{"help": "https://opendata.housing.gov.ie/ga/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "59c991ba-ca82-4dc5-8471-0d9879cc2df2", "total_estimation_threshold": null, "records": [{"_id":1,"No.":1,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"7 units, Rivercourt, Carlow (Phase 1)","No. of Units":3,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":2,"No.":2,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"7 units, Rivercourt, Carlow (Phase 2)","No. of Units":4,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":3,"No.":3,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Ballickmoyler, Graigcullen, Carlow (Phase 1)","No. of Units":27,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":4,"No.":4,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Ballickmoyler, Graigcullen, Carlow (Phase 2)","No. of Units":30,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":5,"No.":5,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Barrett Street, Bagnalstown, Co. Carlow (Phase 1)","No. of Units":10,"Approved Housing Body":"Tintean Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2018"},{"_id":6,"No.":6,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)","No. of Units":15,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":7,"No.":7,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)","No. of Units":12,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2018","Completed":""},{"_id":8,"No.":8,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 3)","No. of Units":32,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2018","Completed":""},{"_id":9,"No.":9,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)","No. of Units":14,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":10,"No.":10,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Laragh Beg, Ballon, Co. Carlow (Phase 1)","No. of Units":14,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q3-2018","On site":"","Completed":""},{"_id":11,"No.":11,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Laragh Beg, Ballon, Co. Carlow (Phase 2)","No. of Units":8,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q3-2018","On site":"","Completed":""},{"_id":12,"No.":12,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Rivercourt,  Carlow  (Phase 1)*","No. of Units":8,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2018","Completed":""},{"_id":13,"No.":13,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Rivercourt,  Carlow  (Phase 2)","No. of Units":8,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2018","Completed":""},{"_id":14,"No.":14,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Rivercourt,  Carlow  (Phase 3)","No. of Units":12,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2018","Completed":""},{"_id":15,"No.":15,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Rivercourt,  Carlow  (Phase 4)","No. of Units":9,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2018","Completed":""},{"_id":16,"No.":16,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Rivercourt,  Carlow  (Phase 5)","No. of Units":10,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2018","Completed":""},{"_id":17,"No.":17,"Funding Programme":"CALF Turnkey","LA":"Carlow","Scheme/Project Name":"Sleaty Street, Graigcullen, Carlow  (Phase 1)","No. of Units":26,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2019"},{"_id":18,"No.":18,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 1)","No. of Units":8,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":19,"No.":19,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 2)","No. of Units":4,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":20,"No.":20,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 3)","No. of Units":5,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":21,"No.":21,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 4)","No. of Units":8,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":22,"No.":22,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Cluain Dara, Kingscourt, Co Cavan (Phase 1)","No. of Units":16,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2016"},{"_id":23,"No.":23,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee, Cavan (Phase 1)","No. of Units":4,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2018"},{"_id":24,"No.":24,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee, Cavan (Phase 2)","No. of Units":5,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2018"},{"_id":25,"No.":25,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Drumalee Manor, Drumalee, Cavan (Phase 3)","No. of Units":2,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":26,"No.":26,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Rampart View, Virginia, Co. Cavan (Phase 1)","No. of Units":8,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":27,"No.":27,"Funding Programme":"CALF Turnkey","LA":"Cavan","Scheme/Project Name":"Rampart View, Virginia, Co. Cavan (Phase 2)","No. of Units":11,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":28,"No.":28,"Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)","No. of Units":12,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2018"},{"_id":29,"No.":29,"Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)","No. of Units":18,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":30,"No.":30,"Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)","No. of Units":3,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":31,"No.":31,"Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)","No. of Units":2,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q2-2018","Completed":""},{"_id":32,"No.":32,"Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Lios Anama, Sixmilebridge, Clare (Phase 1)","No. of Units":28,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":33,"No.":33,"Funding Programme":"CALF Construction","LA":"Clare","Scheme/Project Name":"Revised - Bruachlan, Westbury, Co Clare (Phase 1)","No. of Units":22,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2017","On site":"","Completed":""},{"_id":34,"No.":34,"Funding Programme":"CALF Turnkey","LA":"Clare","Scheme/Project Name":"Tullyvarraga, Shannon, Co. Clare (Phase 1)*","No. of Units":47,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2018","Completed":""},{"_id":35,"No.":35,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"Leeside Apartments, Bachelors Quay, Cork City (Phase 1)","No. of Units":72,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":36,"No.":36,"Funding Programme":"CALF Construction","LA":"Cork City","Scheme/Project Name":"Lower Glanmire Road, Cork City (Phase 1)","No. of Units":8,"Approved Housing Body":"Galtan Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":37,"No.":37,"Funding Programme":"CALF Construction","LA":"Cork City","Scheme/Project Name":"Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)","No. of Units":3,"Approved Housing Body":"Galtan Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2018"},{"_id":38,"No.":38,"Funding Programme":"CALF Construction","LA":"Cork City","Scheme/Project Name":"Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)","No. of Units":3,"Approved Housing Body":"Galtan Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":39,"No.":39,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"Millerd Street, Cork (Phase 1)","No. of Units":25,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":40,"No.":40,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"North Abbey Street, Cork City  (Phase 1)","No. of Units":6,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":41,"No.":41,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"Redforge Road, Blackpool, Cork City (Phase 1)*","No. of Units":80,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q3-2018","On site":"","Completed":""},{"_id":42,"No.":42,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)","No. of Units":31,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":43,"No.":43,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)","No. of Units":21,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2018","Completed":""},{"_id":44,"No.":44,"Funding Programme":"CALF Turnkey","LA":"Cork City","Scheme/Project Name":"The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)","No. of Units":17,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":45,"No.":45,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"3 units, Mullavale, Castletownroche, Co. Cork (Phase 1)","No. of Units":3,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2019","Completed":""},{"_id":46,"No.":46,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Beach Road, Passage West, Co. Cork (Phase 1)","No. of Units":3,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":47,"No.":47,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"College Manor, Cobh (Phase 1)","No. of Units":10,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2016"},{"_id":48,"No.":48,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Coolroe, Ballincollig, Co. Cork (Phase 1)","No. of Units":44,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q4-2018","On site":"","Completed":""},{"_id":49,"No.":49,"Funding Programme":"CALF Construction","LA":"Cork County","Scheme/Project Name":"Duntahane, Fermoy, Co. Cork (Phase 1)","No. of Units":46,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q4-2018","Completed":""},{"_id":50,"No.":50,"Funding Programme":"CALF Construction","LA":"Cork County","Scheme/Project Name":"Firgrove Harrisons lane (Phase 1)","No. of Units":6,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":51,"No.":51,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)*","No. of Units":42,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q4-2018","Completed":""},{"_id":52,"No.":52,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Mullavale, Castletownroche, Co. Cork (Phase 1)","No. of Units":6,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":53,"No.":53,"Funding Programme":"CALF Construction","LA":"Cork County","Scheme/Project Name":"Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)","No. of Units":40,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q4-2018","Completed":""},{"_id":54,"No.":54,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Ticknock, Cobh, Cork (Phase 1)","No. of Units":8,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":55,"No.":55,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Togher Cross, Lehenaghmore, Co. Cork (Phase 1)","No. of Units":9,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2018","Completed":""},{"_id":56,"No.":56,"Funding Programme":"CALF Turnkey","LA":"Cork County","Scheme/Project Name":"Weston, Carrigaline, Co. Cork (Phase 1)","No. of Units":7,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2018"},{"_id":57,"No.":57,"Funding Programme":"CALF Construction","LA":"DLR","Scheme/Project Name":"Abbeyview, Monkstown, Co. Dublin (Phase 1)","No. of Units":11,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q4-2018","On site":"","Completed":""},{"_id":58,"No.":58,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*","No. of Units":8,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":59,"No.":59,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Bishops Gate, Kilternan, Dublin 18  (Phase 1)*","No. of Units":4,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2018"},{"_id":60,"No.":60,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Bishops Gate, Kilternan, Dublin 18  (Phase 2)*","No. of Units":2,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2018"},{"_id":61,"No.":61,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Block C, Abbey Road, Monkstown, (Phase 1)*","No. of Units":3,"Approved Housing Body":"Fold Housing Association Ireland Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":62,"No.":62,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*","No. of Units":44,"Approved Housing Body":"The Iveagh Trust","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q3-2017","Completed":""},{"_id":63,"No.":63,"Funding Programme":"CALF Construction","LA":"DLR","Scheme/Project Name":"Cromlech Fields, Loughlinstown, Ballybrack, Dublin (Phase 1)","No. of Units":34,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":64,"No.":64,"Funding Programme":"CALF Construction","LA":"DLR","Scheme/Project Name":"Enniskerry Road, Sandyford, Dublin 18, (Phase 1)","No. of Units":53,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":65,"No.":65,"Funding Programme":"CALF Construction","LA":"DLR","Scheme/Project Name":"Enniskerry Road, Sandyford, Dublin 19, (Phase 1)","No. of Units":52,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""},{"_id":66,"No.":66,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)","No. of Units":1,"Approved Housing Body":"St John of God Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":67,"No.":67,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*","No. of Units":8,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":68,"No.":68,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Marine Walk, Marine Road, Dun Laoghaire (Phase 1)*","No. of Units":2,"Approved Housing Body":"Oaklee Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2016","Completed":""},{"_id":69,"No.":69,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*","No. of Units":2,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":70,"No.":70,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*","No. of Units":4,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":71,"No.":71,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*","No. of Units":2,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":72,"No.":72,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*","No. of Units":5,"Approved Housing Body":"Fold Housing Association Ireland Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":73,"No.":73,"Funding Programme":"CALF Turnkey","LA":"DLR","Scheme/Project Name":"Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*","No. of Units":4,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2017"},{"_id":74,"No.":74,"Funding Programme":"CALF Turnkey","LA":"Donegal","Scheme/Project Name":"Ardrawer, Kiltoy, Letterkenny, Co. Donegal (Phase 1)","No. of Units":46,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2018","On site":"","Completed":""},{"_id":75,"No.":75,"Funding Programme":"CALF Turnkey","LA":"Donegal","Scheme/Project Name":"Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*","No. of Units":33,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q4-2017","Completed":""},{"_id":76,"No.":76,"Funding Programme":"CALF Turnkey","LA":"Donegal","Scheme/Project Name":"Forge Road, Donegal (Phase 1)","No. of Units":4,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2016"},{"_id":77,"No.":77,"Funding Programme":"CALF Construction","LA":"Donegal","Scheme/Project Name":"Post Tender - Ernedale Ballyshannon (Phase 1)","No. of Units":11,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":78,"No.":78,"Funding Programme":"CALF Construction","LA":"Donegal","Scheme/Project Name":"Raphoe Road, Castlefinn, Co. Donegal (Phase 1)","No. of Units":10,"Approved Housing Body":"Habinteg Housing Association (Ireland) Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q2-2018","On site":"","Completed":""},{"_id":79,"No.":79,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)","No. of Units":14,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2016"},{"_id":80,"No.":80,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)","No. of Units":21,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2017"},{"_id":81,"No.":81,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)","No. of Units":10,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2017"},{"_id":82,"No.":82,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)","No. of Units":3,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2017"},{"_id":83,"No.":83,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)","No. of Units":1,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":84,"No.":84,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":"Annamore Court, Ballyfermot (Phase 1)","No. of Units":70,"Approved Housing Body":"The Iveagh Trust","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2017"},{"_id":85,"No.":85,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Balfe Road, Crumlin, Dublin 12 (Phase 1)*","No. of Units":16,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":86,"No.":86,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":" Ballygall Road East Phase 2 (Phase 1)","No. of Units":11,"Approved Housing Body":"Fold Housing Association Ireland Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2016"},{"_id":87,"No.":87,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":"Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)","No. of Units":23,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q2-2018","On site":"","Completed":""},{"_id":88,"No.":88,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":"Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 2)","No. of Units":39,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q2-2018","On site":"","Completed":""},{"_id":89,"No.":89,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*","No. of Units":26,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2018"},{"_id":90,"No.":90,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Bluebell Avenue, Dublin 12 (Phase 1)","No. of Units":7,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2018"},{"_id":91,"No.":91,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":"Broome Lodge,\r\nDunmanus Court, Cabra (Phase 1)","No. of Units":33,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":92,"No.":92,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Canal Meadows, Bluebell, Dublin 12 (Phase 1)","No. of Units":4,"Approved Housing Body":"Túath Housing Association Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2019"},{"_id":93,"No.":93,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*","No. of Units":16,"Approved Housing Body":"Respond","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":94,"No.":94,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Clongriffin, Dublin 13 (Phase 1)*","No. of Units":84,"Approved Housing Body":"The Iveagh Trust","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"Q1-2018","Completed":""},{"_id":95,"No.":95,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Crumlin Village, Dublin 12 (Phase 1)","No. of Units":3,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q2-2017"},{"_id":96,"No.":96,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Crumlin Village, Dublin 12 (Phase 2)","No. of Units":2,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q3-2017"},{"_id":97,"No.":97,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":"Harolds Cross, Dublin 6 (Phase 1)","No. of Units":28,"Approved Housing Body":"Focus Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2016"},{"_id":98,"No.":98,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Merville Court, Merville Avenue, Fairview (Phase 1)","No. of Units":5,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q1-2017"},{"_id":99,"No.":99,"Funding Programme":"CALF Turnkey","LA":"Dublin City","Scheme/Project Name":"Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)","No. of Units":8,"Approved Housing Body":"Cluid Housing ","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"","On site":"","Completed":"Q4-2017"},{"_id":100,"No.":100,"Funding Programme":"CALF Construction","LA":"Dublin City","Scheme/Project Name":"North King Street, Dublin 7  (Phase 1)","No. of Units":30,"Approved Housing Body":"Co-operative Housing Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre Planning":"","Stage 3 Pre Tender design":"","Stage 4 Tender Report of Final Turnkey/CALF approval":"Q1-2019","On site":"","Completed":""}], "fields": [{"id": "_id", "type": "int"}, {"id": "No.", "type": "numeric"}, {"id": "Funding Programme", "type": "text"}, {"id": "LA", "type": "text"}, {"id": "Scheme/Project Name", "type": "text"}, {"id": "No. of Units", "type": "numeric"}, {"id": "Approved Housing Body", "type": "text"}, {"id": "Stage 1 Capital Appraisal", "type": "text"}, {"id": "Stage 2 Pre Planning", "type": "text"}, {"id": "Stage 3 Pre Tender design", "type": "text"}, {"id": "Stage 4 Tender Report of Final Turnkey/CALF approval", "type": "text"}, {"id": "On site", "type": "text"}, {"id": "Completed", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=59c991ba-ca82-4dc5-8471-0d9879cc2df2", "next": "/api/3/action/datastore_search?resource_id=59c991ba-ca82-4dc5-8471-0d9879cc2df2&offset=100"}, "total": 1416, "total_was_estimated": false}}