{"help": "https://opendata.housing.gov.ie/en_GB/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "67ad3fe3-e615-4de5-ab55-51061a86d8c4", "total_estimation_threshold": null, "records": [{"_id":1,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Tullow Road, Carlow - Phase 1","No. of Units":18,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":2,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Tullow Road, Carlow - Phase 2","No. of Units":22,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":3,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Tullow Road, Carlow - Phase 3","No. of Units":23,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":4,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"The Laurels, Carlow Town","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2018"},{"_id":5,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Ard na Greine, Tullow","No. of Units":16,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":6,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Dublin Road, Tullow","No. of Units":21,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":7,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Bagenalstown","No. of Units":42,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2017, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":8,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Bilboa","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":9,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Hacketstown","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":10,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Mount Leinster Park, Carlow","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2017"},{"_id":11,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Myshall","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"},{"_id":12,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Pound Lane, Borris","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q3-2017"},{"_id":13,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Rathvilly","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2017"},{"_id":14,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Moneybeg, Bagenalstown","No. of Units":24,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q3-2017"},{"_id":15,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Paulville, Tullow (SRD)","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q3-2017"},{"_id":16,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Maryborough St., Carlow","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"},{"_id":17,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Drumin, St. Mullins (SRD)","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":18,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Mill Race Court, Carlow Town","No. of Units":14,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"Stage 1 approved in Q3-2015, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":19,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Royal Oak Road, Bagenalstown","No. of Units":6,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q4-2017, the scheme is being tendered.","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":20,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Ballincarrig, Wexford Road","No. of Units":6,"Approved Housing Body":"Tintean Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2016"},{"_id":21,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Barrett Street, Bagnalstown, Co. Carlow (Phase 1)","No. of Units":10,"Approved Housing Body":"Tintean Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"},{"_id":22,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)","No. of Units":59,"Approved Housing Body":"Tath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":23,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"River Court,  Carlow  (Phase 1)*","No. of Units":10,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q1-2018","On Site":"","Completed":""},{"_id":24,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"River Court,  Carlow  (Phase 2)","No. of Units":26,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q1-2018","On Site":"","Completed":""},{"_id":25,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"River Court,  Carlow  (Phase 3)","No. of Units":11,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q1-2018","On Site":"","Completed":""},{"_id":26,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"River Court,  Carlow  (Phase 4)","No. of Units":9,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q1-2018","On Site":"","Completed":""},{"_id":27,"No.":"","Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Sleaty Street, Graigcullen, Carlow  (Phase 1)","No. of Units":26,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":28,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Rosehill, Mullagh (Phase 6)","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":29,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Butlersbridge (Phase 2)","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"},{"_id":30,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Woodlands, Ballyhaise","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":31,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Butlersbridge (Phase 1)","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2017"},{"_id":32,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Clones Road, Butlersbridge","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q4-2017, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":33,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Corstruce, Ballinagh","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q1-2018, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":34,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Main Street, Mullagh","No. of Units":19,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2018, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":35,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Holborn Hill, Belturbet","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2018, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":36,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan","Scheme/Project Name":"Elm Grove","No. of Units":13,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2018, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":37,"No.":"","Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Cluain Dara, Kingscourt, Co Cavan (Phase 1)","No. of Units":16,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2016"},{"_id":38,"No.":"","Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee, Cavan (Phase 1)","No. of Units":4,"Approved Housing Body":"Tath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2018"},{"_id":39,"No.":"","Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee, Cavan (Phase 2)","No. of Units":5,"Approved Housing Body":"Tath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2017","Completed":""},{"_id":40,"No.":"","Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee, Cavan (Phase 3)","No. of Units":2,"Approved Housing Body":"Tath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2017","Completed":""},{"_id":41,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Clare","Scheme/Project Name":"River View, School Road, Corofin","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":42,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Roslevan, Ennis","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q1-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":43,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Feakle","No. of Units":13,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q2-2018, the scheme is being tendered.","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":44,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Glor Srutha, Knockbrack Lower, Clonlara","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q1-2018, the scheme is being tendered.","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":45,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Seaview Park, Quilty","No. of Units":18,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q3-2017, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":46,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Tullyglass, Shannon","No. of Units":21,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2016, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":47,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Ashline, Kilrush Road, Ennis","No. of Units":40,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"Stage 1 approved in Q4-2017, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":48,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Cahercalla, Ennis (Phase 2)","No. of Units":14,"Approved Housing Body":"Cuan an Chlair Ltd","Stage 1 Capital Appraisal":"Stage 1 approved in Q4-2016, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":49,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Laurel Lodge, Clare Road, Ennis","No. of Units":3,"Approved Housing Body":"Society of Saint Vincent de Paul","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2016"},{"_id":50,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Haggard View, Clarecastle (Phase 2)","No. of Units":2,"Approved Housing Body":"Anvers Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2018"},{"_id":51,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Haggard View, Clarecastle (Phase 1)","No. of Units":2,"Approved Housing Body":"Anvers Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"},{"_id":52,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Monaskeha Heights","No. of Units":2,"Approved Housing Body":"Newgrove Housing Association Ltd","Stage 1 Capital Appraisal":"Stage 1 approved in Q4-2017, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":53,"No.":"","Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)","No. of Units":12,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2018"},{"_id":54,"No.":"","Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)","No. of Units":19,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":55,"No.":"","Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)","No. of Units":5,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q2-2018","On Site":"","Completed":""},{"_id":56,"No.":"","Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Lios Anama, Sixmilebridge, Clare (Phase 1)","No. of Units":28,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2017"},{"_id":57,"No.":"","Funding Programme":"CALF Construction","LA":"Clare","Scheme/Project Name":"Revised - Bruachlan, Westbury, Co Clare (Phase 1)","No. of Units":22,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Scheme approved for CALF funding Q1-2017","On Site":"","Completed":""},{"_id":58,"No.":"","Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Tullyvarraga, Shannon, Co. Clare (Phase 1)*","No. of Units":47,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":59,"No.":"","Funding Programme":"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","LA":"Clare","Scheme/Project Name":"Shannon East","No. of Units":50,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Q1-2018","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":60,"No.":"","Funding Programme":"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","LA":"Cork","Scheme/Project Name":"The Miles, Clonakilty","No. of Units":54,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Q1-2018","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":61,"No.":"","Funding Programme":"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","LA":"Cork","Scheme/Project Name":"Poundhill, Skibbereen","No. of Units":50,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Q1-2018","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":62,"No.":"","Funding Programme":"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","LA":"Cork","Scheme/Project Name":"Oakwood, Macroom","No. of Units":50,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Q1-2018","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":63,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Arus Mhuire","No. of Units":30,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2017","Completed":""},{"_id":64,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"1-4 Marble Lane","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2017"},{"_id":65,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Barack Street","No. of Units":32,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q1-2018, the scheme is fully approved.","On Site":"","Completed":""},{"_id":66,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"FaranFerris","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":67,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"High Street","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":68,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Tramore Road","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q1-2018","Completed":""},{"_id":69,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Whites Street","No. of Units":43,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q1-2018, the scheme is fully approved.","On Site":"","Completed":""},{"_id":70,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Woods Street","No. of Units":16,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Stage 4 approved in Q1-2018, the scheme is fully approved.","On Site":"","Completed":""},{"_id":71,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Church Road","No. of Units":43,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2017","Completed":""},{"_id":72,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Sheridan Park, Tramore Road","No. of Units":28,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2016"},{"_id":73,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"1-5 Ard Aoibhinn, Banduff, Mayfield","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q3-2017","Completed":""},{"_id":74,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Corcorans Quay","No. of Units":3,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":75,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Blarney Street","No. of Units":25,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":76,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"37-39 Dublin Street, Blackpool, Cork","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2018"},{"_id":77,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"6-10 Ard Aoibhinn, Banduff, Mayfield","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":78,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"2 Deanrock Cottages, Togher","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":79,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"258 & 259 Blarney Street, Cork","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"},{"_id":80,"No.":"","Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"1 & 2 The Groves, Skehard Road, Cork","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q2-2018"},{"_id":81,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"The Meadows, Knocknacullen","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q3-2016"},{"_id":82,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Boyces Street","No. of Units":51,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q1-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":83,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Shandon Street/John Philpott Curran Street","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q1-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":84,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"St. Johns Well","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q2-2018, the scheme is being tendered.","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":85,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Churchfield Place East","No. of Units":3,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":86,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Deanrock, Togher","No. of Units":65,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2016","Completed":""},{"_id":87,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Gerald Griffin Street","No. of Units":41,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q3-2017","Completed":""},{"_id":88,"No.":"","Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Cappanoole","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2016"},{"_id":89,"No.":"","Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 1 B Knocknaheeny","No. of Units":29,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q4-2017"},{"_id":90,"No.":"","Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 2 A Knocknaheeny","No. of Units":47,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2018","Completed":""},{"_id":91,"No.":"","Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 1 C Knocknaheeny","No. of Units":41,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":92,"No.":"","Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 2 B Knocknaheeny","No. of Units":38,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":93,"No.":"","Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 2C Knocknaheeny","No. of Units":24,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q2-2018, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":94,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Edel House, Grattan Street","No. of Units":33,"Approved Housing Body":"Good Shepherd Services Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"Stage 3 approved in Q1-2018, the scheme is being tendered.","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":95,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Saint Vincent's Convent, Vincent's Ave/St. Mary's Street","No. of Units":25,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"Stage 1 approved in Q2-2015, outline design and costs being prepared.","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":96,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Thomas Davis Street (Phase 1)","No. of Units":28,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q4-2017, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":97,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Ceanncora Lawn, Ballinlough","No. of Units":1,"Approved Housing Body":"Cork Mental Health Voluntary Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q2-2017","Completed":""},{"_id":98,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"St. Joachim & Anne's, Anglesea Street","No. of Units":8,"Approved Housing Body":"Simon Community : Cork Simon","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"Stage 2 approved in Q4-2017, full design/tender being prepared.","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":""},{"_id":99,"No.":"","Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"27-29 Dublin Street, Blackpool","No. of Units":10,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"Q4-2016","Completed":""},{"_id":100,"No.":"","Funding Programme":"CALF Construction","LA":"Cork City","Scheme/Project Name":"124 Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)","No. of Units":3,"Approved Housing Body":"Galtan Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","On Site":"","Completed":"Q1-2018"}], "fields": [{"id": "_id", "type": "int"}, {"id": "No.", "type": "text"}, {"id": "Funding Programme", "type": "text"}, {"id": "LA", "type": "text"}, {"id": "Scheme/Project Name", "type": "text"}, {"id": "No. of Units", "type": "numeric"}, {"id": "Approved Housing Body", "type": "text"}, {"id": "Stage 1 Capital Appraisal", "type": "text"}, {"id": "Stage 2 Pre Planning", "type": "text"}, {"id": "Stage 3 Pre Tender design", "type": "text"}, {"id": "Stage 4 Tender Report or Final Turnkey/CALF approval", "type": "text"}, {"id": "On Site", "type": "text"}, {"id": "Completed", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=67ad3fe3-e615-4de5-ab55-51061a86d8c4", "next": "/api/3/action/datastore_search?resource_id=67ad3fe3-e615-4de5-ab55-51061a86d8c4&offset=100"}, "total": 1067, "total_was_estimated": false}}