1933	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 2)*	3	Tuath Housing Association	""	""	""	""	""	Q2-2019
1934	1934	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 3)*	12	Tuath Housing Association	""	""	""	""	""	Q4-2019
1935	1935	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1936	1936	CALF Turnkey	Meath	Commons, Duleek, Co. Meath (Phase 1)*	22	North & East Housing Association Ltd	""	""	""	""	Q1-2021	""
1937	1937	CALF Turnkey	Meath	Dun Eimear, Bettystown, Co. Meath (Phase 1)*	12	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1938	1938	CALF Turnkey	Meath	Dun Eimear, Bettystown, Co. Meath (Phase 2)*	11	Clï¿½id Housing	""	""	""	""	""	Q4-2019
1939	1939	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	Tuath Housing Association	""	""	""	""	""	Q1-2018
1940	1940	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	Tuath Housing Association	""	""	""	""	""	Q1-2018
1941	1941	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)*	10	Tuath Housing Association	""	""	""	""	""	Q2-2018
1942	1942	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	6	Tuath Housing Association	""	""	""	""	""	Q2-2018
1943	1943	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	Tuath Housing Association	""	""	""	""	""	Q2-2018
1944	1944	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	Tuath Housing Association	""	""	""	""	""	Q3-2018
1945	1945	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Clï¿½id Housing	""	""	""	""	""	Q1-2019
1946	1946	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)*	1	Tuath Housing Association	""	""	""	""	""	Q3-2018
1947	1947	CALF Turnkey	Meath	Frederick Manor, Ashbourne, Co. Meath (Phase 1)*	11	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1948	1948	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 1)	20	Tuath Housing Association	""	""	""	""	""	Q4-2019
1949	1949	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 2)	18	Tuath Housing Association	""	""	""	""	""	Q4-2020
1950	1950	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)	7	Tuath Housing Association	""	""	""	""	""	Q1-2021
1951	1951	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 4)	9	Tuath Housing Association	""	""	""	""	""	Q2-2021
1952	1952	CALF Turnkey	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 1)	19	Tuath Housing Association	""	""	""	""	Q4-2020	""
1953	1953	CALF Turnkey	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 2)	15	Tuath Housing Association	""	""	""	""	Q4-2020	""
1954	1954	CALF Turnkey	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 3)	15	Tuath Housing Association	""	""	""	""	Q4-2020	""
1955	1955	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	Tuath Housing Association	""	""	""	""	""	Q2-2018
1956	1956	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	Tuath Housing Association	""	""	""	""	""	Q1-2018
1957	1957	CALF Turnkey	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 1)	5	Tuath Housing Association	""	""	""	""	""	Q3-2021
1958	1958	CALF Turnkey	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 2)	5	Tuath Housing Association	""	""	""	""	""	Q3-2021
1959	1959	CALF Turnkey	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 3)	6	Tuath Housing Association	""	""	""	""	Q3-2020	""
1960	1960	CALF Turnkey	Meath	Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 1)*	11	Tuath Housing Association	""	""	""	""	Q3-2021	""
1961	1961	CALF Turnkey	Meath	Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 2)*	11	Tuath Housing Association	""	""	""	""	Q3-2021	""
1962	1962	CALF Turnkey	Meath	Maudelins Brook, Duleek, Co.Meath (Phase 1)*	20	Respond	""	""	""	""	""	Q4-2019
1963	1963	CALF Turnkey	Meath	Maydenhayes, Donacarney, Co. Meath (Phase 1)*	12	Clï¿½id Housing	""	""	""	""	""	Q3-2021
1964	1964	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing	""	""	""	""	""	Q4-2016
1965	1965	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
1966	1966	CALF Turnkey	Meath	Millteog, Athboy Road, Trim, Co. Meath (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q4-2019
1967	1967	CALF Turnkey	Meath	Millteog, Athboy Road, Trim, Co. Meath (Phase 2)*	9	Oaklee Housing	""	""	""	""	""	Q2-2020
1968	1968	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Clï¿½id Housing	""	""	""	""	""	Q1-2017
1969	1969	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Clï¿½id Housing	""	""	""	""	""	Q4-2017
1970	1970	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Clï¿½id Housing	""	""	""	""	""	Q4-2017
1971	1971	CALF Turnkey	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 1)*	13	Tuath Housing Association	""	""	""	""	""	Q4-2020
1972	1972	CALF Turnkey	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 1)	6	Tuath Housing Association	""	""	""	""	Q2-2021	""
1973	1973	CALF Turnkey	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 2)	6	Tuath Housing Association	""	""	""	""	Q2-2021	""
1974	1974	CALF Turnkey	Meath	Oldbridge Manor, Drogheda, Co. Meath (Phase 1)*	29	Tuath Housing Association	""	""	""	""	""	Q4-2020
1975	1975	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	3	Tuath Housing Association	""	""	""	""	""	Q4-2018
1976	1976	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 10)	5	Tuath Housing Association	""	""	""	""	""	Q4-2020
1977	1977	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q2-2019
1978	1978	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 3)	2	Tuath Housing Association	""	""	""	""	""	Q3-2019
1979	1979	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 4)	5	Tuath Housing Association	""	""	""	""	""	Q3-2019
1980	1980	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 5)	4	Tuath Housing Association	""	""	""	""	""	Q4-2019
1981	1981	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 6)	6	Tuath Housing Association	""	""	""	""	""	Q1-2020
1982	1982	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 7)	3	Tuath Housing Association	""	""	""	""	""	Q1-2020
1983	1983	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 8)	4	Tuath Housing Association	""	""	""	""	""	Q3-2020
1984	1984	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 9)	6	Tuath Housing Association	""	""	""	""	""	Q3-2020
1985	1985	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q2-2017
1986	1986	CALF Turnkey	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q4-2020
1987	1987	CALF Turnkey	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 2)*	14	Clï¿½id Housing	""	""	""	""	""	Q2-2021
1988	1988	CALF Turnkey	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 3)	16	Clï¿½id Housing	""	""	""	""	Q4-2019	""
1989	1989	CALF Turnkey	Meath	Ruxton Oaks, Navan, Co. Meath (Phase 1)*	8	Clï¿½id Housing	""	""	""	""	Q1-2021	""
1990	1990	CALF Turnkey	Meath	Ruxton Oaks, Navan, Co. Meath (Phase 2)*	12	Clï¿½id Housing	""	""	""	""	Q1-2021	""
1991	1991	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Clï¿½id Housing	""	""	""	""	""	Q3-2017
1992	1992	CALF Turnkey	Meath	St Marys Dunboyne, Co. Meath (Phase 1)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1993	1993	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)	24	Respond	""	""	""	""	""	Q4-2018
1994	1994	CALF Turnkey	Meath	The Bungalows, Dunshauglin, Co. Meath (Phase 1)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2020
1995	1995	CALF Turnkey	Meath	The Maudelins (Phase 2), Main Street, Duleek, Co. Meath (Phase 1)*	30	Respond	""	""	""	""	""	Q4-2020
1996	1996	CALF Turnkey	Meath	The Maudlins, Trim, Co. Meath (Phase 1)	9	Clï¿½id Housing	""	""	""	""	""	Q1-2021
1997	1997	CALF Turnkey	Meath	The Way, Broadmeadow Vale, Ratoath, Co. Meath (Phase 1)	2	Tuath Housing Association	""	""	""	""	""	Q4-2019
1998	1998	CALF Turnkey	Meath	The Willows, Dunshaughlin, Co. Meath (Phase 1)*	96	Clï¿½id Housing	""	""	""	""	Q2-2021	""
1999	1999	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	8	Clï¿½id Housing	""	""	""	""	""	Q2-2016
2000	2000	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 2)	7	Clï¿½id Housing	""	""	""	""	""	Q3-2016
2001	2001	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 3)	8	Clï¿½id Housing	""	""	""	""	""	Q4-2016
2002	2002	CALF Turnkey	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 1)	14	Tuath Housing Association	""	""	""	""	""	Q2-2020
2003	2003	CALF Turnkey	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 2)	13	Tuath Housing Association	""	""	""	""	""	Q3-2020
2004	2004	CALF Turnkey	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 3)	2	Tuath Housing Association	""	""	""	""	""	Q3-2021
2005	2005	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
2006	2006	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town	6	*N/A	""	""	""	""	""	Q4-2017
2007	2007	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
2008	2008	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
2009	2009	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	""	Q2-2019
2010	2010	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
2011	2011	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	""	Q4-2018
2012	2012	SHIP CONSTRUCTION TURNKEY	Monaghan	Plï¿½s an Bhrï¿½, Rosevale, Bree, Castleblayney	26	*N/A	""	""	""	""	""	Q4-2020
2013	2013	SHIP CONSTRUCTION TURNKEY	Monaghan	Ard na Radhairc, Carrickmacross, Co. Monaghan	41	*N/A	""	""	""	""	Q3-2019	""
2014	2014	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	6	*N/A	""	""	""	""	""	Q4-2020
2015	2015	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q3-2019
2016	2016	SHIP CONSTRUCTION TURNKEY	Monaghan	Drummond Radhairc, Carrickmacross	1	*N/A	""	""	""	""	""	Q3-2019
2017	2017	SHIP CONSTRUCTION TURNKEY	Monaghan	Cnoc na Greine, Tydavnet	6	*N/A	""	""	""	""	""	Q4-2020
2018	2018	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill Darach, Bree, Castleblayney	30	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2019	2019	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
2020	2020	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	30	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2021	2021	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockcarrick, Annyalla	30	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2022	2022	SHIP CONSTRUCTION SINGLE STAGE	Monaghan	Folly Court, Ballybay	6	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2023	2023	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	""	Q2-2019
2024	2024	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	""	Q4-2019
2025	2025	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	""	Q4-2020
2026	2026	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	""	Q4-2020
2027	2027	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q3-2019	""
2028	2028	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	6	*N/A	""	""	""	""	Q3-2019	""
2029	2029	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	""	""	""	Q3-2019	""
2030	2030	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	""	""	""	Q3-2019	""
2031	2031	SHIP CONSTRUCTION	Monaghan	Lui Na Greine, Scotstown	6	*N/A	""	""	""	""	Q2-2020	""
2032	2032	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan	16	*N/A	""	""	""	""	""	Q4-2018
2033	2033	SHIP CONSTRUCTION	Monaghan	12 Church St., Ballybay	2	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2034	2034	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q1-2020	""
2035	2035	SHIP CONSTRUCTION	Monaghan	Church Hill, Clones	2	*N/A	""	""	""	""	Q2-2021	""
2036	2036	SHIP CONSTRUCTION	Monaghan	13 McCurtain Street, Clones	1	*N/A	""	""	""	""	Q1-2021	""
2037	2037	SHIP CONSTRUCTION	Monaghan	Lui na Greine, Scotstown	26	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2038	2038	SHIP CONSTRUCTION	Monaghan	Ballybay Courtyard, Ballybay	7	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2039	2039	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	""	""	Q1-2021	""
2040	2040	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	19	Oaklee Housing Trust	""	""	""	""	""	Q2-2021
2041	2041	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
2042	2042	CAS CONSTRUCTION	Monaghan	Birch Court Apts., 34 Main Street, Ballybay	4	North ? East Housing Association Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2043	2043	CALF Turnkey	Monaghan	Bree, Castleblayney \n (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q4-2020
2044	2044	CALF Turnkey	Monaghan	Bree, Castleblayney \n (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q2-2021
2045	2045	CALF Turnkey	Monaghan	Bree, Castleblayney \n (Phase 3)	8	Tuath Housing Association	""	""	""	""	""	Q3-2021
2046	2046	CALF Turnkey	Monaghan	Bree, Castleblayney \n (Phase 4)	13	Tuath Housing Association	""	""	""	""	Q2-2019	""
2047	2047	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monaghan  (Phase 1)	50	Respond	""	""	""	""	""	Q4-2019
2048	2048	CALF Turnkey	Monaghan	Lakeview Apartments, Drummond Radhairc, Carrickmacross, Co Monaghan (Phase 1)*	12	North & East Housing Association Ltd	""	""	""	""	Q3-2019	""
2049	2049	CALF Turnkey	Monaghan	Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 1)*	20	Tuath Housing Association	""	""	""	Q2-2021	""	""
2050	2050	CALF Turnkey	Monaghan	Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 2)*	21	Tuath Housing Association	""	""	""	Q2-2021	""	""
2051	2051	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Tuath Housing Association	""	""	""	""	""	Q2-2021
2052	2052	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	6	Tuath Housing Association	""	""	""	""	Q3-2019	""
2053	2053	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	6	Tuath Housing Association	""	""	""	""	Q3-2019	""
2054	2054	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 4)	14	Tuath Housing Association	""	""	""	""	Q3-2019	""
2055	2055	CALF Construction	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing	""	""	""	""	""	Q4-2018
2056	2056	CALF Turnkey	Monaghan	Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 1)	8	Tuath Housing Association	""	""	""	""	Q3-2020	""
2057	2057	CALF Turnkey	Monaghan	Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 2)*	8	Tuath Housing Association	""	""	""	""	Q3-2020	""
2058	2058	CALF Turnkey	Monaghan	The Meadows, Emy, Emyvale, Co. Monaghan (Phase 1)*	7	Tuath Housing Association	""	""	""	""	Q2-2021	""
2059	2059	CALF Turnkey	Monaghan	The Meadows, Emy, Emyvale, Co. Monaghan (Phase 2)	7	Tuath Housing Association	""	""	""	""	Q2-2021	""
2060	2060	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	2	*N/A	""	""	""	""	""	Q3-2020
2061	2061	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
2062	2062	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	""	Q2-2019
2063	2063	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	""	""	Q4-2018
2064	2064	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	4	*N/A	""	""	""	""	""	Q4-2019
2065	2065	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Cloneygowan	4	*N/A	""	""	""	""	""	Q4-2019
2066	2066	SHIP CONSTRUCTION TURNKEY	Offaly	Main Street, Daingean	8	*N/A	""	""	""	""	Q4-2020	""
2067	2067	SHIP CONSTRUCTION TURNKEY	Offaly	McCauley Drive, Birr	34	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2068	2068	SHIP CONSTRUCTION TURNKEY	Offaly	Riverside, Tullamore	5	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2069	2069	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Clonygowan	2	*N/A	""	""	""	""	""	Q2-2021
2070	2070	SHIP CONSTRUCTION TURNKEY	Offaly	Coolgarry, Walsh Island 	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2071	2071	SHIP CONSTRUCTION TURNKEY	Offaly	Mucklagh, Tullamore	8	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2072	2072	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	2	*N/A	""	""	""	""	""	Q1-2021
2073	2073	SHIP CONSTRUCTION TURNKEY	Offaly	Bog Road, Portarlington	28	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2074	2074	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	4	*N/A	""	""	""	""	""	Q2-2021
2075	2075	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Clonygowan	1	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2076	2076	SHIP CONSTRUCTION SINGLE STAGE	Offaly	78 & 110 Church Hill, Tullamore	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2077	2077	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	""	Q3-2020
2078	2078	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	9	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
2079	2079	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2080	2080	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	""	Q4-2019
2081	2081	SHIP CONSTRUCTION	Offaly	Beechgrove, Belmont	7	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
2082	2082	SHIP CONSTRUCTION	Offaly	Raheen ,Clara	38	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2083	2083	SHIP CONSTRUCTION	Offaly	Elderberry Drive, Moneygall	4	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
2084	2084	SHIP CONSTRUCTION	Offaly	Sr. Senan Avenue, Edenderry	4	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2085	2085	SHIP CONSTRUCTION	Offaly	Dargan Drive, Chancery Lane, Tullamore (Phase 2)	20	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
2086	2086	SHIP CONSTRUCTION	Offaly	1 Newbridge St., Birr	1	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2087	2087	SHIP CONSTRUCTION	Offaly	Sycamore Drive, Ballycumber	8	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
2088	2088	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean Phase 2	9	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
2089	2089	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	""	Q4-2019
2090	2090	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q2-2021
2091	2091	CAS CONSTRUCTION	Offaly	Scurragh, Birr (AKA Camcor Green)	6	Cluid Housing Association	""	""	""	""	""	Q4-2019
2092	2092	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	""	""	""	Q1-2021	""
2093	2093	CAS CONSTRUCTION	Offaly	Presentation Convent, Portarlington	39	Sophia Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2094	2094	CAS CONSTRUCTION	Offaly	Clonamore Hotel, Tullamore	17	Sophia Housing Association Ltd	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
2095	2095	CALF Turnkey	Offaly	3 units, An Corran, Crinkle, Birr, Co. Offaly (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
2096	2096	CALF Construction	Offaly	Kearneyï¿½s Field, Tullamore, Co. Offaly (Phase 1)	41	Oaklee Housing	""	""	""	""	Q2-2021	""
2097	2097	CALF Construction	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	Tuath Housing Association	""	""	""	""	""	Q2-2021
2098	2098	CALF Turnkey	Offaly	Rahan Road, Tullamore, Co. Offaly (Phase 1)*	26	Clï¿½id Housing	""	""	""	""	Q4-2020	""
2099	2099	CALF Turnkey	Offaly	The Hawthorns, Arden Road, Tullamore, Co. Offaly (Phase 1)	16	Clï¿½id Housing	""	""	""	""	Q1-2020	""
2100	2100	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
2101	2101	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	""	Q1-2019
2102	2102	SHIP CONSTRUCTION TURNKEY	Roscommon	Lisroyne Court, Strokestown	10	*N/A	""	""	""	""	""	Q4-2019
2103	2103	SHIP CONSTRUCTION TURNKEY	Roscommon	Warren Grove, Boyle	4	*N/A	""	""	""	""	""	Q4-2018
2104	2104	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksfield, Monksland	2	*N/A	""	""	""	""	""	Q4-2020
2105	2105	SHIP CONSTRUCTION	Roscommon	Cloonfad	3	*N/A	""	""	""	""	""	Q2-2021
2106	2106	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
2107	2107	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
2108	2108	SHIP CONSTRUCTION	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	""	""	""	""	Q4-2020
2109	2109	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	""	""	""	""	Q1-2021
2110	2110	SHIP CONSTRUCTION	Roscommon	Old Tuam Road,  Monksland, Athlone	2	*N/A	""	""	""	""	""	Q4-2020
2111	2111	SHIP CONSTRUCTION	Roscommon	Meadowbrook, Ballyclare Td., Ballyleague	16	*N/A	""	""	""	""	Q3-2020	""
2112	2112	SHIP CONSTRUCTION	Roscommon	Lisroyne Td., Strokestown	10	*N/A	""	""	""	""	Q4-2020	""
2113	2113	SHIP CONSTRUCTION	Roscommon	Windmill Road, Elphin Road	10	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2114	2114	SHIP CONSTRUCTION	Roscommon	Lakeview Heights, Bellspark Td., Boyle	6	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2115	2115	SHIP CONSTRUCTION	Roscommon	Lisnamult, Ardnanagh Td., Roscommon Town	8	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
2116	2116	CALF Turnkey	Roscommon	Castle View Apartments, Block B, Roscommon Town (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2117	2117	CALF Turnkey	Roscommon	Monksland, Athlone, Co. Roscommon (Phase 1)*	35	Tuath Housing Association	""	""	""	""	Q4-2019	""
2118	2118	CALF Turnkey	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Clï¿½id Housing	""	""	""	""	""	Q3-2018
2119	2119	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
2120	2120	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	""	""	""	Q2-2021
2121	2121	SHIP CONSTRUCTION TURNKEY	Sligo	Fairgreen Square, Ballisodare	2	*N/A	""	""	""	""	""	Q4-2019
2122	2122	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	14	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2123	2123	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	16	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2124	2124	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	30	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2125	2125	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	13	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2126	2126	SHIP CONSTRUCTION SINGLE STAGE	Sligo	St. Joseph's Terrace, Sligo	1	*N/A	""	""	""	""	""	Q4-2019
2127	2127	SHIP CONSTRUCTION	Sligo	Collooney	18	*N/A	""	""	""	""	""	Q4-2019
2128	2128	SHIP CONSTRUCTION	Sligo	Knappagh Road, Sligo	28	*N/A	""	""	""	""	""	Q4-2020
2129	2129	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	""	Q4-2018
2130	2130	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	14	*N/A	""	""	""	""	""	Q3-2018
2131	2131	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
2132	2132	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	""	""	""	Q4-2019
2133	2133	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	8	*N/A	""	""	""	""	""	Q4-2017
2134	2134	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry (Phase 1)	10	*N/A	""	""	""	""	Q3-2020	""
2135	2135	SHIP CONSTRUCTION	Sligo	Dromore West	10	*N/A	""	""	""	""	Q4-2019	""
2136	2136	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2137	2137	SHIP CONSTRUCTION	Sligo	House at Ballinode	1	*N/A	""	""	""	""	""	Q4-2018
2138	2138	SHIP CONSTRUCTION	Sligo	SRD at Crowagh, Dromore West	1	*N/A	""	""	""	""	Q4-2020	""
2139	2139	SHIP CONSTRUCTION	Sligo	Gormley Park, Bunnanadden	6	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
2140	2140	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry (Phase 2) & The Green Rd,	19	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2141	2141	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2020
2142	2142	CAS CONSTRUCTION	Sligo	Killeshin, First Sea Road, Sligo	5	Newgrove Housing Association Ltd	""	""	""	""	Q4-2020	""
2143	2143	SHIP CONSTRUCTION TURNKEY	South Dublin	Ardsolus, Kingswood, Dublin 24	2	*N/A	""	""	""	""	""	Q4-2018
2144	2144	SHIP CONSTRUCTION TURNKEY	South Dublin	White Pines, Stocking Avenue, Rathfarnham, Dublin 16	26	*N/A	""	""	""	""	""	Q4-2018
2145	2145	SHIP CONSTRUCTION TURNKEY	South Dublin	Shackleton Park / Gandon Park, Adamstown	22	*N/A	""	""	""	""	""	Q4-2019
2146	2146	SHIP CONSTRUCTION TURNKEY	South Dublin	Gandon Park, Adamstown, Lucan	12	*N/A	""	""	""	""	""	Q4-2019
2147	2147	SHIP CONSTRUCTION SINGLE STAGE	South Dublin	37 Greenfort Gardens, Clondalkin	2	*N/A	""	""	""	""	Q4-2020	""
2148	2148	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	""	Q4-2018
2149	2149	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	""	Q3-2019
2150	2150	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght	47	*N/A	""	""	""	""	""	Q2-2018
2151	2151	SHIP CONSTRUCTION RAPID	South Dublin	St. Marks Avenue, Clondalkin	41	*N/A	""	""	""	""	Q3-2020	""
2152	2152	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght	22	*N/A	""	""	""	""	""	Q3-2018
2153	2153	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght	21	*N/A	""	""	""	""	""	Q4-2018
2154	2154	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale, Clondalkin, Dublin 22	22	*N/A	""	""	""	""	Q4-2020	""
2155	2155	SHIP CONSTRUCTION RAPID	South Dublin	Riverside Cottages, Templeogue	10	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2156	2156	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale, Clondalkin, Dublin 22	21	*N/A	""	""	""	""	Q4-2020	""
2157	2157	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	17	*N/A	""	""	""	""	""	Q4-2018
2158	2158	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	""	Q4-2018
2159	2159	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	""	Q1-2019
2160	2160	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	""	Q4-2018
2161	2161	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	""	Q4-2018
2162	2162	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
2163	2163	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
2164	2164	SHIP CONSTRUCTION	South Dublin	Balgaddy F, Griffeen Avenue, Lucan Co. Dublin	69	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
2165	2165	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
2166	2166	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
2167	2167	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
2168	2168	SHIP CONSTRUCTION	South Dublin	St. Catherineï¿½s, Knockmore Avenue, Killinarden, Tallaght	12	*N/A	""	""	""	""	Q4-2020	""
2169	2169	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	""	""	""	Q4-2020	""
2170	2170	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	9	*N/A	""	""	""	""	""	Q1-2019
2171	2171	SHIP CONSTRUCTION	South Dublin	Nangor Road, Clondalkin, Dublin 22	93	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
2172	2172	SHIP CONSTRUCTION	South Dublin	Grand Canal, Lindisfarne, Clondalkin,	19	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2173	2173	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q1-2020
2174	2174	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	""	""	Q4-2019	""
2175	2175	CALF Turnkey	South Dublin	2 properties Tullyhall, Lucan, County Dublin (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q2-2019
2176	2176	CALF Turnkey	South Dublin	6 units Elder Heath, Kiltipper Road, Tallaght, Dublin 24 (Phase 1)*	6	Clï¿½id Housing	""	""	""	""	""	Q4-2019
2177	2177	CALF Turnkey	South Dublin	Ardsolus, Old Naas Road, Dublin 22 (Phase 1)	10	Respond	""	""	""	""	""	Q3-2019
2178	2178	CALF Turnkey	South Dublin	Aylmer Heath, Newcastle, Co. Dublin 22 (Phase 1)	32	Respond	""	""	""	""	""	Q4-2020
2179	2179	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	6	Tuath Housing Association	""	""	""	""	""	Q4-2018
2180	2180	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 2)	4	Tuath Housing Association	""	""	""	""	""	Q1-2019
2181	2181	CALF Turnkey	South Dublin	Balrothery, Castletymon Road, Dublin Road (Phase 1)*	13	Clï¿½id Housing	""	""	""	""	""	Q4-2019
2182	2182	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q3-2017
2183	2183	CALF Turnkey	South Dublin	Burgage Gardens, Newcastle, Co. Dublin (Phase 1)*	4	Respond	""	""	""	""	""	Q2-2020
2184	2184	CALF Turnkey	South Dublin	Burgage, Newcastle, Co. Dublin 22 (Phase 1)	10	Respond	""	""	""	""	""	Q4-2019
2185	2185	CALF Turnkey	South Dublin	Burgage, Newcastle, Co. Dublin 22 (Phase 2)	26	Respond	""	""	""	""	""	Q2-2020
2186	2186	CALF Turnkey	South Dublin	Citywest Quarter, Citywest, Dublin 24 (Phase 1)*	32	Tuath Housing Association	""	""	""	""	""	Q2-2021
2187	2187	CALF Turnkey	South Dublin	Cloverhill Lodge, Cloverhill Rd, Clondalkin, D22 (Phase 1)*	40	Oaklee Housing	""	""	""	""	Q2-2021	""
2188	2188	CALF Turnkey	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 1)	45	Tuath Housing Association	""	""	""	""	""	Q4-2020
2189	2189	CALF Turnkey	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 2)	15	Tuath Housing Association	""	""	""	""	""	Q4-2020
2190	2190	CALF Turnkey	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 3)*	23	Tuath Housing Association	""	""	""	""	""	Q4-2020
2191	2191	CALF Turnkey	South Dublin	Cuil Duin Green, Cuil Duin, Citywest, Dublin 24 (Phase 1)*	24	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
2192	2192	CALF Turnkey	South Dublin	De Selby Heights, Tallaght, Dublin 24 (Phase 1)	9	Tuath Housing Association	""	""	""	""	""	Q4-2019
2193	2193	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Clï¿½id Housing	""	""	""	""	""	Q1-2018
2194	2194	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Clï¿½id Housing	""	""	""	""	""	Q1-2018
2195	2195	CALF Turnkey	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q4-2019
2196	2196	CALF Turnkey	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 2)*	9	Clï¿½id Housing	""	""	""	""	""	Q1-2021
2197	2197	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q3-2018
2198	2198	CALF Turnkey	South Dublin	Edenbrook, Citywest, Dublin 24 (Phase 1)	17	Tuath Housing Association	""	""	""	""	""	Q4-2019
2199	2199	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Clï¿½id Housing	""	""	""	""	""	Q1-2018
2200	2200	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Clï¿½id Housing	""	""	""	""	""	Q2-2018
2201	2201	CALF Construction	South Dublin	Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)	40	Clï¿½id Housing	""	""	""	""	Q3-2020	""
2202	2202	CALF Turnkey	South Dublin	Finians Way, Newcastle South, Newcastle, Co. Dublin (Phase 1)*	2	Clanmil Housing Association Ireland	""	""	""	""	Q1-2020	""
2203	2203	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)	32	Respond	""	""	""	""	""	Q3-2021
2204	2204	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 2)	38	Respond	""	""	""	""	""	Q3-2021
2205	2205	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 3)*	24	Respond	""	""	""	""	Q4-2018	""
2206	2206	CALF Turnkey	South Dublin	Graydon, Newcastle, Co. Dublin (Phase 1)*	8	Tuath Housing Association	""	""	""	""	Q1-2020	""
2207	2207	CALF Turnkey	South Dublin	Green Lane, Rathcoole, Co. Dublin (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q4-2020
2208	2208	CALF Turnkey	South Dublin	Green Lane, Rathcoole, Co. Dublin (Phase 2)*	9	Tuath Housing Association	""	""	""	""	""	Q4-2020
2209	2209	CALF Turnkey	South Dublin	Hallwell, Tubber Lane, Adamstown, Co Dublin (Phase 1)*	45	The Iveagh Trust	""	""	""	""	Q2-2018	""
2210	2210	CALF Turnkey	South Dublin	Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*	24	Respond	""	""	""	""	Q4-2018	""
2211	2211	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)*	13	Clï¿½id Housing	""	""	""	""	""	Q2-2018
2212	2212	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)	12	Clï¿½id Housing	""	""	""	""	""	Q4-2018
2213	2213	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Clï¿½id Housing	""	""	""	""	""	Q1-2017
2214	2214	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Clï¿½id Housing	""	""	""	""	""	Q3-2017
2215	2215	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Clï¿½id Housing	""	""	""	""	""	Q4-2018
2216	2216	CALF Turnkey	South Dublin	Mountain Gate, Kiltipper Rd., Dublin 24 (Phase 1)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	Q3-2021	""	""
2217	2217	CALF Turnkey	South Dublin	Moyglas, Lucan, Co Dublin (Phase 1)	13	Respond	""	""	""	""	""	Q1-2016
2218	2218	CALF Turnkey	South Dublin	Moyglas, Lucan, Co Dublin (Phase 2)*	1	Respond	""	""	""	""	""	Q2-2017
2219	2219	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Clï¿½id Housing	""	""	""	""	""	Q3-2017
2220	2220	CALF Construction	South Dublin	Old Lucan Road, Palmerstown, Dublin 20 (Phase 1)	4	Tuath Housing Association	""	""	""	Q3-2021	""	""
2221	2221	CALF Turnkey	South Dublin	Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	""	""	Q4-2020
2222	2222	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	Tuath Housing Association	""	""	""	""	""	Q3-2018
2223	2223	CALF Turnkey	South Dublin	Phase 2, Aylmer Drive, Aylmer Heath, Newcastle, Co. Dublin (Phase 1)*	17	Respond	""	""	""	""	""	Q2-2021
2224	2224	CALF Turnkey	South Dublin	Raheen House, Old Nangor Road, Clondalkin, Dublin 22 (Phase 1)	9	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
2225	2225	CALF Turnkey	South Dublin	Rathmill Meadows and Green, Rathcoole, Co. Dublin (Phase 1)*	11	Oaklee Housing	""	""	""	""	""	Q4-2019
2226	2226	CALF Turnkey	South Dublin	Sallypark, Clondalkin, Dublin 22 (Phase 1)*	85	Clï¿½id Housing	""	""	""	""	Q4-2020	""
2227	2227	CALF Turnkey	South Dublin	San Guida, New Road, Clondalkin, Dublin 22 (Phase 1)*	21	Clï¿½id Housing	""	""	""	""	Q3-2021	""
2228	2228	CALF Turnkey	South Dublin	Scholarstown Road, Rathfarnham, Dublin 16 (Phase 1)*	7	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2019	""
2229	2229	CALF Turnkey	South Dublin	Scholarstown Road, Rathfarnham, Dublin 16 (Phase 2)*	7	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2019	""
2230	2230	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
2231	2231	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
2232	2232	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
2233	2233	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
2234	2234	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Clï¿½id Housing	""	""	""	""	""	Q2-2019
2235	2235	CALF Turnkey	South Dublin	Somerton, Lucan, Co. Dublin (Phase 1)*	32	Respond	""	""	""	""	""	Q4-2019
2236	2236	CALF Construction	South Dublin	St. Catherineï¿½s, Knockmore Avenue, Killinarden, Tallaght, Dublin 24 (Phase 1)	2	Sophia Housing Association Ltd	""	""	""	""	Q2-2021	""
2237	2237	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2019
2238	2238	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
2239	2239	CALF Turnkey	South Dublin	Stone Masons Court, Fortunestown Lane, Citywest Dublin (Phase 1)*	12	Clï¿½id Housing	""	""	""	""	""	Q2-2019
2240	2240	CALF Turnkey	South Dublin	Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	Tuath Housing Association	""	""	""	""	""	Q4-2018
2241	2241	CALF Turnkey	South Dublin	The Mews, Citywest Village, Citywest, Dublin 24 (Phase 1)*	22	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
2242	2242	CALF Turnkey	South Dublin	The Rise, Citywest Village, Citywest, Dublin 24 (Phase 1)*	13	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
2243	2243	CALF Construction	South Dublin	The Weir, Whitestown Way, Tallaght, Dublin 24 (Phase 1)	81	Clï¿½id Housing	""	""	""	""	Q2-2021	""
2244	2244	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q3-2017
2245	2245	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 2)*	2	Tuath Housing Association	""	""	""	""	""	Q4-2018
2246	2246	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Clï¿½id Housing	""	""	""	""	""	Q4-2018
2247	2247	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Clï¿½id Housing	""	""	""	""	""	Q2-2019
2248	2248	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Clï¿½id Housing	""	""	""	""	""	Q4-2019
2249	2249	CALF Turnkey	South Dublin	Wilkins Court, Limekiln Lane, Dublin 12 (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
2250	2250	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
2251	2251	CALF Turnkey	South Dublin	Willowview, Ballyboden Road, Rathfarnham, Dublin 14 (Phase 1)*	12	Clï¿½id Housing	""	""	""	""	""	Q2-2021
2252	2252	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	""	""	Q4-2020
2253	2253	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	6	*N/A	""	""	""	""	""	Q2-2019
2254	2254	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	""	""	Q4-2020
2255	2255	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane	9	*N/A	""	""	""	""	""	Q4-2018
2256	2256	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles	4	*N/A	""	""	""	""	""	Q4-2018
2257	2257	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane	4	*N/A	""	""	""	""	""	Q2-2019
2258	2258	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles	5	*N/A	""	""	""	""	""	Q4-2019
2259	2259	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	12	*N/A	""	""	""	""	Q3-2020	""
2260	2260	SHIP CONSTRUCTION TURNKEY	Tipperary	Ma Charoin, Manna South, Templemore	13	*N/A	""	""	""	""	Q1-2021	""
2261	2261	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	5	*N/A	""	""	""	""	""	Q3-2019
2262	2262	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	6	*N/A	""	""	""	""	""	Q4-2019
2263	2263	SHIP CONSTRUCTION TURNKEY	Tipperary	Glencree, Newport	3	*N/A	""	""	""	""	""	Q4-2019
2264	2264	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	4	*N/A	""	""	""	""	""	Q4-2019
2265	2265	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles	5	*N/A	""	""	""	""	""	Q4-2019
2266	2266	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	29	*N/A	""	""	""	""	Q3-2020	""
2267	2267	SHIP CONSTRUCTION TURNKEY	Tipperary	Rosanna Close, Tipperary Town	18	*N/A	""	""	""	""	""	Q4-2020
2268	2268	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor Road, Clonmel	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2269	2269	SHIP CONSTRUCTION TURNKEY	Tipperary	Rosanna Close, Tipperary Town	1	*N/A	""	""	""	""	Q3-2020	""
2270	2270	SHIP CONSTRUCTION TURNKEY	Tipperary	Hazel Close, Carrick on Suir	14	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2271	2271	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2272	2272	SHIP CONSTRUCTION TURNKEY	Tipperary	Cois Abhainn, Mullinahone	3	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2273	2273	SHIP CONSTRUCTION TURNKEY	Tipperary	Glentara, Roscrea	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2274	2274	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor Road, Clonmel	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2275	2275	SHIP CONSTRUCTION SINGLE STAGE	Tipperary	Mulkear View, Newport, Tipperary	3	*N/A	""	""	""	""	""	Q4-2018
2276	2276	SHIP CONSTRUCTION SINGLE STAGE	Tipperary	Grange Road, Ballina	4	*N/A	""	""	""	""	""	Q4-2020
2277	2277	SHIP CONSTRUCTION RENEWAL	Tipperary	Boherclough Street, Cashel	9	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2278	2278	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	""	""	""	Q4-2020	""
2279	2279	SHIP CONSTRUCTION	Tipperary	Knockanrawley	14	*N/A	""	""	""	""	""	Q1-2021
2280	2280	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	14	*N/A	""	""	""	""	Q2-2020	""
2281	2281	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	6	*N/A	""	""	""	""	Q4-2020	""
2282	2282	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
2283	2283	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	""	""	""	Q4-2019	""
2284	2284	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	""	""	""	Q3-2020	""
2285	2285	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	""	""	""	Q3-2020	""
2286	2286	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	""	""	""	Q4-2020	""
2287	2287	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	""	""	""	Q2-2021
2288	2288	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	""	""	Q3-2020
2289	2289	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	""	Q4-2018
2290	2290	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	""	""	""	Q3-2020
2291	2291	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
2292	2292	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	""	""	Q4-2019	""
2293	2293	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
2294	2294	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
2295	2295	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
2296	2296	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	8	*N/A	""	""	""	""	Q3-2020	""
2297	2297	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
2298	2298	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2018
2299	2299	SHIP CONSTRUCTION	Tipperary	Bansha	14	*N/A	""	""	""	""	Q3-2021	""
2300	2300	SHIP CONSTRUCTION	Tipperary	Ned Hayes Drive, Twomileborris, Thurles	22	*N/A	""	""	""	""	Q3-2021	""
2301	2301	SHIP CONSTRUCTION	Tipperary	Donohill	8	*N/A	""	""	""	""	Q3-2021	""
2302	2302	SHIP CONSTRUCTION	Tipperary	Mullinahone	10	*N/A	""	""	""	""	Q1-2021	""
2303	2303	SHIP CONSTRUCTION	Tipperary	Ballyclerihan	14	*N/A	""	""	""	""	Q3-2021	""
2304	2304	SHIP CONSTRUCTION	Tipperary	Ard Alainn, Moyne	9	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2305	2305	SHIP CONSTRUCTION	Tipperary	Ardcroney	4	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2306	2306	SHIP CONSTRUCTION	Tipperary	Comeragh Drive, Clonmel	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2307	2307	SHIP CONSTRUCTION	Tipperary	Church Street, Templemore	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2308	2308	SHIP CONSTRUCTION	Tipperary	Woodview Close, Nenagh	10	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
2309	2309	SHIP CONSTRUCTION	Tipperary	Grove Street. Roscrea	7	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2310	2310	SHIP CONSTRUCTION	Tipperary	William Street, Clonmel	4	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2311	2311	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	26	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
2312	2312	SHIP CONSTRUCTION	Tipperary	Knockanrawley	14	*N/A	""	""	""	""	""	Q2-2021
2313	2313	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	4	*N/A	""	""	""	""	Q3-2020	""
2314	2314	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	14	*N/A	""	""	""	""	Q2-2020	""
2315	2315	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	5	*N/A	""	""	""	""	Q4-2020	""
2316	2316	SHIP CONSTRUCTION	Tipperary	Mountain View, Cahir	43	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
2317	2317	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	20	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
2318	2318	CAS CONSTRUCTION TURNKEY	Tipperary	Monastery Close, Templemore Road, Thurles	15	Thurles Lions Trust Housing Assoc.	""	""	""	""	""	Q2-2019
2319	2319	CAS CONSTRUCTION TURNKEY	Tipperary	Drummin Village, Nenagh	8	Nenagh Voluntary Housing Association	""	""	""	""	""	Q4-2020
2320	2320	CAS CONSTRUCTION TURNKEY	Tipperary	Kichham Street, Carrick en Suir	12	Tï¿½ath Housing Association Ltd	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2321	2321	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	""	""	""	Q2-2021	""
2322	2322	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	""	""	""	Q2-2021	""
2323	2323	CAS CONSTRUCTION	Tipperary	Main Street, Templemore	14	Templemore Voluntary Housing Association	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
2324	2324	CAS CONSTRUCTION	Tipperary	Deerpark Road, Ashwell's Lot	2	SPADE ï¿½ St. Patrickï¿½s Dwellings for the Elderly	""	""	""	""	Q2-2021	""
2325	2325	CALF Turnkey	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 1)	41	Respond	""	""	""	""	""	Q4-2019
2326	2326	CALF Turnkey	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 2)	2	Respond	""	""	""	""	""	Q4-2019
2327	2327	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Clï¿½id Housing	""	""	""	""	""	Q2-2017
2328	2328	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2329	2329	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co. Tipperary (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2330	2330	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co. Tipperary (Phase 2)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
2331	2331	CALF Turnkey	Tipperary	Mill Street, Carrick on Suir, Co. Tipperary (Phase 1)	22	Tuath Housing Association	""	""	""	""	""	Q3-2020
2332	2332	CALF Turnkey	Tipperary	The Avenue, Drummin Village, Nenagh, Co. Tipperary (Phase 1)	13	Focus Housing Association CLG	""	""	""	""	""	Q4-2020
2333	2333	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	8	*N/A	""	""	""	""	""	Q3-2018
2334	2334	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
2335	2335	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	""	Q4-2018
2336	2336	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
2337	2337	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	""	Q4-2018
2338	2338	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	10	*N/A	""	""	""	""	""	Q4-2018
2339	2339	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	21	*N/A	""	""	""	""	""	Q4-2018
2340	2340	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	20	*N/A	""	""	""	""	""	Q3-2019
2341	2341	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	14	*N/A	""	""	""	""	""	Q4-2019
2342	2342	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	6	*N/A	""	""	""	""	""	Q2-2020
2343	2343	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	15	*N/A	""	""	""	""	""	Q3-2020
2344	2344	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	6	*N/A	""	""	""	""	""	Q3-2019
2345	2345	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	8	*N/A	""	""	""	""	""	Q4-2019
2346	2346	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	6	*N/A	""	""	""	""	""	Q4-2019
2347	2347	SHIP CONSTRUCTION TURNKEY	Waterford	Mount Suir, Gracedieu, Carrickphierish	18	*N/A	""	""	""	""	""	Q4-2019
2348	2348	SHIP CONSTRUCTION TURNKEY	Waterford	Brideview Close, Tallow	2	*N/A	""	""	""	""	""	Q3-2020
2349	2349	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	19	*N/A	""	""	""	""	""	Q4-2020
2350	2350	SHIP CONSTRUCTION TURNKEY	Waterford	7A and 8A Barnes Lane, The Glen, Waterford	2	*N/A	""	""	""	""	""	Q4-2019
2351	2351	SHIP CONSTRUCTION TURNKEY	Waterford	Sherlock Walk, Gracedieu, Waterford	2	*N/A	""	""	""	""	""	Q2-2020
2352	2352	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	13	*N/A	""	""	""	""	""	Q1-2021
2353	2353	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	10	*N/A	""	""	""	""	""	Q2-2021
2354	2354	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	23	*N/A	""	""	""	""	""	Q2-2021
2355	2355	SHIP CONSTRUCTION TURNKEY	Waterford	The Courtyard, Morrissons Road, Waterford City	8	*N/A	""	""	""	""	""	Q2-2021
2356	2356	SHIP CONSTRUCTION TURNKEY	Waterford	Bounds Court, Airport Road, Waterford	15	N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2357	2357	SHIP CONSTRUCTION TURNKEY	Waterford	Brideview Close, Tallow; Main Street, Aglish; Bye Lane, Kilmacthomas, Co. Waterford	9	N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2358	2358	SHIP CONSTRUCTION SINGLE STAGE	Waterford	Apt 1 and Apt 2 Rivercourt, Grattan Quay, Waterford City	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2359	2359	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	49	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
2360	2360	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	22	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
2361	2361	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
2362	2362	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	""	Q4-2018
2363	2363	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn (Saviours Green), Ballybeg	5	*N/A	""	""	""	""	""	Q3-2020
2364	2364	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	""	""	Q2-2020
2365	2365	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
2366	2366	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	""	Q2-2019
2367	2367	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	""	""	""	Q2-2021
2368	2368	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
2369	2369	SHIP CONSTRUCTION	Waterford	Doyles Street, Waterford City	4	*N/A	""	""	""	""	Q2-2020	""
2370	2370	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
2371	2371	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	17	*N/A	""	""	""	""	Q3-2021	""
2372	2372	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
2373	2373	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
2374	2374	SHIP CONSTRUCTION	Waterford	Bath St, Waterford City	4	*N/A	""	""	""	""	""	Q4-2019
2375	2375	SHIP CONSTRUCTION	Waterford	Graigueshoneen, Kilmacthomas	16	*N/A	""	""	""	""	Q4-2020	""
2376	2376	SHIP CONSTRUCTION	Waterford	Mount Esker, Ballytruckle Road, Waterford City	14	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
2377	2377	SHIP CONSTRUCTION	Waterford	Newgate Street, Waterford City	36	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
2378	2378	SHIP CONSTRUCTION	Waterford	Fountain Street, Ferrybank, Waterford	14	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
2379	2379	SHIP CONSTRUCTION	Waterford	Meeting House Lane, Waterford City	6	N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
2380	2380	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
2381	2381	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
2382	2382	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	""	""	Q2-2021
2383	2383	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Oaklee Housing Trust	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
2384	2384	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford 	9	Anvers Housing Association Ltd	""	""	""	""	""	Q4-2020
2385	2385	CALF Turnkey	Waterford	Kilbarry, Waterford (Phase 1)	69	Respond	""	""	""	""	""	Q3-2020
2386	2386	CALF Turnkey	Waterford	Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 1)	26	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2019	""
2387	2387	CALF Turnkey	Waterford	Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 2)	31	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2019	""
2388	2388	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
2389	2389	CALF Turnkey	Waterford	The Walk, Fairfield Park, Kilcohan, Waterford (Phase 1)	40	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
2390	2390	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City (Phase 1)	24	*N/A	""	""	""	""	""	Q2-2021
2391	2391	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2021
2392	2392	SHIP DIALOG	Westmeath	Lissywollen, Athlone	55	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2393	2393	SHIP DIALOG	Westmeath	Lissywollen, Athlone	55	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2394	2394	SHIP DIALOG	Westmeath	Lissywollen, Athlone	38	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2395	2395	SHIP DIALOG	Westmeath	Lissywollen, Athlone	22	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2396	2396	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
2397	2397	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	""	Q2-2019
2398	2398	SHIP CONSTRUCTION TURNKEY	Westmeath	Abbeybrook, Kilbeggan	7	*N/A	""	""	""	""	""	Q1-2019
2399	2399	SHIP CONSTRUCTION TURNKEY	Westmeath	Coill Rua, Mullingar	6	*N/A	""	""	""	""	""	Q4-2019
2400	2400	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	3	*N/A	""	""	""	""	""	Q1-2020
2401	2401	SHIP CONSTRUCTION TURNKEY	Westmeath	Austin Friars Street, Mullingar	4	*N/A	""	""	""	""	Q3-2020	""
2402	2402	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	5	*N/A	""	""	""	""	""	Q4-2020
2403	2403	SHIP CONSTRUCTION TURNKEY	Westmeath	Oakcrest, Ballinderry, Mullingar	8	*N/A	""	""	""	""	Q2-2021	""
2404	2404	SHIP CONSTRUCTION TURNKEY	Westmeath	St. Marys Place, Athlone	9	*N/A	""	""	""	""	Q2-2021	""
2405	2405	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	1	*N/A	""	""	""	""	""	Q2-2021
2406	2406	SHIP CONSTRUCTION TURNKEY	Westmeath	Bellaugh, Athlone	17	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2407	2407	SHIP CONSTRUCTION TURNKEY	Westmeath	The Cedars, Lakepoint, Mullingar	7	*N/A	""	""	""	""	Q2-2021	""
2408	2408	SHIP CONSTRUCTION TURNKEY	Westmeath	The Cedars, Lakepoint, Mullingar	10	*N/A	""	""	""	""	Q2-2021	""
2409	2409	SHIP CONSTRUCTION TURNKEY	Westmeath	The Cedars, Lakepoint, Mullingar	11	*N/A	""	""	""	""	Q2-2021	""
2410	2410	SHIP CONSTRUCTION RAPID	Westmeath	O'Growney Green, Mullingar	22	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2411	2411	SHIP CONSTRUCTION RAPID	Westmeath	Dalton Park, Mullingar	17	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
2412	2412	SHIP CONSTRUCTION RAPID	Westmeath	Water Street, Castlepollard	8	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2413	2413	SHIP CONSTRUCTION RAPID	Westmeath	Ennell Court, Mullingar (Phase 1)	15	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
2414	2414	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2021
2415	2415	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	""	Q4-2018
2416	2416	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	1	*N/A	""	""	""	""	""	Q1-2018
2417	2417	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone	21	*N/A	""	""	""	""	""	Q2-2020
2418	2418	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
2419	2419	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
2420	2420	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	31	*N/A	""	""	""	""	Q2-2021	""
2421	2421	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2422	2422	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	2	*N/A	""	""	""	""	""	Q2-2021
2423	2423	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 2)	24	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2424	2424	SHIP CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	32	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
2425	2425	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone	12	*N/A	""	""	""	""	""	Q3-2020
2426	2426	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2021
2427	2427	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	2	*N/A	""	""	""	""	Q4-2019	""
2428	2428	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	10	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q1-2021
2429	2429	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	17	Tï¿½ath Housing Association Ltd	""	""	""	""	Q4-2019	""
2430	2430	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	9	Tï¿½ath Housing Association Ltd	""	""	""	""	Q4-2019	""
2431	2431	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q3-2021
2432	2432	CALF Turnkey	Westmeath	Ashe Road, Mullingar, Co. Westmeath (Phase 1)*	18	Clï¿½id Housing	""	""	""	Q2-2021	""	""
2433	2433	CALF Turnkey	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q2-2021
2434	2434	CALF Turnkey	Westmeath	Bower Hill, Lower Road, Athlone, Co. Westmeath (Phase 1)*	15	Clï¿½id Housing	""	""	""	Q3-2021	""	""
2435	2435	CALF Turnkey	Westmeath	Charlestown, Mullingar (Phase 1)*	37	Respond	""	""	""	Q2-2021	""	""
2436	2436	CALF Turnkey	Westmeath	Charlestown, Mullingar (Phase 2)*	62	Respond	""	""	""	Q2-2021	""	""
2437	2437	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Co. Westmeath (Phase 1)	8	Tuath Housing Association	""	""	""	""	""	Q4-2020
2438	2438	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	Tuath Housing Association	""	""	""	""	""	Q2-2017
2439	2439	CALF Turnkey	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 1)*	13	Clï¿½id Housing	""	""	""	""	""	Q4-2020
2440	2440	CALF Turnkey	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 2)*	23	Clï¿½id Housing	""	""	""	""	""	Q1-2021
2441	2441	CALF Turnkey	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 3)	8	Clï¿½id Housing	""	""	""	""	""	Q2-2021
2442	2442	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	10	Tuath Housing Association	""	""	""	""	""	Q3-2021
2443	2443	CALF Turnkey	Westmeath	Garran Geal, Kinnegad, Westmeath (Phase 1)*	24	Tuath Housing Association	""	""	""	""	Q4-2020	""
2444	2444	CALF Turnkey	Westmeath	Ghairdin Beag, Main Street, Rathwire, Killucan, Co. Westmeath (Phase 1)	6	Tuath Housing Association	""	""	""	""	""	Q4-2020
2445	2445	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q2-2021
2446	2446	CALF Turnkey	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q1-2021
2447	2447	CALF Turnkey	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 2)	4	Tuath Housing Association	""	""	""	""	Q3-2019	""
2448	2448	CALF Turnkey	Westmeath	Springfield Cottages, Mullingar, Co. Westmeath (Phase 1)*	13	Clï¿½id Housing	""	""	""	Q2-2021	""	""
2449	2449	CALF Turnkey	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 1)	8	Tuath Housing Association	""	""	""	""	""	Q4-2019
2450	2450	CALF Turnkey	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 2)*	14	Tuath Housing Association	""	""	""	""	""	Q2-2020
2451	2451	CALF Turnkey	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 3)	10	Tuath Housing Association	""	""	""	""	""	Q2-2020
2452	2452	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
2453	2453	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	8	*N/A	""	""	""	""	""	Q1-2018
2454	2454	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	11	*N/A	""	""	""	""	""	Q4-2018
2455	2455	SHIP CONSTRUCTION TURNKEY	Wexford	Rath an Duin, Castlebridge	3	*N/A	""	""	""	""	""	Q3-2018
2456	2456	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	2	*N/A	""	""	""	""	""	Q2-2019
2457	2457	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	10	*N/A	""	""	""	""	""	Q1-2019
2458	2458	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	10	*N/A	""	""	""	""	""	Q4-2018
2459	2459	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey	5	*N/A	""	""	""	""	""	Q4-2018
2460	2460	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey	2	*N/A	""	""	""	""	""	Q1-2019
2461	2461	SHIP CONSTRUCTION TURNKEY	Wexford	Whitewater Estuary, Ballyhack	3	*N/A	""	""	""	""	""	Q3-2020
2462	2462	SHIP CONSTRUCTION TURNKEY	Wexford	Riverchapel Lane, Gorey	4	*N/A	""	""	""	""	""	Q4-2019
2463	2463	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	4	*N/A	""	""	""	""	""	Q2-2019
2464	2464	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey	3	*N/A	""	""	""	""	""	Q4-2019
2465	2465	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	10	*N/A	""	""	""	""	""	Q3-2019
2466	2466	SHIP CONSTRUCTION TURNKEY	Wexford	St. Martin's Road, Rosslare Harbour	4	*N/A	""	""	""	""	""	Q4-2019
2467	2467	SHIP CONSTRUCTION TURNKEY	Wexford	Clonattin Upper, Gorey	8	*N/A	""	""	""	""	""	Q4-2020
2468	2468	SHIP CONSTRUCTION TURNKEY	Wexford	Airhill, Belvedere Rd, Wexford	7	*N/A	""	""	""	""	""	Q3-2021
2469	2469	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	2	*N/A	""	""	""	""	""	Q4-2019
2470	2470	SHIP CONSTRUCTION TURNKEY	Wexford	Michael Street, New Ross 	3	*N/A	""	""	""	""	""	Q2-2021
2471	2471	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	14	*N/A	""	""	""	""	""	Q4-2020
2472	2472	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	1	*N/A	""	""	""	""	""	Q3-2019
2473	2473	SHIP CONSTRUCTION TURNKEY	Wexford	Ballynaglough, Blackwater	4	*N/A	""	""	""	""	Q4-2019	""
2474	2474	SHIP CONSTRUCTION TURNKEY	Wexford	No.'s 64 & 74 Chapelwood, Kilmuckridge	2	*N/A	""	""	""	""	""	Q1-2020
2475	2475	SHIP CONSTRUCTION TURNKEY	Wexford	5 The Break Ayelsbridge, Riverchapel	1	*N/A	""	""	""	""	""	Q1-2020
2476	2476	SHIP CONSTRUCTION TURNKEY	Wexford	Tobar Muire, Creagh Gorey	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2477	2477	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	1	*N/A	""	""	""	""	""	Q1-2020
2478	2478	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Gorey - Phase 2	4	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2479	2479	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock Hill, Wexford	5	*N/A	""	""	""	""	""	Q2-2021
2480	2480	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	5	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2481	2481	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	6	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2482	2482	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	2	*N/A	""	""	""	""	""	Q2-2021
2483	2483	SHIP CONSTRUCTION TURNKEY	Wexford	Ard an Bhile, Healysland, New Ross, Co. Wexford	22	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2484	2484	SHIP CONSTRUCTION TURNKEY	Wexford	Tobar Muire, Creagh Gorey	29	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2485	2485	SHIP CONSTRUCTION TURNKEY	Wexford	Ballynaglough, Blackwater	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2486	2486	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	3	*N/A	""	""	""	""	Q2-2021	""
2487	2487	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	3	*N/A	""	""	""	""	Q2-2021	""
2488	2488	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	4	*N/A	""	""	""	""	Q2-2021	""
2489	2489	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	3	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2490	2490	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	2	*N/A	""	""	""	""	""	Q2-2021
2491	2491	SHIP CONSTRUCTION TURNKEY	Wexford	Clonard Little, Wexford 	9	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2492	2492	SHIP CONSTRUCTION TURNKEY	Wexford	Ard an Bhile, Healysland, New Ross, Co. Wexford	21	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2493	2493	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	9	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2494	2494	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	""	""	Q4-2019
2495	2495	SHIP CONSTRUCTION	Wexford	Cloghulatagh, Taghmon	18	*N/A	""	""	""	""	""	Q4-2020
2496	2496	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	""	""	Q4-2019
2497	2497	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	""	Q1-2019
2498	2498	SHIP CONSTRUCTION	Wexford	Danescastle	10	*N/A	""	""	""	""	""	Q1-2019
2499	2499	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	""	Q3-2019
2500	2500	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	22	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2501	2501	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
2502	2502	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	40	*N/A	""	""	""	""	Q2-2020	""
2503	2503	SHIP CONSTRUCTION	Wexford	Oilgate, Enniscorthy	2	*N/A	""	""	""	""	""	Q2-2018
2504	2504	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
2505	2505	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
2506	2506	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	5	*N/A	""	""	""	""	""	Q4-2018
2507	2507	SHIP CONSTRUCTION	Wexford	Baile an Trï¿½, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
2508	2508	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
2509	2509	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
2510	2510	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
2511	2511	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	6	*N/A	""	""	""	""	Q2-2019	""
2512	2512	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford, Phase 1	23	*N/A	""	""	""	""	Q2-2019	""
2513	2513	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy	17	*N/A	""	""	""	""	Q2-2019	""
2514	2514	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	12	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2515	2515	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	4	*N/A	""	""	""	""	""	Q4-2018
2516	2516	SHIP CONSTRUCTION	Wexford	Wexford Street, Gorey	30	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
2517	2517	SHIP CONSTRUCTION	Wexford	Bullawn, Irishtown, New Ross	3	*N/A	""	""	""	""	Q3-2021	""
2518	2518	SHIP CONSTRUCTION	Wexford	Ballyhine, Barntown	7	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2519	2519	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	22	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
2520	2520	SHIP CONSTRUCTION	Wexford	Doire Moling estate at Monamolin, Gorey, Co. Wexford	5	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
2521	2521	CAS CONSTRUCTION TURNKEY	Wexford	Clonattin, Gorey	6	Tï¿½ath Housing Association Ltd	""	""	""	""	""	Q2-2021
2522	2522	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
2523	2523	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
2524	2524	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2525	2525	CALF Turnkey	Wexford	24 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	8	Tuath Housing Association	""	""	""	""	""	Q3-2020
2526	2526	CALF Turnkey	Wexford	24 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 2)	16	Tuath Housing Association	""	""	""	""	""	Q4-2020
2527	2527	CALF Turnkey	Wexford	67 units, Coolcotts, Wexford (Phase 1)*	67	Clï¿½id Housing	""	""	""	""	Q3-2020	""
2528	2528	CALF Turnkey	Wexford	9 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	9	Tuath Housing Association	""	""	""	""	""	Q2-2021
2529	2529	CALF Turnkey	Wexford	 Ard Uisce, Wexford Town (Phase 1)	5	Tuath Housing Association	""	""	""	""	""	Q4-2017
2530	2530	CALF Turnkey	Wexford	 Ard Uisce, Whiterock, Wexford  (Phase 1)	1	Tuath Housing Association	""	""	""	""	""	Q1-2018
2531	2531	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	Tuath Housing Association	""	""	""	""	""	Q1-2018
2532	2532	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	Tuath Housing Association	""	""	""	""	""	Q1-2017
2533	2533	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2534	2534	CALF Turnkey	Wexford	Clonard, Wexford (Phase 1)*	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2535	2535	CALF Turnkey	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 1)	34	Oaklee Housing	""	""	""	""	""	Q4-2018
2536	2536	CALF Turnkey	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 2)	6	Oaklee Housing	""	""	""	""	""	Q2-2019
2537	2537	CALF Turnkey	Wexford	Forgelands, Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)*	18	Tuath Housing Association	""	""	""	""	""	Q3-2021
2538	2538	CALF Turnkey	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
2539	2539	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 1)	9	Tuath Housing Association	""	""	""	""	""	Q4-2019
2540	2540	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 2)	9	Tuath Housing Association	""	""	""	""	""	Q1-2020
2541	2541	CALF Turnkey	Wexford	Greenville, Enniscorthy, Co. Wexford (Phase 1)*	6	Oaklee Housing	""	""	""	""	""	Q2-2019
2542	2542	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2016
2543	2543	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2016
2544	2544	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2017
2545	2545	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
2546	2546	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 1)	14	Tuath Housing Association	""	""	""	""	""	Q4-2020
2547	2547	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 2)	14	Tuath Housing Association	""	""	""	""	""	Q4-2020
2548	2548	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 3)	16	Tuath Housing Association	""	""	""	""	""	Q1-2021
2549	2549	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 4)*	27	Tuath Housing Association	""	""	""	""	""	Q2-2021
2550	2550	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2016
2551	2551	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2019
2552	2552	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2553	2553	CALF Turnkey	Wexford	Mill Heights, Castlebridge, Wexford (Phase 1)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
2554	2554	CALF Turnkey	Wexford	Mill Heights, Castlebridge, Wexford (Phase 2)*	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
2555	2555	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q4-2020
2556	2556	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 2)*	14	Tuath Housing Association	""	""	""	""	""	Q4-2020
2557	2557	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*	8	Tuath Housing Association	""	""	""	""	""	Q1-2021
2558	2558	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 4)*	8	Tuath Housing Association	""	""	""	""	""	Q2-2021
2559	2559	CALF Turnkey	Wexford	Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
2560	2560	CALF Turnkey	Wexford	Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 2)	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
2561	2561	CALF Turnkey	Wexford	Pï¿½irc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*	16	Clï¿½id Housing	""	""	""	""	""	Q3-2021
2562	2562	CALF Turnkey	Wexford	Pï¿½irc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 2)	14	Clï¿½id Housing	""	""	""	""	""	Q3-2021
2563	2563	CALF Turnkey	Wexford	Pï¿½irc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 3)*	22	Clï¿½id Housing	""	""	""	""	Q3-2019	""
2564	2564	CALF Turnkey	Wexford	Ramstown, Gorey, Wexford (Phase 1)	24	Tuath Housing Association	""	""	""	""	Q2-2021	""
2565	2565	CALF Turnkey	Wexford	Ramstown, Gorey, Wexford (Phase 2)	20	Tuath Housing Association	""	""	""	""	Q2-2021	""
2566	2566	CALF Turnkey	Wexford	Ramstown, Gorey, Wexford (Phase 3)*	24	Tuath Housing Association	""	""	""	""	Q2-2021	""
2567	2567	CALF Turnkey	Wexford	Tobar Mhuire, Creagh, Gorey, Wexford (Phase 1)*	17	Clï¿½id Housing	""	""	""	Q2-2021	""	""
2568	2568	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	2	*N/A	""	""	""	""	""	Q2-2018
2569	2569	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 7 Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q4-2018
2570	2570	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	10	*N/A	""	""	""	""	""	Q2-2019
2571	2571	SHIP CONSTRUCTION TURNKEY	Wicklow	Fernhill, Arklow	1	*N/A	""	""	""	""	""	Q3-2018
2572	2572	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q1-2019
2573	2573	SHIP CONSTRUCTION TURNKEY	Wicklow	Woodview Cottages, Rathnew	2	*N/A	""	""	""	""	""	Q4-2019
2574	2574	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	10	*N/A	""	""	""	""	""	Q3-2019
2575	2575	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q2-2019
2576	2576	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	15	*N/A	""	""	""	""	""	Q3-2019
2577	2577	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	4	*N/A	""	""	""	""	""	Q4-2019
2578	2578	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	2	*N/A	""	""	""	""	""	Q4-2019
2579	2579	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	14	*N/A	""	""	""	""	""	Q4-2019
2580	2580	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	6	*N/A	""	""	""	""	""	Q2-2020
2581	2581	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	9	*N/A	""	""	""	""	""	Q4-2019
2582	2582	SHIP CONSTRUCTION TURNKEY	Wicklow	Kirvin Hill, Broomhall, Rathnew	2	*N/A	""	""	""	""	""	Q2-2019
2583	2583	SHIP CONSTRUCTION TURNKEY	Wicklow	Weaver Square, Baltinglass, Co. Wicklow	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2584	2584	SHIP CONSTRUCTION TURNKEY	Wicklow	Carraig Beag, WicklowTown	5	*N/A	""	""	""	""	""	Q3-2020
2585	2585	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	2	*N/A	""	""	""	""	""	Q4-2020
2586	2586	SHIP CONSTRUCTION TURNKEY	Wicklow	The Birches, Ballinaclash	2	*N/A	""	""	""	""	""	Q2-2021
2587	2587	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods Phase 2	2	*N/A	""	""	""	""	""	Q2-2020
2588	2588	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods Phase 2	1	*N/A	""	""	""	""	""	Q4-2020
2589	2589	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	2	*N/A	""	""	""	""	""	Q1-2021
2590	2590	SHIP CONSTRUCTION TURNKEY	Wicklow	Vartry Heights, Roundwood, Co. Wicklow	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2591	2591	SHIP CONSTRUCTION TURNKEY	Wicklow	Avonmore View, Rathdrum	13	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
2592	2592	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	1	*N/A	""	""	""	""	""	Q2-2021
2593	2593	SHIP CONSTRUCTION SINGLE STAGE	Wicklow	Church Lane, Newcastle	1	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
2594	2594	SHIP CONSTRUCTION RAPID	Wicklow	Sli na Slainte, Whitehall, Baltinglass	7	*N/A	""	""	""	""	""	Q4-2019
2595	2595	SHIP CONSTRUCTION RAPID	Wicklow	Merrymeeting View, Rathnew	46	*N/A	""	""	""	""	""	Q2-2021
2596	2596	SHIP CONSTRUCTION RAPID	Wicklow	Coolattin Oaks, Carnew (Phase 4)	22	*N/A	""	""	""	""	""	Q4-2020
2597	2597	SHIP CONSTRUCTION RAPID	Wicklow	Shillelagh Phase 4	20	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
2598	2598	SHIP CONSTRUCTION RAPID	Wicklow	Ashtown Lane, Wicklow Town	40	*N/A	""	""	""	""	Q3-2020	""
2599	2599	SHIP CONSTRUCTION RAPID	Wicklow	Ard na Greine, West Ward, Bray	31	*N/A	""	""	""	""	Q2-2020	""
2600	2600	SHIP CONSTRUCTION RAPID	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	Q3-2021	""
2601	2601	SHIP CONSTRUCTION RAPID	Wicklow	Sheehan Court, Back Street, Arklow	7	*N/A	""	""	""	""	Q2-2021	""
2602	2602	SHIP CONSTRUCTION RAPID	Wicklow	Mountainview, Moneycarroll, Newtownmountkennedy, Co. Wicklow	22	*N/A	""	""	""	""	Q3-2020	""
2603	2603	SHIP CONSTRUCTION RAPID	Wicklow	Sli na Slainte, Whitehall, Baltinglass	27	*N/A	""	""	""	""	""	Q1-2020
2604	2604	SHIP CONSTRUCTION RAPID	Wicklow	Three Trouts, Greystones	40	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
2605	2605	SHIP CONSTRUCTION RAPID	Wicklow	Greenhills Road, Wicklow Town	36	*N/A	""	""	""	""	Q2-2021	""
2606	2606	SHIP CONSTRUCTION RAPID	Wicklow	Cedar Court, Schools Road, Bray	14	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2607	2607	SHIP CONSTRUCTION RAPID	Wicklow	Coolattin Oaks, Carnew (Phase 4)	8	*N/A	""	""	""	""	""	Q1-2021
2608	2608	SHIP CONSTRUCTION RAPID	Wicklow	Rathnew, Merrymeeting, Co. Wicklow (Phase 2)	21	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2609	2609	SHIP CONSTRUCTION RAPID	Wicklow	Tinahely & Lugduff, Co Wicklow	20	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
2610	2610	SHIP CONSTRUCTION RAPID	Wicklow	Carrigoona, Bray	20	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
2611	2611	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 3)	21	*N/A	""	""	""	""	Q4-2019	""
2612	2612	SHIP CONSTRUCTION	Wicklow	10A & 10 B Castle Villas, Greystones	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2613	2613	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	""	""	""	Q3-2019
2614	2614	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow	17	*N/A	""	""	""	""	""	Q3-2019
2615	2615	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 2)	26	*N/A	""	""	""	""	Q4-2019	""
2616	2616	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	""	""	""	Q4-2020
2617	2617	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	""	""	""	Q4-2020
2618	2618	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	""	Q4-2018
2619	2619	SHIP CONSTRUCTION	Wicklow	St Mary's Rd., Arklow (Old Library Site)	7	*N/A	""	""	""	""	""	Q4-2018
2620	2620	SHIP CONSTRUCTION	Wicklow	Jameson Heights,  Kilmacanogue	20	*N/A	""	""	""	""	""	Q4-2020
2621	2621	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	""	Q4-2018
2622	2622	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	23	*N/A	""	""	""	""	""	Q4-2020
2623	2623	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	""	""	""	""	Q3-2019
2624	2624	SHIP CONSTRUCTION	Wicklow	Carrig Eden, 1 Marine Road, Greystones (Phases 1 and 2)	35	*N/A	""	""	""	""	""	Q4-2020
2625	2625	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	""	""	""	""	Q2-2020
2626	2626	SHIP CONSTRUCTION	Wicklow	Blackhills, Glenealy, Co. Wicklow	2	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
2627	2627	SHIP CONSTRUCTION	Wicklow	Age Friendly Apartments at Main St, Kilcoole, Greystones	4	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
2628	2628	SHIP CONSTRUCTION	Wicklow	Mill Road, Greystones	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2629	2629	SHIP CONSTRUCTION	Wicklow	Carraig Eden, Greysones (Phase 3)	14	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
2630	2630	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	19	*N/A	""	""	""	""	""	Q2-2021
2631	2631	SHIP CONSTRUCTION	Wicklow	Knockroe, Delgany, Co. Wicklow	2	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
2632	2632	SHIP CONSTRUCTION	Wicklow	Ard Rua, Barndarraig, Arklow, Co. Wicklow	12	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
2633	2633	CAS CONSTRUCTION TURNKEY	Wicklow	Rathcoran Square, Baltinglass	8	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2021
2634	2634	CAS CONSTRUCTION TURNKEY	Wicklow	Apt 1 & 2 Carrigbrae House, The Friary, Church Road, Bray	2	Ark Housing Association Limited	""	""	""	""	""	Q4-2020
2635	2635	CAS CONSTRUCTION SINGLE STAGE	Wicklow	Hollybrook Park, Bray, Co. Wicklow	4	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2636	2636	CALF Turnkey	Wicklow	Abbey St, Wicklow  (Phase 1)	6	Tuath Housing Association	""	""	""	""	""	Q4-2018
2637	2637	CALF Turnkey	Wicklow	Avondale Grange, Ballygannon, Rathdrum, Co. Wicklow (Phase 1)*	36	Respond	""	""	""	""	Q2-2021	""
2638	2638	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 1)*	9	Clï¿½id Housing	""	""	""	""	""	Q4-2019
2639	2639	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 2)*	8	Clï¿½id Housing	""	""	""	""	""	Q3-2020
2640	2640	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 3)*	4	Clï¿½id Housing	""	""	""	""	""	Q4-2020
2641	2641	CALF Turnkey	Wicklow	Ballycrone Manor, Kilcoole, Co. Wicklow (Phase 1)*	18	Respond	""	""	""	""	Q4-2020	""
2642	2642	CALF Turnkey	Wicklow	Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 1)*	40	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2021
2643	2643	CALF Turnkey	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	Tuath Housing Association	""	""	""	""	""	Q2-2018
2644	2644	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)*	8	Tuath Housing Association	""	""	""	""	""	Q4-2018
2645	2645	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)*	7	Tuath Housing Association	""	""	""	""	""	Q2-2019
2646	2646	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 3)*	4	Tuath Housing Association	""	""	""	""	""	Q4-2019
2647	2647	CALF Turnkey	Wicklow	Glenheron, Greystones, County Wicklow (Phase 1)	2	Tuath Housing Association	""	""	""	""	""	Q4-2020
2648	2648	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2649	2649	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 2)	73	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
2650	2650	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow (Phase 1)	11	Tuath Housing Association	""	""	""	""	Q2-2021	""
2651	2651	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow (Phase 2)	12	Tuath Housing Association	""	""	""	""	Q2-2021	""
2652	2652	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow (Phase 3)	13	Tuath Housing Association	""	""	""	""	Q2-2021	""
2653	2653	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow (Phase 4)	17	Tuath Housing Association	""	""	""	""	Q2-2021	""
2654	2654	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow (Phase 5)*	35	Tuath Housing Association	""	""	""	""	Q2-2021	""
2655	2655	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)	11	Tuath Housing Association	""	""	""	""	""	Q3-2020
2656	2656	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)	15	Tuath Housing Association	""	""	""	""	Q4-2020	""
2657	2657	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)	14	Tuath Housing Association	""	""	""	""	""	Q3-2020
2658	2658	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)	13	Tuath Housing Association	""	""	""	""	Q4-2020	""
2659	2659	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 3)	13	Tuath Housing Association	""	""	""	""	""	Q4-2020
2660	2660	CALF Turnkey	Wicklow	Lower Main Street, Arklow, Co. Wicklow (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	""	Q2-2021	""
2661	2661	CALF Turnkey	Wicklow	Meadow Gate, Marlton Road, Wicklow Town (Phase 1)*	4	Tuath Housing Association	""	""	""	""	""	Q4-2020
2662	2662	CALF Turnkey	Wicklow	Phase 2, Hazelbrook, Rathnew, Co. Wicklow (Phase 1)	56	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2663	2663	CALF Turnkey	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2020
2664	2664	CALF Turnkey	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 2)*	24	Respond	""	""	""	""	""	Q2-2021
2665	2665	CALF Turnkey	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 3)	16	Respond	""	""	""	""	""	Q3-2021
2666	2666	CALF Turnkey	Wicklow	Sessile Oaks, Ballyguile, Wicklow, Co. Wicklow (Phase 1)*	14	Tuath Housing Association	""	""	""	""	Q1-2017	""
2667	2667	CALF Turnkey	Wicklow	Sessile Oaks, Ballyguile, Wicklow, Co. Wicklow (Phase 2)	10	Tuath Housing Association	""	""	""	""	Q1-2017	""
2668	2668	CALF Turnkey	Wicklow	Sessile Oaks, Ballyguile, Wicklow, Co. Wicklow (Phase 3)	4	Tuath Housing Association	""	""	""	""	Q1-2017	""
2669	2669	CALF Turnkey	Wicklow	Ternlee, Coldross Lane, Kilcoole, Co. Wicklow (Phase 1)*	4	Clï¿½id Housing	""	""	""	""	""	Q2-2019
2670	2670	CALF Turnkey	Wicklow	Ternlee, Coldross Lane, Kilcoole, Co. Wicklow (Phase 2)*	2	Clï¿½id Housing	""	""	""	""	""	Q4-2019
2671	2671	CALF Turnkey	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)*	7	Tuath Housing Association	""	""	""	""	""	Q4-2018
2672	2672	CALF Turnkey	Wicklow	The Old Rectory, Blessington, Co. Wicklow (Phase 1)*	45	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
2673	2673	CALF Turnkey	Wicklow	Viewmount, Rathdrum, County Wicklow (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q2-2020
2674	2674	CALF Turnkey	Wicklow	Woodpark, Rathdrum, Co. Wicklow (Phase 1)*	4	Tuath Housing Association	""	""	""	""	""	Q3-2019
2675	2675	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Wicklow	Convent Lands (Phase 1)	23	*N/A	""	""	""	""	""	Q2-2020