﻿_id	No_	Funding Programme	LA	Scheme/Project Name	No_ of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	On Site	Completed
1	1	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	6	*N/A	""	""	""	""	""	Q3-2019
2	2	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	6	*N/A	""	""	""	""	""	Q3-2019
3	3	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	12	*N/A	""	""	""	""	""	Q3-2020
4	4	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	10	*N/A	""	""	""	""	""	Q4-2020
5	5	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	10	*N/A	""	""	""	""	Q4-2017	""
6	6	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	19	*N/A	""	""	""	""	Q4-2017	""
7	7	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Father Flood Avenue, Rathvilly	8	*N/A	""	""	""	""	""	Q4-2019
8	8	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Oliver's Crescent, Myshall	4	*N/A	""	""	""	""	""	Q4-2019
9	9	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Mary's Court & Dereen Heights, Tullow	6	*N/A	""	""	""	""	""	Q4-2020
10	10	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Crowsgrove, Kildavin	1	*N/A	""	""	""	""	""	Q1-2020
11	11	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Ardattin	6	*N/A	""	""	""	""	Q1-2020	""
12	12	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Brownbog, Hackettstown	1	*N/A	""	""	""	""	Q1-2020	""
13	13	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Spahill, Borris	1	*N/A	""	""	""	""	""	Q4-2020
14	14	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Rural Ballypierce, Kildavin	1	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
15	15	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
16	16	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	""	Q4-2018
17	17	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	""	""	""	Q3-2019
18	18	SHIP CONSTRUCTION	Carlow	Bagenalstown	20	*N/A	""	""	""	""	""	Q3-2020
19	19	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
20	20	SHIP CONSTRUCTION	Carlow	Slate Row, Hacketstown	4	*N/A	""	""	""	""	""	Q4-2018
21	21	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
22	22	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
23	23	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
24	24	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
25	25	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
26	26	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
27	27	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
28	28	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
29	29	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	9	*N/A	""	""	""	""	Q3-2020	""
30	30	SHIP CONSTRUCTION	Carlow	Barrack Street, Carlow	7	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
31	31	CAS CONSTRUCTION TURNKEY	Carlow	Pollerton Big, Carlow	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2020
32	32	CAS CONSTRUCTION	Carlow	Gleann na Bearu, Royal Oak Road, Bagenalstown	6	Respond	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
33	33	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
34	34	CAS CONSTRUCTION	Carlow	Homefield, Blackbog Road, Carlow	3	Carlow Voluntary Housing Association	""	""	""	""	Q4-2020	""
35	35	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
36	36	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 2)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
37	37	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
38	38	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 2)	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
39	39	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
40	40	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	Tath Housing Association	""	""	""	""	""	Q4-2018
41	41	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	12	Tath Housing Association	""	""	""	""	""	Q2-2019
42	42	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q2-2019
43	43	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 4)	6	Tath Housing Association	""	""	""	""	""	Q3-2019
44	44	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 5)	16	Tath Housing Association	""	""	""	""	""	Q4-2019
45	45	CALF Turnkey	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2018
46	46	CALF Turnkey	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 1)*	32	Tath Housing Association	""	""	""	""	Q2-2019	""
47	47	CALF Turnkey	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 2)*	21	Tath Housing Association	""	""	""	""	Q2-2019	""
48	48	CALF Turnkey	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 3)	10	Tath Housing Association	""	""	""	""	Q2-2019	""
49	49	CALF Turnkey	Carlow	Greenhills, Leighlin Road, Graiguecullen, Carlow (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
50	50	CALF Turnkey	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 1)	3	Tath Housing Association	""	""	""	""	""	Q4-2020
51	51	CALF Turnkey	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 2)	6	Tath Housing Association	""	""	""	""	Q4-2019	""
52	52	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 1)	28	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
53	53	CALF Turnkey	Carlow	Rivercourt,  Carlow  (Phase 2)*	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
54	54	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing	""	""	""	""	""	Q1-2019
55	55	CALF Turnkey	Carlow	Tanner Hall, Athy Road, Carlow (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
56	56	CALF Turnkey	Carlow	The Millrace, Burrin, Co. Carlow (Phase 1)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
57	57	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	3	*N/A	""	""	""	""	""	Q4-2019
58	58	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2020
59	59	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 3)	3	*N/A	""	""	""	""	""	Q4-2020
60	60	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 4)	4	*N/A	""	""	""	""	Q2-2019	""
61	61	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff 	4	*N/A	""	""	""	""	Q1-2021	""
62	62	SHIP CONSTRUCTION TURNKEY	Cavan	Woodsland, Killyfinla, Ballyjamesduff	8	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
63	63	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
64	64	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
65	65	SHIP CONSTRUCTION TURNKEY	Cavan	Lakeland Close, Swellan, Cavan Town	2	*N/A	""	""	""	""	""	Q4-2020
66	66	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	8	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
67	67	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	12	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
68	68	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	11	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
69	69	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	12	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
70	70	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	""	Q1-2019
71	71	SHIP CONSTRUCTION	Cavan	Butlersbridge	4	*N/A	""	""	""	""	""	Q1-2018
72	72	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	""	Q4-2018
73	73	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
74	74	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	""	""	""	Q3-2020
75	75	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	""	""	""	Q1-2020	""
76	76	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	""	""	""	""	Q4-2020	""
77	77	SHIP CONSTRUCTION	Cavan	Elm Grove, Main St, Cavan Town	13	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
78	78	SHIP CONSTRUCTION	Cavan	Cavan Road, Ballinagh	15	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
79	79	SHIP CONSTRUCTION	Cavan	Main St., Butlersbridge	6	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
80	80	SHIP CONSTRUCTION	Cavan	Cluain Dara, Kingscourt	3	*N/A	""	""	""	""	Q1-2021	""
81	81	SHIP CONSTRUCTION	Cavan	Fairymount Close, Kingscourt, Co. Cavan	3	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
82	82	SHIP CONSTRUCTION	Cavan	St. Bridgets Terrace, Cavan Town (Infill)	12	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
83	83	SHIP CONSTRUCTION	Cavan	Beckscourt, Eastboro, Bailieborough	47	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
84	84	CAS CONSTRUCTION TURNKEY	Cavan	Castlemanor Village, Cavan Town	29	Tath Housing Association Ltd	""	""	""	""	""	Q3-2019
85	85	CAS CONSTRUCTION	Cavan	St. Killian's Housing Association Ltd., Mullagh, Co. Cavan	4	St. Killian's Housing Association, Mullagh, Co. Cavan	""	""	""	""	Q1-2021	""
86	86	CALF Turnkey	Cavan	16 Units, Fairgreen Park, Mullagh, Co. Cavan (Phase 1)	16	Clanmil Housing Association Ireland	""	""	""	""	Q1-2020	""
87	87	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 1)	12	Tath Housing Association	""	""	""	Q1-2019	""	""
88	88	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 2)	13	Tath Housing Association	""	""	""	Q1-2019	""	""
89	89	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
90	90	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q2-2018
91	91	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	Tath Housing Association	""	""	""	""	""	Q3-2018
92	92	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	Tath Housing Association	""	""	""	""	""	Q4-2018
93	93	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 1)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
94	94	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 2)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
95	95	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 3)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2019	""
96	96	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 4)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2019	""
97	97	CALF Turnkey	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2020
98	98	CALF Turnkey	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 2)*	22	Cluid Housing	""	""	""	""	Q4-2019	""
99	99	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	""	Q4-2018
100	100	SHIP CONSTRUCTION TURNKEY	Clare	Cloughleigh Road + Shallee Drive, Ennis	4	*N/A	""	""	""	""	""	Q4-2020
101	101	SHIP CONSTRUCTION TURNKEY	Clare	Shantraud Woods, Killaloe	4	*N/A	""	""	""	""	Q3-2020	""
102	102	SHIP CONSTRUCTION SINGLE STAGE	Clare	Cappagh Lodge, Sixmilebridge	2	*N/A	""	""	""	""	""	Q4-2020
103	103	SHIP CONSTRUCTION SINGLE STAGE	Clare	St. Michaels Place, Kilmihil	2	*N/A	""	""	""	""	""	Q4-2020
104	104	SHIP CONSTRUCTION SINGLE STAGE	Clare	Madden's Terrace, Clarecastle	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
105	105	SHIP CONSTRUCTION SINGLE STAGE	Clare	Dun na Mara, Doonbeg	2	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
106	106	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	""	""	""	Q2-2020
107	107	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	""	""	Q4-2019
108	108	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	""	""	Q4-2019
109	109	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	""	""	""	Q4-2020
110	110	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	""	""	""	""	Q3-2020	""
111	111	SHIP CONSTRUCTION	Clare	Miltown Malbay	27	*N/A	""	""	""	""	Q3-2020	""
112	112	SHIP CONSTRUCTION	Clare	Doonaun, Tulla	25	*N/A	""	""	""	""	Q4-2020	""
113	113	SHIP CONSTRUCTION	Clare	Boheraroan, Newmarket-on-Fergus	18	*N/A	""	""	""	""	Q4-2020	""
114	114	SHIP CONSTRUCTION	Clare	Scariff	18	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
115	115	SHIP CONSTRUCTION	Clare	Kilkee Road, Doonbeg	8	*N/A	""	""	""	""	Q1-2020	""
116	116	SHIP CONSTRUCTION	Clare	Tulla Road, Roslevan, Ennis	8	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
117	117	SHIP CONSTRUCTION	Clare	St Senan's Terrace, Kilrush	3	*N/A	""	""	""	""	""	Q4-2019
118	118	SHIP CONSTRUCTION	Clare	Drumcliffe Road, Ennis, Co. Clare	26	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
119	119	SHIP CONSTRUCTION	Clare	Deerpark, Ennistymon	30	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
120	120	SHIP CONSTRUCTION	Clare	Ballyliddan West, Sixmilebridge	16	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
121	121	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
122	122	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
123	123	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	15	Cuan an Chlair Ltd	""	""	""	""	""	Q4-2020
124	124	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
125	125	CAS CONSTRUCTION	Clare	Monaskeha Heights	4	Newgrove Housing Association Ltd	""	""	""	""	""	Q3-2019
126	126	CAS CONSTRUCTION	Clare	Roo East	4	Thomond Housing Association Ltd	""	""	""	""	""	Q4-2018
127	127	CAS CONSTRUCTION	Clare	9 Elmwood, Ballycannon Heights, Meelick	4	Thomond Housing Association Ltd	""	""	""	""	""	Q1-2019
128	128	CAS CONSTRUCTION	Clare	Teach Rua, Edenvale Ennis	4	Newgrove Housing Association Ltd	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
129	129	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2018
130	130	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	18	Cluid Housing	""	""	""	""	""	Q4-2018
131	131	CALF Turnkey	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2020
132	132	CALF Turnkey	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 2)*	2	Cluid Housing	""	""	""	""	Q2-2019	""
133	133	CALF Turnkey	Clare	Cluain Fia, Crusheen, Co. Clare (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q2-2020
134	134	CALF Turnkey	Clare	Cluain Fia, Crusheen, Co. Clare (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q4-2020
135	135	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
136	136	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2019
137	137	CALF Turnkey	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 1)*	29	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
138	138	CALF Turnkey	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 2)*	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2019	""
139	139	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
140	140	CALF Construction	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	Q2-2016	""	""
141	141	CALF Turnkey	Clare	Sycamore Drive, Ennis, Co. Clare (Phase 1)*	3	Cluid Housing	""	""	""	""	""	Q4-2019
142	142	CALF Turnkey	Clare	Sycamore Drive, Ennis, Co. Clare (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q4-2020
143	143	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
144	144	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 2)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
145	145	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	51	*N/A	""	""	""	""	Q4-2019	""
146	146	SHIP DIALOG	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	""	Q4-2018
147	147	SHIP DIALOG	Cork City	Barrack Street	32	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
148	148	SHIP DIALOG	Cork City	FaranFerris	5	*N/A	""	""	""	""	""	Q4-2019
149	149	SHIP DIALOG	Cork City	High Street	9	*N/A	""	""	""	""	""	Q4-2019
150	150	SHIP DIALOG	Cork City	Tramore Road	4	*N/A	""	""	""	""	""	Q4-2018
151	151	SHIP DIALOG	Cork City	Whites Street	43	*N/A	""	""	""	""	""	Q4-2019
152	152	SHIP DIALOG	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
153	153	SHIP DIALOG	Cork City	Church Road, Blackrock	43	*N/A	""	""	""	""	""	Q3-2018
154	154	SHIP DIALOG	Cork City	1-5, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
155	155	SHIP DIALOG	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
156	156	SHIP DIALOG	Cork City	Blarney Street	25	*N/A	""	""	""	""	""	Q4-2019
157	157	SHIP DIALOG	Cork City	Ballinure Road, Cork City	5	*N/A	""	""	""	""	""	Q4-2020
158	158	SHIP DIALOG	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
159	159	SHIP DIALOG	Cork City	Gerald Griffin Street, Cork	13	*N/A	""	""	""	""	""	Q4-2020
160	160	SHIP DIALOG	Cork City	Lower John Street, Cork	17	*N/A	""	""	""	""	""	Q4-2020
161	161	SHIP DIALOG	Cork City	Skehard Road, Blackrock, Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
162	162	SHIP DIALOG	Cork City	Coach Street, Cork	12	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
163	163	SHIP DIALOG	Cork City	Shanakiel Road, Cork	20	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
164	164	SHIP DIALOG	Cork City	Spring Lane, Blackpool, Cork	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
165	165	SHIP DIALOG	Cork City	Glen Ryan Road, Cork	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
166	166	SHIP DIALOG	Cork City	Pouladuff Road, Cork 	11	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
167	167	SHIP DIALOG	Cork City	Watercourse Road, Blackpool, Cork	37	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
168	168	SHIP DIALOG	Cork City	Denroche's Cross, Glasheen Road, Cork	43	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
169	169	SHIP DIALOG	Cork City	Wolsey Court, Blackpool, Cork	49	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
170	170	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
171	171	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
172	172	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
173	173	SHIP CONSTRUCTION TURNKEY	Cork City	6-10, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q4-2018
174	174	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	""	Q4-2018
175	175	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
176	176	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
177	177	SHIP CONSTRUCTION TURNKEY	Cork City	3B & 9B South Terrace Court, South Terrace, Cork	2	*N/A	""	""	""	""	""	Q4-2018
178	178	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinlough Road / Knockrea Lawn, Ballinlough, Cork	6	*N/A	""	""	""	""	""	Q2-2019
179	179	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork	10	*N/A	""	""	""	""	""	Q4-2019
180	180	SHIP CONSTRUCTION TURNKEY	Cork City	Gearney's Boreen, Commons Road, Cork	3	*N/A	""	""	""	""	""	Q4-2019
181	181	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork (Phase 2)	10	*N/A	""	""	""	""	""	Q4-2019
182	182	SHIP CONSTRUCTION TURNKEY	Cork City	Eagle Valley, Sarsfield Road	1	*N/A	""	""	""	""	""	Q4-2019
183	183	SHIP CONSTRUCTION TURNKEY	Cork City	Knockfree Avenue, Glengarriff Road, Fairhill, Cork	2	*N/A	""	""	""	""	""	Q4-2019
184	184	SHIP CONSTRUCTION TURNKEY	Cork City	3-10 Herbert Lawn, Belmont, Rochestown, Cork	8	*N/A	""	""	""	""	""	Q4-2019
185	185	SHIP CONSTRUCTION TURNKEY	Cork City	Elton Wood & Herbert Lawn, Rochestown, Cork 	8	*N/A	""	""	""	""	""	Q4-2019
186	186	SHIP CONSTRUCTION TURNKEY	Cork City	Aspen Drive, Maryborough Hill, Cork 	29	*N/A	""	""	""	""	""	Q4-2019
187	187	SHIP CONSTRUCTION TURNKEY	Cork City	5 Fairfield Heights, Upper Fairhill, Cork 	3	*N/A	""	""	""	""	""	Q4-2020
188	188	SHIP CONSTRUCTION TURNKEY	Cork City	Ringcroft Avenue, Ringmahon Road, Mahon	2	*N/A	""	""	""	""	""	Q4-2020
189	189	SHIP CONSTRUCTION TURNKEY	Cork City	Cluain Ard, Waterloo Road, Blarney, Cork	3	*N/A	""	""	""	""	""	Q4-2020
190	190	SHIP CONSTRUCTION	Cork City	Poulavone, Ballincollig	57	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
191	191	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
192	192	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
193	193	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	""	""	""	Q4-2020
194	194	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	""	""	Q4-2019
195	195	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	""	Q4-2018
196	196	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	8	*N/A	""	""	""	""	""	Q4-2018
197	197	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	43	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
198	198	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
199	199	SHIP CONSTRUCTION	Cork City	Madonna House, Ballincollig (Phase 2)	6	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
200	200	SHIP CONSTRUCTION	Cork City	Bramble Cottages	5	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
201	201	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	32	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
202	202	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	3	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
203	203	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	7	*N/A	""	""	""	""	""	Q1-2019
204	204	SHIP CONSTRUCTION	Cork City	Hollywood Estate Infill Housing, Blarney Road, Cork	7	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
205	205	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	50	*N/A	""	""	""	""	""	Q3-2019
206	206	SHIP CONSTRUCTION	Cork City	Clover Hill Court, Bessboro Road, Mahon, Cork	51	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
207	207	SHIP CONSTRUCTION	Cork City	Westside, Model Farm Road, Cork	32	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
208	208	SHIP CONSTRUCTION	Cork City	Gerald Griffin Apartments - Block 7, North Monastery Road / St. Vincent's Road, Cork	6	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
209	209	SHIP CONSTRUCTION	Cork City	Sli Gartan, Mayfield, Cork 	1	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
210	210	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 1B	29	*N/A	""	""	""	""	""	Q4-2017
211	211	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 2A	47	*N/A	""	""	""	""	""	Q4-2019
212	212	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 1C	41	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
213	213	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 2B	38	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
214	214	REGENERATION	Cork City	CNWQR Knocknaheeney Phase 2C	24	*N/A	""	""	""	""	""	Q4-2020
215	215	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Knocknaheeny, Cork	3	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
216	216	REGENERATION	Cork City	Ardmore Avenue, Knocknaheeny, Cork	1	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
217	217	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 3B	62	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
218	218	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 4A	43	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
219	219	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	37	Good Shepherd Services Ltd	""	""	""	""	""	Q4-2020
220	220	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	20	Respond	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
221	221	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	""	Stage 3 approved Q4-2019, the scheme is now approved to proceed to tender.	""	""	""
222	222	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
223	223	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	""	""	""	Q4-2020
224	224	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
225	225	CAS CONSTRUCTION	Cork City	Ard na Ri, Closes Green, Farranree, Cork	20	Farranree Sheltered Housing Association	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
226	226	CALF Turnkey	Cork City	Model Quarters, Tower, Blarney, Co Cork  (Phase 1)	3	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2019	""
227	227	CALF Turnkey	Cork City	Kyle Street  (Phase 1)	6	Focus Housing Association CLG	""	""	""	Q1-2021	""	""
228	228	CALF Turnkey	Cork City	5 units, Shandon Street, Cork (Phase 1)	5	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2019
229	229	CALF Turnkey	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 1)*	37	Tath Housing Association	""	""	""	""	""	Q4-2019
230	230	CALF Turnkey	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 2)*	49	Tath Housing Association	""	""	""	""	""	Q4-2020
231	231	CALF Turnkey	Cork City	Boherboy Road, Silversprings Hill, Cork City  (Phase 1)*	15	Respond	""	""	""	Q1-2021	""	""
232	232	CALF Turnkey	Cork City	Convent Gardens, Blackrock Villas, Blackrock, Co. Cork (Phase 1)	1	Tath Housing Association	""	""	""	""	""	Q4-2019
233	233	CALF Turnkey	Cork City	Crawford Gate, Bessboro, Blackrock, Co. Cork (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q4-2020
234	234	CALF Turnkey	Cork City	Crawford Gate, Bessboro, Blackrock, Co. Cork (Phase 2)	2	Tath Housing Association	""	""	""	""	""	Q4-2020
235	235	CALF Turnkey	Cork City	Croppy Boy, Fairhill, Cork (Phase 1)	7	Tath Housing Association	""	""	""	""	""	Q3-2020
236	236	CALF Turnkey	Cork City	Croppy Boy, Fairhill, Cork (Phase 2)*	14	Tath Housing Association	""	""	""	""	""	Q4-2020
237	237	CALF Turnkey	Cork City	Emerald View, Old Mallow Road, Cork City (Phase 1)	6	Focus Housing Association CLG	""	""	""	Q1-2021	""	""
238	238	CALF Turnkey	Cork City	Evergreen Road, Turners Cross, Cork  (Phase 1)*	28	Respond	""	""	""	Q4-2020	""	""
239	239	CALF Construction	Cork City	Green Lane, Blackpool, Cork City (Phase 1)	112	Cluid Housing	""	""	""	Q1-2021	""	""
240	240	CALF Turnkey	Cork City	Haig Gardens, Boreenamanna Road and Wallace Avenue, Ballintemple (Phase 1)*	27	Respond	""	""	""	Q4-2020	""	""
241	241	CALF Turnkey	Cork City	Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*	19	Respond	""	""	""	""	Q1-2020	""
242	242	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 1)	72	Cluid Housing	""	""	""	""	""	Q4-2018
243	243	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 2)	6	Cluid Housing	""	""	""	""	""	Q3-2019
244	244	CALF Turnkey	Cork City	Lios Cara, Rathpeacon, Killeens, Cork (Phase 1)	12	Cluid Housing	""	""	""	Q4-2019	""	""
245	245	CALF Construction	Cork City	Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	""	""	Q4-2019
246	246	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
247	247	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	""	Q4-2018
248	248	CALF Turnkey	Cork City	Maryborough Ridge & Blackrock  Villas\n (Phase 1)*	57	Tath Housing Association	""	""	""	""	""	Q4-2019
249	249	CALF Turnkey	Cork City	Miles Stream, Shanakiel, Cork (Phase 1)	6	Tath Housing Association	""	""	""	Q4-2020	""	""
250	250	CALF Turnkey	Cork City	Miles Stream, Shanakiel, Cork (Phase 2)	14	Tath Housing Association	""	""	""	Q4-2020	""	""
251	251	CALF Turnkey	Cork City	Miles Stream, Shanakiel, Cork (Phase 3)	22	Tath Housing Association	""	""	""	Q4-2020	""	""
252	252	CALF Turnkey	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	""	""	Q4-2020
253	253	CALF Turnkey	Cork City	North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
254	254	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)	18	Respond	""	""	""	""	""	Q4-2020
255	255	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 2)*	62	Respond	""	""	""	""	Q1-2020	""
256	256	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)	31	Tath Housing Association	""	""	""	""	""	Q4-2018
257	257	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)	21	Tath Housing Association	""	""	""	""	""	Q4-2019
258	258	CALF Turnkey	Cork City	Springville House, Bulls Lane, Blackrock Road, Cork (Phase 1)	35	Tath Housing Association	""	""	""	""	Q4-2020	""
259	259	CALF Turnkey	Cork City	The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)	17	Tath Housing Association	""	""	""	""	""	Q4-2019
260	260	CALF Turnkey	Cork City	The Oaks, Frankfield, Douglas, Cork City (Phase 1)*	2	Tath Housing Association	""	""	""	""	Q4-2019	""
261	261	CALF Turnkey	Cork City	 Tower Street, Cork City (Phase 1)	2	Threshold Ltd	""	""	""	Q3-2020	""	""
262	262	CALF Turnkey	Cork City	Woodside, Kerry Pike, Cork (Phase 1)*	22	Cluid Housing	""	""	""	""	""	Q4-2020
263	263	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	18	*N/A	""	""	""	""	""	Q2-2018
264	264	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
265	265	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	""	Q4-2018
266	266	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	11	*N/A	""	""	""	""	""	Q4-2019
267	267	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
268	268	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
269	269	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	12	*N/A	""	""	""	""	""	Q4-2017
270	270	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	4	*N/A	""	""	""	""	""	Q4-2019
271	271	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
272	272	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	12	*N/A	""	""	""	""	""	Q1-2017
273	273	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	16	*N/A	""	""	""	""	""	Q1-2017
274	274	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	5	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
275	275	SHIP CONSTRUCTION TURNKEY	Cork County	St. Marys Road, Dunmanway Phase 2	7	*N/A	""	""	""	""	""	Q3-2020
276	276	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	10	*N/A	""	""	""	""	Q1-2020	""
277	277	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	5	*N/A	""	""	""	""	""	Q4-2019
278	278	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q4-2019
279	279	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	""	Q2-2019
280	280	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	""	""	Q2-2019
281	281	SHIP CONSTRUCTION TURNKEY	Cork County	No. 43 & No. 50 Chapel Court, Skibbereen 	2	*N/A	""	""	""	""	""	Q3-2018
282	282	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	""	Q4-2018
283	283	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara, Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q4-2018
284	284	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	9	*N/A	""	""	""	""	""	Q2-2019
285	285	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	15	*N/A	""	""	""	""	""	Q4-2020
286	286	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire	4	*N/A	""	""	""	""	""	Q4-2018
287	287	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mount Rivers	3	*N/A	""	""	""	""	""	Q4-2020
288	288	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 3	17	*N/A	""	""	""	""	""	Q4-2020
289	289	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
290	290	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	13	*N/A	""	""	""	""	""	Q4-2018
291	291	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	2	*N/A	""	""	""	""	""	Q4-2019
292	292	SHIP CONSTRUCTION TURNKEY	Cork County	No.9 and No.10  Chapel Court, Skibbereen,	2	*N/A	""	""	""	""	""	Q4-2018
293	293	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton	8	*N/A	""	""	""	""	""	Q4-2018
294	294	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	""	Q4-2018
295	295	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac	4	*N/A	""	""	""	""	""	Q4-2018
296	296	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow	10	*N/A	""	""	""	""	""	Q4-2019
297	297	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton (Phase 2)	14	*N/A	""	""	""	""	""	Q3-2019
298	298	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (2)	7	*N/A	""	""	""	""	""	Q3-2018
299	299	SHIP CONSTRUCTION TURNKEY	Cork County	Canon St, Rathcormac	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
300	300	SHIP CONSTRUCTION TURNKEY	Cork County	Percival St, Kanturk	2	*N/A	""	""	""	""	""	Q4-2018
301	301	SHIP CONSTRUCTION TURNKEY	Cork County	9 & 9a Main Street, Boherbue	2	*N/A	""	""	""	""	""	Q4-2018
302	302	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal - Phase 2	6	*N/A	""	""	""	""	""	Q2-2019
303	303	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac Phase 2	4	*N/A	""	""	""	""	""	Q2-2019
304	304	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fil, Curraclough, Bandon	13	*N/A	""	""	""	""	""	Q4-2019
305	305	SHIP CONSTRUCTION TURNKEY	Cork County	Maple Woods, Midleton	6	*N/A	""	""	""	""	""	Q4-2018
306	306	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy - Phase 3	8	*N/A	""	""	""	""	Q4-2017	""
307	307	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary's Road, Dunmanway Phase 3	6	*N/A	""	""	""	""	""	Q3-2020
308	308	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal, Phase 2	20	*N/A	""	""	""	""	Q1-2019	""
309	309	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	12	*N/A	""	""	""	""	""	Q4-2020
310	310	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Broomfield, Midleton - Phase 2	11	*N/A	""	""	""	""	""	Q1-2021
311	311	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Bloomfield, Midleton - Phase 3	17	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
312	312	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	2	*N/A	""	""	""	""	""	Q3-2019
313	313	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow 	6	*N/A	""	""	""	""	""	Q2-2020
314	314	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Orga, Ballinhassig	4	*N/A	""	""	""	""	""	Q4-2019
315	315	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard, Ballyhooly	8	*N/A	""	""	""	""	""	Q4-2020
316	316	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Ard, Cobh	6	*N/A	""	""	""	""	""	Q3-2019
317	317	SHIP CONSTRUCTION TURNKEY	Cork County	Baltimore, West Cork	12	*N/A	""	""	""	""	""	Q4-2019
318	318	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	2	*N/A	""	""	""	""	""	Q4-2019
319	319	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Ard, Freemount	4	*N/A	""	""	""	""	""	Q4-2019
320	320	SHIP CONSTRUCTION TURNKEY	Cork County	Glengarriff	5	*N/A	""	""	""	""	""	Q4-2019
321	321	SHIP CONSTRUCTION TURNKEY	Cork County	The Cove, Glandore	4	*N/A	""	""	""	""	""	Q4-2019
322	322	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Lisgoold, Leamlara	3	*N/A	""	""	""	""	""	Q4-2019
323	323	SHIP CONSTRUCTION TURNKEY	Cork County	Millstreet Road, Macroom	12	*N/A	""	""	""	""	""	Q4-2020
324	324	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 2	14	*N/A	""	""	""	""	""	Q4-2019
325	325	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	12	*N/A	""	""	""	""	""	Q4-2020
326	326	SHIP CONSTRUCTION TURNKEY	Cork County	Glenbeg The Beeches, Boherbue	4	*N/A	""	""	""	""	""	Q4-2019
327	327	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	3	*N/A	""	""	""	""	""	Q4-2019
328	328	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk - Phase 3	4	*N/A	""	""	""	""	""	Q1-2021
329	329	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Lisgoold, Leamlara	1	*N/A	""	""	""	""	""	Q2-2020
330	330	SHIP CONSTRUCTION TURNKEY	Cork County	Bruhenny, Churchtown	6	*N/A	""	""	""	""	""	Q4-2019
331	331	SHIP CONSTRUCTION TURNKEY	Cork County	Ard Bhaile, Buttevant	6	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
332	332	SHIP CONSTRUCTION TURNKEY	Cork County	Cecilstown, Mallow	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
333	333	SHIP CONSTRUCTION TURNKEY	Cork County	Ballymacmoy, Killavullen, Co. Cork	13	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
334	334	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	25	*N/A	""	""	""	""	Q3-2020	""
335	335	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q3-2019
336	336	SHIP CONSTRUCTION TURNKEY	Cork County	Gortnaclohy, Skibbereen, Co. Cork	34	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
337	337	SHIP CONSTRUCTION TURNKEY	Cork County	Castle Heights, Carrigaline	3	*N/A	""	""	""	""	""	Q4-2020
338	338	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	7	*N/A	""	""	""	""	""	Q4-2019
339	339	SHIP CONSTRUCTION TURNKEY	Cork County	The Court, Ard Cashel, Watergrasshill	4	*N/A	""	""	""	""	""	Q4-2019
340	340	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	58	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
341	341	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk - Phase 2	10	*N/A	""	""	""	""	""	Q4-2020
342	342	SHIP CONSTRUCTION TURNKEY	Cork County	Glenbeg, The Beeches, Boherbue	8	*N/A	""	""	""	""	""	Q4-2020
343	343	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	3	*N/A	""	""	""	""	""	Q4-2020
344	344	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy - Phase 2	40	*N/A	""	""	""	""	Q4-2017	""
345	345	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fil, Curraclough, Bandon	17	*N/A	""	""	""	""	""	Q3-2020
346	346	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	10	*N/A	""	""	""	""	Q1-2020	""
347	347	SHIP CONSTRUCTION TURNKEY	Cork County	St. Marys Road, Dunmanway 	7	*N/A	""	""	""	""	""	Q4-2019
348	348	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road Carrigtwohill	7	*N/A	""	""	""	""	""	Q4-2020
349	349	SHIP CONSTRUCTION TURNKEY	Cork County	An Goritin Rua, Millstreet Road, Macroom	14	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
350	350	SHIP CONSTRUCTION TURNKEY	Cork County	King St, Mitchelstown	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
351	351	SHIP CONSTRUCTION TURNKEY	Cork County	Lyraneag, Rockchapel,	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
352	352	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Reidh, Ballyvourney	1	*N/A	""	""	""	""	""	Q4-2019
353	353	SHIP CONSTRUCTION TURNKEY	Cork County	Curragh, Upper Aghada	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
354	354	SHIP CONSTRUCTION TURNKEY	Cork County	Glebe Manor, Whitegate	12	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
355	355	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	""	Q4-2020	""
356	356	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmorna, Mallow	1	*N/A	""	""	""	""	""	Q4-2020
357	357	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard Ballhooly	6	*N/A	""	""	""	""	""	Q1-2021
358	358	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard Ballhooly	6	*N/A	""	""	""	""	Q1-2021	""
359	359	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow 	20	*N/A	""	""	""	""	""	Q4-2020
360	360	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow 	18	*N/A	""	""	""	""	Q1-2019	""
361	361	SHIP CONSTRUCTION TURNKEY	Cork County	Fana Na gCann, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
362	362	SHIP CONSTRUCTION TURNKEY	Cork County	Drakes Point, Knocknagore, Crosshaven	5	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
363	363	SHIP CONSTRUCTION TURNKEY	Cork County	Scarteen, Newmarket, Co. Cork	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
364	364	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale	14	*N/A	""	""	""	""	""	Q4-2020
365	365	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	6	*N/A	""	""	""	""	Q1-2020	""
366	366	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	18	*N/A	""	""	""	""	Q1-2020	""
367	367	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale	19	*N/A	""	""	""	""	Q4-2019	""
368	368	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	1	*N/A	""	""	""	""	""	Q3-2020
369	369	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter,Mallow	8	*N/A	""	""	""	""	""	Q3-2020
370	370	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 3	4	*N/A	""	""	""	""	""	Q1-2021
371	371	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	""	""	Q4-2020
372	372	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Castletreasure Grove, Douglas	2	*N/A	""	""	""	""	""	Q4-2019
373	373	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Seaview Cottages, Derrymihan, Castletownbere	3	*N/A	""	""	""	""	""	Q4-2020
374	374	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Curraleigh, Inniscarra	1	*N/A	""	""	""	""	""	Q3-2019
375	375	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Main St. Dunmanway	1	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
376	376	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Thomas Kent Street, Cobh	1	*N/A	""	""	""	""	""	Q4-2020
377	377	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Croke Place, Garranmacgarrett, Kilbrin, kanturk	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
378	378	SHIP CONSTRUCTION SINGLE STAGE	Cork County	22 Aisling Ghael, Coolacoosane, Millview Road, Kanturk	1	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
379	379	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Mullaghroe South, Cullen	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
380	380	SHIP CONSTRUCTION SINGLE STAGE	Cork County	3 Knockbrogan Park, Bandon	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
381	381	SHIP CONSTRUCTION	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	""	Q4-2019
382	382	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	17	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
383	383	SHIP CONSTRUCTION	Cork County	Station Road, Blarney	18	*N/A	""	""	""	""	""	Q4-2020
384	384	SHIP CONSTRUCTION	Cork County	Bluepool, Kanturk	12	*N/A	""	""	""	""	""	Q4-2020
385	385	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork Phase 1	7	*N/A	""	""	""	""	""	Q3-2019
386	386	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	""	""	Q3-2019	""
387	387	SHIP CONSTRUCTION	Cork County	Newtown House , Bantry	1	*N/A	""	""	""	""	Q3-2020	""
388	388	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	""	Q4-2018
389	389	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	""	Q4-2018
390	390	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
391	391	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
392	392	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	""	""	""	Q3-2019	""
393	393	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	10	*N/A	""	""	""	""	""	Q4-2020
394	394	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
395	395	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline	10	*N/A	""	""	""	""	""	Q4-2018
396	396	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1A & 1B (ii))	16	*N/A	""	""	""	""	""	Q1-2019
397	397	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1C)	18	*N/A	""	""	""	""	""	Q1-2019
398	398	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	5	*N/A	""	""	""	""	Q3-2020	""
399	399	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	6	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
400	400	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
401	401	SHIP CONSTRUCTION	Cork County	Sleaveen East, Macroom	8	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
402	402	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline Phase 1B	5	*N/A	""	""	""	""	""	Q4-2018
403	403	SHIP CONSTRUCTION	Cork County	Tudor Grove, Ballincollig	16	*N/A	""	""	""	""	""	Q4-2019
404	404	SHIP CONSTRUCTION	Cork County	Pound Lane, Kilworth 	7	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
405	405	SHIP CONSTRUCTION	Cork County	24 Glenview Terrace Lyre Co Cork	1	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
406	406	SHIP CONSTRUCTION	Cork County	Broomfield West, Avoncore, Midelton	10	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
407	407	SHIP CONSTRUCTION	Cork County	Knocknagown, Rylane	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
408	408	SHIP CONSTRUCTION	Cork County	Uplands (Phase 2), College Road,  Fermoy	11	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
409	409	SHIP CONSTRUCTION	Cork County	Lissoran, Ballinspittle	4	*N/A	""	""	""	""	Q4-2020	""
410	410	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork - Phase 2	2	*N/A	""	""	""	""	Q3-2018	""
411	411	SHIP CONSTRUCTION	Cork County	Convent Road, Doneraile	17	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
412	412	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	13	*N/A	""	""	""	""	Q3-2020	""
413	413	SHIP CONSTRUCTION	Cork County	St. Gobnaits, Ballyvourney, Co. Cork	20	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
414	414	SHIP CONSTRUCTION	Cork County	Mill Road, Kanturk, Co. Cork	9	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
415	415	SHIP CONSTRUCTION	Cork County	Chapel Lane, Ballydehob, Co. Cork	13	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
416	416	SHIP CONSTRUCTION	Cork County	Uplands (Phase 1) Fermoy	31	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
417	417	CAS CONSTRUCTION TURNKEY	Cork County	Ardmanagh, Schull	12	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
418	418	CAS CONSTRUCTION SINGLE STAGE	Cork County	Bayview Seskin Bantry Co. Cork	1	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
419	419	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	""	""	""	""	Q1-2021	""
420	420	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	""	Q3-2018
421	421	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	""	Q1-2019
422	422	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
423	423	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	""	""	Q4-2019
424	424	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
425	425	CAS CONSTRUCTION	Cork County	Care Home Facility, Masseytown, Macroom	1	Tath Housing Association Ltd	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
426	426	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
427	427	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	9	Charleville Care Project Ltd	""	""	""	""	Q4-2020	""
428	428	CAS CONSTRUCTION	Cork County	St. Michaels, 36 Main Street, Bandon, Co. Cork	6	Bandon Geriatric ? Community Council	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
429	429	CAS CONSTRUCTION	Cork County	Distillery Lane, Distillery Walk, Midleton	7	*N/A	""	""	""	""	Q1-2021	""
430	430	CAS CONSTRUCTION	Cork County	Mardyke, Skibbereen	4	*N/A	""	""	""	""	Q1-2021	""
431	431	CAS CONSTRUCTION	Cork County	Lisheen Field, Kilbarry Road, Dunmanway, Co. Cork	16	Cluid Housing Association	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
432	432	CALF Turnkey	Cork County	21 units, Brookhill, Carrigaline, Cork (Phase 1)	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
433	433	CALF Turnkey	Cork County	3 units, Mullavale, Castletownroche, Co. Cork (Phase 1)	3	Respond	""	""	""	""	""	Q2-2019
434	434	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
435	435	CALF Turnkey	Cork County	Brookhill (5 Units), Carrigaline, Cork (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
436	436	CALF Turnkey	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
437	437	CALF Turnkey	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
438	438	CALF Turnkey	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 2)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
439	439	CALF Turnkey	Cork County	Cascade Apartments, Castlelake, Carrigtwohill, Cork (Phase 1)	95	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2020	""
440	440	CALF Turnkey	Cork County	Chapel Court, Skibbereen, Cork (Phase 1)	8	Cluid Housing	""	""	""	Q1-2021	""	""
441	441	CALF Turnkey	Cork County	Chapel Court, Skibbereen, Cork (Phase 2)	8	Cluid Housing	""	""	""	Q1-2021	""	""
442	442	CALF Turnkey	Cork County	Cluain Reidh, Ballymakeera, Co. Cork (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q3-2020
443	443	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q4-2016
444	444	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 1)*	24	Respond	""	""	""	""	""	Q4-2020
445	445	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 2)	20	Respond	""	""	""	""	""	Q1-2021
446	446	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	""	""	Q4-2020
447	447	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
448	448	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)	20	Respond	""	""	""	""	""	Q4-2019
449	449	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 2)*	22	Respond	""	""	""	""	""	Q4-2020
450	450	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
451	451	CALF Construction	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing	""	""	""	""	""	Q3-2020
452	452	CALF Turnkey	Cork County	Radharc Na Tuaithe, Knockraha, Cork (Phase 1)*	7	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
453	453	CALF Turnkey	Cork County	Sunville, Church Road, Carrigaline, Co. Cork (Phase 1)	6	Focus Housing Association CLG	""	""	""	""	""	Q4-2020
454	454	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q3-2019
455	455	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	""	Q4-2018
456	456	CALF Turnkey	Cork County	Togher Cross, Lehenaghmore, Co. Cork (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2019
457	457	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
458	458	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty	52	*N/A	""	""	""	""	Q4-2019	""
459	459	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen	50	*N/A	""	""	""	""	Q4-2019	""
460	460	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom	50	*N/A	""	""	""	""	Q4-2019	""
461	461	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
462	462	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace, Monkstown	14	*N/A	""	""	""	""	""	Q4-2018
463	463	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	22	*N/A	""	""	""	""	""	Q1-2021
464	464	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	33	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
465	465	SHIP CONSTRUCTION TURNKEY	DLR	George's Street Upper, Dun Laoghaire	5	*N/A	""	""	""	""	""	Q1-2021
466	466	SHIP CONSTRUCTION TURNKEY	DLR	Rosemount View, Dundrum, Dublin 14	8	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
467	467	SHIP CONSTRUCTION TURNKEY	DLR	16 Greygates, Mount Merrion, Co. Dublin:	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
468	468	SHIP CONSTRUCTION RAPID VOLUMETRIC	DLR	Rockville Green (Glenamuck Cottages)	13	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
469	469	SHIP CONSTRUCTION RAPID VOLUMETRIC	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
470	470	SHIP CONSTRUCTION RAPID VOLUMETRIC	DLR	Ballyogan Court, Ballyogan	67	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
471	471	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
472	472	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
473	473	SHIP CONSTRUCTION	DLR	Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
474	474	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
475	475	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
476	476	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
477	477	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
478	478	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	""	Q4-2018
479	479	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
480	480	SHIP CONSTRUCTION	DLR	Fitzgerald Park	33	*N/A	""	""	""	""	""	Q4-2018
481	481	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
482	482	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
483	483	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
484	484	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
485	485	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
486	486	SHIP CONSTRUCTION	DLR	Ballyogan Avenue, Ballyogan	2	*N/A	""	""	""	""	Q1-2020	""
487	487	SHIP CONSTRUCTION	DLR	St. Laurences Park, Stillorgan	89	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
488	488	SHIP CONSTRUCTION	DLR	Fitzgerald Park	17	*N/A	""	""	""	""	""	Q1-2019
489	489	SHIP CONSTRUCTION	DLR	Moyola Court, Churchtown Lower, Dublin 14	4	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
490	490	SHIP CONSTRUCTION	DLR	Shanganagh Castle	200	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
491	491	SHIP CONSTRUCTION	DLR	Site at Roebuck Road, Clonskeagh, Dublin 14	3	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
492	492	SHIP CONSTRUCTION	DLR	37A Rollins Villas, Sallynoggin, Co. Dublin 	1	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
493	493	SHIP CONSTRUCTION	DLR	Old Coastguard Cottages, Coal Harbour, Harbour Road	4	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
494	494	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
495	495	CALF Construction	DLR	Abbeyview House, Monkstown, Dublin (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2020
496	496	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q4-2018
497	497	CALF Turnkey	DLR	Ballybetagh Road, Kilternan, Co Dublin (Phase 1)*	22	Clanmil Housing Association Ireland	""	""	""	Q1-2021	""	""
498	498	CALF Turnkey	DLR	Belarmine Drive, Belarmine, Stepaside, Dublin 18 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q4-2019
499	499	CALF Turnkey	DLR	Bishops Gate, Enniskerry Rd., Dublin 18 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2019
500	500	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
501	501	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q3-2018
502	502	CALF Turnkey	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
503	503	CALF Turnkey	DLR	Clay Farm (Block E3), Ballyogan Road, Leopardstown, Dublin 18 (Phase 1)*	24	The Iveagh Trust	""	""	""	""	""	Q4-2019
504	504	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	""	Q2-2019
505	505	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	9	Respond	""	""	""	""	Q3-2019	""
506	506	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 2)	44	Respond	""	""	""	""	Q3-2019	""
507	507	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 1)	18	Tath Housing Association	""	""	""	""	Q3-2019	""
508	508	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 2)	34	Tath Housing Association	""	""	""	""	Q3-2019	""
509	509	CALF Turnkey	DLR	Eustace Court, Upper Glenageary Road, Dun Laoghaire, Rathdown, Co. Dublin (Phase 1)	4	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2019
510	510	CALF Turnkey	DLR	Garrison Mews, The Ramparts, Cabinteely, Co. Dublin (Phase 1)*	5	Focus Housing Association CLG	""	""	""	""	""	Q4-2020
511	511	CALF Turnkey	DLR	Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)	1	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2018
512	512	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	""	Q4-2018
513	513	CALF Turnkey	DLR	Johnstown Court, Cabinteely, Dublin 18 (Phase 1)*	51	Cluid Housing	""	""	""	""	Q2-2019	""
514	514	CALF Turnkey	DLR	Johnstown Court, Cabinteely, Dublin 18 (Phase 2)*	50	Cluid Housing	""	""	""	""	Q2-2019	""
515	515	CALF Turnkey	DLR	Knockrabo, Mount Anville Road, Goatstown, Dublin 14 (Phase 1)*	6	Oaklee Housing	""	""	""	""	""	Q4-2020
516	516	CALF Construction	DLR	Loughlinstown View(formerly Cromlech Fields) Loughlinstown, Ballybrack, Dublin (Phase 1)	34	Co - Operative Housing Ireland Society Limited	""	""	""	Q1-2019	""	""
517	517	CALF Turnkey	DLR	Marine Walk, Marine Road, Dun Laoghaire (Phase 1)*	2	Oaklee Housing	""	""	""	""	""	Q4-2020
518	518	CALF Turnkey	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 1)*	14	Tath Housing Association	""	""	""	""	""	Q1-2021
519	519	CALF Turnkey	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 2)*	18	Tath Housing Association	""	""	""	""	Q4-2019	""
520	520	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	""	Q4-2018
521	521	CALF Turnkey	DLR	Rockville Hall, Glenamuck Road, Dunlaoghaire, Dublin 18 (Phase 1)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
522	522	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2017
523	523	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
524	524	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
525	525	CALF Turnkey	DLR	The Glen, Glenamuck Road, Carrickmines, Dublin 18 (Phase 1)*	48	Respond	""	""	""	""	Q1-2021	""
526	526	CALF Turnkey	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)	59	Respond	""	""	""	""	Q3-2020	""
527	527	CALF Turnkey	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)*	6	Respond	""	""	""	""	Q3-2020	""
528	528	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2017
529	529	SHIP DIALOG	Donegal	Drumrooske West	36	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
530	530	SHIP DIALOG	Donegal	Convent Road, Carndonagh	53	*N/A	""	""	""	""	Q1-2021	""
531	531	SHIP DIALOG	Donegal	Convoy	24	*N/A	""	""	""	""	Q4-2020	""
532	532	SHIP DIALOG	Donegal	Donegal Road, Ballybofey	14	*N/A	""	""	""	""	Q1-2021	""
533	533	SHIP DIALOG	Donegal	Admiran, Stranorlar	52	*N/A	""	""	""	""	Q1-2021	""
534	534	SHIP DIALOG	Donegal	Rockview, Carrickboy	5	*N/A	""	""	""	""	Q1-2021	""
535	535	SHIP DIALOG	Donegal	Ardaravan, Buncrana	4	*N/A	""	""	""	""	Q4-2020	""
536	536	SHIP DIALOG	Donegal	Glencrow, Moville	35	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
537	537	SHIP DIALOG	Donegal	Ballyraine, Letterkenny	25	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
538	538	SHIP DIALOG	Donegal	Lough Fern Heights, Milford	17	*N/A	""	""	""	""	Q1-2021	""
539	539	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
540	540	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	18	*N/A	""	""	""	""	""	Q4-2018
541	541	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	18	*N/A	""	""	""	""	Q3-2020	""
542	542	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 2)	8	*N/A	""	""	""	""	""	Q1-2019
543	543	SHIP CONSTRUCTION TURNKEY	Donegal	Carnamuggagh, Letterkenny	30	*N/A	""	""	""	""	""	Q4-2020
544	544	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	10	*N/A	""	""	""	""	""	Q4-2019
545	545	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 3)	10	*N/A	""	""	""	""	""	Q2-2019
546	546	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	34	*N/A	""	""	""	""	Q4-2020	""
547	547	SHIP CONSTRUCTION TURNKEY	Donegal	Stisin an Chirt, Falcarragh (Phase 1)	6	*N/A	""	""	""	""	""	Q4-2019
548	548	SHIP CONSTRUCTION TURNKEY	Donegal	Staisin An Chirt, Falcarragh (Phase 2)	6	*N/A	""	""	""	""	""	Q4-2020
549	549	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	7	*N/A	""	""	""	""	""	Q3-2020
550	550	SHIP CONSTRUCTION SINGLE STAGE	Donegal	Figart, Dunfanaghy	8	*N/A	""	""	""	""	""	Q4-2019
551	551	SHIP CONSTRUCTION SINGLE STAGE	Donegal	SRD Loughanure Annagry	1	*N/A	""	""	""	""	Q1-2021	""
552	552	SHIP CONSTRUCTION SINGLE STAGE	Donegal	SRD Meenderrynasloe, Annagry	1	*N/A	""	""	""	""	Q1-2021	""
553	553	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	""	""	Q3-2020	""
554	554	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	""	""	""	""	Q4-2019
555	555	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	""	""	""	Q4-2020
556	556	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	""	""	Q4-2019
557	557	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	""	""	Q3-2019	""
558	558	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	""	""	""	Q4-2019	""
559	559	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	""	Q4-2018
560	560	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Ph 2)	4	*N/A	""	""	""	""	""	Q4-2018
561	561	SHIP CONSTRUCTION	Donegal	Pound Street, Dunfanaghy	4	*N/A	""	""	""	""	Q3-2020	""
562	562	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
563	563	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	""	Q4-2018
564	564	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	""	""	Q3-2019	""
565	565	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
566	566	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
567	567	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
568	568	SHIP CONSTRUCTION	Donegal	Trusk Road, Ballybofey	19	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
569	569	SHIP CONSTRUCTION	Donegal	Crana Crescent, Buncrana	16	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
570	570	SHIP CONSTRUCTION	Donegal	Drumacrin, Bundoran	42	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
571	571	SHIP CONSTRUCTION	Donegal	Gallow's Lane, Lifford	29	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
572	572	CAS CONSTRUCTION TURNKEY	Donegal	Ballaghderg, Letterkenny	14	Respond	""	""	""	""	""	Q4-2020
573	573	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	""	""	Q4-2020	""
574	574	CAS CONSTRUCTION	Donegal	Cois Locha, Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	""	""	Q3-2020	""
575	575	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	""	""	""	""	Q4-2020
576	576	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
577	577	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	34	Habinteg Housing Association (Ireland) Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
578	578	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	""	Q1-2021
579	579	CALF Turnkey	Donegal	Cnoc Moineir, Ardarawer, Letterkenny, Co. Donegal (Phase 1)*	46	Cluid Housing	""	""	""	""	Q2-2018	""
580	580	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2016
581	581	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2018
582	582	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospect Hill	58	*N/A	""	""	""	""	""	Q4-2017
583	583	SHIP CONSTRUCTION TURNKEY	Dublin City	Parkside, Balgriffin, Dublin 13	16	*N/A	""	""	""	""	""	Q4-2018
584	584	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	47	*N/A	""	""	""	""	""	Q4-2018
585	585	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	45	*N/A	""	""	""	""	""	Q4-2019
586	586	SHIP CONSTRUCTION TURNKEY	Dublin City	88-89 Drimnagh Road Dublin 12	24	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
587	587	SHIP CONSTRUCTION TURNKEY	Dublin City	St. Pancras, Harolds Cross, Dublin 6	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
588	588	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
589	589	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Bunratty Road	78	*N/A	""	""	""	""	Q4-2019	""
590	590	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Bonham Street Dublin  8	57	*N/A	""	""	""	""	Q4-2019	""
591	591	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Cork Street/Chamber Street Dublin 8	55	*N/A	""	""	""	""	Q1-2020	""
592	592	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Springvale Chapelizod Dublin 8	71	*N/A	""	""	""	""	Q1-2020	""
593	593	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Cromcastle & Woodville, Coolock, Dublin 5	156	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
594	594	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Crumlin Road - Rafters Lane, Dublin 12	47	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
595	595	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	St. Andrews Court, Dublin 2	37	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
596	596	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
597	597	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
598	598	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
599	599	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
600	600	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
601	601	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	53	*N/A	""	""	""	""	""	Q4-2018
602	602	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	13	*N/A	""	""	""	""	""	Q3-2018
603	603	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	3	*N/A	""	""	""	""	""	Q3-2018
604	604	SHIP CONSTRUCTION RAPID VOLUMETRIC	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	19	*N/A	""	""	""	""	""	Q4-2019
605	605	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
606	606	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	""	Q2-2019	""
607	607	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
608	608	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q2-2019	""
609	609	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
610	610	SHIP CONSTRUCTION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q1-2018	""
611	611	SHIP CONSTRUCTION	Dublin City	Sackville Avenue Cottages	11	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
612	612	SHIP CONSTRUCTION	Dublin City	O'Devaney Gardens - Phase 1A	56	*N/A	""	""	""	""	Q3-2018	""
613	613	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
614	614	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
615	615	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
616	616	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
617	617	SHIP CONSTRUCTION	Dublin City	Priory Hall	9	*N/A	""	""	""	""	""	Q1-2017
618	618	SHIP CONSTRUCTION	Dublin City	Priory Hall	24	*N/A	""	""	""	""	""	Q4-2019
619	619	SHIP CONSTRUCTION	Dublin City	Glin Court, Coolock, Dublin 17	32	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
620	620	SHIP CONSTRUCTION	Dublin City	Dorset Streeet, Dublin 7	115	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
621	621	SHIP CONSTRUCTION	Dublin City	Matt Talbot Court	92	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
622	622	SHIP CONSTRUCTION	Dublin City	Kildonan Road	75	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
623	623	SHIP CONSTRUCTION	Dublin City	Lands at Emmet Road	109	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
624	624	SHIP CONSTRUCTION	Dublin City	Slademore Avenue, Ayrfield, Dublin 13	39	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
625	625	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	5	*N/A	""	""	""	""	""	Q4-2018
626	626	REGENERATION	Dublin City	St Teresa's Gardens Margaret Kennedy Road Project	54	*N/A	""	""	""	""	""	Q4-2020
627	627	REGENERATION	Dublin City	Dolphin House, Dublin 8	100	*N/A	""	""	""	""	""	Q3-2018
628	628	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
629	629	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	2	*N/A	""	""	""	""	""	Q4-2019
630	630	REGENERATION	Dublin City	St. Bricins Park	11	*N/A	""	""	""	""	""	Q4-2018
631	631	REGENERATION	Dublin City	Constitution Hill Dublin 7	130	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
632	632	CAS CONSTRUCTION TURNKEY	Dublin City	Block 70, The Plaza, Parkwest, Dublin 12 	43	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
633	633	CAS CONSTRUCTION TURNKEY	Dublin City	Apartments 1-3, 42 North Strand Road, Dublin 3	3	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2020
634	634	CAS CONSTRUCTION TURNKEY	Dublin City	5A & 5B Willow Park Crescent	2	Tath Housing Association Ltd	""	""	""	""	""	Q3-2020
635	635	CAS CONSTRUCTION SINGLE STAGE	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	""	Q4-2020	""
636	636	CAS CONSTRUCTION SINGLE STAGE	Dublin City	13A Casement Drive / 307A Casement Road, Finglas, Dublin 11	4	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
637	637	CAS CONSTRUCTION SINGLE STAGE	Dublin City	88 Lower Drumcondra Road, Dublin 9 	6	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
638	638	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2018
639	639	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	22	Tath Housing Association Ltd	""	""	""	""	Q3-2019	""
640	640	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	""	Q4-2018
641	641	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	""	Q4-2019
642	642	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street, Dublin 2	20	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
643	643	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
644	644	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	""	""	""	""	Q1-2021
645	645	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
646	646	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
647	647	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	14	Simon Community : Dublin Simon	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
648	648	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
649	649	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
650	650	CAS CONSTRUCTION	Dublin City	Sarsfield Road, Ballyfermot, Dublin 10	6	Respond	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
651	651	CAS CONSTRUCTION	Dublin City	53a Keeper Road, Drimnagh, Dublin 12	9	Respond	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
652	652	CAS CONSTRUCTION	Dublin City	Barnamore Grove, Finglas, Dublin 11	2	Arlington Novas Ireland Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
653	653	CAS CONSTRUCTION	Dublin City	Berryfield Drive, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
654	654	CALF Construction	Dublin City	3 units, Block A Jamestown Court, Dublin 8 (Phase 1)	3	ALONE	""	""	""	""	""	Q4-2020
655	655	CALF Turnkey	Dublin City	9 units Dorset Street, Dublin 1 (Phase 1)	9	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2020
656	656	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2016
657	657	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	Tath Housing Association	""	""	""	""	""	Q1-2017
658	658	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q2-2017
659	659	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	Tath Housing Association	""	""	""	""	""	Q3-2017
660	660	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	Tath Housing Association	""	""	""	""	""	Q4-2018
661	661	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
662	662	CALF Turnkey	Dublin City	Aughrim Street, Stoneybatter, Dublin 7 (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	""	Q3-2019	""
663	663	CALF Turnkey	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2018
664	664	CALF Construction	Dublin City	Ballygall Road East Phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
665	665	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	62	Cluid Housing	""	""	""	Q2-2018	""	""
666	666	CALF Turnkey	Dublin City	Blackbanks View, 754 Howth Road, Raheny, Dublin 5 (Phase 1)*	40	Cluid Housing	""	""	""	""	""	Q1-2021
667	667	CALF Turnkey	Dublin City	Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	Tath Housing Association	""	""	""	""	""	Q2-2018
668	668	CALF Construction	Dublin City	Block A, Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	""	""	Q4-2020
669	669	CALF Turnkey	Dublin City	Bluebell Avenue, Bluebell, Dublin 12 (Phase 1)*	52	Respond	""	""	""	""	Q4-2019	""
670	670	CALF Turnkey	Dublin City	Bluebell Avenue, Dublin 12 (Phase 1)	7	Tath Housing Association	""	""	""	""	""	Q4-2018
671	671	CALF Construction	Dublin City	Broome Lodge,\nDunmanus Court, Cabra (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q4-2017
672	672	CALF Turnkey	Dublin City	Camac Park, Bluebell, Dublin 12 (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q2-2020
673	673	CALF Turnkey	Dublin City	Canal Meadows, Bluebell, Dublin 12 (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q1-2019
674	674	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
675	675	CALF Turnkey	Dublin City	Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*	65	Respond	""	""	""	""	Q2-2019	""
676	676	CALF Turnkey	Dublin City	Chanel Manor, Coolock, Dublin 5 (Phase 1)*	22	Respond	""	""	""	""	Q4-2020	""
677	677	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	""	Q2-2019
678	678	CALF Turnkey	Dublin City	Connaught Street, Phibsborough, Dublin 7 (Phase 1)	20	Focus Housing Association CLG	""	""	""	Q3-2020	""	""
679	679	CALF Turnkey	Dublin City	Cromwellsfort Court, Cromwellsfort Road, Walkinstown, Dublin 12 (Phase 1)*	12	Oaklee Housing	""	""	""	""	""	Q3-2020
680	680	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2017
681	681	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing	""	""	""	""	""	Q3-2017
682	682	CALF Construction	Dublin City	Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
683	683	CALF Turnkey	Dublin City	Donnybrook Gardens, Lands of Greenfield Park, Donnybrook, Dublin 4 (Phase 1)*	4	RHD Housing	""	""	""	""	Q1-2018	""
684	684	CALF Turnkey	Dublin City	Elanora Court, Long Mile Road, Walkinstown, Dublin 12 (Phase 1)*	153	Respond	""	""	""	""	Q3-2020	""
685	685	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Housing Association CLG	""	""	""	""	""	Q4-2016
686	686	CALF Turnkey	Dublin City	Harolds Cross, Dublin 6W (Phase 1)	12	Respond	""	""	""	Q1-2021	""	""
687	687	CALF Turnkey	Dublin City	Huband Road, Bluebell, Dublin 12 (Phase 1)	6	Clanmil Housing Association Ireland	""	""	""	Q1-2021	""	""
688	688	CALF Turnkey	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 1)	1	Tath Housing Association	""	""	""	""	""	Q4-2019
689	689	CALF Turnkey	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 2)	4	Tath Housing Association	""	""	""	""	""	Q4-2020
690	690	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2017
691	691	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q4-2017
692	692	CALF Turnkey	Dublin City	Mountjoy Square North, Dublin 1 (Phase 1)	31	Respond	""	""	""	""	""	Q4-2019
693	693	CALF Turnkey	Dublin City	Newtown Cottages Malahide Road Coolock Dublin 17 (Phase 1)	3	Clanmil Housing Association Ireland	""	""	""	""	Q3-2020	""
694	694	CALF Construction	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
695	695	CALF Turnkey	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2019
696	696	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
697	697	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
698	698	CALF Turnkey	Dublin City	Park West Campus, Kileen Road, Dublin 12 (Phase 1)	41	Tath Housing Association	""	""	""	""	Q4-2020	""
699	699	CALF Construction	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2019
700	700	CALF Construction	Dublin City	Post Tender Johns Lane West Dublin 8 (Phase 1)	31	Focus Housing Association CLG	""	""	""	""	""	Q4-2018
701	701	CALF Construction	Dublin City	POST TENDER, Poplar Row, Ballybough, Dublin 3 (Phase 1)	29	Oaklee Housing	""	""	""	""	""	Q4-2019
702	702	CALF Turnkey	Dublin City	Ravensdale Court, Kimmage, Dublin 12. (Phase 1)	12	Tath Housing Association	""	""	""	""	Q4-2020	""
703	703	CALF Construction	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	""	""	Q3-2020
704	704	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	Tath Housing Association	""	""	""	""	""	Q4-2019
705	705	CALF Construction	Dublin City	Revised, St Marys Mansions, Dublin 1 (Phase 1)	80	Cluid Housing	""	""	""	""	""	Q4-2019
706	706	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
707	707	CALF Turnkey	Dublin City	Royal Canal Crescent, Rathborne Park, Rathborne, Dublin15 (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q4-2020
708	708	CALF Turnkey	Dublin City	Royal Canal Park, Ashtown, Dublin 15 (Phase 1)*	46	Respond	""	""	""	""	""	Q4-2020
709	709	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	44	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
710	710	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	6	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
711	711	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 2)	42	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q2-2020
712	712	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 3)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
713	713	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing	""	""	""	""	""	Q3-2018
714	714	CALF Turnkey	Dublin City	Sundrive Mews, Kimmage, Dublin 12 (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2019
715	715	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	28	Tath Housing Association	""	""	""	""	""	Q2-2016
716	716	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	18	Tath Housing Association	""	""	""	""	""	Q4-2016
717	717	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	Tath Housing Association	""	""	""	""	""	Q1-2017
718	718	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	Tath Housing Association	""	""	""	""	""	Q1-2017
719	719	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
720	720	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	""	Q1-2019	""
721	721	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	""	""	Q4-2020
722	722	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
723	723	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
724	724	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
725	725	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
726	726	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
727	727	SHIP CONSTRUCTION TURNKEY	Fingal	Ravenswood, North Road, Finglas	2	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
728	728	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
729	729	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
730	730	SHIP CONSTRUCTION TURNKEY	Fingal	Kenure Gate, Park Road, Rush	4	*N/A	""	""	""	""	""	Q4-2018
731	731	SHIP CONSTRUCTION TURNKEY	Fingal	Glaslinn, Donabate	3	*N/A	""	""	""	""	""	Q4-2018
732	732	SHIP CONSTRUCTION TURNKEY	Fingal	Bremore Pastures Park, Balbriggan	4	*N/A	""	""	""	""	""	Q4-2018
733	733	SHIP CONSTRUCTION TURNKEY	Fingal	Northwood Green, Santry, Dublin 9	37	*N/A	""	""	""	""	""	Q4-2018
734	734	SHIP CONSTRUCTION TURNKEY	Fingal	Hollytown Cottages	4	*N/A	""	""	""	""	""	Q4-2019
735	735	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh Ballyboughal Co. Dublin	5	*N/A	""	""	""	""	""	Q3-2019
736	736	SHIP CONSTRUCTION TURNKEY	Fingal	Rahillion, Donabate	1	*N/A	""	""	""	""	""	Q4-2019
737	737	SHIP CONSTRUCTION TURNKEY	Fingal	Bay Meadows Avenue/Square, Hollystown Dublin 15	12	*N/A	""	""	""	""	""	Q4-2020
738	738	SHIP CONSTRUCTION TURNKEY	Fingal	Bay Meadows, Hollystown, Dublin 15	10	*N/A	""	""	""	""	""	Q3-2020
739	739	SHIP CONSTRUCTION SINGLE STAGE	Fingal	Outlands, Rathbeale Road, Swords	11	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
740	740	SHIP CONSTRUCTION RAPID VOLUMETRIC	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	""	Q4-2019
741	741	SHIP CONSTRUCTION RAPID VOLUMETRIC	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
742	742	SHIP CONSTRUCTION RAPID VOLUMETRIC	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
743	743	SHIP CONSTRUCTION RAPID VOLUMETRIC	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	""	""	Q4-2019
744	744	SHIP CONSTRUCTION RAPID VOLUMETRIC	Fingal	Church Fields, Phase 2B, Mulhuddart, Dublin 15.	51	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
745	745	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	""	""	Q2-2019
746	746	SHIP CONSTRUCTION	Fingal	Rowlestown	10	*N/A	""	""	""	""	""	Q2-2019
747	747	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	5	*N/A	""	""	""	""	""	Q2-2018
748	748	SHIP CONSTRUCTION	Fingal	Castlelands, Park View, Balbriggan (Phase 3)	24	*N/A	""	""	""	""	""	Q1-2019
749	749	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	""	""	Q2-2020
750	750	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	2	*N/A	""	""	""	""	""	Q3-2017
751	751	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
752	752	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
753	753	SHIP CONSTRUCTION	Fingal	St. Cronan's Cottages, Swords - Infill	1	*N/A	""	""	""	""	""	Q2-2016
754	754	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	25	*N/A	""	""	""	""	""	Q4-2017
755	755	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
756	756	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	15	*N/A	""	""	""	""	""	Q1-2018
757	757	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	""	""	""	Q3-2019
758	758	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	4	*N/A	""	""	""	""	""	Q3-2018
759	759	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	25	*N/A	""	""	""	""	""	Q4-2018
760	760	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth	8	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
761	761	SHIP CONSTRUCTION	Fingal	Wellview	20	*N/A	""	""	""	""	Q3-2020	""
762	762	SHIP CONSTRUCTION	Fingal	Rowlestown	6	*N/A	""	""	""	""	""	Q4-2019
763	763	SHIP CONSTRUCTION	Fingal	Rowlestown	6	*N/A	""	""	""	""	""	Q4-2019
764	764	SHIP CONSTRUCTION	Fingal	Cappaghfinn, Cappagh Road Finglas - Phase 3	69	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
765	765	SHIP CONSTRUCTION	Fingal	Rowlestown	4	*N/A	""	""	""	""	""	Q3-2019
766	766	SHIP CONSTRUCTION	Fingal	Leonards Garage, Lusk	10	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
767	767	SHIP CONSTRUCTION	Fingal	Church Road, Lusk	5	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
768	768	SHIP CONSTRUCTION	Fingal	Church Fields, Phase 2B, Mulhuddart, Dublin 15.	16	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
769	769	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Tath Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
770	770	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas	6	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
771	771	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	""	""	Q3-2020	""
772	772	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
773	773	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
774	774	CAS CONSTRUCTION	Fingal	Garristown	5	North ? East Housing Association Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
775	775	CALF Turnkey	Fingal	4 units, Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
776	776	CALF Turnkey	Fingal	Allendale Square, Clonsilla, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	""	Q2-2020
777	777	CALF Turnkey	Fingal	An Muileann, Kettles Lane, Swords, Dublin (Phase 1)	24	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
778	778	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q4-2018
779	779	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 2)*	12	Tath Housing Association	""	""	""	""	""	Q4-2018
780	780	CALF Turnkey	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 1)	18	Tath Housing Association	""	""	""	""	Q4-2019	""
781	781	CALF Turnkey	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 2)	15	Tath Housing Association	""	""	""	""	Q4-2019	""
782	782	CALF Turnkey	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 3)	16	Tath Housing Association	""	""	""	""	Q4-2019	""
783	783	CALF Turnkey	Fingal	Bellingsmore, Hollywoodrath, Dubin 15 (Phase 1)	29	Tath Housing Association	""	""	""	""	""	Q4-2020
784	784	CALF Turnkey	Fingal	Bellingsmore, Hollywoodrath, Dubin 15 (Phase 2)	12	Tath Housing Association	""	""	""	""	""	Q4-2020
785	785	CALF Turnkey	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 1)*	29	Respond	""	""	""	""	Q4-2019	""
786	786	CALF Turnkey	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 2)*	30	Respond	""	""	""	""	Q4-2019	""
787	787	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q2-2016
788	788	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	Tath Housing Association	""	""	""	""	""	Q3-2016
789	789	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	Tath Housing Association	""	""	""	""	""	Q4-2016
790	790	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	Tath Housing Association	""	""	""	""	""	Q1-2017
791	791	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	Tath Housing Association	""	""	""	""	""	Q2-2017
792	792	CALF Turnkey	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 1)*	94	Respond	""	""	""	""	Q3-2019	""
793	793	CALF Turnkey	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 2)*	44	Respond	""	""	""	""	Q3-2019	""
794	794	CALF Turnkey	Fingal	Cois Sruthan, Ballyboughal, Co.Dublin (Phase 1)*	17	Oaklee Housing	""	""	""	""	""	Q3-2020
795	795	CALF Turnkey	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2019
796	796	CALF Turnkey	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 2)*	6	Tath Housing Association	""	""	""	""	Q1-2019	""
797	797	CALF Turnkey	Fingal	Dun Si, St. Marnock Bay, Station Road, Portmarnock, Co. Dublin\n\n (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q2-2020
798	798	CALF Turnkey	Fingal	Dun Si, St. Marnock Bay, Station Road, Portmarnock, Co. Dublin\n\n (Phase 2)*	5	Cluid Housing	""	""	""	""	""	Q4-2020
799	799	CALF Turnkey	Fingal	Dunsoghly, Dublin 11 (Phase 1)*	19	Cluid Housing	""	""	""	""	""	Q4-2020
800	800	CALF Turnkey	Fingal	Knightsgate, Rush, Co. Dublin (Phase 1)*	38	Cluid Housing	""	""	""	""	""	Q4-2019
801	801	CALF Turnkey	Fingal	Knightsgate, Rush, Co. Dublin (phase 2) (Phase 1)	19	Cluid Housing	""	""	""	""	""	Q3-2020
802	802	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing	""	""	""	""	Q4-2018	""
803	803	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing	""	""	""	""	""	Q4-2018
804	804	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
805	805	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	28	The Iveagh Trust	""	""	""	""	""	Q4-2020
806	806	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	""	Q4-2019
807	807	CALF Turnkey	Fingal	Norseman's Court, Norseman's Walk, Lusk Village, Lusk, Co. Dublin (Phase 1)*	18	Cluid Housing	""	""	""	""	""	Q4-2020
808	808	CALF Turnkey	Fingal	Northwood Green, Santry, Dublin 9 (Phase 1)*	6	Respond	""	""	""	""	""	Q4-2018
809	809	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 1)	48	Respond	""	""	""	""	""	Q4-2019
810	810	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 2)*	7	Respond	""	""	""	""	""	Q2-2020
811	811	CALF Construction	Fingal	Old Coolock Lane, Santry, Dublin 9 (Phase 1)	28	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2019	""	""
812	812	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)	17	Respond	""	""	""	""	""	Q4-2020
813	813	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 2)*	10	Respond	""	""	""	""	Q4-2018	""
814	814	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	Tath Housing Association	""	""	""	""	""	Q3-2019
815	815	CALF Turnkey	Fingal	Phoenix Park Avenue, Castleknock, Dublin 15 (Phase 1)*	31	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
816	816	CALF Turnkey	Fingal	Riverwood Square, Dublin 15 (Phase 1)*	24	Cluid Housing	""	""	""	""	Q4-2019	""
817	817	CALF Turnkey	Fingal	Semple Woods, Donabate, Co. Dublin (Phase 1)*	7	Tath Housing Association	""	""	""	""	""	Q4-2020
818	818	CALF Turnkey	Fingal	Semple Woods, Donabate, Co. Dublin (Phase 2)*	3	Tath Housing Association	""	""	""	""	Q4-2019	""
819	819	CALF Turnkey	Fingal	Semple Woods, Donabate, North County Dublin (Phase 1)*	30	Tath Housing Association	""	""	""	""	""	Q4-2019
820	820	CALF Turnkey	Fingal	St Marnocks Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q4-2017
821	821	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	Tath Housing Association	""	""	""	""	""	Q4-2017
822	822	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
823	823	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
824	824	CALF Turnkey	Fingal	Taylor Hill Crescent, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
825	825	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	21	Cluid Housing	""	""	""	""	""	Q2-2020
826	826	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2018
827	827	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	24	Cluid Housing	""	""	""	""	""	Q4-2019
828	828	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 2)	1	Cluid Housing	""	""	""	""	""	Q4-2020
829	829	CALF Turnkey	Fingal	The Forge, Lusk, Co. Dublin (Phase 1)	8	Oaklee Housing	""	""	""	""	""	Q4-2019
830	830	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Cluid Housing	""	""	""	""	""	Q4-2017
831	831	CALF Turnkey	Fingal	Waterside, Malahide, Dublin (Phase 1)	5	Cluid Housing	""	""	""	""	""	Q4-2020
832	832	CALF Turnkey	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
833	833	CALF Turnkey	Fingal	Weston, Feltrim Road, Swords, North County Dublin (Phase 1)	24	Oaklee Housing	""	""	""	""	""	Q4-2019
834	834	CALF Turnkey	Fingal	Weston, Feltrim Road, Swords, North County Dublin (Phase 2)*	10	Oaklee Housing	""	""	""	""	""	Q3-2020
835	835	CALF Turnkey	Fingal	 Wrens Hill, (Formerly The Galleries),  Donabate, Co. Dublin (Phase 1)	43	Oaklee Housing	""	""	""	""	""	Q4-2019
836	836	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine, (Glasshouse Site) Monivea Road (Phase 1)	6	*N/A	""	""	""	""	""	Q3-2019
837	837	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 2)	16	*N/A	""	""	""	""	""	Q4-2019
838	838	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 3)	7	*N/A	""	""	""	""	""	Q4-2019
839	839	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 4)	13	*N/A	""	""	""	""	""	Q3-2020
840	840	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 5)	8	*N/A	""	""	""	""	""	Q4-2020
841	841	SHIP CONSTRUCTION TURNKEY	Galway City	Garra Caol, (Coast Road Site) Dublin Road	27	*N/A	""	""	""	""	Q1-2020	""
842	842	SHIP CONSTRUCTION TURNKEY	Galway City	Garra Caol (Coast Road Site) Dublin Road	26	*N/A	""	""	""	""	Q1-2020	""
843	843	SHIP CONSTRUCTION	Galway City	Ard Cr, Ballymoneen Road (Phase 2)	78	*N/A	""	""	""	""	""	Q4-2020
844	844	SHIP CONSTRUCTION	Galway City	Ard Cr, Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
845	845	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More	15	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
846	846	SHIP CONSTRUCTION	Galway City	Garra Beag, Monivea Road, Ballybaan More	58	*N/A	""	""	""	""	Q1-2020	""
847	847	SHIP CONSTRUCTION	Galway City	Keeraun, Ballymoneen Road	60	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
848	848	SHIP CONSTRUCTION	Galway City	Clareview Park, Ballybaan	5	*N/A	""	""	""	""	Q1-2021	""
849	849	SHIP CONSTRUCTION	Galway City	Merlin Park Lands, Galway City	18	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
850	850	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
851	851	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	""	""	""	""	Q4-2020	""
852	852	CAS CONSTRUCTION	Galway City	47 Forster Street, Galway City (Domestic Violence Refuge)	9	Cope Galway	""	""	""	""	""	Q4-2019
853	853	CAS CONSTRUCTION	Galway City	Doughiska, Galway City	7	Respond	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
854	854	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
855	855	CALF Turnkey	Galway City	Block C, Sraith Fhada, Doughiska, Galway (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2020
856	856	CALF Turnkey	Galway City	Block D, Sraith Fhada, Doughiska, Galway (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2019
857	857	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
858	858	CALF Turnkey	Galway City	Breacan, Letteragh Road, Galway City (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q4-2019
859	859	CALF Turnkey	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 1)	7	Respond	""	""	""	""	""	Q4-2019
860	860	CALF Turnkey	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 2)*	8	Respond	""	""	""	""	""	Q3-2020
861	861	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 1)	10	Respond	""	""	""	""	""	Q4-2019
862	862	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 2)	71	Respond	""	""	""	""	""	Q4-2020
863	863	CALF Turnkey	Galway City	Clybaun Road, Knocknacarra, Galway (Phase 1)	9	Tath Housing Association	""	""	""	""	Q4-2020	""
864	864	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q3-2017
865	865	CALF Turnkey	Galway City	Creig Ard, Roscam, Galway City  (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2020
866	866	CALF Turnkey	Galway City	Creig Ard, Roscam, Galway City  (Phase 2)	10	Cluid Housing	""	""	""	""	Q4-2019	""
867	867	CALF Turnkey	Galway City	Creig Ard, Roscam, Galway City, Co. Galway (Phase 1)*	17	Cluid Housing	""	""	""	""	Q4-2019	""
868	868	CALF Turnkey	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 1)	43	Respond	""	""	""	""	Q3-2020	""
869	869	CALF Turnkey	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 2)*	40	Respond	""	""	""	""	Q3-2020	""
870	870	CALF Turnkey	Galway City	Leana Theas, Cappagh Road, Galway City (Phase 1)*	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
871	871	CALF Turnkey	Galway City	Letteragh Road, Rahoon, Galway City (Phase 1)*	23	Cluid Housing	""	""	""	""	Q3-2020	""
872	872	CALF Turnkey	Galway City	Letteragh Road, Rahoon, Galway City (Phase 2)	16	Cluid Housing	""	""	""	""	Q3-2020	""
873	873	CALF Turnkey	Galway City	Letteragh Road, Rahoon, Galway City (Phase 3)*	25	Cluid Housing	""	""	""	""	Q3-2020	""
874	874	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
875	875	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q1-2017
876	876	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	Tath Housing Association	""	""	""	""	""	Q4-2017
877	877	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	Tath Housing Association	""	""	""	""	""	Q3-2018
878	878	CALF Turnkey	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q2-2017
879	879	CALF Turnkey	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q2-2017
880	880	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 1)*	20	Cluid Housing	""	""	""	""	""	Q1-2019
881	881	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke	74	*N/A	""	""	""	""	Q4-2019	""
882	882	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro Gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
883	883	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
884	884	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
885	885	SHIP CONSTRUCTION TURNKEY	Galway County	Ashthorn Avenue, Headford	10	*N/A	""	""	""	""	""	Q4-2018
886	886	SHIP CONSTRUCTION TURNKEY	Galway County	Cuirt na hAbhann, Claregalway 	8	*N/A	""	""	""	""	""	Q4-2018
887	887	SHIP CONSTRUCTION TURNKEY	Galway County	Tulaigh na Grine, Tullahill, Loughrea	19	*N/A	""	""	""	""	""	Q4-2019
888	888	SHIP CONSTRUCTION TURNKEY	Galway County	Gort na dTulach, Tullahill, Loughrea - Phase 2A	17	*N/A	""	""	""	""	""	Q4-2019
889	889	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	4	*N/A	""	""	""	""	""	Q4-2019
890	890	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	24	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
891	891	SHIP CONSTRUCTION TURNKEY	Galway County	Pirc an Triantin, Tullahill, Loughrea, - Phase 3	10	*N/A	""	""	""	""	""	Q4-2020
892	892	SHIP CONSTRUCTION TURNKEY	Galway County	Gort na dTulach, Tullahill, Loughrea - Phase 2B	15	*N/A	""	""	""	""	""	Q4-2020
893	893	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	8	*N/A	""	""	""	""	""	Q4-2020
894	894	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	""	Q4-2020
895	895	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	7	*N/A	""	""	""	""	""	Q4-2020
896	896	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	9	*N/A	""	""	""	""	""	Q1-2021
897	897	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	""	Q1-2021
898	898	SHIP CONSTRUCTION TURNKEY	Galway County	Garra Mhic Aodha, Tubber Road, Gort 	17	*N/A	""	""	""	""	Q2-2020	""
899	899	SHIP CONSTRUCTION TURNKEY	Galway County	Pirc an Triantin, Tullahill, Loughrea - Phase 4	9	*N/A	""	""	""	""	Q3-2018	""
900	900	SHIP CONSTRUCTION TURNKEY	Galway County	Garra Mhic Aodha, Tubber Road, Gort	14	*N/A	""	""	""	""	Q2-2020	""
901	901	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	21	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
902	902	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	8	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
903	903	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	""	Q4-2019
904	904	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	""	Q3-2019
905	905	SHIP CONSTRUCTION	Galway County	Na Clocha Rua, An Cheathr Rua	4	*N/A	""	""	""	""	""	Q4-2019
906	906	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
907	907	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
908	908	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	""	Q4-2018
909	909	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
910	910	SHIP CONSTRUCTION	Galway County	Cill Ciarn (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
911	911	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
912	912	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige, Roundstone	8	*N/A	""	""	""	""	""	Q4-2020
913	913	SHIP CONSTRUCTION	Galway County	Gort na gCloch, Hospital Road, Clifden	16	*N/A	""	""	""	""	Q4-2020	""
914	914	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	18	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
915	915	SHIP CONSTRUCTION	Galway County	Caislen Raithln, Ardrahan	12	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
916	916	SHIP CONSTRUCTION	Galway County	Barrack Street, Loughrea	5	*N/A	""	""	""	""	Q2-2020	""
917	917	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam - Phase 2	24	*N/A	""	""	""	""	""	Q3-2019
918	918	SHIP CONSTRUCTION	Galway County	Cartron, Kinvara	10	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
919	919	SHIP CONSTRUCTION	Galway County	Gort U Lochlainn, Moycullen	31	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
920	920	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	16	*N/A	""	""	""	""	""	Q4-2018
921	921	SHIP CONSTRUCTION	Galway County	Fna Bhu, Tuam	18	*N/A	""	""	""	""	Q4-2020	""
922	922	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam - Phase 3	19	*N/A	""	""	""	""	""	Q4-2019
923	923	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige , Roundstone	6	*N/A	""	""	""	""	""	Q1-2021
924	924	SHIP CONSTRUCTION	Galway County	Ballyglass, Ardrahan (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
925	925	SHIP CONSTRUCTION	Galway County	Woodpark, Portumna (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
926	926	SHIP CONSTRUCTION	Galway County	Carrowmore West, Clontuskert, Ballinasloe (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
927	927	SHIP CONSTRUCTION	Galway County	Woodfireld, Dunmore (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
928	928	SHIP CONSTRUCTION	Galway County	Knockaloura West, Brownsgrove, Tuam (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
929	929	SHIP CONSTRUCTION	Galway County	Creggaturlough, Craughwell (SRD)	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
930	930	SHIP CONSTRUCTION	Galway County	Gort na gCloch, Hospital Road, Clifden	10	*N/A	""	""	""	""	Q4-2020	""
931	931	SHIP CONSTRUCTION	Galway County	Fna Bhu, Tuam	13	*N/A	""	""	""	""	Q4-2020	""
932	932	SHIP CONSTRUCTION	Galway County	Fna Bhu, Tuam	18	*N/A	""	""	""	""	Q4-2020	""
933	933	CAS CONSTRUCTION TURNKEY	Galway County	Tubber Road, Gort	11	Inis Housing Association Ltd	""	""	""	""	Q2-2020	""
934	934	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	""	""	""	Q4-2020	""
935	935	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
936	936	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	""	Q3-2019
937	937	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
938	938	CAS CONSTRUCTION	Galway County	Mountbellew	5	Tath Housing Association Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
939	939	CAS CONSTRUCTION	Galway County	Springfield, Parkmore, Ballinasloe	4	Peter Triest Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
940	940	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
941	941	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	18	Cluid Housing Association	""	""	""	""	""	Q3-2020
942	942	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	4	Peter Triest Housing Association Ltd	""	""	""	""	""	Q4-2019
943	943	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	""	""	""	""	Q4-2020
944	944	CAS CONSTRUCTION	Galway County	Shannon Road, Portumna	4	Carraig Dubh Housing Association	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
945	945	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2018
946	946	CALF Turnkey	Galway County	Dunloe Street, Ballinasloe, Co. Galway (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
947	947	CALF Turnkey	Galway County	Oranhill, Oranmore, Co. Galway (Phase 1)*	22	Cluid Housing	""	""	""	Q1-2021	""	""
948	948	CALF Turnkey	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2020
949	949	CALF Turnkey	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q1-2021
950	950	CALF Turnkey	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 3)*	16	Cluid Housing	""	""	""	""	Q4-2019	""
951	951	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing	""	""	""	""	""	Q3-2017
952	952	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole	2	*N/A	""	""	""	""	""	Q1-2018
953	953	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
954	954	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
955	955	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	5	*N/A	""	""	""	""	""	Q3-2018
956	956	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin	3	*N/A	""	""	""	""	""	Q4-2018
957	957	SHIP CONSTRUCTION TURNKEY	Kerry	47 Woodview, Cahirdown, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
958	958	SHIP CONSTRUCTION TURNKEY	Kerry	Dromin Upper, Listowel	8	*N/A	""	""	""	""	""	Q4-2020
959	959	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 3	3	*N/A	""	""	""	""	""	Q4-2018
960	960	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 2	1	*N/A	""	""	""	""	""	Q2-2019
961	961	SHIP CONSTRUCTION TURNKEY	Kerry	Ballygologue, Road, Listowel	2	*N/A	""	""	""	""	""	Q4-2019
962	962	SHIP CONSTRUCTION TURNKEY	Kerry	Marian Terrace, Ballyheigue	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
963	963	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Pinewood Estate, Killarney	6	*N/A	""	""	""	""	""	Q4-2019
964	964	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Glannagilliagh, Caragh Lake, Killorglin (SRD)	1	*N/A	""	""	""	""	Q4-2020	""
965	965	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Knockawinna, Brosna, Co Kerry	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
966	966	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Carrigcannon, Lyreacrumpane (SRD)	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
967	967	SHIP CONSTRUCTION	Kerry	Cois Gallain, Killorglin	14	*N/A	""	""	""	""	""	Q4-2019
968	968	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	""	""	""	Q4-2019	""
969	969	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	""	Q4-2018
970	970	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
971	971	SHIP CONSTRUCTION	Kerry	Cuirt Eaglaise, Milltown	8	*N/A	""	""	""	""	""	Q4-2019
972	972	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	""	Q3-2019
973	973	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
974	974	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
975	975	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	""	""	Q4-2019
976	976	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
977	977	SHIP CONSTRUCTION	Kerry	Glenach, Ballybunion	20	*N/A	""	""	""	""	""	Q1-2021
978	978	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	""	Q4-2018
979	979	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	""	Q4-2018
980	980	SHIP CONSTRUCTION	Kerry	An Carrigin, Tralee	28	*N/A	""	""	""	""	""	Q4-2020
981	981	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	""	Q4-2018
982	982	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	""	""	""	Q4-2020
983	983	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	""	Q3-2019
984	984	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	""	Q3-2019
985	985	SHIP CONSTRUCTION	Kerry	Owngarry, Killorglin	1	*N/A	""	""	""	""	""	Q4-2019
986	986	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	61	*N/A	""	""	""	""	Q3-2020	""
987	987	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	""	""	""	Q4-2020
988	988	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
989	989	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	""	""	""	Q1-2021
990	990	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	22	*N/A	""	""	""	""	Q3-2019	""
991	991	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	21	*N/A	""	""	""	""	Q3-2020	""
992	992	SHIP CONSTRUCTION	Kerry	Croogorts, Tralee	30	*N/A	""	""	""	""	Q3-2020	""
993	993	SHIP CONSTRUCTION	Kerry	Rock Rd., Killarney	10	*N/A	""	""	""	""	Q3-2020	""
994	994	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 4)	14	*N/A	""	""	""	""	""	Q1-2021
995	995	SHIP CONSTRUCTION	Kerry	Baile an Gharra, Lixnaw (Phase 2)	10	*N/A	""	""	""	""	Q1-2020	""
996	996	SHIP CONSTRUCTION	Kerry	Woodview Place, Tarbert	22	*N/A	""	""	""	""	Q1-2021	""
997	997	SHIP CONSTRUCTION	Kerry	Marconi South, Ballybunion	14	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
998	998	SHIP CONSTRUCTION	Kerry	Rahoonane - New Site, Tralee	8	*N/A	""	""	""	""	Q1-2021	""
999	999	SHIP CONSTRUCTION	Kerry	Rusheen, Ballylongford	7	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1000	1000	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 5)	14	*N/A	""	""	""	""	Q1-2021	""
1001	1001	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	""	Q4-2018
1002	1002	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
1003	1003	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
1004	1004	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	""	Q4-2018
1005	1005	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
1006	1006	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	""	""	""	Q1-2021
1007	1007	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	""	Q4-2018
1008	1008	CAS CONSTRUCTION	Kerry	Chamfers Place (Mitchels road, Tralee)	18	Cluid Housing Association	""	""	""	""	Q4-2020	""
1009	1009	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	""	Q4-2018
1010	1010	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	Social Action Group Rathmore	""	""	""	""	""	Q3-2020
1011	1011	CALF Turnkey	Kerry	Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 1)*	54	Cluid Housing	""	""	""	""	Q4-2020	""
1012	1012	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1013	1013	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 2)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1014	1014	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 3)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1015	1015	CALF Turnkey	Kerry	Barraduff, Killarney, Co. Kerry (Phase 4)*	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1016	1016	CALF Turnkey	Kerry	Cahirdown Wood, Listowel, Co. Kerry (Phase 1)*	12	Cluid Housing	""	""	""	""	Q3-2020	""
1017	1017	CALF Turnkey	Kerry	Cahirdown Wood, Listowel, Co. Kerry (Phase 2)	26	Cluid Housing	""	""	""	""	Q3-2020	""
1018	1018	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing	""	""	""	""	""	Q2-2016
1019	1019	CALF Turnkey	Kerry	Deerpark Avenue, Tralee, Co. Kerry (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
1020	1020	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)*	61	Cluid Housing	""	""	""	""	""	Q3-2020
1021	1021	CALF Turnkey	Kerry	Doon Road, Lisloose, Tralee, Co. Kerry (Phase 1)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
1022	1022	CALF Turnkey	Kerry	Dromcairn, Tralee, Co. Kerry (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2020
1023	1023	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 1)	14	Respond	""	""	""	""	""	Q4-2018
1024	1024	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 2)	2	Respond	""	""	""	""	""	Q4-2019
1025	1025	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 3)	5	Respond	""	""	""	""	""	Q2-2020
1026	1026	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 4)	1	Respond	""	""	""	""	Q3-2018	""
1027	1027	CALF Turnkey	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Cluid Housing	""	""	""	""	""	Q4-2019
1028	1028	CALF Turnkey	Kerry	Hunters Lodge, Hunters Wood, Ballyseedy, Tralee, Co. Kerry (Phase 1)	10	Cluid Housing	""	""	""	Q2-2020	""	""
1029	1029	CALF Turnkey	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Cluid Housing	""	""	""	""	""	Q4-2019
1030	1030	CALF Turnkey	Kerry	Lawlers Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 1)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1031	1031	CALF Turnkey	Kerry	Lawlers Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 2)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1032	1032	CALF Turnkey	Kerry	Lios Ard, Lisloose, Tralee, Co. Kerry (Phase 1)	28	Cluid Housing	""	""	""	""	Q4-2019	""
1033	1033	CALF Turnkey	Kerry	Moanmore, Pound Road, Castleisland, Co. Kerry (Phase 1)*	14	Cluid Housing	""	""	""	""	Q2-2020	""
1034	1034	CALF Turnkey	Kerry	Oakwood, Coolegrean, Killarney, Co. Kerry (Phase 1)	59	Cluid Housing	""	""	""	""	""	Q3-2019
1035	1035	CALF Turnkey	Kerry	Sruthan na Saili, Derreen, Co. Kerry (Phase 1)*	22	Cluid Housing	""	""	""	""	""	Q4-2020
1036	1036	CALF Turnkey	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Cluid Housing	""	""	""	""	""	Q3-2020
1037	1037	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
1038	1038	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
1039	1039	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
1040	1040	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
1041	1041	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin (Phase 2)	7	*N/A	""	""	""	""	""	Q1-2018
1042	1042	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
1043	1043	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	""	Q4-2018
1044	1044	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
1045	1045	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot	6	*N/A	""	""	""	""	""	Q4-2018
1046	1046	SHIP CONSTRUCTION TURNKEY	Kildare	Grove Lane, Robertstown	3	*N/A	""	""	""	""	""	Q1-2020
1047	1047	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill, Prosperous	5	*N/A	""	""	""	""	""	Q4-2018
1048	1048	SHIP CONSTRUCTION TURNKEY	Kildare	The Green, Elsmore Naas	5	*N/A	""	""	""	""	""	Q4-2018
1049	1049	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	10	*N/A	""	""	""	""	""	Q1-2019
1050	1050	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	16	*N/A	""	""	""	""	""	Q3-2020
1051	1051	SHIP CONSTRUCTION TURNKEY	Kildare	Beech Park Wood, Leixlip	4	*N/A	""	""	""	""	""	Q3-2019
1052	1052	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	18	*N/A	""	""	""	""	""	Q2-2019
1053	1053	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	10	*N/A	""	""	""	""	""	Q3-2019
1054	1054	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)	20	*N/A	""	""	""	""	""	Q3-2019
1055	1055	SHIP CONSTRUCTION TURNKEY	Kildare	Cluain Dara, Derrinturn, Kildare	1	*N/A	""	""	""	""	""	Q2-2019
1056	1056	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	3	*N/A	""	""	""	""	""	Q4-2019
1057	1057	SHIP CONSTRUCTION TURNKEY	Kildare	School Walk, Allenwood	4	*N/A	""	""	""	""	""	Q4-2019
1058	1058	SHIP CONSTRUCTION TURNKEY	Kildare	Stoneleigh, Naas	6	*N/A	""	""	""	""	""	Q4-2019
1059	1059	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q1-2020
1060	1060	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q3-2020
1061	1061	SHIP CONSTRUCTION TURNKEY	Kildare	Barrack Close, Ballymore Eustace	2	*N/A	""	""	""	""	""	Q2-2020
1062	1062	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	6	*N/A	""	""	""	""	""	Q2-2020
1063	1063	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill Prosperous	1	*N/A	""	""	""	""	""	Q4-2019
1064	1064	SHIP CONSTRUCTION TURNKEY	Kildare	Greenfield House, Maynooth	1	*N/A	""	""	""	""	""	Q4-2019
1065	1065	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	10	*N/A	""	""	""	""	""	Q4-2020
1066	1066	SHIP CONSTRUCTION TURNKEY	Kildare	Railway House, Dublin Road, Naas 	3	*N/A	""	""	""	""	""	Q3-2020
1067	1067	SHIP CONSTRUCTION TURNKEY	Kildare	Loughminane Green, Kildare Town 	2	*N/A	""	""	""	""	""	Q4-2020
1068	1068	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	26	*N/A	""	""	""	""	""	Q4-2020
1069	1069	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh 	9	*N/A	""	""	""	""	""	Q4-2020
1070	1070	SHIP CONSTRUCTION TURNKEY	Kildare	Barrack Close, Ballymore Eustace	2	*N/A	""	""	""	""	""	Q3-2020
1071	1071	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	9	*N/A	""	""	""	""	""	Q3-2020
1072	1072	SHIP CONSTRUCTION TURNKEY	Kildare	Temple Mills, Rathangan	2	*N/A	""	""	""	""	""	Q4-2020
1073	1073	SHIP CONSTRUCTION TURNKEY	Kildare	Longstone, Craddockstown, Naas	5	*N/A	""	""	""	""	""	Q4-2020
1074	1074	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	4	*N/A	""	""	""	""	""	Q4-2020
1075	1075	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	6	*N/A	""	""	""	""	""	Q4-2020
1076	1076	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturm	3	*N/A	""	""	""	""	""	Q4-2020
1077	1077	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	2	*N/A	""	""	""	""	""	Q4-2020
1078	1078	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	2	*N/A	""	""	""	""	Q4-2019	""
1079	1079	SHIP CONSTRUCTION TURNKEY	Kildare	Straffan Road, Greenfield, Maynooth	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1080	1080	SHIP CONSTRUCTION TURNKEY	Kildare	Main Street, Robertstown	2	*N/A	""	""	""	""	""	Q4-2020
1081	1081	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	2	*N/A	""	""	""	""	""	Q1-2021
1082	1082	SHIP CONSTRUCTION TURNKEY	Kildare	Abbotsfield Clane	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1083	1083	SHIP CONSTRUCTION TURNKEY	Kildare	Old Mill Race, Monasterevin	9	*N/A	""	""	""	""	Q4-2019	""
1084	1084	SHIP CONSTRUCTION TURNKEY	Kildare	Kildangan	20	*N/A	""	""	""	""	Q4-2020	""
1085	1085	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	2	*N/A	""	""	""	""	Q1-2020	""
1086	1086	SHIP CONSTRUCTION RAPID VOLUMETRIC	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1087	1087	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1088	1088	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
1089	1089	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
1090	1090	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland, Kildare Town	32	*N/A	""	""	""	""	""	Q3-2019
1091	1091	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	""	""	""	Q3-2020
1092	1092	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	""	""	""	Q4-2019
1093	1093	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
1094	1094	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
1095	1095	SHIP CONSTRUCTION	Kildare	Newtown House, Leixlip	4	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1096	1096	SHIP CONSTRUCTION	Kildare	Coill Dubh	10	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1097	1097	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1098	1098	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
1099	1099	SHIP CONSTRUCTION	Kildare	Ambassador Site, Kill	33	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1100	1100	SHIP CONSTRUCTION	Kildare	Carbury	5	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1101	1101	SHIP CONSTRUCTION	Kildare	St. Evins Park Monasterevin	16	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1102	1102	SHIP CONSTRUCTION	Kildare	Castle Park, Athy	4	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1103	1103	SHIP CONSTRUCTION	Kildare	Oldtown Mill, Celbridge	57	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1104	1104	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1105	1105	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1106	1106	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1107	1107	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	""	""	Q4-2019	""
1108	1108	CAS CONSTRUCTION	Kildare	St. John's Convent, New Street, Rathangan	28	Sophia Housing Association Ltd	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1109	1109	CAS CONSTRUCTION	Kildare	Dominican Lands, Athy	30	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1110	1110	CALF Turnkey	Kildare	Bellingsfield, Naas, Kildare (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2018
1111	1111	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2018
1112	1112	CALF Turnkey	Kildare	Castle Farm, Jigginstown, Naas, Co. Kildare (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2019
1113	1113	CALF Turnkey	Kildare	Castle Farm, Naas, Co. Kildare (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q2-2019
1114	1114	CALF Construction	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	Tath Housing Association	""	""	""	""	Q1-2020	""
1115	1115	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 1)*	6	Cill Dara Housing Association	""	""	""	""	""	Q4-2019
1116	1116	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 2)*	11	Cill Dara Housing Association	""	""	""	""	""	Q4-2019
1117	1117	CALF Turnkey	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 1)*	26	Tath Housing Association	""	""	""	""	""	Q4-2019
1118	1118	CALF Turnkey	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 2)*	17	Tath Housing Association	""	""	""	""	Q2-2018	""
1119	1119	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q4-2018
1120	1120	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 2)*	3	Tath Housing Association	""	""	""	""	""	Q3-2019
1121	1121	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 1)	18	Tath Housing Association	""	""	""	""	""	Q1-2019
1122	1122	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 2)	6	Tath Housing Association	""	""	""	""	""	Q1-2019
1123	1123	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 3)	6	Tath Housing Association	""	""	""	""	""	Q1-2019
1124	1124	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 4)	6	Tath Housing Association	""	""	""	""	""	Q2-2019
1125	1125	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 5)	4	Tath Housing Association	""	""	""	""	""	Q2-2019
1126	1126	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 6)	5	Tath Housing Association	""	""	""	""	""	Q3-2019
1127	1127	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 7)*	18	Tath Housing Association	""	""	""	""	""	Q4-2019
1128	1128	CALF Construction	Kildare	Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)	35	Respond	""	""	""	""	Q1-2021	""
1129	1129	CALF Turnkey	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 1)*	21	Cluid Housing	""	""	""	""	""	Q1-2021
1130	1130	CALF Turnkey	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 2)	19	Cluid Housing	""	""	""	""	Q3-2018	""
1131	1131	CALF Turnkey	Kildare	Hawthorn Manor, Brockagh, Coill Dubh, Co. Kildare (Phase 1)*	5	Oaklee Housing	""	""	""	""	""	Q4-2019
1132	1132	CALF Turnkey	Kildare	Kilbelin Abbey, Kildare, Phase 1 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q1-2021
1133	1133	CALF Turnkey	Kildare	Kilbelin Abbey, Kildare, Phase 2 (Phase 1)*	4	Cluid Housing	""	""	""	""	Q2-2019	""
1134	1134	CALF Turnkey	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2019
1135	1135	CALF Turnkey	Kildare	Leinster Square, Dublin Street, Kildare Town, Co Kildare (Phase 1)*	4	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1136	1136	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1137	1137	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 2)*	17	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1138	1138	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 3)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1139	1139	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 4)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1140	1140	CALF Turnkey	Kildare	Loughlion, Kildare Town, Kildare (Phase 5)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1141	1141	CALF Turnkey	Kildare	Main Street, Prosperous, Clane, Co. Kildare (Phase 1)*	16	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
1142	1142	CALF Turnkey	Kildare	Mariavilla and Elsmore, Kildare (Phase 1)*	15	Tath Housing Association	""	""	""	""	""	Q4-2019
1143	1143	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing	""	""	""	""	""	Q3-2018
1144	1144	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing	""	""	""	""	""	Q1-2018
1145	1145	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2018
1146	1146	CALF Turnkey	Kildare	Oakpark, Craddockstown, Kildare (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q4-2020
1147	1147	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	Tath Housing Association	""	""	""	""	""	Q2-2018
1148	1148	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	Tath Housing Association	""	""	""	""	""	Q3-2018
1149	1149	CALF Turnkey	Kildare	Phase 2, White Oaks, Newbridge, Kildare (Phase 1)	36	Cluid Housing	""	""	""	""	""	Q4-2019
1150	1150	CALF Turnkey	Kildare	Revised Rye Abbey, Kilcock, Co Kildare (apts)\n (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q2-2017
1151	1151	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
1152	1152	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	Tath Housing Association	""	""	""	""	""	Q2-2017
1153	1153	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	Tath Housing Association	""	""	""	""	""	Q4-2017
1154	1154	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	Tath Housing Association	""	""	""	""	""	Q1-2018
1155	1155	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q2-2017
1156	1156	CALF Turnkey	Kildare	The Arches, Castlefarm, Naas, Co. Kildare (Phase 1)*	4	Tath Housing Association	""	""	""	""	""	Q4-2020
1157	1157	CALF Turnkey	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 1)*	5	Cluid Housing	""	""	""	""	""	Q4-2019
1158	1158	CALF Turnkey	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 2)*	3	Cluid Housing	""	""	""	""	""	Q4-2020
1159	1159	CALF Turnkey	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 3)*	16	Cluid Housing	""	""	""	""	Q4-2018	""
1160	1160	CALF Turnkey	Kildare	The Paddocks, Newbridge, Co Kildare (Phase 1)	18	Cluid Housing	""	""	""	""	""	Q4-2020
1161	1161	CALF Turnkey	Kildare	The Paddocks, Newbridge, Kildare  (Phase 1)	26	Cluid Housing	""	""	""	""	Q2-2020	""
1162	1162	CALF Turnkey	Kildare	The Paddocks, Newbridge, Kildare  (Phase 2)	33	Cluid Housing	""	""	""	""	Q2-2020	""
1163	1163	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	18	Respond	""	""	""	""	""	Q4-2019
1164	1164	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)*	18	Respond	""	""	""	""	Q3-2019	""
1165	1165	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 2)	32	Respond	""	""	""	""	""	Q2-2020
1166	1166	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 1)*	14	Cluid Housing	""	""	""	""	""	Q4-2018
1167	1167	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 2)	24	Cluid Housing	""	""	""	""	""	Q4-2018
1168	1168	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q1-2019
1169	1169	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 4)	2	Cluid Housing	""	""	""	""	""	Q4-2019
1170	1170	CALF Turnkey	Kildare	Willouise, Sallins, Kildare (Phase 1)	31	Tath Housing Association	""	""	""	""	""	Q4-2020
1171	1171	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas (Phase 1)	36	*N/A	""	""	""	""	""	Q2-2020
1172	1172	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas (Phase 2)	38	*N/A	""	""	""	""	""	Q3-2020
1173	1173	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	""	""	Q1-2019	""
1174	1174	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
1175	1175	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
1176	1176	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank	8	*N/A	""	""	""	""	""	Q1-2018
1177	1177	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
1178	1178	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	1	*N/A	""	""	""	""	""	Q3-2018
1179	1179	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford (Phase 3)	18	*N/A	""	""	""	""	""	Q4-2018
1180	1180	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	""	Q3-2018	""
1181	1181	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
1182	1182	SHIP CONSTRUCTION TURNKEY	Kilkenny	Ogenty, Gowran	12	*N/A	""	""	""	""	""	Q4-2018
1183	1183	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Court, Hebron Road, Kilkenny	8	*N/A	""	""	""	""	Q3-2020	""
1184	1184	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Oakridge, Ferrybank, Co. Kilkenny	4	*N/A	""	""	""	""	""	Q2-2020
1185	1185	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Green, Hebron Road, Kilkenny	58	*N/A	""	""	""	""	Q3-2020	""
1186	1186	SHIP CONSTRUCTION TURNKEY	Kilkenny	Lower Kilmacow, Co. Kilkenny	16	*N/A	""	""	""	""	Q3-2020	""
1187	1187	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Ferrybank, Co. Kilkenny	15	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1188	1188	SHIP CONSTRUCTION TURNKEY	Kilkenny	Piltown, Kilkenny	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1189	1189	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Group Home Cloghabrody, Thomastown	4	*N/A	""	""	""	""	""	Q3-2020
1190	1190	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Inchacarron, Mullinavat	2	*N/A	""	""	""	""	Q3-2019	""
1191	1191	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Shanganny, Jenkinstown	2	*N/A	""	""	""	""	Q4-2019	""
1192	1192	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Old Fire Station, Graiguenamanagh	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1193	1193	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	""	""	""	Q4-2019
1194	1194	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
1195	1195	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	6	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1196	1196	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	""	""	""	Q4-2020
1197	1197	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	""	""	Q3-2019	""
1198	1198	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	""	Q3-2020
1199	1199	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	Q1-2019	""
1200	1200	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
1201	1201	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
1202	1202	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	""	Q4-2018
1203	1203	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	18	*N/A	""	""	""	""	Q2-2020	""
1204	1204	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown, Co. Kilkenny	25	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1205	1205	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Kennyswell Road, Kilkenny	88	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1206	1206	SHIP CONSTRUCTION	Kilkenny	Ayrfield	9	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1207	1207	SHIP CONSTRUCTION	Kilkenny	Canal Road, Johnstown, Co. Kilkenny Project 1	5	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1208	1208	SHIP CONSTRUCTION	Kilkenny	Canal Road Johnstown Project 2	2	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1209	1209	SHIP CONSTRUCTION	Kilkenny	Canal Road Johnstown Project 3	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1210	1210	CAS CONSTRUCTION TURNKEY	Kilkenny	Golf Links Road, Kilkenny	15	Respond	""	""	""	""	""	Q3-2019
1211	1211	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	4	Kingsriver Housing Association Limited	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
1212	1212	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	""	Q4-2018
1213	1213	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
1214	1214	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	""	Q4-2018
1215	1215	CAS CONSTRUCTION	Kilkenny	Brooke House, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
1216	1216	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
1217	1217	CAS CONSTRUCTION	Kilkenny	Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
1218	1218	CAS CONSTRUCTION	Kilkenny	Red Barn, Patrick Street, Ballyragget	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1219	1219	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett	4	Oaklee Housing Trust	""	""	""	""	""	Q4-2018
1220	1220	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	2	Camphill Communities of Ireland	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1221	1221	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	3	Good Shepherd Services Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1222	1222	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1223	1223	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, Kilkenny	12	Good Shepherd Services Ltd	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1224	1224	CAS CONSTRUCTION	Kilkenny	Bridge Street, Callan	6	Good Shepherd Services Ltd	""	""	""	""	""	Q4-2019
1225	1225	CAS CONSTRUCTION	Kilkenny	Grennan Villa, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	Q3-2020	""
1226	1226	CAS CONSTRUCTION	Kilkenny	Fiennes Court, William Street, Kilkenny	7	Good Shepherd Services Ltd	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
1227	1227	CAS CONSTRUCTION	Kilkenny	St. John of god Convent, College Road, Kilkenny	12	Sophia Housing Association Ltd	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1228	1228	CAS CONSTRUCTION	Kilkenny	The Round House, Kells, Co. Kilkenny	4	SOS Kilkenny Housing Association Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1229	1229	CAS CONSTRUCTION	Kilkenny	Ladywell Street, Thomastown, Co. Kilkenny	6	Good Shepherd Services Ltd	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1230	1230	CAS CONSTRUCTION	Kilkenny	Dinan lodge,Suttonsrath, Jenkinstown, Co. Kilkenny	1	Housing Agency	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1231	1231	CAS CONSTRUCTION	Kilkenny	Maise Belle,Seixeslough,Newpark,Kilkenny	1	Good Shepherd Services Ltd	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1232	1232	CAS CONSTRUCTION	Kilkenny	Callan Road, Kilkenny	12	Kilkenny Voluntary Housing Association	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1233	1233	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
1234	1234	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 2)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
1235	1235	CALF Turnkey	Kilkenny	Cois Na Bearu, Graiguenemanagh, Kilkenny (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1236	1236	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	""	Q4-2019
1237	1237	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q2-2017
1238	1238	CALF Turnkey	Kilkenny	Love Lane, Castlecomer, Co. Kilkenny (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
1239	1239	CALF Turnkey	Kilkenny	Margarets Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	""	Q1-2019	""
1240	1240	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	28	Respond	""	""	""	""	""	Q4-2020
1241	1241	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 2)*	22	Respond	""	""	""	""	Q4-2018	""
1242	1242	CALF Turnkey	Kilkenny	OLoughlin Court, Kilkenny  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
1243	1243	CALF Turnkey	Kilkenny	Orchard Close, Kilkenny (Phase 1)*	23	Cluid Housing	""	""	""	""	Q4-2020	""
1244	1244	CALF Construction	Kilkenny	Park Lane, Friary Walk, Callan, Co Kilkenny (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q2-2019
1245	1245	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing	""	""	""	""	""	Q3-2018
1246	1246	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing	""	""	""	""	""	Q4-2019
1247	1247	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	6	*N/A	""	""	""	""	""	Q4-2020
1248	1248	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	5	*N/A	""	""	""	""	Q2-2020	""
1249	1249	SHIP CONSTRUCTION TURNKEY	Laois	Clonaslee	7	*N/A	""	""	""	""	""	Q4-2020
1250	1250	SHIP CONSTRUCTION TURNKEY	Laois	Church Ave., Stradbally	31	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1251	1251	SHIP CONSTRUCTION SINGLE STAGE	Laois	Harpurs Lane, Portlaoise	1	*N/A	""	""	""	""	""	Q4-2019
1252	1252	SHIP CONSTRUCTION SINGLE STAGE	Laois	Hillview, Portlaoise	2	*N/A	""	""	""	""	""	Q4-2020
1253	1253	SHIP CONSTRUCTION SINGLE STAGE	Laois	Coolroe, Ballybrittas	1	*N/A	""	""	""	""	Q4-2020	""
1254	1254	SHIP CONSTRUCTION SINGLE STAGE	Laois	The Orchard, Stradbally	6	*N/A	""	""	""	""	""	Q1-2020
1255	1255	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	""	""	""	Q3-2020	""
1256	1256	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	""	""	""	Q3-2019	""
1257	1257	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	""	""	""	Q4-2020	""
1258	1258	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	""	""	""	Q4-2020	""
1259	1259	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	""	""	Q1-2020	""
1260	1260	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
1261	1261	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1262	1262	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	7	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1263	1263	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	""	""	""	""	Q4-2020	""
1264	1264	SHIP CONSTRUCTION	Laois	St Kieran's Park, Errill	14	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1265	1265	SHIP CONSTRUCTION	Laois	Clonrooske, Knockmay	11	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1266	1266	SHIP CONSTRUCTION	Laois	Carraig Glas, Stradbally	26	*N/A	""	""	""	""	Q1-2021	""
1267	1267	SHIP CONSTRUCTION	Laois	Stradbally Road, Portlaoise	50	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1268	1268	SHIP CONSTRUCTION	Laois	Iona	9	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1269	1269	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	51	Sophia Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1270	1270	CAS CONSTRUCTION	Laois	County Hotel, Portlaoise	10	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1271	1271	CALF Turnkey	Laois	Ballickmoyler, Graiguecullen, Laois (Phase 1)*	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1272	1272	CALF Turnkey	Laois	Ballymorris Court, Portarlington, Co Laois (Phase 1)	46	Cluid Housing	""	""	""	Q1-2021	""	""
1273	1273	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2019
1274	1274	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 2)	6	Cluid Housing	""	""	""	""	""	Q4-2019
1275	1275	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 3)	5	Cluid Housing	""	""	""	""	""	Q2-2020
1276	1276	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 4)*	9	Cluid Housing	""	""	""	""	""	Q1-2021
1277	1277	CALF Turnkey	Laois	Bellingham, Portlaoise\n (Phase 5)*	6	Cluid Housing	""	""	""	""	Q1-2017	""
1278	1278	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 1)*	9	Tath Housing Association	""	""	""	""	""	Q3-2020
1279	1279	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 2)*	8	Tath Housing Association	""	""	""	""	""	Q3-2020
1280	1280	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q4-2020
1281	1281	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 4)	9	Tath Housing Association	""	""	""	""	""	Q1-2021
1282	1282	CALF Turnkey	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 1)	14	Cluid Housing	""	""	""	""	Q4-2018	""
1283	1283	CALF Turnkey	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 2)*	6	Cluid Housing	""	""	""	""	Q4-2018	""
1284	1284	CALF Turnkey	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 3)	12	Cluid Housing	""	""	""	""	Q4-2018	""
1285	1285	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	Tath Housing Association	""	""	""	""	""	Q3-2018
1286	1286	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	Tath Housing Association	""	""	""	""	""	Q4-2018
1287	1287	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	Tath Housing Association	""	""	""	""	""	Q4-2018
1288	1288	CALF Turnkey	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1289	1289	CALF Turnkey	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 2)	4	North & East Housing Association Ltd	""	""	""	""	""	Q4-2020
1290	1290	CALF Turnkey	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 3)*	6	North & East Housing Association Ltd	""	""	""	""	Q1-2019	""
1291	1291	CALF Turnkey	Laois	Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q3-2018
1292	1292	CALF Turnkey	Laois	Harpurs Lane, Portlaoise, Co. Laois (Phase 1)*	44	Respond	""	""	""	Q1-2021	""	""
1293	1293	CALF Turnkey	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 1)	10	Cluid Housing	""	""	""	""	Q3-2018	""
1294	1294	CALF Turnkey	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 2)	10	Cluid Housing	""	""	""	""	Q3-2018	""
1295	1295	CALF Construction	Laois	Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing	""	""	""	""	""	Q2-2018
1296	1296	CALF Turnkey	Laois	Knockmay Mews, Old Knockmay Road, Portlaoise, Co. Laois (Phase 1)	3	Tath Housing Association	""	""	""	""	""	Q3-2020
1297	1297	CALF Turnkey	Laois	Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1298	1298	CALF Turnkey	Laois	Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1299	1299	CALF Turnkey	Laois	Main Street, Stradbally, Co. Laois (Phase 1)	16	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1300	1300	CALF Turnkey	Laois	Phase 2 The Glen, Kilnacourt, Portarlington, Co Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1301	1301	CALF Construction	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing	""	""	""	""	""	Q1-2018
1302	1302	CALF Turnkey	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 1)	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1303	1303	CALF Turnkey	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 2)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1304	1304	CALF Turnkey	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 3)*	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1305	1305	CALF Turnkey	Laois	Spa Street, Droughill, Portarlington, Co. Laois (Phase 1)*	26	Oaklee Housing	""	""	""	""	Q4-2020	""
1306	1306	CALF Turnkey	Laois	The Glen, Kilnacourt, Portarlington, Co. Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
1307	1307	CALF Turnkey	Laois	The Meadows, Mountrath Road, Portlaoise, Co. Laois (Phase 1)*	48	Cluid Housing	""	""	""	""	Q1-2021	""
1308	1308	CALF Turnkey	Laois	Wilton Lawns, Portarlington, Co. Laois (Phase 1)	2	Respond	""	""	""	Q1-2021	""	""
1309	1309	SHIP CONSTRUCTION TURNKEY	Leitrim	Roosky	7	*N/A	""	""	""	""	""	Q4-2019
1310	1310	SHIP CONSTRUCTION TURNKEY	Leitrim	Drumshanbo	9	*N/A	""	""	""	""	""	Q3-2019
1311	1311	SHIP CONSTRUCTION TURNKEY	Leitrim	Church Lane, Ballinamore	9	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1312	1312	SHIP CONSTRUCTION TURNKEY	Leitrim	Druminshingore, Newtowngore	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1313	1313	SHIP CONSTRUCTION TURNKEY	Leitrim	Carraig Breac, Drumshanbo	5	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1314	1314	SHIP CONSTRUCTION TURNKEY	Leitrim	Oakgrove, Kinlough	5	*N/A	""	""	""	""	""	Q4-2020
1315	1315	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Mohill	3	*N/A	""	""	""	""	""	Q4-2020
1316	1316	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Mohill	2	*N/A	""	""	""	""	""	Q1-2021
1317	1317	SHIP CONSTRUCTION TURNKEY	Leitrim	Lough Meen Estate, Drumkeerin	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1318	1318	SHIP CONSTRUCTION TURNKEY	Leitrim	Commons Lane, Manorhamilton	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1319	1319	SHIP CONSTRUCTION TURNKEY	Leitrim	Cluain Oir, Liscara, Carrick on Shannon	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1320	1320	SHIP CONSTRUCTION TURNKEY	Leitrim	Manorhamilton & Carrigallen	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1321	1321	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	St. Patricks Park Site, Carrick on Shannon	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1322	1322	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	Druminshingore Td., Newtowngore	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1323	1323	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	""	""	Q4-2019	""
1324	1324	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	""	Q4-2018
1325	1325	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 3)	5	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1326	1326	SHIP CONSTRUCTION	Leitrim	Townparks, Carrick on Shannon	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1327	1327	SHIP CONSTRUCTION	Leitrim	Lahard, Ballinamore	10	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1328	1328	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
1329	1329	CALF Turnkey	Leitrim	Cnoc an Luir, Drumshanbo, Co. Leitrim (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q4-2019
1330	1330	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	9	*N/A	""	""	""	""	""	Q4-2019
1331	1331	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park (Phase 2), Ballysimon Road, 	1	*N/A	""	""	""	""	""	Q4-2019
1332	1332	SHIP CONSTRUCTION TURNKEY	Limerick	Carraig Desmond, Newcastle West	8	*N/A	""	""	""	""	""	Q4-2019
1333	1333	SHIP CONSTRUCTION TURNKEY	Limerick	Knocklong	2	*N/A	""	""	""	""	""	Q4-2020
1334	1334	SHIP CONSTRUCTION TURNKEY	Limerick	Carraig Desmond	2	*N/A	""	""	""	""	""	Q4-2019
1335	1335	SHIP CONSTRUCTION TURNKEY	Limerick	Redgate Close, Old Cratloe Road, Limerick City	14	*N/A	""	""	""	""	Q1-2020	""
1336	1336	SHIP CONSTRUCTION TURNKEY	Limerick	The Orchard, Main Street, Pallaskenry	8	*N/A	""	""	""	""	Q1-2020	""
1337	1337	SHIP CONSTRUCTION TURNKEY	Limerick	Gortboy, Charleville Road, kIlmallock	33	*N/A	""	""	""	""	Q4-2020	""
1338	1338	SHIP CONSTRUCTION TURNKEY	Limerick	The Orchard, Main Street, Pallaskenry	8	*N/A	""	""	""	""	Q1-2020	""
1339	1339	SHIP CONSTRUCTION TURNKEY	Limerick	Knocklong	5	*N/A	""	""	""	""	Q1-2021	""
1340	1340	SHIP CONSTRUCTION RAPID VOLUMETRIC	Limerick	Faha View, Patrickswell	16	*N/A	""	""	""	""	""	Q4-2019
1341	1341	SHIP CONSTRUCTION RAPID VOLUMETRIC	Limerick	Old Christians Site, Rathbane	43	*N/A	""	""	""	""	Q2-2020	""
1342	1342	SHIP CONSTRUCTION	Limerick	Patricks Villas, Castleconnell	4	*N/A	""	""	""	""	""	Q4-2020
1343	1343	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	""	""	Q1-2020	""
1344	1344	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	""	""	""	Q4-2020	""
1345	1345	SHIP CONSTRUCTION	Limerick	Burke Avenue, Limerick City	12	*N/A	""	""	""	""	""	Q4-2019
1346	1346	SHIP CONSTRUCTION	Limerick	Fannings Corner, Limerick City	3	*N/A	""	""	""	""	""	Q4-2019
1347	1347	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	""	""	""	""	Q4-2020
1348	1348	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	""	""	""	Q3-2019	""
1349	1349	SHIP CONSTRUCTION	Limerick	Deerpark, Adare	30	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1350	1350	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	""	""	Q3-2020	""
1351	1351	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1352	1352	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	""	Q4-2018
1353	1353	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	7	*N/A	""	""	""	""	""	Q4-2019
1354	1354	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	""	Q1-2019
1355	1355	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	""	Q3-2019
1356	1356	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	""	""	""	""	Q1-2021
1357	1357	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	""	""	""	Q2-2020	""
1358	1358	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
1359	1359	SHIP CONSTRUCTION	Limerick	Knocklong	12	*N/A	""	""	""	""	Q1-2021	""
1360	1360	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	3	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1361	1361	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1362	1362	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
1363	1363	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhills Road	3	*N/A	""	""	""	""	Q2-2020	""
1364	1364	SHIP CONSTRUCTION	Limerick	Clueing Dara, Broadford, Limerick	18	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1365	1365	SHIP CONSTRUCTION	Limerick	Radharc an Ghleanna, Mountcollins	4	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1366	1366	SHIP CONSTRUCTION	Limerick	OConnor Park, Ardagh, Co. Limerick	8	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1367	1367	SHIP CONSTRUCTION	Limerick	Church Glen, Ballylanders, Co. Limerick	9	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1368	1368	SHIP CONSTRUCTION	Limerick	Radharc Cillin, Kilfinane, Co. Limerick	10	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1369	1369	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
1370	1370	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
1371	1371	REGENERATION	Limerick	Sheep / Athlunkards Street	8	Tath Housing Association Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1372	1372	REGENERATION	Limerick	Churchfield	19	*N/A	""	""	""	""	""	Q1-2018
1373	1373	REGENERATION	Limerick	Churchfield	38	Cluid Housing Association	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1374	1374	REGENERATION	Limerick	Cosgrave Park	30	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1375	1375	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1376	1376	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
1377	1377	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
1378	1378	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
1379	1379	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
1380	1380	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
1381	1381	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
1382	1382	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
1383	1383	REGENERATION	Limerick	Ballinacurra Weston Vacant Refurbs, Lot 1 & 2**	14	*N/A	""	""	""	""	""	Q4-2016
1384	1384	REGENERATION	Limerick	St. Mary's Park Infills	15	*N/A	""	""	""	""	""	Q4-2018
1385	1385	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Tath Housing Association Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1386	1386	REGENERATION	Limerick	45A-46A Cliona Park	2	*N/A	""	""	""	""	Q2-2020	""
1387	1387	REGENERATION	Limerick	Dalgaish Park	27	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1388	1388	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1389	1389	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1390	1390	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
1391	1391	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1392	1392	REGENERATION	Limerick	Churchfield	23	*N/A	""	""	""	""	""	Q2-2018
1393	1393	REGENERATION	Limerick	St. Mary's Park Infills	4	*N/A	""	""	""	""	""	Q1-2019
1394	1394	REGENERATION	Limerick	Infill developments at Carew Park and Moyross	38	Peter McVerry Trust Ltd	""	""	""	""	Q1-2021	""
1395	1395	REGENERATION	Limerick	2019 Rebuilds (Southill, Moyross, St Mary's Park and Ballinacurra Weston)	8	*N/A	""	""	""	""	""	Q4-2019
1396	1396	CAS CONSTRUCTION TURNKEY	Limerick	Carebright Community, Ardykeohane, Bruff	6	Carebright Ltd	""	""	""	""	""	Q1-2019
1397	1397	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral Place	2	Arlington Novas Ireland Ltd	""	""	""	""	""	Q4-2019
1398	1398	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral place	3	Arlington Novas Ireland Ltd	""	""	""	""	""	Q1-2020
1399	1399	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral place	1	Arlington Novas Ireland Ltd	""	""	""	""	""	Q2-2020
1400	1400	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	16	Croom Voluntary Housing Association Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1401	1401	CAS CONSTRUCTION	Limerick	Cappamore	10	Cappamore Housing Association Ltd	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
1402	1402	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
1403	1403	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
1404	1404	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1405	1405	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
1406	1406	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	12	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1407	1407	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1408	1408	CAS CONSTRUCTION	Limerick	McGarry House, 7 Alphonsus Street	8	Arlington Novas Ireland Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1409	1409	CAS CONSTRUCTION	Limerick	47 & 48 Main Street, Croom, Limerick	4	Croom Voluntary Housing Association Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1410	1410	CAS CONSTRUCTION	Limerick	58 Henry Street	5	Simon Community : Midwest Simon	""	""	""	""	Q1-2021	""
1411	1411	CAS CONSTRUCTION	Limerick	43 & 44 Main Street, Croom	4	Croom Voluntary Housing Association Ltd	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1412	1412	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
1413	1413	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 2)	2	Respond	""	""	""	""	""	Q4-2018
1414	1414	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 3)	2	Respond	""	""	""	""	""	Q4-2018
1415	1415	CALF Turnkey	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 1)	46	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
1416	1416	CALF Turnkey	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 2)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
1417	1417	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 1)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1418	1418	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 2)	27	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1419	1419	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 3)*	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1420	1420	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 4)*	33	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1421	1421	CALF Turnkey	Limerick	Bloodmill Road, Singland, Limerick (Phase 5)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1422	1422	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 1)*	24	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1423	1423	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 2)*	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1424	1424	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 3)*	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1425	1425	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 4)*	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1426	1426	CALF Turnkey	Limerick	Clonmacken, Condell Road, Limerick (Phase 5)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1427	1427	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2018
1428	1428	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
1429	1429	CALF Turnkey	Limerick	Cois Carraig, Clarina Village, Clarina, Co. Limerick (Phase 1)	18	Cluid Housing	""	""	""	""	""	Q4-2020
1430	1430	CALF Turnkey	Limerick	Dromsally Woods, Cappamore, Co. Limerick (Phase 1)	5	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
1431	1431	CALF Turnkey	Limerick	Glendale Lawn, Bloodmill Road, Limerick (Phase 1)	4	Cluid Housing	""	""	""	""	Q3-2020	""
1432	1432	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q1-2018
1433	1433	CALF Turnkey	Limerick	Laurelville, Mill Road, Corbally, Limerick (Phase 1)*	13	Cluid Housing	""	""	""	""	Q3-2018	""
1434	1434	CALF Turnkey	Limerick	Mungret Gate, Baunacloka, Mungret, Limerick (Phase 1)	8	Cluid Housing	""	""	""	""	Q3-2018	""
1435	1435	CALF Turnkey	Limerick	Mungret Gate, Baunacloka, Mungret, Limerick (Phase 2)*	23	Cluid Housing	""	""	""	""	Q3-2018	""
1436	1436	CALF Turnkey	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2017
1437	1437	CALF Turnkey	Limerick	Toormore, Main Street, Bruree, Co. Limerick (Phase 1)	16	Cluid Housing	""	""	""	""	Q3-2020	""
1438	1438	CALF Turnkey	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 1)*	19	Cluid Housing	""	""	""	""	Q3-2020	""
1439	1439	CALF Turnkey	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 2)	11	Cluid Housing	""	""	""	""	Q3-2020	""
1440	1440	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	14	*N/A	""	""	""	""	""	Q4-2017
1441	1441	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough	4	*N/A	""	""	""	""	""	Q3-2018
1442	1442	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
1443	1443	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck	7	*N/A	""	""	""	""	""	Q4-2018
1444	1444	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2019
1445	1445	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2019
1446	1446	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara	5	*N/A	""	""	""	""	""	Q4-2018
1447	1447	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard	14	*N/A	""	""	""	""	""	Q4-2019
1448	1448	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	29	*N/A	""	""	""	""	""	Q4-2018
1449	1449	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q4-2019
1450	1450	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	4	*N/A	""	""	""	""	""	Q3-2019
1451	1451	SHIP CONSTRUCTION TURNKEY	Longford	Church Street, Edgeworthstown	5	*N/A	""	""	""	""	""	Q3-2020
1452	1452	SHIP CONSTRUCTION TURNKEY	Longford	Smithfield, Legan	18	*N/A	""	""	""	""	""	Q3-2020
1453	1453	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q4-2019
1454	1454	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q2-2019
1455	1455	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 4)	6	*N/A	""	""	""	""	""	Q4-2019
1456	1456	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1457	1457	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2019
1458	1458	SHIP CONSTRUCTION TURNKEY	Longford	 Abhainn Glas, Edgeworthstown	4	*N/A	""	""	""	""	""	Q4-2019
1459	1459	SHIP CONSTRUCTION TURNKEY	Longford	Caislean Breac, Newtownforbes	2	*N/A	""	""	""	""	""	Q4-2019
1460	1460	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town, Phase 1	4	*N/A	""	""	""	""	""	Q1-2020
1461	1461	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard(Phase 3)	4	*N/A	""	""	""	""	""	Q4-2019
1462	1462	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q4-2019
1463	1463	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town, Phase 2	6	*N/A	""	""	""	""	""	Q4-2020
1464	1464	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	7	*N/A	""	""	""	""	""	Q4-2019
1465	1465	SHIP CONSTRUCTION TURNKEY	Longford	Sl Corglass, Legga	4	*N/A	""	""	""	""	""	Q1-2021
1466	1466	SHIP CONSTRUCTION TURNKEY	Longford	Radharc Na Muileann, Knock, Lanesborough	2	*N/A	""	""	""	""	""	Q4-2019
1467	1467	SHIP CONSTRUCTION TURNKEY	Longford	Pearse Drive, Longford Town	1	*N/A	""	""	""	""	""	Q4-2019
1468	1468	SHIP CONSTRUCTION TURNKEY	Longford	Cartrons, Kenagh	5	*N/A	""	""	""	""	""	Q4-2020
1469	1469	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town, Phase 3	4	*N/A	""	""	""	""	""	Q3-2020
1470	1470	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	8	*N/A	""	""	""	""	""	Q1-2021
1471	1471	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	1	*N/A	""	""	""	""	""	Q4-2020
1472	1472	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Lane, Longford	21	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1473	1473	SHIP CONSTRUCTION TURNKEY	Longford	O'Hara Site, Connaught Rd.,Longford	14	*N/A	""	""	""	""	Q1-2021	""
1474	1474	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford	2	*N/A	""	""	""	""	""	Q4-2020
1475	1475	SHIP CONSTRUCTION TURNKEY	Longford	Sli Corglass, Legga	5	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1476	1476	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	""	Q3-2019
1477	1477	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
1478	1478	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	""	""	""	""	Q4-2019
1479	1479	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	""	""	""	Q3-2020	""
1480	1480	SHIP CONSTRUCTION	Longford	St.Rita's, Park Road, Longford	14	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1481	1481	SHIP CONSTRUCTION	Longford	Fairgreen View, Longford Town	1	*N/A	""	""	""	""	Q4-2020	""
1482	1482	SHIP CONSTRUCTION	Longford	Cranleymore, Abbeylara	3	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1483	1483	SHIP CONSTRUCTION	Longford	Cloonahard, Edgeworthstown	1	*N/A	""	""	""	""	Q3-2020	""
1484	1484	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q1-2017
1485	1485	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Tath Housing Association	""	""	""	Q2-2018	""	""
1486	1486	SHIP CONSTRUCTION TURNKEY	Louth	Brabazon Hall, Termonfeckin, Drogheda	5	*N/A	""	""	""	""	""	Q4-2019
1487	1487	SHIP CONSTRUCTION TURNKEY	Louth	Castletown Road, Dundalk 	6	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1488	1488	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 1	13	*N/A	""	""	""	""	""	Q4-2020
1489	1489	SHIP CONSTRUCTION TURNKEY	Louth	Green Gates Manor, Haynestown, Dundalk	44	*N/A	""	""	""	""	""	Q2-2020
1490	1490	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk - Phase 1	16	*N/A	""	""	""	""	""	Q3-2020
1491	1491	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 2	9	*N/A	""	""	""	""	""	Q4-2020
1492	1492	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 3	10	*N/A	""	""	""	""	""	Q1-2021
1493	1493	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 4	9	*N/A	""	""	""	""	Q4-2019	""
1494	1494	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 5	8	*N/A	""	""	""	""	Q4-2019	""
1495	1495	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk - Phase 2	17	*N/A	""	""	""	""	""	Q4-2020
1496	1496	SHIP CONSTRUCTION TURNKEY	Louth	Bridgegate Close, Bridgegate, Ardee	1	*N/A	""	""	""	""	""	Q4-2020
1497	1497	SHIP CONSTRUCTION TURNKEY	Louth	Termon River, Termonfeckin	2	*N/A	""	""	""	""	""	Q4-2020
1498	1498	SHIP CONSTRUCTION TURNKEY	Louth	Glyde View, Tallanstown	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1499	1499	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk - Phase 3	29	*N/A	""	""	""	""	""	Q4-2020
1500	1500	SHIP CONSTRUCTION TURNKEY	Louth	Termon River, Termonfeckin	1	*N/A	""	""	""	""	Q1-2018	""
1501	1501	SHIP CONSTRUCTION SINGLE STAGE	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
1502	1502	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2 - Phase 1	4	*N/A	""	""	""	""	""	Q1-2018
1503	1503	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1	7	*N/A	""	""	""	""	""	Q4-2016
1504	1504	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1 - Phase 2	5	*N/A	""	""	""	""	""	Q2-2017
1505	1505	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1 - Phase 3	3	*N/A	""	""	""	""	""	Q3-2017
1506	1506	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1 - Phase 4	7	*N/A	""	""	""	""	""	Q4-2017
1507	1507	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2018
1508	1508	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2018
1509	1509	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2 - Phase 6	2	*N/A	""	""	""	""	""	Q4-2019
1510	1510	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3	2	*N/A	""	""	""	""	""	Q2-2017
1511	1511	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2017
1512	1512	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 3	4	*N/A	""	""	""	""	""	Q4-2017
1513	1513	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 7	2	*N/A	""	""	""	""	""	Q1-2019
1514	1514	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4	1	*N/A	""	""	""	""	""	Q3-2018
1515	1515	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 1 - Phase 6	1	*N/A	""	""	""	""	""	Q1-2020
1516	1516	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4 - Phase 3	5	*N/A	""	""	""	""	""	Q1-2019
1517	1517	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 4	1	*N/A	""	""	""	""	""	Q2-2018
1518	1518	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 5	4	*N/A	""	""	""	""	""	Q3-2018
1519	1519	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2 - Phase 3	1	*N/A	""	""	""	""	""	Q1-2019
1520	1520	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
1521	1521	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4 - Phase 2	4	*N/A	""	""	""	""	""	Q4-2018
1522	1522	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 6	5	*N/A	""	""	""	""	""	Q4-2018
1523	1523	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 4 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
1524	1524	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 3 - Phase 8	2	*N/A	""	""	""	""	""	Q2-2019
1525	1525	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Phase 2	2	*N/A	""	""	""	""	""	Q2-2019
1526	1526	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Phase 1	1	*N/A	""	""	""	""	""	Q1-2019
1527	1527	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Phase 4	3	*N/A	""	""	""	""	""	Q4-2019
1528	1528	SHIP CONSTRUCTION SINGLE STAGE	Louth	Moneymore, Drogheda	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1529	1529	SHIP CONSTRUCTION SINGLE STAGE	Louth	Rathmullen, Drogheda	4	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1530	1530	SHIP CONSTRUCTION SINGLE STAGE	Louth	Gort Uaine, Clogherhead	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1531	1531	SHIP CONSTRUCTION SINGLE STAGE	Louth	School Lane, Dunleer	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1532	1532	SHIP CONSTRUCTION SINGLE STAGE	Louth	Doire Beag, Collon	6	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1533	1533	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6 - Dromiskin	1	*N/A	""	""	""	""	Q1-2021	""
1534	1534	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 2 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2019
1535	1535	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6 - Phase 1	1	*N/A	""	""	""	""	""	Q3-2019
1536	1536	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Phase 3	4	*N/A	""	""	""	""	""	Q3-2019
1537	1537	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6 - Phase 2	2	*N/A	""	""	""	""	""	Q4-2019
1538	1538	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6 - Dromiskin	1	*N/A	""	""	""	""	Q1-2021	""
1539	1539	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Bay Estate, Dundalk	1	*N/A	""	""	""	""	""	Q1-2020
1540	1540	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Mary St. North, Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1541	1541	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Bridge Crescent, Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1542	1542	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1543	1543	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - Dundalk	1	*N/A	""	""	""	""	Q1-2021	""
1544	1544	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 - St. Clements Park, Dundalk	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1545	1545	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 5 -  Dundalk	1	*N/A	""	""	""	""	""	Q4-2020
1546	1546	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6 - Bolton Square, Drogheda	1	*N/A	""	""	""	""	""	Q3-2020
1547	1547	SHIP CONSTRUCTION SINGLE STAGE	Louth	CPO Bundle 6 - Ardee	1	*N/A	""	""	""	""	Q1-2021	""
1548	1548	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
1549	1549	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2), Drogheda	72	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1550	1550	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	""	""	""	Q1-2020	""
1551	1551	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	93	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1552	1552	SHIP CONSTRUCTION	Louth	Muirhevnamor, Dundalk (Phase 1)	18	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1553	1553	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
1554	1554	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	""	""	""	Q1-2020	""
1555	1555	CAS CONSTRUCTION TURNKEY	Louth	Liscorrie, Bog Road, Drogheda	12	Tath Housing Association Ltd	""	""	""	""	Q1-2020	""
1556	1556	CAS CONSTRUCTION	Louth	Slieveroe Crescent, Dundalk	1	Cluid Housing Association	""	""	""	""	Q1-2021	""
1557	1557	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1558	1558	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	""	Q4-2018
1559	1559	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1560	1560	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
1561	1561	CAS CONSTRUCTION	Louth	Coulter Park, Dundalk	7	Tath Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1562	1562	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda	4	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1563	1563	CAS CONSTRUCTION	Louth	Riverwell Close, Dundalk	1	Respond	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1564	1564	CAS CONSTRUCTION	Louth	Highfield, Newry Road, Dundalk (Domestic Violence Refuge)	12	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1565	1565	CAS CONSTRUCTION	Louth	10-16 The Alleys, St. Peter's Place, Drogheda	14	Peter McVerry Trust Ltd	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1566	1566	CALF Turnkey	Louth	2 units An Rian, Termonfeckin Rd., Drogheda, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1567	1567	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
1568	1568	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q3-2020
1569	1569	CALF Turnkey	Louth	Carlinn Drive, Mullaharlin Road, Dundalk, Co. Louth (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q4-2020
1570	1570	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q1-2017
1571	1571	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing	""	""	""	""	""	Q1-2017
1572	1572	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q1-2018
1573	1573	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	Tath Housing Association	""	""	""	""	""	Q1-2018
1574	1574	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	Tath Housing Association	""	""	""	""	""	Q3-2018
1575	1575	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	Tath Housing Association	""	""	""	""	""	Q3-2018
1576	1576	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	Tath Housing Association	""	""	""	""	""	Q4-2018
1577	1577	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	22	Tath Housing Association	""	""	""	""	""	Q4-2018
1578	1578	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 7)	22	Tath Housing Association	""	""	""	""	""	Q2-2019
1579	1579	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 1)*	16	Tath Housing Association	""	""	""	""	""	Q1-2021
1580	1580	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 2)	10	Tath Housing Association	""	""	""	""	Q1-2020	""
1581	1581	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 3)	16	Tath Housing Association	""	""	""	""	Q1-2020	""
1582	1582	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 4)	11	Tath Housing Association	""	""	""	""	Q1-2020	""
1583	1583	CALF Turnkey	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 5)	12	Tath Housing Association	""	""	""	""	Q1-2020	""
1584	1584	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q1-2021
1585	1585	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 2)*	15	Cluid Housing	""	""	""	""	Q3-2019	""
1586	1586	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 3)	15	Cluid Housing	""	""	""	""	Q3-2019	""
1587	1587	CALF Turnkey	Louth	Clonmore Close, Ardee, Co. Louth (Phase 4)	13	Cluid Housing	""	""	""	""	Q3-2019	""
1588	1588	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	Tath Housing Association	""	""	""	""	""	Q4-2018
1589	1589	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	8	Tath Housing Association	""	""	""	""	""	Q1-2019
1590	1590	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	7	Tath Housing Association	""	""	""	""	""	Q2-2019
1591	1591	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q1-2017
1592	1592	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q3-2017
1593	1593	CALF Turnkey	Louth	Donore Road, Drogheda, Co. Louth (Phase 1)	66	Cluid Housing	""	""	""	Q1-2021	""	""
1594	1594	CALF Turnkey	Louth	Dowdallshill, Dundalk, Co. Louth (Phase 1)*	13	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1595	1595	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)*	65	Respond	""	""	""	""	Q4-2020	""
1596	1596	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 1)*	14	Respond	""	""	""	""	""	Q1-2019
1597	1597	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 2)*	14	Respond	""	""	""	""	""	Q4-2019
1598	1598	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 3)	3	Respond	""	""	""	""	Q3-2017	""
1599	1599	CALF Turnkey	Louth	Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 1)*	65	Cluid Housing	""	""	""	""	Q4-2020	""
1600	1600	CALF Turnkey	Louth	Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 2)	65	Cluid Housing	""	""	""	""	Q4-2020	""
1601	1601	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	11	Tath Housing Association	""	""	""	""	""	Q2-2019
1602	1602	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	14	Tath Housing Association	""	""	""	""	""	Q2-2019
1603	1603	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	15	Tath Housing Association	""	""	""	""	""	Q2-2019
1604	1604	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	47	Tath Housing Association	""	""	""	""	""	Q3-2019
1605	1605	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	24	Tath Housing Association	""	""	""	""	""	Q4-2019
1606	1606	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 6)*	1	Tath Housing Association	""	""	""	""	""	Q4-2020
1607	1607	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1608	1608	CALF Turnkey	Louth	Halliday Mills, Quay Street, Dundalk, Co. Louth (Phase 1)*	85	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1609	1609	CALF Turnkey	Louth	Harbour Grove, Dundalk, Co. Louth (Phase 1)	8	North & East Housing Association Ltd	""	""	""	""	""	Q2-2020
1610	1610	CALF Turnkey	Louth	Harbour View, Coulter Place, Dundalk (Phase 1)	24	Cluid Housing	""	""	""	""	Q1-2020	""
1611	1611	CALF Turnkey	Louth	Knock Shee Close, Blackrock, Co. Louth (Phase 1)	1	Cluid Housing	""	""	""	""	""	Q4-2020
1612	1612	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
1613	1613	CALF Turnkey	Louth	Knockshee Close, Blackrock, Co. Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2020
1614	1614	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	Tath Housing Association	""	""	""	""	""	Q4-2017
1615	1615	CALF Turnkey	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 1)*	15	Tath Housing Association	""	""	""	""	""	Q4-2020
1616	1616	CALF Turnkey	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 2)	8	Tath Housing Association	""	""	""	""	""	Q1-2021
1617	1617	CALF Turnkey	Louth	Mount Hamilton, Dundalk, Co. Louth (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q4-2019
1618	1618	CALF Turnkey	Louth	Newfoundwell Road, Drogheda, Co Louth (Phase 1)*	55	Cluid Housing	""	""	""	""	Q3-2020	""
1619	1619	CALF Turnkey	Louth	Newfoundwell Road, Drogheda, Co Louth (Phase 2)	39	Cluid Housing	""	""	""	""	Q3-2020	""
1620	1620	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 1)*	17	Respond	""	""	""	""	Q4-2020	""
1621	1621	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 2)*	23	Respond	""	""	""	""	Q4-2020	""
1622	1622	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 3)*	46	Respond	""	""	""	""	Q4-2020	""
1623	1623	CALF Turnkey	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 4)*	47	Respond	""	""	""	""	Q4-2020	""
1624	1624	CALF Turnkey	Louth	Oriel Heights, Collon, Co. Louth (Phase 1)*	13	North & East Housing Association Ltd	""	""	""	Q1-2021	""	""
1625	1625	CALF Construction	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q2-2018
1626	1626	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 1)	20	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1627	1627	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 2)*	25	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1628	1628	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2019
1629	1629	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 2)*	22	Tath Housing Association	""	""	""	""	Q1-2019	""
1630	1630	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 3)*	6	Tath Housing Association	""	""	""	""	Q1-2019	""
1631	1631	CALF Turnkey	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 4)*	7	Tath Housing Association	""	""	""	""	Q1-2019	""
1632	1632	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q3-2016
1633	1633	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1634	1634	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	6	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1635	1635	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	3	North & East Housing Association Ltd	""	""	""	""	""	Q3-2019
1636	1636	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	14	North & East Housing Association Ltd	""	""	""	""	""	Q3-2019
1637	1637	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	12	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1638	1638	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 6)	16	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1639	1639	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q2-2018
1640	1640	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	Tath Housing Association	""	""	""	""	""	Q3-2018
1641	1641	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	Tath Housing Association	""	""	""	""	""	Q3-2018
1642	1642	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	Tath Housing Association	""	""	""	""	""	Q4-2018
1643	1643	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	Tath Housing Association	""	""	""	""	""	Q2-2019
1644	1644	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	4	Tath Housing Association	""	""	""	""	""	Q4-2019
1645	1645	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 7)	12	Tath Housing Association	""	""	""	""	""	Q3-2020
1646	1646	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2017
1647	1647	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2019
1648	1648	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	16	Cluid Housing	""	""	""	""	""	Q4-2019
1649	1649	CALF Construction	Louth	Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing	""	""	""	""	""	Q2-2016
1650	1650	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Co. Louth (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1651	1651	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1652	1652	CALF Turnkey	Louth	Tullybrook, Drogheda, Co. Louth  (Phase 1)*	85	Cluid Housing	""	""	""	""	Q1-2021	""
1653	1653	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	""	""	Q2-2020
1654	1654	SHIP CONSTRUCTION TURNKEY	Mayo	Carrabeg, Newport Road, Castlebar	2	*N/A	""	""	""	""	""	Q4-2018
1655	1655	SHIP CONSTRUCTION TURNKEY	Mayo	Cois Abhainn, Bonniconlon	2	*N/A	""	""	""	""	""	Q2-2019
1656	1656	SHIP CONSTRUCTION TURNKEY	Mayo	Chapel Street, Louisburgh	3	*N/A	""	""	""	""	""	Q4-2019
1657	1657	SHIP CONSTRUCTION TURNKEY	Mayo	Bunree, Ballina	3	*N/A	""	""	""	""	Q4-2019	""
1658	1658	SHIP CONSTRUCTION TURNKEY	Mayo	Heathervale, Castlebar - Phase 2	9	*N/A	""	""	""	""	""	Q4-2020
1659	1659	SHIP CONSTRUCTION TURNKEY	Mayo	Friars Court, Ballina	2	*N/A	""	""	""	""	""	Q4-2019
1660	1660	SHIP CONSTRUCTION TURNKEY	Mayo	Riverside Drive, Ballina	3	*N/A	""	""	""	""	""	Q4-2019
1661	1661	SHIP CONSTRUCTION TURNKEY	Mayo	Davitt Terrace, Castlebar	4	*N/A	""	""	""	""	""	Q4-2019
1662	1662	SHIP CONSTRUCTION TURNKEY	Mayo	Chapel St., Louisburgh	2	*N/A	""	""	""	""	""	Q4-2020
1663	1663	SHIP CONSTRUCTION TURNKEY	Mayo	Ard Rua, Claremorris	7	*N/A	""	""	""	""	""	Q4-2019
1664	1664	SHIP CONSTRUCTION TURNKEY	Mayo	Silver Springs, Claremorris	20	*N/A	""	""	""	""	Q3-2020	""
1665	1665	SHIP CONSTRUCTION TURNKEY	Mayo	Barley Hill, Bohola	3	*N/A	""	""	""	""	""	Q4-2020
1666	1666	SHIP CONSTRUCTION TURNKEY	Mayo	Main St., Charlestown	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1667	1667	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Pound Road, Castlebar	6	*N/A	""	""	""	""	""	Q4-2019
1668	1668	SHIP CONSTRUCTION SINGLE STAGE	Mayo	The Boreen, Crossmolina	3	*N/A	""	""	""	""	Q1-2020	""
1669	1669	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Deel Court, Crossmolina	3	*N/A	""	""	""	""	Q1-2020	""
1670	1670	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Kilmaine	6	*N/A	""	""	""	""	""	Q4-2019
1671	1671	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Knockroe, Moygownagh	3	*N/A	""	""	""	""	Q1-2020	""
1672	1672	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Liskilleen, Ballinrobe,	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1673	1673	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Low Park, Charlestown	3	*N/A	""	""	""	""	Q3-2020	""
1674	1674	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	""	Q2-2019
1675	1675	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
1676	1676	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
1677	1677	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	""	Q1-2019
1678	1678	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1679	1679	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	""	""	Q4-2019
1680	1680	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	""	""	Q4-2019
1681	1681	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
1682	1682	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	""	""	""	Q4-2020
1683	1683	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	5	*N/A	""	""	""	""	""	Q4-2019
1684	1684	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	""	""	Q4-2020
1685	1685	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
1686	1686	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
1687	1687	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	""	""	""	Q4-2019
1688	1688	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	""	""	""	Q4-2019
1689	1689	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar - Phase 2	22	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
1690	1690	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	""	""	""	Q4-2020
1691	1691	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1692	1692	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
1693	1693	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1694	1694	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
1695	1695	SHIP CONSTRUCTION	Mayo	Cross	15	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1696	1696	SHIP CONSTRUCTION	Mayo	Bonniconlon	5	*N/A	""	""	""	""	Q2-2020	""
1697	1697	SHIP CONSTRUCTION	Mayo	Cloonkeadagh Road, Kiltimagh	21	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1698	1698	SHIP CONSTRUCTION	Mayo	Rehins Fort, Ballina	50	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1699	1699	SHIP CONSTRUCTION	Mayo	Murrevagh, Mulranney	14	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1700	1700	SHIP CONSTRUCTION	Mayo	50 Units @ Golf Course Rd., Westport	50	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1701	1701	SHIP CONSTRUCTION	Mayo	Ballyglass, Carnacon, Claremorris	6	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1702	1702	SHIP CONSTRUCTION	Mayo	Lios na Circe, Saleen, Castlebar - Phase 3	14	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1703	1703	SHIP CONSTRUCTION	Mayo	7 St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
1704	1704	SHIP CONSTRUCTION	Mayo	Atlantic Drive ,Belmullet	4	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1705	1705	SHIP CONSTRUCTION	Mayo	Walsh St., Ballina	8	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1706	1706	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
1707	1707	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2018
1708	1708	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
1709	1709	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
1710	1710	CALF Turnkey	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 1)	4	Tath Housing Association	""	""	""	""	Q3-2020	""
1711	1711	CALF Turnkey	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 2)	4	Tath Housing Association	""	""	""	""	Q3-2020	""
1712	1712	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
1713	1713	CALF Turnkey	Mayo	Humbert Way, Castlebar, Co. Mayo (Phase 1)	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1714	1714	CALF Turnkey	Mayo	Monamore, Lodge Road, Westport, Co. Mayo (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q4-2019
1715	1715	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing	""	""	""	""	Q2-2019	""
1716	1716	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	19	*N/A	""	""	""	""	""	Q4-2018
1717	1717	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	16	*N/A	""	""	""	""	""	Q4-2018
1718	1718	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	8	*N/A	""	""	""	""	""	Q3-2019
1719	1719	SHIP CONSTRUCTION TURNKEY	Meath	Bracken Hill, Kilmessan	3	*N/A	""	""	""	""	""	Q4-2019
1720	1720	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	4	*N/A	""	""	""	""	""	Q3-2019
1721	1721	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	5	*N/A	""	""	""	""	""	Q4-2018
1722	1722	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	4	*N/A	""	""	""	""	""	Q3-2019
1723	1723	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan 	8	*N/A	""	""	""	""	""	Q2-2019
1724	1724	SHIP CONSTRUCTION TURNKEY	Meath	Cois na Mara, Bettystown	2	*N/A	""	""	""	""	""	Q3-2019
1725	1725	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	14	*N/A	""	""	""	""	""	Q4-2019
1726	1726	SHIP CONSTRUCTION TURNKEY	Meath	Cherry Hill Court, Kells	2	*N/A	""	""	""	""	""	Q4-2019
1727	1727	SHIP CONSTRUCTION TURNKEY	Meath	Broadmeadow Vale, Rathoath	2	*N/A	""	""	""	""	""	Q4-2019
1728	1728	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	11	*N/A	""	""	""	""	""	Q4-2020
1729	1729	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	15	*N/A	""	""	""	""	""	Q4-2020
1730	1730	SHIP CONSTRUCTION TURNKEY	Meath	The Brambles, Longford rd., Duleek	16	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1731	1731	SHIP CONSTRUCTION TURNKEY	Meath	26 Willow Green, Dunshaughlin	1	*N/A	""	""	""	""	""	Q3-2020
1732	1732	SHIP CONSTRUCTION TURNKEY	Meath	Seoid na Tra, Bettytown	2	*N/A	""	""	""	""	""	Q3-2020
1733	1733	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	1	*N/A	""	""	""	""	""	Q4-2020
1734	1734	SHIP CONSTRUCTION TURNKEY	Meath	Connaught Street, Athboy	7	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1735	1735	SHIP CONSTRUCTION SINGLE STAGE	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	""	Q4-2018
1736	1736	SHIP CONSTRUCTION SINGLE STAGE	Meath	The Belfry, Trim	3	*N/A	""	""	""	""	""	Q4-2019
1737	1737	SHIP CONSTRUCTION SINGLE STAGE	Meath	Broville, Corballis, Laytown, Co. Meath	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1738	1738	SHIP CONSTRUCTION SINGLE STAGE	Meath	11 Glenidan Court, Enfield, Co. Meath	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1739	1739	SHIP CONSTRUCTION RAPID VOLUMETRIC	Meath	Kilmainhamwood	4	*N/A	""	""	""	""	""	Q4-2019
1740	1740	SHIP CONSTRUCTION RAPID VOLUMETRIC	Meath	Cortown	10	*N/A	""	""	""	""	""	Q4-2019
1741	1741	SHIP CONSTRUCTION RAPID VOLUMETRIC	Meath	Oldcastle	16	*N/A	""	""	""	""	""	Q4-2019
1742	1742	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	""	Q4-2020
1743	1743	SHIP CONSTRUCTION	Meath	St. Oliver's Park, Ratoath	17	*N/A	""	""	""	""	""	Q4-2019
1744	1744	SHIP CONSTRUCTION	Meath	Riverside (Townparks), Kells	40	*N/A	""	""	""	""	""	Q4-2020
1745	1745	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	""	Q1-2019
1746	1746	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
1747	1747	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	""	""	""	Q4-2020
1748	1748	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1749	1749	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	""	""	""	Q1-2020	""
1750	1750	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
1751	1751	SHIP CONSTRUCTION	Meath	Farganstown, Navan	84	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1752	1752	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1753	1753	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1754	1754	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	16	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1755	1755	SHIP CONSTRUCTION	Meath	Castle Street, Ashbourne - Dept of Education Site	74	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1756	1756	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	16	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1757	1757	SHIP CONSTRUCTION	Meath	Church Street, Kells, Co. Meath	3	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1758	1758	SHIP CONSTRUCTION	Meath	Haggard Street, Trim, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1759	1759	SHIP CONSTRUCTION	Meath	Pitcher Lane, Kells, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1760	1760	SHIP CONSTRUCTION	Meath	Swan Lane, Balreask	6	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1761	1761	SHIP CONSTRUCTION	Meath	Carrick St., Kells	30	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1762	1762	SHIP CONSTRUCTION	Meath	Lagore, Dunshaughlin	34	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1763	1763	SHIP CONSTRUCTION	Meath	Convent Lands, Kildalkey, Athboy	20	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1764	1764	CAS CONSTRUCTION TURNKEY	Meath	Bridge Street, Ashbourne, Co Meath  	20	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1765	1765	CAS CONSTRUCTION TURNKEY	Meath	Gainsfield, Common Road, Navan Co. Meath	6	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1766	1766	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1767	1767	CAS CONSTRUCTION	Meath	Women's Refuge, Tailteann Drive, Windtown, Navan	8	Meath Womens Housing Association CLG	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1768	1768	CALF Turnkey	Meath	18 units Churchfields, Ashbourne, Co. Meath (Phase 1)	18	Tath Housing Association	""	""	""	""	""	Q4-2018
1769	1769	CALF Turnkey	Meath	5 units Dunville, Athlumney, Navan, Co. Meath (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q1-2019
1770	1770	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q1-2018
1771	1771	CALF Turnkey	Meath	Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 1)	6	Tath Housing Association	""	""	""	""	Q3-2020	""
1772	1772	CALF Turnkey	Meath	Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 2)*	15	Tath Housing Association	""	""	""	""	Q3-2020	""
1773	1773	CALF Turnkey	Meath	Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1774	1774	CALF Turnkey	Meath	Ashewood, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	Q3-2020	""	""
1775	1775	CALF Turnkey	Meath	Athboy Road, Navan, Co. Meath (Phase 1)*	63	Respond	""	""	""	""	Q1-2021	""
1776	1776	CALF Turnkey	Meath	Blackcastle, Slane Road, Navan, Co. Meath (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q4-2018
1777	1777	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 1)*	1	Tath Housing Association	""	""	""	""	""	Q2-2019
1778	1778	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 2)*	1	Tath Housing Association	""	""	""	""	""	Q2-2019
1779	1779	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 3)*	10	Tath Housing Association	""	""	""	""	""	Q4-2019
1780	1780	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2018
1781	1781	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing	""	""	""	""	""	Q3-2018
1782	1782	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2017
1783	1783	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q2-2017
1784	1784	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 1)*	10	Tath Housing Association	""	""	""	""	""	Q4-2018
1785	1785	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 2)*	3	Tath Housing Association	""	""	""	""	""	Q2-2019
1786	1786	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 3)*	12	Tath Housing Association	""	""	""	""	""	Q4-2019
1787	1787	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1788	1788	CALF Turnkey	Meath	Dun Eimear, Bettystown, Co. Meath (Phase 1)*	12	Cluid Housing	""	""	""	""	""	Q4-2019
1789	1789	CALF Turnkey	Meath	Dun Eimear, Bettystown, Co. Meath (Phase 2)*	11	Cluid Housing	""	""	""	""	""	Q4-2019
1790	1790	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q1-2018
1791	1791	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	Tath Housing Association	""	""	""	""	""	Q1-2018
1792	1792	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)*	10	Tath Housing Association	""	""	""	""	""	Q2-2018
1793	1793	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	6	Tath Housing Association	""	""	""	""	""	Q2-2018
1794	1794	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	Tath Housing Association	""	""	""	""	""	Q2-2018
1795	1795	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	Tath Housing Association	""	""	""	""	""	Q3-2018
1796	1796	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Cluid Housing	""	""	""	""	""	Q1-2019
1797	1797	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)*	1	Tath Housing Association	""	""	""	""	""	Q3-2018
1798	1798	CALF Turnkey	Meath	Frederick Manor, Ashbourne, Co. Meath (Phase 1)*	11	Cluid Housing	""	""	""	""	""	Q1-2021
1799	1799	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 1)	20	Tath Housing Association	""	""	""	""	""	Q4-2019
1800	1800	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 2)	18	Tath Housing Association	""	""	""	""	""	Q4-2020
1801	1801	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)	7	Tath Housing Association	""	""	""	""	""	Q1-2021
1802	1802	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 4)	9	Tath Housing Association	""	""	""	""	Q3-2018	""
1803	1803	CALF Turnkey	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 1)	20	Tath Housing Association	""	""	""	""	Q4-2020	""
1804	1804	CALF Turnkey	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 2)	15	Tath Housing Association	""	""	""	""	Q4-2020	""
1805	1805	CALF Turnkey	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 3)	14	Tath Housing Association	""	""	""	""	Q4-2020	""
1806	1806	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	Tath Housing Association	""	""	""	""	""	Q2-2018
1807	1807	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q1-2018
1808	1808	CALF Turnkey	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 1)	5	Tath Housing Association	""	""	""	""	Q3-2020	""
1809	1809	CALF Turnkey	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 2)	5	Tath Housing Association	""	""	""	""	Q3-2020	""
1810	1810	CALF Turnkey	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 3)	6	Tath Housing Association	""	""	""	""	Q3-2020	""
1811	1811	CALF Turnkey	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 1)*	6	Oaklee Housing	""	""	""	Q1-2021	""	""
1812	1812	CALF Turnkey	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 2)	6	Oaklee Housing	""	""	""	Q1-2021	""	""
1813	1813	CALF Turnkey	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 3)*	16	Oaklee Housing	""	""	""	Q1-2021	""	""
1814	1814	CALF Turnkey	Meath	Maudelins Brook, Duleek, Co.Meath (Phase 1)*	20	Respond	""	""	""	""	""	Q4-2019
1815	1815	CALF Turnkey	Meath	Maydenhayes, Donacarney, Co. Meath (Phase 1)*	12	Cluid Housing	""	""	""	""	Q1-2020	""
1816	1816	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing	""	""	""	""	""	Q4-2016
1817	1817	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
1818	1818	CALF Turnkey	Meath	Millteog, Athboy Road, Trim, Co. Meath (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q4-2019
1819	1819	CALF Turnkey	Meath	Millteog, Athboy Road, Trim, Co. Meath (Phase 2)*	9	Oaklee Housing	""	""	""	""	""	Q2-2020
1820	1820	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q1-2017
1821	1821	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing	""	""	""	""	""	Q4-2017
1822	1822	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q4-2017
1823	1823	CALF Turnkey	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 1)*	13	Tath Housing Association	""	""	""	""	""	Q4-2020
1824	1824	CALF Turnkey	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 1)	6	Tath Housing Association	""	""	""	Q3-2020	""	""
1825	1825	CALF Turnkey	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 2)	6	Tath Housing Association	""	""	""	Q3-2020	""	""
1826	1826	CALF Turnkey	Meath	Oldbridge Manor, Drogheda, Co. Meath (Phase 1)*	29	Tath Housing Association	""	""	""	""	""	Q4-2020
1827	1827	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	3	Tath Housing Association	""	""	""	""	""	Q4-2018
1828	1828	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 10)	5	Tath Housing Association	""	""	""	""	""	Q4-2020
1829	1829	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 2)	6	Tath Housing Association	""	""	""	""	""	Q2-2019
1830	1830	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 3)	2	Tath Housing Association	""	""	""	""	""	Q3-2019
1831	1831	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 4)	5	Tath Housing Association	""	""	""	""	""	Q3-2019
1832	1832	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 5)	4	Tath Housing Association	""	""	""	""	""	Q4-2019
1833	1833	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 6)	6	Tath Housing Association	""	""	""	""	""	Q1-2020
1834	1834	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 7)	3	Tath Housing Association	""	""	""	""	""	Q1-2020
1835	1835	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 8)	4	Tath Housing Association	""	""	""	""	""	Q3-2020
1836	1836	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 9)	6	Tath Housing Association	""	""	""	""	""	Q3-2020
1837	1837	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2017
1838	1838	CALF Turnkey	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2020
1839	1839	CALF Turnkey	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 2)*	14	Cluid Housing	""	""	""	""	Q4-2019	""
1840	1840	CALF Turnkey	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 3)	16	Cluid Housing	""	""	""	""	Q4-2019	""
1841	1841	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q3-2017
1842	1842	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)	24	Respond	""	""	""	""	""	Q4-2018
1843	1843	CALF Turnkey	Meath	The Bungalows, Dunshauglin, Co. Meath (Phase 1)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2020
1844	1844	CALF Turnkey	Meath	The Maudelins (Phase 2), Main Street, Duleek, Co. Meath (Phase 1)*	30	Respond	""	""	""	""	""	Q4-2020
1845	1845	CALF Turnkey	Meath	The Maudlins, Trim, Co. Meath (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q1-2021
1846	1846	CALF Turnkey	Meath	The Way, Broadmeadow Vale, Ratoath, Co. Meath (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q4-2019
1847	1847	CALF Turnkey	Meath	The Willows, Dunshaughlin, Co. Meath (Phase 1)*	96	Cluid Housing	""	""	""	Q1-2021	""	""
1848	1848	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q2-2016
1849	1849	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 2)	7	Cluid Housing	""	""	""	""	""	Q3-2016
1850	1850	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 3)	8	Cluid Housing	""	""	""	""	""	Q4-2016
1851	1851	CALF Turnkey	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q2-2020
1852	1852	CALF Turnkey	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 2)	13	Tath Housing Association	""	""	""	""	""	Q3-2020
1853	1853	CALF Turnkey	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 3)	2	Tath Housing Association	""	""	""	""	Q2-2019	""
1854	1854	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
1855	1855	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town	6	*N/A	""	""	""	""	""	Q4-2017
1856	1856	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
1857	1857	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
1858	1858	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	""	Q2-2019
1859	1859	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
1860	1860	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	""	Q4-2018
1861	1861	SHIP CONSTRUCTION TURNKEY	Monaghan	Pls an Bhr, Rosevale, Bree, Castleblayney	26	*N/A	""	""	""	""	""	Q4-2020
1862	1862	SHIP CONSTRUCTION TURNKEY	Monaghan	Ard na Radhairc, Carrickmacross, Co. Monaghan	41	*N/A	""	""	""	""	Q3-2019	""
1863	1863	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	6	*N/A	""	""	""	""	""	Q4-2020
1864	1864	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q3-2019
1865	1865	SHIP CONSTRUCTION TURNKEY	Monaghan	Drummond Radhairc, Carrickmacross	1	*N/A	""	""	""	""	""	Q3-2019
1866	1866	SHIP CONSTRUCTION TURNKEY	Monaghan	Cnoc na Greine, Tydavnet	6	*N/A	""	""	""	""	""	Q4-2020
1867	1867	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill Darach, Bree, Castleblayney	30	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1868	1868	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1869	1869	SHIP CONSTRUCTION SINGLE STAGE	Monaghan	Folly Court, Ballybay	6	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1870	1870	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	""	Q2-2019
1871	1871	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	""	Q4-2019
1872	1872	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	""	Q4-2020
1873	1873	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	""	Q4-2020
1874	1874	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q3-2019	""
1875	1875	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	6	*N/A	""	""	""	""	Q3-2019	""
1876	1876	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	""	""	""	Q3-2019	""
1877	1877	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	""	""	""	Q3-2019	""
1878	1878	SHIP CONSTRUCTION	Monaghan	Lui Na Greine, Scotstown	6	*N/A	""	""	""	""	Q2-2020	""
1879	1879	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan	16	*N/A	""	""	""	""	""	Q4-2018
1880	1880	SHIP CONSTRUCTION	Monaghan	12 Church St., Ballybay	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1881	1881	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q1-2020	""
1882	1882	SHIP CONSTRUCTION	Monaghan	Church Hill, Clones	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1883	1883	SHIP CONSTRUCTION	Monaghan	13 McCurtain Street, Clones	1	*N/A	""	""	""	""	Q1-2021	""
1884	1884	SHIP CONSTRUCTION	Monaghan	Lui na Greine, Scotstown	26	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1885	1885	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	""	""	Q1-2021	""
1886	1886	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	19	Oaklee Housing Trust	""	""	""	""	Q1-2020	""
1887	1887	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
1888	1888	CAS CONSTRUCTION	Monaghan	Birch Court Apts., 34 Main Street, Ballybay	4	North ? East Housing Association Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1889	1889	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2020
1890	1890	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 2)	6	Tath Housing Association	""	""	""	""	Q2-2019	""
1891	1891	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 3)	8	Tath Housing Association	""	""	""	""	Q2-2019	""
1892	1892	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 4)	13	Tath Housing Association	""	""	""	""	Q2-2019	""
1893	1893	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monaghan  (Phase 1)	50	Respond	""	""	""	""	""	Q4-2019
1894	1894	CALF Turnkey	Monaghan	Lakeview Apartments, Drummond Radhairc, Carrickmacross, Co Monaghan (Phase 1)*	12	North & East Housing Association Ltd	""	""	""	""	Q3-2019	""
1895	1895	CALF Turnkey	Monaghan	Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 1)*	20	Tath Housing Association	""	""	""	Q4-2020	""	""
1896	1896	CALF Turnkey	Monaghan	Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 2)*	21	Tath Housing Association	""	""	""	Q4-2020	""	""
1897	1897	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Tath Housing Association	""	""	""	""	Q3-2019	""
1898	1898	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	6	Tath Housing Association	""	""	""	""	Q3-2019	""
1899	1899	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	6	Tath Housing Association	""	""	""	""	Q3-2019	""
1900	1900	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 4)	14	Tath Housing Association	""	""	""	""	Q3-2019	""
1901	1901	CALF Construction	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing	""	""	""	""	""	Q4-2018
1902	1902	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
1903	1903	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	""	Q2-2019
1904	1904	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	""	""	Q4-2018
1905	1905	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr (Phase 1)	4	*N/A	""	""	""	""	""	Q4-2019
1906	1906	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Cloneygowan	4	*N/A	""	""	""	""	""	Q4-2019
1907	1907	SHIP CONSTRUCTION TURNKEY	Offaly	Main Street, Daingean	8	*N/A	""	""	""	""	Q4-2020	""
1908	1908	SHIP CONSTRUCTION TURNKEY	Offaly	McCauley Drive, Birr	34	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1909	1909	SHIP CONSTRUCTION TURNKEY	Offaly	Riverside, Tullamore	5	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1910	1910	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Clonygowan	3	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1911	1911	SHIP CONSTRUCTION TURNKEY	Offaly	Coolgarry, Walsh Island 	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1912	1912	SHIP CONSTRUCTION TURNKEY	Offaly	Mucklagh, Tullamore	8	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1913	1913	SHIP CONSTRUCTION TURNKEY	Offaly	Bog Road, Portarlington	28	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1914	1914	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	4	*N/A	""	""	""	""	Q1-2019	""
1915	1915	SHIP CONSTRUCTION RAPID VOLUMETRIC	Offaly	McGregol, Birr (Phase 2.1)	2	*N/A	""	""	""	""	""	Q3-2020
1916	1916	SHIP CONSTRUCTION RAPID VOLUMETRIC	Offaly	McGregol, Birr (Phase 2.2)	2	*N/A	""	""	""	""	""	Q1-2021
1917	1917	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	""	Q3-2020
1918	1918	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	9	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
1919	1919	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
1920	1920	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	""	Q4-2019
1921	1921	SHIP CONSTRUCTION	Offaly	Beechgrove, Belmont	7	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1922	1922	SHIP CONSTRUCTION	Offaly	Raheen ,Clara	38	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1923	1923	SHIP CONSTRUCTION	Offaly	Elderberry Drive, Moneygall	4	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1924	1924	SHIP CONSTRUCTION	Offaly	Sr. Senan Avenue, Edenderry	4	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1925	1925	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore (Phase 2)	20	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1926	1926	SHIP CONSTRUCTION	Offaly	1 Newbridge St., Birr	1	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1927	1927	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	""	Q4-2019
1928	1928	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	Tath Housing Association Ltd	""	""	""	""	Q3-2019	""
1929	1929	CAS CONSTRUCTION	Offaly	Scurragh, Birr (AKA Camcor Green)	6	Cluid Housing Association	""	""	""	""	""	Q4-2019
1930	1930	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	""	""	""	Q1-2021	""
1931	1931	CAS CONSTRUCTION	Offaly	Presentation Convent, Portarlington	39	Sophia Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1932	1932	CAS CONSTRUCTION	Offaly	Clonamore Hotel, Tullamore	17	Sophia Housing Association Ltd	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1933	1933	CALF Turnkey	Offaly	3 units, An Corran, Crinkle, Birr, Co. Offaly (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1934	1934	CALF Construction	Offaly	Kearneys Field, Tullamore, Co. Offaly (Phase 1)	41	Oaklee Housing	""	""	""	Q1-2021	""	""
1935	1935	CALF Construction	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	Tath Housing Association	""	""	""	""	Q3-2019	""
1936	1936	CALF Turnkey	Offaly	Rahan Road, Tullamore, Co. Offaly (Phase 1)*	26	Cluid Housing	""	""	""	""	Q4-2020	""
1937	1937	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
1938	1938	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	""	Q1-2019
1939	1939	SHIP CONSTRUCTION TURNKEY	Roscommon	Lisroyne Court, Strokestown	10	*N/A	""	""	""	""	""	Q4-2019
1940	1940	SHIP CONSTRUCTION TURNKEY	Roscommon	Warren Grove, Boyle	4	*N/A	""	""	""	""	""	Q4-2018
1941	1941	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksfield, Monksland	2	*N/A	""	""	""	""	""	Q4-2020
1942	1942	SHIP CONSTRUCTION	Roscommon	Cloonfad	3	*N/A	""	""	""	""	Q4-2019	""
1943	1943	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
1944	1944	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
1945	1945	SHIP CONSTRUCTION	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	""	""	""	""	Q4-2020
1946	1946	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	""	""	""	""	Q1-2021
1947	1947	SHIP CONSTRUCTION	Roscommon	Old Tuam Road,  Monksland, Athlone	2	*N/A	""	""	""	""	""	Q4-2020
1948	1948	SHIP CONSTRUCTION	Roscommon	Meadowbrook, Ballyclare Td., Ballyleague, Co. Roscommon	16	*N/A	""	""	""	""	Q3-2020	""
1949	1949	SHIP CONSTRUCTION	Roscommon	Lisroyne Td., Strokestown	10	*N/A	""	""	""	""	Q4-2020	""
1950	1950	SHIP CONSTRUCTION	Roscommon	Windmill Road, Elphin, Co. Roscommon	6	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1951	1951	SHIP CONSTRUCTION	Roscommon	Lakeview Heights, Ballspark Td., Boyle	4	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1952	1952	SHIP CONSTRUCTION	Roscommon	Lisnamult, Ardnanagh Td., Roscommon Town	8	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
1953	1953	CALF Turnkey	Roscommon	Castle View Apartments, Block B, Roscommon Town (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
1954	1954	CALF Turnkey	Roscommon	Monksland, Athlone, Co. Roscommon (Phase 1)*	35	Tath Housing Association	""	""	""	""	Q4-2019	""
1955	1955	CALF Turnkey	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing	""	""	""	""	""	Q3-2018
1956	1956	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
1957	1957	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	""	""	Q4-2019	""
1958	1958	SHIP CONSTRUCTION TURNKEY	Sligo	Fairgreen Square, Ballisodare	2	*N/A	""	""	""	""	""	Q4-2019
1959	1959	SHIP CONSTRUCTION SINGLE STAGE	Sligo	St. Joseph's Terrace, Sligo	1	*N/A	""	""	""	""	""	Q4-2019
1960	1960	SHIP CONSTRUCTION	Sligo	Collooney	18	*N/A	""	""	""	""	""	Q4-2019
1961	1961	SHIP CONSTRUCTION	Sligo	Knappagh Road, Sligo	28	*N/A	""	""	""	""	""	Q4-2020
1962	1962	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	""	Q4-2018
1963	1963	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	14	*N/A	""	""	""	""	""	Q3-2018
1964	1964	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
1965	1965	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	""	""	""	Q4-2019
1966	1966	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	8	*N/A	""	""	""	""	""	Q4-2017
1967	1967	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	""	""	""	""	Q3-2020	""
1968	1968	SHIP CONSTRUCTION	Sligo	Dromore West	10	*N/A	""	""	""	""	Q4-2019	""
1969	1969	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1970	1970	SHIP CONSTRUCTION	Sligo	House at Ballinode	1	*N/A	""	""	""	""	""	Q4-2018
1971	1971	SHIP CONSTRUCTION	Sligo	SRD at Crowagh, Dromore West	1	*N/A	""	""	""	""	Q4-2020	""
1972	1972	SHIP CONSTRUCTION	Sligo	Gormley Park, Bunnanadden	6	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1973	1973	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	15	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1974	1974	REGENERATION	Sligo	Geldof Drive & Centre Park, Cranmore, Sligo	30	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1975	1975	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2020
1976	1976	CAS CONSTRUCTION	Sligo	Killeshin, First Sea Road, Sligo	5	Newgrove Housing Association Ltd	""	""	""	""	Q4-2020	""
1977	1977	SHIP CONSTRUCTION TURNKEY	South Dublin	Ardsolus, Kingswood, Dublin 24	2	*N/A	""	""	""	""	""	Q4-2018
1978	1978	SHIP CONSTRUCTION TURNKEY	South Dublin	White Pines, Stocking Avenue, Rathfarnham, Dublin 16	26	*N/A	""	""	""	""	""	Q4-2018
1979	1979	SHIP CONSTRUCTION TURNKEY	South Dublin	Shackleton Park / Gandon Park, Adamstown	22	*N/A	""	""	""	""	""	Q4-2019
1980	1980	SHIP CONSTRUCTION TURNKEY	South Dublin	Gandon Park, Adamstown, Lucan	12	*N/A	""	""	""	""	""	Q4-2019
1981	1981	SHIP CONSTRUCTION SINGLE STAGE	South Dublin	37 Greenfort Gardens, Clondalkin	2	*N/A	""	""	""	""	Q4-2020	""
1982	1982	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	""	Q4-2018
1983	1983	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	""	Q3-2019
1984	1984	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	St. Aidan's Brookfield, Tallaght	47	*N/A	""	""	""	""	""	Q2-2018
1985	1985	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	St. Marks Avenue, Clondalkin	41	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1986	1986	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	St. Aidan's Brookfield, Tallaght	22	*N/A	""	""	""	""	""	Q3-2018
1987	1987	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	St. Aidan's Brookfield, Tallaght	21	*N/A	""	""	""	""	""	Q4-2018
1988	1988	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	Riversdale, Clondalkin, Dublin 22	22	*N/A	""	""	""	""	Q4-2020	""
1989	1989	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	Riverside Cottages, Templeogue	11	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1990	1990	SHIP CONSTRUCTION RAPID VOLUMETRIC	South Dublin	Riversdale, Clondalkin, Dublin 22	21	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1991	1991	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	17	*N/A	""	""	""	""	""	Q4-2018
1992	1992	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	""	Q4-2018
1993	1993	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	""	Q1-2019
1994	1994	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	""	Q4-2018
1995	1995	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	""	Q4-2018
1996	1996	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
1997	1997	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
1998	1998	SHIP CONSTRUCTION	South Dublin	Balgaddy F, Griffeen Avenue, Lucan Co. Dublin	69	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1999	1999	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
2000	2000	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
2001	2001	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
2002	2002	SHIP CONSTRUCTION	South Dublin	St. Catherines, Knockmore Avenue, Killinarden, Tallaght	12	*N/A	""	""	""	""	Q4-2020	""
2003	2003	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	""	""	""	Q4-2020	""
2004	2004	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	9	*N/A	""	""	""	""	""	Q1-2019
2005	2005	SHIP CONSTRUCTION	South Dublin	Nangor Road, Clondalkin, Dublin 22	93	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
2006	2006	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tath Housing Association Ltd	""	""	""	""	""	Q1-2020
2007	2007	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	""	""	Q4-2019	""
2008	2008	CALF Turnkey	South Dublin	2 properties Tullyhall, Lucan, County Dublin (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q2-2019
2009	2009	CALF Turnkey	South Dublin	6 units Elder Heath, Kiltipper Road, Tallaght, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q4-2019
2010	2010	CALF Turnkey	South Dublin	Ardsolus, Old Naas Road, Dublin 22 (Phase 1)	10	Respond	""	""	""	""	""	Q3-2019
2011	2011	CALF Turnkey	South Dublin	Aylmer Heath, Newcastle, Co. Dublin (Phase 1)	32	Respond	""	""	""	""	""	Q4-2020
2012	2012	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q4-2018
2013	2013	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 2)	4	Tath Housing Association	""	""	""	""	""	Q1-2019
2014	2014	CALF Turnkey	South Dublin	Balrothery, Castletymon Road, Dublin Road (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q4-2019
2015	2015	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q3-2017
2016	2016	CALF Turnkey	South Dublin	Burgage Gardens, Newcastle, Co. Dublin (Phase 1)*	4	Respond	""	""	""	""	""	Q2-2020
2017	2017	CALF Turnkey	South Dublin	Burgage, Newcastle, Co. Dublin (Phase 1)	10	Respond	""	""	""	""	""	Q4-2019
2018	2018	CALF Turnkey	South Dublin	Burgage, Newcastle, Co. Dublin (Phase 2)	26	Respond	""	""	""	""	""	Q2-2020
2019	2019	CALF Turnkey	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 1)	45	Tath Housing Association	""	""	""	""	""	Q4-2020
2020	2020	CALF Turnkey	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 2)	15	Tath Housing Association	""	""	""	""	""	Q4-2020
2021	2021	CALF Turnkey	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 3)*	23	Tath Housing Association	""	""	""	""	""	Q4-2020
2022	2022	CALF Turnkey	South Dublin	Cuil Duin Green, Cuil Duin, Citywest, Dublin 24 (Phase 1)*	24	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
2023	2023	CALF Turnkey	South Dublin	De Selby Heights, Tallaght, Dublin 24 (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q4-2019
2024	2024	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q1-2018
2025	2025	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q1-2018
2026	2026	CALF Turnkey	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2019
2027	2027	CALF Turnkey	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 2)*	9	Cluid Housing	""	""	""	""	""	Q1-2021
2028	2028	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
2029	2029	CALF Turnkey	South Dublin	Edenbrook, Citywest, Dublin 24 (Phase 1)	17	Tath Housing Association	""	""	""	""	""	Q4-2019
2030	2030	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing	""	""	""	""	""	Q1-2018
2031	2031	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing	""	""	""	""	""	Q2-2018
2032	2032	CALF Construction	South Dublin	Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)	40	Cluid Housing	""	""	""	""	Q3-2020	""
2033	2033	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)	70	Respond	""	""	""	""	Q4-2018	""
2034	2034	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 2)*	24	Respond	""	""	""	""	Q4-2018	""
2035	2035	CALF Turnkey	South Dublin	Green Lane, Rathcoole, Co. Dublin (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q4-2020
2036	2036	CALF Turnkey	South Dublin	Green Lane, Rathcoole, Co. Dublin (Phase 2)*	9	Tath Housing Association	""	""	""	""	""	Q4-2020
2037	2037	CALF Turnkey	South Dublin	Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*	24	Respond	""	""	""	""	Q4-2018	""
2038	2038	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q2-2018
2039	2039	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q4-2018
2040	2040	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q1-2017
2041	2041	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2017
2042	2042	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
2043	2043	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q3-2017
2044	2044	CALF Turnkey	South Dublin	Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	""	""	Q4-2020
2045	2045	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q3-2018
2046	2046	CALF Turnkey	South Dublin	Phase 2, Aylmer Drive, Aylmer Heath, Newcastle, Co. Dublin (Phase 1)*	17	Respond	""	""	""	""	Q4-2019	""
2047	2047	CALF Turnkey	South Dublin	Raheen House, Old Nangor Road, Clondalkin, Dublin 22 (Phase 1)	9	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
2048	2048	CALF Turnkey	South Dublin	Rathmill Meadows and Green, Rathcoole, Co. Dublin (Phase 1)*	11	Oaklee Housing	""	""	""	""	""	Q4-2019
2049	2049	CALF Turnkey	South Dublin	Sallypark, Clondalkin, Dublin 22 (Phase 1)*	85	Cluid Housing	""	""	""	""	Q4-2020	""
2050	2050	CALF Turnkey	South Dublin	Scholarstown Road, Rathfarnham, Dublin 16 (Phase 1)*	14	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2019	""
2051	2051	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
2052	2052	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
2053	2053	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
2054	2054	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
2055	2055	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q2-2019
2056	2056	CALF Turnkey	South Dublin	Somerton, Lucan, Co. Dublin (Phase 1)*	32	Respond	""	""	""	""	""	Q4-2019
2057	2057	CALF Construction	South Dublin	St. Catherines, Knockmore Avenue, Killinarden, Tallaght, Dublin 24 (Phase 1)	2	Sophia Housing Association Ltd	""	""	""	Q4-2020	""	""
2058	2058	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2019
2059	2059	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
2060	2060	CALF Turnkey	South Dublin	Stone Masons Court, Fortunestown Lane, Citywest Dublin (Phase 1)*	12	Cluid Housing	""	""	""	""	""	Q2-2019
2061	2061	CALF Turnkey	South Dublin	Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q4-2018
2062	2062	CALF Turnkey	South Dublin	The Mews, Citywest Village, Citywest, Dublin 24 (Phase 1)*	22	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2020
2063	2063	CALF Turnkey	South Dublin	The Rise, Citywest Village, Citywest, Dublin 24 (Phase 1)*	13	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
2064	2064	CALF Construction	South Dublin	The Weir, Whitestown Way, Tallaght, Dublin 24 (Phase 1)	81	Cluid Housing	""	""	""	Q1-2021	""	""
2065	2065	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q3-2017
2066	2066	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 2)*	2	Tath Housing Association	""	""	""	""	""	Q4-2018
2067	2067	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing	""	""	""	""	""	Q4-2018
2068	2068	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Cluid Housing	""	""	""	""	""	Q2-2019
2069	2069	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing	""	""	""	""	""	Q4-2019
2070	2070	CALF Turnkey	South Dublin	Wilkins Court, Limekiln Lane, Dublin 12 (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
2071	2071	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
2072	2072	CALF Turnkey	South Dublin	Willowview, Ballyboden Road, Rathfarnham, Dublin 14 (Phase 1)*	12	Cluid Housing	""	""	""	""	Q4-2019	""
2073	2073	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	""	""	Q4-2020
2074	2074	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	6	*N/A	""	""	""	""	""	Q2-2019
2075	2075	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	""	""	Q4-2020
2076	2076	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane	9	*N/A	""	""	""	""	""	Q4-2018
2077	2077	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles	4	*N/A	""	""	""	""	""	Q4-2018
2078	2078	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
2079	2079	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 2)	5	*N/A	""	""	""	""	""	Q4-2019
2080	2080	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	20	*N/A	""	""	""	""	Q3-2020	""
2081	2081	SHIP CONSTRUCTION TURNKEY	Tipperary	Ma Charoin, Manna South, Templemore	13	*N/A	""	""	""	""	Q3-2020	""
2082	2082	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 2)	5	*N/A	""	""	""	""	""	Q3-2019
2083	2083	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2019
2084	2084	SHIP CONSTRUCTION TURNKEY	Tipperary	Glencree, Newport	3	*N/A	""	""	""	""	""	Q4-2019
2085	2085	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 4)	4	*N/A	""	""	""	""	""	Q4-2019
2086	2086	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 3)	5	*N/A	""	""	""	""	""	Q4-2019
2087	2087	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	21	*N/A	""	""	""	""	Q3-2020	""
2088	2088	SHIP CONSTRUCTION TURNKEY	Tipperary	Rosanna Close, Tipperary Town	18	*N/A	""	""	""	""	""	Q4-2020
2089	2089	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor Road, Clonmel	21	*N/A	""	""	""	""	Q4-2020	""
2090	2090	SHIP CONSTRUCTION TURNKEY	Tipperary	Clogheen Road, Ardfinnan	13	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2091	2091	SHIP CONSTRUCTION TURNKEY	Tipperary	Rosanna Close, Tipperary Town	1	*N/A	""	""	""	""	Q3-2020	""
2092	2092	SHIP CONSTRUCTION TURNKEY	Tipperary	Roscrea	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2093	2093	SHIP CONSTRUCTION SINGLE STAGE	Tipperary	Mulkear View, Newport, Tipperary	3	*N/A	""	""	""	""	""	Q4-2018
2094	2094	SHIP CONSTRUCTION SINGLE STAGE	Tipperary	Grange Road, Ballina	4	*N/A	""	""	""	""	""	Q4-2020
2095	2095	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	""	""	""	Q4-2020	""
2096	2096	SHIP CONSTRUCTION	Tipperary	Knockanrawley	14	*N/A	""	""	""	""	""	Q1-2021
2097	2097	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	28	*N/A	""	""	""	""	Q2-2020	""
2098	2098	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	11	*N/A	""	""	""	""	Q4-2020	""
2099	2099	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
2100	2100	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	""	""	""	Q4-2019	""
2101	2101	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	""	""	""	Q3-2020	""
2102	2102	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	""	""	""	Q3-2020	""
2103	2103	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	""	""	""	Q4-2020	""
2104	2104	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	""	""	Q3-2019	""
2105	2105	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	""	""	Q3-2020
2106	2106	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	""	Q4-2018
2107	2107	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	""	""	""	Q3-2020
2108	2108	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
2109	2109	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	""	""	Q4-2019	""
2110	2110	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
2111	2111	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
2112	2112	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
2113	2113	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	12	*N/A	""	""	""	""	Q3-2020	""
2114	2114	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
2115	2115	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2018
2116	2116	SHIP CONSTRUCTION	Tipperary	Bansha	14	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
2117	2117	SHIP CONSTRUCTION	Tipperary	Ned Hayes Drive, Twomileborris, Thurles	22	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
2118	2118	SHIP CONSTRUCTION	Tipperary	Donohill, 	8	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
2119	2119	SHIP CONSTRUCTION	Tipperary	Mullinahone	10	*N/A	""	""	""	""	Q1-2021	""
2120	2120	SHIP CONSTRUCTION	Tipperary	Clerihan	14	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
2121	2121	SHIP CONSTRUCTION	Tipperary	Ard Alainn, Moyne	9	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2122	2122	SHIP CONSTRUCTION	Tipperary	Ardcroney	4	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2123	2123	SHIP CONSTRUCTION	Tipperary	Comeragh Drive, Clonmel	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2124	2124	SHIP CONSTRUCTION	Tipperary	Church Street, Templemore	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2125	2125	SHIP CONSTRUCTION	Tipperary	Castle Crescent, Nenagh	9	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
2126	2126	SHIP CONSTRUCTION	Tipperary	Boherclough Street, Cashel	12	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2127	2127	SHIP CONSTRUCTION	Tipperary	Grove Street. Roscrea	7	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2128	2128	SHIP CONSTRUCTION	Tipperary	William Street, Clonmel	4	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2129	2129	SHIP CONSTRUCTION	Tipperary	Knockanrawley	14	*N/A	""	""	""	""	Q4-2019	""
2130	2130	CAS CONSTRUCTION TURNKEY	Tipperary	Monastery Close, Templemore Road, Thurles	15	Thurles Lions Trust Housing Assoc.	""	""	""	""	""	Q2-2019
2131	2131	CAS CONSTRUCTION TURNKEY	Tipperary	Drummin Village, Nenagh	8	Nenagh Voluntary Housing Association	""	""	""	""	""	Q4-2020
2132	2132	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	""	""	""	Q4-2020	""
2133	2133	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	""	""	""	Q1-2021	""
2134	2134	CAS CONSTRUCTION	Tipperary	Main Street, Templemore	14	Templemore Voluntary Housing Association	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
2135	2135	CAS CONSTRUCTION	Tipperary	Deerpark Road, Ashwell's Lot	2	SPADE  St. Patricks Dwellings for the Elderly	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2136	2136	CALF Turnkey	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 1)	41	Respond	""	""	""	""	""	Q4-2019
2137	2137	CALF Turnkey	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 2)	2	Respond	""	""	""	""	""	Q4-2019
2138	2138	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2017
2139	2139	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2140	2140	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co. Tipperary (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2141	2141	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co. Tipperary (Phase 2)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
2142	2142	CALF Turnkey	Tipperary	Mill Street, Carrick on Suir, Co. Tipperary (Phase 1)	22	Tath Housing Association	""	""	""	""	""	Q3-2020
2143	2143	CALF Turnkey	Tipperary	The Avenue, Drummin Village, Nenagh, Co. Tipperary (Phase 1)	13	Focus Housing Association CLG	""	""	""	""	""	Q4-2020
2144	2144	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	8	*N/A	""	""	""	""	""	Q3-2018
2145	2145	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
2146	2146	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	""	Q4-2018
2147	2147	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
2148	2148	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	""	Q4-2018
2149	2149	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan - Phase 2	10	*N/A	""	""	""	""	""	Q4-2018
2150	2150	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan - Phase 3	21	*N/A	""	""	""	""	""	Q4-2018
2151	2151	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	20	*N/A	""	""	""	""	""	Q3-2019
2152	2152	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 2	14	*N/A	""	""	""	""	""	Q4-2019
2153	2153	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 3	6	*N/A	""	""	""	""	""	Q2-2020
2154	2154	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 4	15	*N/A	""	""	""	""	""	Q3-2020
2155	2155	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	6	*N/A	""	""	""	""	""	Q3-2019
2156	2156	SHIP CONSTRUCTION TURNKEY	Waterford	Railway Gardens, Lismore	17	*N/A	""	""	""	""	Q3-2019	""
2157	2157	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	8	*N/A	""	""	""	""	""	Q4-2019
2158	2158	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	6	*N/A	""	""	""	""	""	Q4-2019
2159	2159	SHIP CONSTRUCTION TURNKEY	Waterford	Mount Suir, Gracedieu, Carrickphierish	18	*N/A	""	""	""	""	""	Q4-2019
2160	2160	SHIP CONSTRUCTION TURNKEY	Waterford	19 & 20 Bride View Close, Tallow	2	*N/A	""	""	""	""	""	Q3-2020
2161	2161	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	19	*N/A	""	""	""	""	""	Q4-2020
2162	2162	SHIP CONSTRUCTION TURNKEY	Waterford	7A and 8A Barnes Lane, The Glen, Waterford	2	*N/A	""	""	""	""	""	Q4-2019
2163	2163	SHIP CONSTRUCTION TURNKEY	Waterford	4 and 12 Ard Alainn, Sherlock Walk, Gracedieu, Waterford	2	*N/A	""	""	""	""	""	Q2-2020
2164	2164	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	13	*N/A	""	""	""	""	""	Q1-2021
2165	2165	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	33	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2166	2166	SHIP CONSTRUCTION SINGLE STAGE	Waterford	Apt 1 and Apt 2 Rivercourt, Grattan Quay, Waterford City	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2167	2167	SHIP CONSTRUCTION RAPID VOLUMETRIC	Waterford	Ballygunner, Waterford City	49	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
2168	2168	SHIP CONSTRUCTION RAPID VOLUMETRIC	Waterford	Ballynaneashagh, Waterford City	22	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
2169	2169	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
2170	2170	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	""	Q4-2018
2171	2171	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City (also referred to as Saviours Green, Ballybeg)	5	*N/A	""	""	""	""	""	Q3-2020
2172	2172	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	""	""	Q2-2020
2173	2173	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
2174	2174	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	""	Q2-2019
2175	2175	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	""	""	Q1-2020	""
2176	2176	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
2177	2177	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	""	""	""	""	Q2-2020	""
2178	2178	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
2179	2179	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	17	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
2180	2180	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
2181	2181	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	""	""	""	Q1-2021	""
2182	2182	SHIP CONSTRUCTION	Waterford	Bath St, Waterford City	4	*N/A	""	""	""	""	""	Q4-2019
2183	2183	SHIP CONSTRUCTION	Waterford	Graigueshoneen, Kilmacthomas, Co Waterford	16	*N/A	""	""	""	""	Q4-2020	""
2184	2184	SHIP CONSTRUCTION	Waterford	Mount Esker, Ballytruckle Road, Waterford City	14	*N/A	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
2185	2185	SHIP CONSTRUCTION	Waterford	Newgate Street, Waterford City	36	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
2186	2186	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
2187	2187	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
2188	2188	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	""	Q4-2019	""
2189	2189	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford 	9	Anvers Housing Association Ltd	""	""	""	""	""	Q4-2020
2190	2190	CALF Turnkey	Waterford	Kilbarry, Waterford (Phase 1)	69	Respond	""	""	""	""	""	Q3-2020
2191	2191	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
2192	2192	CALF Turnkey	Waterford	The Walk, Fairfield Park, Kilcohan, Waterford (Phase 1)	40	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
2193	2193	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	58	*N/A	""	""	""	""	Q4-2019	""
2194	2194	SHIP DIALOG	Westmeath	Lissywollen, Athlone	55	*N/A	""	""	""	""	Q1-2021	""
2195	2195	SHIP DIALOG	Westmeath	Lissywollen, Athlone (Phase 2A and 2B)	55	*N/A	""	""	""	""	Q1-2021	""
2196	2196	SHIP DIALOG	Westmeath	Lissywollen, Athlone (Phase 3A)	38	*N/A	""	""	""	""	Q1-2021	""
2197	2197	SHIP DIALOG	Westmeath	Lissywollen, Athlone (Phase 3B)	22	*N/A	""	""	""	""	Q1-2021	""
2198	2198	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
2199	2199	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	""	Q2-2019
2200	2200	SHIP CONSTRUCTION TURNKEY	Westmeath	Abbeybrook, Kilbeggan	7	*N/A	""	""	""	""	""	Q1-2019
2201	2201	SHIP CONSTRUCTION TURNKEY	Westmeath	Lakepoint, Mullingar	24	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
2202	2202	SHIP CONSTRUCTION TURNKEY	Westmeath	Coill Rua, Mullingar	6	*N/A	""	""	""	""	""	Q4-2019
2203	2203	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	3	*N/A	""	""	""	""	""	Q1-2020
2204	2204	SHIP CONSTRUCTION TURNKEY	Westmeath	Valley Cottages, Mullingar	3	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
2205	2205	SHIP CONSTRUCTION TURNKEY	Westmeath	Austin Friars Street, Mullingar	4	*N/A	""	""	""	""	Q3-2020	""
2206	2206	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	5	*N/A	""	""	""	""	""	Q4-2020
2207	2207	SHIP CONSTRUCTION TURNKEY	Westmeath	Oakcrest, Ballinderry, Mullingar	8	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2208	2208	SHIP CONSTRUCTION TURNKEY	Westmeath	St. Marys Place, Athlone	9	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2209	2209	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	1	*N/A	""	""	""	""	Q1-2020	""
2210	2210	SHIP CONSTRUCTION RAPID VOLUMETRIC	Westmeath	O'Growney Green, Mullingar	26	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2211	2211	SHIP CONSTRUCTION RAPID VOLUMETRIC	Westmeath	Dalton Park, Mullingar	15	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
2212	2212	SHIP CONSTRUCTION RAPID VOLUMETRIC	Westmeath	Water Street, Castlepollard	7	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2213	2213	SHIP CONSTRUCTION RAPID VOLUMETRIC	Westmeath	Ennell Court, Mullingar (Phase 1)	15	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2214	2214	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	""	""	""	""	Q3-2019	""
2215	2215	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	""	Q4-2018
2216	2216	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	1	*N/A	""	""	""	""	""	Q1-2018
2217	2217	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 1.1)	21	*N/A	""	""	""	""	""	Q2-2020
2218	2218	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
2219	2219	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
2220	2220	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	19	*N/A	""	""	""	""	Q1-2021	""
2221	2221	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
2222	2222	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	""	""	""	Q3-2019	""
2223	2223	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 2)	24	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2224	2224	SHIP CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	32	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
2225	2225	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 1.2)	12	*N/A	""	""	""	""	""	Q3-2020
2226	2226	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar (Phase 2)	12	*N/A	""	""	""	""	Q1-2021	""
2227	2227	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	10	Tath Housing Association Ltd	""	""	""	""	""	Q1-2021
2228	2228	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	17	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2229	2229	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	9	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2230	2230	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2231	2231	CALF Turnkey	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)*	14	Oaklee Housing	""	""	""	""	Q1-2020	""
2232	2232	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Co. Westmeath (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2020
2233	2233	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q2-2017
2234	2234	CALF Turnkey	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q4-2020
2235	2235	CALF Turnkey	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 2)*	23	Cluid Housing	""	""	""	""	""	Q1-2021
2236	2236	CALF Turnkey	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 3)	8	Cluid Housing	""	""	""	""	Q4-2018	""
2237	2237	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	10	Tath Housing Association	""	""	""	""	Q4-2019	""
2238	2238	CALF Turnkey	Westmeath	Ghairdin Beag, Main Street, Rathwire, Killucan, Co. Westmeath (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q4-2020
2239	2239	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	Tath Housing Association	""	""	""	""	Q4-2018	""
2240	2240	CALF Turnkey	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q1-2021
2241	2241	CALF Turnkey	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2019
2242	2242	CALF Turnkey	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 2)*	14	Tath Housing Association	""	""	""	""	""	Q2-2020
2243	2243	CALF Turnkey	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q2-2020
2244	2244	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
2245	2245	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	8	*N/A	""	""	""	""	""	Q1-2018
2246	2246	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	11	*N/A	""	""	""	""	""	Q4-2018
2247	2247	SHIP CONSTRUCTION TURNKEY	Wexford	Rath an Duin, Castlebridge	3	*N/A	""	""	""	""	""	Q3-2018
2248	2248	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2a)	2	*N/A	""	""	""	""	""	Q2-2019
2249	2249	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford - Phase 2	10	*N/A	""	""	""	""	""	Q1-2019
2250	2250	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1b)	10	*N/A	""	""	""	""	""	Q4-2018
2251	2251	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey	5	*N/A	""	""	""	""	""	Q4-2018
2252	2252	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 2	2	*N/A	""	""	""	""	""	Q1-2019
2253	2253	SHIP CONSTRUCTION TURNKEY	Wexford	Whitewater Estuary, Ballyhack	3	*N/A	""	""	""	""	""	Q3-2020
2254	2254	SHIP CONSTRUCTION TURNKEY	Wexford	Riverchapel Lane, Gorey	4	*N/A	""	""	""	""	""	Q4-2019
2255	2255	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford-Phase 3	4	*N/A	""	""	""	""	""	Q2-2019
2256	2256	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 3	3	*N/A	""	""	""	""	""	Q4-2019
2257	2257	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford Phase 4	10	*N/A	""	""	""	""	""	Q3-2019
2258	2258	SHIP CONSTRUCTION TURNKEY	Wexford	St. Martin's Road, Rosslare Harbour	4	*N/A	""	""	""	""	""	Q4-2019
2259	2259	SHIP CONSTRUCTION TURNKEY	Wexford	Clonattin Upper, Gorey	8	*N/A	""	""	""	""	""	Q4-2020
2260	2260	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2b)	2	*N/A	""	""	""	""	""	Q4-2019
2261	2261	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	14	*N/A	""	""	""	""	""	Q4-2020
2262	2262	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2 C)	1	*N/A	""	""	""	""	""	Q3-2019
2263	2263	SHIP CONSTRUCTION TURNKEY	Wexford	Ballynaglough, Blackwater	16	*N/A	""	""	""	""	Q4-2019	""
2264	2264	SHIP CONSTRUCTION TURNKEY	Wexford	Clonhasten, Enniscorthy	50	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
2265	2265	SHIP CONSTRUCTION TURNKEY	Wexford	No.'s 64 & 74 Chapelwood, Kilmuckridge	2	*N/A	""	""	""	""	""	Q1-2020
2266	2266	SHIP CONSTRUCTION TURNKEY	Wexford	5 The Break Ayelsbridge, Riverchapel	1	*N/A	""	""	""	""	""	Q1-2020
2267	2267	SHIP CONSTRUCTION TURNKEY	Wexford	Creagh, Gorey	39	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2268	2268	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	1	*N/A	""	""	""	""	""	Q1-2020
2269	2269	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Gorey - Phase 2	4	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2270	2270	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock Hill, Wexford	5	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2271	2271	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2272	2272	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2273	2273	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	4	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2274	2274	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	""	""	Q4-2019
2275	2275	SHIP CONSTRUCTION	Wexford	Cloghulatagh, Taghmon	18	*N/A	""	""	""	""	""	Q4-2020
2276	2276	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	""	""	Q4-2019
2277	2277	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	""	Q1-2019
2278	2278	SHIP CONSTRUCTION	Wexford	Danescastle	10	*N/A	""	""	""	""	""	Q1-2019
2279	2279	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	""	Q3-2019
2280	2280	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford (Phase 1)	22	*N/A	""	""	""	""	Q3-2020	""
2281	2281	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
2282	2282	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	40	*N/A	""	""	""	""	Q2-2020	""
2283	2283	SHIP CONSTRUCTION	Wexford	Oilgate, Enniscorthy	2	*N/A	""	""	""	""	""	Q2-2018
2284	2284	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
2285	2285	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
2286	2286	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	5	*N/A	""	""	""	""	""	Q4-2018
2287	2287	SHIP CONSTRUCTION	Wexford	Baile an Tr, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
2288	2288	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
2289	2289	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
2290	2290	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
2291	2291	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	7	*N/A	""	""	""	""	Q2-2019	""
2292	2292	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy	17	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2293	2293	SHIP CONSTRUCTION	Wexford	Creagh (East), Gorey	4	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2294	2294	SHIP CONSTRUCTION	Wexford	Rosbercon, New Ross	28	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2295	2295	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 2)	4	*N/A	""	""	""	""	""	Q4-2018
2296	2296	SHIP CONSTRUCTION	Wexford	St. Joseph's, Wexford Street, Gorey	20	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
2297	2297	SHIP CONSTRUCTION	Wexford	Bullawn, Irishtown, New Ross	2	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
2298	2298	SHIP CONSTRUCTION	Wexford	Ballyhine, Barntown	7	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2299	2299	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford (Phase 2)	22	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
2300	2300	SHIP CONSTRUCTION	Wexford	Creagh (West), Gorey	8	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2301	2301	CAS CONSTRUCTION TURNKEY	Wexford	Clonattin, Gorey	6	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2302	2302	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
2303	2303	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
2304	2304	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2305	2305	CALF Turnkey	Wexford	24 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q3-2020
2306	2306	CALF Turnkey	Wexford	24 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 2)	16	Tath Housing Association	""	""	""	""	""	Q4-2020
2307	2307	CALF Turnkey	Wexford	67 units, Coolcotts, Wexford (Phase 1)*	67	Cluid Housing	""	""	""	""	Q3-2020	""
2308	2308	CALF Turnkey	Wexford	9 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	9	Tath Housing Association	""	""	""	""	Q4-2019	""
2309	2309	CALF Turnkey	Wexford	 Ard Uisce, Wexford Town (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q4-2017
2310	2310	CALF Turnkey	Wexford	 Ard Uisce, Whiterock, Wexford  (Phase 1)	1	Tath Housing Association	""	""	""	""	""	Q1-2018
2311	2311	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q1-2018
2312	2312	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q1-2017
2313	2313	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2314	2314	CALF Turnkey	Wexford	Clonard, Wexford (Phase 1)*	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2315	2315	CALF Turnkey	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 1)	34	Oaklee Housing	""	""	""	""	""	Q4-2018
2316	2316	CALF Turnkey	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 2)	6	Oaklee Housing	""	""	""	""	""	Q2-2019
2317	2317	CALF Turnkey	Wexford	Forgelands, Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)*	18	Tath Housing Association	""	""	""	""	Q3-2020	""
2318	2318	CALF Turnkey	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2020
2319	2319	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q4-2019
2320	2320	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 2)	9	Tath Housing Association	""	""	""	""	""	Q1-2020
2321	2321	CALF Turnkey	Wexford	Greenville, Enniscorthy, Co. Wexford (Phase 1)*	6	Oaklee Housing	""	""	""	""	""	Q2-2019
2322	2322	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2016
2323	2323	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2016
2324	2324	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2017
2325	2325	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
2326	2326	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2020
2327	2327	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 2)	14	Tath Housing Association	""	""	""	""	""	Q4-2020
2328	2328	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 3)	16	Tath Housing Association	""	""	""	""	""	Q1-2021
2329	2329	CALF Turnkey	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 4)*	27	Tath Housing Association	""	""	""	""	Q3-2019	""
2330	2330	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2016
2331	2331	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2019
2332	2332	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2333	2333	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2020
2334	2334	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 2)*	14	Tath Housing Association	""	""	""	""	""	Q4-2020
2335	2335	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*	8	Tath Housing Association	""	""	""	""	""	Q1-2021
2336	2336	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 4)*	8	Tath Housing Association	""	""	""	""	Q4-2019	""
2337	2337	CALF Turnkey	Wexford	Pirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*	16	Cluid Housing	""	""	""	""	Q3-2019	""
2338	2338	CALF Turnkey	Wexford	Pirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 2)*	14	Cluid Housing	""	""	""	""	Q3-2019	""
2339	2339	CALF Turnkey	Wexford	Pirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 3)	22	Cluid Housing	""	""	""	""	Q3-2019	""
2340	2340	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	2	*N/A	""	""	""	""	""	Q2-2018
2341	2341	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 7 Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q4-2018
2342	2342	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	10	*N/A	""	""	""	""	""	Q2-2019
2343	2343	SHIP CONSTRUCTION TURNKEY	Wicklow	Fernhill, Arklow	1	*N/A	""	""	""	""	""	Q3-2018
2344	2344	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q1-2019
2345	2345	SHIP CONSTRUCTION TURNKEY	Wicklow	Woodview Cottages, Rathnew	2	*N/A	""	""	""	""	""	Q4-2019
2346	2346	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	10	*N/A	""	""	""	""	""	Q3-2019
2347	2347	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q2-2019
2348	2348	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	15	*N/A	""	""	""	""	""	Q3-2019
2349	2349	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	4	*N/A	""	""	""	""	""	Q4-2019
2350	2350	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	2	*N/A	""	""	""	""	""	Q4-2019
2351	2351	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	14	*N/A	""	""	""	""	""	Q4-2019
2352	2352	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	6	*N/A	""	""	""	""	""	Q2-2020
2353	2353	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	9	*N/A	""	""	""	""	""	Q4-2019
2354	2354	SHIP CONSTRUCTION TURNKEY	Wicklow	Kirvin Hill, Broomhall, Rathnew	2	*N/A	""	""	""	""	""	Q2-2019
2355	2355	SHIP CONSTRUCTION TURNKEY	Wicklow	Weaver Square, Baltinglass, Co. Wicklow	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2356	2356	SHIP CONSTRUCTION TURNKEY	Wicklow	Carraig Beag, WicklowTown	5	*N/A	""	""	""	""	""	Q3-2020
2357	2357	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugdugff, Tinahely	2	*N/A	""	""	""	""	""	Q4-2020
2358	2358	SHIP CONSTRUCTION TURNKEY	Wicklow	The Birches, Ballinaclash	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2359	2359	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods Phase 2	2	*N/A	""	""	""	""	""	Q2-2020
2360	2360	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods Phase 2	1	*N/A	""	""	""	""	""	Q4-2020
2361	2361	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	2	*N/A	""	""	""	""	""	Q1-2021
2362	2362	SHIP CONSTRUCTION TURNKEY	Wicklow	Vartry Heights, Roundwood, Co. Wicklow	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
2363	2363	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	1	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2364	2364	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Sli na Slainte, Whitehall, Baltinglass	7	*N/A	""	""	""	""	""	Q4-2019
2365	2365	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Merrymeeting View, Rathnew	46	*N/A	""	""	""	""	Q2-2019	""
2366	2366	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Coolattin Oaks, Carnew (Phase 4)	22	*N/A	""	""	""	""	""	Q4-2020
2367	2367	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Shillelagh Phase 4	20	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
2368	2368	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Ashtown Lane, Wicklow Town	40	*N/A	""	""	""	""	Q3-2020	""
2369	2369	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Ard na Greine, West Ward, Bray	31	*N/A	""	""	""	""	Q2-2020	""
2370	2370	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	Q3-2020	""
2371	2371	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Sheehan Court, Back Street, Arklow	7	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2372	2372	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Mountainview, Moneycarroll, Newtownmountkennedy, Co. Wicklow	22	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
2373	2373	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Sli na Slainte, Whitehall, Baltinglass - Phase 2	27	*N/A	""	""	""	""	""	Q1-2020
2374	2374	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Three Trouts, Greystones	40	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
2375	2375	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Greenhills Road, Wicklow Town	36	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
2376	2376	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Cedar Court, Schools Road, Bray	14	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2377	2377	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Coolattin Oaks, Carnew (Phase 4)	8	*N/A	""	""	""	""	""	Q1-2021
2378	2378	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Rathnew, Merrymeeting, Co. Wicklow (Phase 2)	21	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2379	2379	SHIP CONSTRUCTION RAPID VOLUMETRIC	Wicklow	Tinahely & Lugduff, Co Wicklow	20	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
2380	2380	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 3)	21	*N/A	""	""	""	""	Q4-2019	""
2381	2381	SHIP CONSTRUCTION	Wicklow	10A & 10 B Castle Villas, Greystones	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2382	2382	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	""	""	""	Q3-2019
2383	2383	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow	17	*N/A	""	""	""	""	""	Q3-2019
2384	2384	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 2)	26	*N/A	""	""	""	""	Q4-2019	""
2385	2385	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	""	""	""	Q4-2020
2386	2386	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	""	""	""	Q4-2020
2387	2387	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	""	Q4-2018
2388	2388	SHIP CONSTRUCTION	Wicklow	St Mary's Rd., Arklow (Old Library Site)	7	*N/A	""	""	""	""	""	Q4-2018
2389	2389	SHIP CONSTRUCTION	Wicklow	Jameson Heights,  Kilmacanogue	20	*N/A	""	""	""	""	""	Q4-2020
2390	2390	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	""	Q4-2018
2391	2391	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	23	*N/A	""	""	""	""	""	Q4-2020
2392	2392	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	""	""	""	""	Q3-2019
2393	2393	SHIP CONSTRUCTION	Wicklow	Carrig Eden, 1 Marine Road, Greystones	35	*N/A	""	""	""	""	""	Q4-2020
2394	2394	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	""	""	""	""	Q2-2020
2395	2395	SHIP CONSTRUCTION	Wicklow	Blackhills, Glenealy, Co. Wicklow	2	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
2396	2396	SHIP CONSTRUCTION	Wicklow	Age Friendly Apartments at Main St, Kilcoole, Greystones	4	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
2397	2397	SHIP CONSTRUCTION	Wicklow	Mill Road, Greystones	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
2398	2398	SHIP CONSTRUCTION	Wicklow	Carraig Eden, Greysones Phase 3	14	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
2399	2399	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	19	*N/A	""	""	""	""	Q1-2019	""
2400	2400	SHIP CONSTRUCTION	Wicklow	Kockroe, Delgany, Co. Wicklow	2	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
2401	2401	CAS CONSTRUCTION TURNKEY	Wicklow	Rathcoran Square, Baltinglass	8	Peter McVerry Trust Ltd	""	""	""	""	Q1-2021	""
2402	2402	CAS CONSTRUCTION TURNKEY	Wicklow	Apt 1 & 2 Carrigbrae House, The Friary, Church Road, Bray	2	Ark Housing Association Limited	""	""	""	""	""	Q4-2020
2403	2403	CAS CONSTRUCTION SINGLE STAGE	Wicklow	Hollybrook Park, Bray, Co. Wicklow	4	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2404	2404	CALF Turnkey	Wicklow	Abbey St, Wicklow  (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q4-2018
2405	2405	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 1)*	9	Cluid Housing	""	""	""	""	""	Q4-2019
2406	2406	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 2)*	8	Cluid Housing	""	""	""	""	""	Q3-2020
2407	2407	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 3)*	4	Cluid Housing	""	""	""	""	""	Q4-2020
2408	2408	CALF Turnkey	Wicklow	Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 1)*	40	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2018	""
2409	2409	CALF Turnkey	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	Tath Housing Association	""	""	""	""	""	Q2-2018
2410	2410	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q4-2018
2411	2411	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)*	7	Tath Housing Association	""	""	""	""	""	Q2-2019
2412	2412	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 3)*	4	Tath Housing Association	""	""	""	""	""	Q4-2019
2413	2413	CALF Turnkey	Wicklow	Glenheron, Greystones, County Wicklow (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q4-2020
2414	2414	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2415	2415	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 2)	73	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
2416	2416	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q3-2020
2417	2417	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)	14	Tath Housing Association	""	""	""	""	""	Q3-2020
2418	2418	CALF Turnkey	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 3)	13	Tath Housing Association	""	""	""	""	""	Q4-2020
2419	2419	CALF Turnkey	Wicklow	Lower Main Street, Arklow, Co. Wicklow (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
2420	2420	CALF Turnkey	Wicklow	Meadow Gate, Marlton Road, Wicklow Town (Phase 1)*	4	Tath Housing Association	""	""	""	""	""	Q4-2020
2421	2421	CALF Turnkey	Wicklow	Phase 2, Hazelbrook, Rathnew, Co. Wicklow (Phase 1)	56	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2422	2422	CALF Turnkey	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2020
2423	2423	CALF Turnkey	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 2)*	24	Respond	""	""	""	""	Q3-2019	""
2424	2424	CALF Turnkey	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 3)	16	Respond	""	""	""	""	Q3-2019	""
2425	2425	CALF Turnkey	Wicklow	Sessile Oaks, Ballyguile, Wicklow, Co. Wicklow (Phase 1)*	14	Tath Housing Association	""	""	""	""	Q1-2017	""
2426	2426	CALF Turnkey	Wicklow	Sessile Oaks, Ballyguile, Wicklow, Co. Wicklow (Phase 2)	4	Tath Housing Association	""	""	""	""	Q1-2017	""
2427	2427	CALF Turnkey	Wicklow	Sessile Oaks, Ballyguile, Wicklow, Co. Wicklow (Phase 3)	10	Tath Housing Association	""	""	""	""	Q1-2017	""
2428	2428	CALF Turnkey	Wicklow	Ternlee, Coldross Lane, Kilcoole, Co. Wicklow (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2019
2429	2429	CALF Turnkey	Wicklow	Ternlee, Coldross Lane, Kilcoole, Co. Wicklow (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q4-2019
2430	2430	CALF Turnkey	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)*	7	Tath Housing Association	""	""	""	""	""	Q4-2018
2431	2431	CALF Turnkey	Wicklow	Viewmount, Rathdrum, County Wicklow (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q2-2020
2432	2432	CALF Turnkey	Wicklow	Woodpark, Rathdrum, Co. Wicklow (Phase 1)*	4	Tath Housing Association	""	""	""	""	""	Q3-2019
2433	2433	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Wicklow	Convent Lands (Phase 1)	23	*N/A	""	""	""	""	""	Q2-2020