﻿_id	No_	Funding Programme	LA	Scheme/Project Name	No_ of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	On Site	Completed
1	1	CAS CONSTRUCTION	Carlow	Gleann na Bearu, Royal Oak Road, Bagenalstown	6	Respond	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
2	2	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
3	3	CAS CONSTRUCTION TURNKEY	Carlow	Pollerton Big, Carlow	6	Tintean Housing Association Ltd	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
4	4	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
5	5	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	""	Q4-2018
6	6	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	""	""	Q1-2019	""
7	7	SHIP CONSTRUCTION	Carlow	Bagenalstown Phase 1	20	*N/A	""	""	""	""	Q2-2019	""
8	8	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
9	9	SHIP CONSTRUCTION	Carlow	Slate Row, Hacketstown	4	*N/A	""	""	""	""	""	Q4-2018
10	10	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
11	11	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
12	12	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
13	13	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
14	14	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
15	15	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
16	16	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
17	17	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
18	18	SHIP CONSTRUCTION	Carlow	Father Flood Avenue, Rathvilly	8	*N/A	""	""	""	""	Q1-2019	""
19	19	SHIP CONSTRUCTION	Carlow	St. Oliver's Crescent, Myshall	4	*N/A	""	""	""	""	Q2-2019	""
20	20	SHIP CONSTRUCTION	Carlow	St. Mary's Court & Dereen Heights	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
21	21	SHIP CONSTRUCTION	Carlow	Crowsgrove, Kildavin	1	*N/A	""	""	""	""	Q2-2019	""
22	22	SHIP CONSTRUCTION	Carlow	Shillelagh Road, Tullow, Co. Carlow	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
23	23	SHIP CONSTRUCTION	Carlow	Ardattin	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
24	24	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 1	6	*N/A	""	""	""	""	Q4-2017	""
25	25	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 2	6	*N/A	""	""	""	""	Q4-2017	""
26	26	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 3	8	*N/A	""	""	""	""	Q4-2017	""
27	27	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 4	12	*N/A	""	""	""	""	Q4-2017	""
28	28	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 5	12	*N/A	""	""	""	""	Q4-2017	""
29	29	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow - Phase 6	19	*N/A	""	""	""	""	Q4-2017	""
30	30	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 1)	3	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
31	31	CALF Turnkey	Carlow	7 units, Rivercourt, Carlow (Phase 2)	4	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
32	32	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 1)	27	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
33	33	CALF Turnkey	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 2)	30	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
34	34	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
35	35	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
36	36	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	12	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
37	37	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 3)	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
38	38	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 4)	6	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
39	39	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 5)	16	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
40	40	CALF Turnkey	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
41	41	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing	""	""	""	""	""	Q1-2019
42	42	CAS CONSTRUCTION TURNKEY	Cavan	Castlemanor Village, Cavan Town	29	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
43	43	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	""	Q1-2019
44	44	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2018
45	45	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	""	Q4-2018
46	46	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
47	47	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
48	48	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
49	49	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
50	50	SHIP CONSTRUCTION	Cavan	Elm Grove, Main St, Cavan Town	13	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
51	51	SHIP CONSTRUCTION	Cavan	Cavan Road, Ballinagh	15	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
52	52	SHIP CONSTRUCTION	Cavan	Main St., Butlersbridge	6	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
53	53	SHIP CONSTRUCTION	Cavan	Cluain Dara, Kingscourt	3	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
54	54	SHIP CONSTRUCTION	Cavan	Magheranure, Cootehill, Co. Cavan	22	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
55	55	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 1)	3	*N/A	""	""	""	""	Q2-2019	""
56	56	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 2)	4	*N/A	""	""	""	""	Q2-2019	""
57	57	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduffy (Phase 3)	7	*N/A	""	""	""	""	Q2-2019	""
58	58	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 1)	12	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
59	59	CALF Turnkey	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 2)	13	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
60	60	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
61	61	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
62	62	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
63	63	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
64	64	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 1)	8	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
65	65	CALF Turnkey	Cavan	Rampart View, Virginia, Co. Cavan (Phase 2)	11	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
66	66	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	15	Cuan an Chlair Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
67	67	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
68	68	CAS CONSTRUCTION	Clare	Roo East	4	Thomond Housing Association Ltd	""	""	""	""	""	Q4-2018
69	69	CAS CONSTRUCTION	Clare	9 Elmwood	4	Thomond Housing Association Ltd	""	""	""	""	""	Q1-2019
70	70	CAS CONSTRUCTION	Clare	Teach Rua	4	Newgrove Housing Association Ltd	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
71	71	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
72	72	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
73	73	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	""	""	Q2-2019	""
74	74	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	""	Q4-2018	""
75	75	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	""	Q4-2018	""
76	76	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	""	""	Q2-2019	""
77	77	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
78	78	SHIP CONSTRUCTION	Clare	Miltown Malbay	27	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
79	79	SHIP CONSTRUCTION	Clare	Doonaun, Tulla	22	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
80	80	SHIP CONSTRUCTION	Clare	Boheraroan, Newmarket-on-Fergus	18	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
81	81	SHIP CONSTRUCTION	Clare	Cappagh Lodge, Sixmilebridge	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
82	82	SHIP CONSTRUCTION	Clare	St. Michaels Place, Kilmihil	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
83	83	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	""	Q4-2018
84	84	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2018
85	85	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	18	Cluid Housing	""	""	""	""	""	Q4-2018
86	86	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	3	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
87	87	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	""	Q2-2019
88	88	CALF Turnkey	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 1)*	31	Co-operative Housing Ireland	""	""	""	Q2-2019	""	""
89	89	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
90	90	CALF Construction	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Q1-2017	""	""
91	91	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	47	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
92	92	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	51	*N/A	""	""	Q1-2018	""	""	""
93	93	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	37	Good Shepherd Services Ltd	""	""	""	""	Q1-2019	""
94	94	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
95	95	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
96	96	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
97	97	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
98	98	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
99	99	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
100	100	REGENERATION	Cork City	Phase 2A Knocknaheeny (Phase 1)	16	*N/A	""	""	""	""	Q2-2018	""
101	101	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
102	102	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
103	103	REGENERATION	Cork City	Phase 2C Knocknaheeny	24	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
104	104	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Foyle Avenue, Knocknaheeny, Cork	2	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
105	105	REGENERATION	Cork City	Ardmore Avenue, Knocknaheeny, Cork	1	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
106	106	REGENERATION	Cork City	Phase 2A Knocknaheeny (Phase 2)	31	*N/A	""	""	""	""	Q2-2018	""
107	107	REGENERATION	Cork City	Phase 3B	62	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
108	108	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
109	109	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	""	""	""	Q2-2019	""
110	110	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
111	111	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	""	Q4-2018	""
112	112	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	""	Q4-2018
113	113	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
114	114	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	42	*N/A	""	""	""	Stage 4 approved Q3-2017, the scheme is fully approved.	""	""
115	115	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
116	116	SHIP CONSTRUCTION	Cork City	Bramble Cottages	5	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
117	117	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	20	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
118	118	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
119	119	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 2)	7	*N/A	""	""	""	""	""	Q1-2019
120	120	SHIP CONSTRUCTION	Cork City	Hollywood Estate Infill Housing, Blarney Road, Cork	7	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
121	121	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 3)	50	*N/A	""	""	""	""	Q1-2018	""
122	122	SHIP CONSTRUCTION	Cork City	Clover Hill Court, Bessboro Road, Mahon, Cork	51	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
123	123	SHIP CONSTRUCTION	Cork City	Westside, Model Farm Road, Cork	32	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
124	124	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	""	Q4-2018
125	125	SHIP CONSTRUCTION TURNKEY	Cork City	Barrack Street	32	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
126	126	SHIP CONSTRUCTION TURNKEY	Cork City	FaranFerris	5	*N/A	""	""	""	""	Q2-2018	""
127	127	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	""	Q4-2018	""
128	128	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	""	""	Q4-2018
129	129	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	""	Q3-2018	""
130	130	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
131	131	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road, Tramore	43	*N/A	""	""	""	""	""	Q3-2018
132	132	SHIP CONSTRUCTION TURNKEY	Cork City	1-5, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
133	133	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
134	134	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street	25	*N/A	""	""	""	""	Q2-2018	""
135	135	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinure Road, Cork City	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
136	136	SHIP CONSTRUCTION TURNKEY	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
137	137	SHIP CONSTRUCTION TURNKEY	Cork City	7-11 Gerald Griffin Street, Cork	13	*N/A	""	""	""	""	Q1-2019	""
138	138	SHIP CONSTRUCTION TURNKEY	Cork City	29/30 Lower John Street, Cork	17	*N/A	""	""	""	""	Q1-2019	""
139	139	SHIP CONSTRUCTION TURNKEY	Cork City	Skehard Road, Blackrock, Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
140	140	SHIP CONSTRUCTION TURNKEY	Cork City	Coach Street, Cork	13	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
141	141	SHIP CONSTRUCTION TURNKEY	Cork City	Shanakiel Road, Cork	20	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
142	142	SHIP CONSTRUCTION TURNKEY	Cork City	Spring Lane, Blackpool, Cork	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
143	143	SHIP CONSTRUCTION TURNKEY	Cork City	Glen Ryan Road, Cork	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
144	144	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
145	145	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
146	146	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
147	147	SHIP CONSTRUCTION TURNKEY	Cork City	6-10, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q4-2018
148	148	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	""	Q4-2018
149	149	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
150	150	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
151	151	SHIP CONSTRUCTION TURNKEY	Cork City	3B & 9B South Terrace Court, South Terrace, Cork	2	*N/A	""	""	""	""	""	Q4-2018
152	152	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinlough Road / Knockrea Lawn, Ballinlough, Cork	6	*N/A	""	""	""	""	""	Q2-2019
153	153	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork (Phase 1)	10	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
154	154	SHIP CONSTRUCTION TURNKEY	Cork City	Gearney's Boreen, Commons Road, Cork	3	*N/A	""	""	""	""	Q2-2019	""
155	155	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork (Phase 2)	5	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
156	156	SHIP CONSTRUCTION TURNKEY	Cork City	134A Eagle Valley, Sarsfield Road	1	*N/A	""	""	""	""	Q1-2018	""
157	157	CALF Construction	Cork City	Green Lane, Blackpool, Cork City (Phase 1)	112	Cluid Housing	""	""	""	Q2-2019	""	""
158	158	CALF Turnkey	Cork City	Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*	19	Respond	""	""	""	Q2-2019	""	""
159	159	CALF Turnkey	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 1)	72	Cluid Housing	""	""	""	""	""	Q4-2018
160	160	CALF Construction	Cork City	Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	""	Q1-2019	""
161	161	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
162	162	CALF Construction	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	""	Q4-2018
163	163	CALF Turnkey	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	""	Q1-2019	""
164	164	CALF Turnkey	Cork City	Cork City (Phase 1)	32	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
165	165	CALF Turnkey	Cork City	North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
166	166	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)*	80	Respond	""	""	""	Q3-2018	""	""
167	167	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)	31	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
168	168	CALF Turnkey	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)	21	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
169	169	CALF Turnkey	Cork City	The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)	17	Tath Housing Association Ltd	""	""	""	""	Q1-2019	""
170	170	CALF Turnkey	Cork City	Togher Cross, Lehenaghmore, Co. Cork (Phase 1)	9	Cluid Housing	""	""	""	""	Q3-2018	""
171	171	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
172	172	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	""	Q3-2018
173	173	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	""	Q1-2019
174	174	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
175	175	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	""	Q1-2019	""
176	176	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
177	177	CAS CONSTRUCTION	Cork County	Care Home Facility, Masseytown, Macroom	1	Tath Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
178	178	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
179	179	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	8	Charleville Care Project Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
180	180	SHIP CONSTRUCTION	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
181	181	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	15	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
182	182	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork Phase 1	7	*N/A	""	""	""	""	Q3-2018	""
183	183	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
184	184	SHIP CONSTRUCTION	Cork County	Poulavone, Ballincollig	57	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
185	185	SHIP CONSTRUCTION	Cork County	Newtown House , Bantry	1	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
186	186	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	""	Q4-2018
187	187	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	""	Q4-2018
188	188	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	14	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
189	189	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
190	190	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
191	191	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	10	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
192	192	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
193	193	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline phase 1A	10	*N/A	""	""	""	""	""	Q4-2018
194	194	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1A & 1B (ii))	16	*N/A	""	""	""	""	""	Q1-2019
195	195	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1C)	18	*N/A	""	""	""	""	""	Q1-2019
196	196	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	18	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
197	197	SHIP CONSTRUCTION	Cork County	Madonna House, Ballincollig	6	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
198	198	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	4	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
199	199	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	""	""	""	Q2-2019	""
200	200	SHIP CONSTRUCTION	Cork County	Sleaveen Sleaveen East, Macroom	8	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
201	201	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline Phase 1B	5	*N/A	""	""	""	""	""	Q4-2018
202	202	SHIP CONSTRUCTION	Cork County	Tudor Grove, Ballincollig	16	*N/A	""	""	""	""	Q2-2019	""
203	203	SHIP CONSTRUCTION	Cork County	Pound Lane, Kilworth 	6	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
204	204	SHIP CONSTRUCTION	Cork County	24 Glenview Terrace Lyre Co Cork	1	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
205	205	SHIP CONSTRUCTION	Cork County	Broomfield West, Avoncore, Midelton	10	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
206	206	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork - Phase 2	2	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
207	207	SHIP CONSTRUCTION RAPID	Cork County	Abbeywood, Midleton	70	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
208	208	SHIP CONSTRUCTION RAPID	Cork County	Station Road, Blarney	18	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
209	209	SHIP CONSTRUCTION RAPID	Cork County	Bluepool, Kanturk	12	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
210	210	SHIP CONSTRUCTION	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	""	Q2-2019	""
211	211	SHIP CONSTRUCTION	Cork County	Castletreasure Grove, Douglas	2	*N/A	""	""	""	""	Q2-2019	""
212	212	SHIP CONSTRUCTION	Cork County	Seaview Cottages, Derrymihan, Castletownbere	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
213	213	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (1)	18	*N/A	""	""	""	""	""	Q2-2018
214	214	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
215	215	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	""	Q4-2018
216	216	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	25	*N/A	""	""	""	""	Q3-2018	""
217	217	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
218	218	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
219	219	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	""	Q4-2017
220	220	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy - Phase 1	17	*N/A	""	""	""	""	Q4-2017	""
221	221	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
222	222	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
223	223	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
224	224	SHIP CONSTRUCTION TURNKEY	Cork County	St. Marys Road, Dunmanway Phase 1	14	*N/A	""	""	""	""	Q3-2018	""
225	225	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	10	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
226	226	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	5	*N/A	""	""	""	""	Q2-2019	""
227	227	SHIP CONSTRUCTION TURNKEY	Cork County	HazelBrook, Ballyvinter, Mallow	16	*N/A	""	""	""	""	Q1-2019	""
228	228	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	""	Q2-2019
229	229	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	""	""	Q2-2019
230	230	SHIP CONSTRUCTION TURNKEY	Cork County	No. 43 & No. 50 Chapel Court, Skibbereen 	2	*N/A	""	""	""	""	""	Q3-2018
231	231	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	""	Q4-2018
232	232	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara, Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q4-2018
233	233	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 1	9	*N/A	""	""	""	""	""	Q2-2019
234	234	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal, Phase 1	15	*N/A	""	""	""	""	Q1-2019	""
235	235	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire	4	*N/A	""	""	""	""	""	Q4-2018
236	236	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mont Rivers, Co. Cork.	3	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
237	237	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 3	11	*N/A	""	""	""	""	Q1-2019	""
238	238	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
239	239	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	""	Q2-2019	""
240	240	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal - Phase 1	13	*N/A	""	""	""	""	""	Q4-2018
241	241	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	6	*N/A	""	""	""	""	Q3-2018	""
242	242	SHIP CONSTRUCTION TURNKEY	Cork County	No.9 and No.10  Chapel Court, Skibbereen,	2	*N/A	""	""	""	""	""	Q4-2018
243	243	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
244	244	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	""	Q4-2018
245	245	SHIP CONSTRUCTION TURNKEY	Cork County	Milleenacola, Bantry	51	*N/A	""	""	""	""	Q2-2019	""
246	246	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac Phase 1	4	*N/A	""	""	""	""	""	Q4-2018
247	247	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow	12	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
248	248	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton (Phase 2)	14	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
249	249	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (2)	7	*N/A	""	""	""	""	""	Q3-2018
250	250	SHIP CONSTRUCTION TURNKEY	Cork County	Canon St, Rathcormac	3	*N/A	""	""	""	""	Q1-2019	""
251	251	SHIP CONSTRUCTION TURNKEY	Cork County	Percival St, Kanturk	2	*N/A	""	""	""	""	""	Q4-2018
252	252	SHIP CONSTRUCTION TURNKEY	Cork County	9 & 9a Main Street, Boherbue	2	*N/A	""	""	""	""	""	Q4-2018
253	253	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal - Phase 2	6	*N/A	""	""	""	""	""	Q2-2019
254	254	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac Phase 2	4	*N/A	""	""	""	""	""	Q2-2019
255	255	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fil, Curraclough, Bandon	30	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
256	256	SHIP CONSTRUCTION TURNKEY	Cork County	Maple Woods, Midleton	6	*N/A	""	""	""	""	""	Q4-2018
257	257	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy - Phase 2	35	*N/A	""	""	""	""	Q4-2017	""
258	258	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary's Road, Dunmanway Phase 2	6	*N/A	""	""	""	""	Q4-2018	""
259	259	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal, Phase 2	20	*N/A	""	""	""	""	Q1-2019	""
260	260	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull, Co. Cork	7	*N/A	""	""	""	""	Q2-2019	""
261	261	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Bloomfield, Midleton - Phase 1	10	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
262	262	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Broomfield, Midleton - Phase 2	6	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
263	263	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Bloomfield, Midleton - Phase 3	22	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
264	264	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Carin, Station Road, Carrigtwohill	2	*N/A	""	""	""	""	Q2-2019	""
265	265	SHIP CONSTRUCTION TURNKEY	Cork County	HazelBrook, Ballyvinter, Mallow	52	*N/A	""	""	""	""	Q1-2019	""
266	266	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Orga, Ballinhassig	4	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
267	267	SHIP CONSTRUCTION TURNKEY	Cork County	Baltimore, West Cork	12	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
268	268	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull, Co. Cork	7	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
269	269	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 2	24	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
270	270	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Carin, Station Road, Carrigtwohill	19	*N/A	""	""	""	""	Q2-2019	""
271	271	CALF Turnkey	Cork County	3 units, Mullavale, Castletownroche, Co. Cork (Phase 1)	3	Respond	""	""	""	""	""	Q2-2019
272	272	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
273	273	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
274	274	CALF Turnkey	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 1)	44	Respond	""	""	""	Q4-2018	""	""
275	275	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	""	Q4-2018	""
276	276	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
277	277	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)	20	Respond	""	""	""	""	Q4-2018	""
278	278	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 2)*	22	Respond	""	""	""	""	Q4-2018	""
279	279	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
280	280	CALF Construction	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing	""	""	""	""	Q4-2018	""
281	281	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
282	282	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 2)	5	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
283	283	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	""	Q4-2018
284	284	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
285	285	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty	52	*N/A	""	""	Q1-2018	""	""	""
286	286	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen	50	*N/A	""	""	Q1-2018	""	""	""
287	287	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom	50	*N/A	""	""	Q1-2018	""	""	""
288	288	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
289	289	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	""	""	""	Q1-2019	""
290	290	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
291	291	SHIP CONSTRUCTION	DLR	Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
292	292	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
293	293	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
294	294	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
295	295	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
296	296	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	""	Q4-2018
297	297	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
298	298	SHIP CONSTRUCTION	DLR	Fitzgerald Park - Phase 1	33	*N/A	""	""	""	""	""	Q4-2018
299	299	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
300	300	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
301	301	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
302	302	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
303	303	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
304	304	SHIP CONSTRUCTION	DLR	Ballyogan Avenue, Ballyogan	2	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
305	305	SHIP CONSTRUCTION	DLR	St. Laurences Park, Stillorgan	49	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
306	306	SHIP CONSTRUCTION	DLR	Fitzgerald Park - Phase 2	17	*N/A	""	""	""	""	""	Q1-2019
307	307	SHIP CONSTRUCTION	DLR	Ballyogan Court, Ballyogan	67	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
308	308	SHIP CONSTRUCTION RAPID	DLR	Rockville Drive (Glenamuck Cottages)	13	*N/A	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
309	309	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
310	310	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
311	311	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace, Monkstown	14	*N/A	""	""	""	""	""	Q4-2018
312	312	CALF Construction	DLR	Abbeyview, Monkstown, Co. Dublin (Phase 1)	11	Cluid Housing	""	""	""	Q4-2018	""	""
313	313	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
314	314	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
315	315	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q3-2018
316	316	CALF Turnkey	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
317	317	CALF Turnkey	DLR	Clay Farm (Block E3), Ballyogan Road, Leopardstown, Dublin 18 (Phase 1)*	24	The Iveagh Trust	""	""	""	""	Q2-2017	""
318	318	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	""	Q2-2019
319	319	CALF Construction	DLR	Cromlech Fields, Loughlinstown, Ballybrack, Dublin (Phase 1)	34	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
320	320	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	53	Respond	""	""	""	Q1-2019	""	""
321	321	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 1)	52	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
322	322	CALF Turnkey	DLR	Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)	1	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2018
323	323	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	""	Q4-2018
324	324	CALF Turnkey	DLR	Marine Walk, Marine Road, Dun Laoghaire (Phase 1)*	2	Oaklee Housing	""	""	""	""	Q1-2016	""
325	325	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	""	Q4-2018
326	326	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2017
327	327	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
328	328	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
329	329	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2017
330	330	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
331	331	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
332	332	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
333	333	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	""	""	""	Q2-2019	""
334	334	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
335	335	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	20	Habinteg Housing Association (Ireland) Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
336	336	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
337	337	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	""	""	""	Q2-2019	""
338	338	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	""	""	Q1-2019	""
339	339	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	""	Q4-2018	""
340	340	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
341	341	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
342	342	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	""	Q4-2018
343	343	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Ph 2)	4	*N/A	""	""	""	""	""	Q4-2018
344	344	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
345	345	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	""	Q4-2018
346	346	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	""	""	Q2-2019	""
347	347	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
348	348	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
349	349	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
350	350	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 1)	18	*N/A	""	""	""	""	""	Q4-2018
351	351	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	18	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
352	352	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 2)	8	*N/A	""	""	""	""	""	Q1-2019
353	353	SHIP CONSTRUCTION TURNKEY	Donegal	Carnamuggagh, Letterkenny	30	*N/A	""	""	""	""	Q1-2019	""
354	354	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	19	*N/A	""	""	""	""	Q2-2019	""
355	355	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 3)	10	*N/A	""	""	""	""	""	Q2-2019
356	356	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	Q4-2017	""
357	357	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2016
358	358	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2018
359	359	CALF Construction	Donegal	Raphoe Road, Castlefinn, Co. Donegal (Phase 1)	10	Habinteg Housing Association (Ireland) Ltd	""	""	""	Q2-2018	""	""
360	360	CAS CONSTRUCTION	Dublin City	38/39 Bolton Street, Dublin 1	8	Arlington Novas Ireland Ltd	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
361	361	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2018
362	362	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
363	363	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	""	Q4-2018
364	364	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	Q3-2018	""
365	365	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	18	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
366	366	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
367	367	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
368	368	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
369	369	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
370	370	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	14	Simon Community : Dublin Simon	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
371	371	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
372	372	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
373	373	CAS CONSTRUCTION TURNKEY	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
374	374	REGENERATION	Dublin City	St. Teresa's Gardens	54	*N/A	""	""	""	""	Q4-2018	""
375	375	REGENERATION	Dublin City	Dolphin House, Dublin 8 (Phase 1)	100	*N/A	""	""	""	""	""	Q3-2018
376	376	REGENERATION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q1-2019	""
377	377	REGENERATION	Dublin City	Sackville Avenue Cottages	11	*N/A	Stage 1 approved Q2-2016, outline design and costs being prepared.	""	""	""	""	""
378	378	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	""	""	""	""	Q3-2018	""
379	379	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
380	380	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
381	381	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
382	382	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
383	383	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
384	384	REGENERATION	Dublin City	St. Bricins Park	11	*N/A	""	""	""	""	""	Q4-2018
385	385	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
386	386	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2015, full design/tender being prepared.	""	""	""	""
387	387	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	70	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
388	388	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	""	Q2-2019	""
389	389	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
390	390	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q1-2019	""
391	391	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1 - Phase 1	5	*N/A	""	""	""	""	""	Q4-2018
392	392	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
393	393	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 1	9	*N/A	""	""	""	""	""	Q1-2017
394	394	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 2	26	*N/A	""	""	""	""	Q2-2017	""
395	395	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1 - Phase 2	2	*N/A	""	""	""	""	Q1-2017	""
396	396	SHIP CONSTRUCTION RAPID	Dublin City	Bonham Street Dublin  8	57	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
397	397	SHIP CONSTRUCTION RAPID	Dublin City	Cork Street / Chamber Street Dublin 8	55	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
398	398	SHIP CONSTRUCTION RAPID	Dublin City	Springvale Chapelizod Dublin 8	73	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
399	399	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
400	400	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
401	401	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
402	402	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
403	403	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
404	404	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard Site Ph1	53	*N/A	""	""	""	""	""	Q4-2018
405	405	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	Stage 2 approved Q3-2015, full design/tender being prepared.	""	""	""	""
406	406	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Rathvilly Drive site	13	*N/A	""	""	""	""	""	Q3-2018
407	407	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Woodbank Drive site	3	*N/A	""	""	""	""	""	Q3-2018
408	408	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard site Ph 2	19	*N/A	""	""	""	""	Q3-2018	""
409	409	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospecthill	58	*N/A	""	""	""	""	""	Q4-2017
410	410	SHIP CONSTRUCTION TURNKEY	Dublin City	Parkside, Balgriffin, Dublin 13	16	*N/A	""	""	""	""	""	Q4-2018
411	411	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	47	*N/A	""	""	""	""	""	Q4-2018
412	412	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	45	*N/A	""	""	""	""	Q4-2018	""
413	413	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
414	414	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
415	415	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
416	416	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	Tath Housing Association Ltd	""	""	""	""	""	Q3-2017
417	417	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
418	418	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
419	419	CALF Turnkey	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2018
420	420	CALF Construction	Dublin City	Ballygall Road East Phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
421	421	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	23	Cluid Housing	""	""	""	Q2-2018	""	""
422	422	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 2)	39	Cluid Housing	""	""	""	Q2-2018	""	""
423	423	CALF Turnkey	Dublin City	Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
424	424	CALF Construction	Dublin City	Block A, Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	""	Q2-2019	""
425	425	CALF Turnkey	Dublin City	Bluebell Avenue, Dublin 12 (Phase 1)	7	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
426	426	CALF Turnkey	Dublin City	Bow Lane West, Dublin 8 (Phase 1)	18	Oaklee Housing	""	""	""	""	Q4-2017	""
427	427	CALF Construction	Dublin City	Broome Lodge,\nDunmanus Court, Cabra (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q4-2017
428	428	CALF Turnkey	Dublin City	Canal Meadows, Bluebell, Dublin 12 (Phase 1)	4	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
429	429	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
430	430	CALF Turnkey	Dublin City	Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*	65	Respond	""	""	""	Q2-2019	""	""
431	431	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	""	Q2-2019
432	432	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2017
433	433	CALF Turnkey	Dublin City	Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing	""	""	""	""	""	Q3-2017
434	434	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Ireland	""	""	""	""	""	Q4-2016
435	435	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
436	436	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q4-2017
437	437	CALF Turnkey	Dublin City	Mountjoy Square North, Dublin 1 (Phase 1)	31	Respond	""	""	""	""	Q2-2018	""
438	438	CALF Construction	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
439	439	CALF Turnkey	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
440	440	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
441	441	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
442	442	CALF Construction	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing	""	""	""	""	Q4-2018	""
443	443	CALF Construction	Dublin City	POST TENDER Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2018	""
444	444	CALF Construction	Dublin City	Post Tender Johns Lane West Dublin 8 (Phase 1)	31	Focus Ireland	""	""	""	""	""	Q4-2018
445	445	CALF Construction	Dublin City	POST TENDER, Poplar Row, Ballybough, Dublin 3 (Phase 1)	29	Oaklee Housing	""	""	""	""	Q3-2018	""
446	446	CALF Construction	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	""	Q2-2019	""
447	447	CALF Construction	Dublin City	Revised - St Marys Mansions, Dublin 1 (Phase 1)	80	Cluid Housing	""	""	""	""	Q4-2017	""
448	448	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	Tath Housing Association Ltd	""	""	""	""	Q2-2017	""
449	449	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
450	450	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	97	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2018	""
451	451	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing	""	""	""	""	""	Q3-2018
452	452	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	18	Tath Housing Association Ltd	""	""	""	""	""	Q2-2016
453	453	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	28	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
454	454	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
455	455	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
456	456	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
457	457	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	""	Q1-2019	""
458	458	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	""	Q1-2019	""
459	459	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Tath Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
460	460	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 1)	6	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
461	461	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
462	462	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
463	463	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
464	464	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	""	""	Q2-2019
465	465	SHIP CONSTRUCTION	Fingal	Rolestown (Phase 1)	10	*N/A	""	""	""	""	""	Q2-2019
466	466	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.3)	5	*N/A	""	""	""	""	""	Q2-2018
467	467	SHIP CONSTRUCTION	Fingal	Castlelands, Park View, Balbriggan (Phase 3)	24	*N/A	""	""	""	""	""	Q1-2019
468	468	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	""	Q4-2018	""
469	469	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 1)	2	*N/A	""	""	""	""	""	Q3-2017
470	470	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
471	471	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
472	472	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
473	473	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.1)	25	*N/A	""	""	""	""	""	Q4-2017
474	474	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 2)	6	*N/A	""	""	""	""	""	Q4-2018
475	475	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.2) 	15	*N/A	""	""	""	""	""	Q1-2018
476	476	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	""	""	Q1-2019	""
477	477	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.4)	4	*N/A	""	""	""	""	""	Q3-2018
478	478	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.5)	25	*N/A	""	""	""	""	""	Q4-2018
479	479	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth, Co Dublin	8	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
480	480	SHIP CONSTRUCTION	Fingal	Wellview Infill	20	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
481	481	SHIP CONSTRUCTION	Fingal	Rolestown (Phase 2)	10	*N/A	""	""	""	""	Q2-2018	""
482	482	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	Q3-2018	""
483	483	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
484	484	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
485	485	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
486	486	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	""	Q4-2018	""
487	487	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
488	488	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
489	489	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 1), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
490	490	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 2), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
491	491	SHIP CONSTRUCTION TURNKEY	Fingal	Ravenswood, North Road, Finglas (Phase 2)	2	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
492	492	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
493	493	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
494	494	SHIP CONSTRUCTION TURNKEY	Fingal	Kenure Gate, Park Road, Rush	4	*N/A	""	""	""	""	""	Q4-2018
495	495	SHIP CONSTRUCTION TURNKEY	Fingal	Glaslinn, Donabate	3	*N/A	""	""	""	""	""	Q4-2018
496	496	SHIP CONSTRUCTION TURNKEY	Fingal	Bremore Pastures Park, Balbriggan	4	*N/A	""	""	""	""	""	Q4-2018
497	497	SHIP CONSTRUCTION TURNKEY	Fingal	Northwood Green, Santry, Dublin 9	37	*N/A	""	""	""	""	""	Q4-2018
498	498	SHIP CONSTRUCTION TURNKEY	Fingal	Hollytown Cottages	4	*N/A	""	""	""	""	Q1-2019	""
499	499	CALF Turnkey	Fingal	4 units, Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
500	500	CALF Turnkey	Fingal	Allendale Square, Clonsilla, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	Q1-2019	""
501	501	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	12	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
502	502	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 2)*	12	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
503	503	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	Tath Housing Association Ltd	""	""	""	""	""	Q2-2016
504	504	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	Tath Housing Association Ltd	""	""	""	""	""	Q3-2016
505	505	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	Tath Housing Association Ltd	""	""	""	""	""	Q4-2016
506	506	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
507	507	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
508	508	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing	""	""	""	""	Q4-2018	""
509	509	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing	""	""	""	""	""	Q4-2018
510	510	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
511	511	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	10	The Iveagh Trust	""	""	""	""	Q3-2018	""
512	512	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 2)*	18	The Iveagh Trust	""	""	""	""	Q3-2018	""
513	513	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	Q3-2018	""
514	514	CALF Turnkey	Fingal	Northwood Green, Santry, Dublin 9 (Phase 1)*	6	Respond	""	""	""	""	""	Q4-2018
515	515	CALF Turnkey	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 1)*	55	Respond	""	""	""	""	Q3-2018	""
516	516	CALF Construction	Fingal	Old Coolock Lane, Santry, Dublin 9 (Phase 1)	28	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2019	""	""
517	517	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	Q4-2018	""
518	518	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
519	519	CALF Turnkey	Fingal	St Marnocks Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q4-2017
520	520	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
521	521	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
522	522	CALF Turnkey	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
523	523	CALF Turnkey	Fingal	Taylor Hill Crescent, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
524	524	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2018
525	525	CALF Turnkey	Fingal	The Galleries, Turvey Avenue, Donabate (Phase 1)	43	Oaklee Housing	""	""	""	""	Q2-2017	""
526	526	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Cluid Housing	""	""	""	""	""	Q4-2017
527	527	CALF Turnkey	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
528	528	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
529	529	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
530	530	CAS CONSTRUCTION	Galway City	47 Forster Street	9	Cope Galway	""	""	""	""	Q4-2018	""
531	531	CAS CONSTRUCTION	Galway City	Doughiska, Co. Galway	7	Respond	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
532	532	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	78	*N/A	""	""	""	""	Q2-2019	""
533	533	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
534	534	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway.	7	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
535	535	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway	58	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
536	536	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	70	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
537	537	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine, (Glasshouse Site) Monivea Road - (Phase 1)	6	*N/A	""	""	""	""	Q4-2018	""
538	538	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 2)	12	*N/A	""	""	""	""	Q4-2018	""
539	539	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 3)	14	*N/A	""	""	""	""	Q4-2018	""
540	540	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 4)	14	*N/A	""	""	""	""	Q4-2018	""
541	541	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 5)	2	*N/A	""	""	""	""	Q4-2018	""
542	542	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
543	543	CALF Turnkey	Galway City	Block D, Straith Fhada, Doughiska, Galway (Phase 1)	14	Tath Housing Association Ltd	""	""	""	""	Q1-2019	""
544	544	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
545	545	CALF Turnkey	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 1)*	15	Respond	""	""	""	""	Q2-2019	""
546	546	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 1)	15	Respond	""	""	""	""	Q2-2018	""
547	547	CALF Turnkey	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 2)	66	Respond	""	""	""	""	Q2-2018	""
548	548	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q3-2017
549	549	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
550	550	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
551	551	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
552	552	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
553	553	CALF Turnkey	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)*	12	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
554	554	CALF Turnkey	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)*	12	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
555	555	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 1)*	20	Cluid Housing	""	""	""	""	""	Q1-2019
556	556	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke	74	*N/A	""	""	Q1-2018	""	""	""
557	557	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
558	558	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
559	559	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	Q2-2018	""
560	560	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
561	561	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
562	562	CAS CONSTRUCTION	Galway County	Springfield, Parkmore (Ballinasloe)	4	Peter Triest Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
563	563	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
564	564	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	18	Cluid Housing Association	""	""	""	""	Q4-2018	""
565	565	CAS CONSTRUCTION	Galway County	Caheroyn, Athenry	4	Peter Triest Housing Association Ltd	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
566	566	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	5	Peter Triest Housing Association Ltd	""	""	""	""	Q2-2019	""
567	567	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
568	568	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	Q2-2018	""
569	569	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	Q2-2018	""
570	570	SHIP CONSTRUCTION	Galway County	Na Clocha Rua, An Cheathr Rua, Co. Galway	4	*N/A	""	""	""	""	Q2-2019	""
571	571	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
572	572	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
573	573	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	""	Q4-2018
574	574	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
575	575	SHIP CONSTRUCTION	Galway County	Cill Ciarn (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
576	576	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
577	577	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige, Roundstone, Co. Galway	14	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
578	578	SHIP CONSTRUCTION	Galway County	Claremount, Oughterard	13	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
579	579	SHIP CONSTRUCTION	Galway County	Hospital Road, Clifden	26	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
580	580	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	17	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
581	581	SHIP CONSTRUCTION	Galway County	Caislen Raithln, Ardrahan	12	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
582	582	SHIP CONSTRUCTION	Galway County	Barrack Street, Loughrea	5	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
583	583	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam. Phase 2	14	*N/A	""	""	""	""	Q4-2017	""
584	584	SHIP CONSTRUCTION	Galway County	Cartron, Kinvarra	6	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
585	585	SHIP CONSTRUCTION	Galway County	Gort U Lochlainn, Moycullen	30	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
586	586	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam. Phase 1	16	*N/A	""	""	""	""	""	Q4-2018
587	587	SHIP CONSTRUCTION	Galway County	Tr an Bhu, TUam, Co. Galway	40	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
588	588	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam, Phase 3	31	*N/A	""	""	""	""	Q4-2017	""
589	589	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
590	590	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
591	591	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
592	592	SHIP CONSTRUCTION TURNKEY	Galway County	Ashthorn Avenue, Headford	10	*N/A	""	""	""	""	""	Q4-2018
593	593	SHIP CONSTRUCTION TURNKEY	Galway County	Cuirt na hAbhann, Claregalway 	8	*N/A	""	""	""	""	""	Q4-2018
594	594	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loghrea - Phase 1	48	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
595	595	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loghrea - Phase 2	13	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
596	596	SHIP CONSTRUCTION TURNKEY	Galway County	An Fuaran Estate, Oranmore	4	*N/A	""	""	""	""	Q2-2019	""
597	597	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q2-2018
598	598	CALF Turnkey	Galway County	Dunloe Street, Ballinasloe, Co. Galway (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
599	599	CALF Turnkey	Galway County	Sliabh Carran, Gort, Co Galway  (Phase 1)	9	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
600	600	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing	""	""	""	""	""	Q3-2017
601	601	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
602	602	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	""	Q4-2018
603	603	CAS CONSTRUCTION	Kerry	Chamfers Place	18	Cluid Housing Association	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
604	604	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	""	Q4-2018
605	605	CAS CONSTRUCTION	Kerry	Hawley Park Apartments, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
606	606	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	Social Action Group Rathmore	""	""	""	""	Q4-2018	""
607	607	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	""	Q4-2018
608	608	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
609	609	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
610	610	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	""	Q4-2018
611	611	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
612	612	SHIP CONSTRUCTION	Kerry	Cois Gallain, Killorglin	14	*N/A	""	""	""	""	Q1-2019	""
613	613	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
614	614	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	""	Q4-2018
615	615	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
616	616	SHIP CONSTRUCTION	Kerry	Cuirt Eaglaise, Milltown	8	*N/A	""	""	""	""	Q4-2018	""
617	617	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	Q2-2018	""
618	618	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
619	619	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
620	620	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	""	Q4-2018	""
621	621	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
622	622	SHIP CONSTRUCTION	Kerry	Glenach, Ballybunion	20	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
623	623	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	""	Q4-2018
624	624	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	""	Q4-2018
625	625	SHIP CONSTRUCTION	Kerry	An Carrigin, Tralee	28	*N/A	""	""	""	""	Q2-2019	""
626	626	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	""	Q4-2018
627	627	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
628	628	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
629	629	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
630	630	SHIP CONSTRUCTION	Kerry	Owngarry, Killorglin	1	*N/A	""	""	""	""	Q1-2019	""
631	631	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	61	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
632	632	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
633	633	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
634	634	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
635	635	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	22	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
636	636	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee	8	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
637	637	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	20	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
638	638	SHIP CONSTRUCTION	Kerry	Crogorts, Tralee	30	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
639	639	SHIP CONSTRUCTION	Kerry	Rock Rd., Killarney	10	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
640	640	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase4)	14	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
641	641	SHIP CONSTRUCTION	Kerry	Baile an Gharra, Lixnaw (PHASE 2)	12	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
642	642	SHIP CONSTRUCTION	Kerry	Rathass, Tralee	6	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
643	643	SHIP CONSTRUCTION	Kerry	Woodview Place, Tarbert	20	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
644	644	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	6	*N/A	""	""	""	""	Q1-2019	""
645	645	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 1	2	*N/A	""	""	""	""	""	Q1-2018
646	646	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
647	647	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
648	648	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	5	*N/A	""	""	""	""	""	Q3-2018
649	649	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 1	3	*N/A	""	""	""	""	""	Q4-2018
650	650	SHIP CONSTRUCTION TURNKEY	Kerry	47 Woodview, Cahirdown, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
651	651	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 3	3	*N/A	""	""	""	""	""	Q4-2018
652	652	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 2	1	*N/A	""	""	""	""	""	Q2-2019
653	653	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing	""	""	""	""	""	Q2-2016
654	654	CALF Turnkey	Kerry	Deerpark Avenue, Tralee, Co. Kerry (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
655	655	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)*	61	Cluid Housing	""	""	""	""	Q4-2018	""
656	656	CALF Turnkey	Kerry	Doon Road, Lisloose, Tralee, Co. Kerry (Phase 1)*	14	Co-operative Housing Ireland	""	""	""	""	Q4-2018	""
657	657	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 1)	14	Respond	""	""	""	""	""	Q4-2018
658	658	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 2)	2	Respond	""	""	""	""	Q3-2018	""
659	659	CALF Turnkey	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 3)	6	Respond	""	""	""	""	Q3-2018	""
660	660	CALF Turnkey	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Cluid Housing	""	""	""	""	Q4-2018	""
661	661	CALF Turnkey	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Cluid Housing	""	""	""	""	Q1-2019	""
662	662	CALF Turnkey	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Cluid Housing	""	""	""	""	Q1-2019	""
663	663	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
664	664	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
665	665	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
666	666	CAS CONSTRUCTION	Kildare	Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	""	""	""	""	Q1-2019	""
667	667	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
668	668	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
669	669	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
670	670	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
671	671	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	""	""	Q1-2018	""
672	672	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	""	""	Q1-2019	""
673	673	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	""	""	Q4-2018	""
674	674	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
675	675	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
676	676	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
677	677	SHIP CONSTRUCTION	Kildare	Coill Dubh	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
678	678	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
679	679	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
680	680	SHIP CONSTRUCTION	Kildare	Skenagun, Castledermot	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
681	681	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
682	682	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
683	683	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
684	684	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
685	685	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
686	686	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
687	687	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
688	688	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	""	Q4-2018
689	689	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
690	690	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot	6	*N/A	""	""	""	""	""	Q4-2018
691	691	SHIP CONSTRUCTION TURNKEY	Kildare	Grove Lane, Robertstown	3	*N/A	""	""	""	""	Q1-2017	""
692	692	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill, Prosperous	5	*N/A	""	""	""	""	""	Q4-2018
693	693	SHIP CONSTRUCTION TURNKEY	Kildare	The Green, Elsmore Naas	5	*N/A	""	""	""	""	""	Q4-2018
694	694	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn (Phase 1.1)	10	*N/A	""	""	""	""	""	Q1-2019
695	695	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn (Phase 2)	19	*N/A	""	""	""	""	Q4-2018	""
696	696	SHIP CONSTRUCTION TURNKEY	Kildare	Beech Park Wood, Leixlip	4	*N/A	""	""	""	""	Q1-2019	""
697	697	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town - Ph1	18	*N/A	""	""	""	""	""	Q2-2019
698	698	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn (Phase 1.2)	10	*N/A	""	""	""	""	Q1-2018	""
699	699	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town - Ph2	20	*N/A	""	""	""	""	Q1-2019	""
700	700	SHIP CONSTRUCTION TURNKEY	Kildare	Cluain Dara, Derrinturn, Kildare	1	*N/A	""	""	""	""	""	Q2-2019
701	701	CALF Turnkey	Kildare	Bellingsfield, Naas, Kildare (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2018
702	702	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2018
703	703	CALF Turnkey	Kildare	Castle Farm, Naas, Co. Kildare (Phase 1)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
704	704	CALF Construction	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	Tath Housing Association Ltd	""	""	""	Q3-2018	""	""
705	705	CALF Turnkey	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 1)*	17	Cill Dara Housing Association	""	""	""	""	Q1-2018	""
706	706	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 1)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
707	707	CALF Turnkey	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 2)*	3	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
708	708	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 1)	18	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
709	709	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 2)	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
710	710	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 3)	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
711	711	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 4)	6	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
712	712	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 5)	4	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
713	713	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 6)	5	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
714	714	CALF Turnkey	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 7)*	18	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
715	715	CALF Construction	Kildare	Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)	35	Respond	""	""	""	Q2-2019	""	""
716	716	CALF Turnkey	Kildare	Hawthorn Manor, Brockagh, Coill Dubh, Co. Kildare (Phase 1)*	5	Oaklee Housing	""	""	""	""	Q4-2018	""
717	717	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing	""	""	""	""	""	Q3-2018
718	718	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing	""	""	""	""	""	Q1-2018
719	719	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2018
720	720	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
721	721	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
722	722	CALF Turnkey	Kildare	Revised Rye Abbey, Kilcock, Co Kildare (apts)\n (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q2-2017
723	723	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
724	724	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
725	725	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
726	726	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
727	727	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q2-2017
728	728	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	50	Respond	""	""	""	""	Q4-2018	""
729	729	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 1)*	14	Cluid Housing	""	""	""	""	""	Q4-2018
730	730	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 2)	24	Cluid Housing	""	""	""	""	""	Q4-2018
731	731	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q1-2019
732	732	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 4)	2	Cluid Housing	""	""	""	""	Q1-2018	""
733	733	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas	74	*N/A	""	""	""	""	Q1-2019	""
734	734	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	Q1-2018	""	""	""
735	735	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
736	736	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	""	Q4-2018
737	737	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
738	738	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	""	Q4-2018
739	739	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
740	740	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
741	741	CAS CONSTRUCTION	Kilkenny	Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
742	742	CAS CONSTRUCTION	Kilkenny	"""Red Barn"" Patrick Street, Ballyragget"	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
743	743	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett	4	Oaklee Housing Trust	""	""	""	""	""	Q4-2018
744	744	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	5	Camphill Communities of Ireland	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
745	745	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	4	Good Shepherd Services Ltd	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
746	746	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
747	747	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, Kilkenny	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
748	748	CAS CONSTRUCTION	Kilkenny	Bridge Street, Callan	6	Good Shepherd Services Ltd	""	""	""	""	Q2-2019	""
749	749	CAS CONSTRUCTION	Kilkenny	Grennan Villa, Thomastown	5	Camphill Communities of Ireland	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
750	750	CAS CONSTRUCTION TURNKEY	Kilkenny	Golf Links Road, Kilkenny	15	Respond	""	""	""	""	Q2-2019	""
751	751	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	""	""	Q1-2019	""
752	752	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
753	753	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	6	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
754	754	SHIP CONSTRUCTION	Kilkenny	Crokers Hill (Phase 2) Kennyswell Road, Kilkenny	35	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
755	755	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	""	""	Q1-2019	""
756	756	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
757	757	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	Q2-2018	""
758	758	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	Q1-2019	""
759	759	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
760	760	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
761	761	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	""	Q4-2018
762	762	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	15	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
763	763	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown	15	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
764	764	SHIP CONSTRUCTION	Kilkenny	Crokers Hill (Phase 1), Kennyswell Road, Kilkenny	51	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
765	765	SHIP CONSTRUCTION	Kilkenny	Group Home Cloghabrody, Thomastown	1	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
766	766	SHIP CONSTRUCTION	Kilkenny	Inchacarron, Mullinavat	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
767	767	SHIP CONSTRUCTION	Kilkenny	Shanganny, Jenkinstown	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
768	768	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
769	769	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
770	770	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 1)	8	*N/A	""	""	""	""	""	Q1-2018
771	771	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
772	772	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	1	*N/A	""	""	""	""	""	Q3-2018
773	773	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford (Phase 3)	18	*N/A	""	""	""	""	""	Q4-2018
774	774	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	""	Q3-2018	""
775	775	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
776	776	SHIP CONSTRUCTION TURNKEY	Kilkenny	Ogenty, Gowran	12	*N/A	""	""	""	""	""	Q4-2018
777	777	SHIP CONSTRUCTION TURNKEY	Kilkenny	Lower Kilmacow	16	*N/A	""	""	""	""	Q2-2019	""
778	778	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
779	779	CALF Turnkey	Kilkenny	Castlehyde, Rosbercon (Phase 2)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
780	780	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	Q2-2018	""
781	781	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q2-2017
782	782	CALF Turnkey	Kilkenny	Love Lane, Castlecomer, Co. Kilkenny (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	Q1-2019	""
783	783	CALF Turnkey	Kilkenny	Margarets Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	""	Q1-2019	""
784	784	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	11	Respond	""	""	""	""	Q4-2018	""
785	785	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 2)	17	Respond	""	""	""	""	Q4-2018	""
786	786	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 3)*	22	Respond	""	""	""	""	Q4-2018	""
787	787	CALF Turnkey	Kilkenny	OLoughlin Court, Kilkenny  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
788	788	CALF Construction	Kilkenny	Park Lane, Friary Walk, Callan, Co Kilkenny (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q2-2019
789	789	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing	""	""	""	""	""	Q3-2018
790	790	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing	""	""	""	""	Q3-2018	""
791	791	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	47	Sophia Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
792	792	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
793	793	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
794	794	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
795	795	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
796	796	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
797	797	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
798	798	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
799	799	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	8	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
800	800	SHIP CONSTRUCTION	Laois	Coolroe, Ballybrittas	1	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
801	801	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
802	802	SHIP CONSTRUCTION	Laois	St Kieran's Park, Errill	14	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
803	803	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	""	""	""	""	Q1-2019	""
804	804	SHIP CONSTRUCTION	Laois	Hillview, Portlaoise	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
805	805	SHIP CONSTRUCTION	Laois	The Orchard, Stradbally	6	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
806	806	CALF Turnkey	Laois	Ballickmoyler, Graigcullen, Laois (Phase 1)*	20	Co-operative Housing Ireland	""	""	""	Q1-2019	""	""
807	807	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 1)	4	Cluid Housing	""	""	""	""	Q1-2017	""
808	808	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 2)	6	Cluid Housing	""	""	""	""	Q1-2017	""
809	809	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 3)	5	Cluid Housing	""	""	""	""	Q1-2017	""
810	810	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 4)*	9	Cluid Housing	""	""	""	""	Q1-2017	""
811	811	CALF Turnkey	Laois	Bellingham, Portlaoise, Co. Laois (Phase 5)*	6	Cluid Housing	""	""	""	""	Q1-2017	""
812	812	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 1)*	17	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
813	813	CALF Turnkey	Laois	Borris Road, Portlaoise, Co. Laois (Phase 2)	19	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
814	814	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
815	815	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
816	816	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
817	817	CALF Turnkey	Laois	Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q3-2018
818	818	CALF Construction	Laois	Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing	""	""	""	""	""	Q2-2018
819	819	CALF Turnkey	Laois	Lake Drive, Kilminchy, Co. Laois (Phase 1)	10	Oaklee Housing	""	""	""	Q2-2019	""	""
820	820	CALF Turnkey	Laois	Main Street, Stradbally, Co. Laois (Phase 1)	16	North & East Housing Association Ltd	""	""	""	""	Q1-2019	""
821	821	CALF Construction	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing	""	""	""	""	""	Q1-2018
822	822	CALF Turnkey	Laois	Wilton Lawns, Portarlington, Co. Laois (Phase 1)	2	Respond	""	""	""	Q2-2019	""	""
823	823	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
824	824	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
825	825	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	""	Q4-2018
826	826	SHIP CONSTRUCTION TURNKEY	Leitrim	Roosky	7	*N/A	""	""	""	""	Q1-2019	""
827	827	SHIP CONSTRUCTION TURNKEY	Leitrim	Drumshanbo	9	*N/A	""	""	""	""	Q1-2019	""
828	828	CALF Turnkey	Leitrim	Cnoc an Luir, Drumshanbo, Co. Leitrim (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	Q2-2019	""
829	829	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	13	Croom Voluntary Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
830	830	CAS CONSTRUCTION	Limerick	Cappamore	10	Cappamore Housing Association Ltd	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
831	831	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
832	832	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
833	833	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	""	Q2-2018	""
834	834	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
835	835	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	6	Peter McVerry Trust Ltd	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
836	836	CAS CONSTRUCTION	Limerick	Pinewood, Mulcaire Drive, Garraunykee	1	Daughters Of Charity Of St Vincent De Paul	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
837	837	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
838	838	CAS CONSTRUCTION TURNKEY	Limerick	Carebright Community, Ardykeohane, Bruff	6	Carebright Ltd	""	""	""	""	""	Q1-2019
839	839	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral Place	6	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
840	840	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
841	841	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
842	842	REGENERATION	Limerick	Gaol Lane	1	*N/A	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
843	843	REGENERATION	Limerick	Sheep / Athlunkards Street	8	Tath Housing Association Ltd	""	Stage 2 approved Q2-2014, full design/tender being prepared.	""	""	""	""
844	844	REGENERATION	Limerick	Churchfield (Phase 1.2)	19	*N/A	""	""	""	""	""	Q1-2018
845	845	REGENERATION	Limerick	Churchfield (Phase 2)	38	Cluid Housing Association	""	Stage 2 approved Q4-2014, full design/tender being prepared.	""	""	""	""
846	846	REGENERATION	Limerick	Cosgrave Park	9	Co-operative Housing Ireland (Formerly NABCo)	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
847	847	REGENERATION	Limerick	Palm Close	27	Cluid Housing Association	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
848	848	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
849	849	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
850	850	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
851	851	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
852	852	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
853	853	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
854	854	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
855	855	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
856	856	REGENERATION	Limerick	BCW Vacant Refurbs, Lot 1 & 2**	14	*N/A	""	""	""	""	""	Q4-2016
857	857	REGENERATION	Limerick	St. Mary's Park Infills (Phase 1)	15	*N/A	""	""	""	""	""	Q4-2018
858	858	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Tath Housing Association Ltd	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
859	859	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved Q1-2015, outline design and costs being prepared.	""	""	""	""	""
860	860	REGENERATION	Limerick	45A-46A Cliona Park	2	*N/A	""	Stage 2 approved Q1-2016, full design/tender being prepared.	""	""	""	""
861	861	REGENERATION	Limerick	Dalgaish Park	27	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
862	862	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved Q1-2015, outline design and costs being prepared.	""	""	""	""	""
863	863	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
864	864	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
865	865	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
866	866	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
867	867	REGENERATION	Limerick	Churchfield (Phase 1.1)	23	*N/A	""	""	""	""	""	Q2-2018
868	868	REGENERATION	Limerick	St. Mary's Park Infills (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2019
869	869	SHIP CONSTRUCTION	Limerick	Patricks Villas, Castleconnell	4	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
870	870	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
871	871	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
872	872	SHIP CONSTRUCTION	Limerick	1-12 Burke Avenue, Limerick City	12	*N/A	""	""	""	""	Q1-2019	""
873	873	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	""	""	""	""	Q2-2019	""
874	874	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	2	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
875	875	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	""	""	""	Q2-2019	""
876	876	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
877	877	SHIP CONSTRUCTION	Limerick	Deerpark, Adare	30	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
878	878	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
879	879	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
880	880	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	""	Q4-2018
881	881	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	7	*N/A	""	""	""	""	Q3-2018	""
882	882	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	""	Q1-2019
883	883	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	Q3-2018	""
884	884	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
885	885	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
886	886	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
887	887	SHIP CONSTRUCTION	Limerick	Mountpelier	12	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
888	888	SHIP CONSTRUCTION	Limerick	Knocklong	12	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
889	889	SHIP CONSTRUCTION	Limerick	Convent Street, King's Island	2	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
890	890	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	3	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
891	891	SHIP CONSTRUCTION	Limerick	Towerfield Crescent, Croom	3	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
892	892	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
893	893	SHIP CONSTRUCTION RAPID	Limerick	Faha View, Patrickswell	16	*N/A	""	""	""	""	Q4-2018	""
894	894	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	43	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
895	895	SHIP CONSTRUCTION RAPID	Limerick	Barnakyle, Patrickswell 	24	*N/A	""	""	""	""	Q2-2019	""
896	896	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	10	*N/A	""	""	""	""	Q1-2019	""
897	897	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
898	898	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 2)	2	Respond	""	""	""	""	""	Q4-2018
899	899	CALF Turnkey	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 3)	2	Respond	""	""	""	""	""	Q4-2018
900	900	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co-operative Housing Ireland	""	""	""	""	""	Q1-2018
901	901	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
902	902	CALF Turnkey	Limerick	Drominbeg, Rhebogue, Limerick (Phase 1)	10	Co-operative Housing Ireland	""	""	""	Q2-2019	""	""
903	903	CALF Turnkey	Limerick	Drominbeg, Rhebogue, Limerick (Phase 2)	10	Co-operative Housing Ireland	""	""	""	Q2-2019	""	""
904	904	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q1-2018
905	905	CALF Turnkey	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2017
906	906	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	Q3-2018	""
907	907	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
908	908	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
909	909	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
910	910	SHIP CONSTRUCTION	Longford	St.Rita's, Park Road, Longford	8	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
911	911	SHIP CONSTRUCTION	Longford	Fairgreen View, Longford Town	1	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
912	912	SHIP CONSTRUCTION	Longford	Cranleymore, Abbeylara	3	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
913	913	SHIP CONSTRUCTION	Longford	Cloonahard	1	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
914	914	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 1)	14	*N/A	""	""	""	""	""	Q4-2017
915	915	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 1)	4	*N/A	""	""	""	""	""	Q3-2018
916	916	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
917	917	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 1)	7	*N/A	""	""	""	""	""	Q4-2018
918	918	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 2)	8	*N/A	""	""	""	""	Q3-2018	""
919	919	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 3)	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
920	920	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara	5	*N/A	""	""	""	""	""	Q4-2018
921	921	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard	14	*N/A	""	""	""	""	Q3-2018	""
922	922	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	29	*N/A	""	""	""	""	""	Q4-2018
923	923	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	Q1-2019	""
924	924	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 1)	4	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
925	925	SHIP CONSTRUCTION TURNKEY	Longford	Church Street, Edgeworthstown	5	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
926	926	SHIP CONSTRUCTION TURNKEY	Longford	Smithfield, Legan, Co-Longford	18	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
927	927	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	Q2-2019	""
928	928	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish, Co-Longford	4	*N/A	""	""	""	""	""	Q2-2019
929	929	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 3)	14	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
930	930	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
931	931	SHIP CONSTRUCTION TURNKEY	Longford	12 Units @Mill Race Park ,Drumlish, Co-Longford	4	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
932	932	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q1-2017
933	933	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Tath Housing Association Ltd	""	""	""	Q2-2018	""	""
934	934	CAS CONSTRUCTION	Louth	5 Slieveroe Cresent, Dundalk	1	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
935	935	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	Tath Housing Association Ltd	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
936	936	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
937	937	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
938	938	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	""	Q4-2018
939	939	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
940	940	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
941	941	CAS CONSTRUCTION	Louth	36 Strand Hill, Clogherhead	4	St. John of God Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
942	942	CAS CONSTRUCTION	Louth	Coulter Park, Dundalk	7	Tath Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
943	943	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
944	944	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda	4	North ? East Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
945	945	CAS CONSTRUCTION	Louth	Riverwell Close, Dundalk	1	Respond	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
946	946	CAS CONSTRUCTION	Louth	Carntown, Ballymackenny, Drogheda	1	St. John of God Housing Association Ltd	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
947	947	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
948	948	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
949	949	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 1	4	*N/A	""	""	""	""	""	Q1-2018
950	950	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 1	7	*N/A	""	""	""	""	""	Q4-2016
951	951	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 2	5	*N/A	""	""	""	""	""	Q2-2017
952	952	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 3	3	*N/A	""	""	""	""	""	Q3-2017
953	953	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
954	954	SHIP CONSTRUCTION	Louth	Boice Court, Drogheda (Phase 2 - 4)	69	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
955	955	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
956	956	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 4	7	*N/A	""	""	""	""	""	Q4-2017
957	957	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	93	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
958	958	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2018
959	959	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2018
960	960	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 5	5	*N/A	""	""	""	""	Q3-2017	""
961	961	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 1	2	*N/A	""	""	""	""	""	Q2-2017
962	962	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2017
963	963	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 3	4	*N/A	""	""	""	""	""	Q4-2017
964	964	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 7	2	*N/A	""	""	""	""	""	Q1-2019
965	965	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 1	1	*N/A	""	""	""	""	""	Q3-2018
966	966	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 6	1	*N/A	""	""	""	Stage 4 approved Q1-2016, the scheme is fully approved.	""	""
967	967	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 3	5	*N/A	""	""	""	""	""	Q1-2019
968	968	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 4	1	*N/A	""	""	""	""	""	Q2-2018
969	969	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 5	4	*N/A	""	""	""	""	""	Q3-2018
970	970	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 3	1	*N/A	""	""	""	""	""	Q1-2019
971	971	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
972	972	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 2	4	*N/A	""	""	""	""	""	Q4-2018
973	973	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 6	5	*N/A	""	""	""	""	""	Q4-2018
974	974	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
975	975	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 8	2	*N/A	""	""	""	""	""	Q2-2019
976	976	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 2	2	*N/A	""	""	""	""	""	Q2-2019
977	977	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 1	1	*N/A	""	""	""	""	""	Q1-2019
978	978	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 3	16	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
979	979	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
980	980	SHIP CONSTRUCTION TURNKEY	Louth	1-5 Brabazon Hall, Termonfeckin, Drogheda	5	*N/A	""	""	""	""	Q4-2018	""
981	981	CALF Turnkey	Louth	2 units An Rian, Termonfeckin Rd., Drogheda, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
982	982	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
983	983	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
984	984	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q1-2017
985	985	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing	""	""	""	""	""	Q1-2017
986	986	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
987	987	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
988	988	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
989	989	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
990	990	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
991	991	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	22	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
992	992	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 7)	22	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
993	993	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
994	994	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	8	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
995	995	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	7	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
996	996	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q1-2017
997	997	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q3-2017
998	998	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)*	14	Respond	""	""	""	""	""	Q1-2019
999	999	CALF Turnkey	Louth	Dublin Road, Dundalk, Co. Louth (Phase 2)*	17	Respond	""	""	""	""	Q3-2017	""
1000	1000	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	11	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1001	1001	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	14	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1002	1002	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	15	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1003	1003	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	47	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1004	1004	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	25	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1005	1005	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
1006	1006	CALF Turnkey	Louth	Harbour Grove, Dundalk, Co. Louth (Phase 1)	8	North & East Housing Association Ltd	""	""	""	""	Q3-2018	""
1007	1007	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
1008	1008	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
1009	1009	CALF Turnkey	Louth	Mill Wharf, Constitution Hill, Drogheda, Co. Louth (Phase 1)	25	Respond	""	""	""	""	Q4-2016	""
1010	1010	CALF Construction	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1011	1011	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q3-2016
1012	1012	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1013	1013	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	6	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1014	1014	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	11	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
1015	1015	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	14	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
1016	1016	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	20	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
1017	1017	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1018	1018	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
1019	1019	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
1020	1020	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1021	1021	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1022	1022	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	16	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
1023	1023	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2017
1024	1024	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	16	Cluid Housing	""	""	""	""	Q1-2017	""
1025	1025	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	15	Cluid Housing	""	""	""	""	Q1-2017	""
1026	1026	CALF Construction	Louth	Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing	""	""	""	""	""	Q2-2016
1027	1027	CALF Turnkey	Louth	Termon River, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	""	Q1-2018	""
1028	1028	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	""	Q1-2019	""
1029	1029	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
1030	1030	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2018
1031	1031	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
1032	1032	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
1033	1033	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	""	Q2-2019
1034	1034	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
1035	1035	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
1036	1036	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	""	Q1-2019
1037	1037	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1038	1038	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	""	Q4-2018	""
1039	1039	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	""	Q4-2018	""
1040	1040	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
1041	1041	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	""	""	Q1-2019	""
1042	1042	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	5	*N/A	""	""	""	""	Q1-2019	""
1043	1043	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	""	Q4-2018	""
1044	1044	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
1045	1045	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
1046	1046	SHIP CONSTRUCTION	Mayo	St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
1047	1047	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	""	""	Q4-2018	""
1048	1048	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	""	""	Q4-2018	""
1049	1049	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	""	""	Q1-2019	""
1050	1050	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1051	1051	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
1052	1052	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1053	1053	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
1054	1054	SHIP CONSTRUCTION	Mayo	Cross, Co-Mayo	15	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1055	1055	SHIP CONSTRUCTION	Mayo	Bonniconlon	5	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1056	1056	SHIP CONSTRUCTION	Mayo	Cloonkeadagh Road, Kiltimagh, Co-Mayo	23	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1057	1057	SHIP CONSTRUCTION	Mayo	50 Units @ Rehins Fort, Ballina, Co-Mayo	50	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1058	1058	SHIP CONSTRUCTION	Mayo	Pound Road, Castlebar	6	*N/A	""	""	""	""	Q2-2019	""
1059	1059	SHIP CONSTRUCTION	Mayo	The Boreen, Crossmolina	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1060	1060	SHIP CONSTRUCTION	Mayo	Deel Court, Crossmolina	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1061	1061	SHIP CONSTRUCTION	Mayo	Kilmaine	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1062	1062	SHIP CONSTRUCTION	Mayo	Knockroe, Moygownagh	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1063	1063	SHIP CONSTRUCTION	Mayo	Church Road, Belmullet	5	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1064	1064	SHIP CONSTRUCTION TURNKEY	Mayo	Carrabeg, Newport Road, Castlebar	2	*N/A	""	""	""	""	""	Q4-2018
1065	1065	SHIP CONSTRUCTION TURNKEY	Mayo	Cois Abhainn, Bonniconlon	2	*N/A	""	""	""	""	""	Q2-2019
1066	1066	SHIP CONSTRUCTION TURNKEY	Mayo	3 Units @ Chapel Street, Louisburgh	3	*N/A	""	""	""	""	Q4-2018	""
1067	1067	SHIP CONSTRUCTION TURNKEY	Mayo	3 Units @Bunree, Ballina	3	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1068	1068	SHIP CONSTRUCTION TURNKEY	Mayo	Friars Court, Ballina	2	*N/A	""	""	""	""	Q2-2019	""
1069	1069	SHIP CONSTRUCTION TURNKEY	Mayo	Riverside Drive, Ballina	3	*N/A	""	""	""	""	Q2-2019	""
1070	1070	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
1071	1071	CALF Turnkey	Mayo	Monamore, Lodge Road, Westport, Co. Mayo (Phase 1)*	2	Tath Housing Association Ltd	""	""	""	""	Q3-2018	""
1072	1072	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing	""	""	""	""	Q2-2019	""
1073	1073	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1074	1074	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	Q1-2019	""
1075	1075	SHIP CONSTRUCTION	Meath	St. Oliver's, Ratoath	17	*N/A	""	""	""	""	Q1-2018	""
1076	1076	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	""	""	Q1-2019	""
1077	1077	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	""	Q1-2019
1078	1078	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
1079	1079	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1080	1080	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	""	""	Q2-2019	""
1081	1081	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1082	1082	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1083	1083	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
1084	1084	SHIP CONSTRUCTION	Meath	Farganstown	86	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1085	1085	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1086	1086	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1087	1087	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1088	1088	SHIP CONSTRUCTION	Meath	Castle Street, Ashbourne	55	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1089	1089	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	9	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1090	1090	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	""	""	""	Q1-2019	""
1091	1091	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	""	""	""	Q1-2019	""
1092	1092	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	""	""	""	Q1-2019	""
1093	1093	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	""	Q4-2018
1094	1094	SHIP CONSTRUCTION	Meath	The Belfry, Trim	3	*N/A	""	""	""	""	Q1-2019	""
1095	1095	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	19	*N/A	""	""	""	""	""	Q4-2018
1096	1096	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	16	*N/A	""	""	""	""	""	Q4-2018
1097	1097	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown, Co. Meath	8	*N/A	""	""	""	""	Q3-2018	""
1098	1098	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	5	*N/A	""	""	""	""	""	Q4-2018
1099	1099	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan 	8	*N/A	""	""	""	""	""	Q2-2019
1100	1100	CALF Turnkey	Meath	18 units Churchfields, Ashbourne, Co. Meath (Phase 1)	18	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1101	1101	CALF Turnkey	Meath	5 units Dunville, Athlumney, Navan, Co. Meath (Phase 1)	5	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
1102	1102	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q1-2018
1103	1103	CALF Turnkey	Meath	Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1104	1104	CALF Turnkey	Meath	Blackcastle, Slane Road, Navan, Co. Meath (Phase 1)	9	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1105	1105	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 1)*	1	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1106	1106	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 2)*	1	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1107	1107	CALF Turnkey	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 3)*	10	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
1108	1108	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2018
1109	1109	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing	""	""	""	""	""	Q3-2018
1110	1110	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2017
1111	1111	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
1112	1112	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 1)*	10	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1113	1113	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 2)*	3	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1114	1114	CALF Turnkey	Meath	Churchfields, Ashbourne, Meath (Phase 3)*	12	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1115	1115	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
1116	1116	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1117	1117	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1118	1118	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)*	10	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1119	1119	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	6	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1120	1120	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1121	1121	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
1122	1122	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Cluid Housing	""	""	""	""	""	Q1-2019
1123	1123	CALF Turnkey	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)*	1	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
1124	1124	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 1)	4	Cluid Housing	""	""	""	""	Q4-2017	""
1125	1125	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 2)	7	Cluid Housing	""	""	""	""	Q4-2017	""
1126	1126	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 1)	20	Tath Housing Association Ltd	""	""	""	""	Q3-2018	""
1127	1127	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 2)	21	Tath Housing Association Ltd	""	""	""	""	Q3-2018	""
1128	1128	CALF Turnkey	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)	13	Tath Housing Association Ltd	""	""	""	""	Q3-2018	""
1129	1129	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1130	1130	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1131	1131	CALF Turnkey	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 1)*	6	Oaklee Housing	""	""	""	Q2-2019	""	""
1132	1132	CALF Turnkey	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 2)	6	Oaklee Housing	""	""	""	Q2-2019	""	""
1133	1133	CALF Turnkey	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 3)*	16	Oaklee Housing	""	""	""	Q2-2019	""	""
1134	1134	CALF Turnkey	Meath	Maudelins Brook, Duleek, Co.Meath (Phase 1)	20	Respond	""	""	""	""	Q4-2018	""
1135	1135	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing	""	""	""	""	""	Q4-2016
1136	1136	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
1137	1137	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q1-2017
1138	1138	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing	""	""	""	""	""	Q4-2017
1139	1139	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q4-2017
1140	1140	CALF Turnkey	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1141	1141	CALF Turnkey	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 2)	7	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1142	1142	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	3	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1143	1143	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 2)	6	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1144	1144	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 3)	2	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1145	1145	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 4)	5	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1146	1146	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 5)	4	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1147	1147	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 6)	4	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1148	1148	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 7)	20	Tath Housing Association Ltd	""	""	""	""	Q2-2018	""
1149	1149	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2017
1150	1150	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q3-2017
1151	1151	CALF Turnkey	Meath	Sln Duff, Kentstown, Co. Meath (Phase 1)	2	Cluid Housing	""	""	""	""	Q1-2018	""
1152	1152	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)	24	Respond	""	""	""	""	""	Q4-2018
1153	1153	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q2-2016
1154	1154	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 2)	7	Cluid Housing	""	""	""	""	""	Q3-2016
1155	1155	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 3)	8	Cluid Housing	""	""	""	""	""	Q4-2016
1156	1156	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1157	1157	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1158	1158	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
1159	1159	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	""	Q2-2019
1160	1160	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	Q3-2018	""
1161	1161	SHIP CONSTRUCTION	Monaghan	Davy's & Adjacent Porperty, Fermanagh St., Clones	3	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1162	1162	SHIP CONSTRUCTION	Monaghan	Boyle Sports Site, Fermanagh St., Clones	3	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1163	1163	SHIP CONSTRUCTION	Monaghan	82 & 83 Fermanagh St., Clones	3	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1164	1164	SHIP CONSTRUCTION	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1165	1165	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1166	1166	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1167	1167	SHIP CONSTRUCTION	Monaghan	Bothar na Mullen, Scotstown	32	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1168	1168	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan	16	*N/A	""	""	""	""	""	Q4-2018
1169	1169	SHIP CONSTRUCTION	Monaghan	12 Church St., Ballybay	2	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1170	1170	SHIP CONSTRUCTION	Monaghan	3 Apts @ 63 Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1171	1171	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
1172	1172	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2017
1173	1173	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
1174	1174	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
1175	1175	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	""	Q2-2019
1176	1176	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
1177	1177	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	""	Q4-2018
1178	1178	SHIP CONSTRUCTION TURNKEY	Monaghan	Rosevale, Bree, Castleblayney	26	*N/A	""	""	""	""	Q2-2019	""
1179	1179	SHIP CONSTRUCTION TURNKEY	Monaghan	Corr an Tobair, Carrickmacross, Co. Monaghan	41	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1180	1180	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross, Co. Monaghan	8	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1181	1181	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1182	1182	SHIP CONSTRUCTION TURNKEY	Monaghan	35 Drummond Radhairc, Carrickmacross, Co. Monaghan	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1183	1183	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 1)	8	Tath Housing Association Ltd	""	""	""	""	Q2-2019	""
1184	1184	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 2)	14	Tath Housing Association Ltd	""	""	""	""	Q2-2019	""
1185	1185	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 3)	8	Tath Housing Association Ltd	""	""	""	""	Q2-2019	""
1186	1186	CALF Turnkey	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 4)	8	Tath Housing Association Ltd	""	""	""	""	Q2-2019	""
1187	1187	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 1)	18	Respond	""	""	""	""	Q2-2018	""
1188	1188	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 2)	12	Respond	""	""	""	""	Q2-2018	""
1189	1189	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 3)	20	Respond	""	""	""	""	Q2-2018	""
1190	1190	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Tath Housing Association Ltd	""	""	""	Q4-2017	""	""
1191	1191	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	4	Tath Housing Association Ltd	""	""	""	Q4-2017	""	""
1192	1192	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	4	Tath Housing Association Ltd	""	""	""	Q4-2017	""	""
1193	1193	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 4)	4	Tath Housing Association Ltd	""	""	""	Q4-2017	""	""
1194	1194	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 5)	14	Tath Housing Association Ltd	""	""	""	Q4-2017	""	""
1195	1195	CALF Construction	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing	""	""	""	""	""	Q4-2018
1196	1196	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	Q3-2018	""
1197	1197	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1198	1198	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	""	""	Q1-2019	""
1199	1199	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1200	1200	CAS CONSTRUCTION	Offaly	Presentation Convent, Portarlington	32	Sophia Housing Association Ltd	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1201	1201	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	Q3-2018	""
1202	1202	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1203	1203	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1204	1204	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	Q4-2017	""
1205	1205	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr (Phase 2)	8	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1206	1206	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
1207	1207	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	""	Q2-2019
1208	1208	SHIP CONSTRUCTION TURNKEY	Offaly	Coolagarry, Walsh Island, 	4	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1209	1209	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	""	""	Q4-2018
1210	1210	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr (Phase 1)	4	*N/A	""	""	""	""	Q1-2019	""
1211	1211	CALF Construction	Offaly	Kearneys Field, Tullamore, Co. Offaly (Phase 1)	41	Oaklee Housing	""	""	""	Q2-2019	""	""
1212	1212	SHIP CONSTRUCTION	Roscommon	Cloonfad	3	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1213	1213	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
1214	1214	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
1215	1215	SHIP CONSTRUCTION	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1216	1216	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1217	1217	SHIP CONSTRUCTION	Roscommon	Old Tuam Road,  Monksland, Athlone	2	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1218	1218	SHIP CONSTRUCTION	Roscommon	Longford TD, Castlerea	6	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1219	1219	SHIP CONSTRUCTION	Roscommon	Monksland, Athlone, Co-Roscommon	50	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1220	1220	SHIP CONSTRUCTION	Roscommon	Meadowbrook, Ballyclare Td., Ballyleague, Co. Roscommon	18	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1221	1221	SHIP CONSTRUCTION	Roscommon	Lisroyne Td., Strokestown	8	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1222	1222	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
1223	1223	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	""	Q1-2019
1224	1224	SHIP CONSTRUCTION TURNKEY	Roscommon	Lisroyne Court, Strokestown	10	*N/A	""	""	""	""	Q3-2018	""
1225	1225	SHIP CONSTRUCTION TURNKEY	Roscommon	Warren Grove, Boyle	4	*N/A	""	""	""	""	""	Q4-2018
1226	1226	CALF Turnkey	Roscommon	Castle View Apartments, Block A, Roscommon Town (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q2-2019	""
1227	1227	CALF Turnkey	Roscommon	Castle View Apartments, Block B, Roscommon Town (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q3-2018	""
1228	1228	CALF Turnkey	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing	""	""	""	""	""	Q3-2018
1229	1229	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
1230	1230	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	Q1-2018	""	""	""
1231	1231	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	""	Q4-2018	""
1232	1232	CAS CONSTRUCTION	Sligo	Killeshin, First Sea Road, Sligo	5	Newgrove Housing Association Ltd	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1233	1233	SHIP CONSTRUCTION	Sligo	Collooney	15	*N/A	""	""	""	""	Q4-2018	""
1234	1234	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	""	""	""	Q4-2018	""
1235	1235	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	""	Q4-2018
1236	1236	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (2)	14	*N/A	""	""	""	""	""	Q3-2018
1237	1237	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
1238	1238	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	""	""	Q4-2018	""
1239	1239	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (1)	8	*N/A	""	""	""	""	""	Q4-2017
1240	1240	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1241	1241	SHIP CONSTRUCTION	Sligo	Dromore West	10	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1242	1242	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1243	1243	SHIP CONSTRUCTION	Sligo	House at Ballinode	1	*N/A	""	""	""	""	""	Q4-2018
1244	1244	SHIP CONSTRUCTION	Sligo	94 St Joseph's Terrace	1	*N/A	""	""	""	""	Q4-2018	""
1245	1245	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tath Housing Association Ltd	""	""	""	""	Q1-2019	""
1246	1246	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1247	1247	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght (Phase 1)	17	*N/A	""	""	""	""	""	Q4-2018
1248	1248	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	""	Q4-2018
1249	1249	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	""	Q1-2019
1250	1250	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	""	Q4-2018
1251	1251	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	""	Q4-2018
1252	1252	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
1253	1253	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
1254	1254	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
1255	1255	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
1256	1256	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
1257	1257	SHIP CONSTRUCTION	South Dublin	St. Catherines, Knockmore Avenue, Killinarden, Tallaght	13	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1258	1258	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1259	1259	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght (Phase 2)	9	*N/A	""	""	""	""	""	Q1-2019
1260	1260	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	""	Q4-2018
1261	1261	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	Q3-2018	""
1262	1262	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 1)	47	*N/A	""	""	""	""	""	Q2-2018
1263	1263	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 2)	22	*N/A	""	""	""	""	""	Q3-2018
1264	1264	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Sheehy Skeffington)	21	*N/A	""	""	""	""	""	Q4-2018
1265	1265	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale, Clondalkin, Dublin 22	44	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1266	1266	SHIP CONSTRUCTION RAPID	South Dublin	Riverside Cottages, Templeogue	13	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1267	1267	SHIP CONSTRUCTION TURNKEY	South Dublin	Ardsolus, Kingswood, Dublin 24	2	*N/A	""	""	""	""	""	Q4-2018
1268	1268	SHIP CONSTRUCTION TURNKEY	South Dublin	White Pines, Stocking Avenue, Rathfarnham, Dublin 16	26	*N/A	""	""	""	""	""	Q4-2018
1269	1269	CALF Turnkey	South Dublin	2 properties Tullyhall, Lucan, County Dublin (Phase 1)*	2	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1270	1270	CALF Turnkey	South Dublin	6 units Elder Heath, Kiltipper Road, Tallaght, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	Q1-2018	""
1271	1271	CALF Turnkey	South Dublin	6 units Elder Heath, Kiltipper Road, Tallaght, Dublin 24 (Phase 2)*	2	Cluid Housing	""	""	""	""	Q1-2018	""
1272	1272	CALF Turnkey	South Dublin	Ardsolus, Old Naas Road, Dublin 22 (Phase 1)	10	Respond	""	""	""	""	Q4-2018	""
1273	1273	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1274	1274	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 2)	4	Tath Housing Association Ltd	""	""	""	""	""	Q1-2019
1275	1275	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q3-2017
1276	1276	CALF Turnkey	South Dublin	De Selby Lawns, Tallaght, Dublin 24 (Phase 1)	9	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1277	1277	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q1-2018
1278	1278	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q1-2018
1279	1279	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
1280	1280	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing	""	""	""	""	""	Q1-2018
1281	1281	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing	""	""	""	""	""	Q2-2018
1282	1282	CALF Construction	South Dublin	Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)	40	Cluid Housing	""	""	""	Q1-2019	""	""
1283	1283	CALF Turnkey	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)*	94	Respond	""	""	""	""	Q4-2018	""
1284	1284	CALF Turnkey	South Dublin	Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*	24	Respond	""	""	""	""	Q4-2018	""
1285	1285	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q2-2018
1286	1286	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q4-2018
1287	1287	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q1-2017
1288	1288	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2017
1289	1289	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
1290	1290	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q3-2017
1291	1291	CALF Turnkey	South Dublin	Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	""	Q2-2019	""
1292	1292	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	""	Q3-2018
1293	1293	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1294	1294	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
1295	1295	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1296	1296	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
1297	1297	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q2-2019
1298	1298	CALF Construction	South Dublin	St. Catherines, Killinarden, Tallaght, Dublin 24 (Phase 1)	2	Sophia Housing Association Ltd	""	""	""	Q2-2019	""	""
1299	1299	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	Q2-2018	""
1300	1300	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
1301	1301	CALF Turnkey	South Dublin	Stone Masons Court, Fortunestown Lane, Citywest Dublin (Phase 1)*	12	Cluid Housing	""	""	""	""	""	Q2-2019
1302	1302	CALF Turnkey	South Dublin	Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1303	1303	CALF Turnkey	South Dublin	The Mews, Citywest Village, Citywest, Dublin 24 (Phase 1)*	22	Fold Housing Association Ireland Ltd	""	""	""	Q2-2019	""	""
1304	1304	CALF Turnkey	South Dublin	The Rise, Citywest Village, Citywest, Dublin 24 (Phase 1)*	13	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2018	""
1305	1305	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 1)*	2	Tath Housing Association Ltd	""	""	""	""	""	Q3-2017
1306	1306	CALF Turnkey	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 2)*	2	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1307	1307	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing	""	""	""	""	""	Q4-2018
1308	1308	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Cluid Housing	""	""	""	""	""	Q2-2019
1309	1309	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing	""	""	""	""	Q2-2018	""
1310	1310	CALF Construction	South Dublin	Whitestown Way, Tallaght, Dublin 24 (Phase 1)	81	Cluid Housing	""	""	""	Q1-2019	""	""
1311	1311	CALF Turnkey	South Dublin	Wilkins Court, Limekiln Lane, Dublin 12 (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
1312	1312	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1313	1313	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	""	Q1-2019	""
1314	1314	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1315	1315	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1316	1316	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved Q3-2015, outline design and costs being prepared.	""	""	""	""	""
1317	1317	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1318	1318	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1319	1319	CAS CONSTRUCTION TURNKEY	Tipperary	Monastery Close, Templemore Road, Thurles	15	Thurles Lions Trust Housing Assoc.	""	""	""	""	""	Q2-2019
1320	1320	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1321	1321	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	""	Stage 3 approved Q2-2019, the scheme is now approved to proceed to tender.	""	""	""
1322	1322	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	28	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1323	1323	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	11	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1324	1324	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
1325	1325	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1326	1326	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1327	1327	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1328	1328	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1329	1329	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1330	1330	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1331	1331	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	""	Q4-2018	""
1332	1332	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	""	Q4-2018
1333	1333	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	""	""	Q1-2019	""
1334	1334	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
1335	1335	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1336	1336	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
1337	1337	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
1338	1338	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
1339	1339	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	12	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1340	1340	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
1341	1341	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2018
1342	1342	SHIP CONSTRUCTION	Tipperary	Bansha	14	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1343	1343	SHIP CONSTRUCTION	Tipperary	Twomileborris, Thurles	22	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1344	1344	SHIP CONSTRUCTION	Tipperary	Donohill, 	4	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1345	1345	SHIP CONSTRUCTION	Tipperary	Mullinahone	10	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1346	1346	SHIP CONSTRUCTION	Tipperary	Clerihan	14	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1347	1347	SHIP CONSTRUCTION	Tipperary	Ard Alainn, Moyne	9	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1348	1348	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport, Tipperary	3	*N/A	""	""	""	""	""	Q4-2018
1349	1349	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 1)	6	*N/A	""	""	""	""	""	Q2-2019
1350	1350	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	""	Q4-2018	""
1351	1351	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 1)	9	*N/A	""	""	""	""	""	Q4-2018
1352	1352	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 1)	4	*N/A	""	""	""	""	""	Q4-2018
1353	1353	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1354	1354	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 2)	10	*N/A	""	""	""	""	Q4-2018	""
1355	1355	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	41	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1356	1356	SHIP CONSTRUCTION TURNKEY	Tipperary	Ma Charoin, Manna South, Templemore	13	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1357	1357	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 2)	5	*N/A	""	""	""	""	Q4-2018	""
1358	1358	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 3)	10	*N/A	""	""	""	""	Q4-2018	""
1359	1359	CALF Turnkey	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 1)	43	Respond	""	""	""	""	Q2-2018	""
1360	1360	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2017
1361	1361	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
1362	1362	CALF Turnkey	Tipperary	Mill Street, Carrick on Suir, Co. Tipperary (Phase 1)	22	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1363	1363	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
1364	1364	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
1365	1365	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1366	1366	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1367	1367	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
1368	1368	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	4	Anvers Housing Association Ltd	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1369	1369	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1370	1370	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	""	Q4-2018
1371	1371	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City	5	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1372	1372	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	""	Q2-2019	""
1373	1373	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
1374	1374	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	""	Q2-2019
1375	1375	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1376	1376	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
1377	1377	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	Stage 1 approved Q1-2014, outline design and costs being prepared.	""	""	""	""	""
1378	1378	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
1379	1379	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	17	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1380	1380	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1381	1381	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1382	1382	SHIP CONSTRUCTION	Waterford	Rough Sleeper Emerg Accom, Bath St, Waterford City	4	*N/A	""	""	""	""	Q1-2019	""
1383	1383	SHIP CONSTRUCTION	Waterford	Graigueshoneen, Kilthomas, Co Waterford	16	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1384	1384	SHIP CONSTRUCTION	Waterford	Mount Esker, Ballytruckle Road, Waterford City	13	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1385	1385	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	49	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1386	1386	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	20	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1387	1387	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan -  Phase 1	8	*N/A	""	""	""	""	""	Q3-2018
1388	1388	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
1389	1389	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	""	Q4-2018
1390	1390	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
1391	1391	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	""	Q4-2018
1392	1392	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan - Phase 2	10	*N/A	""	""	""	""	""	Q4-2018
1393	1393	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan - Phase 3	21	*N/A	""	""	""	""	""	Q4-2018
1394	1394	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 1	20	*N/A	""	""	""	""	Q4-2018	""
1395	1395	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 2	14	*N/A	""	""	""	""	Q4-2018	""
1396	1396	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 3	10	*N/A	""	""	""	""	Q4-2018	""
1397	1397	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 4	11	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1398	1398	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1399	1399	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1400	1400	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1401	1401	CALF Turnkey	Waterford	Kilbarry, Waterford (Phase 1)	69	Respond	""	""	""	""	Q4-2018	""
1402	1402	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
1403	1403	CALF Turnkey	Waterford	The Walk, Fairfield Park, Kilcohan, Waterford (Phase 1)	40	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2018	""
1404	1404	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	58	*N/A	""	""	Q1-2018	""	""	""
1405	1405	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Tath Housing Association Ltd	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
1406	1406	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
1407	1407	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	""	Q4-2018
1408	1408	SHIP CONSTRUCTION	Westmeath	16 Ennell Court	1	*N/A	""	""	""	""	""	Q1-2018
1409	1409	SHIP CONSTRUCTION	Westmeath	Arcadia Site A, Athlone - Phase 1	19	*N/A	""	""	""	""	Q2-2018	""
1410	1410	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
1411	1411	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
1412	1412	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	31	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1413	1413	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1414	1414	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar - Phase 1	2	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1415	1415	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone Phase 2	21	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1416	1416	SHIP CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	22	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1417	1417	SHIP CONSTRUCTION	Westmeath	Arcadia Site A, Athlone - Phase 2	14	*N/A	""	""	""	""	Q2-2018	""
1418	1418	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar - Phase 2	2	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1419	1419	SHIP CONSTRUCTION RAPID	Westmeath	O'Growney Green, Mullingar	14	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1420	1420	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
1421	1421	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	""	Q2-2019
1422	1422	SHIP CONSTRUCTION TURNKEY	Westmeath	Abbeybrook, Kilbeggan	7	*N/A	""	""	""	""	""	Q1-2019
1423	1423	SHIP CONSTRUCTION TURNKEY	Westmeath	Lakepoint, Mullingar	31	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1424	1424	CALF Turnkey	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)	14	Oaklee Housing	""	""	""	Q3-2018	""	""
1425	1425	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Co. Westmeath (Phase 1)	8	Tath Housing Association Ltd	""	""	""	""	Q2-2019	""
1426	1426	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	Tath Housing Association Ltd	""	""	""	""	""	Q2-2017
1427	1427	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1428	1428	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1429	1429	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
1430	1430	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown, Co Wexford	13	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1431	1431	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	""	Q4-2018	""
1432	1432	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	""	""	""	Q2-2019	""
1433	1433	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	""	Q3-2018	""
1434	1434	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	""	Q1-2019
1435	1435	SHIP CONSTRUCTION	Wexford	Danescastle	10	*N/A	""	""	""	""	""	Q1-2019
1436	1436	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	Q2-2018	""
1437	1437	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford (Phase 1)	20	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1438	1438	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
1439	1439	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	40	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1440	1440	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	""	Q2-2018
1441	1441	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
1442	1442	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
1443	1443	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 1)	5	*N/A	""	""	""	""	""	Q4-2018
1444	1444	SHIP CONSTRUCTION	Wexford	Baile an Tr, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
1445	1445	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
1446	1446	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
1447	1447	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
1448	1448	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	7	*N/A	""	""	""	""	Q2-2019	""
1449	1449	SHIP CONSTRUCTION	Wexford	Ballywish, Castlebridge	11	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1450	1450	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford	36	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1451	1451	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy, Co Wexford	17	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1452	1452	SHIP CONSTRUCTION	Wexford	Creagh (East), Gorey	4	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1453	1453	SHIP CONSTRUCTION	Wexford	Rosbercon, New Ross	28	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1454	1454	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 2)	4	*N/A	""	""	""	""	""	Q4-2018
1455	1455	SHIP CONSTRUCTION	Wexford	Wexford Street, Gorey, Co. Wexford	20	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1456	1456	SHIP CONSTRUCTION	Wexford	Rosemary Heights, Ferns,Co. Wicklow	7	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1457	1457	SHIP CONSTRUCTION	Wexford	Bullawn, Irishtown, New Ross	2	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1458	1458	SHIP CONSTRUCTION	Wexford	Ballyhine, Barntown, Co. Wexford	6	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1459	1459	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford (Phase 2)	24	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1460	1460	SHIP CONSTRUCTION	Wexford	Creagh (West), Gorey	8	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1461	1461	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
1462	1462	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1a)	8	*N/A	""	""	""	""	""	Q1-2018
1463	1463	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford - Phase 1	11	*N/A	""	""	""	""	""	Q4-2018
1464	1464	SHIP CONSTRUCTION TURNKEY	Wexford	Castlebridge, Co Wexford	3	*N/A	""	""	""	""	""	Q3-2018
1465	1465	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2a)	2	*N/A	""	""	""	""	""	Q2-2019
1466	1466	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford - Phase 2	10	*N/A	""	""	""	""	""	Q1-2019
1467	1467	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1b)	10	*N/A	""	""	""	""	""	Q4-2018
1468	1468	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 1	5	*N/A	""	""	""	""	""	Q4-2018
1469	1469	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 2	2	*N/A	""	""	""	""	""	Q1-2019
1470	1470	SHIP CONSTRUCTION TURNKEY	Wexford	Whitewater Estuary, Ballyhack, Co. Wexford	3	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1471	1471	SHIP CONSTRUCTION TURNKEY	Wexford	Riverchapel Lane, Gorey	4	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
1472	1472	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford-Phase 3	4	*N/A	""	""	""	""	""	Q2-2019
1473	1473	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 3	3	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1474	1474	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford Phase 4	10	*N/A	""	""	""	""	Q1-2018	""
1475	1475	SHIP CONSTRUCTION TURNKEY	Wexford	Airhill, Belvedere Rd, Wexford - Phase 1	3	*N/A	""	""	""	""	Q2-2019	""
1476	1476	SHIP CONSTRUCTION TURNKEY	Wexford	St. Martin's Road, Rosslare Harbour	4	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1477	1477	SHIP CONSTRUCTION TURNKEY	Wexford	Clonattin Upper, Gorey, Co. Wexford	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1478	1478	SHIP CONSTRUCTION TURNKEY	Wexford	Airhill, Belvedere Rd, Wexford - Phase 2	4	*N/A	""	""	""	""	Q2-2019	""
1479	1479	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2b)	3	*N/A	""	""	""	""	Q1-2018	""
1480	1480	CALF Turnkey	Wexford	 Ard Uisce, Wexford Town (Phase 1)	5	Tath Housing Association Ltd	""	""	""	""	""	Q4-2017
1481	1481	CALF Turnkey	Wexford	 Ard Uisce, Whiterock, Wexford  (Phase 1)	1	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1482	1482	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2018
1483	1483	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	Tath Housing Association Ltd	""	""	""	""	""	Q1-2017
1484	1484	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
1485	1485	CALF Turnkey	Wexford	Clonard, Wexford (Phase 1)*	10	Co-operative Housing Ireland	""	""	""	""	Q4-2018	""
1486	1486	CALF Turnkey	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 1)*	34	Oaklee Housing	""	""	""	""	""	Q4-2018
1487	1487	CALF Turnkey	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 2)	6	Oaklee Housing	""	""	""	""	""	Q2-2019
1488	1488	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey (Phase 1)	18	Tath Housing Association Ltd	""	""	""	""	Q4-2018	""
1489	1489	CALF Turnkey	Wexford	Greenville, Enniscorthy, Co. Wexford (Phase 1)*	6	Oaklee Housing	""	""	""	""	""	Q2-2019
1490	1490	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q2-2016
1491	1491	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	9	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1492	1492	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
1493	1493	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
1494	1494	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1495	1495	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)*	14	Co-operative Housing Ireland	""	""	""	""	""	Q2-2019
1496	1496	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)*	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1497	1497	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)*	19	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1498	1498	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 2)*	22	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1499	1499	CALF Turnkey	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*	18	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1500	1500	CALF Turnkey	Wexford	Pirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*	52	Cluid Housing	""	""	""	Q2-2019	""	""
1501	1501	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 1)	8	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1502	1502	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 2)	11	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1503	1503	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 3)	11	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1504	1504	CALF Turnkey	Wexford	Ramstown, Gorey, Co. Wexford (Phase 4)	26	Tath Housing Association Ltd	""	""	""	Q1-2019	""	""
1505	1505	CALF Turnkey	Wexford	Roxborough, Mulgannon, Wexford (Phase 1)	12	Tath Housing Association Ltd	""	""	""	Q2-2019	""	""
1506	1506	CALF Turnkey	Wexford	Roxborough, Mulgannon, Wexford (Phase 2)	9	Tath Housing Association Ltd	""	""	""	Q2-2019	""	""
1507	1507	CALF Turnkey	Wexford	Roxborough, Mulgannon, Wexford (Phase 3)	18	Tath Housing Association Ltd	""	""	""	Q2-2019	""	""
1508	1508	CALF Turnkey	Wexford	Roxborough, Mulgannon, Wexford (Phase 4)*	10	Tath Housing Association Ltd	""	""	""	Q2-2019	""	""
1509	1509	CALF Turnkey	Wexford	Roxborough, Mulgannon, Wexford (Phase 5)	22	Tath Housing Association Ltd	""	""	""	Q2-2019	""	""
1510	1510	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 3)	21	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1511	1511	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	""	""	Q4-2018	""
1512	1512	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 1)	17	*N/A	""	""	""	""	Q4-2017	""
1513	1513	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 2)	26	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1514	1514	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	""	""	Q3-2018	""
1515	1515	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1516	1516	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	""	Q4-2018
1517	1517	SHIP CONSTRUCTION	Wicklow	St Mary's Rd., Arklow (Old Library Site)	7	*N/A	""	""	""	""	""	Q4-2018
1518	1518	SHIP CONSTRUCTION	Wicklow	Jameson Heights,  Kilmacanogue	20	*N/A	""	""	""	""	Q2-2019	""
1519	1519	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	""	Q4-2018
1520	1520	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	""	""	Q1-2019	""
1521	1521	SHIP CONSTRUCTION	Wicklow	Oak Drive, Blessington	1	*N/A	""	""	""	""	Q4-2018	""
1522	1522	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	30	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1523	1523	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	""	""	""	Q1-2019	""
1524	1524	SHIP CONSTRUCTION RAPID	Wicklow	Whitehall, Baltinglass	34	*N/A	""	""	""	""	Q1-2019	""
1525	1525	SHIP CONSTRUCTION RAPID	Wicklow	Merrymeeting View, Rathnew	46	*N/A	""	""	""	""	Q2-2019	""
1526	1526	SHIP CONSTRUCTION RAPID	Wicklow	Coolattin Oaks (Ph4), Carnew	30	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1527	1527	SHIP CONSTRUCTION RAPID	Wicklow	Shillelagh Phase 4	22	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1528	1528	SHIP CONSTRUCTION RAPID	Wicklow	Ashtown Lane, Wicklow Town	40	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1529	1529	SHIP CONSTRUCTION RAPID	Wicklow	Ard na Greine, West Ward, Bray	31	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1530	1530	SHIP CONSTRUCTION RAPID	Wicklow	Avondale Heights, Rathdrum (Phase 2)	20	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1531	1531	SHIP CONSTRUCTION RAPID	Wicklow	Sheehan Court, Back Street, Arklow	7	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1532	1532	SHIP CONSTRUCTION RAPID	Wicklow	Mountainview, NTMK	28	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
1533	1533	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	2	*N/A	""	""	""	""	""	Q2-2018
1534	1534	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 7 Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q4-2018
1535	1535	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	10	*N/A	""	""	""	""	""	Q2-2019
1536	1536	SHIP CONSTRUCTION TURNKEY	Wicklow	Fernhill, Arklow	1	*N/A	""	""	""	""	""	Q3-2018
1537	1537	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q1-2019
1538	1538	SHIP CONSTRUCTION TURNKEY	Wicklow	Merrymeeting, Rathnew	2	*N/A	""	""	""	Stage 4 approved Q4-2018, the scheme is fully approved.	""	""
1539	1539	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	30	*N/A	""	""	""	""	Q2-2018	""
1540	1540	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q2-2019
1541	1541	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	24	*N/A	""	""	""	""	Q3-2018	""
1542	1542	SHIP CONSTRUCTION TURNKEY	Wicklow	Kirvin Hill, Rathnew	2	*N/A	""	""	""	""	""	Q2-2019
1543	1543	SHIP CONSTRUCTION TURNKEY	Wicklow	Rossmore, NTMK	1	*N/A	""	""	""	""	""	Q2-2019
1544	1544	CALF Turnkey	Wicklow	Abbey St, Wicklow  (Phase 1)	6	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1545	1545	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 1)*	5	Cluid Housing	""	""	""	""	Q1-2018	""
1546	1546	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 2)*	4	Cluid Housing	""	""	""	""	Q1-2018	""
1547	1547	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 3)	8	Cluid Housing	""	""	""	""	Q1-2018	""
1548	1548	CALF Turnkey	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 4)	4	Cluid Housing	""	""	""	""	Q1-2018	""
1549	1549	CALF Turnkey	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	Tath Housing Association Ltd	""	""	""	""	""	Q2-2018
1550	1550	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)*	8	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1551	1551	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)*	7	Tath Housing Association Ltd	""	""	""	""	""	Q2-2019
1552	1552	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 3)*	4	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
1553	1553	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 1)*	15	Co-operative Housing Ireland	""	""	""	""	""	Q4-2018
1554	1554	CALF Turnkey	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 2)	73	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
1555	1555	CALF Turnkey	Wicklow	Ternlee, Cooldross Lane, Kilcoole, Co. Wicklow (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2019
1556	1556	CALF Turnkey	Wicklow	Ternlee, Cooldross Lane, Kilcoole, Co. Wicklow (Phase 2)*	2	Cluid Housing	""	""	""	""	Q4-2017	""
1557	1557	CALF Turnkey	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)*	7	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1558	1558	CALF Turnkey	Wicklow	Woodpark, Rathdrum, Co. Wicklow (Phase 1)*	4	Tath Housing Association Ltd	""	""	""	""	Q4-2017	""
1559	1559	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Wicklow	Convent Lands	51	*N/A	""	""	""	""	Q1-2019	""