{"help": "https://opendata.housing.gov.ie/ga/api/3/action/help_show?name=datastore_search", "success": true, "result": {"include_total": true, "limit": 100, "records_format": "objects", "resource_id": "8be876b7-349c-4659-928b-27bfbc61ab3f", "total_estimation_threshold": null, "records": [{"_id":1,"No.":1,"Funding Programme":"CAS CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Mill Race Court, Carlow Town","No. of Units":14,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":2,"No.":2,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Royal Oak Road, Bagenalstown  ","No. of Units":24,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":3,"No.":3,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Pound Lane, Borris","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":4,"No.":4,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Rural Cottages at Rathvilly & Tullow","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":5,"No.":5,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"St Patrick's Park, Tullow","No. of Units":14,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":6,"No.":6,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Rathvilly","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":7,"No.":7,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Mount Leinster Park, Carlow","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"The scheme was Stage 3 approved in Q3 2016 scheme now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":8,"No.":8,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Maryborough St, Carlow","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":9,"No.":9,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Myshall","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":10,"No.":10,"Funding Programme":"SHIP CONSTRUCTION","LA":"Carlow","Scheme/Project Name":"Hackettstown","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":11,"No.":11,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Carlow","Scheme/Project Name":"Sleaty Street, Carlow","No. of Units":26,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q2 2016","Site Start":"","Practical Completion":""},{"_id":12,"No.":12,"Funding Programme":"CAS CONSTRUCTION","LA":"Carlow ","Scheme/Project Name":"Ballincarrig, Wexford Road, Carlow","No. of Units":7,"Approved Housing Body":"Tintean Carlow Voluntary Housing Association ","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":13,"No.":13,"Funding Programme":"CAS CONSTRUCTION","LA":"Carlow ","Scheme/Project Name":"Royal Oak Rd, Bagenalstown, Carlow","No. of Units":6,"Approved Housing Body":"Respond!  ","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":14,"No.":14,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cavan ","Scheme/Project Name":"Cluain Dara, Kingscourt","No. of Units":16,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":15,"No.":15,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan ","Scheme/Project Name":"Woodlands, Ballyhaise","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":16,"No.":16,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan ","Scheme/Project Name":"Butlersbridge ","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":17,"No.":17,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cavan ","Scheme/Project Name":"Rosehill, Mullagh (Phase 6) ","No. of Units":8,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":18,"No.":18,"Funding Programme":"CALF CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Bruachlan, Westbury, Co Clare","No. of Units":22,"Approved Housing Body":"Co-operative Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q2 2016","Site Start":"","Practical Completion":""},{"_id":19,"No.":19,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Cahercalla, Ennis (Phase 2) ","No. of Units":10,"Approved Housing Body":"Cuan an Chlair","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":20,"No.":20,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare","Scheme/Project Name":"Seaview Park, Quilty","No. of Units":18,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":21,"No.":21,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare ","Scheme/Project Name":"Laurel Lodge, Clare Road, Ennis","No. of Units":3,"Approved Housing Body":"Society of Saint Vincent \nde Paul","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":22,"No.":22,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare ","Scheme/Project Name":"Kildysart Road, Ennis ","No. of Units":7,"Approved Housing Body":"Clare Haven Services Ltd.","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":23,"No.":23,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare ","Scheme/Project Name":"Tullyglass, Shannon","No. of Units":21,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":24,"No.":24,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare ","Scheme/Project Name":"Feakle","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":25,"No.":25,"Funding Programme":"SHIP CONSTRUCTION","LA":"Clare ","Scheme/Project Name":"Glor Srutha, Knockbrack Lower, Clonlara","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":26,"No.":26,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Clare  ","Scheme/Project Name":"Lios Anama, Sixmilebridge, Clare","No. of Units":28,"Approved Housing Body":"Co-operative Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":27,"No.":27,"Funding Programme":"CAS CONSTRUCTION","LA":"Clare  ","Scheme/Project Name":"Doonbeg","No. of Units":12,"Approved Housing Body":"Kilkee Housing Association","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":28,"No.":28,"Funding Programme":"CALF CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Firgrove Harrisons lane","No. of Units":6,"Approved Housing Body":"Co-operative Ireland","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":29,"No.":29,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"College Manor, Cobh","No. of Units":10,"Approved Housing Body":"The Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":30,"No.":30,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Passage West area, Co. Cork","No. of Units":3,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2016","Site Start":"","Practical Completion":""},{"_id":31,"No.":31,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Fellowship House, Togher","No. of Units":28,"Approved Housing Body":"Tabor Lodge Addiction & Housing Services","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"The scheme was Stage 4 approved in Q2 2016 scheme is now fully approved","Site Start":"","Practical Completion":""},{"_id":32,"No.":32,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Avenue House, Bandon","No. of Units":9,"Approved Housing Body":"Bandon Geriatric & Community Council","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":33,"No.":33,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Church View, Love Lane, Charleville","No. of Units":2,"Approved Housing Body":"Charleville Care Project Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":34,"No.":34,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Church View, Love Lane, Charleville","No. of Units":4,"Approved Housing Body":"Charleville Care Project Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2015 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":35,"No.":35,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Townlands, Rosscarbery","No. of Units":9,"Approved Housing Body":"Rosscarbery Housing Association","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":36,"No.":36,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Cuan Barra, Kilmore, Ballingeary","No. of Units":3,"Approved Housing Body":"Coiste Tithe Uibh Laoire Teo","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":37,"No.":37,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay","No. of Units":16,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":38,"No.":38,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"St. Francis Court, Youghal","No. of Units":4,"Approved Housing Body":"Respond!  ","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q1 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":39,"No.":39,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Duntahan Road, fermoy","No. of Units":12,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":40,"No.":40,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Brookwood, Kilnagurteen, Macroom, ","No. of Units":1,"Approved Housing Body":"Anvers Housing Association","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":41,"No.":41,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Castle Treasure Grove","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":42,"No.":42,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Oliver Plunkett Hill, Fermoy","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2015","Practical Completion":""},{"_id":43,"No.":43,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Kilnagleary, Carrigaline","No. of Units":49,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q2 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":44,"No.":44,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Fairfield, Macroom","No. of Units":7,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":45,"No.":45,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Beechgrove, Clonakilty","No. of Units":56,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":46,"No.":46,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Droum, Castletownbere","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":47,"No.":47,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Newtown, Bantry","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q2 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":48,"No.":48,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork County","Scheme/Project Name":"Poulavone, Ballincollig","No. of Units":67,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":49,"No.":49,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Castletreasure, Douglas (P1&2)","No. of Units":28,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q1 2016","Practical Completion":""},{"_id":50,"No.":50,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"College Wood, Cobh","No. of Units":32,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q1 2016","Practical Completion":""},{"_id":51,"No.":51,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Castletreasure, Douglas (P3)","No. of Units":12,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":52,"No.":52,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Crannard, Fermoy","No. of Units":52,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q3 2016","Site Start":"","Practical Completion":""},{"_id":53,"No.":53,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Ballincollig ","No. of Units":34,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q1 2016","Site Start":"","Practical Completion":""},{"_id":54,"No.":54,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Passage West ","No. of Units":26,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2015","Site Start":"","Practical Completion":""},{"_id":55,"No.":55,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Midelton ","No. of Units":61,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2015","Site Start":"","Practical Completion":""},{"_id":56,"No.":56,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Bantry","No. of Units":30,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2016","Site Start":"","Practical Completion":""},{"_id":57,"No.":57,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork County","Scheme/Project Name":"Whitechurch","No. of Units":12,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q2 2016","Site Start":"","Practical Completion":""},{"_id":58,"No.":58,"Funding Programme":"CALF CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"124 Lr. Glanmire Road & 2 Breamer, Cork","No. of Units":6,"Approved Housing Body":"Galtan Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2016","Site Start":"","Practical Completion":""},{"_id":59,"No.":59,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Popes Road, Blackpool, Cork City","No. of Units":7,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2016","Site Start":"","Practical Completion":""},{"_id":60,"No.":60,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Cork City area","No. of Units":18,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q3 2016","Site Start":"","Practical Completion":""},{"_id":61,"No.":61,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Millfield Cottages, Blackpool, Cork","No. of Units":18,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q3 2016","Site Start":"","Practical Completion":""},{"_id":62,"No.":62,"Funding Programme":"CALF CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Sonamar, Togher, Waterford Road, Cork","No. of Units":8,"Approved Housing Body":"Respond!","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":63,"No.":63,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"27-29 Dublin Street, Blackpool, Cork","No. of Units":10,"Approved Housing Body":"Respond!  ","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":64,"No.":64,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Thomas Davis Street, Cork City","No. of Units":35,"Approved Housing Body":"Respond!  ","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":65,"No.":65,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Saint Vincent's Convent, Vincent's Ave/St. Mary's St. Cork City","No. of Units":25,"Approved Housing Body":"Respond!  ","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q3 2015 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":66,"No.":66,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Ceanncora Lawn, Ballinlough, Cork","No. of Units":1,"Approved Housing Body":"Cork Mental Health","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2015 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":67,"No.":67,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Edel House, Grattan Street","No. of Units":33,"Approved Housing Body":"Good Shepherd Services Ltd","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q1 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":68,"No.":68,"Funding Programme":"CAS CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"St. Joachim & Anne's, Anglesea St","No. of Units":8,"Approved Housing Body":"Cork Simon","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":69,"No.":69,"Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 1 B Knocknaheeny","No. of Units":29,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q1 2016","Practical Completion":""},{"_id":70,"No.":70,"Funding Programme":"REGENERATION","LA":"Cork City","Scheme/Project Name":"Phase 2 A Knocknaheeny","No. of Units":47,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":71,"No.":71,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Deanrock, Togher","No. of Units":66,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":72,"No.":72,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Gerald Griffin Street","No. of Units":40,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q3 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":73,"No.":73,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Cappanoole","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":74,"No.":74,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"St. Johns Well","No. of Units":6,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":75,"No.":75,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Shandon Street/John Philpott Curran Street","No. of Units":9,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":76,"No.":76,"Funding Programme":"SHIP CONSTRUCTION","LA":"Cork City","Scheme/Project Name":"Churchfield Place East","No. of Units":3,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":77,"No.":77,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Ard Aoibhinn, Banduff, Mayfield","No. of Units":5,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q2 2016","Site Start":"","Practical Completion":""},{"_id":78,"No.":78,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Corcorans Quay","No. of Units":3,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q2 2016","Site Start":"","Practical Completion":""},{"_id":79,"No.":79,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Church Road","No. of Units":43,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q4 2016","Site Start":"","Practical Completion":""},{"_id":80,"No.":80,"Funding Programme":"SHIP CONSTRUCTION TURNKEY","LA":"Cork City","Scheme/Project Name":"Sheridan Park, Tramore Road","No. of Units":28,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":81,"No.":81,"Funding Programme":"CAS CONSTRUCTION","LA":"DLR","Scheme/Project Name":"30 Obelisk Walk, Blackrock","No. of Units":1,"Approved Housing Body":"St. John of God","Stage 1 Capital Appraisal":"The scheme was Stage 1 approved in Q4 2016 outline design and costs now being prepared","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":82,"No.":82,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Rochestown House (Phase 2)","No. of Units":34,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q2 2016"},{"_id":83,"No.":83,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Cromlech Close","No. of Units":15,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q3 2016"},{"_id":84,"No.":84,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Clontibret House","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q4 2016"},{"_id":85,"No.":85,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Shanganagh Park Lodge","No. of Units":1,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":"Scheme completed in Q3 2016"},{"_id":86,"No.":86,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Rochestown House (Phase 3)","No. of Units":14,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":87,"No.":87,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Fitzgerald Park","No. of Units":50,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":88,"No.":88,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Rosemount Court","No. of Units":44,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":89,"No.":89,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"St Michaels Terrace","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q2 2016","Practical Completion":""},{"_id":90,"No.":90,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Broadford Rise","No. of Units":21,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":91,"No.":91,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Sallynoggin Park ","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":92,"No.":92,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Park Close Sallynoggin","No. of Units":10,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":93,"No.":93,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"Assistant Harbour Master House","No. of Units":2,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q4 2016","Practical Completion":""},{"_id":94,"No.":94,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR","Scheme/Project Name":"152 Pottery Road, Dun Laoghaire","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q2 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":95,"No.":95,"Funding Programme":"SHIP CONSTRUCTION RAPID","LA":"DLR","Scheme/Project Name":"George's Place,","No. of Units":12,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":96,"No.":96,"Funding Programme":"SHIP CONSTRUCTION RAPID","LA":"DLR","Scheme/Project Name":"Churchtown","No. of Units":28,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"Scheme started on site in Q3 2016","Practical Completion":""},{"_id":97,"No.":97,"Funding Programme":"SHIP CONSTRUCTION RAPID","LA":"DLR","Scheme/Project Name":"Glenamuck/Stillorgan","No. of Units":14,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":98,"No.":98,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR ","Scheme/Project Name":"33,35, & 37 Temple Road","No. of Units":3,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"The scheme was Stage 3 approved in Q4 2016 scheme now being tendered","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":99,"No.":99,"Funding Programme":"SHIP CONSTRUCTION","LA":"DLR ","Scheme/Project Name":"66 Georges Street, Dun Laoghaire, Co. Dublin","No. of Units":4,"Approved Housing Body":"*N/A","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"The scheme was Stage 2 approved in Q4 2016 full design/tender being prepared","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"","Site Start":"","Practical Completion":""},{"_id":100,"No.":100,"Funding Programme":"CALF CONSTRUCTION","LA":"Donegal","Scheme/Project Name":" Ballyshannon area","No. of Units":11,"Approved Housing Body":"Cluid Housing Association","Stage 1 Capital Appraisal":"","Stage 2 Pre-Planning":"","Stage 3 Pre-Tender design":"","Stage 4 Tender Report or Final Turnkey/CALF approval":"Approval of turnkey/construction project Q2 2015","Site Start":"","Practical Completion":""}], "fields": [{"id": "_id", "type": "int"}, {"id": "No.", "type": "numeric"}, {"id": "Funding Programme", "type": "text"}, {"id": "LA", "type": "text"}, {"id": "Scheme/Project Name", "type": "text"}, {"id": "No. of Units", "type": "numeric"}, {"id": "Approved Housing Body", "type": "text"}, {"id": "Stage 1 Capital Appraisal", "type": "text"}, {"id": "Stage 2 Pre-Planning", "type": "text"}, {"id": "Stage 3 Pre-Tender design", "type": "text"}, {"id": "Stage 4 Tender Report or Final Turnkey/CALF approval", "type": "text"}, {"id": "Site Start", "type": "text"}, {"id": "Practical Completion", "type": "text"}], "_links": {"start": "/api/3/action/datastore_search?resource_id=8be876b7-349c-4659-928b-27bfbc61ab3f", "next": "/api/3/action/datastore_search?resource_id=8be876b7-349c-4659-928b-27bfbc61ab3f&offset=100"}, "total": 504, "total_was_estimated": false}}