﻿_id	No.	Funding Programme	LA	Scheme/Project Name	No. of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	Site Start	Site Finish
1	1	CALF CONSTRUCTION TURNKEY	Carlow	Sleaty Street, Graigcullen, Carlow	26	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
2	2	CALF CONSTRUCTION TURNKEY	Carlow	River Court, Carlow 	10	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
3	3	CALF CONSTRUCTION TURNKEY	Carlow	Barrett Street, Bagnalstown	10	Tintean Housing Association	""	""	""	""	""	Q2-2017
4	4	CAS CONSTRUCTION	Carlow	Mill Race Court, Carlow Town	14	Cluid Housing Association	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
5	5	CAS CONSTRUCTION	Carlow	Royal Oak Road, Bagenalstown	6	Respond!	""	Stage 2 approved in Q2-2015 - full design/tender being prepared	""	""	""	""
6	6	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
7	7	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	Q3-2017	""
8	8	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
9	9	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
10	10	SHIP CONSTRUCTION	Carlow	Bagenalstown	42	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
11	11	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
12	12	SHIP CONSTRUCTION	Carlow	Hacketstown	4	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
13	13	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	Q2-2017	""
14	14	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	Q2-2017	""
15	15	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
16	16	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
17	17	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
18	18	SHIP CONSTRUCTION	Carlow	Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
19	19	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	Q1-2016	""
20	20	SHIP CONSTRUCTION	Carlow	Rathvilly (SRD)	1	*N/A	""	""	""	""	Q3-2016	""
21	21	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow	63	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
22	22	CALF CONSTRUCTION TURNKEY	Cavan	Drumalee Manor, Drumalee Phase 2	7	Tath Housing Association	""	""	""	""	Q1-2017	""
23	23	CALF CONSTRUCTION TURNKEY	Cavan	Drumalee Manor, Drumalee Phase 1	4	Tath Housing Association	""	""	""	""	Q1-2017	""
24	24	CALF CONSTRUCTION TURNKEY	Cavan	Cluain Dara, Kingscourt	16	Cluid Housing Association	""	""	""	""	""	Q4-2016
25	25	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
26	26	SHIP CONSTRUCTION	Cavan	Butlersbridge	4	*N/A	""	""	""	""	Q2-2017	""
27	27	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	Q3-2017	""
28	28	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
29	29	CALF CONSTRUCTION	Clare	Bruachlan, Westbury	22	Co operative Ireland	""	""	""	Scheme approved for CALF funding Q2-2016	""	""
30	30	CALF CONSTRUCTION TURNKEY	Clare	Lios Anama, Sixmilebridge	28	Co operative Ireland	""	""	""	""	Q3-2016	""
31	31	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	10	Cuan an Chlair Ltd	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
32	32	CAS CONSTRUCTION	Clare	Doonbeg	12	Kilkee Housing Association Ltd	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
33	33	CAS CONSTRUCTION	Clare	Kildysart Road, Ennis	7	Clare Haven Services Ltd	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
34	34	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
35	35	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
36	36	SHIP CONSTRUCTION	Clare	Feakle	11	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
37	37	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
38	38	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
39	39	SHIP CONSTRUCTION	Clare	Tullyglass, Shannon	21	*N/A	""	Stage 2 approved in Q2-2016 - full design/tender being prepared	""	""	""	""
40	40	SHIP CONSTRUCTION	Clare	River View, School Road, Corofin	2	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
41	41	CAS CONSTRUCTION	Cork	Duntahan Road, Fermoy	12	Respond!	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
42	42	CAS CONSTRUCTION	Cork	Brookwood, Kilnagurteen, Macroom	1	Anvers Housing Association Ltd	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
43	43	CAS CONSTRUCTION	Cork	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
44	44	CAS CONSTRUCTION	Cork	St. Francis Court, Youghal	4	Respond!	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
45	45	CAS CONSTRUCTION	Cork	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
46	46	CAS CONSTRUCTION	Cork	Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
47	47	CAS CONSTRUCTION	Cork	Avenue House, Bandon	9	Bandon Geriatric & Community Council	""	""	""	""	Q3-2016	""
48	48	CAS CONSTRUCTION	Cork	Church View, Love Lane, Charleville	6	Charleville Care Project Ltd	""	""	""	""	Q2-2017	""
49	49	CAS CONSTRUCTION	Cork	Fellowship House, Togher	31	Tabor Lodge Addiction & Housing Services Ltd	""	""	""	""	Q1-2017	""
50	50	SHIP CONSTRUCTION	Cork	Ard Na Greine, Cortmacsherry	15	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
51	51	SHIP CONSTRUCTION	Cork	Station Road, Blarney	18	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
52	52	SHIP CONSTRUCTION	Cork	Bluepool, Kanturk	16	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
53	53	SHIP CONSTRUCTION	Cork	Cloyne, East Cork	9	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
54	54	SHIP CONSTRUCTION	Cork	Model Village, Dripsey	6	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
55	55	SHIP CONSTRUCTION	Cork	Beechgrove, Clonakilty	56	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
56	56	SHIP CONSTRUCTION	Cork	Castle Treasure Grove	1	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
57	57	SHIP CONSTRUCTION	Cork	Poulavone, Ballincollig	57	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
58	58	SHIP CONSTRUCTION	Cork	Newtown, Bantry	1	*N/A	Stage 1 approved in Q2-2016 - outline design and costs are now being prepared	""	""	""	""	""
59	59	SHIP CONSTRUCTION	Cork	Fairfield, Macroom	7	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
60	60	SHIP CONSTRUCTION	Cork	Droum, Castletownbere	2	*N/A	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
61	61	SHIP CONSTRUCTION	Cork	Kilnagleary, Carrigaline	49	*N/A	""	""	""	""	Q3-2017	""
62	62	SHIP CONSTRUCTION	Cork	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
63	63	SHIP CONSTRUCTION	Cork	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
64	64	SHIP CONSTRUCTION TURNKEY	Cork	Church Road, Carrigtwohill	25	*N/A	""	""	""	""	Q3-2017	""
65	65	SHIP CONSTRUCTION TURNKEY	Cork	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	Q3-2017	""
66	66	SHIP CONSTRUCTION TURNKEY	Cork	Gleann Tuairigh, Youghal	2	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
67	67	SHIP CONSTRUCTION TURNKEY	Cork	Kanturk	25	*N/A	""	""	""	Stage 4 approved in Q1-2017 - the scheme is now fully approved	""	""
68	68	SHIP CONSTRUCTION TURNKEY	Cork	Clondulane, Fermoy	2	*N/A	""	""	""	""	Q1-2017	""
69	69	SHIP CONSTRUCTION TURNKEY	Cork	Bantry	30	*N/A	""	""	""	Stage 4 approved in Q4-2016 - the scheme is now fully approved	""	""
70	70	SHIP CONSTRUCTION TURNKEY	Cork	College Wood, Cobh	32	*N/A	""	""	""	""	Q1-2016	""
71	71	SHIP CONSTRUCTION TURNKEY	Cork	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	Q4-2016	""
72	72	SHIP CONSTRUCTION TURNKEY	Cork	Crannard, Fermoy	52	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
73	73	SHIP CONSTRUCTION TURNKEY	Cork	CulAird Carraigtwohill	29	*N/A	""	""	""	""	Q4-2016	""
74	74	SHIP CONSTRUCTION TURNKEY	Cork	Whitechurch	8	*N/A	""	""	""	Stage 4 approved in Q2-2016 - the scheme is now fully approved	""	""
75	75	SHIP CONSTRUCTION TURNKEY	Cork	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
76	76	SHIP CONSTRUCTION TURNKEY	Cork	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
77	77	SHIP CONSTRUCTION TURNKEY	Cork	Abbeywood, Midelton	61	*N/A	""	""	""	""	Q3-2017	""
78	78	SHIP CONSTRUCTION TURNKEY	Cork	Claragh Road, Millstreet	6	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
79	79	SHIP CONSTRUCTION TURNKEY	Cork	St. Mary?s Road, Dunmanway	20	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
80	80	SHIP CONSTRUCTION TURNKEY	Cork	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
81	81	CALF CONSTRUCTION	Cork City	124 Lr. Glanmire Road & 2 Breamer, Cork	6	Galtan Ltd	""	""	""	""	Q1-2017	""
82	82	CALF CONSTRUCTION TURNKEY	Cork City	the Meadows, Knopckacullen Ease, Gurranabraher, Cork	72	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
83	83	CALF CONSTRUCTION TURNKEY	Cork City	Popes Road, Blackpool	7	Cluid Housing Association	""	""	""	""	Q1-2017	""
84	84	CALF CONSTRUCTION TURNKEY	Cork City	Millfield Cottages, Blackpool	18	Respond!	""	""	""	""	Q1-2017	""
85	85	CALF CONSTRUCTION TURNKEY	Cork City	Leitrim Street, Cork City	18	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q3-2016	""	""
86	86	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	33	Good Shepherd Services Ltd	""	Stage 2 approved in Q1-2016 - full design/tender being prepared	""	""	""	""
87	87	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond!	""	""	""	""	Q3-2016	""
88	88	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond!	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
89	89	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	Q2-2017	""
90	90	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
91	91	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond!	""	""	""	""	Q4-2016	""
92	92	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	Q3-2016	""
93	93	REGENERATION	Cork City	Phase 2 A Knocknaheeny	47	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
94	94	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
95	95	REGENERATION	Cork City	Phase 2 B Knocknaheeny	36	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
96	96	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
97	97	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
98	98	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
99	99	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
100	100	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
101	101	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	66	*N/A	""	""	""	""	Q4-2016	""
102	102	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	42	*N/A	""	""	""	""	Q3-2017	""
103	103	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
104	104	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
105	105	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
106	106	SHIP CONSTRUCTION TURNKEY	Cork City	Barack Street	32	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
107	107	SHIP CONSTRUCTION TURNKEY	Cork City	Faranree	5	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
108	108	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
109	109	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
110	110	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
111	111	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
112	112	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road	43	*N/A	""	""	""	""	Q2-2017	""
113	113	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
114	114	SHIP CONSTRUCTION TURNKEY	Cork City	Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	Q3-2017	""
115	115	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	Stage 4 approved in Q1-2017 - the scheme is now fully approved	""	""
116	116	CALF CONSTRUCTION	Cork	Firgrove Harrisons Lane	6	Co operative Ireland	""	""	""	""	Q3-2016	""
117	117	CALF CONSTRUCTION	Cork	Cappagh, Ballynacubby, Kinsale, Co. Cork	40	Cluid Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
118	118	CALF CONSTRUCTION TURNKEY	Cork	Ticknock, Cobh	8	Respond!	""	""	""	""	Q1-2017	""
119	119	CALF CONSTRUCTION TURNKEY	Cork	College Manor, Cobh	10	Tath Housing Association	""	""	""	""	""	Q4-2016
120	120	CALF CONSTRUCTION TURNKEY	Cork	Church View, Enniskeane	12	Cluid Housing Association	""	""	""	""	Q1-2017	""
121	121	CALF CONSTRUCTION TURNKEY	Cork	Beach Road, Passage West	3	Cluid Housing Association	""	""	""	""	Q1-2017	""
122	122	CALF CONSTRUCTION	DLR	Abbeyview House, Monkstown	8	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2015	""	""
123	123	CALF CONSTRUCTION TURNKEY	DLR	Woodbank, Dublin Rd, Shankill *	4	Cluid Housing Association	""	""	""	""	""	Q3-2017
124	124	CALF CONSTRUCTION TURNKEY	DLR	The Avenue, Glenside, Carrickmines Green, Dublin 18 *	5	Fold Ireland Housing Association	""	""	""	""	Q3-2017	""
125	125	CALF CONSTRUCTION TURNKEY	DLR	Stillorgan Gate, Kilmacud Road Upper, Co. Dublin *	4	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
126	126	CALF CONSTRUCTION TURNKEY	DLR	Respond & Tuath Project Dublin 18 area.	56	Respond!	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
127	127	CALF CONSTRUCTION TURNKEY	DLR	Respond & Tuath Project Dublin 18 area.	49	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
128	128	CALF CONSTRUCTION TURNKEY	DLR	Hyde Road, Belmont, Stepaside	8	Respond!	""	""	""	""	Q3-2016	""
129	129	CALF CONSTRUCTION TURNKEY	DLR	Bishops Gate, Kilternan, Dublin 18	6	Cluid Housing Association	""	""	""	""	Q3-2017	""
130	130	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
131	131	SHIP CONSTRUCTION	DLR	66 George's Street, Dun Laoghaire	4	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
132	132	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
133	133	SHIP CONSTRUCTION	DLR	33,35, & 37 Temple Road	3	*N/A	""	""	""	""	Q3-2017	""
134	134	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
135	135	SHIP CONSTRUCTION	DLR	Park Close - Sallynoggin	10	*N/A	""	""	""	""	Q1-2017	""
136	136	SHIP CONSTRUCTION	DLR	Sallynoggin Park	4	*N/A	""	""	""	""	Q4-2016	""
137	137	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q3-2016
138	138	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	Q4-2016	""
139	139	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
140	140	SHIP CONSTRUCTION	DLR	Fitzgerald Park	50	*N/A	""	""	""	""	Q4-2016	""
141	141	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	Q3-2016	""
142	142	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
143	143	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
144	144	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
145	145	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q2-2016
146	146	SHIP CONSTRUCTION RAPID	DLR	Glenamuck/Stillorgan (Rockville Drive)	14	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
147	147	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	Q3-2017	""
148	148	CALF CONSTRUCTION	Donegal	Ernedale Heights, Ballyshannon	11	Cluid Housing Association	""	""	""	""	Q3-2017	""
149	149	CALF CONSTRUCTION TURNKEY	Donegal	Forge Road, Donegal	4	Cluid Housing Association	""	""	""	""	""	Q3-2016
150	150	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	6	Apex Housing Association	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
151	151	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
152	152	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
153	153	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
154	154	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	Q2-2017	""
155	155	SHIP CONSTRUCTION	Donegal	Carrigart (Phase 1)	17	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
156	156	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
157	157	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
158	158	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
159	159	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
160	160	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
161	161	SHIP CONSTRUCTION	Donegal	Buncrana - Rockytown (Phase 1)	21	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
162	162	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	Q3-2017	""
163	163	SHIP CONSTRUCTION	Donegal	Carndonagh - Abbots Wood (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
164	164	SHIP CONSTRUCTION	Donegal	Dunfanaghy	13	*N/A	""	Stage 2 approved in Q2-2016 - full design/tender being prepared	""	""	""	""
165	165	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
166	166	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	Q1-2017	""
167	167	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
168	168	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
169	169	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
170	170	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar  (Turnkey)	21	*N/A	""	""	""	""	Q2-2017	""
171	171	CALF CONSTRUCTION	Dublin City	Wad River Close, Ballymun, Dublin 9	9	Cluid Housing Association	""	""	""	Scheme re approved for approval Q3-2017	""	""
172	172	CALF CONSTRUCTION	Dublin City	St Mary?s Mansions, Dublin 1	80	Cluid Housing Association	""	""	""	Scheme approved for revised CALF approval Q2-2017	""	""
173	173	CALF CONSTRUCTION	Dublin City	Richmond Road, Dublin 9	39	Co operative Ireland	""	""	""	""	Q2-2017	""
174	174	CALF CONSTRUCTION	Dublin City	Raleigh Court, Crumlin	33	Tath Housing Association	""	""	""	""	Q2-2017	""
175	175	CALF CONSTRUCTION	Dublin City	Poplar Row, Dublin 3	29	Oaklee Housing Trust	""	""	""	Scheme approved for revised CALF approval Q2-2017	""	""
176	176	CALF CONSTRUCTION	Dublin City	Orchard Lawns, Ballyfermot	72	Co operative Ireland	""	""	""	""	Q4-2016	""
177	177	CALF CONSTRUCTION	Dublin City	Harolds Cross, Dublin 6	28	Focus Ireland	""	""	""	""	""	Q4-2016
178	178	CALF CONSTRUCTION	Dublin City	Dominic Place, Dublin	9	The Aids Fund	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
179	179	CALF CONSTRUCTION	Dublin City	Dolphin Park, Rialto, Dublin 8	43	Fold Ireland Housing Association	""	""	""	Scheme approved for Revised CALF funding Q3-2017	""	""
180	180	CALF CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus Court, Cabra	33	Cluid Housing Association	""	""	""	""	Q1-2016	""
181	181	CALF CONSTRUCTION	Dublin City	Ballygall Road East - Phase 2	11	Fold Ireland Housing Association	""	""	""	""	""	Q1-2016
182	182	CALF CONSTRUCTION	Dublin City	Annamore Court, Ballyfermot	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
183	183	CALF CONSTRUCTION	Dublin City	5 6 Johns Lane West, Dublin 8	31	Focus Ireland	""	""	""	""	Q2-2017	""
184	184	CALF CONSTRUCTION TURNKEY	Dublin City	Thornwood, Beaumont - Phase 1	46	Tath Housing Association	""	""	""	""	""	Q3-2016
185	185	CALF CONSTRUCTION TURNKEY	Dublin City	Thornwood, Beaumont - Final Phase	22	Tath Housing Association	""	""	""	""	""	Q1-2017
186	186	CALF CONSTRUCTION TURNKEY	Dublin City	Stormanstown Hall, Ballymun Road, (revised)	42	Oaklee Housing Trust	""	""	""	""	Q4-2016	""
187	187	CALF CONSTRUCTION TURNKEY	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12	97	Fold Ireland Housing Association	""	""	""	""	Q1-2017	""
188	188	CALF CONSTRUCTION TURNKEY	Dublin City	Milrose House, Bluebell Avenue, Dublin 12	8	Cluid Housing Association	""	""	""	""	Q1-2017	""
189	189	CALF CONSTRUCTION TURNKEY	Dublin City	Merville Court, Merville Avenue, Fairview	5	Co operative Ireland	""	""	""	""	""	Q1-2017
190	190	CALF CONSTRUCTION TURNKEY	Dublin City	Long Mile Road, Dublin 12	61	Respond!	""	""	""	""	Q2-2017	""
191	191	CALF CONSTRUCTION TURNKEY	Dublin City	Clongriffin, Dublin 13	84	The Iveagh Trust	""	""	""	""	Q3-2017	""
192	192	CALF CONSTRUCTION TURNKEY	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5	16	Respond!	""	""	""	""	Q3-2017	""
193	193	CALF CONSTRUCTION TURNKEY	Dublin City	Camac Place, Bluebell, Dublin 12	5	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
194	194	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Phase 3	10	Tath Housing Association	""	""	""	""	""	Q2-2017
195	195	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Phase 2	21	Tath Housing Association	""	""	""	""	""	Q1-2017
196	196	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Phase 1	14	Tath Housing Association	""	""	""	""	""	Q4-2016
197	197	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Final Phase	4	Tath Housing Association	""	""	""	""	""	Q3-2017
198	198	CALF CONSTRUCTION TURNKEY	Dublin City	175 176 North Strand Road, 5 Lamps, Dublin 1	10	Co operative Ireland	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
199	199	CALF CONSTRUCTION TURNKEY	Dublin City	11 13 Crumlin Village, Dublin 12 Phase 2	2	Cluid Housing Association	""	""	""	""	""	Q3-2017
200	200	CALF CONSTRUCTION TURNKEY	Dublin City	11 13 Crumlin Village, Dublin 12 Phase 1	3	Cluid Housing Association	""	""	""	""	""	Q2-2017
201	201	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
202	202	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	Tath Housing Association Ltd	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
203	203	CAS CONSTRUCTION	Dublin City	"""Martanna House"" High Park, Grace Park Road,Dublin 9"	8	Respond!	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
204	204	CAS CONSTRUCTION	Dublin City	Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
205	205	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	18	Peter McVerry Trust Ltd	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
206	206	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
207	207	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
208	208	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q3-2017
209	209	CAS CONSTRUCTION	Dublin City	St Agathas Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
210	210	REGENERATION	Dublin City	Dominick Street	73	*N/A	Stage 1 approved in Q2-2016 - outline design and costs are now being prepared	""	""	""	""	""
211	211	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
212	212	REGENERATION	Dublin City	Dolphin House, D8 Phase 1	100	*N/A	""	""	""	""	Q4-2016	""
213	213	REGENERATION	Dublin City	St. Teresa's Gardens	50	*N/A	Stage 1 approved in Q3-2013 - outline design and costs are now being prepared	""	""	""	""	""
214	214	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
215	215	REGENERATION	Dublin City	Sackville Avenue Cottages	12	*N/A	Stage 1 approved in Q2-2016 - outline design and costs are now being prepared	""	""	""	""	""
216	216	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	Q4-2015	""
217	217	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
218	218	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved in Q3-2015 - full design/tender being prepared	""	""	""	""
219	219	SHIP CONSTRUCTION	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	Stage 2 approved in Q3-2015 - full design/tender being prepared	""	""	""	""
220	220	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	62	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
221	221	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	60	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
222	222	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	30	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
223	223	SHIP CONSTRUCTION	Dublin City	North King Street, Dublin 7	30	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
224	224	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	7	*N/A	""	""	""	""	Q4-2016	""
225	225	SHIP CONSTRUCTION	Dublin City	Priory Hall, Dublin 13 (Phase 1)	9	*N/A	""	""	""	""	""	Q3-2016
226	226	SHIP CONSTRUCTION	Dublin City	Priory Hall, Dublin 13 (Phase 2)	26	*N/A	""	""	""	""	Q4-2014	""
227	227	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	Q4-2016	""
228	228	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	Q4-2016	""
229	229	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	Q4-2016	""
230	230	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	40	*N/A	""	""	""	""	""	Q3-2017
231	231	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
232	232	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	53	*N/A	""	""	""	""	Q3-2017	""
233	233	SHIP CONSTRUCTION RAPID	Dublin City	Wood bank/Rathvilly, Finglas	17	*N/A	""	""	""	""	Q3-2017	""
234	234	CALF CONSTRUCTION TURNKEY	Fingal	Weavers Walk, Clonsilla Road, Dublin 15	33	Co operative Ireland	""	""	""	""	Q3-2017	""
235	235	CALF CONSTRUCTION TURNKEY	Fingal	The Hermitage, Balgriffin, Co. Dublin *	54	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
236	236	CALF CONSTRUCTION TURNKEY	Fingal	The Gallery, Donabate	43	Oaklee Housing Trust	""	""	""	""	Q2-2017	""
237	237	CALF CONSTRUCTION TURNKEY	Fingal	St Werburghs Court, Drynam Rd, Swords	18	Tath Housing Association	""	""	""	""	Q2-2017	""
238	238	CALF CONSTRUCTION TURNKEY	Fingal	St Marnock's Bay, Portmarnock *	10	Cluid Housing Association	""	""	""	""	Q2-2017	""
239	239	CALF CONSTRUCTION TURNKEY	Fingal	Millers Glen, Oldtown, Swords	28	The Iveagh Trust	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
240	240	CALF CONSTRUCTION TURNKEY	Fingal	Dun Emer, Lusk	54	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
241	241	CALF CONSTRUCTION TURNKEY	Fingal	Castlegrange, Clonsilla - Phase 3	8	Tath Housing Association	""	""	""	""	""	Q2-2017
242	242	CALF CONSTRUCTION TURNKEY	Fingal	Castlegrange, Clonsilla - Phase 2	21	Tath Housing Association	""	""	""	""	""	Q1-2017
243	243	CALF CONSTRUCTION TURNKEY	Fingal	Castlegrange, Clonsilla - Phase 1	19	Tath Housing Association	""	""	""	""	""	Q4-2016
244	244	CAS CONSTRUCTION	Fingal	The Obelisk, Strand Street, Skerries	5	Prosper Fingal Housing Assocaition Ltd	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
245	245	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Tath Housing Association Ltd	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
246	246	CAS CONSTRUCTION	Fingal	Ravenswood	6	Peter McVerry Trust Ltd	""	""	""	""	Q3-2017	""
247	247	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
248	248	CAS CONSTRUCTION	Fingal	Balglass Road, Howth	15	Fold Housing Association Ireland Ltd	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
249	249	CAS CONSTRUCTION	Fingal	Church Road/Ladyswell Road, Mulhuddart	22	Cluid Housing Association	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
250	250	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North & East Housing Association Ltd	""	""	""	""	""	Q3-2017
251	251	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	Q2-2017	""
252	252	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	6	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
253	253	SHIP CONSTRUCTION	Fingal	Rowlestown	20	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
254	254	SHIP CONSTRUCTION	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
255	255	SHIP CONSTRUCTION	Fingal	Racecourse Common, Lusk (Phase 2)	74	*N/A	""	""	""	""	Q4-2016	""
256	256	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 2)	32	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
257	257	SHIP CONSTRUCTION	Fingal	Castlelands Part View (Phase 3)	24	*N/A	""	""	""	""	Q1-2017	""
258	258	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
259	259	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	8	*N/A	""	""	""	""	Q4-2016	""
260	260	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
261	261	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
262	262	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
263	263	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	44	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
264	264	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
265	265	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	25	*N/A	""	""	""	""	Q3-2017	""
266	266	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	Q3-2017	""
267	267	SHIP CONSTRUCTION TURNKEY	Fingal	1-10 Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
268	268	SHIP CONSTRUCTION TURNKEY	Fingal	1-6 Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
269	269	CALF CONSTRUCTION TURNKEY	Fingal 	Castlefield, Clonsilla, Dublin 11 	62	Tath Housing Association	""	""	""	""	Q1-2017	""
270	270	CAS CONSTRUCTION	Galway	Letterfrack (Phase 2)	11	Cluid Housing Association	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
271	271	CAS CONSTRUCTION	Galway	Rossaveal Cottages, Ros a Mhl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
272	272	CAS CONSTRUCTION	Galway	Claregalway	14	Claregalway and District Day Care Centre	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
273	273	CAS CONSTRUCTION	Galway	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
274	274	CAS CONSTRUCTION	Galway	Mountbellew	5	Mountbellew Voluntary Homes Association	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
275	275	CAS CONSTRUCTION	Galway	Springfield, Parkmore	4	Peter Triest Housing Association Ltd	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
276	276	CAS CONSTRUCTION	Galway	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
277	277	CAS CONSTRUCTION	Galway	Dunlo Hill, Ballinasloe	17	Cluid Housing Association	""	""	Stage 3 approved in Q1-2016 - the scheme is now being tendered	""	""	""
278	278	SHIP CONSTRUCTION	Galway	Esker Fields, Ballinasloe	2	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
279	279	SHIP CONSTRUCTION	Galway	Garbally Drive, Ballinasloe	10	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
280	280	SHIP CONSTRUCTION	Galway	Gilmartin Road, Tuam	61	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
281	281	SHIP CONSTRUCTION	Galway	Gort Mhailor, Athenry (Phase 2)	10	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
282	282	SHIP CONSTRUCTION	Galway	Weir Road, Tuam	30	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
283	283	SHIP CONSTRUCTION	Galway	Culleen, Carraroe, Connemara	6	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
284	284	SHIP CONSTRUCTION	Galway	Ardrahan (SRD)	1	*N/A	""	""	""	""	Q2-2017	""
285	285	SHIP CONSTRUCTION	Galway	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	Q2-2017	""
286	286	SHIP CONSTRUCTION	Galway	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
287	287	SHIP CONSTRUCTION	Galway	Tomnajulla, Corndulla (SRD)	1	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
288	288	SHIP CONSTRUCTION	Galway	Cill Ciarn (SRD)	1	*N/A	""	""	""	""	Q3-2017	""
289	289	SHIP CONSTRUCTION	Galway	Kinvara (SRD)	1	*N/A	""	""	""	""	Q2-2017	""
290	290	SHIP CONSTRUCTION	Galway	Roundstone	10	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
291	291	CALF CONSTRUCTION TURNKEY	Galway City	Reilean, Roscam, Block 5 Galway *	12	Tath Housing Association	""	""	""	""	""	Q2-2017
292	292	CALF CONSTRUCTION TURNKEY	Galway City	Reilean, Roscam, Block 4 Galway *	12	Tath Housing Association	""	""	""	""	""	Q2-2017
293	293	CALF CONSTRUCTION TURNKEY	Galway City	Murrough, Renmore, Galway	20	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
294	294	CALF CONSTRUCTION TURNKEY	Galway City	Maoilin, Ballymoneen Road, Galway - Phase 2 *	4	Tath Housing Association	""	""	""	""	Q2-2015	""
295	295	CALF CONSTRUCTION TURNKEY	Galway City	Maoilin, Ballymoneen Road, Galway - Phase 1 *	2	Tath Housing Association	""	""	""	""	""	Q1-2017
296	296	CALF CONSTRUCTION TURNKEY	Galway City	Cnoc na R, clybaun Road, Galway *	2	Cluid Housing Association	""	""	""	""	""	Q3-2017
297	297	CALF CONSTRUCTION TURNKEY	Galway City	Castlegar Road, Galway	81	Respond!	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
298	298	CALF CONSTRUCTION TURNKEY	Galway City	Boireann Beag, Ros Cam, Galway	16	Cluid Housing Association	""	""	""	""	""	Q4-2016
299	299	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q3-2017
300	300	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
301	301	CAS CONSTRUCTION	Galway City	47 Forster Street	9	Cope Galway	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
302	302	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	55	*N/A	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
303	303	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	Q2-2017	""
304	304	SHIP CONSTRUCTION	Galway City	Ballinfoile Park, Headford Road (Infill Units)	10	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
305	305	SHIP CONSTRUCTION	Galway City	Corrib Park (Infill Units)	3	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
306	306	SHIP CONSTRUCTION	Galway City	Castlepark, Ballybane (Infill Units)	4	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
307	307	SHIP CONSTRUCTION	Galway City	Carn Ard, Circular Road (Infill Units)	6	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
308	308	CALF CONSTRUCTION	Galway	Spiddal Cottages, Co Galway - Phase 2	8	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2016	""	""
309	309	CALF CONSTRUCTION	Galway	Spiddal Cottages, Co Galway - Phase 1	23	Cluid Housing Association	""	""	""	""	""	Q3-2017
310	310	CALF CONSTRUCTION TURNKEY	Galway	Cnoc na Si, Portumna	13	Co operative Ireland	""	""	""	""	Q4-2016	""
311	311	CALF CONSTRUCTION TURNKEY	Galway	 Ballinasloe Area, Galway	39	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q3-2016	""	""
312	312	CALF CONSTRUCTION TURNKEY	Kerry	Cathair Lakes Farrantoreen Road, Killorglin	6	Cluid Housing Association	""	""	""	""	""	Q2-2016
313	313	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
314	314	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
315	315	CAS CONSTRUCTION	Kerry	Mitchels-Boherbee	16	Cluid Housing Association	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
316	316	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
317	317	CAS CONSTRUCTION	Kerry	Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
318	318	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
319	319	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
320	320	SHIP CONSTRUCTION	Kerry	Ardmoneel, Killorglin	14	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
321	321	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
322	322	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
323	323	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road	4	*N/A	""	""	""	""	Q2-2017	""
324	324	SHIP CONSTRUCTION	Kerry	Milltown	8	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
325	325	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
326	326	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	Q1-2017	""
327	327	SHIP CONSTRUCTION	Kerry	Single Rural Dwellings	3	*N/A	""	""	""	""	Q3-2017	""
328	328	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	Q1-2017	""
329	329	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	Stage 2 approved in Q2-2016 - full design/tender being prepared	""	""	""	""
330	330	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
331	331	SHIP CONSTRUCTION	Kerry	Marconi Avenue, Ballybunion	20	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
332	332	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
333	333	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
334	334	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	5	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
335	335	SHIP CONSTRUCTION	Kerry	Balloonagh, Tralee	28	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
336	336	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
337	337	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
338	338	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
339	339	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
340	340	SHIP CONSTRUCTION	Kerry	Owngarry, killorglin	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
341	341	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	56	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
342	342	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
343	343	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
344	344	SHIP CONSTRUCTION	Kerry	SRD @ Cullenagh Upr, Beaufort	1	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
345	345	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole	10	*N/A	""	""	""	""	Q2-2017	""
346	346	SHIP CONSTRUCTION TURNKEY	Kerry	Cahirdown Wood, Listowel	22	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
347	347	REGENERATION	Kerry 	Crolar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	Q2-2017	""
348	348	REGENERATION	Kerry 	St Martin's Park, Tralee	4	*N/A	""	""	""	""	Q2-2017	""
349	349	REGENERATION	Kerry 	Dingle Road, Tralee	1	*N/A	""	""	""	""	Q1-2017	""
350	350	CALF CONSTRUCTION TURNKEY	Kildare	The Pike, Shenagun, Castledermot	6	Respond!	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
351	351	CALF CONSTRUCTION TURNKEY	Kildare	Roseberry Hill, Newbridge - Phase 3	16	Tath Housing Association	""	""	""	""	Q3-2016	""
352	352	CALF CONSTRUCTION TURNKEY	Kildare	Roseberry Hill, Newbridge - Phase 2	16	Tath Housing Association	""	""	""	""	Q3-2016	""
353	353	CALF CONSTRUCTION TURNKEY	Kildare	Roseberry Hill, Newbridge - Phase 1	13	Tath Housing Association	""	""	""	""	""	Q2-2017
354	354	CALF CONSTRUCTION TURNKEY	Kildare	Moorefield Road, Newbridge	2	Co operative Ireland	""	""	""	""	Q2-2017	""
355	355	CALF CONSTRUCTION TURNKEY	Kildare	Gallows Hill, Athy	24	Respond!	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
356	356	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
357	357	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
358	358	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
359	359	CAS CONSTRUCTION	Kildare	27 Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
360	360	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	14	Homeless Care Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
361	361	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
362	362	SHIP CONSTRUCTION	Kildare	Athgarvan Village	30	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
363	363	SHIP CONSTRUCTION	Kildare	Rathasker, Naas	48	*N/A	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
364	364	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
365	365	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
366	366	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
367	367	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2)	19	*N/A	""	""	""	""	Q4-2016	""
368	368	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	Q3-2017	""
369	369	SHIP CONSTRUCTION	Kildare	Dominican Church Site, Athy	30	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
370	370	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
371	371	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
372	372	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin	13	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
373	373	CALF CONSTRUCTION	Kilkenny	Walkin Street, Kilkenny	43	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q1-2014	""	""
374	374	CALF CONSTRUCTION	Kilkenny	Golf Links Road, Kilkenny *	39	Respond!	""	""	""	Scheme approved for CALF funding Q4-2015 (revised approval received in Q3-2017) 	""	""
375	375	CALF CONSTRUCTION	Kilkenny	Friary Walk, Callan	16	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
376	376	CALF CONSTRUCTION TURNKEY	Kilkenny	Moneenview side Rd, Moneenroe	9	Oaklee Housing Trust	""	""	""	""	Q1-2017	""
377	377	CALF CONSTRUCTION TURNKEY	Kilkenny	Chapel St. and New Road, Mooncoin, Co. Kilkenny	6	Respond!	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
378	378	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
379	379	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
380	380	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	Q3-2017	""
381	381	CAS CONSTRUCTION	Kilkenny	Golf Links Road, Kilkenny	15	Respond!	Stage 1 approved in Q2-2016 - outline design and costs are now being prepared	""	""	""	""	""
382	382	CAS CONSTRUCTION	Kilkenny	Ballytobin, Callan	4	Camphill Communities of Ireland	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
383	383	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
384	384	CAS CONSTRUCTION	Kilkenny	Greenshill, Kilkenny	6	The Good Shepherd Centre (Kilkenny) Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
385	385	CAS CONSTRUCTION	Kilkenny	Nimble Spaces Project at Callan	16	Camphill Communities of Ireland	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
386	386	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
387	387	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
388	388	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
389	389	SHIP CONSTRUCTION	Kilkenny	Rural Cottage Barna, Freshford	1	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
390	390	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	7	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
391	391	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Pennyswell Road, Kilkenny	80	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
392	392	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	18	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
393	393	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	14	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
394	394	SHIP CONSTRUCTION	Kilkenny	Abbeyquarter Vicar Street, Kilkenny	30	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
395	395	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
396	396	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	18	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
397	397	SHIP CONSTRUCTION	Kilkenny	Robertshill, Kilkenny	4	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
398	398	SHIP CONSTRUCTION	Kilkenny	The Butts, Kilkenny	22	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
399	399	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
400	400	SHIP CONSTRUCTION	Kilkenny	Gaol Rooad, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
401	401	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
402	402	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q3-2017
403	403	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
404	404	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank	11	*N/A	""	""	""	""	Q2-2017	""
405	405	CALF CONSTRUCTION	Laois	Cluin Inn Mountrath	11	Oaklee Housing Trust	""	""	""	""	Q3-2017	""
406	406	CALF CONSTRUCTION	Laois	55/56 Kirwan Park, Mountmellick	2	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
407	407	CALF CONSTRUCTION TURNKEY	Laois	Wilton Lawns, Portarlington	2	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
408	408	CAS CONSTRUCTION	Laois	Abbeyleix Road, Portlaoise	16	Respond!	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
409	409	CAS CONSTRUCTION	Laois	St. Fintan's Hospital, Dublin Road, Portlaoise	8	Oaklee Housing Trust	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
410	410	SHIP CONSTRUCTION	Laois	Main Street, Rathdowney	5	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
411	411	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
412	412	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	20	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
413	413	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
414	414	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
415	415	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	8	*N/A	""	Stage 2 approved in Q1-2016 - full design/tender being prepared	""	""	""	""
416	416	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	Q4-2016	""
417	417	CALF CONSTRUCTION TURNKEY	Laois 	31 36 Droimnin, Stradbally	6	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
418	418	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	Q2-2017	""
419	419	SHIP CONSTRUCTION	Leitrim	Summerhill, Carrick on Shannon	20	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
420	420	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	Q2-2017	""
421	421	SHIP CONSTRUCTION	Leitrim	Attirory, Carrick-on-Shannon	24	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
422	422	CALF CONSTRUCTION	Limerick	1 20 Park View Row, Hyde Road, Limerick	20	Cluid Housing Association	""	""	""	""	Q3-2016	""
423	423	CALF CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	11	Respond!	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
424	424	CALF CONSTRUCTION TURNKEY	Limerick	Old Dublin Road, Rhebogue, Limerick	16	Cluid Housing Association	""	""	""	""	Q3-2017	""
425	425	CALF CONSTRUCTION TURNKEY	Limerick	Cosgrave Park, Moyross, Limerick City (Regen)	21	Co operative Ireland	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
426	426	CALF CONSTRUCTION TURNKEY	Limerick	Cluain Ard, Fedamore	4	Co operative Ireland	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
427	427	CALF CONSTRUCTION TURNKEY	Limerick	Ard Aulin, Mungret	8	Cluid Housing Association	""	""	""	""	""	Q2-2017
428	428	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	10	Croom Voluntary Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
429	429	CAS CONSTRUCTION	Limerick	Cappamore	12	Cappamore Housing Association Ltd	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
430	430	CAS CONSTRUCTION	Limerick	Drominbeg, Rhebogue	21	Co-operative Housing Ireland (Formerly NABCo)	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
431	431	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
432	432	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	Q2-2017	""
433	433	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	12	Associated Charities Trust Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
434	434	REGENERATION	Limerick	Orchard Site	26	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
435	435	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved in Q1-2015 - outline design and costs are now being prepared	""	""	""	""	""
436	436	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved in Q1-2015 - outline design and costs are now being prepared	""	""	""	""	""
437	437	REGENERATION	Limerick	Dalgaish Park	24	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
438	438	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	Q1-2016	""
439	439	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
440	440	REGENERATION	Limerick	Gaol Lane New Build	1	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
441	441	REGENERATION	Limerick	Sheep / Athlunkards Street	8	*N/A	""	Stage 2 approved in Q2-2014 - full design/tender being prepared	""	""	""	""
442	442	REGENERATION	Limerick	Churchfield, Phase 1	42	*N/A	""	""	""	""	Q3-2016	""
443	443	REGENERATION	Limerick	Churchfield, Phase 2	38	*N/A	""	Stage 2 approved in Q1-2015 - full design/tender being prepared	""	""	""	""
444	444	REGENERATION	Limerick	Cosgrave Park	30	*N/A	""	Stage 2 approved in Q4-2014 - full design/tender being prepared	""	""	""	""
445	445	REGENERATION	Limerick	Palm Close	27	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
446	446	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
447	447	REGENERATION	Limerick	Cliona Park Phase 2	10	*N/A	""	""	""	""	""	Q2-2017
448	448	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
449	449	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
450	450	REGENERATION	Limerick	Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
451	451	REGENERATION	Limerick	Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
452	452	REGENERATION	Limerick	St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
453	453	REGENERATION	Limerick	BCW Rebuild	14	*N/A	""	""	""	""	""	Q4-2016
454	454	REGENERATION	Limerick	St. Mary's Park Infills	19	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
455	455	REGENERATION	Limerick	Cliona Park Phase 3	18	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
456	456	REGENERATION	Limerick	45 46 Cliona Park	2	*N/A	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
457	457	SHIP CONSTRUCTION	Limerick	Patrick?s Villas, Castleconnell	5	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
458	458	SHIP CONSTRUCTION	Limerick	Brannigans Site, Musgrave Street	15	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
459	459	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	Q1-2017	""
460	460	SHIP CONSTRUCTION	Limerick	Ballygreannan Road, Limerick City	2	*N/A	""	""	""	""	Q1-2017	""
461	461	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	7	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
462	462	SHIP CONSTRUCTION	Limerick	1-12 Burke Avenue, Limerick City	12	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
463	463	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
464	464	SHIP CONSTRUCTION	Limerick	Childers Road, Limerick City	24	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
465	465	SHIP CONSTRUCTION	Limerick	Sexton Street North & Kileely Court	10	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
466	466	SHIP CONSTRUCTION	Limerick	Site Adj. to Athlunkard Boat Club, Limerick City	4	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
467	467	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	3	*N/A	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
468	468	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	11	*N/A	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
469	469	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	38	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
470	470	SHIP CONSTRUCTION	Limerick	Deerpark, Adare	30	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
471	471	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
472	472	SHIP CONSTRUCTION	Limerick	Lisheen Park, Patrickswell	16	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
473	473	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
474	474	SHIP CONSTRUCTION	Limerick	Hassett Villas, Thomondgate	3	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
475	475	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	6	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
476	476	SHIP CONSTRUCTION	Limerick	Vance's Lands, Limerick City	37	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
477	477	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
478	478	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
479	479	CALF CONSTRUCTION TURNKEY	Longford	Cartrun Breac, Lisbrack Rd, Longford	7	Cluid Housing Association	""	""	""	""	""	Q1-2017
480	480	SHIP CONSTRUCTION	Longford	Church View, Lanesborough	13	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
481	481	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
482	482	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	Q2-2017	""
483	483	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	16	*N/A	""	""	""	""	""	Q3-2017
484	484	CALF CONSTRUCTION	Louth	Scarlett Street, Drogheda	15	North & East Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q3-2016	""	""
485	485	CALF CONSTRUCTION	Louth	Rath na Gloinne	3	Cluid Housing Association	""	""	""	""	""	Q3-2016
486	486	CALF CONSTRUCTION	Louth	Clos na Manach, Carlingford	10	Tath Housing Association	""	""	""	""	Q2-2017	""
487	487	CALF CONSTRUCTION	Louth	Bishops Court, Dundalk	2	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
488	488	CALF CONSTRUCTION	Louth	2 Slieve Row Crescent, Dundalk	1	Cluid Housing Association	""	""	""	""	""	Q2-2016
489	489	CALF CONSTRUCTION TURNKEY	Louth	Rathmullen Road, Drogheda	54	North & East Housing Association Ltd	""	""	""	Scheme approved for revised CALF approval Q2-2017	""	""
490	490	CALF CONSTRUCTION TURNKEY	Louth	Rathmullen Road, Drogheda	51	Tath Housing Association	""	""	""	Scheme approved for revised CALF approval Q2-2017	""	""
491	491	CALF CONSTRUCTION TURNKEY	Louth	Mount Hamilton, Dundalk Phase 3	15	Cluid Housing Association	""	""	""	""	Q4-2016	""
492	492	CALF CONSTRUCTION TURNKEY	Louth	Mount Hamilton, Dundalk Phase 2	16	Cluid Housing Association	""	""	""	""	Q4-2016	""
493	493	CALF CONSTRUCTION TURNKEY	Louth	Mount Hamilton, Dundalk Phase 1	12	Cluid Housing Association	""	""	""	""	Q4-2016	""
494	494	CALF CONSTRUCTION TURNKEY	Louth	Liscorrie, Bog Lane, Drogheda	41	Tath Housing Association	""	""	""	""	Q4-2016	""
495	495	CALF CONSTRUCTION TURNKEY	Louth	Coulter Place Armagh Road Dundalk Phase 2	12	Cluid Housing Association	""	""	""	""	""	Q3-2017
496	496	CALF CONSTRUCTION TURNKEY	Louth	Coulter Place Armagh Road Dundalk Phase 1	10	Cluid Housing Association	""	""	""	""	""	Q1-2017
497	497	CALF CONSTRUCTION TURNKEY	Louth	Castleguard, Ardee	102	Tath Housing Association	""	""	""	""	Q2-2017	""
498	498	CALF CONSTRUCTION TURNKEY	Louth	Castle Court, Castlebellingham - Phase 2	10	Cluid Housing Association	""	""	""	""	""	Q1-2017
499	499	CALF CONSTRUCTION TURNKEY	Louth	Castle Court, Castlebellingham - Phase 1	4	Cluid Housing Association	""	""	""	""	""	Q1-2017
500	500	CALF CONSTRUCTION TURNKEY	Louth	Avourwen Meadows, Drogheda	50	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
501	501	CALF CONSTRUCTION TURNKEY	Louth	Aston Village	8	Respond!	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
502	502	CAS CONSTRUCTION	Louth	5 Slieveroe Cresent, Dundalk	1	Cluid Housing Association	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
503	503	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	Tath Housing Association Ltd	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
504	504	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	8	Simon Community : Dundalk Simon	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
505	505	CAS CONSTRUCTION	Louth	Clontygora, Dundalk	11	Cluid Housing Association	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
506	506	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North & East Housing Association Ltd	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
507	507	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North & East Housing Association Ltd	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
508	508	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
509	509	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond!	""	""	""	""	""	Q1-2017
510	510	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
511	511	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	Stage 1 approved in Q3-2013 - outline design and costs are now being prepared	""	""	""	""	""
512	512	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	Q1-2017	""
513	513	SHIP CONSTRUCTION	Louth	Drogheda B&R project	12	*N/A	""	""	""	""	Q3-2017	""
514	514	SHIP CONSTRUCTION	Louth	Dundalk B&R project (1)	7	*N/A	""	""	""	""	""	Q4-2016
515	515	SHIP CONSTRUCTION	Louth	Dundalk B&R project (2)	7	*N/A	""	""	""	""	""	Q2-2017
516	516	SHIP CONSTRUCTION	Louth	Dundalk B&R project (3)	4	*N/A	""	""	""	""	""	Q3-2017
517	517	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q3-2016
518	518	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2 - 4)	69	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
519	519	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
520	520	SHIP CONSTRUCTION	Louth	Dundalk B&R project (4)	11	*N/A	""	""	""	""	Q3-2017	""
521	521	CALF CONSTRUCTION TURNKEY	Mayo	Ballina area	11	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
522	522	CAS CONSTRUCTION	Mayo	Glenamoy	6	Glenamoy Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
523	523	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	Stage 3 approved in Q3-2016 - the scheme is now being tendered	""	""	""
524	524	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
525	525	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
526	526	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
527	527	SHIP CONSTRUCTION	Mayo	Market Street, Swinford	2	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
528	528	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
529	529	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	Q3-2017	""
530	530	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
531	531	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	Q3-2017	""
532	532	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
533	533	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford - Phase 3	10	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
534	534	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
535	535	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
536	536	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
537	537	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	4	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
538	538	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
539	539	SHIP CONSTRUCTION	Mayo	Single Rural Dwelling	7	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
540	540	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	Q2-2017	""
541	541	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	Q3-2016	""
542	542	SHIP CONSTRUCTION	Mayo	7 St. Patrick's Tce., Westport	1	*N/A	""	""	""	""	""	Q2-2017
543	543	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
544	544	SHIP CONSTRUCTION	Mayo	Killavally	8	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
545	545	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar	22	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
546	546	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	26	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
547	547	SHIP CONSTRUCTION	Mayo	Bothar Dubh, Claremorris	12	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
548	548	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	Q4-2016	""
549	549	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	Q4-2016	""
550	550	SHIP CONSTRUCTION	Mayo	Glengad, Pullathomas (SRD)	1	*N/A	""	""	""	""	Q4-2016	""
551	551	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	Q4-2016	""
552	552	CALF CONSTRUCTION TURNKEY	Meath	Tubberclaire, Navan	23	Cluid Housing Association	""	""	""	""	""	Q2-2016
553	553	CALF CONSTRUCTION TURNKEY	Meath	Seabury Lawns, Mornington	6	Cluid Housing Association	""	""	""	""	Q1-2017	""
554	554	CALF CONSTRUCTION TURNKEY	Meath	Seabury Lawns, Mornington	25	Cluid Housing Association	""	""	""	""	""	Q3-2017
555	555	CALF CONSTRUCTION TURNKEY	Meath	Royal Oaks, Enfield *	4	Cluid Housing Association	""	""	""	""	""	Q2-2017
556	556	CALF CONSTRUCTION TURNKEY	Meath	Mill Lane, Flower Hill, Navan	20	Oaklee Housing Trust	""	""	""	""	""	Q1-2016
557	557	CALF CONSTRUCTION TURNKEY	Meath	Meath	24	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
558	558	CALF CONSTRUCTION TURNKEY	Meath	Grangehall, Dunshaughlin	7	Tath Housing Association	""	""	""	""	Q1-2017	""
559	559	CALF CONSTRUCTION TURNKEY	Meath	Fitzherbert Wood, Slane Rd., Navan, Co. Meath	44	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
560	560	CALF CONSTRUCTION TURNKEY	Meath	Dunville, Athlumney, Co. Meath	64	Tath Housing Association	""	""	""	""	Q3-2017	""
561	561	CALF CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettytown	30	Tath Housing Association	""	""	""	""	Q3-2017	""
562	562	CALF CONSTRUCTION TURNKEY	Meath	Churchfields, Ashbourne *	8	Tath Housing Association	""	""	""	""	""	Q2-2017
563	563	CALF CONSTRUCTION TURNKEY	Meath	Blackcastle, Slane Road, Navan	11	Tath Housing Association	""	""	""	""	Q3-2017	""
564	564	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 4	20	Cluid Housing Association	""	""	""	""	Q4-2016	""
565	565	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 3	18	Cluid Housing Association	""	""	""	""	Q4-2016	""
566	566	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 2	18	Cluid Housing Association	""	""	""	""	Q4-2016	""
567	567	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 1	11	Cluid Housing Association	""	""	""	""	""	Q1-2017
568	568	CALF CONSTRUCTION TURNKEY	Meath	27 Ardmore Rise, Bettystown	1	North & East Housing Association Ltd	""	""	""	""	Q1-2017	""
569	569	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
570	570	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	12	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
571	571	SHIP CONSTRUCTION	Meath	Ratoath	17	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
572	572	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
573	573	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
574	574	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	Q3-2017	""
575	575	SHIP CONSTRUCTION	Meath	Kilmainhamwood	4	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
576	576	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
577	577	SHIP CONSTRUCTION	Meath	Carlanstown	10	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
578	578	SHIP CONSTRUCTION	Meath	Cortown	10	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
579	579	SHIP CONSTRUCTION	Meath	Donore	20	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
580	580	SHIP CONSTRUCTION	Meath	Oldcastle	15	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
581	581	SHIP CONSTRUCTION	Meath	Dunshaughlin	25	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
582	582	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
583	583	CALF CONSTRUCTION	Monaghan	Liseggerton Road, Clones	6	Oaklee Housing Trust	""	""	""	""	Q2-2017	""
584	584	CALF CONSTRUCTION TURNKEY	Monaghan	Magheross, Carrickmacross *	50	Tath Housing Association	""	""	""	""	Q2-2017	""
585	585	CALF CONSTRUCTION TURNKEY	Monaghan	Kingscourt Road, Carrickmacross, Co. Monaghan	33	Respond!	""	""	""	""	Q3-2017	""
586	586	CALF CONSTRUCTION TURNKEY	Monaghan	Killycard, Castleblaney	32	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
587	587	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
588	588	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
589	589	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond!	""	""	""	""	""	Q2-2017
590	590	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
591	591	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
592	592	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	Q4-2016	""
593	593	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen (Phase 1) Monaghan Town	6	*N/A	""	""	""	""	Q4-2016	""
594	594	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen (Phase 2) Monaghan Town	8	*N/A	""	""	""	""	""	Q2-2017
595	595	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen (Phase 3) Monaghan Town	8	*N/A	""	""	""	""	""	Q2-2017
596	596	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
597	597	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough, Monaghan	5	*N/A	""	""	""	""	Q2-2016	""
598	598	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	12	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
599	599	CALF CONSTRUCTION	Offaly	Killane Drive, Edenderry	25	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
600	600	CALF CONSTRUCTION	Offaly	Kearney's Field, Tullamore	53	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
601	601	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
602	602	CAS CONSTRUCTION	Offaly	Killane Drive, Edenderry	2	Tath Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
603	603	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	""	""	Q3-2017	""
604	604	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	20	Oaklee Housing Trust	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
605	605	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	18	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
606	606	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
607	607	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
608	608	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
609	609	CALF CONSTRUCTION TURNKEY	Roscommon	River Oaks, Kilcolman, Ballaghaderreen	12	Respond!	""	""	""	""	Q3-2017	""
610	610	CALF CONSTRUCTION TURNKEY	Roscommon	Monksfield, Bealnamulla, Athlone	40	Cluid Housing Association	""	""	""	""	Q3-2017	""
611	611	CALF CONSTRUCTION TURNKEY	Roscommon	Monksfield Park, Tuam Road, Athlone	14	Cluid Housing Association	""	""	""	""	Q1-2016	""
612	612	SHIP CONSTRUCTION	Roscommon	Cloonfad	2	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
613	613	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
614	614	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
615	615	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	Q1-2017	""
616	616	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
617	617	SHIP CONSTRUCTION	Sligo	Colloney	15	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
618	618	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	Stage 2 approved in Q3-2016 - full design/tender being prepared	""	""	""	""
619	619	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
620	620	SHIP CONSTRUCTION	Sligo	Carrowbunnaun, Strandhill	20	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
621	621	SHIP CONSTRUCTION	Sligo	Fr Flanagan Tce.	22	*N/A	""	""	""	""	Q1-2017	""
622	622	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
623	623	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
624	624	CALF CONSTRUCTION TURNKEY	South Dublin	Tullyhall, Lucan - Phase 1 *	2	Tath Housing Association	""	""	""	""	""	Q3-2017
625	625	CALF CONSTRUCTION TURNKEY	South Dublin	Tullyhall, Lucan - Final Phase	2	Tath Housing Association	""	""	""	""	Q2-2017	""
626	626	CALF CONSTRUCTION TURNKEY	South Dublin	Station Road, Clondalkin	5	Respond!	""	""	""	""	""	Q3-2017
627	627	CALF CONSTRUCTION TURNKEY	South Dublin	Scholarstown Wood (Houses) *	8	Circle Voluntary Housing Association	""	""	""	""	Q3-2017	""
628	628	CALF CONSTRUCTION TURNKEY	South Dublin	Scholarstown Wood (Apts)	6	Circle Voluntary Housing Association	""	""	""	""	Q3-2017	""
629	629	CALF CONSTRUCTION TURNKEY	South Dublin	Milford Manor, Clondalkin - Phase 1	25	Cluid Housing Association	""	""	""	""	""	Q1-2017
630	630	CALF CONSTRUCTION TURNKEY	South Dublin	Milford Manor, Clondalkin - Final Phase 	15	Cluid Housing Association	""	""	""	""	""	Q3-2017
631	631	CALF CONSTRUCTION TURNKEY	South Dublin	Milford Manor, Clondalkin	25	Cluid Housing Association	""	""	""	""	Q1-2017	""
632	632	CALF CONSTRUCTION TURNKEY	South Dublin	Dodderbrook, Oldcourt Road, Ballycullen, Dublin 24 	14	Cluid Housing Association	""	""	""	""	Q1-2017	""
633	633	CALF CONSTRUCTION TURNKEY	South Dublin	Broadfield Grove, Rathcoole-phase 1 *	10	Oaklee Housing Trust	""	""	""	""	""	Q3-2017
634	634	CALF CONSTRUCTION TURNKEY	South Dublin	Broadfield Grove, Rathcoole - final phase *	4	Oaklee Housing Trust	""	""	""	""	""	Q3-2017
635	635	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tath Housing Association Ltd	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
636	636	CAS CONSTRUCTION	South Dublin	1 Hollyville Terrace, Palmerston	2	Cluid Housing Association	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
637	637	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
638	638	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	28	*N/A	""	""	""	""	Q3-2017	""
639	639	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	Q3-2017	""
640	640	SHIP CONSTRUCTION	South Dublin	Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	Q3-2017	""
641	641	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	Q2-2017	""
642	642	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	Q2-2017	""
643	643	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	18	*N/A	""	""	""	""	Q1-2017	""
644	644	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	Q2-2017	""
645	645	SHIP CONSTRUCTION	South Dublin	St. Marks Avenue, Clondalkin	39	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
646	646	SHIP CONSTRUCTION	South Dublin	Balgaddy F	50	*N/A	Stage 1 approved in Q1-2015 - outline design and costs are now being prepared	""	""	""	""	""
647	647	SHIP CONSTRUCTION	South Dublin	Belgard Road, Tallaght	3	*N/A	""	""	""	""	""	Q1-2016
648	648	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
649	649	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
650	650	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
651	651	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin	59	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
652	652	SHIP CONSTRUCTION RAPID	South Dublin	St Aidan's,  Brookfield, Tallaght	85	*N/A	""	""	""	""	Q3-2017	""
653	653	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
654	654	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
655	655	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
656	656	CAS CONSTRUCTION	Tipperary	Fethard	4	Belmont Park Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
657	657	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
658	658	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
659	659	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
660	660	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
661	661	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	25	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
662	662	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	9	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
663	663	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
664	664	SHIP CONSTRUCTION	Tipperary	Templetouhy	6	*N/A	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
665	665	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
666	666	SHIP CONSTRUCTION	Tipperary	Killeanaule Road, Fethard	10	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
667	667	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	8	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
668	668	SHIP CONSTRUCTION	Tipperary	Borrisokane	17	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
669	669	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
670	670	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
671	671	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
672	672	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
673	673	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q4-2016
674	674	SHIP CONSTRUCTION	Tipperary	Mitchels St., Thurles	1	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
675	675	SHIP CONSTRUCTION	Tipperary	Waller's Lot, Cashel	10	*N/A	Stage 1 approved in Q2-2015 - outline design and costs are now being prepared	""	""	""	""	""
676	676	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	10	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
677	677	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	2	*N/A	""	""	""	""	""	Q4-2016
678	678	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
679	679	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
680	680	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
681	681	CALF CONSTRUCTION TURNKEY	Tipperary 	Ashbury, Roscrea	12	Cluid Housing Association	""	""	""	""	""	Q2-2017
682	682	CALF CONSTRUCTION	Waterford	St Johns College, Waterford	36	Respond!	""	""	""	""	""	Q1-2016
683	683	CALF CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon Road, Dungarvan	20	Co operative Ireland	""	""	""	""	Q1-2017	""
684	684	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
685	685	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
686	686	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond!	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
687	687	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
688	688	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
689	689	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	6	Anvers Housing Association Ltd	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
690	690	SHIP CONSTRUCTION	Waterford	Avondale, Kilcohan	21	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
691	691	SHIP CONSTRUCTION	Waterford	An Garran, Tramore	32	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
692	692	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
693	693	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City	8	*N/A	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
694	694	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	20	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
695	695	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	Q4-2016	""
696	696	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
697	697	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	Stage 2 approved in Q2-2016 - full design/tender being prepared	""	""	""	""
698	698	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	Q3-2017	""
699	699	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
700	700	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
701	701	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	39	*N/A	""	""	""	""	Q3-2017	""
702	702	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	Q3-2017	""
703	703	CALF CONSTRUCTION TURNKEY	Westmeath	Cluain Mullen, Castlepollard	2	Tath Housing Association	""	""	""	""	""	Q2-2017
704	704	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	3	Tath Housing Association Ltd	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
705	705	CAS CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	9	Tath Housing Association Ltd	Stage 1 approved in Q3-2015 - outline design and costs are now being prepared	""	""	""	""	""
706	706	CAS CONSTRUCTION	Westmeath	Springfield, Mullingar	12	Tath Housing Association Ltd	Stage 1 approved in Q1-2014 - outline design and costs are now being prepared	""	""	""	""	""
707	707	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	28	*N/A	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
708	708	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	Q2-2017	""
709	709	SHIP CONSTRUCTION	Westmeath	16 Ennell Court	1	*N/A	""	""	""	""	Q2-2017	""
710	710	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Athlone (Arcadia) - Site No. 2	33	*N/A	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
711	711	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
712	712	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
713	713	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	33	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
714	714	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
715	715	CALF CONSTRUCTION	Wexford	Meadowfields 	12	Co operative Ireland	""	""	""	""	""	Q3-2016
716	716	CALF CONSTRUCTION TURNKEY	Wexford	Wexford	28	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
717	717	CALF CONSTRUCTION TURNKEY	Wexford	Unit No's 238, 239, 240, 241, 245 Ard Uisce, Whiterock	5	Tath Housing Association	""	""	""	""	Q4-2016	""
718	718	CALF CONSTRUCTION TURNKEY	Wexford	Hunters Green, Gorey - Phase 3	9	Co operative Ireland	""	""	""	""	Q1-2015	""
719	719	CALF CONSTRUCTION TURNKEY	Wexford	Hunters Green, Gorey - Phase 2	11	Co operative Ireland	""	""	""	""	""	Q1-2017
720	720	CALF CONSTRUCTION TURNKEY	Wexford	Enniscorthy	40	Oaklee Housing Trust	""	""	""	""	Q3-2017	""
721	721	CALF CONSTRUCTION TURNKEY	Wexford	Ballyboggan, Castlebridge	10	Co operative Ireland	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
722	722	CALF CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	6	Tath Housing Association	""	""	""	""	""	Q1-2017
723	723	CALF CONSTRUCTION TURNKEY	Wexford	233-253 Ard uisce, Whiterock, Wexford *	6	Tath Housing Association	""	""	""	""	Q3-2017	""
724	724	CALF CONSTRUCTION TURNKEY	Wexford	 Hunters Green, Gorey - Phase 1	18	Co operative Ireland	""	""	""	""	""	Q2-2016
725	725	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
726	726	CAS CONSTRUCTION	Wexford	Westlands, Wexford	7	Respond!	""	""	Stage 3 approved in Q2-2017 - the scheme is now being tendered	""	""	""
727	727	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
728	728	SHIP CONSTRUCTION	Wexford	Belvedere Road, Wexford	7	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
729	729	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
730	730	SHIP CONSTRUCTION	Wexford	King Street, Wexford	3	*N/A	Stage 1 approved in Q3-2017 - outline design and costs are now being prepared	""	""	""	""	""
731	731	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
732	732	SHIP CONSTRUCTION	Wexford	Carricklawn, Coolcots, Wexford	14	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
733	733	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
734	734	SHIP CONSTRUCTION	Wexford	Maudlintown, Wexford	5	*N/A	Stage 1 approved in Q1-2017 - outline design and costs are now being prepared	""	""	""	""	""
735	735	SHIP CONSTRUCTION	Wexford	41 St Martins Park	1	*N/A	""	""	""	""	Q1-2017	""
736	736	SHIP CONSTRUCTION	Wexford	5 Mountain View	1	*N/A	""	""	""	""	Q1-2017	""
737	737	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
738	738	SHIP CONSTRUCTION	Wexford	Danescastle	12	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
739	739	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
740	740	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	36	*N/A	Stage 1 approved in Q4-2016 - outline design and costs are now being prepared	""	""	""	""	""
741	741	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	Stage 4 approved in Q2-2017 - the scheme is now fully approved	""	""
742	742	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	14	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""
743	743	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	Q1-2017	""
744	744	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	Q3-2017	""
745	745	SHIP CONSTRUCTION	Wexford	Clonard, Wexford	26	*N/A	Stage 1 approved in Q1-2016 - outline design and costs are now being prepared	""	""	""	""	""
746	746	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	Stage 3 approved in Q3-2016 - the scheme is now being tendered	""	""	""
747	747	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	9	*N/A	""	""	Stage 3 approved in Q1-2017 - the scheme is now being tendered	""	""	""
748	748	SHIP CONSTRUCTION	Wexford	Baile an Tr, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
749	749	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
750	750	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
751	751	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
752	752	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
753	753	CALF CONSTRUCTION	Wicklow	St Ernan's View, Merrymeeting, Rathnew	45	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
754	754	CALF CONSTRUCTION TURNKEY	Wicklow	Bollarney North, Wicklow Town, Wicklow	32	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
755	755	CALF CONSTRUCTION TURNKEY	Wicklow	Abbey St, Wicklow	6	Tath Housing Association	""	""	""	""	Q2-2017	""
756	756	CAS CONSTRUCTION	Wicklow	Lathaleer, Baltinglass	5	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
757	757	SHIP CONSTRUCTION	Wicklow	Emoclew (Phase 3)	21	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
758	758	SHIP CONSTRUCTION	Wicklow	10A Castle Villas, Greystones	1	*N/A	""	Stage 2 approved in Q3-2017 - full design/tender being prepared	""	""	""	""
759	759	SHIP CONSTRUCTION	Wicklow	Ard Na Mara, Kilcoole	2	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
760	760	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
761	761	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 1)	17	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
762	762	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 2)	26	*N/A	""	Stage 2 approved in Q2-2017 - full design/tender being prepared	""	""	""	""
763	763	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
764	764	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	Stage 2 approved in Q4-2016 - full design/tender being prepared	""	""	""	""
765	765	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	Q3-2017	""
766	766	SHIP CONSTRUCTION	Wicklow	Old Library, Arklow	7	*N/A	""	""	""	Stage 4 approved in Q3-2017 - the scheme is now fully approved	""	""
767	767	SHIP CONSTRUCTION	Wicklow	Sugarloaf View, Kilmacanogue	20	*N/A	""	Stage 2 approved in Q1-2017 - full design/tender being prepared	""	""	""	""
768	768	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum (Phase 2)	20	*N/A	""	""	""	""	Q3-2017	""
769	769	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
770	770	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	Stage 1 approved in Q2-2017 - outline design and costs are now being prepared	""	""	""	""	""
771	771	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	30	*N/A	""	""	Stage 3 approved in Q3-2017 - the scheme is now being tendered	""	""	""
772	772	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	Stage 1 approved in Q3-2016 - outline design and costs are now being prepared	""	""	""	""	""