{"help": "https://opendata.housing.gov.ie/en_GB/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "1a9d3408-b8db-43ed-b2b6-5c3acf483e70", "total_estimation_threshold": null, "records": [{"_id":1,"No.":1,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Sleaty Street, Graigcullen, Carlow","No. of Units":26,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q2-2017","Site Start":"","Site Finish":""},{"_id":2,"No.":2,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"River Court, Carlow ","No. of Units":10,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q1-2017","Site Start":"","Site Finish":""},{"_id":3,"No.":3,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Barrett Street, Bagnalstown","No. of Units":10,"Approved Housing Body":"Tintean Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q2-2017"},{"_id":4,"No.":4,"Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Mill Race Court, Carlow Town","No. of Units":14,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":5,"No.":5,"Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Royal Oak Road, Bagenalstown","No. of Units":6,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2015 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":6,"No.":6,"Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Ballincarrig, Wexford Road","No. of Units":6,"Approved Housing Body":"Tintean Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q4-2016"},{"_id":7,"No.":7,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"The Laurels, Carlow Town","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2017","Site Finish":""},{"_id":8,"No.":8,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Ard na Greine, Tullow","No. of Units":16,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q3-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":9,"No.":9,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Dublin Road, Tullow","No. of Units":21,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":10,"No.":10,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Bagenalstown","No. of Units":42,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":11,"No.":11,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Bilboa","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q3-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":12,"No.":12,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Hacketstown","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q3-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":13,"No.":13,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Mount Leinster Park, Carlow","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q2-2017","Site Finish":""},{"_id":14,"No.":14,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Myshall","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q2-2017","Site Finish":""},{"_id":15,"No.":15,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Pound Lane, Borris","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q3-2017"},{"_id":16,"No.":16,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Rathvilly","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q2-2017"},{"_id":17,"No.":17,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Moneybeg, Bagenalstown","No. of Units":24,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q3-2017"},{"_id":18,"No.":18,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Tullow (SRD)","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q3-2017"},{"_id":19,"No.":19,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Maryborough St., Carlow","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2016","Site Finish":""},{"_id":20,"No.":20,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Rathvilly (SRD)","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2016","Site Finish":""},{"_id":21,"No.":21,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Tullow Road, Carlow","No. of Units":63,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":22,"No.":22,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee Phase 2","No. of Units":7,"Approved Housing Body":"Tath Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":23,"No.":23,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee Phase 1","No. of Units":4,"Approved Housing Body":"Tath Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":24,"No.":24,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cavan","Scheme/Project Name":"Cluain Dara, Kingscourt","No. of Units":16,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q4-2016"},{"_id":25,"No.":25,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Rosehill, Mullagh (Phase 6)","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q2-2017 - the scheme is now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":26,"No.":26,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Butlersbridge","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q2-2017","Site Finish":""},{"_id":27,"No.":27,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Woodlands, Ballyhaise","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2017","Site Finish":""},{"_id":28,"No.":28,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Butlersbridge (Phase 1)","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q2-2017"},{"_id":29,"No.":29,"Funding Programme":"CALF CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Bruachlan, Westbury","No. of Units":22,"Approved Housing Body":"Co operative Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q2-2016","Site Start":"","Site Finish":""},{"_id":30,"No.":30,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Clare","Scheme/Project Name":"Lios Anama, Sixmilebridge","No. of Units":28,"Approved Housing Body":"Co operative Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2016","Site Finish":""},{"_id":31,"No.":31,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Cahercalla, Ennis (Phase 2)","No. of Units":10,"Approved Housing Body":"Cuan an Chlair Ltd","Stage 1 Capital Appraisal":"Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":32,"No.":32,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Doonbeg","No. of Units":12,"Approved Housing Body":"Kilkee Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":33,"No.":33,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Kildysart Road, Ennis","No. of Units":7,"Approved Housing Body":"Clare Haven Services Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q4-2016 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":34,"No.":34,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Laurel Lodge, Clare Road, Ennis","No. of Units":3,"Approved Housing Body":"Society of Saint Vincent de Paul","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q4-2016"},{"_id":35,"No.":35,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Roslevan, Ennis","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":36,"No.":36,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Feakle","No. of Units":11,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":37,"No.":37,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Glor Srutha, Knockbrack Lower, Clonlara","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q3-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":38,"No.":38,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Seaview Park, Quilty","No. of Units":18,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q2-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":39,"No.":39,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Tullyglass, Shannon","No. of Units":21,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2016 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":40,"No.":40,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"River View, School Road, Corofin","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":41,"No.":41,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Duntahan Road, Fermoy","No. of Units":12,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q1-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":42,"No.":42,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Brookwood, Kilnagurteen, Macroom","No. of Units":1,"Approved Housing Body":"Anvers Housing Association Ltd","Stage 1 Capital Appraisal":"Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":43,"No.":43,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay","No. of Units":16,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":44,"No.":44,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"St. Francis Court, Youghal","No. of Units":4,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q1-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":45,"No.":45,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Cuan Barra, Kilmore, Ballingeary","No. of Units":3,"Approved Housing Body":"Coiste Tithe Uibh Laoire Teoranta","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q2-2017 - the scheme is now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":46,"No.":46,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Townlands, Rosscarbery","No. of Units":9,"Approved Housing Body":"Rosscarbery Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q2-2017 - the scheme is now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":47,"No.":47,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Avenue House, Bandon","No. of Units":9,"Approved Housing Body":"Bandon Geriatric & Community Council","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2016","Site Finish":""},{"_id":48,"No.":48,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Church View, Love Lane, Charleville","No. of Units":6,"Approved Housing Body":"Charleville Care Project Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q2-2017","Site Finish":""},{"_id":49,"No.":49,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Fellowship House, Togher","No. of Units":31,"Approved Housing Body":"Tabor Lodge Addiction & Housing Services Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":50,"No.":50,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Ard Na Greine, Cortmacsherry","No. of Units":15,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":51,"No.":51,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Station Road, Blarney","No. of Units":18,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":52,"No.":52,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Bluepool, Kanturk","No. of Units":16,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":53,"No.":53,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Cloyne, East Cork","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":54,"No.":54,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Model Village, Dripsey","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":55,"No.":55,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Beechgrove, Clonakilty","No. of Units":56,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q3-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":56,"No.":56,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Castle Treasure Grove","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":57,"No.":57,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Poulavone, Ballincollig","No. of Units":57,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":58,"No.":58,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Newtown, Bantry","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2016 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":59,"No.":59,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Fairfield, Macroom","No. of Units":7,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q3-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":60,"No.":60,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Droum, Castletownbere","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q1-2017 - the scheme is now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":61,"No.":61,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Kilnagleary, Carrigaline","No. of Units":49,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2017","Site Finish":""},{"_id":62,"No.":62,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Kilnagleary, Carrigaline (Phase 4)","No. of Units":15,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":63,"No.":63,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork","Scheme/Project Name":"Oliver Plunkett Hill, Fermoy","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q2-2017"},{"_id":64,"No.":64,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Church Road, Carrigtwohill","No. of Units":25,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2017","Site Finish":""},{"_id":65,"No.":65,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Inis Alainn & Castleoaks, Bandon","No. of Units":11,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2017","Site Finish":""},{"_id":66,"No.":66,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Gleann Tuairigh, Youghal","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q3-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":67,"No.":67,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Kanturk","No. of Units":25,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q1-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":68,"No.":68,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Clondulane, Fermoy","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":69,"No.":69,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Bantry","No. of Units":30,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q4-2016 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":70,"No.":70,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"College Wood, Cobh","No. of Units":32,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2016","Site Finish":""},{"_id":71,"No.":71,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Castletreasure, Douglas (Phase 3)","No. of Units":12,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q4-2016","Site Finish":""},{"_id":72,"No.":72,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Crannard, Fermoy","No. of Units":52,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":73,"No.":73,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"CulAird Carraigtwohill","No. of Units":29,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q4-2016","Site Finish":""},{"_id":74,"No.":74,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Whitechurch","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q2-2016 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":75,"No.":75,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Castletreasure, Douglas (Phase 1)","No. of Units":12,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q1-2017"},{"_id":76,"No.":76,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Castletreasure, Douglas (Phase 2)","No. of Units":16,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q1-2017"},{"_id":77,"No.":77,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Abbeywood, Midelton","No. of Units":61,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2017","Site Finish":""},{"_id":78,"No.":78,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Claragh Road, Millstreet","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q3-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":79,"No.":79,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"St. Mary?s Road, Dunmanway","No. of Units":20,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q3-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":80,"No.":80,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork","Scheme/Project Name":"Downeen Cross, Rosscarbery","No. of Units":7,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q3-2017 - the scheme is now fully approved","Site Start":"","Site Finish":""},{"_id":81,"No.":81,"Funding Programme":"CALF CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"124 Lr. Glanmire Road & 2 Breamer, Cork","No. of Units":6,"Approved Housing Body":"Galtan Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":82,"No.":82,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"the Meadows, Knopckacullen Ease, Gurranabraher, Cork","No. of Units":72,"Approved Housing Body":"Tath Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF Funding Q3-2017","Site Start":"","Site Finish":""},{"_id":83,"No.":83,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Popes Road, Blackpool","No. of Units":7,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":84,"No.":84,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Millfield Cottages, Blackpool","No. of Units":18,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q1-2017","Site Finish":""},{"_id":85,"No.":85,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Leitrim Street, Cork City","No. of Units":18,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q3-2016","Site Start":"","Site Finish":""},{"_id":86,"No.":86,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Edel House, Grattan Street","No. of Units":33,"Approved Housing Body":"Good Shepherd Services Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q1-2016 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":87,"No.":87,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Saint Vincent's Convent, Vincent's Ave/St. Mary's Street","No. of Units":25,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2016","Site Finish":""},{"_id":88,"No.":88,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Thomas Davis Street (Phase 1)","No. of Units":28,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":89,"No.":89,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Ceanncora Lawn, Ballinlough","No. of Units":1,"Approved Housing Body":"Cork Mental Health Voluntary Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q2-2017","Site Finish":""},{"_id":90,"No.":90,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"St. Joachim & Anne's, Anglesea Street","No. of Units":8,"Approved Housing Body":"Simon Community : Cork Simon","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q3-2017 - the scheme is now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":91,"No.":91,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"27-29 Dublin Street, Blackpool","No. of Units":10,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q4-2016","Site Finish":""},{"_id":92,"No.":92,"Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 1 B Knocknaheeny","No. of Units":29,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Q3-2016","Site Finish":""},{"_id":93,"No.":93,"Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 2 A Knocknaheeny","No. of Units":47,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q3-2017 - the scheme is now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":94,"No.":94,"Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 1 C Knocknaheeny","No. of Units":41,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":95,"No.":95,"Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 2 B Knocknaheeny","No. of Units":36,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":96,"No.":96,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"The Meadows, Knocknacullen","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":"Q3-2016"},{"_id":97,"No.":97,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Boyces Street","No. of Units":51,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":98,"No.":98,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Shandon Street/John Philpott Curran Street","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q3-2017 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":99,"No.":99,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"St. Johns Well","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q4-2016 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""},{"_id":100,"No.":100,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Churchfield Place East","No. of Units":3,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q4-2016 - full design/tender being prepared","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Site Finish":""}], "fields": [{"id": "_id", "type": "int"}, {"id": "No.", "type": "numeric"}, {"id": "Funding Programme", "type": "text"}, {"id": "LA", "type": "text"}, {"id": "Scheme/Project Name", "type": "text"}, {"id": "No. of Units", "type": "numeric"}, {"id": "Approved Housing Body", "type": "text"}, {"id": "Stage 1 Capital Appraisal", "type": "text"}, {"id": "Stage 2 Pre Planning", "type": "text"}, {"id": "Stage 3 Pre Tender design", "type": "text"}, {"id": "Stage 4 Tender Report or Final Turnkey/CALF approval", "type": "text"}, {"id": "Site Start", "type": "text"}, {"id": "Site Finish", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=1a9d3408-b8db-43ed-b2b6-5c3acf483e70", "next": "/api/3/action/datastore_search?resource_id=1a9d3408-b8db-43ed-b2b6-5c3acf483e70&offset=100"}, "total": 772, "total_was_estimated": false}}