  "fields": [{"id":"_id","type":"int"},{"id":"No.","type":"numeric"},{"id":"Funding Programme","type":"text"},{"id":"LA","type":"text"},{"id":"Scheme/Project Name","type":"text"},{"id":"No. of Units","type":"numeric"},{"id":"Approved Housing Body","type":"text"},{"id":"Stage 1 Capital Appraisal","type":"text"},{"id":"Stage 2 Pre-Planning","type":"text"},{"id":"Stage 3 Pre-Tender design","type":"text"},{"id":"Stage 4 Tender Report or Final Turnkey/CALF approval","type":"text"},{"id":"Site Start","type":"text"},{"id":"Practical Completion","type":"text"}],
  "records": [
    [1,1,"CAS CONSTRUCTION","Carlow","Mill Race Court, Carlow Town",14,"Cluid Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [2,2,"SHIP CONSTRUCTION","Carlow","Royal Oak Road, Bagenalstown  ",24,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [3,3,"SHIP CONSTRUCTION","Carlow","Pound Lane, Borris",4,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [4,4,"SHIP CONSTRUCTION","Carlow","Rural Cottages at Rathvilly & Tullow",2,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [5,5,"SHIP CONSTRUCTION","Carlow","St Patrick's Park, Tullow",14,"*N/A","","The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","","","",""],
    [6,6,"SHIP CONSTRUCTION","Carlow","Rathvilly",10,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [7,7,"SHIP CONSTRUCTION","Carlow","Mount Leinster Park, Carlow",4,"*N/A","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [8,8,"SHIP CONSTRUCTION","Carlow","Maryborough St, Carlow",5,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [9,9,"SHIP CONSTRUCTION","Carlow","Myshall",4,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [10,10,"SHIP CONSTRUCTION","Carlow","Hackettstown",4,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [11,11,"SHIP CONSTRUCTION TURNKEY","Carlow","Sleaty Street, Carlow",26,"*N/A","","","","Approval of turnkey/construction project Q2 2016","",""],
    [12,12,"CAS CONSTRUCTION","Carlow ","Ballincarrig, Wexford Road, Carlow",7,"Tintean Carlow Voluntary Housing Association ","","","","","","Scheme completed in Q4 2016"],
    [13,13,"CAS CONSTRUCTION","Carlow ","Royal Oak Rd, Bagenalstown, Carlow",6,"Respond!  ","","The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","","","",""],
    [14,14,"CALF CONSTRUCTION TURNKEY","Cavan ","Cluain Dara, Kingscourt",16,"Cluid Housing Association","","","","","","Scheme completed in Q4 2016"],
    [15,15,"SHIP CONSTRUCTION","Cavan ","Woodlands, Ballyhaise",8,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [16,16,"SHIP CONSTRUCTION","Cavan ","Butlersbridge ",6,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [17,17,"SHIP CONSTRUCTION","Cavan ","Rosehill, Mullagh (Phase 6) ",8,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [18,18,"CALF CONSTRUCTION","Clare","Bruachlan, Westbury, Co Clare",22,"Co-operative Ireland","","","","Approval of turnkey/construction project Q2 2016","",""],
    [19,19,"CAS CONSTRUCTION","Clare","Cahercalla, Ennis (Phase 2) ",10,"Cuan an Chlair","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [20,20,"SHIP CONSTRUCTION","Clare","Seaview Park, Quilty",18,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [21,21,"CAS CONSTRUCTION","Clare ","Laurel Lodge, Clare Road, Ennis",3,"Society of Saint Vincent \nde Paul","","","","","","Scheme completed in Q4 2016"],
    [22,22,"CAS CONSTRUCTION","Clare ","Kildysart Road, Ennis ",7,"Clare Haven Services Ltd.","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [23,23,"SHIP CONSTRUCTION","Clare ","Tullyglass, Shannon",21,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [24,24,"SHIP CONSTRUCTION","Clare ","Feakle",10,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [25,25,"SHIP CONSTRUCTION","Clare ","Glor Srutha, Knockbrack Lower, Clonlara",10,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [26,26,"CALF CONSTRUCTION TURNKEY","Clare  ","Lios Anama, Sixmilebridge, Clare",28,"Co-operative Ireland","","","","","Scheme started on site in Q3 2016",""],
    [27,27,"CAS CONSTRUCTION","Clare  ","Doonbeg",12,"Kilkee Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [28,28,"CALF CONSTRUCTION","Cork County","Firgrove Harrisons lane",6,"Co-operative Ireland","","","","","Scheme started on site in Q3 2016",""],
    [29,29,"CALF CONSTRUCTION TURNKEY","Cork County","College Manor, Cobh",10,"The Housing Association","","","","","","Scheme completed in Q4 2016"],
    [30,30,"CALF CONSTRUCTION TURNKEY","Cork County","Passage West area, Co. Cork",3,"Cluid Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [31,31,"CAS CONSTRUCTION","Cork County","Fellowship House, Togher",28,"Tabor Lodge Addiction & Housing Services","","","","The scheme was Stage 4 approved in Q2 2016 scheme is now fully approved","",""],
    [32,32,"CAS CONSTRUCTION","Cork County","Avenue House, Bandon",9,"Bandon Geriatric & Community Council","","","","","Scheme started on site in Q3 2016",""],
    [33,33,"CAS CONSTRUCTION","Cork County","Church View, Love Lane, Charleville",2,"Charleville Care Project Ltd","","The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","","","",""],
    [34,34,"CAS CONSTRUCTION","Cork County","Church View, Love Lane, Charleville",4,"Charleville Care Project Ltd","","The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","","","",""],
    [35,35,"CAS CONSTRUCTION","Cork County","Townlands, Rosscarbery",9,"Rosscarbery Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [36,36,"CAS CONSTRUCTION","Cork County","Cuan Barra, Kilmore, Ballingeary",3,"Coiste Tithe Uibh Laoire Teo","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [37,37,"CAS CONSTRUCTION","Cork County","Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay",16,"Cluid Housing Association","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [38,38,"CAS CONSTRUCTION","Cork County","St. Francis Court, Youghal",4,"Respond!  ","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [39,39,"CAS CONSTRUCTION","Cork County","Duntahan Road, fermoy",12,"Respond!","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [40,40,"CAS CONSTRUCTION","Cork County","Brookwood, Kilnagurteen, Macroom, ",1,"Anvers Housing Association","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [41,41,"SHIP CONSTRUCTION","Cork County","Castle Treasure Grove",1,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [42,42,"SHIP CONSTRUCTION","Cork County","Oliver Plunkett Hill, Fermoy",10,"*N/A","","","","","Scheme started on site in Q4 2015",""],
    [43,43,"SHIP CONSTRUCTION","Cork County","Kilnagleary, Carrigaline",49,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [44,44,"SHIP CONSTRUCTION","Cork County","Fairfield, Macroom",7,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [45,45,"SHIP CONSTRUCTION","Cork County","Beechgrove, Clonakilty",56,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [46,46,"SHIP CONSTRUCTION","Cork County","Droum, Castletownbere",2,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [47,47,"SHIP CONSTRUCTION","Cork County","Newtown, Bantry",1,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [48,48,"SHIP CONSTRUCTION","Cork County","Poulavone, Ballincollig",67,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [49,49,"SHIP CONSTRUCTION TURNKEY","Cork County","Castletreasure, Douglas (P1&2)",28,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [50,50,"SHIP CONSTRUCTION TURNKEY","Cork County","College Wood, Cobh",32,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [51,51,"SHIP CONSTRUCTION TURNKEY","Cork County","Castletreasure, Douglas (P3)",12,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [52,52,"SHIP CONSTRUCTION TURNKEY","Cork County","Crannard, Fermoy",52,"*N/A","","","","Approval of turnkey/construction project Q3 2016","",""],
    [53,53,"SHIP CONSTRUCTION TURNKEY","Cork County","Ballincollig ",34,"*N/A","","","","Approval of turnkey/construction project Q1 2016","",""],
    [54,54,"SHIP CONSTRUCTION TURNKEY","Cork County","Passage West ",26,"*N/A","","","","Approval of turnkey/construction project Q4 2015","",""],
    [55,55,"SHIP CONSTRUCTION TURNKEY","Cork County","Midelton ",61,"*N/A","","","","Approval of turnkey/construction project Q4 2015","",""],
    [56,56,"SHIP CONSTRUCTION TURNKEY","Cork County","Bantry",30,"*N/A","","","","Approval of turnkey/construction project Q4 2016","",""],
    [57,57,"SHIP CONSTRUCTION TURNKEY","Cork County","Whitechurch",12,"*N/A","","","","Approval of turnkey/construction project Q2 2016","",""],
    [58,58,"CALF CONSTRUCTION","Cork City","124 Lr. Glanmire Road & 2 Breamer, Cork",6,"Galtan Ltd","","","","Approval of turnkey/construction project Q4 2016","",""],
    [59,59,"CALF CONSTRUCTION TURNKEY","Cork City","Popes Road, Blackpool, Cork City",7,"Cluid Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [60,60,"CALF CONSTRUCTION TURNKEY","Cork City","Cork City area",18,"Cluid Housing Association","","","","Approval of turnkey/construction project Q3 2016","",""],
    [61,61,"CALF CONSTRUCTION TURNKEY","Cork City","Millfield Cottages, Blackpool, Cork",18,"Respond!","","","","Approval of turnkey/construction project Q3 2016","",""],
    [62,62,"CALF CONSTRUCTION TURNKEY","Cork City","Sonamar, Togher, Waterford Road, Cork",8,"Respond!","","","","","Scheme started on site in Q4 2016",""],
    [63,63,"CAS CONSTRUCTION","Cork City","27-29 Dublin Street, Blackpool, Cork",10,"Respond!  ","","","","","Scheme started on site in Q4 2016",""],
    [64,64,"CAS CONSTRUCTION","Cork City","Thomas Davis Street, Cork City",35,"Respond!  ","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [65,65,"CAS CONSTRUCTION","Cork City","Saint Vincent's Convent, Vincent's Ave/St. Mary's St. Cork City",25,"Respond!  ","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [66,66,"CAS CONSTRUCTION","Cork City","Ceanncora Lawn, Ballinlough, Cork",1,"Cork Mental Health","","The scheme was Stage 2 approved in Q4 2015 full design/tender being prepared","","","",""],
    [67,67,"CAS CONSTRUCTION","Cork City","Edel House, Grattan Street",33,"Good Shepherd Services Ltd","","The scheme was Stage 2 approved in Q1 2016 full design/tender being prepared","","","",""],
    [68,68,"CAS CONSTRUCTION","Cork City","St. Joachim & Anne's, Anglesea St",8,"Cork Simon","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [69,69,"REGENERATION","Cork City","Phase 1 B Knocknaheeny",29,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [70,70,"REGENERATION","Cork City","Phase 2 A Knocknaheeny",47,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [71,71,"SHIP CONSTRUCTION","Cork City","Deanrock, Togher",66,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [72,72,"SHIP CONSTRUCTION","Cork City","Gerald Griffin Street",40,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [73,73,"SHIP CONSTRUCTION","Cork City","Cappanoole",2,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [74,74,"SHIP CONSTRUCTION","Cork City","St. Johns Well",6,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [75,75,"SHIP CONSTRUCTION","Cork City","Shandon Street/John Philpott Curran Street",9,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [76,76,"SHIP CONSTRUCTION","Cork City","Churchfield Place East",3,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [77,77,"SHIP CONSTRUCTION TURNKEY","Cork City","Ard Aoibhinn, Banduff, Mayfield",5,"*N/A","","","","Approval of turnkey/construction project Q2 2016","",""],
    [78,78,"SHIP CONSTRUCTION TURNKEY","Cork City","Corcorans Quay",3,"*N/A","","","","Approval of turnkey/construction project Q2 2016","",""],
    [79,79,"SHIP CONSTRUCTION TURNKEY","Cork City","Church Road",43,"*N/A","","","","Approval of turnkey/construction project Q4 2016","",""],
    [80,80,"SHIP CONSTRUCTION TURNKEY","Cork City","Sheridan Park, Tramore Road",28,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [81,81,"CAS CONSTRUCTION","DLR","30 Obelisk Walk, Blackrock",1,"St. John of God","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [82,82,"SHIP CONSTRUCTION","DLR","Rochestown House (Phase 2)",34,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [83,83,"SHIP CONSTRUCTION","DLR","Cromlech Close",15,"*N/A","","","","","","Scheme completed in Q3 2016"],
    [84,84,"SHIP CONSTRUCTION","DLR","Clontibret House",4,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [85,85,"SHIP CONSTRUCTION","DLR","Shanganagh Park Lodge",1,"*N/A","","","","","","Scheme completed in Q3 2016"],
    [86,86,"SHIP CONSTRUCTION","DLR","Rochestown House (Phase 3)",14,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [87,87,"SHIP CONSTRUCTION","DLR","Fitzgerald Park",50,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [88,88,"SHIP CONSTRUCTION","DLR","Rosemount Court",44,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [89,89,"SHIP CONSTRUCTION","DLR","St Michaels Terrace",4,"*N/A","","","","","Scheme started on site in Q2 2016",""],
    [90,90,"SHIP CONSTRUCTION","DLR","Broadford Rise",21,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [91,91,"SHIP CONSTRUCTION","DLR","Sallynoggin Park ",4,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [92,92,"SHIP CONSTRUCTION","DLR","Park Close Sallynoggin",10,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [93,93,"SHIP CONSTRUCTION","DLR","Assistant Harbour Master House",2,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [94,94,"SHIP CONSTRUCTION","DLR","152 Pottery Road, Dun Laoghaire",4,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [95,95,"SHIP CONSTRUCTION RAPID","DLR","George's Place,",12,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [96,96,"SHIP CONSTRUCTION RAPID","DLR","Churchtown",28,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [97,97,"SHIP CONSTRUCTION RAPID","DLR","Glenamuck/Stillorgan",14,"*N/A","","The scheme was Stage 2 approved in Q4 2016 design/tender being prepared","","","",""],
    [98,98,"SHIP CONSTRUCTION","DLR ","33,35, & 37 Temple Road",3,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [99,99,"SHIP CONSTRUCTION","DLR ","66 Georges Street, Dun Laoghaire, Co. Dublin",4,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [100,100,"CALF CONSTRUCTION","Donegal"," Ballyshannon area",11,"Cluid Housing Association","","","","Approval of turnkey/construction project Q2 2015","",""],
    [101,101,"CALF CONSTRUCTION TURNKEY","Donegal","Forge Road, Donegal",4,"Cluid Housing Association","","","","","","Scheme completed in Q3 2016"],
    [102,102,"CALF CONSTRUCTION TURNKEY","Donegal","Ballyshannon",22,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q4 2016","",""],
    [103,103,"CAS CONSTRUCTION","Donegal","Meenmore, Dungloe",15,"Donegal Parents and Friends Housing Association Ltd","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [104,104,"CAS CONSTRUCTION","Donegal","Glenrowan House, Drumkeen, Stranorlar",6,"Apex Housing Association","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [105,105,"CAS CONSTRUCTION","Donegal","Willowbrook, Glencar, Letterkenny",40,"Apex Housing Association","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [106,106,"SHIP CONSTRUCTION","Donegal","Ardara (Phase 3) ",8,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [107,107,"SHIP CONSTRUCTION","Donegal","Ard Connell, Ardara",1,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [108,108,"SHIP CONSTRUCTION","Donegal","Manorcunningham (Phase 1)",2,"*N/A","","","","","Scheme started on site in Q2 2016",""],
    [109,109,"SHIP CONSTRUCTION","Donegal","Manorcunningham (Phase 2)",8,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [110,110,"SHIP CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",24,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [111,111,"CAS CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",10,"Oaklee Housing Trust","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [112,112,"SHIP CONSTRUCTION","Donegal","Newtoncunningham",7,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [113,113,"SHIP CONSTRUCTION","Donegal","Carndonagh Abbots Wood (Phase 2)",4,"*N/A","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [114,114,"SHIP CONSTRUCTION","Donegal","Dunfanaghy",13,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [115,115,"SHIP CONSTRUCTION","Donegal","Buncrana Rockytown (Phase 1)",20,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [116,116,"SHIP CONSTRUCTION","Donegal","Radharc na Tra Breige, Malin (Phase 3)",8,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [117,117,"SHIP CONSTRUCTION","Donegal ","Long Lane, Letterkenny ",34,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [118,118,"SHIP CONSTRUCTION","Donegal ","Cois Abhainn, St Johnston (Phase 2)",6,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [119,119,"SHIP CONSTRUCTION","Donegal ","Emerald Drive, Killybegs (Phase 6)",10,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [120,120,"CALF CONSTRUCTION","Dublin City","Ballygall Road East phase 2",11,"Fold Ireland Housing Association","","","","","","Scheme completed in Q1 2016"],
    [121,121,"CALF CONSTRUCTION","Dublin City","Poplar Row, Dublin 3",29,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q1 2015","",""],
    [122,122,"CALF CONSTRUCTION","Dublin City","St Mary?s Mansions, Dublin 1",56,"Cluid Housing Association","","","","Approval of turnkey/construction project Q1 2015","",""],
    [123,123,"CALF CONSTRUCTION","Dublin City","Richmond Road, Dublin 9",39,"Co-operative Ireland","","","","Approval of turnkey/construction project Q4 2015","",""],
    [124,124,"CALF CONSTRUCTION","Dublin City","Wad River Close, Ballymun, Dublin 9",8,"Cluid Housing Association","","","","Approval of turnkey/construction project Q2 2016","",""],
    [125,125,"CALF CONSTRUCTION","Dublin City","Raleigh Square, Crumlin",33,"The Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [126,126,"CALF CONSTRUCTION","Dublin City","Harolds Cross, Dublin 6",28,"Focus Ireland","","","","","","Scheme completed in Q4 2016"],
    [127,127,"CALF CONSTRUCTION","Dublin City","Broome Lodge,\nDunmanus Court, Cabra",33,"Cluid Housing Association","","","","","Scheme started on site in Q1 2016",""],
    [128,128,"CALF CONSTRUCTION","Dublin City","Annamore Court, Ballyfermot",70,"The Iveagh Trust","","","","","Scheme started on site in Q1 2016",""],
    [129,129,"CALF CONSTRUCTION","Dublin City","Orchard Lawns, Ballyfermot",72,"Co-operative Ireland","","","","","Scheme started on site in Q4 2016",""],
    [130,130,"CALF CONSTRUCTION TURNKEY","Dublin City"," An Riasc, Farnham Drive, Finglas",14,"The Housing Association","","","","","","Scheme completed in Q2 2016"],
    [131,131,"CALF CONSTRUCTION TURNKEY","Dublin City","Thornwood, Beaumont",46,"The Housing Association","","","","","","Scheme completed in Q2 2016"],
    [132,132,"CALF CONSTRUCTION TURNKEY","Dublin City","St Agnes Convent, Armagh Road, Crumlin, Dublin 12",97,"Fold Ireland Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [133,133,"CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Finglas, Phase 1,2,3 and 4",35,"The Housing Association","","","","","Scheme started on site in Q3 2015",""],
    [134,134,"CALF CONSTRUCTION TURNKEY","Dublin City","Thornwood, Beaumont",22,"The Housing Association","","","","","Scheme started on site in Q1 2016",""],
    [135,135,"CALF CONSTRUCTION TURNKEY","Dublin City","Merville Court, Merville Avenue, Fairview",5,"Co-operative Ireland","","","","","Scheme started on site in Q2 2016",""],
    [136,136,"CALF CONSTRUCTION TURNKEY","Dublin City","Stormanstown Hall, Ballymun Road, (revised)",42,"Oaklee Housing Trust","","","","","Scheme started on site in Q4 2016",""],
    [137,137,"CAS CONSTRUCTION","Dublin City","Broome Lodge, Dunmanus, Dublin 7",10,"Cluid Housing Association","","","","","Scheme started on site in Q1 2016",""],
    [138,138,"CAS CONSTRUCTION","Dublin City","St Agathas Court, North William Street, Dublin 1",11,"Peter McVerry","","","","","Scheme started on site in Q2 2016",""],
    [139,139,"CAS CONSTRUCTION","Dublin City","180-187 Townsend Street",18,"Peter McVerry","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [140,140,"CAS CONSTRUCTION","Dublin City","High Park, Dublin City",8,"Respond!  ","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [141,141,"CAS CONSTRUCTION","Dublin City","Beechill, Dublin 4",20,"RHDVHA","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [142,142,"CAS CONSTRUCTION","Dublin City","Ellis Court, Dublin",23,"The Housing Association","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [143,143,"CAS CONSTRUCTION","Dublin City","Rafter's Lane, Dublin 12",15,"Walkinston Housing","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [144,144,"REGENERATION","Dublin City","Dolphin House, D8 Phase 1",100,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [145,145,"REGENERATION","Dublin City","Dominick Street",73,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [146,146,"REGENERATION","Dublin City","Sackville Avenue Cottages",12,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [147,147,"REGENERATION","Dublin City","O'Devaney Gardens",56,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [148,148,"REGENERATION","Dublin City","Maxwell Road",9,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [149,149,"SHIP CONSTRUCTION","Dublin City","Bunratty Road Phase 1c, Dublin 17",62,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [150,150,"SHIP CONSTRUCTION","Dublin City","Cornamona, Ballyfermot, Dublin 12",60,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [151,151,"SHIP CONSTRUCTION","Dublin City","North King Street, Dublin 7",30,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [152,152,"SHIP CONSTRUCTION","Dublin City","Infirmary Road, Dublin 7",30,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [153,153,"SHIP CONSTRUCTION","Dublin City","Belcamp B, Dublin 17",12,"*N/A","","The scheme was Stage 2 approved in Q3 2015 full design/tender being prepared","","","",""],
    [154,154,"SHIP CONSTRUCTION","Dublin City","Belcamp C, Dublin 17",16,"*N/A","","The scheme was Stage 2 approved in Q3 2015 full design/tender being prepared","","","",""],
    [155,155,"SHIP CONSTRUCTION","Dublin City","Ballybough Road, Dublin 1",7,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [156,156,"SHIP CONSTRUCTION","Dublin City","Priory Hall, Dublin 13",35,"*N/A","","","","","Scheme started on site in Q4 2014",""],
    [157,157,"SHIP CONSTRUCTION","Dublin City","Hampton Wood, Finglas, Dublin 11 (Pt.V)",25,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [158,158,"SHIP CONSTRUCTION RAPID","Dublin City","Poppintree, Ballymun",22,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [159,159,"SHIP CONSTRUCTION RAPID","Dublin City","Cherry Orchard, Ballyfermot",24,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [160,160,"SHIP CONSTRUCTION RAPID","Dublin City","Mourne Road",29,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [161,161,"SHIP CONSTRUCTION RAPID","Dublin City","St Helenas, Finglas",40,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [162,162,"SHIP CONSTRUCTION RAPID","Dublin City","Belcamp, Dublin 17",38,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [163,163,"SHIP CONSTRUCTION RAPID","Dublin City","Wood bank/Rathvilly",17,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [164,164,"SHIP CONSTRUCTION RAPID","Dublin City","Cherry Orchard",53,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [165,165,"SHIP CONSTRUCTION RAPID","Dublin City","Bunratty Road",60,"*N/A","","","Scheme now being tendered","","",""],
    [166,166,"CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange (2), Clonsilla",19,"The Housing Association","","","","","","Scheme completed in Q2 2016"],
    [167,167,"CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange (2), Clonsilla",25,"The Housing Association","","","","","Scheme started on site in Q4 2015",""],
    [168,168,"CALF CONSTRUCTION TURNKEY","Fingal","Hansfield, Clonsilla, Dublin 15",98,"The Housing Association","","","","","Scheme started on site in Q3 2016",""],
    [169,169,"CALF CONSTRUCTION TURNKEY","Fingal","Dun Emer, Lusk",54,"The Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [170,170,"CALF CONSTRUCTION TURNKEY","Fingal","The Gallery, Donabate",43,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q3 2016","",""],
    [171,171,"CAS CONSTRUCTION","Fingal","Darcystown, Ringfort, Balrothery, Co Dublin",9,"North & East Housing \nAssociation","","","","","Scheme started on site in Q2 2016",""],
    [172,172,"CAS CONSTRUCTION","Fingal","Estuary Road, Malahide, Co Dublin",8,"Society of Saint Vincent \nde Paul","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [173,173,"CAS CONSTRUCTION","Fingal","22 College Street, Baldoyle, Co Dublin",4,"Cluid Housing Association","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [174,174,"CAS CONSTRUCTION","Fingal","Church Road/Ladyswell Road, Mulhuddart",22,"Cluid Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [175,175,"CAS CONSTRUCTION","Fingal","Balglass Road, Howth",15,"Fold Ireland Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [176,176,"CAS CONSTRUCTION","Fingal","Ravenswood",6,"Peter McVerry","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [177,177,"SHIP CONSTRUCTION","Fingal","St. Conan's Cottages, Swords",1,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [178,178,"SHIP CONSTRUCTION","Fingal","St. Cronan's Green, Swords",14,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [179,179,"SHIP CONSTRUCTION","Fingal","Cappaghfinn (Phase 1)",14,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [180,180,"SHIP CONSTRUCTION","Fingal","Racecourse Common, Lusk (Phase 2)",74,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [181,181,"SHIP CONSTRUCTION","Fingal","The Grange, Ballyboughal",8,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [182,182,"SHIP CONSTRUCTION","Fingal","Rathbeale Road, Swords",24,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [183,183,"SHIP CONSTRUCTION","Fingal","Cappaghfinn (Phase 2)",32,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [184,184,"SHIP CONSTRUCTION","Fingal","Castlelands Part View (Phase 3)",24,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [185,185,"SHIP CONSTRUCTION RAPID","Fingal","Wellview Mulhuddart",20,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [186,186,"SHIP CONSTRUCTION RAPID","Fingal","Pinewood, Balbriggan",25,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [187,187,"CAS CONSTRUCTION","Galway County","Letterfrack (Phase 1)",13,"Cluid Housing Association","","","","","","Scheme completed in Q2 2016"],
    [188,188,"CAS CONSTRUCTION","Galway County","Dunlo Hill, Ballinasloe",17,"Cluid Housing Association","","","The scheme was Stage 3 approved in Q1 2016 scheme now being tendered","","",""],
    [189,189,"CAS CONSTRUCTION","Galway County","Mountbellew",5,"Mountbellew Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [190,190,"CAS CONSTRUCTION","Galway County","Eanach Mheain, Carraroe",13,"Tearmann Eanna Teo","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [191,191,"CAS CONSTRUCTION","Galway County","Rossaveal Cottages, Ros a Mhil, South Connemara",8,"Tearmann Eanna Teo","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [192,192,"CAS CONSTRUCTION","Galway County","Claregalway",12,"Claregalway Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [193,193,"SHIP CONSTRUCTION","Galway County","Weir Road, Tuam",30,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [194,194,"SHIP CONSTRUCTION","Galway County","Garbally Drive, Ballinasloe",10,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [195,195,"CALF CONSTRUCTION","Galway County","Spiddal Cottages, Co Galway",31,"Cluid Housing Association","","","","Approval of turnkey/construction project Q1 2016","",""],
    [196,196,"SHIP CONSTRUCTION","Galway County","Esker Fields, Ballinasloe",2,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [197,197,"SHIP CONSTRUCTION","Galway County","Gilmartin Road, Tuam",40,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [198,198,"SHIP CONSTRUCTION","Galway County","Gort Mhailor, Athenry (Phase 2)",10,"*N/A","The scheme was Stage 1 approved in Q2 2015 - Scheme is on hold while drainage issues are addressed.","","","","",""],
    [199,199,"CALF CONSTRUCTION TURNKEY","Galway City","Reilean, Roscam, Block 5 Galway",12,"The Housing Association","","","","","Scheme started on site in Q4 2015",""],
    [200,200,"CALF CONSTRUCTION TURNKEY","Galway City","Reilean, Roscam,Block 4 Galway",12,"The Housing Association","","","","","Scheme started on site in Q4 2015",""],
    [201,201,"CALF CONSTRUCTION TURNKEY","Galway City"," Ballinasloe Area, Galway",39,"Cluid Housing Association","","","","Approval of turnkey/construction project Q3 2016","",""],
    [202,202,"CALF CONSTRUCTION TURNKEY","Galway City","Maoilin, Ballymoneen Road, Galway",6,"The Housing Association","","","","","Scheme started on site in Q2 2015",""],
    [203,203,"CAS CONSTRUCTION","Galway City","47 Forster Street",9,"Cope, Galway","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [204,204,"CAS CONSTRUCTION","Galway City","Cul Garrai, Rahoon",6,"Peter Triest Housing Association","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [205,205,"CAS CONSTRUCTION","Galway City","97/98 Rockfield",4,"Carrig Dubh Housing Association","","","","","Scheme started on site in Q3 2016",""],
    [206,206,"SHIP CONSTRUCTION","Galway City","Ballymoneen Road (Phase 1)",14,"*N/A","","","The scheme was Stage 3 approved in Q1 2016 scheme now being tendered","","",""],
    [207,207,"SHIP CONSTRUCTION","Galway City","Ballymoneen Road (Phase 2)",55,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [208,208,"CALF CONSTRUCTION TURNKEY","Galway City ","Boireann Beag, Ros Cam, Galway",16,"Cluid Housing Association","","","","","","Scheme completed in Q4 2016"],
    [209,209,"CAS CONSTRUCTION","Kerry","The Parsonage, Caherciveen",5,"Caherciveen Social \nServices","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [210,210,"CAS CONSTRUCTION","Kerry","Mitchels-Boherbee",16,"Cluid Housing Association","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [211,211,"CAS CONSTRUCTION","Kerry","Mitchels-Hawley Park",15,"Kingdom Voluntary \nHousing","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [212,212,"CAS CONSTRUCTION","Kerry","22 College Road, Castleisland",4,"Kerry Immigrants.","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [213,213,"CAS CONSTRUCTION","Kerry","Armagh House, Killarney",6,"Cluid Housing Association","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [214,214,"REGENERATION","Kerry","Urban Terrace, Tralee",2,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [215,215,"REGENERATION","Kerry","Clonmore Road, Tralee",3,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [216,216,"SHIP CONSTRUCTION","Kerry","The Park, Killarney",20,"*N/A","","","The scheme was Stage 3 approved in Q2 2016 scheme now being tendered","","",""],
    [217,217,"SHIP CONSTRUCTION","Kerry","Single Rural Dwellings",3,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [218,218,"SHIP CONSTRUCTION","Kerry","Bill Kinnerk Road",4,"*N/A","","","The scheme was Stage 3 approved in Q2 2016 scheme now being tendered","","",""],
    [219,219,"SHIP CONSTRUCTION","Kerry","Lixnaw",4,"*N/A","","","","The scheme was Stage 4 approved in Q4 2016 scheme is now fully approved","",""],
    [220,220,"SHIP CONSTRUCTION","Kerry","Killeen, Tralee",21,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [221,221,"SHIP CONSTRUCTION","Kerry","Listowel",7,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [222,222,"SHIP CONSTRUCTION","Kerry","Milltown",9,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [223,223,"SHIP CONSTRUCTION","Kerry","Kenmare",22,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [224,224,"SHIP CONSTRUCTION","Kerry","Listowel",1,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [225,225,"SHIP CONSTRUCTION","Kerry","Rathmore/Barraduff",20,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [226,226,"SHIP CONSTRUCTION","Kerry","Ardmoneel, Killorglin",14,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [227,227,"CALF CONSTRUCTION TURNKEY","Kerry ","Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry",6,"Cluid Housing Association","","","","","","Scheme completed in Q2 2016"],
    [228,228,"REGENERATION","Kerry ","Crolar Na Mistaelach, Tralee",11,"*N/A","","","Pre tender approved Q4 2016","","",""],
    [229,229,"REGENERATION","Kerry ","St Martin's Park, Tralee",4,"*N/A","","","Pre tender approved Q4 2016","","",""],
    [230,230,"REGENERATION","Kerry ","Dingle Road, Tralee",1,"*N/A","","","","Approval of planned construction project Q4 2016","",""],
    [231,231,"CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge",45,"The Housing Association","","","","","Scheme started on site in Q2 2016",""],
    [232,232,"CAS CONSTRUCTION","Kildare","Craddockstown, Naas",4,"KARE","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [233,233,"CAS CONSTRUCTION","Kildare","Main St., Kilcullen",4,"Camphill Communities of Ireland","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [234,234,"CAS CONSTRUCTION","Kildare","Jigginstown House, Naas",14,"Homeless Care Ltd","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [235,235,"CAS CONSTRUCTION","Kildare","El Kantara, Newbridge",2,"KARE","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [236,236,"CAS CONSTRUCTION","Kildare","27 Mansfield Grove, Athy",4,"KARE","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [237,237,"SHIP CONSTRUCTION","Kildare","Athgarvan Road, Newbridge",13,"*N/A","","","The scheme was Stage 3 approved in Q1 2016 scheme now being tendered","","",""],
    [238,238,"SHIP CONSTRUCTION","Kildare ","Kilcock (Phase 2)",20,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [239,239,"SHIP CONSTRUCTION","Kildare ","Bishopsland",34,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [240,240,"SHIP CONSTRUCTION","Kildare ","Rathagan",18,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [241,241,"SHIP CONSTRUCTION","Kildare ","Prosperous",12,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [242,242,"SHIP CONSTRUCTION","Kildare ","Rathasker, Naas",50,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [243,243,"SHIP CONSTRUCTION","Kildare ","Athgarvan",30,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [244,244,"CALF CONSTRUCTION","Kilkenny","Walkin Street, Kilkenny",43,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q1 2014","",""],
    [245,245,"CALF CONSTRUCTION TURNKEY","Kilkenny","Golf Links Road, Kilkenny",39,"Respond!","","","","Approval of turnkey/construction project Q4 2015","",""],
    [246,246,"CALF CONSTRUCTION TURNKEY","Kilkenny","North Kilkenny",9,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q4 2016","",""],
    [247,247,"CAS CONSTRUCTION","Kilkenny","Friary Walk, Callan",12,"Cluid Housing Association","","","","","","Scheme completed in Q3 2016"],
    [248,248,"CAS CONSTRUCTION","Kilkenny","\"Brooke House\", Thomastown",5,"Camphill Communities of Ireland","","","","","Scheme started on site in Q3 2016",""],
    [249,249,"CAS CONSTRUCTION","Kilkenny","Good Shepherd Centre Wing 1952",12,"The Good Shepherd \nCentre","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [250,250,"CAS CONSTRUCTION","Kilkenny","Nimble Spaces Project at Callan",16,"Camphill Communities of Ireland","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [251,251,"CAS CONSTRUCTION","Kilkenny","Greenshill, Kilkenny",6,"The Good Shepherd \nCentre","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [252,252,"CAS CONSTRUCTION","Kilkenny","Ballytobin, Callan",4,"Camphill Communities of Ireland","The scheme was Stage 1 approved in Q3 2014 outline design and costs now being prepared","","","","",""],
    [253,253,"CAS CONSTRUCTION","Kilkenny","Golf Links Road, Kilkenny",15,"Respond!  ","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [254,254,"SHIP CONSTRUCTION","Kilkenny","Gaol Rooad, Kilkenny",10,"*N/A","","","","","","Scheme completed in Q3 2016"],
    [255,255,"SHIP CONSTRUCTION","Kilkenny","Rosehill, Kiells Road, Kilkenny",6,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [256,256,"SHIP CONSTRUCTION","Kilkenny","The Butts, Kilkenny",22,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [257,257,"SHIP CONSTRUCTION","Kilkenny","Abbeyquarter Vicar Street, Kilkenny",30,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [258,258,"SHIP CONSTRUCTION","Kilkenny","Donaguile, Castlecomer",18,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [259,259,"SHIP CONSTRUCTION","Kilkenny","Bolton, Callan",39,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [260,260,"SHIP CONSTRUCTION","Kilkenny","Robertshill, Kilkenny",10,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [261,261,"SHIP CONSTRUCTION","Kilkenny","Main Street, Piltown",18,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [262,262,"SHIP CONSTRUCTION","Kilkenny","Station Road, Ballyragget",14,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [263,263,"SHIP CONSTRUCTION TURNKEY","Kilkenny ","Newpark, Casltecomer Road, Kilkenny",7,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [264,264,"SHIP CONSTRUCTION TURNKEY","Kilkenny ","Togher Way, Urlingford",11,"*N/A","","","","Approval of turnkey/construction project Q4 2016","",""],
    [265,265,"CALF CONSTRUCTION","Laois","Cluin Inn Mountrath",11,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q2 2015","",""],
    [266,266,"CALF CONSTRUCTION TURNKEY","Laois","Wilton Lawns, Portarlington, Co. Laois",2,"The Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [267,267,"CAS CONSTRUCTION","Laois","Abbeyleix Road, Portlaoise",16,"Respond!  ","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [268,268,"CAS CONSTRUCTION","Laois","St. Fintan's Hospital, Dublin Road, Portlaoise",8,"Oaklee Housing Trust","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [269,269,"SHIP CONSTRUCTION","Laois","Ballymorris Road, Portarlington",20,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [270,270,"SHIP CONSTRUCTION","Laois ","Conniberry Way, Old Knockmay Road, Portlaoise",33,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [271,271,"SHIP CONSTRUCTION","Laois ","Shannon Street, Mountrath",8,"*N/A","","The scheme was Stage 2 approved in Q1 2016 full design/tender being prepared","","","",""],
    [272,272,"SHIP CONSTRUCTION","Laois ","Pattison Est. Mountmellick",10,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [273,273,"SHIP CONSTRUCTION","Laois ","Harpurs Lane, Portlaoise ",1,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [274,274,"SHIP CONSTRUCTION","Laois ","Gleann na Glaise, Ballyroan",10,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [275,275,"CAS CONSTRUCTION","Leitrim","Ballinamore",2,"Society of Saint Vincent \nde Paul","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [276,276,"SHIP CONSTRUCTION","Leitrim ","Taobh Tire, Manorhamilton (Phase 2)",7,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [277,277,"CALF CONSTRUCTION","Limerick","Hyde Road, Limerick City",20,"Cluid Housing Association","","","","","Scheme started on site in Q3 2016",""],
    [278,278,"CALF CONSTRUCTION","Limerick","Mirth Thomondgate",18,"Associated Charities Trust","","","","Approval of turnkey/construction project Q1 2014","",""],
    [279,279,"CALF CONSTRUCTION TURNKEY","Limerick","Mungret Area , Co Limerick",8,"Cluid Housing Association","","","","","Scheme started on site in Q4 2016",""],
    [280,280,"CAS CONSTRUCTION","Limerick","Cuan Mhuire, Bruree",6,"Cuan Mhuire, Bruree","","","","The scheme was Stage 4 approved in Q4 2016 scheme is now fully approved","",""],
    [281,281,"CAS CONSTRUCTION","Limerick","Speakers Corner, Limerick City ",4,"Mid West Simon","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [282,282,"CAS CONSTRUCTION","Limerick","Drominbeg, Rhebogue",21,"NABCO","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [283,283,"CAS CONSTRUCTION","Limerick","Cappamore",12,"Cappamore Housing Association","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [284,284,"REGENERATION","Limerick","Lord Edward Street, P2: Main Contract*",81,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [285,285,"REGENERATION","Limerick","Gaol Lane New Build",1,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [286,286,"REGENERATION","Limerick","Sheep / Athlunkards Street",8,"*N/A","","The scheme was Stage 2 approved in Q2 2014 full design/tender being prepared","","","",""],
    [287,287,"REGENERATION","Limerick","Churchfield, Phase 1",42,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [288,288,"REGENERATION","Limerick","Churchfield, Phase 2",38,"*N/A","","The scheme was Stage 2 approved in Q4 2014 full design/tender being prepared","","","",""],
    [289,289,"REGENERATION","Limerick","Cosgrave Park",30,"*N/A","","The scheme was Stage 2 approved in Q1 2015 full design/tender being prepared","","","",""],
    [290,290,"REGENERATION","Limerick","Palm Close",26,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [291,291,"REGENERATION","Limerick","Orchard Site",27,"*N/A","The scheme was Stage 1 approved in Q1 2013 outline design and costs now being prepared","","","","",""],
    [292,292,"REGENERATION","Limerick","176-177 Cliona Park ",2,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [293,293,"REGENERATION","Limerick","Cliona Park Phase 2",10,"*N/A","","","","","Scheme started on site in Q4 2015",""],
    [294,294,"REGENERATION","Limerick","8-10 Gaol Lane",3,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [295,295,"REGENERATION","Limerick","1-3 Weston Gardens",3,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [296,296,"REGENERATION","Limerick","Moyross Rebuild",6,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [297,297,"REGENERATION","Limerick","Southhill Rebuild",8,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [298,298,"REGENERATION","Limerick","St. Mary's Park Rebuild",9,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [299,299,"REGENERATION","Limerick","BCW Rebuild",14,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [300,300,"REGENERATION","Limerick","St. Mary's Park Infills",19,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [301,301,"REGENERATION","Limerick","Cliona Park Phase 3",18,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [302,302,"REGENERATION","Limerick","Carew Park",37,"*N/A","The scheme was Stage 1 approved in Q1 2015 outline design and costs now being prepared","","","","",""],
    [303,303,"REGENERATION","Limerick","45-46 Cliona Park",2,"*N/A","","The scheme was Stage 2 approved in Q1 2016 full design/tender being prepared","","","",""],
    [304,304,"REGENERATION","Limerick","Dalgaish Park",17,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [305,305,"REGENERATION","Limerick","Markievicz Drive",13,"*N/A","The scheme was Stage 1 approved in Q1 2015 outline design and costs now being prepared","","","","",""],
    [306,306,"SHIP CONSTRUCTION","Limerick","Clonmacken, Limerick City",40,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [307,307,"SHIP CONSTRUCTION","Limerick","Deerpark, Adare",30,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [308,308,"SHIP CONSTRUCTION","Limerick","Glenview Drive, Hospital",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [309,309,"SHIP CONSTRUCTION","Limerick","Lisheen Park, Patrickswell",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [310,310,"SHIP CONSTRUCTION","Limerick","Wallers Well, Limerick City (Phase 2)",18,"*N/A","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [311,311,"SHIP CONSTRUCTION","Limerick","Joseph Street, Limerick City",3,"*N/A","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [312,312,"SHIP CONSTRUCTION","Limerick","Rathbane Road, Limerick City",2,"*N/A","The scheme was Stage 1 approved in Q4 2013 outline design and costs now being prepared","","","","",""],
    [313,313,"SHIP CONSTRUCTION","Limerick","Sycamore Avenue, Limerick City",4,"*N/A","The scheme was Stage 1 approved in Q4 2013 outline design and costs now being prepared","","","","",""],
    [314,314,"SHIP CONSTRUCTION","Limerick","Clare Street, Limerick City",6,"*N/A","The scheme was Stage 1 approved in Q1 2014 outline design and costs now being prepared","","","","",""],
    [315,315,"SHIP CONSTRUCTION","Limerick","Hassett Villas, Thomondgate",3,"*N/A","The scheme was Stage 1 approved in Q1 2014 outline design and costs now being prepared","","","","",""],
    [316,316,"SHIP CONSTRUCTION","Limerick","Kilmurry Court, Garryowen",6,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [317,317,"SHIP CONSTRUCTION","Limerick","Site Adj. to Athlunkard Boat Club, Limerick City",4,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [318,318,"SHIP CONSTRUCTION","Limerick","Sexton Street North & Kileely Court",10,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [319,319,"SHIP CONSTRUCTION","Limerick","Childers Road, Limerick City",24,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [320,320,"SHIP CONSTRUCTION","Limerick","Gough Place, Rosbrien Road, Limerick",7,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [321,321,"SHIP CONSTRUCTION","Limerick","Chas Flats, Limerick City",3,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [322,322,"SHIP CONSTRUCTION","Limerick","1-12 Burke Avenue, Limerick City ",12,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [323,323,"CALF CONSTRUCTION TURNKEY","Longford","Cartrun Breac, Lisbrack Rd, Longford",7,"Cluid Housing Association","","","","","Scheme started on site in Q3 2016",""],
    [324,324,"SHIP CONSTRUCTION TURNKEY","Longford","Mill Race Park, Drumlish",14,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [325,325,"SHIP CONSTRUCTION","Longford ","Edgeworthstown Road, Ballymahon",4,"*N/A","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [326,326,"SHIP CONSTRUCTION","Longford ","Rathcline Rd, Lanesborough",4,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [327,327,"SHIP CONSTRUCTION","Longford ","Church View, Lanesborough",13,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [328,328,"CALF CONSTRUCTION","Louth","Rath na Gloinne",3,"Cluid Housing Association","","","","","","Scheme completed in Q3 2016"],
    [329,329,"CALF CONSTRUCTION","Louth","Aston Village",8,"Respond!","","","","Approval of turnkey/construction project Q4 2016","",""],
    [330,330,"CALF CONSTRUCTION","Louth","Clos na Manach, Carlingford",10,"The Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [331,331,"CALF CONSTRUCTION","Louth","2 Slieve Row Crescent, Dundalk",1,"Cluid Housing Association","","","","","","Scheme completed in Q2 2016"],
    [332,332,"CALF CONSTRUCTION","Louth","Scarlett Street, Drogheda",15,"North & East Housing Association","","","","Approval of turnkey/construction project Q3 2016","",""],
    [333,333,"CALF CONSTRUCTION TURNKEY","Louth","Castle Court, Castlebellingham",14,"Cluid Housing Association","","","","","Scheme started on site in Q2 2016",""],
    [334,334,"CALF CONSTRUCTION TURNKEY","Louth","Liscorrie, Bog Lane, Drogheda",41,"The Housing Association","","","","","Scheme started on site in Q4 2016",""],
    [335,335,"CALF CONSTRUCTION TURNKEY","Louth","Coulter Place, Dundalk",22,"Cluid Housing Association","","","","","Scheme started on site in Q2 2016",""],
    [336,336,"CALF CONSTRUCTION TURNKEY","Louth","Rathmullen Road, Drogheda",35,"The Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [337,337,"CALF CONSTRUCTION TURNKEY","Louth","Rathmullen Road, Drogheda",35,"North & East Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [338,338,"REGENERATION","Louth","Cox's Dimesne Phase 2a",14,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [339,339,"REGENERATION","Louth","Cox's Dimesne Phase 2b",7,"*N/A","The scheme was Stage 1 approved in Q3 2013 outline design and costs now being prepared","","","","",""],
    [340,340,"CAS CONSTRUCTION","Louth ","Tierney Street, Ardee",7,"Oaklee Housing Trust","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [341,341,"CAS CONSTRUCTION","Louth ","Barrack Street, Dundalk",10,"Dundalk Simon Community","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [342,342,"CAS CONSTRUCTION","Louth ","Clontygora, Dundalk",11,"Cluid Housing Association","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [343,343,"CAS CONSTRUCTION","Louth ","McArdle Green (Moneymore), Drogheda ",1,"North & East Housing \nAssociation","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [344,344,"CAS CONSTRUCTION","Louth ","Tredagh View, Drogheda",1,"Respond!  ","","","","","Scheme started on site in Q3 2016",""],
    [345,345,"CAS CONSTRUCTION","Louth ","Saltown, Dundalk",7,"North & East Housing \nAssociation","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [346,346,"SHIP CONSTRUCTION","Louth ","Boice Court (Phase 2)",23,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [347,347,"SHIP CONSTRUCTION","Louth ","Boice Court (Phase 3)",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [348,348,"SHIP CONSTRUCTION","Louth ","Father Finn Park (Phase 2)",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [349,349,"SHIP CONSTRUCTION","Louth ","Woodlands, Dunleer",4,"*N/A","","","","","","Scheme completed in Q3 2016"],
    [350,350,"SHIP CONSTRUCTION","Louth ","Dundalk derelict units",17,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [351,351,"SHIP CONSTRUCTION","Louth ","Dundalk derelict units",7,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [352,352,"SHIP CONSTRUCTION","Louth ","Drogheda derelict units",12,"*N/A","","","","The scheme was approved in Q1 2016 - scheme is now fully approved","",""],
    [353,353,"SHIP CONSTRUCTION","Louth ","55/57 Bothar Brugha, Drogheda",3,"*N/A","","","","The scheme was approved in Q3 2016 - scheme is now fully approved","",""],
    [354,354,"CALF CONSTRUCTION TURNKEY","Mayo"," Ballina area",11,"Cluid Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [355,355,"CAS CONSTRUCTION","Mayo","Killosheehan, Ballinrobe",6,"Society of Saint Vincent \nde Paul","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [356,356,"SHIP CONSTRUCTION","Mayo ","Tubberhill, Westport (Phase 2)",21,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [357,357,"SHIP CONSTRUCTION","Mayo ","Marian Crescent, Ballina",4,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [358,358,"SHIP CONSTRUCTION","Mayo ","Knockmore, Ballina ",8,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [359,359,"SHIP CONSTRUCTION","Mayo ","Kilkelly Road, Knock (Phase 3)",4,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [360,360,"SHIP CONSTRUCTION","Mayo ","Kilmeena (Phase 2) ",4,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [361,361,"SHIP CONSTRUCTION","Mayo ","Barhauve, Rossport",1,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [362,362,"SHIP CONSTRUCTION","Mayo ","Claggaun, Ballycroy",1,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [363,363,"SHIP CONSTRUCTION","Mayo ","Glengad, Pollatomish",1,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [364,364,"SHIP CONSTRUCTION","Mayo ","Gorthbrack, Inver",1,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [365,365,"SHIP CONSTRUCTION","Mayo ","SRDs",8,"*N/A","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [366,366,"SHIP CONSTRUCTION","Mayo ","Knocknageeha, Newport",1,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [367,367,"CAS CONSTRUCTION","Mayo  ","Admiral Browne Rd., Foxford",8,"Society of Saint Vincent \nde Paul","","","","","","Scheme completed in Q3 2016"],
    [368,368,"CAS CONSTRUCTION","Mayo  ","Irishtown, Foxford",4,"Society of Saint Vincent \nde Paul","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [369,369,"CAS CONSTRUCTION","Mayo  ","Logmore, Belmullet",7,"Irish Wheelchair Association","","","","","Scheme started on site in Q4 2015",""],
    [370,370,"CALF CONSTRUCTION TURNKEY","Meath","Tubberclaire, Navan",23,"Cluid Housing Association","","","","","","Scheme completed in Q3 2016"],
    [371,371,"CALF CONSTRUCTION TURNKEY","Meath","Grangehall, Dunshaughlin",7,"The Housing Association","","","","Approval of turnkey/construction project Q3 2016","",""],
    [372,372,"CALF CONSTRUCTION TURNKEY","Meath"," Ashbourne area, Co Meath",67,"Cluid Housing Association","","","","","Scheme started on site in Q4 2016",""],
    [373,373,"CALF CONSTRUCTION TURNKEY","Meath","Meath",24,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q4 2016","",""],
    [374,374,"SHIP CONSTRUCTION","Meath","Bettystown (Phase 1)",16,"*N/A","","","","","Scheme started on site in Q2 2016",""],
    [375,375,"SHIP CONSTRUCTION","Meath","Bettystown (Phase 2)",12,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [376,376,"SHIP CONSTRUCTION","Meath","Cherry Court, Summerhill",19,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [377,377,"SHIP CONSTRUCTION","Meath"," Riverside, Kells ",40,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [378,378,"SHIP CONSTRUCTION","Meath","Connaught Grove, Athboy",32,"*N/A","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [379,379,"SHIP CONSTRUCTION","Meath","Ratoath",17,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [380,380,"CALF CONSTRUCTION TURNKEY","Meath ","Mill Lane, Flower Hill, Navan, Co Meath",20,"Oaklee Housing Trust","","","","","","Scheme completed in Q1 2016"],
    [381,381,"CALF CONSTRUCTION","Monaghan","Liseggerton Road, Clones",6,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q4 2014","",""],
    [382,382,"CALF CONSTRUCTION TURNKEY","Monaghan","Magheross, Carrickmacross",33,"The Housing Association","","","","Approval of turnkey/construction project Q2 2016","",""],
    [383,383,"CAS CONSTRUCTION","Monaghan","Convent Lands, Carrickmacross",7,"Respond!  ","","","","","Scheme started on site in Q1 2016",""],
    [384,384,"CAS CONSTRUCTION","Monaghan","Liseggerton, Clones",16,"Oaklee Housing Trust","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [385,385,"SHIP CONSTRUCTION","Monaghan","Latlorcan, Monaghan Town",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 - Scheme delayed by legal challenge","","","","",""],
    [386,386,"SHIP CONSTRUCTION","Monaghan ","Bree, Castleblayney",8,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [387,387,"SHIP CONSTRUCTION TURNKEY","Monaghan ","The Meadows, Smithborough, Monaghan",5,"*N/A","","","","","Scheme started on site in Q2 2016",""],
    [388,388,"SHIP CONSTRUCTION TURNKEY","Monaghan ","Drumbear Wood, Monaghan Town",12,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [389,389,"SHIP CONSTRUCTION TURNKEY","Monaghan ","Knockroe Glen, Monaghan Town",22,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [390,390,"SHIP CONSTRUCTION TURNKEY","Monaghan ","Railway View, Kilnacloy, Monaghan Town",16,"*N/A","","","","Approval of turnkey/construction project Q3 2016","",""],
    [391,391,"CAS CONSTRUCTION","Offaly","Scurragh, Birr",6,"Cluid Housing Association","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [392,392,"CAS CONSTRUCTION","Offaly","Killane Drive, Edenderry",2,"The Housing Association","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [393,393,"SHIP CONSTRUCTION","Offaly","Blundell Wood, Edenderry",33,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [394,394,"SHIP CONSTRUCTION","Offaly","Chancery Lane, Tullamore",18,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [395,395,"CALF CONSTRUCTION TURNKEY","Roscommon","Athlone",14,"Cluid Housing Association","","","","Approval of turnkey/construction project Q1 2016","",""],
    [396,396,"CALF CONSTRUCTION TURNKEY","Roscommon","Additional units Athlone area",40,"Cluid Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [397,397,"SHIP CONSTRUCTION TURNKEY","Roscommon ","Monksland, Athlone",10,"*N/A","","","","Approval of turnkey/construction project Q3 2016","",""],
    [398,398,"CAS CONSTRUCTION","Sligo","\"Shermac\" Tonaphubble",6,"Newgrove Housing Association Ltd","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [399,399,"SHIP CONSTRUCTION","Sligo","Fr Flanagan Tce.",22,"*N/A","","","","The scheme was Stage 4 approved in Q2 2016 scheme is now fully approved","",""],
    [400,400,"SHIP CONSTRUCTION","Sligo","Carrowbunnaun, Strandhill",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [401,401,"SHIP CONSTRUCTION","Sligo","Caltragh, Culleens",1,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [402,402,"SHIP CONSTRUCTION","Sligo","Knappagh Road",28,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [403,403,"SHIP CONSTRUCTION","Sligo","Colloney",13,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [404,404,"SHIP CONSTRUCTION","Sligo ","Rosses Point ",14,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [405,405,"CALF CONSTRUCTION TURNKEY","South Dublin","Station Road, Clondalkin, Co. Dublin",5,"Respond!","","","","","Scheme started on site in Q2 2016",""],
    [406,406,"CAS CONSTRUCTION","South Dublin","1 Hollyville Terrace, Palmerston",2,"Cluid Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [407,407,"CAS CONSTRUCTION","South Dublin","Old Nangor Road, Clondalkin",10,"Dublin Simon \nCommunity","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [408,408,"CAS CONSTRUCTION","South Dublin","Collinstown Grove, Clondalkin",4,"The Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [409,409,"SHIP CONSTRUCTION","South Dublin","Suncroft, Tallaght",10,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [410,410,"SHIP CONSTRUCTION","South Dublin","Belgard Road, Tallagh",3,"*N/A","","","","","","Scheme completed in Q1 2016"],
    [411,411,"SHIP CONSTRUCTION","South Dublin","St Finians",2,"*N/A","","","","","","Scheme completed in Q3 2016"],
    [412,412,"SHIP CONSTRUCTION","South Dublin","St Marks Green, Clondalkin",11,"*N/A","","","","The scheme was Stage 4 approved in Q4 2016 scheme is now fully approved","",""],
    [413,413,"SHIP CONSTRUCTION","South Dublin","Fortunestown (MacUilliam)",28,"*N/A","","","The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","","",""],
    [414,414,"SHIP CONSTRUCTION","South Dublin","Mayfield Estate",18,"*N/A","","","","The scheme was Stage 4 approved in Q4 2016 scheme is now fully approved","",""],
    [415,415,"SHIP CONSTRUCTION","South Dublin","Dromcarra, Tallaght",14,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [416,416,"SHIP CONSTRUCTION","South Dublin","Letts Field, Neilstown, Clondalkin",37,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [417,417,"SHIP CONSTRUCTION","South Dublin","Ballyboden,  Rathfarnham",40,"*N/A","","The scheme was Stage 2 approved in Q1 2016 full design/tender being prepared","","","",""],
    [418,418,"SHIP CONSTRUCTION","South Dublin","Balgaddy F",50,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [419,419,"SHIP CONSTRUCTION","South Dublin","St. Marks Avenue, Clondalkin ",39,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [420,420,"SHIP CONSTRUCTION","South Dublin","Killinarden, Tallaght",28,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [421,421,"SHIP CONSTRUCTION RAPID","South Dublin","St Aidan's,  Brookfield Tallaght",85,"*N/A","","The scheme was Stage 2 approved in Q4 2016 design/tender being prepared","","","",""],
    [422,422,"CAS CONSTRUCTION","Tipperary","Fethard",4,"Brothers of Charity/Belmount Park Housing Association Ltd. ","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [423,423,"CAS CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",9,"Cluid Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [424,424,"CAS CONSTRUCTION","Tipperary","Ballinagrana (3), The Strand (3) & Castle Street, Carrick on Suir",7,"Camphill Communities of Ireland","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [425,425,"SHIP CONSTRUCTION","Tipperary","Two houses, Borrisoleigh",2,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [426,426,"SHIP CONSTRUCTION","Tipperary","Lacey Avenue, Templemore",4,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [427,427,"SHIP CONSTRUCTION","Tipperary","Mitchels St., Thurles",1,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [428,428,"SHIP CONSTRUCTION","Tipperary","Gortataggart, Thurles",2,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [429,429,"SHIP CONSTRUCTION","Tipperary","Kilcooly Way, Gortnahoe",5,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [430,430,"SHIP CONSTRUCTION","Tipperary","Cloughjordan",3,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [431,431,"SHIP CONSTRUCTION","Tipperary","Waller's Lot, Cashel",10,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [432,432,"SHIP CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",20,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [433,433,"SHIP CONSTRUCTION","Tipperary","Borrisoleigh",12,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [434,434,"SHIP CONSTRUCTION","Tipperary","Templetouhy",6,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [435,435,"SHIP CONSTRUCTION","Tipperary","Lower Ballingarry",1,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [436,436,"SHIP CONSTRUCTION","Tipperary","Poulamaleen, Faugheen",1,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [437,437,"SHIP CONSTRUCTION","Tipperary","Glencarrick, Roscrea",10,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [438,438,"CALF CONSTRUCTION","Waterford","St Johns College, Waterford",36,"Respond!","","","","","","Scheme completed in Q1 2016"],
    [439,439,"CALF CONSTRUCTION TURNKEY","Waterford","Estuary Heights, Shandon Road, Dungarvan",20,"Co-operative Ireland","","","","Approval of turnkey/construction project Q3 2016","",""],
    [440,440,"CAS CONSTRUCTION","Waterford","The Paddocks, Williamstown Rd. Waterford",6,"Anvers Housing Association","","The scheme was Stage 2 approved in Q4 2015 full design/tender being prepared","","","",""],
    [441,441,"CAS CONSTRUCTION","Waterford","Ballycarnane, Tramore",18,"Tramore Voluntary Housing association","The scheme was Stage 1 approved in Q3 2014 outline design and costs now being prepared","","","","",""],
    [442,442,"CAS CONSTRUCTION","Waterford","Gleann Ealach, Dunhill",8,"Gleann Ealach Housing Assoc","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [443,443,"CAS CONSTRUCTION","Waterford","Wadding Manor, Ferrybank",10,"Respond!  ","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [444,444,"CAS CONSTRUCTION","Waterford","Powersfield, Hennessys Road, Waterford",3,"Focus Ireland","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [445,445,"CAS CONSTRUCTION","Waterford","Clarendon Court, Waterford City",10,"Cluid Housing Association","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [446,446,"SHIP CONSTRUCTION","Waterford","Old Cinema Site, Dungarvan",15,"*N/A","","","","","","Scheme completed in Q4 2016"],
    [447,447,"SHIP CONSTRUCTION","Waterford","Ardmore Park/Priory Lawn, Waterford City",8,"*N/A","","The scheme was Stage 2 approved in Q4 2015 full design/tender being prepared","","","",""],
    [448,448,"SHIP CONSTRUCTION","Waterford","Larchville, Waterford City",5,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [449,449,"SHIP CONSTRUCTION","Waterford","Patrick Street, Tramore",2,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [450,450,"SHIP CONSTRUCTION","Waterford","Barrack Street, Cappoquin",4,"*N/A","","","","","Scheme started on site in Q4 2016",""],
    [451,451,"SHIP CONSTRUCTION","Waterford","Coolfin Woods, Portlaw",12,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [452,452,"SHIP CONSTRUCTION","Waterford","Ballinroad, Dungarvan",20,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [453,453,"SHIP CONSTRUCTION","Waterford","Alms Houses, Tallow",4,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [454,454,"SHIP CONSTRUCTION","Waterford","An Garran, Tramore",32,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [455,455,"SHIP CONSTRUCTION","Waterford","Doyle Street, Waterford City",4,"*N/A","The scheme was Stage 1 approved in Q1 2014 outline design and costs now being prepared","","","","",""],
    [456,456,"CAS CONSTRUCTION","Westmeath","Springfield, Mullingar",12,"The Housing Association","The scheme was Stage 1 approved in Q1 2014 outline design and costs now being prepared","","","","",""],
    [457,457,"CAS CONSTRUCTION","Westmeath","Canal Avenue, Mullingar ",9,"The Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [458,458,"CAS CONSTRUCTION","Westmeath","St. Anne's Chapel Street, Athlone",4,"Respond!  ","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [459,459,"CAS CONSTRUCTION","Westmeath","Farran, Mullingar  ",3,"The Housing Association","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [460,460,"SHIP CONSTRUCTION","Westmeath","Ennell court (Phase 2)",3,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [461,461,"SHIP CONSTRUCTION","Westmeath","16 Ennell Court",1,"*N/A","","","The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","","",""],
    [462,462,"SHIP CONSTRUCTION","Westmeath","Grange Crescent, Mullingar",2,"*N/A","","","","","","Scheme completed in Q1 2016"],
    [463,463,"SHIP CONSTRUCTION","Westmeath","Clonbrusk, Athlone (Arcadia)  Site No. 2",33,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [464,464,"SHIP CONSTRUCTION","Westmeath","St. Laurence's Terrace, Mullingar",9,"*N/A","","The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","","","",""],
    [465,465,"SHIP CONSTRUCTION","Westmeath","Bun Daire, Kinnegad (Phase 3)",28,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [466,466,"CALF CONSTRUCTION","Wexford"," Wexford town",39,"Cluid Housing Association","","","","Approval of turnkey/construction project Q4 2016","",""],
    [467,467,"CALF CONSTRUCTION TURNKEY","Wexford","10 Hunters Green, Gorey",18,"Co-operative Ireland","","","","","","Scheme completed in Q2 2016"],
    [468,468,"CALF CONSTRUCTION TURNKEY","Wexford","Hunters Green, Gorey",20,"Co-operative Ireland","","","","","Scheme started on site in Q1 2015",""],
    [469,469,"CALF CONSTRUCTION TURNKEY","Wexford","Wexford",28,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q4 2016","",""],
    [470,470,"CALF CONSTRUCTION TURNKEY","Wexford","Enniscorthy",40,"Oaklee Housing Trust","","","","Approval of turnkey/construction project Q4 2016","",""],
    [471,471,"CAS CONSTRUCTION","Wexford","Rathangan",7,"Rathangan Senior Citizens Housing Association","","","","","Scheme started on site in Q1 2016",""],
    [472,472,"CAS CONSTRUCTION","Wexford","Westlands, Wexford",7,"Respond!  ","The scheme was Stage 1 approved in Q3 2014 outline design and costs now being prepared","","","","",""],
    [473,473,"CAS CONSTRUCTION","Wexford","Barrystown",16,"Grantstown Voluntary Housing Association","The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","","","","",""],
    [474,474,"SHIP CONSTRUCTION","Wexford","Shanna Court, Coolcotts ",8,"*N/A","","","","","","Scheme completed in Q1 2016"],
    [475,475,"SHIP CONSTRUCTION","Wexford","Baile an Tr, Riverchapel (Courtown Ardamine)",10,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [476,476,"SHIP CONSTRUCTION","Wexford","Francis Street, Wexford ",1,"*N/A","","","","","Scheme started on site in Q3 2016",""],
    [477,477,"SHIP CONSTRUCTION","Wexford","Baile Eoghain, Gorey",9,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [478,478,"SHIP CONSTRUCTION","Wexford","Killeens, Wexford",14,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [479,479,"SHIP CONSTRUCTION","Wexford","Cherryorchard, Enniscorthy",8,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [480,480,"SHIP CONSTRUCTION","Wexford","Oylegate",2,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [481,481,"SHIP CONSTRUCTION","Wexford","Ross Road, Enniscorthy",1,"*N/A","","The scheme was Stage 2 approved in Q1 2016 full design/tender being prepared","","","",""],
    [482,482,"SHIP CONSTRUCTION","Wexford","Clonard, Wexford",26,"*N/A","The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","","","","",""],
    [483,483,"SHIP CONSTRUCTION","Wexford","Whiterock Hill, Wexford",36,"*N/A","The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","","","","",""],
    [484,484,"SHIP CONSTRUCTION","Wexford","Danescastle",12,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [485,485,"SHIP CONSTRUCTION","Wexford","Creagh, Gorey",10,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [486,486,"SHIP CONSTRUCTION","Wexford","5 Mountain View",1,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [487,487,"SHIP CONSTRUCTION","Wexford","41 St Martins Park",1,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [488,488,"SHIP CONSTRUCTION","Wexford","Slippery Green, Wexford",10,"*N/A","The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","","","","",""],
    [489,489,"CALF CONSTRUCTION","Wexford","Meadowfields (Pt.V)",12,"*N/A","","","","","","Scheme completed in Q2 2016"],
    [490,490,"SHIP CONSTRUCTION","Wexford ","Cois Mara",2,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [491,491,"SHIP CONSTRUCTION TURNKEY","Wexford ","Madeira Oaks, Wexford",8,"*N/A","","","","","Scheme started on site in Q1 2016",""],
    [492,492,"CALF CONSTRUCTION TURNKEY","Wicklow","Vale Road, Arklow, Co. Wicklow",36,"Co-operative Ireland","","","","Approval of turnkey/construction project Q4 2016","",""],
    [493,493,"SHIP CONSTRUCTION","Wicklow","Brewery Bends, Rathdrum (Phase 2)",20,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [494,494,"SHIP CONSTRUCTION","Wicklow","Kilbride Lane, Bray (Murphy's Lands)",42,"*N/A","The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","","","","",""],
    [495,495,"SHIP CONSTRUCTION","Wicklow ","Farrankelly, Greystones (Phase 2)",15,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [496,496,"SHIP CONSTRUCTION","Wicklow ","O'Byrne Road, Bray",1,"*N/A","","The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","","","",""],
    [497,497,"SHIP CONSTRUCTION","Wicklow ","Emoclew Road, Arklow (Phase 1)",17,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [498,498,"SHIP CONSTRUCTION","Wicklow ","Emoclew Road, Arklow (Phase 2)",20,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [499,499,"SHIP CONSTRUCTION","Wicklow ","Sugarloaf View, Kilmacanogue",20,"*N/A","The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","","","","",""],
    [500,500,"SHIP CONSTRUCTION","Wicklow ","FCA Hall, Wicklow Town",8,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [501,501,"SHIP CONSTRUCTION","Wicklow ","Kilmantain Place, Bray",4,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [502,502,"SHIP CONSTRUCTION","Wicklow ","Ard Na Mara, Kilcoole",2,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [503,503,"SHIP CONSTRUCTION","Wicklow ","Druids Brook, Kilcoole",2,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""],
    [504,504,"SHIP CONSTRUCTION","Wicklow ","Old Library, Arklow",7,"*N/A","","The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","","","",""]
]}