﻿_id	No.	Funding Programme	LA	Scheme/Project Name	No. of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	On Site	Completed
1	1	CALF Turnkey	Carlow	115-128 Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	Túath Housing Association Ltd	""	""	""	""	Q2-2017	""
2	2	CALF Turnkey	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
3	3	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
4	4	CALF Turnkey	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	44	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
5	5	CALF Turnkey	Carlow	Laragh Beg, Ballon, Co. Carlow (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Q3-2018	""	""
6	6	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 1)*	7	Co-operative Housing Ireland	""	""	""	Q1-2018	""	""
7	7	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 2)	20	Co-operative Housing Ireland	""	""	""	Q1-2018	""	""
8	8	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 3)	11	Co-operative Housing Ireland	""	""	""	Q1-2018	""	""
9	9	CALF Turnkey	Carlow	River Court,  Carlow  (Phase 4)	9	Co-operative Housing Ireland	""	""	""	Q1-2018	""	""
10	10	CALF Turnkey	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing 	""	""	""	""	Q1-2018	""
11	11	SHIP CONSTRUCTION TURNKEY	Carlow	The Laurels, Tullow Road, Carlow - Phase 1	18	*N/A	""	""	""	""	Q4-2017	""
12	12	SHIP CONSTRUCTION TURNKEY	Carlow	The Laurels, Tullow Road, Carlow - Phase 2	22	*N/A	""	""	""	""	Q4-2017	""
13	13	SHIP CONSTRUCTION TURNKEY	Carlow	The Laurels, Tullow Road, Carlow - Phase 3	23	*N/A	""	""	""	""	Q4-2017	""
14	14	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
15	15	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	Q1-2018	""
16	16	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
17	17	SHIP CONSTRUCTION	Carlow	Bagenalstown	42	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
18	18	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
19	19	SHIP CONSTRUCTION	Carlow	Hacketstown	4	*N/A	""	""	""	""	Q1-2018	""
20	20	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
21	21	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
22	22	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
23	23	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
24	24	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
25	25	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
26	26	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
27	27	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
28	28	CAS CONSTRUCTION	Carlow	Mill Race Court, Carlow Town	14	Cluid Housing Association	Stage 1 approved Q3-2015, outline design and costs are being prepared.	""	""	""	""	""
29	29	CAS CONSTRUCTION	Carlow	Royal Oak Road, Bagenalstown	6	Respond	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
30	30	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
31	31	CALF Turnkey	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing 	""	""	""	""	""	Q4-2016
32	32	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
33	33	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
34	34	CALF Turnkey	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	Túath Housing Association Ltd	""	""	""	""	Q1-2017	""
35	35	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	Q1-2018	""
36	36	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2018
37	37	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	Q4-2017	""
38	38	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
39	39	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
40	40	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
41	41	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
42	42	SHIP CONSTRUCTION	Cavan	Holborn Hill, Belturbet	6	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
43	43	SHIP CONSTRUCTION	Cavan	Elm Grove	13	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
44	44	CALF Construction	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co-operative Housing Ireland	""	""	""	Q1-2017	""	""
45	45	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing 	""	""	""	""	""	Q2-2018
46	46	CALF Turnkey	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	19	Cluid Housing 	""	""	""	""	Q1-2018	""
47	47	CALF Turnkey	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
48	48	CALF Turnkey	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
49	49	CALF Turnkey	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	47	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
50	50	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	Q4-2017	""
51	51	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
52	52	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
53	53	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
54	54	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
55	55	SHIP CONSTRUCTION	Clare	Tullyglass, Shannon	21	*N/A	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
56	56	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
57	57	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	14	Cuan an Chlair Ltd	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
58	58	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
59	59	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
60	60	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
61	61	CAS CONSTRUCTION	Clare	Monaskeha Heights	2	Newgrove Housing Association Ltd	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
62	62	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	50	*N/A	""	""	Q1-2018	""	""	""
63	63	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty	54	*N/A	""	""	Q1-2018	""	""	""
64	64	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen	50	*N/A	""	""	Q1-2018	""	""	""
65	65	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom	50	*N/A	""	""	Q1-2018	""	""	""
66	66	CALF Construction	Cork City	124 Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
67	67	CALF Construction	Cork City	124 Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	Q1-2017	""
68	68	CALF Construction	Cork City	184 Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	Q3-2018	""	""
69	69	CALF Construction	Cork City	Mile Stream, Shanakiel, Cork City  (Phase 1)	50	Co-operative Housing Ireland	""	""	""	Q4-2017	""	""
70	70	CALF Turnkey	Cork City	11 North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	Q3-2018	""	""
71	71	CALF Turnkey	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	Q3-2018	""	""
72	72	CALF Turnkey	Cork City	Popes Road, Blackpool, Cork City (Phase 1)	7	Cluid Housing 	""	""	""	Q4-2016	""	""
73	73	CALF Turnkey	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)*	80	Respond	""	""	""	Q3-2018	""	""
74	74	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 1)	6	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
75	75	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 2)	9	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
76	76	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 3)	9	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
77	77	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 4)	9	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
78	78	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 5)	9	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
79	79	CALF Turnkey	Cork City	Revised-The Meadows, Knockacullen East, Gurranabraher, Cork  (Phase 6)	10	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
80	80	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	Q4-2017	""
81	81	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
82	82	SHIP CONSTRUCTION TURNKEY	Cork City	Barack Street	32	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
83	83	SHIP CONSTRUCTION TURNKEY	Cork City	FaranFerris	5	*N/A	""	""	""	""	Q2-2018	""
84	84	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	""	Q2-2018	""
85	85	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	""	Q1-2018	""
86	86	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	""	Q3-2018	""
87	87	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
88	88	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road	43	*N/A	""	""	""	""	""	Q3-2018
89	89	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
90	90	SHIP CONSTRUCTION TURNKEY	Cork City	1-5, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
91	91	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
92	92	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street	25	*N/A	""	""	""	""	Q2-2018	""
93	93	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
94	94	SHIP CONSTRUCTION TURNKEY	Cork City	6-10, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	Q2-2018	""
95	95	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	Q2-2018	""
96	96	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
97	97	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
98	98	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinure Road, Cork City	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
99	99	SHIP CONSTRUCTION TURNKEY	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
100	100	SHIP CONSTRUCTION TURNKEY	Cork City	Wycherley Place, Glasheen, Cork	4	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
101	101	SHIP CONSTRUCTION RAPID	Cork City	Errigal Heights, The Glen, Cork City	20	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
102	102	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
103	103	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
104	104	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
105	105	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
106	106	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	Q2-2018	""
107	107	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	65	*N/A	""	""	""	""	Q1-2018	""
108	108	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	41	*N/A	""	""	""	""	Q3-2017	""
109	109	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
110	110	SHIP CONSTRUCTION	Cork City	Bramble Cottages	5	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
111	111	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	2	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
112	112	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
113	113	REGENERATION	Cork City	Phase 2 A Knocknaheeny	47	*N/A	""	""	""	""	Q2-2018	""
114	114	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
115	115	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
116	116	REGENERATION	Cork City	Phase 2C Knocknaheeny	24	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
117	117	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	33	Good Shepherd Services Ltd	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
118	118	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved Q2-2015, outline design and costs are being prepared.	""	""	""	""	""
119	119	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
120	120	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
121	121	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
122	122	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
123	123	CALF Construction	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	Q2-2018	""	""
124	124	CALF Construction	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
125	125	CALF Construction	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing 	""	""	""	Q3-2018	""	""
126	126	CALF Turnkey	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q4-2017
127	127	CALF Turnkey	Cork County	College Manor, Cobh (Phase 1)	10	Túath Housing Association Ltd	""	""	""	""	""	Q4-2016
128	128	CALF Turnkey	Cork County	Lackaduff, Codrum, Macroom, Co Cork  (Phase 1)	5	Túath Housing Association Ltd	""	""	""	Q1-2018	""	""
129	129	CALF Turnkey	Cork County	Lackaduff, Codrum, Macroom, Co. Cork - Phase 2 (Phase 1)	2	Túath Housing Association Ltd	""	""	""	Q1-2018	""	""
130	130	CALF Turnkey	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)	42	Respond	""	""	""	Q3-2018	""	""
131	131	CALF Turnkey	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	Q2-2018	""
132	132	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)*	6	Túath Housing Association Ltd	""	""	""	""	Q4-2016	""
133	133	CALF Turnkey	Cork County	Tanners Field, Bandon, Co Cork  (Phase 2)*	5	Túath Housing Association Ltd	""	""	""	""	Q4-2016	""
134	134	CALF Turnkey	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	Q1-2017	""
135	135	CALF Turnkey	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
136	136	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (1)	18	*N/A	""	""	""	""	""	Q2-2018
137	137	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
138	138	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	Q4-2017	""
139	139	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	25	*N/A	""	""	""	""	Q3-2018	""
140	140	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
141	141	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
142	142	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	""	Q4-2017
143	143	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	52	*N/A	""	""	""	""	Q4-2017	""
144	144	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
145	145	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
146	146	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
147	147	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	6	*N/A	""	""	""	""	Q1-2018	""
148	148	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary?s Road, Dunmanway	20	*N/A	""	""	""	""	Q3-2018	""
149	149	SHIP CONSTRUCTION TURNKEY	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	Q1-2018	""
150	150	SHIP CONSTRUCTION TURNKEY	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
151	151	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	14	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
152	152	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	6	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
153	153	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	Q1-2018	""
154	154	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	Stage 4 approved Q4-2017, the scheme is fully approved.	""	""
155	155	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	2	*N/A	""	""	""	""	Q1-2018	""
156	156	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	2	*N/A	""	""	""	""	""	Q3-2018
157	157	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	Q2-2017	""
158	158	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara,Ard Cashel, watergrasshill	6	*N/A	""	""	""	""	Q1-2018	""
159	159	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 1	12	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
160	160	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	35	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
161	161	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire Co. Cork	4	*N/A	""	""	""	""	Q3-2018	""
162	162	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mont Rivers, Co. Cork.	3	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
163	163	SHIP CONSTRUCTION TURNKEY	Cork County	Claredon Brooks, Carrs Hill, Douglas Phase 2	33	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
164	164	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
165	165	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
166	166	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	19	*N/A	""	""	""	""	Q3-2018	""
167	167	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	6	*N/A	""	""	""	""	Q3-2018	""
168	168	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen, (phase 2)	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
169	169	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton (Phase 1)	8	*N/A	""	""	""	""	Q3-2018	""
170	170	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	Q3-2018	""
171	171	SHIP CONSTRUCTION TURNKEY	Cork County	Milleenacola, Bantry	51	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
172	172	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac, Co. Cork	8	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
173	173	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow, Co. Cork	12	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
174	174	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midelton (Phase 2)	14	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
175	175	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (2)	7	*N/A	""	""	""	""	""	Q3-2018
176	176	SHIP CONSTRUCTION RAPID	Cork County	Abbeywood, Midleton	70	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
177	177	SHIP CONSTRUCTION RAPID	Cork County	Station Road, Blarney	18	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
178	178	SHIP CONSTRUCTION RAPID	Cork County	Bluepool, Kanturk	12	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
179	179	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	15	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
180	180	SHIP CONSTRUCTION	Cork County	Tower View/C£irt na Sil¡n¡, Cloyne, East Cork	9	*N/A	""	""	""	""	Q3-2018	""
181	181	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
182	182	SHIP CONSTRUCTION	Cork County	Castletreasure Grove, Douglas	1	*N/A	Stage 1 approved Q3-2016, outline design and costs are being prepared.	""	""	""	""	""
183	183	SHIP CONSTRUCTION	Cork County	Poulavone, Ballincollig	57	*N/A	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
184	184	SHIP CONSTRUCTION	Cork County	Newtown, Bantry	1	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
185	185	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	Q4-2017	""
186	186	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	Q2-2018	""
187	187	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
188	188	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
189	189	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
190	190	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
191	191	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
192	192	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline phase 1A	10	*N/A	""	""	""	""	Q1-2018	""
193	193	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1/C)	16	*N/A	""	""	""	""	Q1-2018	""
194	194	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1/D)	18	*N/A	""	""	""	""	Q1-2018	""
195	195	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	18	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
196	196	SHIP CONSTRUCTION	Cork County	Madonna House, Ballincollig	20	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
197	197	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	4	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
198	198	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
199	199	SHIP CONSTRUCTION	Cork County	Sleaveen Sleaveen East, Macroom	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
200	200	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline Phase 1B	5	*N/A	""	""	""	""	Q1-2018	""
201	201	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	Stage 1 approved Q3-2016, outline design and costs are being prepared.	""	""	""	""	""
202	202	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	Q1-2018	""
203	203	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	Q1-2018	""
204	204	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
205	205	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
206	206	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
207	207	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
208	208	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	8	Charleville Care Project Ltd	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
209	209	CALF Construction	DLR	Abbeyview, Monkstown, Co. Dublin (Phase 1)	11	Cluid Housing 	""	""	""	Q3-2018	""	""
210	210	CALF Construction	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	105	Túath Housing Association Ltd	""	""	""	Q1-2017	""	""
211	211	CALF Turnkey	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	Túath Housing Association Ltd	""	""	""	""	Q3-2017	""
212	212	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q3-2018
213	213	CALF Turnkey	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Cluid Housing 	""	""	""	""	""	Q3-2018
214	214	CALF Turnkey	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2017	""
215	215	CALF Turnkey	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	Q3-2017	""
216	216	CALF Turnkey	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	Q1-2016	""
217	217	CALF Turnkey	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	Q1-2018	""
218	218	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q4-2017
219	219	CALF Turnkey	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing 	""	""	""	""	Q1-2017	""
220	220	CALF Turnkey	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2017	""
221	221	CALF Turnkey	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q3-2017
222	222	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
223	223	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace., Monkstown, Co. Dublin	14	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
224	224	SHIP CONSTRUCTION RAPID	DLR	Glenamuck/Stillorgan (Rockville Drive)	14	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
225	225	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
226	226	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
227	227	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
228	228	SHIP CONSTRUCTION	DLR	33,35, & 37 Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
229	229	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
230	230	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
231	231	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
232	232	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
233	233	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	Q1-2017	""
234	234	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
235	235	SHIP CONSTRUCTION	DLR	Fitzgerald Park	50	*N/A	""	""	""	""	Q4-2016	""
236	236	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
237	237	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
238	238	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
239	239	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
240	240	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
241	241	SHIP CONSTRUCTION	DLR	41 Ballyogan Ave., Ballyogan, Co. Dublin	2	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
242	242	SHIP CONSTRUCTION	DLR	St. Laurence?s Park, Stillorgan, Co. Dublin	77	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
243	243	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
244	244	CALF Construction	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing 	""	""	""	""	Q3-2017	""
245	245	CALF Construction	Donegal	Raphoe Road, Castlefinn, Co. Donegal (Phase 1)	10	Habinteg Housing Association (Ireland) Ltd	""	""	""	Q2-2018	""	""
246	246	CALF Turnkey	Donegal	1-46 Ardrawer, Kiltoy, Letterkenny, Co. Donegal (Phase 1)	46	Cluid Housing 	""	""	""	Q1-2018	""	""
247	247	CALF Turnkey	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	Q4-2017	""
248	248	CALF Turnkey	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q3-2016
249	249	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
250	250	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 1)	16	*N/A	""	""	""	""	Q2-2018	""
251	251	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	20	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
252	252	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 2)	18	*N/A	""	""	""	""	Q2-2018	""
253	253	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	Stage 2 approved Q1-2017, full design/tender being prepared.	""	""	""	""
254	254	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
255	255	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
256	256	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
257	257	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	Stage 2 approved Q1-2017, full design/tender being prepared.	""	""	""	""
258	258	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
259	259	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	Q3-2017	""
260	260	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
261	261	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
262	262	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	Q1-2017	""
263	263	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
264	264	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
265	265	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
266	266	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
267	267	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	Stage 1 approved Q4-2016, outline design and costs are being prepared.	""	""	""	""	""
268	268	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
269	269	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
270	270	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
271	271	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	20	Habinteg Housing Association (Ireland) Ltd	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
272	272	CALF Construction	Dublin City	1-2 Mountjoy Square North, Dublin 1 (Phase 1)	31	Respond	""	""	""	""	Q2-2018	""
273	273	CALF Construction	Dublin City	84 North King Street, Dublin 7  (Phase 1)	30	Co-operative Housing Ireland	""	""	""	Q4-2017	""	""
274	274	CALF Construction	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
275	275	CALF Construction	Dublin City	 Ballygall Road East phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
276	276	CALF Construction	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	62	Cluid Housing 	""	""	""	Q2-2018	""	""
277	277	CALF Construction	Dublin City	Block A, Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	Q2-2018	""	""
278	278	CALF Construction	Dublin City	"Broome Lodge,
Dunmanus Court, Cabra (Phase 1)"	33	Cluid Housing 	""	""	""	""	""	Q4-2017
279	279	CALF Construction	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Ireland	""	""	""	""	""	Q4-2016
280	280	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
281	281	CALF Construction	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
282	282	CALF Construction	Dublin City	Post Tender - 5-6 Johns Lane West Dublin 8 (Phase 1)	31	Focus Ireland	""	""	""	""	Q2-2017	""
283	283	CALF Construction	Dublin City	"POST TENDER - Poplar Row, Ballybough, Dublin 3
 (Phase 1)"	29	Oaklee Housing 	""	""	""	""	Q3-2018	""
284	284	CALF Construction	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing 	""	""	""	Q3-2018	""	""
285	285	CALF Construction	Dublin City	POST TENDER Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	Q2-2018	""
286	286	CALF Construction	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	Q3-2018	""	""
287	287	CALF Construction	Dublin City	Revised - St Mary?s Mansions, Dublin 1 (Phase 1)	80	Cluid Housing 	""	""	""	""	Q4-2017	""
288	288	CALF Construction	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	Túath Housing Association Ltd	""	""	""	""	Q2-2017	""
289	289	CALF Construction	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
290	290	CALF Turnkey	Dublin City	11 - 13 Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q2-2017
291	291	CALF Turnkey	Dublin City	11 - 13 Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing 	""	""	""	""	""	Q3-2017
292	292	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	Túath Housing Association Ltd	""	""	""	""	""	Q4-2016
293	293	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	Túath Housing Association Ltd	""	""	""	""	""	Q1-2017
294	294	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
295	295	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	Túath Housing Association Ltd	""	""	""	""	""	Q3-2017
296	296	CALF Turnkey	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	Túath Housing Association Ltd	""	""	""	""	Q3 2015	""
297	297	CALF Turnkey	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	Q4-2017	""
298	298	CALF Turnkey	Dublin City	Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	T£ath Housing Association Ltd	""	""	""	""	""	Q2-2018
299	299	CALF Turnkey	Dublin City	Camac Place, Bluebell, Dublin 12  (Phase 1)	5	Oaklee Housing 	""	""	""	Q2-2017	""	""
300	300	CALF Turnkey	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
301	301	CALF Turnkey	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	Q3-2017	""
302	302	CALF Turnkey	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
303	303	CALF Turnkey	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing 	""	""	""	""	""	Q4-2017
304	304	CALF Turnkey	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
305	305	CALF Turnkey	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	97	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2017	""
306	306	CALF Turnkey	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing 	""	""	""	""	""	Q3-2018
307	307	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 1)	18	Túath Housing Association Ltd	""	""	""	""	""	Q2-2016
308	308	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 2)	28	Túath Housing Association Ltd	""	""	""	""	""	Q4-2016
309	309	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 3)	14	Túath Housing Association Ltd	""	""	""	""	""	Q1-2017
310	310	CALF Turnkey	Dublin City	Thornwood, Beaumont (Phase 4)	8	Túath Housing Association Ltd	""	""	""	""	""	Q1-2017
311	311	CALF Turnkey	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	Q4-2017	""
312	312	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospecthill	58	*N/A	""	""	""	""	""	Q4-2017
313	313	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
314	314	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
315	315	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
316	316	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
317	317	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
318	318	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard Site Ph1	53	*N/A	""	""	""	""	Q4-2017	""
319	319	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
320	320	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Rathvilly Drive site	13	*N/A	""	""	""	""	""	Q3-2018
321	321	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Woodbank Drive site	3	*N/A	""	""	""	""	""	Q3-2018
322	322	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas - Cherry Orchard site Ph 2	19	*N/A	""	""	""	""	Q3-2018	""
323	323	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
324	324	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2015, full design/tender being prepared.	""	""	""	""
325	325	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	70	*N/A	Stage 1 approved Q2-2015, outline design and costs are being prepared.	""	""	""	""	""
326	326	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
327	327	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	Stage 1 approved Q2-2015, outline design and costs are being prepared.	""	""	""	""	""
328	328	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q2-2018	""
329	329	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	7	*N/A	""	""	""	""	Q1-2017	""
330	330	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
331	331	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 1	9	*N/A	""	""	""	""	""	Q1-2017
332	332	SHIP CONSTRUCTION	Dublin City	Priory Hall Phase 2	26	*N/A	""	""	""	""	Q2-2017	""
333	333	REGENERATION	Dublin City	St. Teresa's Gardens	54	*N/A	Stage 1 approved Q3-2013, outline design and costs are being prepared.	""	""	""	""	""
334	334	REGENERATION	Dublin City	Dolphin House, Dublin 8 (Phase 1)	100	*N/A	""	""	""	""	""	Q3-2018
335	335	REGENERATION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
336	336	REGENERATION	Dublin City	Sackville Avenue Cottages	12	*N/A	Stage 1 approved Q2-2016, outline design and costs are being prepared.	""	""	""	""	""
337	337	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	""	""	""	""	Q3-2018	""
338	338	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
339	339	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
340	340	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
341	341	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
342	342	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
343	343	CAS CONSTRUCTION	Dublin City	38/39 Bolton Street, Dublin 1	8	Arlington Novas Ireland Ltd	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
344	344	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
345	345	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	Túath Housing Association Ltd	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
346	346	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	Q4-2017	""
347	347	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	Q3-2018	""
348	348	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	18	Peter McVerry Trust Ltd	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
349	349	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved Q1-2017, outline design and costs are being prepared.	""	""	""	""	""
350	350	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
351	351	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
352	352	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
353	353	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	18	Simon Community : Dublin Simon	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
354	354	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
355	355	CAS CONSTRUCTION	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
356	356	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
357	357	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	Q3-2018	""	""
358	358	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	Q3-2018	""	""
359	359	CALF Construction	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing 	""	""	""	Q3-2018	""	""
360	360	CALF Turnkey	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	24	Túath Housing Association Ltd	""	""	""	""	Q2-2017	""
361	361	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	Túath Housing Association Ltd	""	""	""	""	""	Q2-2016
362	362	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	Túath Housing Association Ltd	""	""	""	""	""	Q3-2016
363	363	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	Túath Housing Association Ltd	""	""	""	""	""	Q4-2016
364	364	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	Túath Housing Association Ltd	""	""	""	""	""	Q1-2017
365	365	CALF Turnkey	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
366	366	CALF Turnkey	Fingal	Hampton Gardens, Balbriggan, Co. Dublin (Phase 1)*	4	Respond	""	""	""	""	Q2-2016	""
367	367	CALF Turnkey	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing 	""	""	""	""	Q1-2018	""
368	368	CALF Turnkey	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
369	369	CALF Turnkey	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	28	The Iveagh Trust	""	""	""	""	Q3-2018	""
370	370	CALF Turnkey	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	Q3-2018	""
371	371	CALF Turnkey	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)*	28	Respond	""	""	""	Q3-2018	""	""
372	372	CALF Turnkey	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	T£ath Housing Association Ltd	""	""	""	""	Q2-2018	""
373	373	CALF Turnkey	Fingal	St Marnock?s Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Cluid Housing 	""	""	""	""	""	Q4-2017
374	374	CALF Turnkey	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	Túath Housing Association Ltd	""	""	""	""	""	Q4-2017
375	375	CALF Turnkey	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing 	""	""	""	""	Q1-2018	""
376	376	CALF Turnkey	Fingal	The Gallery, Donabate (Phase 1)	43	Oaklee Housing 	""	""	""	""	Q2-2017	""
377	377	CALF Turnkey	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Cluid Housing 	""	""	""	""	""	Q4-2017
378	378	CALF Turnkey	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
379	379	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
380	380	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
381	381	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 1), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
382	382	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 2), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
383	383	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
384	384	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	Q3-2018	""
385	385	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
386	386	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
387	387	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
388	388	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	Stage 4 approved Q2 2018, the scheme is fully approved.	""	""
389	389	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
390	390	SHIP CONSTRUCTION	Fingal	Rowlestown	20	*N/A	""	""	""	""	Q2-2018	""
391	391	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.3)	5	*N/A	""	""	""	""	""	Q2-2018
392	392	SHIP CONSTRUCTION	Fingal	Castlelands Part View (Phase 3)	24	*N/A	""	""	""	""	Q1-2017	""
393	393	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
394	394	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 1)	2	*N/A	""	""	""	""	""	Q3-2017
395	395	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
396	396	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
397	397	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
398	398	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.1)	25	*N/A	""	""	""	""	""	Q4-2017
399	399	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 2)	6	*N/A	""	""	""	""	Q4-2016	""
400	400	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.2) 	15	*N/A	""	""	""	""	""	Q1-2018
401	401	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	Stage 3 approved Q3 2018, the scheme is now approved to proceed to tender.	""	""	""
402	402	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.4)	4	*N/A	""	""	""	""	""	Q3-2018
403	403	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.5)	25	*N/A	""	""	""	""	Q4-2016	""
404	404	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Túath Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs are being prepared.	""	""	""	""	""
405	405	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 1)	6	Peter McVerry Trust Ltd	""	""	""	""	Q1-2018	""
406	406	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
407	407	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
408	408	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
409	409	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas (Phase 2)	2	Peter McVerry Trust Ltd	""	""	""	""	Q3-2018	""
410	410	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke	74	*N/A	""	""	Q1-2018	""	""	""
411	411	CALF Turnkey	Galway City	77, 80 and 81 Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
412	412	CALF Turnkey	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
413	413	CALF Turnkey	Galway City	Block E, Sraith Fhada, Doughiska, Galway City (Phase 1)	14	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
414	414	CALF Turnkey	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing 	""	""	""	""	""	Q4-2016
415	415	CALF Turnkey	Galway City	Castlegar Road, Galway (Phase 1)	81	Respond	""	""	""	""	Q2-2018	""
416	416	CALF Turnkey	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Cluid Housing 	""	""	""	""	""	Q3-2017
417	417	CALF Turnkey	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
418	418	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	Túath Housing Association Ltd	""	""	""	""	""	Q1-2017
419	419	CALF Turnkey	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	Túath Housing Association Ltd	""	""	""	""	""	Q4-2017
420	420	CALF Turnkey	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)*	12	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
421	421	CALF Turnkey	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)*	12	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
422	422	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 1)	8	Cluid Housing 	""	""	""	""	Q1-2018	""
423	423	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 2)	8	Cluid Housing 	""	""	""	""	Q1-2018	""
424	424	CALF Turnkey	Galway City	Revised Murrough, Renmore, Galway  (Phase 3)*	4	Cluid Housing 	""	""	""	""	Q1-2018	""
425	425	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine, (Glasshouse Site) Monivea Road, Galway City	52	*N/A	""	""	""	""	Q3-2018	""
426	426	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	78	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
427	427	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
428	428	SHIP CONSTRUCTION	Galway City	Ballinfoile Park, Headford Road (Infill Units)	9	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
429	429	SHIP CONSTRUCTION	Galway City	Corrib Park (Infill Units)	3	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
430	430	SHIP CONSTRUCTION	Galway City	Castlepark, Ballybane (Infill Units)	4	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
431	431	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway.	7	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
432	432	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway	59	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
433	433	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	69	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
434	434	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
435	435	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	Stage 1 approved Q3-2015, outline design and costs are being prepared.	""	""	""	""	""
436	436	CAS CONSTRUCTION	Galway City	47 Forster Street	9	Cope Galway	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
437	437	CALF Construction	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing 	""	""	""	""	""	Q3-2017
438	438	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	""	Q2-2018
439	439	CALF Turnkey	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 2)	3	Co-operative Housing Ireland	""	""	""	""	Q1-2017	""
440	440	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
441	441	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
442	442	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
443	443	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	Q2-2018	""
444	444	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	Q2-2018	""
445	445	SHIP CONSTRUCTION	Galway County	Weir Road, Tuam	30	*N/A	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
446	446	SHIP CONSTRUCTION	Galway County	Culleen, Carraroe, Connemara	6	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
447	447	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
448	448	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
449	449	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
450	450	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	Q2-2018	""
451	451	SHIP CONSTRUCTION	Galway County	Cill Ciar n (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
452	452	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
453	453	SHIP CONSTRUCTION	Galway County	Roundstone	10	*N/A	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
454	454	SHIP CONSTRUCTION	Galway County	Sruchain an Chlair, Oughterard	10	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
455	455	SHIP CONSTRUCTION	Galway County	St. Joseph's, Clifden	23	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
456	456	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	16	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
457	457	SHIP CONSTRUCTION	Galway County	Caisle n Raithl¡n, Ardrahan	10	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
458	458	SHIP CONSTRUCTION	Galway County	Old Area Engineer's Office, Barrack Street, Loughrea	5	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
459	459	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	61	*N/A	""	""	""	""	Q4-2017	""
460	460	SHIP CONSTRUCTION	Galway County	Cartron, Kinvarra	10	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
461	461	SHIP CONSTRUCTION	Galway County	Gort U¡ Lochlainn, Moycullen	30	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
462	462	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
463	463	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mh¡l, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs are being prepared.	""	""	""	""	""
464	464	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	Q2-2018	""
465	465	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
466	466	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	Stage 1 approved Q3-2015, outline design and costs are being prepared.	""	""	""	""	""
467	467	CAS CONSTRUCTION	Galway County	Springfield, Parkmore	4	Peter Triest Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs are being prepared.	""	""	""	""	""
468	468	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
469	469	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	17	Cluid Housing Association	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
470	470	CAS CONSTRUCTION	Galway County	Caheroyn, Athenry	1	Peter Triest Housing Association Ltd	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
471	471	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	5	Peter Triest Housing Association Ltd	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
472	472	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
473	473	CALF Turnkey	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing 	""	""	""	""	""	Q2-2016
474	474	CALF Turnkey	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)	61	Cluid Housing 	""	""	""	Q1-2018	""	""
475	475	CALF Turnkey	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Cluid Housing 	""	""	""	Q3-2018	""	""
476	476	CALF Turnkey	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Cluid Housing 	""	""	""	Q3-2018	""	""
477	477	CALF Turnkey	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Cluid Housing 	""	""	""	Q3-2018	""	""
478	478	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 1	2	*N/A	""	""	""	""	""	Q1-2018
479	479	SHIP CONSTRUCTION TURNKEY	Kerry	Cahirdown Wood, Listowel	38	*N/A	""	""	""	Stage 4 approved Q3-2017, the scheme is fully approved.	""	""
480	480	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
481	481	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	5	*N/A	""	""	""	""	""	Q3-2018
482	482	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	3	*N/A	""	""	""	""	Q2-2017	""
483	483	SHIP CONSTRUCTION TURNKEY	Kerry	Woodview, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
484	484	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
485	485	SHIP CONSTRUCTION	Kerry	Ardmoneel, Killorglin	14	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
486	486	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
487	487	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	Q4-2017	""
488	488	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
489	489	SHIP CONSTRUCTION	Kerry	Milltown	8	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
490	490	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	Q2-2018	""
491	491	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
492	492	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
493	493	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
494	494	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
495	495	SHIP CONSTRUCTION	Kerry	Marconi Avenue, Ballybunion	20	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
496	496	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	Q1-2018	""
497	497	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	Q4-2017	""
498	498	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	6	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
499	499	SHIP CONSTRUCTION	Kerry	Balloonagh, Tralee	28	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
500	500	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	Q1-2018	""
501	501	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
502	502	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
503	503	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	Q3-2018	""
504	504	SHIP CONSTRUCTION	Kerry	Owngarry, killorglin	1	*N/A	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
505	505	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	56	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
506	506	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
507	507	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
508	508	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
509	509	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	24	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
510	510	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee	8	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
511	511	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	20	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
512	512	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	Q2-2017	""
513	513	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
514	514	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
515	515	REGENERATION	Kerry	St Martin's Park, Tralerr	4	*N/A	""	""	""	""	Q2-2017	""
516	516	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
517	517	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
518	518	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	Q4-2017	""
519	519	CAS CONSTRUCTION	Kerry	Mitchels-Boherbee	18	Cluid Housing Association	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
520	520	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	Q4-2017	""
521	521	CAS CONSTRUCTION	Kerry	Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	Stage 1 approved Q2-2017, outline design and costs are being prepared.	""	""	""	""	""
522	522	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
523	523	CALF Turnkey	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland 	""	""	""	""	Q4-2016	""
524	524	CALF Turnkey	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing 	""	""	""	""	""	Q3-2018
525	525	CALF Turnkey	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing 	""	""	""	""	""	Q1-2018
526	526	CALF Turnkey	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q2-2018
527	527	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
528	528	CALF Turnkey	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
529	529	CALF Turnkey	Kildare	"Revised Rye Abbey, Kilcock, Co Kildare (apts)
 (Phase 1)"	33	Cluid Housing 	""	""	""	""	""	Q2-2017
530	530	CALF Turnkey	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
531	531	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
532	532	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	Túath Housing Association Ltd	""	""	""	""	""	Q4-2017
533	533	CALF Turnkey	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
534	534	CALF Turnkey	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q2-2017
535	535	CALF Turnkey	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	50	Respond	""	""	""	Q3-2018	""	""
536	536	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 1)	14	Cluid Housing 	""	""	""	""	Q1-2018	""
537	537	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 2)	24	Cluid Housing 	""	""	""	""	Q1-2018	""
538	538	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 3)*	20	Cluid Housing 	""	""	""	""	Q1-2018	""
539	539	CALF Turnkey	Kildare	White Oaks, Rickardstown, Newbridge, Kildare (Phase 4)*	2	Cluid Housing 	""	""	""	""	Q1-2018	""
540	540	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
541	541	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
542	542	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
543	543	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
544	544	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot, Co. Kildare	6	*N/A	""	""	""	""	Q2-2018	""
545	545	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
546	546	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
547	547	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
548	548	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	Q1-2018	""
549	549	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
550	550	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	Stage 1 approved Q1-2017, outline design and costs are being prepared.	""	""	""	""	""
551	551	SHIP CONSTRUCTION	Kildare	Athgarvan Village	20	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
552	552	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved Q1-2016, outline design and costs are being prepared.	""	""	""	""	""
553	553	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	""	""	Q1-2018	""
554	554	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
555	555	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
556	556	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
557	557	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
558	558	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
559	559	SHIP CONSTRUCTION	Kildare	Coill Dubh, Co. Kildare	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
560	560	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
561	561	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
562	562	SHIP CONSTRUCTION	Kildare	Skenagun, Castledermot	2	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
563	563	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
564	564	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
565	565	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved Q1-2016, outline design and costs are being prepared.	""	""	""	""	""
566	566	CAS CONSTRUCTION	Kildare	Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
567	567	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
568	568	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas	74	*N/A	""	""	""	Q3-2018	""	""
569	569	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	Q1-2018	""	""	""
570	570	CALF Construction	Kilkenny	Friary Walk, Callan, Co Kilkenny (Phase 1)	16	Cluid Housing 	""	""	""	""	Q1-2018	""
571	571	CALF Construction	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing 	""	""	""	""	Q2-2018	""
572	572	CALF Turnkey	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	Q2-2018	""
573	573	CALF Turnkey	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing 	""	""	""	""	""	Q2-2017
574	574	CALF Turnkey	Kilkenny	Margaret?s Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	Q3-2018	""	""
575	575	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	11	Respond	""	""	""	Q3-2018	""	""
576	576	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 2)	17	Respond	""	""	""	Q3-2018	""	""
577	577	CALF Turnkey	Kilkenny	Nuncio Road, Kilkenny (Phase 3)*	22	Respond	""	""	""	Q3-2018	""	""
578	578	CALF Turnkey	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing 	""	""	""	""	""	Q3-2018
579	579	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
580	580	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
581	581	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 1)	8	*N/A	""	""	""	""	""	Q1-2018
582	582	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
583	583	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	1	*N/A	""	""	""	""	""	Q3-2018
584	584	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford Phase 3	18	*N/A	""	""	""	""	Q1-2018	""
585	585	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	""	Q3-2018	""
586	586	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
587	587	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
588	588	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
589	589	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	7	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
590	590	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Pennyswell Road, Kilkenny	80	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
591	591	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
592	592	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
593	593	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	Q2-2018	""
594	594	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
595	595	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
596	596	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
597	597	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	Q1-2018	""
598	598	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	15	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
599	599	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
600	600	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	Q3-2018	""
601	601	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
602	602	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	Q2-2018	""
603	603	CAS CONSTRUCTION	Kilkenny	Nimble Spaces Project at Callan	15	Camphill Communities of Ireland	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
604	604	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
605	605	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
606	606	CAS CONSTRUCTION	Kilkenny	Camphill ~Communities Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
607	607	CAS CONSTRUCTION	Kilkenny	Kyle, Callan, Co. Kilkenny	4	Camphill Communities of Ireland	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
608	608	CAS CONSTRUCTION	Kilkenny	"""Red Barn"" Patrick Street, Ballyragget"	16	Good Shepherd Services Ltd	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
609	609	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett Oaklee	4	Oaklee Housing Trust	""	""	""	""	Q2-2018	""
610	610	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	5	Camphill Communities of Ireland	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
611	611	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	4	Good Shepherd Services Ltd	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
612	612	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
613	613	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, kilkenny	12	Good Shepherd Services Ltd	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
614	614	CALF Construction	Laois	55 56 Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing 	""	""	""	""	""	Q2-2018
615	615	CALF Construction	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing 	""	""	""	""	""	Q1-2018
616	616	CALF Turnkey	Laois	31-36 Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing 	""	""	""	""	""	Q3-2018
617	617	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
618	618	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
619	619	CALF Turnkey	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
620	620	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
621	621	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
622	622	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
623	623	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
624	624	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
625	625	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
626	626	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
627	627	SHIP CONSTRUCTION	Laois	54a & 54b Hillview, Portlaoise	2	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
628	628	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
629	629	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	8	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
630	630	CAS CONSTRUCTION	Laois	Abbeyleix Road, Portlaoise	16	Respond	Stage 1 approved Q3-2015, outline design and costs are being prepared.	""	""	""	""	""
631	631	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	47	Sophia Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
632	632	CALF Turnkey	Leitrim	Cnoc an Iuir, Drumshanbo, Co. Leitrim (Phase 1)	10	Co-operative Housing Ireland	""	""	""	Q3-2018	""	""
633	633	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	28	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
634	634	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	Q2-2017	""
635	635	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
636	636	CALF Construction	Limerick	Cosgrave Park, Moyross, Limerick City  (Phase 1)	21	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
637	637	CALF Construction	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing 	""	""	""	""	""	Q1-2018
638	638	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co-operative Housing Ireland	""	""	""	""	""	Q1-2018
639	639	CALF Turnkey	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co-operative Housing Ireland	""	""	""	""	""	Q3-2018
640	640	CALF Turnkey	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing 	""	""	""	""	""	Q2-2017
641	641	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	11	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
642	642	SHIP CONSTRUCTION RAPID	Limerick	Deerpark, Adare	30	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
643	643	SHIP CONSTRUCTION RAPID	Limerick	Lisheen Park, Patrickswell	16	*N/A	""	""	""	""	Q3-2018	""
644	644	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	33	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
645	645	SHIP CONSTRUCTION RAPID	Limerick	Mountpelier	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
646	646	SHIP CONSTRUCTION RAPID	Limerick	Knocklong	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
647	647	SHIP CONSTRUCTION RAPID	Limerick	Patrickswell (Site 2)	24	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
648	648	SHIP CONSTRUCTION	Limerick	Patrick?s Villas, Castleconnell	4	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
649	649	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
650	650	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	7	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
651	651	SHIP CONSTRUCTION	Limerick	1-12 Burke Avenue, Limerick City	12	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
652	652	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
653	653	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	3	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
654	654	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
655	655	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	38	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
656	656	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
657	657	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	""	""	""	Q3-2018	""
658	658	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	Q2-2018	""
659	659	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	6	*N/A	""	""	""	""	Q3-2018	""
660	660	SHIP CONSTRUCTION	Limerick	Vance's Lands, Limerick City	37	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
661	661	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	Q2-2018	""
662	662	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	Q3-2018	""
663	663	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
664	664	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Moyross	3	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
665	665	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
666	666	SHIP CONSTRUCTION	Limerick	Ballygreannan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
667	667	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
668	668	SHIP CONSTRUCTION	Limerick	Ballyhahill	4	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
669	669	SHIP CONSTRUCTION	Limerick	Convent Street, King's Island	2	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
670	670	SHIP CONSTRUCTION	Limerick	Knockalisheen Road, Moyross	5	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
671	671	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	9	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
672	672	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
673	673	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
674	674	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
675	675	REGENERATION	Limerick	Gaol Lane	1	*N/A	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
676	676	REGENERATION	Limerick	Sheep / Athlunkards Street	8	*N/A	""	Stage 2 approved Q2-2014, full design/tender being prepared.	""	""	""	""
677	677	REGENERATION	Limerick	Churchfield (Phase 1.2)	19	*N/A	""	""	""	""	""	Q1-2018
678	678	REGENERATION	Limerick	Churchfield (Phase 2)	38	Circle Voluntary Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
679	679	REGENERATION	Limerick	Cosgrave Park	30	Co-operative Housing Ireland (Formerly NABCo)	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
680	680	REGENERATION	Limerick	Palm Court	27	Respond	""	Stage 2 approved Q3-2016, full design/tender being prepared.	""	""	""	""
681	681	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
682	682	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
683	683	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
684	684	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
685	685	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
686	686	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
687	687	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
688	688	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
689	689	REGENERATION	Limerick	BCW Vacant Refurbs, Lot 1 & 2**	14	*N/A	""	""	""	""	""	Q4-2016
690	690	REGENERATION	Limerick	St. Mary's Park Infills	19	Túath Housing Association Ltd	""	""	""	""	Q3-2017	""
691	691	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Túath Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
692	692	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved Q1-2015, outline design and costs are being prepared.	""	""	""	""	""
693	693	REGENERATION	Limerick	45-46 Cliona Park	2	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
694	694	REGENERATION	Limerick	Dalgaish Park	24	Cluid Housing Association	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
695	695	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved Q1-2015, outline design and costs are being prepared.	""	""	""	""	""
696	696	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
697	697	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
698	698	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
699	699	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
700	700	REGENERATION	Limerick	Churchfield (Phase 1.1)	23	*N/A	""	""	""	""	""	Q2-2018
701	701	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	10	Croom Voluntary Housing Association Ltd	""	""	""	""	Q2-2018	""
702	702	CAS CONSTRUCTION	Limerick	Cappamore	12	Cappamore Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
703	703	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
704	704	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
705	705	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	""	Q2-2018	""
706	706	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
707	707	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	6	Peter McVerry Trust Ltd	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
708	708	CAS CONSTRUCTION	Limerick	Pinewood, Mulcaire drive, Garraunykee	1	Daughters Of Charity Of St Vincent De Paul	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
709	709	CALF Construction	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Túath Housing Association Ltd	""	""	""	Q2-2018	""	""
710	710	CALF Turnkey	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing 	""	""	""	""	""	Q1-2017
711	711	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 1)	14	*N/A	""	""	""	""	""	Q4-2017
712	712	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 1)	4	*N/A	""	""	""	""	""	Q3-2018
713	713	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
714	714	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 1)	4	*N/A	""	""	""	""	Q3-2018	""
715	715	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 2)	8	*N/A	""	""	""	""	Q3-2018	""
716	716	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 3)	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
717	717	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	27	*N/A	""	""	""	""	Q2-2018	""
718	718	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara, Co. Longford	5	*N/A	""	""	""	""	Q2-2018	""
719	719	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard, Co. Longford	14	*N/A	""	""	""	""	Q3-2018	""
720	720	SHIP CONSTRUCTION	Longford	Church View, Lanesborough	14	*N/A	Stage 1 approved Q3-2015, outline design and costs are being prepared.	""	""	""	""	""
721	721	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	Q3-2018	""
722	722	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
723	723	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
724	724	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
725	725	CALF Construction	Louth	2 Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing 	""	""	""	""	""	Q2-2016
726	726	CALF Construction	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	Túath Housing Association Ltd	""	""	""	Q2-2017	""	""
727	727	CALF Construction	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	Q1-2018	""
728	728	CALF Construction	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
729	729	CALF Turnkey	Louth	10 Termonview, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	Q3-2018	""	""
730	730	CALF Turnkey	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
731	731	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing 	""	""	""	""	""	Q1-2017
732	732	CALF Turnkey	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing 	""	""	""	""	""	Q1-2017
733	733	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
734	734	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
735	735	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
736	736	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
737	737	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	Túath Housing Association Ltd	""	""	""	""	Q2-2017	""
738	738	CALF Turnkey	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	44	Túath Housing Association Ltd	""	""	""	""	Q2-2017	""
739	739	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
740	740	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	10	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
741	741	CALF Turnkey	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	5	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
742	742	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing 	""	""	""	""	""	Q1-2017
743	743	CALF Turnkey	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing 	""	""	""	""	""	Q3-2017
744	744	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	12	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
745	745	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 10)*	10	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
746	746	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	12	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
747	747	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	8	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
748	748	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	11	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
749	749	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	15	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
750	750	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 6)*	10	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
751	751	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 7)*	12	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
752	752	CALF Turnkey	Louth	*Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 8)*	8	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
753	753	CALF Turnkey	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 9)*	14	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
754	754	CALF Turnkey	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q4-2017
755	755	CALF Turnkey	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	Túath Housing Association Ltd	""	""	""	""	""	Q4-2017
756	756	CALF Turnkey	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing 	""	""	""	""	""	Q3-2016
757	757	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
758	758	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	5	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
759	759	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	6	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
760	760	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	4	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
761	761	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	5	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
762	762	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 6)	15	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
763	763	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 7)	4	North & East Housing Association Ltd	""	""	""	""	Q4-2017	""
764	764	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
765	765	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
766	766	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
767	767	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	Túath Housing Association Ltd	""	""	""	""	Q4-2017	""
768	768	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	Túath Housing Association Ltd	""	""	""	""	Q4-2017	""
769	769	CALF Turnkey	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	16	Túath Housing Association Ltd	""	""	""	""	Q4-2017	""
770	770	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing 	""	""	""	""	""	Q4-2017
771	771	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	16	Cluid Housing 	""	""	""	""	Q4-2016	""
772	772	CALF Turnkey	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	15	Cluid Housing 	""	""	""	""	Q4-2016	""
773	773	CALF Turnkey	Louth	The Loakers, Blackrock, Co. Louth (Phase 1)*	16	Cluid Housing 	""	""	""	""	Q3-2018	""
774	774	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
775	775	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project - Phase 1)	4	*N/A	""	""	""	""	""	Q1-2018
776	776	SHIP CONSTRUCTION	Louth	Dundalk (Derelicts Project)	7	*N/A	""	""	""	""	""	Q3-2018
777	777	SHIP CONSTRUCTION	Louth	Dundalk (Derelicts Project)	1	*N/A	""	""	""	""	""	Q2-2018
778	778	SHIP CONSTRUCTION	Louth	Dundalk B&R project (1)	7	*N/A	""	""	""	""	""	Q4-2016
779	779	SHIP CONSTRUCTION	Louth	Dundalk B&R project (2)	7	*N/A	""	""	""	""	""	Q2-2017
780	780	SHIP CONSTRUCTION	Louth	Dundalk B&R project (3)	4	*N/A	""	""	""	""	""	Q3-2017
781	781	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
782	782	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2 - 4)	69	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
783	783	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
784	784	SHIP CONSTRUCTION	Louth	Dundalk B&R project (4)	6	*N/A	""	""	""	""	""	Q4-2017
785	785	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	75	*N/A	Stage 1 approved Q4-2017, outline design and costs are being prepared.	""	""	""	""	""
786	786	SHIP CONSTRUCTION	Louth	Dundalk B&R project (5)	5	*N/A	""	""	""	""	""	Q4-2017
787	787	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project - Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
788	788	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project - Phase 3)	4	*N/A	""	""	""	""	Q3-2017	""
789	789	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
790	790	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
791	791	CAS CONSTRUCTION	Louth	5 Slieveroe Cresent, Dundalk	1	Cluid Housing Association	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
792	792	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	Túath Housing Association Ltd	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
793	793	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
794	794	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North  East Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
795	795	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North  East Housing Association Ltd	""	""	""	""	Q1-2018	""
796	796	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
797	797	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
798	798	CAS CONSTRUCTION	Louth	36 Strand Hill, Clogherhead	4	St. John of God Housing Association Ltd	Stage 1 approved Q2-2017, outline design and costs are being prepared.	""	""	""	""	""
799	799	CAS CONSTRUCTION	Louth	Coulter Park	6	Túath Housing Association Ltd	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
800	800	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
801	801	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda, Co. Louth	4	North  East Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
802	802	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	Q3-2018	""	""
803	803	CALF Turnkey	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co-operative Housing Ireland	""	""	""	""	Q2-2018	""
804	804	CALF Turnkey	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing 	""	""	""	Q1-2018	""	""
805	805	SHIP CONSTRUCTION	Mayo	Market Street, Swinford	2	*N/A	Stage 1 approved Q1-2017, outline design and costs are being prepared.	""	""	""	""	""
806	806	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	Q2-2018	""
807	807	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
808	808	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
809	809	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	Q4-2017	""
810	810	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	Q3-2018	""
811	811	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
812	812	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
813	813	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
814	814	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
815	815	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	4	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
816	816	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
817	817	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
818	818	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
819	819	SHIP CONSTRUCTION	Mayo	St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
820	820	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
821	821	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
822	822	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar	22	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
823	823	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
824	824	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
825	825	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
826	826	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
827	827	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
828	828	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
829	829	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	Q2-2018	""
830	830	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
831	831	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
832	832	CALF Turnkey	Meath	27 Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	Q2-2017	""
833	833	CALF Turnkey	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing 	""	""	""	""	""	Q1-2018
834	834	CALF Turnkey	Meath	BlackCastle,Slane Road, Navan, Co. Meath (Phase 1)	9	Túath Housing Association Ltd	""	""	""	""	Q3-2017	""
835	835	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing 	""	""	""	""	""	Q2-2018
836	836	CALF Turnkey	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing 	""	""	""	""	""	Q3-2018
837	837	CALF Turnkey	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing 	""	""	""	""	""	Q4-2017
838	838	CALF Turnkey	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
839	839	CALF Turnkey	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	Q2-2018	""
840	840	CALF Turnkey	Meath	Commons Road, Navan, Co. Meath (Phase 1)	20	Túath Housing Association Ltd	""	""	""	""	Q3-2018	""
841	841	CALF Turnkey	Meath	Commons Road, Navan, Co. Meath (Phase 2)	20	Túath Housing Association Ltd	""	""	""	""	Q3-2018	""
842	842	CALF Turnkey	Meath	Commons Road, Navan, Co. Meath (Phase 3)	18	Túath Housing Association Ltd	""	""	""	""	Q3-2018	""
843	843	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
844	844	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
845	845	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 3)	4	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
846	846	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	12	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
847	847	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
848	848	CALF Turnkey	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
849	849	CALF Turnkey	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Cluid Housing 	""	""	""	""	Q2-2018	""
850	850	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 1)	4	Cluid Housing 	""	""	""	""	Q4-2017	""
851	851	CALF Turnkey	Meath	Fredrick Manor, Ashbourne, Co. Meath (Phase 2)	7	Cluid Housing 	""	""	""	""	Q4-2017	""
852	852	CALF Turnkey	Meath	Grangehall, Dunshaughlin (Phase 1)	7	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
853	853	CALF Turnkey	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
854	854	CALF Turnkey	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing 	""	""	""	""	""	Q1-2016
855	855	CALF Turnkey	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
856	856	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing 	""	""	""	""	""	Q1-2017
857	857	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing 	""	""	""	""	""	Q4-2017
858	858	CALF Turnkey	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing 	""	""	""	""	""	Q4-2017
859	859	CALF Turnkey	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	44	Túath Housing Association Ltd	""	""	""	""	Q2-2018	""
860	860	CALF Turnkey	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q2-2017
861	861	CALF Turnkey	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing 	""	""	""	""	""	Q3-2017
862	862	CALF Turnkey	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)*	24	Respond	""	""	""	""	Q1-2018	""
863	863	CALF Turnkey	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	23	Cluid Housing 	""	""	""	""	""	Q2-2016
864	864	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Navan	19	*N/A	""	""	""	""	Q3-2018	""
865	865	SHIP CONSTRUCTION TURNKEY	Meath	Clonmagadden, Navan	12	*N/A	""	""	""	""	Q3-2018	""
866	866	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
867	867	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
868	868	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
869	869	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	Q2-2018	""
870	870	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	Q3-2018	""
871	871	SHIP CONSTRUCTION	Meath	St. Oliver's, Ratoath	17	*N/A	""	""	""	""	Q1-2018	""
872	872	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
873	873	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	Q4-2017	""
874	874	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
875	875	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
876	876	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
877	877	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
878	878	SHIP CONSTRUCTION	Meath	Dunshaughlin	25	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
879	879	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
880	880	SHIP CONSTRUCTION	Meath	Farganstown	42	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
881	881	SHIP CONSTRUCTION	Meath	The Belfry, Trim	3	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
882	882	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
883	883	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
884	884	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	6	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
885	885	SHIP CONSTRUCTION	Meath	Dept of Education site, Castle Street, Ashbourne	55	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
886	886	SHIP CONSTRUCTION	Meath	Church View, Rathmoylon	9	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
887	887	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	T£ath Housing Association Ltd	""	""	""	""	Q4-2017	""
888	888	CALF Construction	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing 	""	""	""	""	Q2-2017	""
889	889	CALF Turnkey	Monaghan	Kingscourt Road, Carrickmacross, Co Monagahan  (Phase 1)	50	Respond	""	""	""	""	Q2-2018	""
890	890	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Túath Housing Association Ltd	""	""	""	Q4-2017	""	""
891	891	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	14	Túath Housing Association Ltd	""	""	""	Q4-2017	""	""
892	892	CALF Turnkey	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	12	Túath Housing Association Ltd	""	""	""	Q4-2017	""	""
893	893	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
894	894	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2017
895	895	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
896	896	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan  Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
897	897	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	Q3-2018	""
898	898	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
899	899	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	Q3-2018	""
900	900	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	Q3-2018	""
901	901	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	Q3-2018	""
902	902	SHIP CONSTRUCTION	Monaghan	Davy's & Adjacent Porperty, Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
903	903	SHIP CONSTRUCTION	Monaghan	Boyle Sports Site, Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
904	904	SHIP CONSTRUCTION	Monaghan	82 & 83 Fermanagh St., Clones	3	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
905	905	SHIP CONSTRUCTION	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
906	906	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
907	907	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
908	908	SHIP CONSTRUCTION	Monaghan	Bothar na Mullen, Scotstown	31	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
909	909	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
910	910	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
911	911	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
912	912	CALF Construction	Offaly	Kearney?s Field, Tullamore, Co. Offaly (Phase 1)	35	Oaklee Housing 	""	""	""	Q1-2017	""	""
913	913	CALF Construction	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	Túath Housing Association Ltd	""	""	""	Q2-2017	""	""
914	914	CALF Turnkey	Offaly	Frankford Park, Kilcormac, Co. Offaly (Phase 1)	12	Túath Housing Association Ltd	""	""	""	Q2-2018	""	""
915	915	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr	12	*N/A	""	""	""	Stage 4 approved Q4-2017, the scheme is fully approved.	""	""
916	916	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
917	917	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	Q2-2018	""
918	918	SHIP CONSTRUCTION TURNKEY	Offaly	Coolagarry, Walsh Island, 	4	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
919	919	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
920	920	SHIP CONSTRUCTION SINGLE STAGE	Offaly	Church Street, Clara, Co. Offaly	3	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
921	921	SHIP CONSTRUCTION SINGLE STAGE	Offaly	Beechgrove, Belmont, Co. Offaly	7	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
922	922	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	Q3-2018	""
923	923	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved Q2-2017, outline design and costs are being prepared.	""	""	""	""	""
924	924	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
925	925	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	Q4-2017	""
926	926	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	Q3-2018	""
927	927	CAS CONSTRUCTION	Offaly	Killane Drive, Edenderry	2	Túath Housing Association Ltd	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
928	928	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
929	929	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	20	Oaklee Housing Trust	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
930	930	CALF Turnkey	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing 	""	""	""	""	""	Q3-2018
931	931	CALF Turnkey	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
932	932	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
933	933	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	Q1-2018	""
934	934	SHIP CONSTRUCTION TURNKEY	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
935	935	SHIP CONSTRUCTION	Roscommon	Cloonfad	1	*N/A	Stage 1 approved Q3-2017, outline design and costs are being prepared.	""	""	""	""	""
936	936	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
937	937	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
938	938	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
939	939	SHIP CONSTRUCTION	Roscommon	Monksland, Athlone	1	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
940	940	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	Q1-2018	""	""	""
941	941	SHIP CONSTRUCTION	Sligo	Colloney	15	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
942	942	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
943	943	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	Q1-2018	""
944	944	SHIP CONSTRUCTION	Sligo	Carrowbunnaun, Strandhill	20	*N/A	Stage 1 approved Q2-2015, outline design and costs are being prepared.	""	""	""	""	""
945	945	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
946	946	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
947	947	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	14	*N/A	""	""	""	""	""	Q3-2018
948	948	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	8	*N/A	""	""	""	""	""	Q4-2017
949	949	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
950	950	SHIP CONSTRUCTION	Sligo	94 St Joseph's Terrace	1	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
951	951	SHIP CONSTRUCTION	Sligo	Dromore West 	10	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
952	952	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
953	953	CALF Construction	South Dublin	1 Hollyville Terrace, Palmerstown, Dublin (Phase 1)	2	Cluid Housing 	""	""	""	Q4-2017	""	""
954	954	CALF Turnkey	South Dublin	1-6 Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
955	955	CALF Turnkey	South Dublin	11 Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	Q3-2018	""	""
956	956	CALF Turnkey	South Dublin	41 & 43 Tullyhall, Lucan, County Dublin (Phase 1)*	2	Túath Housing Association Ltd	""	""	""	""	Q3-2018	""
957	957	CALF Turnkey	South Dublin	"47 and 49 Tullyhall Drive, Lucan, Co. Dublin
 (Phase 1)"	2	Túath Housing Association Ltd	""	""	""	""	Q3-2018	""
958	958	CALF Turnkey	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	10	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
959	959	CALF Turnkey	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing 	""	""	""	""	""	Q3-2017
960	960	CALF Turnkey	South Dublin	De Selby Lawns, Tallaght, Dublin 24 (Phase 1)	7	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
961	961	CALF Turnkey	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing 	""	""	""	""	""	Q1-2018
962	962	CALF Turnkey	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing 	""	""	""	""	""	Q1-2018
963	963	CALF Turnkey	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing 	""	""	""	""	""	Q3-2018
964	964	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing 	""	""	""	""	""	Q1-2018
965	965	CALF Turnkey	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing 	""	""	""	""	""	Q2-2018
966	966	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)	13	Cluid Housing 	""	""	""	""	""	Q2-2018
967	967	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)*	12	Cluid Housing 	""	""	""	""	Q1-2017	""
968	968	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing 	""	""	""	""	""	Q1-2017
969	969	CALF Turnkey	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing 	""	""	""	""	""	Q3-2017
970	970	CALF Turnkey	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing 	""	""	""	""	Q1-2018	""
971	971	CALF Turnkey	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Cluid Housing 	""	""	""	""	""	Q3-2017
972	972	CALF Turnkey	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	Túath Housing Association Ltd	""	""	""	""	""	Q3-2018
973	973	CALF Turnkey	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
974	974	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
975	975	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
976	976	CALF Turnkey	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2016	""
977	977	CALF Turnkey	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing 	""	""	""	""	Q1-2018	""
978	978	CALF Turnkey	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	Q2-2018	""
979	979	CALF Turnkey	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
980	980	CALF Turnkey	South Dublin	"Tullyhall, Lucan, Co Dublin			 (Phase 1)*"	2	Túath Housing Association Ltd	""	""	""	""	""	Q3-2017
981	981	CALF Turnkey	South Dublin	"Tullyhall, Lucan, Co Dublin			 (Phase 2)*"	2	Túath Housing Association Ltd	""	""	""	""	Q2-2017	""
982	982	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing 	""	""	""	""	Q2-2018	""
983	983	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Cluid Housing 	""	""	""	""	Q2-2018	""
984	984	CALF Turnkey	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing 	""	""	""	""	Q2-2018	""
985	985	CALF Turnkey	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
986	986	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	Q1-2018	""
987	987	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	Q3-2018	""
988	988	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 1)	47	*N/A	""	""	""	""	""	Q2-2018
989	989	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 2)	22	*N/A	""	""	""	""	""	Q3-2018
990	990	SHIP CONSTRUCTION RAPID	South Dublin	St. Catherine?s, Knockmore Avenue, Killinarden, Tallaght	13	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
991	991	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Sheehy Skeffington)	16	*N/A	""	""	""	""	Q3-2017	""
992	992	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	26	*N/A	""	""	""	""	Q3-2017	""
993	993	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	Q3-2017	""
994	994	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	Q3-2017	""
995	995	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	Q2-2017	""
996	996	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	Q2-2017	""
997	997	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
998	998	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
999	999	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
1000	1000	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
1001	1001	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
1002	1002	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1003	1003	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Túath Housing Association Ltd	""	""	""	Stage 4 approved Q2 2018, the scheme is fully approved.	""	""
1004	1004	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	Stage 2 approved Q4-2016, full design/tender being prepared.	""	""	""	""
1005	1005	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	Q3-2018	""	""
1006	1006	CALF Turnkey	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing 	""	""	""	""	""	Q2-2017
1007	1007	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1008	1008	CALF Turnkey	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 2)	10	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1009	1009	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	21	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1010	1010	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1011	1011	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1012	1012	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
1013	1013	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	28	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1014	1014	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	9	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1015	1015	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
1016	1016	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1017	1017	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	Stage 1 approved Q1-2016, outline design and costs are being prepared.	""	""	""	""	""
1018	1018	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1019	1019	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1020	1020	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	18	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1021	1021	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1022	1022	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1023	1023	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	Q3-2018	""
1024	1024	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1025	1025	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
1026	1026	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1027	1027	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
1028	1028	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
1029	1029	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
1030	1030	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	19	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1031	1031	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
1032	1032	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	Q1-2018	""
1033	1033	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1034	1034	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1035	1035	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1036	1036	CAS CONSTRUCTION	Tipperary	Fethard	4	Belmont Park Housing Association Ltd	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1037	1037	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1038	1038	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1039	1039	CALF Construction	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
1040	1040	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan (Part 1)	31	*N/A	""	""	""	""	Q4-2017	""
1041	1041	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan (Part 2)	8	*N/A	""	""	""	""	""	Q3-2018
1042	1042	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
1043	1043	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	Q4-2017	""
1044	1044	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
1045	1045	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	Q1-2018	""
1046	1046	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	65	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
1047	1047	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	20	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
1048	1048	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1049	1049	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	Q2-2018	""
1050	1050	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City	5	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1051	1051	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1052	1052	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
1053	1053	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	Q1-2018	""
1054	1054	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1055	1055	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
1056	1056	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	Stage 1 approved Q1-2014, outline design and costs are being prepared.	""	""	""	""	""
1057	1057	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
1058	1058	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	11	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1059	1059	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
1060	1060	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1061	1061	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
1062	1062	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
1063	1063	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	Stage 3 approved Q3-2017, the scheme is now approved to proceed to tender.	""	""	""
1064	1064	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1065	1065	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	Stage 1 approved Q4-2016, outline design and costs are being prepared.	""	""	""	""	""
1066	1066	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	4	Anvers Housing Association Ltd	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1067	1067	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	57	*N/A	""	""	Q1-2018	""	""	""
1068	1068	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	2	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
1069	1069	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 2)	2	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
1070	1070	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 3)	2	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
1071	1071	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 4)	2	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
1072	1072	CALF Construction	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 5)	2	Túath Housing Association Ltd	""	""	""	Q3-2018	""	""
1073	1073	CALF Turnkey	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)	14	Oaklee Housing 	""	""	""	Q3-2018	""	""
1074	1074	CALF Turnkey	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	Túath Housing Association Ltd	""	""	""	""	""	Q2-2017
1075	1075	CALF Turnkey	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	Túath Housing Association Ltd	""	""	""	""	Q3-2018	""
1076	1076	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
1077	1077	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	Q3-2018	""
1078	1078	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1079	1079	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	Q2-2017	""
1080	1080	SHIP CONSTRUCTION	Westmeath	16 Ennell Court	1	*N/A	""	""	""	""	""	Q1-2018
1081	1081	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone  Phase 1	33	*N/A	""	""	""	""	Q2-2018	""
1082	1082	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
1083	1083	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
1084	1084	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	32	*N/A	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
1085	1085	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1086	1086	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1087	1087	SHIP CONSTRUCTION	Westmeath	St. Brigid's Green, Mullingar	14	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
1088	1088	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Arcadia, Athlone Phase 2	18	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
1089	1089	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Túath Housing Association Ltd	""	Stage 2 approved Q2-2017, full design/tender being prepared.	""	""	""	""
1090	1090	CALF Turnkey	Wexford	1 property at  Ard Uisce, Whiterock, Wexford  (Phase 1)	1	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
1091	1091	CALF Turnkey	Wexford	 233, 234, 248, 249,252,253 Ard Uisce, Whiterock, Wexford (Phase 1)	6	Túath Housing Association Ltd	""	""	""	""	""	Q1-2018
1092	1092	CALF Turnkey	Wexford	238,239,240,241,245 Ard Uisce, Wexford Town (Phase 1)	5	Túath Housing Association Ltd	""	""	""	""	""	Q4-2017
1093	1093	CALF Turnkey	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	Túath Housing Association Ltd	""	""	""	""	""	Q1-2017
1094	1094	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	4	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1095	1095	CALF Turnkey	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 2)	14	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1096	1096	CALF Turnkey	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1097	1097	CALF Turnkey	Wexford	Glen Aoibhinn, Ardamine, Courtown Harbour, Gorey (Phase 1)*	5	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1098	1098	CALF Turnkey	Wexford	Glen Aoibhinn, Ardamine, Courtown Harbour, Gorey (Phase 2)	5	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1099	1099	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 1)	11	Oaklee Housing 	""	""	""	""	Q3-2017	""
1100	1100	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 2)	10	Oaklee Housing 	""	""	""	""	Q3-2017	""
1101	1101	CALF Turnkey	Wexford	Greenville, The Moyne, Enniscorthy (Phase 3)	19	Oaklee Housing 	""	""	""	""	Q3-2017	""
1102	1102	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 1)	9	Co-operative Housing Ireland	""	""	""	""	""	Q2-2016
1103	1103	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 2)	9	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1104	1104	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 3)	11	Co-operative Housing Ireland	""	""	""	""	""	Q1-2017
1105	1105	CALF Turnkey	Wexford	Hunters Green, Gorey (Phase 4)	9	Co-operative Housing Ireland	""	""	""	""	""	Q4-2017
1106	1106	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 1)	23	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1107	1107	CALF Turnkey	Wexford	Huntershill, Gorey, Co. Wexford (Phase 2)	13	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
1108	1108	CALF Turnkey	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co-operative Housing Ireland	""	""	""	""	""	Q3-2016
1109	1109	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1110	1110	CALF Turnkey	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)	14	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
1111	1111	CALF Turnkey	Wexford	Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	9	Túath Housing Association Ltd	""	""	""	""	Q4-2017	""
1112	1112	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
1113	1113	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1a)	8	*N/A	""	""	""	""	""	Q1-2018
1114	1114	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	9	*N/A	""	""	""	""	Q1-2018	""
1115	1115	SHIP CONSTRUCTION TURNKEY	Wexford	Castlebridge, Co Wexford	3	*N/A	""	""	""	""	""	Q3-2018
1116	1116	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2)	4	*N/A	""	""	""	""	Q1-2018	""
1117	1117	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock,Wexford	26	*N/A	""	""	""	""	Q1-2018	""
1118	1118	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1b)	10	*N/A	""	""	""	""	Q1-2018	""
1119	1119	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1120	1120	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1121	1121	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	""	Q3-2018	""
1122	1122	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	Q2-2018	""
1123	1123	SHIP CONSTRUCTION	Wexford	Danescastle	12	*N/A	""	""	""	""	Q3-2018	""
1124	1124	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	Q2-2018	""
1125	1125	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	45	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1126	1126	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
1127	1127	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	34	*N/A	Stage 1 approved Q1-2018, outline design and costs are being prepared.	""	""	""	""	""
1128	1128	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	""	Q2-2018
1129	1129	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
1130	1130	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
1131	1131	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	9	*N/A	""	""	""	""	Q4-2017	""
1132	1132	SHIP CONSTRUCTION	Wexford	Baile an Tr , Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
1133	1133	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
1134	1134	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
1135	1135	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
1136	1136	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	6	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1137	1137	SHIP CONSTRUCTION	Wexford	Ballywish, Castlebridge	11	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1138	1138	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford	43	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1139	1139	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy, Co Wexford	17	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1140	1140	SHIP CONSTRUCTION	Wexford	Creagh, Gorey, Co Wexford	12	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
1141	1141	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1142	1142	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
1143	1143	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown, Co Wexford	12	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1144	1144	CALF Construction	Wicklow	Post Tender St Ernans View, Merrymeeting, Rathnew, Co Wicklow  (Phase 1)	45	Cluid Housing 	""	""	""	Q3-2018	""	""
1145	1145	CALF Turnkey	Wicklow	Abbey St, Wicklow  (Phase 1)	6	Túath Housing Association Ltd	""	""	""	""	Q4-2016	""
1146	1146	CALF Turnkey	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	Túath Housing Association Ltd	""	""	""	""	""	Q2-2018
1147	1147	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)*	13	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
1148	1148	CALF Turnkey	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)*	6	Túath Housing Association Ltd	""	""	""	""	Q1-2018	""
1149	1149	CALF Turnkey	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)*	7	Túath Housing Association Ltd	""	""	""	""	Q3-2017	""
1150	1150	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely, Phase 1	2	*N/A	""	""	""	""	""	Q2-2018
1151	1151	SHIP CONSTRUCTION TURNKEY	Wicklow	7 Mill Court, Tinahely	1	*N/A	""	""	""	""	Q2-2018	""
1152	1152	SHIP CONSTRUCTION TURNKEY	Wicklow	Vale Road, Arklow	34	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1153	1153	SHIP CONSTRUCTION TURNKEY	Wicklow	Fernhill, Arklow	1	*N/A	""	""	""	""	""	Q3-2018
1154	1154	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely, Phase 2	2	*N/A	""	""	""	""	Q2-2018	""
1155	1155	SHIP CONSTRUCTION RAPID	Wicklow	Whitehall, Baltinglass	34	*N/A	Stage 1 approved Q2-2018, outline design and costs are being prepared.	""	""	""	""	""
1156	1156	SHIP CONSTRUCTION RAPID	Wicklow	Rathnew	47	*N/A	Stage 1 approved Q3-2018, outline design and costs are being prepared.	""	""	""	""	""
1157	1157	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 3)	21	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
1158	1158	SHIP CONSTRUCTION	Wicklow	10A Castle Villas, Greystones	1	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1159	1159	SHIP CONSTRUCTION	Wicklow	Ard Na Mara, Kilcoole	2	*N/A	""	""	""	""	Q3-2018	""
1160	1160	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1161	1161	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 1)	17	*N/A	""	""	""	""	Q4-2017	""
1162	1162	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 2)	26	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1163	1163	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	""	""	Q3-2018	""
1164	1164	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1165	1165	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	Q3-2017	""
1166	1166	SHIP CONSTRUCTION	Wicklow	Old Library, Arklow	7	*N/A	""	""	""	""	Q1-2018	""
1167	1167	SHIP CONSTRUCTION	Wicklow	Sugarloaf View, Kilmacanogue	20	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
1168	1168	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum (Phase 2)	20	*N/A	""	""	""	""	Q3-2017	""
1169	1169	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	""	""	Q2-2018	""
1170	1170	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
1171	1171	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	30	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1172	1172	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	""	Stage 3 approved Q3-2018, the scheme is now approved to proceed to tender.	""	""	""
1173	1173	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Wicklow	Convent Lands	51	*N/A	""	""	Q1-2018	""	""	""