  "fields": [{"id":"_id","type":"int"},{"id":"No.","type":"numeric"},{"id":"Funding Programme","type":"text"},{"id":"LA","type":"text"},{"id":"Scheme/Project Name","type":"text"},{"id":"No. of Units","type":"numeric"},{"id":"Approved Housing Body","type":"text"},{"id":"Stage 1 Capital Appraisal","type":"text"},{"id":"Stage 2 Pre Planning","type":"text"},{"id":"Stage 3 Pre Tender design","type":"text"},{"id":"Stage 4 Tender Report or Final Turnkey/CALF approval","type":"text"},{"id":"Site Start","type":"text"},{"id":"Site Finish","type":"text"}],
  "records": [
    [1,1,"CALF CONSTRUCTION TURNKEY","Carlow","Sleaty Street, Graigcullen, Carlow",26,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [2,2,"CALF CONSTRUCTION TURNKEY","Carlow","River Court, Carlow ",10,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2017","",""],
    [3,3,"CALF CONSTRUCTION TURNKEY","Carlow","Barrett Street, Bagnalstown",10,"Tintean Housing Association","","","","","","Q2-2017"],
    [4,4,"CAS CONSTRUCTION","Carlow","Mill Race Court, Carlow Town",14,"Cluid Housing Association","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [5,5,"CAS CONSTRUCTION","Carlow","Royal Oak Road, Bagenalstown",6,"Respond!","","Stage 2 approved in Q2-2015 - full design/tender being prepared","","","",""],
    [6,6,"CAS CONSTRUCTION","Carlow","Ballincarrig, Wexford Road",6,"Tintean Housing Association Ltd","","","","","","Q4-2016"],
    [7,7,"SHIP CONSTRUCTION","Carlow","The Laurels, Carlow Town",5,"*N/A","","","","","Q3-2017",""],
    [8,8,"SHIP CONSTRUCTION","Carlow","Ard na Greine, Tullow",16,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [9,9,"SHIP CONSTRUCTION","Carlow","Dublin Road, Tullow",21,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [10,10,"SHIP CONSTRUCTION","Carlow","Bagenalstown",42,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [11,11,"SHIP CONSTRUCTION","Carlow","Bilboa",2,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [12,12,"SHIP CONSTRUCTION","Carlow","Hacketstown",4,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [13,13,"SHIP CONSTRUCTION","Carlow","Mount Leinster Park, Carlow",4,"*N/A","","","","","Q2-2017",""],
    [14,14,"SHIP CONSTRUCTION","Carlow","Myshall",4,"*N/A","","","","","Q2-2017",""],
    [15,15,"SHIP CONSTRUCTION","Carlow","Pound Lane, Borris",4,"*N/A","","","","","","Q3-2017"],
    [16,16,"SHIP CONSTRUCTION","Carlow","Rathvilly",10,"*N/A","","","","","","Q2-2017"],
    [17,17,"SHIP CONSTRUCTION","Carlow","Moneybeg, Bagenalstown",24,"*N/A","","","","","","Q3-2017"],
    [18,18,"SHIP CONSTRUCTION","Carlow","Tullow (SRD)",1,"*N/A","","","","","","Q3-2017"],
    [19,19,"SHIP CONSTRUCTION","Carlow","Maryborough St., Carlow",5,"*N/A","","","","","Q1-2016",""],
    [20,20,"SHIP CONSTRUCTION","Carlow","Rathvilly (SRD)",1,"*N/A","","","","","Q3-2016",""],
    [21,21,"SHIP CONSTRUCTION TURNKEY","Carlow","Tullow Road, Carlow",63,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [22,22,"CALF CONSTRUCTION TURNKEY","Cavan","Drumalee Manor, Drumalee Phase 2",7,"Tath Housing Association","","","","","Q1-2017",""],
    [23,23,"CALF CONSTRUCTION TURNKEY","Cavan","Drumalee Manor, Drumalee Phase 1",4,"Tath Housing Association","","","","","Q1-2017",""],
    [24,24,"CALF CONSTRUCTION TURNKEY","Cavan","Cluain Dara, Kingscourt",16,"Cluid Housing Association","","","","","","Q4-2016"],
    [25,25,"SHIP CONSTRUCTION","Cavan","Rosehill, Mullagh (Phase 6)",8,"*N/A","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [26,26,"SHIP CONSTRUCTION","Cavan","Butlersbridge",4,"*N/A","","","","","Q2-2017",""],
    [27,27,"SHIP CONSTRUCTION","Cavan","Woodlands, Ballyhaise",8,"*N/A","","","","","Q3-2017",""],
    [28,28,"SHIP CONSTRUCTION","Cavan","Butlersbridge (Phase 1)",2,"*N/A","","","","","","Q2-2017"],
    [29,29,"CALF CONSTRUCTION","Clare","Bruachlan, Westbury",22,"Co operative Ireland","","","","Scheme approved for CALF funding Q2-2016","",""],
    [30,30,"CALF CONSTRUCTION TURNKEY","Clare","Lios Anama, Sixmilebridge",28,"Co operative Ireland","","","","","Q3-2016",""],
    [31,31,"CAS CONSTRUCTION","Clare","Cahercalla, Ennis (Phase 2)",10,"Cuan an Chlair Ltd","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [32,32,"CAS CONSTRUCTION","Clare","Doonbeg",12,"Kilkee Housing Association Ltd","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [33,33,"CAS CONSTRUCTION","Clare","Kildysart Road, Ennis",7,"Clare Haven Services Ltd","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [34,34,"CAS CONSTRUCTION","Clare","Laurel Lodge, Clare Road, Ennis",3,"Society of Saint Vincent de Paul","","","","","","Q4-2016"],
    [35,35,"SHIP CONSTRUCTION","Clare","Roslevan, Ennis",8,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [36,36,"SHIP CONSTRUCTION","Clare","Feakle",11,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [37,37,"SHIP CONSTRUCTION","Clare","Glor Srutha, Knockbrack Lower, Clonlara",9,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [38,38,"SHIP CONSTRUCTION","Clare","Seaview Park, Quilty",18,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [39,39,"SHIP CONSTRUCTION","Clare","Tullyglass, Shannon",21,"*N/A","","Stage 2 approved in Q2-2016 - full design/tender being prepared","","","",""],
    [40,40,"SHIP CONSTRUCTION","Clare","River View, School Road, Corofin",2,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [41,41,"CAS CONSTRUCTION","Cork","Duntahan Road, Fermoy",12,"Respond!","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [42,42,"CAS CONSTRUCTION","Cork","Brookwood, Kilnagurteen, Macroom",1,"Anvers Housing Association Ltd","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [43,43,"CAS CONSTRUCTION","Cork","Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay",16,"Cluid Housing Association","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [44,44,"CAS CONSTRUCTION","Cork","St. Francis Court, Youghal",4,"Respond!","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [45,45,"CAS CONSTRUCTION","Cork","Cuan Barra, Kilmore, Ballingeary",3,"Coiste Tithe Uibh Laoire Teoranta","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [46,46,"CAS CONSTRUCTION","Cork","Townlands, Rosscarbery",9,"Rosscarbery Housing Association Ltd","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [47,47,"CAS CONSTRUCTION","Cork","Avenue House, Bandon",9,"Bandon Geriatric & Community Council","","","","","Q3-2016",""],
    [48,48,"CAS CONSTRUCTION","Cork","Church View, Love Lane, Charleville",6,"Charleville Care Project Ltd","","","","","Q2-2017",""],
    [49,49,"CAS CONSTRUCTION","Cork","Fellowship House, Togher",31,"Tabor Lodge Addiction & Housing Services Ltd","","","","","Q1-2017",""],
    [50,50,"SHIP CONSTRUCTION","Cork","Ard Na Greine, Cortmacsherry",15,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [51,51,"SHIP CONSTRUCTION","Cork","Station Road, Blarney",18,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [52,52,"SHIP CONSTRUCTION","Cork","Bluepool, Kanturk",16,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [53,53,"SHIP CONSTRUCTION","Cork","Cloyne, East Cork",9,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [54,54,"SHIP CONSTRUCTION","Cork","Model Village, Dripsey",6,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [55,55,"SHIP CONSTRUCTION","Cork","Beechgrove, Clonakilty",56,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [56,56,"SHIP CONSTRUCTION","Cork","Castle Treasure Grove",1,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [57,57,"SHIP CONSTRUCTION","Cork","Poulavone, Ballincollig",57,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [58,58,"SHIP CONSTRUCTION","Cork","Newtown, Bantry",1,"*N/A","Stage 1 approved in Q2-2016 - outline design and costs are now being prepared","","","","",""],
    [59,59,"SHIP CONSTRUCTION","Cork","Fairfield, Macroom",7,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [60,60,"SHIP CONSTRUCTION","Cork","Droum, Castletownbere",2,"*N/A","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [61,61,"SHIP CONSTRUCTION","Cork","Kilnagleary, Carrigaline",49,"*N/A","","","","","Q3-2017",""],
    [62,62,"SHIP CONSTRUCTION","Cork","Kilnagleary, Carrigaline (Phase 4)",15,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [63,63,"SHIP CONSTRUCTION","Cork","Oliver Plunkett Hill, Fermoy",10,"*N/A","","","","","","Q2-2017"],
    [64,64,"SHIP CONSTRUCTION TURNKEY","Cork","Church Road, Carrigtwohill",25,"*N/A","","","","","Q3-2017",""],
    [65,65,"SHIP CONSTRUCTION TURNKEY","Cork","Inis Alainn & Castleoaks, Bandon",11,"*N/A","","","","","Q3-2017",""],
    [66,66,"SHIP CONSTRUCTION TURNKEY","Cork","Gleann Tuairigh, Youghal",2,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [67,67,"SHIP CONSTRUCTION TURNKEY","Cork","Kanturk",25,"*N/A","","","","Stage 4 approved in Q1-2017 - the scheme is now fully approved","",""],
    [68,68,"SHIP CONSTRUCTION TURNKEY","Cork","Clondulane, Fermoy",2,"*N/A","","","","","Q1-2017",""],
    [69,69,"SHIP CONSTRUCTION TURNKEY","Cork","Bantry",30,"*N/A","","","","Stage 4 approved in Q4-2016 - the scheme is now fully approved","",""],
    [70,70,"SHIP CONSTRUCTION TURNKEY","Cork","College Wood, Cobh",32,"*N/A","","","","","Q1-2016",""],
    [71,71,"SHIP CONSTRUCTION TURNKEY","Cork","Castletreasure, Douglas (Phase 3)",12,"*N/A","","","","","Q4-2016",""],
    [72,72,"SHIP CONSTRUCTION TURNKEY","Cork","Crannard, Fermoy",52,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [73,73,"SHIP CONSTRUCTION TURNKEY","Cork","CulAird Carraigtwohill",29,"*N/A","","","","","Q4-2016",""],
    [74,74,"SHIP CONSTRUCTION TURNKEY","Cork","Whitechurch",8,"*N/A","","","","Stage 4 approved in Q2-2016 - the scheme is now fully approved","",""],
    [75,75,"SHIP CONSTRUCTION TURNKEY","Cork","Castletreasure, Douglas (Phase 1)",12,"*N/A","","","","","","Q1-2017"],
    [76,76,"SHIP CONSTRUCTION TURNKEY","Cork","Castletreasure, Douglas (Phase 2)",16,"*N/A","","","","","","Q1-2017"],
    [77,77,"SHIP CONSTRUCTION TURNKEY","Cork","Abbeywood, Midelton",61,"*N/A","","","","","Q3-2017",""],
    [78,78,"SHIP CONSTRUCTION TURNKEY","Cork","Claragh Road, Millstreet",6,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [79,79,"SHIP CONSTRUCTION TURNKEY","Cork","St. Mary?s Road, Dunmanway",20,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [80,80,"SHIP CONSTRUCTION TURNKEY","Cork","Downeen Cross, Rosscarbery",7,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [81,81,"CALF CONSTRUCTION","Cork City","124 Lr. Glanmire Road & 2 Breamer, Cork",6,"Galtan Ltd","","","","","Q1-2017",""],
    [82,82,"CALF CONSTRUCTION TURNKEY","Cork City","the Meadows, Knopckacullen Ease, Gurranabraher, Cork",72,"Tath Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [83,83,"CALF CONSTRUCTION TURNKEY","Cork City","Popes Road, Blackpool",7,"Cluid Housing Association","","","","","Q1-2017",""],
    [84,84,"CALF CONSTRUCTION TURNKEY","Cork City","Millfield Cottages, Blackpool",18,"Respond!","","","","","Q1-2017",""],
    [85,85,"CALF CONSTRUCTION TURNKEY","Cork City","Leitrim Street, Cork City",18,"Cluid Housing Association","","","","Scheme approved for CALF funding Q3-2016","",""],
    [86,86,"CAS CONSTRUCTION","Cork City","Edel House, Grattan Street",33,"Good Shepherd Services Ltd","","Stage 2 approved in Q1-2016 - full design/tender being prepared","","","",""],
    [87,87,"CAS CONSTRUCTION","Cork City","Saint Vincent's Convent, Vincent's Ave/St. Mary's Street",25,"Respond!","","","","","Q3-2016",""],
    [88,88,"CAS CONSTRUCTION","Cork City","Thomas Davis Street (Phase 1)",28,"Respond!","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [89,89,"CAS CONSTRUCTION","Cork City","Ceanncora Lawn, Ballinlough",1,"Cork Mental Health Voluntary Housing Association Ltd","","","","","Q2-2017",""],
    [90,90,"CAS CONSTRUCTION","Cork City","St. Joachim & Anne's, Anglesea Street",8,"Simon Community : Cork Simon","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [91,91,"CAS CONSTRUCTION","Cork City","27-29 Dublin Street, Blackpool",10,"Respond!","","","","","Q4-2016",""],
    [92,92,"REGENERATION","Cork City","Phase 1 B Knocknaheeny",29,"*N/A","","","","","Q3-2016",""],
    [93,93,"REGENERATION","Cork City","Phase 2 A Knocknaheeny",47,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [94,94,"REGENERATION","Cork City","Phase 1 C Knocknaheeny",41,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [95,95,"REGENERATION","Cork City","Phase 2 B Knocknaheeny",36,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [96,96,"SHIP CONSTRUCTION","Cork City","The Meadows, Knocknacullen",1,"*N/A","","","","","","Q3-2016"],
    [97,97,"SHIP CONSTRUCTION","Cork City","Boyces Street",51,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [98,98,"SHIP CONSTRUCTION","Cork City","Shandon Street/John Philpott Curran Street",9,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [99,99,"SHIP CONSTRUCTION","Cork City","St. Johns Well",6,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [100,100,"SHIP CONSTRUCTION","Cork City","Churchfield Place East",3,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [101,101,"SHIP CONSTRUCTION","Cork City","Deanrock, Togher",66,"*N/A","","","","","Q4-2016",""],
    [102,102,"SHIP CONSTRUCTION","Cork City","Gerald Griffin Street",42,"*N/A","","","","","Q3-2017",""],
    [103,103,"SHIP CONSTRUCTION","Cork City","Cappanoole",2,"*N/A","","","","","","Q4-2016"],
    [104,104,"SHIP CONSTRUCTION TURNKEY","Cork City","Arus Mhuire",30,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [105,105,"SHIP CONSTRUCTION TURNKEY","Cork City","1-4 Marble Lane",4,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [106,106,"SHIP CONSTRUCTION TURNKEY","Cork City","Barack Street",32,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [107,107,"SHIP CONSTRUCTION TURNKEY","Cork City","Faranree",5,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [108,108,"SHIP CONSTRUCTION TURNKEY","Cork City","High Street",9,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [109,109,"SHIP CONSTRUCTION TURNKEY","Cork City","Tramore Road",4,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [110,110,"SHIP CONSTRUCTION TURNKEY","Cork City","Whites Street",43,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [111,111,"SHIP CONSTRUCTION TURNKEY","Cork City","Woods Street",16,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [112,112,"SHIP CONSTRUCTION TURNKEY","Cork City","Church Road",43,"*N/A","","","","","Q2-2017",""],
    [113,113,"SHIP CONSTRUCTION TURNKEY","Cork City","Sheridan Park, Tramore Road",28,"*N/A","","","","","","Q4-2016"],
    [114,114,"SHIP CONSTRUCTION TURNKEY","Cork City","Ard Aoibhinn, Banduff, Mayfield",5,"*N/A","","","","","Q3-2017",""],
    [115,115,"SHIP CONSTRUCTION TURNKEY","Cork City","Corcorans Quay",3,"*N/A","","","","Stage 4 approved in Q1-2017 - the scheme is now fully approved","",""],
    [116,116,"CALF CONSTRUCTION","Cork","Firgrove Harrisons Lane",6,"Co operative Ireland","","","","","Q3-2016",""],
    [117,117,"CALF CONSTRUCTION","Cork","Cappagh, Ballynacubby, Kinsale, Co. Cork",40,"Cluid Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [118,118,"CALF CONSTRUCTION TURNKEY","Cork","Ticknock, Cobh",8,"Respond!","","","","","Q1-2017",""],
    [119,119,"CALF CONSTRUCTION TURNKEY","Cork","College Manor, Cobh",10,"Tath Housing Association","","","","","","Q4-2016"],
    [120,120,"CALF CONSTRUCTION TURNKEY","Cork","Church View, Enniskeane",12,"Cluid Housing Association","","","","","Q1-2017",""],
    [121,121,"CALF CONSTRUCTION TURNKEY","Cork","Beach Road, Passage West",3,"Cluid Housing Association","","","","","Q1-2017",""],
    [122,122,"CALF CONSTRUCTION","DLR","Abbeyview House, Monkstown",8,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2015","",""],
    [123,123,"CALF CONSTRUCTION TURNKEY","DLR","Woodbank, Dublin Rd, Shankill *",4,"Cluid Housing Association","","","","","","Q3-2017"],
    [124,124,"CALF CONSTRUCTION TURNKEY","DLR","The Avenue, Glenside, Carrickmines Green, Dublin 18 *",5,"Fold Ireland Housing Association","","","","","Q3-2017",""],
    [125,125,"CALF CONSTRUCTION TURNKEY","DLR","Stillorgan Gate, Kilmacud Road Upper, Co. Dublin *",4,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [126,126,"CALF CONSTRUCTION TURNKEY","DLR","Respond & Tuath Project Dublin 18 area.",56,"Respond!","","","","Scheme approved for CALF funding Q1-2017","",""],
    [127,127,"CALF CONSTRUCTION TURNKEY","DLR","Respond & Tuath Project Dublin 18 area.",49,"Tath Housing Association","","","","Scheme approved for CALF funding Q1-2017","",""],
    [128,128,"CALF CONSTRUCTION TURNKEY","DLR","Hyde Road, Belmont, Stepaside",8,"Respond!","","","","","Q3-2016",""],
    [129,129,"CALF CONSTRUCTION TURNKEY","DLR","Bishops Gate, Kilternan, Dublin 18",6,"Cluid Housing Association","","","","","Q3-2017",""],
    [130,130,"CAS CONSTRUCTION","DLR","30 Obelisk Walk, Blackrock",4,"St. John of God Housing Association Ltd","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [131,131,"SHIP CONSTRUCTION","DLR","66 George's Street, Dun Laoghaire",4,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [132,132,"SHIP CONSTRUCTION","DLR","132 Pottery Road, Dun Laoghaire",4,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [133,133,"SHIP CONSTRUCTION","DLR","33,35, & 37 Temple Road",3,"*N/A","","","","","Q3-2017",""],
    [134,134,"SHIP CONSTRUCTION","DLR","Assistant Harbour Master House",2,"*N/A","","","","","","Q3-2017"],
    [135,135,"SHIP CONSTRUCTION","DLR","Park Close - Sallynoggin",10,"*N/A","","","","","Q1-2017",""],
    [136,136,"SHIP CONSTRUCTION","DLR","Sallynoggin Park",4,"*N/A","","","","","Q4-2016",""],
    [137,137,"SHIP CONSTRUCTION","DLR","Shanganagh Park Lodge",1,"*N/A","","","","","","Q3-2016"],
    [138,138,"SHIP CONSTRUCTION","DLR","Rosemount Court",44,"*N/A","","","","","Q4-2016",""],
    [139,139,"SHIP CONSTRUCTION","DLR","Broadford Rise",21,"*N/A","","","","","Q3-2017",""],
    [140,140,"SHIP CONSTRUCTION","DLR","Fitzgerald Park",50,"*N/A","","","","","Q4-2016",""],
    [141,141,"SHIP CONSTRUCTION","DLR","Rochestown House (Phase 3)",14,"*N/A","","","","","Q3-2016",""],
    [142,142,"SHIP CONSTRUCTION","DLR","St Michael's Terrace",4,"*N/A","","","","","","Q3-2017"],
    [143,143,"SHIP CONSTRUCTION","DLR","Clontibret House",4,"*N/A","","","","","","Q4-2016"],
    [144,144,"SHIP CONSTRUCTION","DLR","Cromlech Close",15,"*N/A","","","","","","Q3-2016"],
    [145,145,"SHIP CONSTRUCTION","DLR","Rochestown House (Phase 2)",34,"*N/A","","","","","","Q2-2016"],
    [146,146,"SHIP CONSTRUCTION RAPID","DLR","Glenamuck/Stillorgan (Rockville Drive)",14,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [147,147,"SHIP CONSTRUCTION RAPID","DLR","George's Place",12,"*N/A","","","","","Q3-2017",""],
    [148,148,"CALF CONSTRUCTION","Donegal","Ernedale Heights, Ballyshannon",11,"Cluid Housing Association","","","","","Q3-2017",""],
    [149,149,"CALF CONSTRUCTION TURNKEY","Donegal","Forge Road, Donegal",4,"Cluid Housing Association","","","","","","Q3-2016"],
    [150,150,"CAS CONSTRUCTION","Donegal","Glenrowan House, Drumkeen, Stranorlar",6,"Apex Housing Association","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [151,151,"CAS CONSTRUCTION","Donegal","Willowbrook, Glencar, Letterkenny",40,"Apex Housing Association","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [152,152,"CAS CONSTRUCTION","Donegal","Meenmore, Dungloe",15,"County Donegal Parents and Friends Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [153,153,"CAS CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",10,"Oaklee Housing Trust","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [154,154,"CAS CONSTRUCTION","Donegal","Dunshenny House, Derry Road, Carndonagh",5,"Apex Housing Association","","","","","Q2-2017",""],
    [155,155,"SHIP CONSTRUCTION","Donegal","Carrigart (Phase 1)",17,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [156,156,"SHIP CONSTRUCTION","Donegal","Meadow Hill, Raphoe",11,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [157,157,"SHIP CONSTRUCTION","Donegal","Radharc na Tra Breige, Malin (Phase 3)",8,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [158,158,"SHIP CONSTRUCTION","Donegal","Cois Abhainn, St Johnston (Phase 2)",6,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [159,159,"SHIP CONSTRUCTION","Donegal","Emerald Drive, Killybegs (Phase 6)",9,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [160,160,"SHIP CONSTRUCTION","Donegal","Long Lane, Letterkenny",29,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [161,161,"SHIP CONSTRUCTION","Donegal","Buncrana - Rockytown (Phase 1)",21,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [162,162,"SHIP CONSTRUCTION","Donegal","Manorcunningham (Phase 2)",8,"*N/A","","","","","Q3-2017",""],
    [163,163,"SHIP CONSTRUCTION","Donegal","Carndonagh - Abbots Wood (Phase 2)",4,"*N/A","","","","","Q3-2017",""],
    [164,164,"SHIP CONSTRUCTION","Donegal","Dunfanaghy",13,"*N/A","","Stage 2 approved in Q2-2016 - full design/tender being prepared","","","",""],
    [165,165,"SHIP CONSTRUCTION","Donegal","Ardara (Phase 3)",8,"*N/A","","","","","","Q2-2017"],
    [166,166,"SHIP CONSTRUCTION","Donegal","Newtoncunningham",7,"*N/A","","","","","Q1-2017",""],
    [167,167,"SHIP CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",24,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [168,168,"SHIP CONSTRUCTION","Donegal","Ard Connell, Ardara (SRD)",1,"*N/A","","","","","","Q1-2017"],
    [169,169,"SHIP CONSTRUCTION","Donegal","Manorcunningham (Phase 1)",2,"*N/A","","","","","","Q2-2017"],
    [170,170,"SHIP CONSTRUCTION TURNKEY","Donegal","Gleann Na Greine, Mullindrait, Stranorlar  (Turnkey)",21,"*N/A","","","","","Q2-2017",""],
    [171,171,"CALF CONSTRUCTION","Dublin City","Wad River Close, Ballymun, Dublin 9",9,"Cluid Housing Association","","","","Scheme re approved for approval Q3-2017","",""],
    [172,172,"CALF CONSTRUCTION","Dublin City","St Mary?s Mansions, Dublin 1",80,"Cluid Housing Association","","","","Scheme approved for revised CALF approval Q2-2017","",""],
    [173,173,"CALF CONSTRUCTION","Dublin City","Richmond Road, Dublin 9",39,"Co operative Ireland","","","","","Q2-2017",""],
    [174,174,"CALF CONSTRUCTION","Dublin City","Raleigh Court, Crumlin",33,"Tath Housing Association","","","","","Q2-2017",""],
    [175,175,"CALF CONSTRUCTION","Dublin City","Poplar Row, Dublin 3",29,"Oaklee Housing Trust","","","","Scheme approved for revised CALF approval Q2-2017","",""],
    [176,176,"CALF CONSTRUCTION","Dublin City","Orchard Lawns, Ballyfermot",72,"Co operative Ireland","","","","","Q4-2016",""],
    [177,177,"CALF CONSTRUCTION","Dublin City","Harolds Cross, Dublin 6",28,"Focus Ireland","","","","","","Q4-2016"],
    [178,178,"CALF CONSTRUCTION","Dublin City","Dominic Place, Dublin",9,"The Aids Fund","","","","Scheme approved for CALF funding Q2-2017","",""],
    [179,179,"CALF CONSTRUCTION","Dublin City","Dolphin Park, Rialto, Dublin 8",43,"Fold Ireland Housing Association","","","","Scheme approved for Revised CALF funding Q3-2017","",""],
    [180,180,"CALF CONSTRUCTION","Dublin City","Broome Lodge, Dunmanus Court, Cabra",33,"Cluid Housing Association","","","","","Q1-2016",""],
    [181,181,"CALF CONSTRUCTION","Dublin City","Ballygall Road East - Phase 2",11,"Fold Ireland Housing Association","","","","","","Q1-2016"],
    [182,182,"CALF CONSTRUCTION","Dublin City","Annamore Court, Ballyfermot",70,"The Iveagh Trust","","","","","","Q2-2017"],
    [183,183,"CALF CONSTRUCTION","Dublin City","5 6 Johns Lane West, Dublin 8",31,"Focus Ireland","","","","","Q2-2017",""],
    [184,184,"CALF CONSTRUCTION TURNKEY","Dublin City","Thornwood, Beaumont - Phase 1",46,"Tath Housing Association","","","","","","Q3-2016"],
    [185,185,"CALF CONSTRUCTION TURNKEY","Dublin City","Thornwood, Beaumont - Final Phase",22,"Tath Housing Association","","","","","","Q1-2017"],
    [186,186,"CALF CONSTRUCTION TURNKEY","Dublin City","Stormanstown Hall, Ballymun Road, (revised)",42,"Oaklee Housing Trust","","","","","Q4-2016",""],
    [187,187,"CALF CONSTRUCTION TURNKEY","Dublin City","St Agnes Convent, Armagh Road, Crumlin, Dublin 12",97,"Fold Ireland Housing Association","","","","","Q1-2017",""],
    [188,188,"CALF CONSTRUCTION TURNKEY","Dublin City","Milrose House, Bluebell Avenue, Dublin 12",8,"Cluid Housing Association","","","","","Q1-2017",""],
    [189,189,"CALF CONSTRUCTION TURNKEY","Dublin City","Merville Court, Merville Avenue, Fairview",5,"Co operative Ireland","","","","","","Q1-2017"],
    [190,190,"CALF CONSTRUCTION TURNKEY","Dublin City","Long Mile Road, Dublin 12",61,"Respond!","","","","","Q2-2017",""],
    [191,191,"CALF CONSTRUCTION TURNKEY","Dublin City","Clongriffin, Dublin 13",84,"The Iveagh Trust","","","","","Q3-2017",""],
    [192,192,"CALF CONSTRUCTION TURNKEY","Dublin City","Chanel College, Coolock Village, Malahide Road, Dublin 5",16,"Respond!","","","","","Q3-2017",""],
    [193,193,"CALF CONSTRUCTION TURNKEY","Dublin City","Camac Place, Bluebell, Dublin 12",5,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q2-2017","",""],
    [194,194,"CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Phase 3",10,"Tath Housing Association","","","","","","Q2-2017"],
    [195,195,"CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Phase 2",21,"Tath Housing Association","","","","","","Q1-2017"],
    [196,196,"CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Phase 1",14,"Tath Housing Association","","","","","","Q4-2016"],
    [197,197,"CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Final Phase",4,"Tath Housing Association","","","","","","Q3-2017"],
    [198,198,"CALF CONSTRUCTION TURNKEY","Dublin City","175 176 North Strand Road, 5 Lamps, Dublin 1",10,"Co operative Ireland","","","","Scheme approved for CALF funding Q2-2017","",""],
    [199,199,"CALF CONSTRUCTION TURNKEY","Dublin City","11 13 Crumlin Village, Dublin 12 Phase 2",2,"Cluid Housing Association","","","","","","Q3-2017"],
    [200,200,"CALF CONSTRUCTION TURNKEY","Dublin City","11 13 Crumlin Village, Dublin 12 Phase 1",3,"Cluid Housing Association","","","","","","Q2-2017"],
    [201,201,"CAS CONSTRUCTION","Dublin City","Beech Hill",19,"Royal Hospital Donnybrook Voluntary Housing Association Ltd","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [202,202,"CAS CONSTRUCTION","Dublin City","Ellis Court, Dublin",23,"Tath Housing Association Ltd","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [203,203,"CAS CONSTRUCTION","Dublin City","\"Martanna House\" High Park, Grace Park Road,Dublin 9",8,"Respond!","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [204,204,"CAS CONSTRUCTION","Dublin City","Rafter's Lane, Dublin 12",11,"Walkinston Housing Association Ltd (WALK)","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [205,205,"CAS CONSTRUCTION","Dublin City","180-187 Townsend Street",18,"Peter McVerry Trust Ltd","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [206,206,"CAS CONSTRUCTION","Dublin City","Old Kilmainham Road, Dublin 8",11,"Arlington Novas Ireland Ltd","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [207,207,"CAS CONSTRUCTION","Dublin City","26 New Street South, Dublin 8",8,"Peter McVerry Trust Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [208,208,"CAS CONSTRUCTION","Dublin City","Broome Lodge, Dunmanus, Dublin 7",10,"Cluid Housing Association","","","","","","Q3-2017"],
    [209,209,"CAS CONSTRUCTION","Dublin City","St Agathas Court, North William Street, Dublin 1",11,"Peter McVerry Trust Ltd","","","","","","Q2-2017"],
    [210,210,"REGENERATION","Dublin City","Dominick Street",73,"*N/A","Stage 1 approved in Q2-2016 - outline design and costs are now being prepared","","","","",""],
    [211,211,"REGENERATION","Dublin City","O'Devaney Gardens",56,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [212,212,"REGENERATION","Dublin City","Dolphin House, D8 Phase 1",100,"*N/A","","","","","Q4-2016",""],
    [213,213,"REGENERATION","Dublin City","St. Teresa's Gardens",50,"*N/A","Stage 1 approved in Q3-2013 - outline design and costs are now being prepared","","","","",""],
    [214,214,"REGENERATION","Dublin City","Maxwell Road",9,"*N/A","","","","","","Q2-2016"],
    [215,215,"REGENERATION","Dublin City","Sackville Avenue Cottages",12,"*N/A","Stage 1 approved in Q2-2016 - outline design and costs are now being prepared","","","","",""],
    [216,216,"REGENERATION","Dublin City","Charlemont",79,"*N/A","","","","","Q4-2015",""],
    [217,217,"SHIP CONSTRUCTION","Dublin City","Hampton Wood",25,"*N/A","","","","","","Q4-2016"],
    [218,218,"SHIP CONSTRUCTION","Dublin City","Belcamp B, Dublin 17",12,"*N/A","","Stage 2 approved in Q3-2015 - full design/tender being prepared","","","",""],
    [219,219,"SHIP CONSTRUCTION","Dublin City","Belcamp C, Dublin 17",16,"*N/A","","Stage 2 approved in Q3-2015 - full design/tender being prepared","","","",""],
    [220,220,"SHIP CONSTRUCTION","Dublin City","Bunratty Road Phase 1c, Dublin 17",62,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [221,221,"SHIP CONSTRUCTION","Dublin City","Cornamona, Ballyfermot, Dublin 12",60,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [222,222,"SHIP CONSTRUCTION","Dublin City","Infirmary Road, Dublin 7",30,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [223,223,"SHIP CONSTRUCTION","Dublin City","North King Street, Dublin 7",30,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [224,224,"SHIP CONSTRUCTION","Dublin City","Ballybough Road, Dublin 1",7,"*N/A","","","","","Q4-2016",""],
    [225,225,"SHIP CONSTRUCTION","Dublin City","Priory Hall, Dublin 13 (Phase 1)",9,"*N/A","","","","","","Q3-2016"],
    [226,226,"SHIP CONSTRUCTION","Dublin City","Priory Hall, Dublin 13 (Phase 2)",26,"*N/A","","","","","Q4-2014",""],
    [227,227,"SHIP CONSTRUCTION RAPID","Dublin City","Belcamp H, Dublin 17",38,"*N/A","","","","","Q4-2016",""],
    [228,228,"SHIP CONSTRUCTION RAPID","Dublin City","Cherry Orchard, Ballyfermot",24,"*N/A","","","","","Q4-2016",""],
    [229,229,"SHIP CONSTRUCTION RAPID","Dublin City","Mourne Road, Drimnagh",29,"*N/A","","","","","Q4-2016",""],
    [230,230,"SHIP CONSTRUCTION RAPID","Dublin City","St Helena's Drive, Finglas",40,"*N/A","","","","","","Q3-2017"],
    [231,231,"SHIP CONSTRUCTION RAPID","Dublin City","Poppintree, Ballymun",22,"*N/A","","","","","","Q2-2016"],
    [232,232,"SHIP CONSTRUCTION RAPID","Dublin City","Cherry Orchard, Ballyfermot",53,"*N/A","","","","","Q3-2017",""],
    [233,233,"SHIP CONSTRUCTION RAPID","Dublin City","Wood bank/Rathvilly, Finglas",17,"*N/A","","","","","Q3-2017",""],
    [234,234,"CALF CONSTRUCTION TURNKEY","Fingal","Weavers Walk, Clonsilla Road, Dublin 15",33,"Co operative Ireland","","","","","Q3-2017",""],
    [235,235,"CALF CONSTRUCTION TURNKEY","Fingal","The Hermitage, Balgriffin, Co. Dublin *",54,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [236,236,"CALF CONSTRUCTION TURNKEY","Fingal","The Gallery, Donabate",43,"Oaklee Housing Trust","","","","","Q2-2017",""],
    [237,237,"CALF CONSTRUCTION TURNKEY","Fingal","St Werburghs Court, Drynam Rd, Swords",18,"Tath Housing Association","","","","","Q2-2017",""],
    [238,238,"CALF CONSTRUCTION TURNKEY","Fingal","St Marnock's Bay, Portmarnock *",10,"Cluid Housing Association","","","","","Q2-2017",""],
    [239,239,"CALF CONSTRUCTION TURNKEY","Fingal","Millers Glen, Oldtown, Swords",28,"The Iveagh Trust","","","","Scheme approved for CALF funding Q2-2017","",""],
    [240,240,"CALF CONSTRUCTION TURNKEY","Fingal","Dun Emer, Lusk",54,"Tath Housing Association","","","","Scheme approved for CALF funding Q4-2016","",""],
    [241,241,"CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange, Clonsilla - Phase 3",8,"Tath Housing Association","","","","","","Q2-2017"],
    [242,242,"CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange, Clonsilla - Phase 2",21,"Tath Housing Association","","","","","","Q1-2017"],
    [243,243,"CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange, Clonsilla - Phase 1",19,"Tath Housing Association","","","","","","Q4-2016"],
    [244,244,"CAS CONSTRUCTION","Fingal","The Obelisk, Strand Street, Skerries",5,"Prosper Fingal Housing Assocaition Ltd","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [245,245,"CAS CONSTRUCTION","Fingal","Killhedge Lane Dun Emer",48,"Tath Housing Association Ltd","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [246,246,"CAS CONSTRUCTION","Fingal","Ravenswood",6,"Peter McVerry Trust Ltd","","","","","Q3-2017",""],
    [247,247,"CAS CONSTRUCTION","Fingal","22 College Street, Baldoyle",4,"Cluid Housing Association","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [248,248,"CAS CONSTRUCTION","Fingal","Balglass Road, Howth",15,"Fold Housing Association Ireland Ltd","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [249,249,"CAS CONSTRUCTION","Fingal","Church Road/Ladyswell Road, Mulhuddart",22,"Cluid Housing Association","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [250,250,"CAS CONSTRUCTION","Fingal","Darcystown, Ringfort, Balrothery",9,"North & East Housing Association Ltd","","","","","","Q3-2017"],
    [251,251,"CAS CONSTRUCTION","Fingal","Estuary Road, Malahide",8,"Society of Saint Vincent de Paul","","","","","Q2-2017",""],
    [252,252,"SHIP CONSTRUCTION","Fingal","Rivermeade, St. Margarets",6,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [253,253,"SHIP CONSTRUCTION","Fingal","Rowlestown",20,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [254,254,"SHIP CONSTRUCTION","Fingal","Church Road, Mulhuddart, Dublin 15",22,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [255,255,"SHIP CONSTRUCTION","Fingal","Racecourse Common, Lusk (Phase 2)",74,"*N/A","","","","","Q4-2016",""],
    [256,256,"SHIP CONSTRUCTION","Fingal","Cappaghfinn (Phase 2)",32,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [257,257,"SHIP CONSTRUCTION","Fingal","Castlelands Part View (Phase 3)",24,"*N/A","","","","","Q1-2017",""],
    [258,258,"SHIP CONSTRUCTION","Fingal","Rathbeale Road, Swords",24,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [259,259,"SHIP CONSTRUCTION","Fingal","The Grange, Ballyboughal",8,"*N/A","","","","","Q4-2016",""],
    [260,260,"SHIP CONSTRUCTION","Fingal","Cappaghfinn (Phase 1)",14,"*N/A","","","","","","Q2-2016"],
    [261,261,"SHIP CONSTRUCTION","Fingal","St. Cronan's Green, Swords",14,"*N/A","","","","","","Q2-2016"],
    [262,262,"SHIP CONSTRUCTION","Fingal","St. Conan's Cottages, Swords",1,"*N/A","","","","","","Q2-2016"],
    [263,263,"SHIP CONSTRUCTION RAPID","Fingal","Avondale, Mulhuddart, Dublin 15",44,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [264,264,"SHIP CONSTRUCTION RAPID","Fingal","Hansfield, Ongar, Dublin 15",36,"*N/A","","","","","","Q3-2017"],
    [265,265,"SHIP CONSTRUCTION RAPID","Fingal","Pinewood, Balbriggan",25,"*N/A","","","","","Q3-2017",""],
    [266,266,"SHIP CONSTRUCTION RAPID","Fingal","Wellview, Mulhuddart",20,"*N/A","","","","","Q3-2017",""],
    [267,267,"SHIP CONSTRUCTION TURNKEY","Fingal","1-10 Blackmills Grove, Blakestown Road, Mulhuddard",10,"*N/A","","","","","","Q2-2017"],
    [268,268,"SHIP CONSTRUCTION TURNKEY","Fingal","1-6 Balgriffin Grove, Malahide Road, Balgriffin",6,"*N/A","","","","","","Q1-2017"],
    [269,269,"CALF CONSTRUCTION TURNKEY","Fingal ","Castlefield, Clonsilla, Dublin 11 ",62,"Tath Housing Association","","","","","Q1-2017",""],
    [270,270,"CAS CONSTRUCTION","Galway","Letterfrack (Phase 2)",11,"Cluid Housing Association","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [271,271,"CAS CONSTRUCTION","Galway","Rossaveal Cottages, Ros a Mhl, South Connemara",8,"Tearmann Eanna Teoranta","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [272,272,"CAS CONSTRUCTION","Galway","Claregalway",14,"Claregalway and District Day Care Centre","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [273,273,"CAS CONSTRUCTION","Galway","Eanach Mheain, Carraroe",13,"Tearmann Eanna Teoranta","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [274,274,"CAS CONSTRUCTION","Galway","Mountbellew",5,"Mountbellew Voluntary Homes Association","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [275,275,"CAS CONSTRUCTION","Galway","Springfield, Parkmore",4,"Peter Triest Housing Association Ltd","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [276,276,"CAS CONSTRUCTION","Galway","Letterfrack (Phase 1)",13,"Cluid Housing Association","","","","","","Q2-2016"],
    [277,277,"CAS CONSTRUCTION","Galway","Dunlo Hill, Ballinasloe",17,"Cluid Housing Association","","","Stage 3 approved in Q1-2016 - the scheme is now being tendered","","",""],
    [278,278,"SHIP CONSTRUCTION","Galway","Esker Fields, Ballinasloe",2,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [279,279,"SHIP CONSTRUCTION","Galway","Garbally Drive, Ballinasloe",10,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [280,280,"SHIP CONSTRUCTION","Galway","Gilmartin Road, Tuam",61,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [281,281,"SHIP CONSTRUCTION","Galway","Gort Mhailor, Athenry (Phase 2)",10,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [282,282,"SHIP CONSTRUCTION","Galway","Weir Road, Tuam",30,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [283,283,"SHIP CONSTRUCTION","Galway","Culleen, Carraroe, Connemara",6,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [284,284,"SHIP CONSTRUCTION","Galway","Ardrahan (SRD)",1,"*N/A","","","","","Q2-2017",""],
    [285,285,"SHIP CONSTRUCTION","Galway","Callowfinish, Carna (SRD)",1,"*N/A","","","","","Q2-2017",""],
    [286,286,"SHIP CONSTRUCTION","Galway","Waterdale, Claregalway (SRD)",1,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [287,287,"SHIP CONSTRUCTION","Galway","Tomnajulla, Corndulla (SRD)",1,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [288,288,"SHIP CONSTRUCTION","Galway","Cill Ciarn (SRD)",1,"*N/A","","","","","Q3-2017",""],
    [289,289,"SHIP CONSTRUCTION","Galway","Kinvara (SRD)",1,"*N/A","","","","","Q2-2017",""],
    [290,290,"SHIP CONSTRUCTION","Galway","Roundstone",10,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [291,291,"CALF CONSTRUCTION TURNKEY","Galway City","Reilean, Roscam, Block 5 Galway *",12,"Tath Housing Association","","","","","","Q2-2017"],
    [292,292,"CALF CONSTRUCTION TURNKEY","Galway City","Reilean, Roscam, Block 4 Galway *",12,"Tath Housing Association","","","","","","Q2-2017"],
    [293,293,"CALF CONSTRUCTION TURNKEY","Galway City","Murrough, Renmore, Galway",20,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [294,294,"CALF CONSTRUCTION TURNKEY","Galway City","Maoilin, Ballymoneen Road, Galway - Phase 2 *",4,"Tath Housing Association","","","","","Q2-2015",""],
    [295,295,"CALF CONSTRUCTION TURNKEY","Galway City","Maoilin, Ballymoneen Road, Galway - Phase 1 *",2,"Tath Housing Association","","","","","","Q1-2017"],
    [296,296,"CALF CONSTRUCTION TURNKEY","Galway City","Cnoc na R, clybaun Road, Galway *",2,"Cluid Housing Association","","","","","","Q3-2017"],
    [297,297,"CALF CONSTRUCTION TURNKEY","Galway City","Castlegar Road, Galway",81,"Respond!","","","","Scheme approved for CALF funding Q2-2017","",""],
    [298,298,"CALF CONSTRUCTION TURNKEY","Galway City","Boireann Beag, Ros Cam, Galway",16,"Cluid Housing Association","","","","","","Q4-2016"],
    [299,299,"CAS CONSTRUCTION","Galway City","97/98 Rockfield",4,"Carraig Dubh Housing Association","","","","","","Q3-2017"],
    [300,300,"CAS CONSTRUCTION","Galway City","Cul Garrai, Rahoon",6,"Peter Triest Housing Association Ltd","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [301,301,"CAS CONSTRUCTION","Galway City","47 Forster Street",9,"Cope Galway","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [302,302,"SHIP CONSTRUCTION","Galway City","Ballymoneen Road (Phase 2)",55,"*N/A","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [303,303,"SHIP CONSTRUCTION","Galway City","Ballymoneen Road (Phase 1)",14,"*N/A","","","","","Q2-2017",""],
    [304,304,"SHIP CONSTRUCTION","Galway City","Ballinfoile Park, Headford Road (Infill Units)",10,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [305,305,"SHIP CONSTRUCTION","Galway City","Corrib Park (Infill Units)",3,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [306,306,"SHIP CONSTRUCTION","Galway City","Castlepark, Ballybane (Infill Units)",4,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [307,307,"SHIP CONSTRUCTION","Galway City","Carn Ard, Circular Road (Infill Units)",6,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [308,308,"CALF CONSTRUCTION","Galway","Spiddal Cottages, Co Galway - Phase 2",8,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2016","",""],
    [309,309,"CALF CONSTRUCTION","Galway","Spiddal Cottages, Co Galway - Phase 1",23,"Cluid Housing Association","","","","","","Q3-2017"],
    [310,310,"CALF CONSTRUCTION TURNKEY","Galway","Cnoc na Si, Portumna",13,"Co operative Ireland","","","","","Q4-2016",""],
    [311,311,"CALF CONSTRUCTION TURNKEY","Galway"," Ballinasloe Area, Galway",39,"Cluid Housing Association","","","","Scheme approved for CALF funding Q3-2016","",""],
    [312,312,"CALF CONSTRUCTION TURNKEY","Kerry","Cathair Lakes Farrantoreen Road, Killorglin",6,"Cluid Housing Association","","","","","","Q2-2016"],
    [313,313,"CAS CONSTRUCTION","Kerry","Armagh House, Killarney",6,"Cluid Housing Association","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [314,314,"CAS CONSTRUCTION","Kerry","22 College Road, Castleisland",4,"Kerry Emigrant Support Housing Association Ltd","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [315,315,"CAS CONSTRUCTION","Kerry","Mitchels-Boherbee",16,"Cluid Housing Association","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [316,316,"CAS CONSTRUCTION","Kerry","The Parsonage, Caherciveen",5,"Caherciveen Social Services (Housing) Ltd","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [317,317,"CAS CONSTRUCTION","Kerry","Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee",15,"Kingdom Voluntary Housing Association","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [318,318,"REGENERATION","Kerry","Urban Terrace, Tralee",2,"*N/A","","","","","","Q4-2016"],
    [319,319,"REGENERATION","Kerry","Clonmore Road, Tralee",3,"*N/A","","","","","","Q4-2016"],
    [320,320,"SHIP CONSTRUCTION","Kerry","Ardmoneel, Killorglin",14,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [321,321,"SHIP CONSTRUCTION","Kerry","Rathmore/Barraduff",20,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [322,322,"SHIP CONSTRUCTION","Kerry","Ardbhearna, Kenmare",22,"*N/A","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [323,323,"SHIP CONSTRUCTION","Kerry","Bill Kinnerk Road",4,"*N/A","","","","","Q2-2017",""],
    [324,324,"SHIP CONSTRUCTION","Kerry","Milltown",8,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [325,325,"SHIP CONSTRUCTION","Kerry","Killeen, Tralee",21,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [326,326,"SHIP CONSTRUCTION","Kerry","Lixnaw",4,"*N/A","","","","","Q1-2017",""],
    [327,327,"SHIP CONSTRUCTION","Kerry","Single Rural Dwellings",3,"*N/A","","","","","Q3-2017",""],
    [328,328,"SHIP CONSTRUCTION","Kerry","The Park, Killarney",20,"*N/A","","","","","Q1-2017",""],
    [329,329,"SHIP CONSTRUCTION","Kerry","Courthouse Lawn, Listowel",7,"*N/A","","Stage 2 approved in Q2-2016 - full design/tender being prepared","","","",""],
    [330,330,"SHIP CONSTRUCTION","Kerry","Dreenagh, Ballyheigue (SRD)",1,"*N/A","","","","","","Q1-2017"],
    [331,331,"SHIP CONSTRUCTION","Kerry","Marconi Avenue, Ballybunion",20,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [332,332,"SHIP CONSTRUCTION","Kerry","Callinafercy, Milltown",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [333,333,"SHIP CONSTRUCTION","Kerry","Cahernaboshina, Ventry",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [334,334,"SHIP CONSTRUCTION","Kerry","Pinewood Estate, Killarney",5,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [335,335,"SHIP CONSTRUCTION","Kerry","Balloonagh, Tralee",28,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [336,336,"SHIP CONSTRUCTION","Kerry","Pinewood Estate, Killarney",1,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [337,337,"SHIP CONSTRUCTION","Kerry","Drom West, Glenbeigh",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [338,338,"SHIP CONSTRUCTION","Kerry","Meanus, Killorglin",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [339,339,"SHIP CONSTRUCTION","Kerry","Tullig Beg, Killorglin",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [340,340,"SHIP CONSTRUCTION","Kerry","Owngarry, killorglin",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [341,341,"SHIP CONSTRUCTION","Kerry","Lohercannon, Tralee",56,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [342,342,"SHIP CONSTRUCTION","Kerry","BallinaKilly Lower, Glenbeigh",1,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [343,343,"SHIP CONSTRUCTION","Kerry","Ashgrove, Listowel",1,"*N/A","","","","","","Q3-2017"],
    [344,344,"SHIP CONSTRUCTION","Kerry","SRD @ Cullenagh Upr, Beaufort",1,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [345,345,"SHIP CONSTRUCTION TURNKEY","Kerry","Ard Na Si, Lispole",10,"*N/A","","","","","Q2-2017",""],
    [346,346,"SHIP CONSTRUCTION TURNKEY","Kerry","Cahirdown Wood, Listowel",22,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [347,347,"REGENERATION","Kerry ","Crolar Na Mistaelach, Tralee",11,"*N/A","","","","","Q2-2017",""],
    [348,348,"REGENERATION","Kerry ","St Martin's Park, Tralee",4,"*N/A","","","","","Q2-2017",""],
    [349,349,"REGENERATION","Kerry ","Dingle Road, Tralee",1,"*N/A","","","","","Q1-2017",""],
    [350,350,"CALF CONSTRUCTION TURNKEY","Kildare","The Pike, Shenagun, Castledermot",6,"Respond!","","","","Scheme approved for CALF funding Q1-2017","",""],
    [351,351,"CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge - Phase 3",16,"Tath Housing Association","","","","","Q3-2016",""],
    [352,352,"CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge - Phase 2",16,"Tath Housing Association","","","","","Q3-2016",""],
    [353,353,"CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge - Phase 1",13,"Tath Housing Association","","","","","","Q2-2017"],
    [354,354,"CALF CONSTRUCTION TURNKEY","Kildare","Moorefield Road, Newbridge",2,"Co operative Ireland","","","","","Q2-2017",""],
    [355,355,"CALF CONSTRUCTION TURNKEY","Kildare","Gallows Hill, Athy",24,"Respond!","","","","Scheme approved for CALF funding Q2-2017","",""],
    [356,356,"CAS CONSTRUCTION","Kildare","Craddockstown, Naas",3,"KARE Promoting Inclusion for People with Intellectual Disabilities","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [357,357,"CAS CONSTRUCTION","Kildare","Main St., Kilcullen",4,"Camphill Communities of Ireland","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [358,358,"CAS CONSTRUCTION","Kildare","El Kantara, Newbridge",2,"KARE Promoting Inclusion for People with Intellectual Disabilities","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [359,359,"CAS CONSTRUCTION","Kildare","27 Mansfield Grove, Athy",4,"KARE Promoting Inclusion for People with Intellectual Disabilities","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [360,360,"CAS CONSTRUCTION","Kildare","Jigginstown House, Naas",14,"Homeless Care Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [361,361,"SHIP CONSTRUCTION","Kildare","Hillview Terrace, Narraghmore",4,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [362,362,"SHIP CONSTRUCTION","Kildare","Athgarvan Village",30,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [363,363,"SHIP CONSTRUCTION","Kildare","Rathasker, Naas",48,"*N/A","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [364,364,"SHIP CONSTRUCTION","Kildare","Dunmurry Rise, Bishopsland",32,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [365,365,"SHIP CONSTRUCTION","Kildare","Anne Street, Prosperous",12,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [366,366,"SHIP CONSTRUCTION","Kildare","Beechgrove, Rathangan",18,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [367,367,"SHIP CONSTRUCTION","Kildare","Kilcock (Phase 2)",19,"*N/A","","","","","Q4-2016",""],
    [368,368,"SHIP CONSTRUCTION","Kildare","Athgarvan Road, Newbridge",13,"*N/A","","","","","Q3-2017",""],
    [369,369,"SHIP CONSTRUCTION","Kildare","Dominican Church Site, Athy",30,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [370,370,"SHIP CONSTRUCTION","Kildare","Newtown, Leixlip",4,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [371,371,"SHIP CONSTRUCTION TURNKEY","Kildare","Bodkin Place, Kilmeague",16,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [372,372,"SHIP CONSTRUCTION TURNKEY","Kildare","Drogheda Street, Monasterevin",13,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [373,373,"CALF CONSTRUCTION","Kilkenny","Walkin Street, Kilkenny",43,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q1-2014","",""],
    [374,374,"CALF CONSTRUCTION","Kilkenny","Golf Links Road, Kilkenny *",39,"Respond!","","","","Scheme approved for CALF funding Q4-2015 (revised approval received in Q3-2017) ","",""],
    [375,375,"CALF CONSTRUCTION","Kilkenny","Friary Walk, Callan",16,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [376,376,"CALF CONSTRUCTION TURNKEY","Kilkenny","Moneenview side Rd, Moneenroe",9,"Oaklee Housing Trust","","","","","Q1-2017",""],
    [377,377,"CALF CONSTRUCTION TURNKEY","Kilkenny","Chapel St. and New Road, Mooncoin, Co. Kilkenny",6,"Respond!","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [378,378,"CAS CONSTRUCTION","Kilkenny","Kingsriver, Ennisnag",2,"Kingsriver Housing Association Limited","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [379,379,"CAS CONSTRUCTION","Kilkenny","Garrin Green",6,"SOS Kilkenny Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [380,380,"CAS CONSTRUCTION","Kilkenny","Hazelbrook, Newrath",2,"Waterford Dove Housing Association","","","","","Q3-2017",""],
    [381,381,"CAS CONSTRUCTION","Kilkenny","Golf Links Road, Kilkenny",15,"Respond!","Stage 1 approved in Q2-2016 - outline design and costs are now being prepared","","","","",""],
    [382,382,"CAS CONSTRUCTION","Kilkenny","Ballytobin, Callan",4,"Camphill Communities of Ireland","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [383,383,"CAS CONSTRUCTION","Kilkenny","Good Shepherd Centre - Wing 1952",12,"The Good Shepherd Centre (Kilkenny) Ltd","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [384,384,"CAS CONSTRUCTION","Kilkenny","Greenshill, Kilkenny",6,"The Good Shepherd Centre (Kilkenny) Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [385,385,"CAS CONSTRUCTION","Kilkenny","Nimble Spaces Project at Callan",16,"Camphill Communities of Ireland","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [386,386,"CAS CONSTRUCTION","Kilkenny","\"Brooke House\", Thomastown",5,"Camphill Communities of Ireland","","","","","","Q3-2017"],
    [387,387,"CAS CONSTRUCTION","Kilkenny","Friary Walk, Callan",12,"Cluid Housing Association","","","","","","Q3-2016"],
    [388,388,"SHIP CONSTRUCTION","Kilkenny","Blackstaff House, Callan",4,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [389,389,"SHIP CONSTRUCTION","Kilkenny","Rural Cottage Barna, Freshford",1,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [390,390,"SHIP CONSTRUCTION","Kilkenny","10 Golf Links Road, Kilkenny",7,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [391,391,"SHIP CONSTRUCTION","Kilkenny","Crokers Hill, Pennyswell Road, Kilkenny",80,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [392,392,"SHIP CONSTRUCTION","Kilkenny","Main Street, Piltown",18,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [393,393,"SHIP CONSTRUCTION","Kilkenny","Station Road, Ballyragget",14,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [394,394,"SHIP CONSTRUCTION","Kilkenny","Abbeyquarter Vicar Street, Kilkenny",30,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [395,395,"SHIP CONSTRUCTION","Kilkenny","Bolton, Callan",38,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [396,396,"SHIP CONSTRUCTION","Kilkenny","Donaguile, Castlecomer",18,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [397,397,"SHIP CONSTRUCTION","Kilkenny","Robertshill, Kilkenny",4,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [398,398,"SHIP CONSTRUCTION","Kilkenny","The Butts, Kilkenny",22,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [399,399,"SHIP CONSTRUCTION","Kilkenny","Rosehill, Kells Road, Kilkenny",6,"*N/A","","","","","","Q1-2017"],
    [400,400,"SHIP CONSTRUCTION","Kilkenny","Gaol Rooad, Kilkenny",10,"*N/A","","","","","","Q3-2016"],
    [401,401,"SHIP CONSTRUCTION","Kilkenny","Greensbridge House",5,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [402,402,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Togher Way, Urlingford",11,"*N/A","","","","","","Q3-2017"],
    [403,403,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Newpark, Castlecomer Road, Kilkenny",7,"*N/A","","","","","","Q1-2017"],
    [404,404,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Abbeygate, Ferrybank",11,"*N/A","","","","","Q2-2017",""],
    [405,405,"CALF CONSTRUCTION","Laois","Cluin Inn Mountrath",11,"Oaklee Housing Trust","","","","","Q3-2017",""],
    [406,406,"CALF CONSTRUCTION","Laois","55/56 Kirwan Park, Mountmellick",2,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [407,407,"CALF CONSTRUCTION TURNKEY","Laois","Wilton Lawns, Portarlington",2,"Tath Housing Association","","","","Scheme approved for CALF funding Q4-2016","",""],
    [408,408,"CAS CONSTRUCTION","Laois","Abbeyleix Road, Portlaoise",16,"Respond!","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [409,409,"CAS CONSTRUCTION","Laois","St. Fintan's Hospital, Dublin Road, Portlaoise",8,"Oaklee Housing Trust","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [410,410,"SHIP CONSTRUCTION","Laois","Main Street, Rathdowney",5,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [411,411,"SHIP CONSTRUCTION","Laois","Harpurs Lane, Portlaoise",1,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [412,412,"SHIP CONSTRUCTION","Laois","Ballymorris Road, Portarlington",20,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [413,413,"SHIP CONSTRUCTION","Laois","Gleann na Glaise, Ballyroan",10,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [414,414,"SHIP CONSTRUCTION","Laois","Pattison Est. Mountmellick",10,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [415,415,"SHIP CONSTRUCTION","Laois","Shannon Street, Mountrath",8,"*N/A","","Stage 2 approved in Q1-2016 - full design/tender being prepared","","","",""],
    [416,416,"SHIP CONSTRUCTION","Laois","Conniberry Way, Old Knockmay Road, Portlaoise",33,"*N/A","","","","","Q4-2016",""],
    [417,417,"CALF CONSTRUCTION TURNKEY","Laois ","31 36 Droimnin, Stradbally",6,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2017","",""],
    [418,418,"CAS CONSTRUCTION","Leitrim","Ballinamore",2,"Society of Saint Vincent de Paul","","","","","Q2-2017",""],
    [419,419,"SHIP CONSTRUCTION","Leitrim","Summerhill, Carrick on Shannon",20,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [420,420,"SHIP CONSTRUCTION","Leitrim","Taobh Tire, Manorhamilton (Phase 2)",7,"*N/A","","","","","Q2-2017",""],
    [421,421,"SHIP CONSTRUCTION","Leitrim","Attirory, Carrick-on-Shannon",24,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [422,422,"CALF CONSTRUCTION","Limerick","1 20 Park View Row, Hyde Road, Limerick",20,"Cluid Housing Association","","","","","Q3-2016",""],
    [423,423,"CALF CONSTRUCTION TURNKEY","Limerick","Woodlawn Park, Ballysimon Road, Limerick",11,"Respond!","","","","Scheme approved for CALF funding Q2-2017","",""],
    [424,424,"CALF CONSTRUCTION TURNKEY","Limerick","Old Dublin Road, Rhebogue, Limerick",16,"Cluid Housing Association","","","","","Q3-2017",""],
    [425,425,"CALF CONSTRUCTION TURNKEY","Limerick","Cosgrave Park, Moyross, Limerick City (Regen)",21,"Co operative Ireland","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [426,426,"CALF CONSTRUCTION TURNKEY","Limerick","Cluain Ard, Fedamore",4,"Co operative Ireland","","","","Scheme approved for CALF funding Q2-2017","",""],
    [427,427,"CALF CONSTRUCTION TURNKEY","Limerick","Ard Aulin, Mungret",8,"Cluid Housing Association","","","","","","Q2-2017"],
    [428,428,"CAS CONSTRUCTION","Limerick","Towerfield Crescent, Croom",10,"Croom Voluntary Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [429,429,"CAS CONSTRUCTION","Limerick","Cappamore",12,"Cappamore Housing Association Ltd","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [430,430,"CAS CONSTRUCTION","Limerick","Drominbeg, Rhebogue",21,"Co-operative Housing Ireland (Formerly NABCo)","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [431,431,"CAS CONSTRUCTION","Limerick","Speakers Corner, Limerick City",4,"Simon Community : Midwest Simon","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [432,432,"CAS CONSTRUCTION","Limerick","Cuan Mhuire, Bruree",6,"Cuan Mhuire Teoranta","","","","","Q2-2017",""],
    [433,433,"CAS CONSTRUCTION","Limerick","Mirth, Thomondgate",12,"Associated Charities Trust Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [434,434,"REGENERATION","Limerick","Orchard Site",26,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [435,435,"REGENERATION","Limerick","Carew Park",37,"*N/A","Stage 1 approved in Q1-2015 - outline design and costs are now being prepared","","","","",""],
    [436,436,"REGENERATION","Limerick","Markievicz Drive",13,"*N/A","Stage 1 approved in Q1-2015 - outline design and costs are now being prepared","","","","",""],
    [437,437,"REGENERATION","Limerick","Dalgaish Park",24,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [438,438,"REGENERATION","Limerick","Lord Edward Street, P2: Main Contract",79,"*N/A","","","","","Q1-2016",""],
    [439,439,"REGENERATION","Limerick","Lord Edward Street, P2: Main Contract",2,"*N/A","","","","","","Q1-2017"],
    [440,440,"REGENERATION","Limerick","Gaol Lane New Build",1,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [441,441,"REGENERATION","Limerick","Sheep / Athlunkards Street",8,"*N/A","","Stage 2 approved in Q2-2014 - full design/tender being prepared","","","",""],
    [442,442,"REGENERATION","Limerick","Churchfield, Phase 1",42,"*N/A","","","","","Q3-2016",""],
    [443,443,"REGENERATION","Limerick","Churchfield, Phase 2",38,"*N/A","","Stage 2 approved in Q1-2015 - full design/tender being prepared","","","",""],
    [444,444,"REGENERATION","Limerick","Cosgrave Park",30,"*N/A","","Stage 2 approved in Q4-2014 - full design/tender being prepared","","","",""],
    [445,445,"REGENERATION","Limerick","Palm Close",27,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [446,446,"REGENERATION","Limerick","176 & 177 Cliona Park",2,"*N/A","","","","","","Q2-2016"],
    [447,447,"REGENERATION","Limerick","Cliona Park Phase 2",10,"*N/A","","","","","","Q2-2017"],
    [448,448,"REGENERATION","Limerick","8-10 Gaol Lane",3,"*N/A","","","","","","Q4-2016"],
    [449,449,"REGENERATION","Limerick","1 3 Weston Gardens",3,"*N/A","","","","","","Q2-2016"],
    [450,450,"REGENERATION","Limerick","Moyross Rebuild",6,"*N/A","","","","","","Q4-2016"],
    [451,451,"REGENERATION","Limerick","Southhill Rebuild",8,"*N/A","","","","","","Q4-2016"],
    [452,452,"REGENERATION","Limerick","St. Mary's Park Rebuild",9,"*N/A","","","","","","Q4-2016"],
    [453,453,"REGENERATION","Limerick","BCW Rebuild",14,"*N/A","","","","","","Q4-2016"],
    [454,454,"REGENERATION","Limerick","St. Mary's Park Infills",19,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [455,455,"REGENERATION","Limerick","Cliona Park Phase 3",18,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [456,456,"REGENERATION","Limerick","45 46 Cliona Park",2,"*N/A","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [457,457,"SHIP CONSTRUCTION","Limerick","Patrick?s Villas, Castleconnell",5,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [458,458,"SHIP CONSTRUCTION","Limerick","Brannigans Site, Musgrave Street",15,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [459,459,"SHIP CONSTRUCTION","Limerick","Clare Street, Limerick City",2,"*N/A","","","","","Q1-2017",""],
    [460,460,"SHIP CONSTRUCTION","Limerick","Ballygreannan Road, Limerick City",2,"*N/A","","","","","Q1-2017",""],
    [461,461,"SHIP CONSTRUCTION","Limerick","Gough Place, Rosbrien Road, Limerick",7,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [462,462,"SHIP CONSTRUCTION","Limerick","1-12 Burke Avenue, Limerick City",12,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [463,463,"SHIP CONSTRUCTION","Limerick","Chas Flats, Limerick City",3,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [464,464,"SHIP CONSTRUCTION","Limerick","Childers Road, Limerick City",24,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [465,465,"SHIP CONSTRUCTION","Limerick","Sexton Street North & Kileely Court",10,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [466,466,"SHIP CONSTRUCTION","Limerick","Site Adj. to Athlunkard Boat Club, Limerick City",4,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [467,467,"SHIP CONSTRUCTION","Limerick","Joseph Street, Limerick City",3,"*N/A","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [468,468,"SHIP CONSTRUCTION","Limerick","Wallers Well, Limerick City (Phase 2)",11,"*N/A","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [469,469,"SHIP CONSTRUCTION","Limerick","Clonmacken, Limerick City",38,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [470,470,"SHIP CONSTRUCTION","Limerick","Deerpark, Adare",30,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [471,471,"SHIP CONSTRUCTION","Limerick","Glenview Drive, Hospital",20,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [472,472,"SHIP CONSTRUCTION","Limerick","Lisheen Park, Patrickswell",16,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [473,473,"SHIP CONSTRUCTION","Limerick","Clare Street, Limerick City",7,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [474,474,"SHIP CONSTRUCTION","Limerick","Hassett Villas, Thomondgate",3,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [475,475,"SHIP CONSTRUCTION","Limerick","Kilmurry Court, Garryowen",6,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [476,476,"SHIP CONSTRUCTION","Limerick","Vance's Lands, Limerick City",37,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [477,477,"SHIP CONSTRUCTION","Limerick","Rathbane Road, Limerick City",2,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [478,478,"SHIP CONSTRUCTION","Limerick","Sycamore Avenue, Limerick City",5,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [479,479,"CALF CONSTRUCTION TURNKEY","Longford","Cartrun Breac, Lisbrack Rd, Longford",7,"Cluid Housing Association","","","","","","Q1-2017"],
    [480,480,"SHIP CONSTRUCTION","Longford","Church View, Lanesborough",13,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [481,481,"SHIP CONSTRUCTION","Longford","Rathcline Road, Lanesborough",4,"*N/A","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [482,482,"SHIP CONSTRUCTION","Longford","Edgeworthstown Road, Ballymahon",4,"*N/A","","","","","Q2-2017",""],
    [483,483,"SHIP CONSTRUCTION TURNKEY","Longford","Mill Race Park, Drumlish",16,"*N/A","","","","","","Q3-2017"],
    [484,484,"CALF CONSTRUCTION","Louth","Scarlett Street, Drogheda",15,"North & East Housing Association Ltd","","","","Scheme approved for CALF funding Q3-2016","",""],
    [485,485,"CALF CONSTRUCTION","Louth","Rath na Gloinne",3,"Cluid Housing Association","","","","","","Q3-2016"],
    [486,486,"CALF CONSTRUCTION","Louth","Clos na Manach, Carlingford",10,"Tath Housing Association","","","","","Q2-2017",""],
    [487,487,"CALF CONSTRUCTION","Louth","Bishops Court, Dundalk",2,"Tath Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [488,488,"CALF CONSTRUCTION","Louth","2 Slieve Row Crescent, Dundalk",1,"Cluid Housing Association","","","","","","Q2-2016"],
    [489,489,"CALF CONSTRUCTION TURNKEY","Louth","Rathmullen Road, Drogheda",54,"North & East Housing Association Ltd","","","","Scheme approved for revised CALF approval Q2-2017","",""],
    [490,490,"CALF CONSTRUCTION TURNKEY","Louth","Rathmullen Road, Drogheda",51,"Tath Housing Association","","","","Scheme approved for revised CALF approval Q2-2017","",""],
    [491,491,"CALF CONSTRUCTION TURNKEY","Louth","Mount Hamilton, Dundalk Phase 3",15,"Cluid Housing Association","","","","","Q4-2016",""],
    [492,492,"CALF CONSTRUCTION TURNKEY","Louth","Mount Hamilton, Dundalk Phase 2",16,"Cluid Housing Association","","","","","Q4-2016",""],
    [493,493,"CALF CONSTRUCTION TURNKEY","Louth","Mount Hamilton, Dundalk Phase 1",12,"Cluid Housing Association","","","","","Q4-2016",""],
    [494,494,"CALF CONSTRUCTION TURNKEY","Louth","Liscorrie, Bog Lane, Drogheda",41,"Tath Housing Association","","","","","Q4-2016",""],
    [495,495,"CALF CONSTRUCTION TURNKEY","Louth","Coulter Place Armagh Road Dundalk Phase 2",12,"Cluid Housing Association","","","","","","Q3-2017"],
    [496,496,"CALF CONSTRUCTION TURNKEY","Louth","Coulter Place Armagh Road Dundalk Phase 1",10,"Cluid Housing Association","","","","","","Q1-2017"],
    [497,497,"CALF CONSTRUCTION TURNKEY","Louth","Castleguard, Ardee",102,"Tath Housing Association","","","","","Q2-2017",""],
    [498,498,"CALF CONSTRUCTION TURNKEY","Louth","Castle Court, Castlebellingham - Phase 2",10,"Cluid Housing Association","","","","","","Q1-2017"],
    [499,499,"CALF CONSTRUCTION TURNKEY","Louth","Castle Court, Castlebellingham - Phase 1",4,"Cluid Housing Association","","","","","","Q1-2017"],
    [500,500,"CALF CONSTRUCTION TURNKEY","Louth","Avourwen Meadows, Drogheda",50,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q1-2017","",""],
    [501,501,"CALF CONSTRUCTION TURNKEY","Louth","Aston Village",8,"Respond!","","","","Scheme approved for CALF funding Q4-2016","",""],
    [502,502,"CAS CONSTRUCTION","Louth","5 Slieveroe Cresent, Dundalk",1,"Cluid Housing Association","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [503,503,"CAS CONSTRUCTION","Louth","Castletowncooley, Riverstown, Dundalk",1,"Tath Housing Association Ltd","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [504,504,"CAS CONSTRUCTION","Louth","Barrack Street, Dundalk",8,"Simon Community : Dundalk Simon","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [505,505,"CAS CONSTRUCTION","Louth","Clontygora, Dundalk",11,"Cluid Housing Association","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [506,506,"CAS CONSTRUCTION","Louth","Saltown, Dundalk",7,"North & East Housing Association Ltd","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [507,507,"CAS CONSTRUCTION","Louth","McArdle Green (Moneymore), Drogheda",1,"North & East Housing Association Ltd","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [508,508,"CAS CONSTRUCTION","Louth","Tierney Street, Ardee",7,"Oaklee Housing Trust","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [509,509,"CAS CONSTRUCTION","Louth","Tredagh View, Drogheda",1,"Respond!","","","","","","Q1-2017"],
    [510,510,"REGENERATION","Louth","Cox's Demesne Phase 2a",14,"*N/A","","","","","","Q4-2016"],
    [511,511,"REGENERATION","Louth","Cox's Demesne Phase 2b",22,"*N/A","Stage 1 approved in Q3-2013 - outline design and costs are now being prepared","","","","",""],
    [512,512,"SHIP CONSTRUCTION","Louth","55/57 Bothar Brugha, Drogheda",3,"*N/A","","","","","Q1-2017",""],
    [513,513,"SHIP CONSTRUCTION","Louth","Drogheda B&R project",12,"*N/A","","","","","Q3-2017",""],
    [514,514,"SHIP CONSTRUCTION","Louth","Dundalk B&R project (1)",7,"*N/A","","","","","","Q4-2016"],
    [515,515,"SHIP CONSTRUCTION","Louth","Dundalk B&R project (2)",7,"*N/A","","","","","","Q2-2017"],
    [516,516,"SHIP CONSTRUCTION","Louth","Dundalk B&R project (3)",4,"*N/A","","","","","","Q3-2017"],
    [517,517,"SHIP CONSTRUCTION","Louth","Woodlands, Dunleer",4,"*N/A","","","","","","Q3-2016"],
    [518,518,"SHIP CONSTRUCTION","Louth","Boice Court (Phase 2 - 4)",69,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [519,519,"SHIP CONSTRUCTION","Louth","Father Finn Park (Phase 2)",17,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [520,520,"SHIP CONSTRUCTION","Louth","Dundalk B&R project (4)",11,"*N/A","","","","","Q3-2017",""],
    [521,521,"CALF CONSTRUCTION TURNKEY","Mayo","Ballina area",11,"Cluid Housing Association","","","","Scheme approved for CALF funding Q4-2016","",""],
    [522,522,"CAS CONSTRUCTION","Mayo","Glenamoy",6,"Glenamoy Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [523,523,"CAS CONSTRUCTION","Mayo","Admiral Browne Road, Foxford (Phase 2)",4,"Society of Saint Vincent de Paul","","","Stage 3 approved in Q3-2016 - the scheme is now being tendered","","",""],
    [524,524,"CAS CONSTRUCTION","Mayo","Killosheehan, Ballinrobe",6,"Society of Saint Vincent de Paul","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [525,525,"CAS CONSTRUCTION","Mayo","Admiral Browne Road, Foxford (Phase 1)",8,"Society of Saint Vincent de Paul","","","","","","Q3-2016"],
    [526,526,"CAS CONSTRUCTION","Mayo","Logmore, Belmullet",7,"Irish Wheelchair Association Ltd","","","","","","Q2-2017"],
    [527,527,"SHIP CONSTRUCTION","Mayo","Market Street, Swinford",2,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [528,528,"SHIP CONSTRUCTION","Mayo","Knocknageeha, Newport",1,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [529,529,"SHIP CONSTRUCTION","Mayo","Kilkelly Road, Knock (Phase 3)",4,"*N/A","","","","","Q3-2017",""],
    [530,530,"SHIP CONSTRUCTION","Mayo","Kilmeena (Phase 2)",4,"*N/A","","","","","Q3-2017",""],
    [531,531,"SHIP CONSTRUCTION","Mayo","Knockmore, Ballina",8,"*N/A","","","","","Q3-2017",""],
    [532,532,"SHIP CONSTRUCTION","Mayo","Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)",4,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [533,533,"SHIP CONSTRUCTION","Mayo","Sliabh Rua, Foxford - Phase 3",10,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [534,534,"SHIP CONSTRUCTION","Mayo","Woodlands, Balla (Phase 3)",4,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [535,535,"SHIP CONSTRUCTION","Mayo","Slinaunroe, Clogher (SRD)",1,"*N/A","","","","","","Q2-2017"],
    [536,536,"SHIP CONSTRUCTION","Mayo","Abbeyquarter, Ballyhaunis",18,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [537,537,"SHIP CONSTRUCTION","Mayo","Tonragee West, Achill (Phase 2)",4,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [538,538,"SHIP CONSTRUCTION","Mayo","Sli na Roba, Friarsquarter, Ballinrobe",16,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [539,539,"SHIP CONSTRUCTION","Mayo","Single Rural Dwelling",7,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [540,540,"SHIP CONSTRUCTION","Mayo","Marian Crescent, Ballina",4,"*N/A","","","","","Q2-2017",""],
    [541,541,"SHIP CONSTRUCTION","Mayo","Tubberhill, Westport (Phase 3)",21,"*N/A","","","","","Q3-2016",""],
    [542,542,"SHIP CONSTRUCTION","Mayo","7 St. Patrick's Tce., Westport",1,"*N/A","","","","","","Q2-2017"],
    [543,543,"SHIP CONSTRUCTION","Mayo","Parke, Castlebar",8,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [544,544,"SHIP CONSTRUCTION","Mayo","Killavally",8,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [545,545,"SHIP CONSTRUCTION","Mayo","Lios na Circa, Saleen, Castlebar",22,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [546,546,"SHIP CONSTRUCTION","Mayo","Kilkelly Road, Swinford",26,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [547,547,"SHIP CONSTRUCTION","Mayo","Bothar Dubh, Claremorris",12,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [548,548,"SHIP CONSTRUCTION","Mayo","Barhauve, Rossport (SRD)",1,"*N/A","","","","","Q4-2016",""],
    [549,549,"SHIP CONSTRUCTION","Mayo","Glaggaun, Ballycroy (SRD)",1,"*N/A","","","","","Q4-2016",""],
    [550,550,"SHIP CONSTRUCTION","Mayo","Glengad, Pullathomas (SRD)",1,"*N/A","","","","","Q4-2016",""],
    [551,551,"SHIP CONSTRUCTION","Mayo","Gorthbrack, Inver (SRD)",1,"*N/A","","","","","Q4-2016",""],
    [552,552,"CALF CONSTRUCTION TURNKEY","Meath","Tubberclaire, Navan",23,"Cluid Housing Association","","","","","","Q2-2016"],
    [553,553,"CALF CONSTRUCTION TURNKEY","Meath","Seabury Lawns, Mornington",6,"Cluid Housing Association","","","","","Q1-2017",""],
    [554,554,"CALF CONSTRUCTION TURNKEY","Meath","Seabury Lawns, Mornington",25,"Cluid Housing Association","","","","","","Q3-2017"],
    [555,555,"CALF CONSTRUCTION TURNKEY","Meath","Royal Oaks, Enfield *",4,"Cluid Housing Association","","","","","","Q2-2017"],
    [556,556,"CALF CONSTRUCTION TURNKEY","Meath","Mill Lane, Flower Hill, Navan",20,"Oaklee Housing Trust","","","","","","Q1-2016"],
    [557,557,"CALF CONSTRUCTION TURNKEY","Meath","Meath",24,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q4-2016","",""],
    [558,558,"CALF CONSTRUCTION TURNKEY","Meath","Grangehall, Dunshaughlin",7,"Tath Housing Association","","","","","Q1-2017",""],
    [559,559,"CALF CONSTRUCTION TURNKEY","Meath","Fitzherbert Wood, Slane Rd., Navan, Co. Meath",44,"Tath Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [560,560,"CALF CONSTRUCTION TURNKEY","Meath","Dunville, Athlumney, Co. Meath",64,"Tath Housing Association","","","","","Q3-2017",""],
    [561,561,"CALF CONSTRUCTION TURNKEY","Meath","Dun Eimear, Bettytown",30,"Tath Housing Association","","","","","Q3-2017",""],
    [562,562,"CALF CONSTRUCTION TURNKEY","Meath","Churchfields, Ashbourne *",8,"Tath Housing Association","","","","","","Q2-2017"],
    [563,563,"CALF CONSTRUCTION TURNKEY","Meath","Blackcastle, Slane Road, Navan",11,"Tath Housing Association","","","","","Q3-2017",""],
    [564,564,"CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 4",20,"Cluid Housing Association","","","","","Q4-2016",""],
    [565,565,"CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 3",18,"Cluid Housing Association","","","","","Q4-2016",""],
    [566,566,"CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 2",18,"Cluid Housing Association","","","","","Q4-2016",""],
    [567,567,"CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 1",11,"Cluid Housing Association","","","","","","Q1-2017"],
    [568,568,"CALF CONSTRUCTION TURNKEY","Meath","27 Ardmore Rise, Bettystown",1,"North & East Housing Association Ltd","","","","","Q1-2017",""],
    [569,569,"SHIP CONSTRUCTION","Meath","Proudstown Road, Navan",4,"*N/A","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [570,570,"SHIP CONSTRUCTION","Meath","Bettystown (Phase 2)",12,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [571,571,"SHIP CONSTRUCTION","Meath","Ratoath",17,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [572,572,"SHIP CONSTRUCTION","Meath","Riverside, Kells",40,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [573,573,"SHIP CONSTRUCTION","Meath","Cherry Court, Summerhill",19,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [574,574,"SHIP CONSTRUCTION","Meath","Connaught Grove, Athboy",32,"*N/A","","","","","Q3-2017",""],
    [575,575,"SHIP CONSTRUCTION","Meath","Kilmainhamwood",4,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [576,576,"SHIP CONSTRUCTION","Meath","Nobber",19,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [577,577,"SHIP CONSTRUCTION","Meath","Carlanstown",10,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [578,578,"SHIP CONSTRUCTION","Meath","Cortown",10,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [579,579,"SHIP CONSTRUCTION","Meath","Donore",20,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [580,580,"SHIP CONSTRUCTION","Meath","Oldcastle",15,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [581,581,"SHIP CONSTRUCTION","Meath","Dunshaughlin",25,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [582,582,"SHIP CONSTRUCTION","Meath","Bettystown (Phase 1)",16,"*N/A","","","","","","Q3-2017"],
    [583,583,"CALF CONSTRUCTION","Monaghan","Liseggerton Road, Clones",6,"Oaklee Housing Trust","","","","","Q2-2017",""],
    [584,584,"CALF CONSTRUCTION TURNKEY","Monaghan","Magheross, Carrickmacross *",50,"Tath Housing Association","","","","","Q2-2017",""],
    [585,585,"CALF CONSTRUCTION TURNKEY","Monaghan","Kingscourt Road, Carrickmacross, Co. Monaghan",33,"Respond!","","","","","Q3-2017",""],
    [586,586,"CALF CONSTRUCTION TURNKEY","Monaghan","Killycard, Castleblaney",32,"Tath Housing Association","","","","Scheme approved for CALF funding Q1-2017","",""],
    [587,587,"CAS CONSTRUCTION","Monaghan","Drumillard, Castleblayney (Phase 2)",2,"Castleblayney Care Housing Association Ltd","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [588,588,"CAS CONSTRUCTION","Monaghan","Liseggerton, Clones",16,"Oaklee Housing Trust","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [589,589,"CAS CONSTRUCTION","Monaghan","Convent Lands, Carrickmacross",7,"Respond!","","","","","","Q2-2017"],
    [590,590,"SHIP CONSTRUCTION","Monaghan","Bree, Castleblayney",8,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [591,591,"SHIP CONSTRUCTION","Monaghan","Latlorcan, Monaghan Town",43,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [592,592,"SHIP CONSTRUCTION TURNKEY","Monaghan","Drumbear Wood, Monaghan Town",12,"*N/A","","","","","Q4-2016",""],
    [593,593,"SHIP CONSTRUCTION TURNKEY","Monaghan","Knockroe Glen (Phase 1) Monaghan Town",6,"*N/A","","","","","Q4-2016",""],
    [594,594,"SHIP CONSTRUCTION TURNKEY","Monaghan","Knockroe Glen (Phase 2) Monaghan Town",8,"*N/A","","","","","","Q2-2017"],
    [595,595,"SHIP CONSTRUCTION TURNKEY","Monaghan","Knockroe Glen (Phase 3) Monaghan Town",8,"*N/A","","","","","","Q2-2017"],
    [596,596,"SHIP CONSTRUCTION TURNKEY","Monaghan","Killycard, Bree, Castleblaney",4,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [597,597,"SHIP CONSTRUCTION TURNKEY","Monaghan","The Meadows, Smithborough, Monaghan",5,"*N/A","","","","","Q2-2016",""],
    [598,598,"SHIP CONSTRUCTION TURNKEY","Monaghan","Maple Grove, Smithborough",12,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [599,599,"CALF CONSTRUCTION","Offaly","Killane Drive, Edenderry",25,"Tath Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [600,600,"CALF CONSTRUCTION","Offaly","Kearney's Field, Tullamore",53,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q1-2017","",""],
    [601,601,"CAS CONSTRUCTION","Offaly","Mountbolus",4,"Mid Offaly Housing Association Ltd","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [602,602,"CAS CONSTRUCTION","Offaly","Killane Drive, Edenderry",2,"Tath Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [603,603,"CAS CONSTRUCTION","Offaly","Scurragh, Birr",6,"Cluid Housing Association","","","","","Q3-2017",""],
    [604,604,"CAS CONSTRUCTION","Offaly","Clonminch, Tullamore",20,"Oaklee Housing Trust","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [605,605,"SHIP CONSTRUCTION","Offaly","Chancery Lane, Tullamore",18,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [606,606,"SHIP CONSTRUCTION","Offaly","Circular Road, Daingean",7,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [607,607,"SHIP CONSTRUCTION","Offaly","Kylebeg, Banagher (Phase 2)",18,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [608,608,"SHIP CONSTRUCTION","Offaly","Blundell Wood, Edenderry",33,"*N/A","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [609,609,"CALF CONSTRUCTION TURNKEY","Roscommon","River Oaks, Kilcolman, Ballaghaderreen",12,"Respond!","","","","","Q3-2017",""],
    [610,610,"CALF CONSTRUCTION TURNKEY","Roscommon","Monksfield, Bealnamulla, Athlone",40,"Cluid Housing Association","","","","","Q3-2017",""],
    [611,611,"CALF CONSTRUCTION TURNKEY","Roscommon","Monksfield Park, Tuam Road, Athlone",14,"Cluid Housing Association","","","","","Q1-2016",""],
    [612,612,"SHIP CONSTRUCTION","Roscommon","Cloonfad",2,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [613,613,"SHIP CONSTRUCTION","Roscommon","Greenfields, Blackstick Road, Roscommon Town",6,"*N/A","","","","","","Q3-2017"],
    [614,614,"SHIP CONSTRUCTION","Roscommon","River Oaks, Ballaghaderreen",10,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [615,615,"SHIP CONSTRUCTION TURNKEY","Roscommon","Monksland, Athlone",10,"*N/A","","","","","Q1-2017",""],
    [616,616,"CAS CONSTRUCTION","Sligo","Cuan Iosa, Ballymote",8,"Society of Saint Vincent de Paul","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [617,617,"SHIP CONSTRUCTION","Sligo","Colloney",15,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [618,618,"SHIP CONSTRUCTION","Sligo","Knappagh Road",28,"*N/A","","Stage 2 approved in Q3-2016 - full design/tender being prepared","","","",""],
    [619,619,"SHIP CONSTRUCTION","Sligo","Caltragh, Culleens",1,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [620,620,"SHIP CONSTRUCTION","Sligo","Carrowbunnaun, Strandhill",20,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [621,621,"SHIP CONSTRUCTION","Sligo","Fr Flanagan Tce.",22,"*N/A","","","","","Q1-2017",""],
    [622,622,"SHIP CONSTRUCTION","Sligo","Daghloonagh, Keash - SRD",1,"*N/A","","","","","","Q4-2016"],
    [623,623,"SHIP CONSTRUCTION","Sligo","Rosses Point",14,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [624,624,"CALF CONSTRUCTION TURNKEY","South Dublin","Tullyhall, Lucan - Phase 1 *",2,"Tath Housing Association","","","","","","Q3-2017"],
    [625,625,"CALF CONSTRUCTION TURNKEY","South Dublin","Tullyhall, Lucan - Final Phase",2,"Tath Housing Association","","","","","Q2-2017",""],
    [626,626,"CALF CONSTRUCTION TURNKEY","South Dublin","Station Road, Clondalkin",5,"Respond!","","","","","","Q3-2017"],
    [627,627,"CALF CONSTRUCTION TURNKEY","South Dublin","Scholarstown Wood (Houses) *",8,"Circle Voluntary Housing Association","","","","","Q3-2017",""],
    [628,628,"CALF CONSTRUCTION TURNKEY","South Dublin","Scholarstown Wood (Apts)",6,"Circle Voluntary Housing Association","","","","","Q3-2017",""],
    [629,629,"CALF CONSTRUCTION TURNKEY","South Dublin","Milford Manor, Clondalkin - Phase 1",25,"Cluid Housing Association","","","","","","Q1-2017"],
    [630,630,"CALF CONSTRUCTION TURNKEY","South Dublin","Milford Manor, Clondalkin - Final Phase ",15,"Cluid Housing Association","","","","","","Q3-2017"],
    [631,631,"CALF CONSTRUCTION TURNKEY","South Dublin","Milford Manor, Clondalkin",25,"Cluid Housing Association","","","","","Q1-2017",""],
    [632,632,"CALF CONSTRUCTION TURNKEY","South Dublin","Dodderbrook, Oldcourt Road, Ballycullen, Dublin 24 ",14,"Cluid Housing Association","","","","","Q1-2017",""],
    [633,633,"CALF CONSTRUCTION TURNKEY","South Dublin","Broadfield Grove, Rathcoole-phase 1 *",10,"Oaklee Housing Trust","","","","","","Q3-2017"],
    [634,634,"CALF CONSTRUCTION TURNKEY","South Dublin","Broadfield Grove, Rathcoole - final phase *",4,"Oaklee Housing Trust","","","","","","Q3-2017"],
    [635,635,"CAS CONSTRUCTION","South Dublin","Collinstown Grove, Clondalkin",4,"Tath Housing Association Ltd","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [636,636,"CAS CONSTRUCTION","South Dublin","1 Hollyville Terrace, Palmerston",2,"Cluid Housing Association","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [637,637,"CAS CONSTRUCTION","South Dublin","Old Nangor Road, Clondalkin",10,"Simon Community : Dublin Simon","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [638,638,"SHIP CONSTRUCTION","South Dublin","Killinarden, Tallaght",28,"*N/A","","","","","Q3-2017",""],
    [639,639,"SHIP CONSTRUCTION","South Dublin","Letts Field, Neilstown, Clondalkin",37,"*N/A","","","","","Q3-2017",""],
    [640,640,"SHIP CONSTRUCTION","South Dublin","Ballyboden,  Rathfarnham",40,"*N/A","","","","","Q3-2017",""],
    [641,641,"SHIP CONSTRUCTION","South Dublin","Dromcarra, Tallaght",14,"*N/A","","","","","Q2-2017",""],
    [642,642,"SHIP CONSTRUCTION","South Dublin","Fortunestown (MacUilliam)",28,"*N/A","","","","","Q2-2017",""],
    [643,643,"SHIP CONSTRUCTION","South Dublin","Mayfield Estate, Clondalkin",18,"*N/A","","","","","Q1-2017",""],
    [644,644,"SHIP CONSTRUCTION","South Dublin","St Marks Green, Clondalkin",11,"*N/A","","","","","Q2-2017",""],
    [645,645,"SHIP CONSTRUCTION","South Dublin","St. Marks Avenue, Clondalkin",39,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [646,646,"SHIP CONSTRUCTION","South Dublin","Balgaddy F",50,"*N/A","Stage 1 approved in Q1-2015 - outline design and costs are now being prepared","","","","",""],
    [647,647,"SHIP CONSTRUCTION","South Dublin","Belgard Road, Tallaght",3,"*N/A","","","","","","Q1-2016"],
    [648,648,"SHIP CONSTRUCTION","South Dublin","St Finians",2,"*N/A","","","","","","Q3-2016"],
    [649,649,"SHIP CONSTRUCTION","South Dublin","Suncroft, Tallaght",10,"*N/A","","","","","","Q4-2016"],
    [650,650,"SHIP CONSTRUCTION RAPID","South Dublin","Killininny Road, Firhouse (Old Mill, Old Bawn)",24,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [651,651,"SHIP CONSTRUCTION RAPID","South Dublin","St Cuthbert's, Clondalkin",59,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [652,652,"SHIP CONSTRUCTION RAPID","South Dublin","St Aidan's,  Brookfield, Tallaght",85,"*N/A","","","","","Q3-2017",""],
    [653,653,"CAS CONSTRUCTION","Tipperary","Ballinagrana, Carrick on Suir",3,"Camphill Communities of Ireland","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [654,654,"CAS CONSTRUCTION","Tipperary","Castle Street, Carrick on Suir",1,"Camphill Communities of Ireland","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [655,655,"CAS CONSTRUCTION","Tipperary","The Strand, Carrick on Suir",3,"Camphill Communities of Ireland","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [656,656,"CAS CONSTRUCTION","Tipperary","Fethard",4,"Belmont Park Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [657,657,"CAS CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",9,"Cluid Housing Association","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [658,658,"CAS CONSTRUCTION","Tipperary","Stanwix House, Kickham Street, Thurles",19,"Thurles Lions Trust Housing Assoc.","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [659,659,"SHIP CONSTRUCTION","Tipperary","Ard na Greine, Clonmel",2,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [660,660,"SHIP CONSTRUCTION","Tipperary","Knockanrawley",28,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [661,661,"SHIP CONSTRUCTION","Tipperary","Mill Road, Thurles",25,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [662,662,"SHIP CONSTRUCTION","Tipperary","Mulkear View, Newport",9,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [663,663,"SHIP CONSTRUCTION","Tipperary","Treacy Park, Carrick on Suir",1,"*N/A","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [664,664,"SHIP CONSTRUCTION","Tipperary","Templetouhy",6,"*N/A","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [665,665,"SHIP CONSTRUCTION","Tipperary","Borrisoleigh",12,"*N/A","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [666,666,"SHIP CONSTRUCTION","Tipperary","Killeanaule Road, Fethard",10,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [667,667,"SHIP CONSTRUCTION","Tipperary","Abbey Street, Cahir",8,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [668,668,"SHIP CONSTRUCTION","Tipperary","Borrisokane",17,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [669,669,"SHIP CONSTRUCTION","Tipperary","Cloughjordan",2,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [670,670,"SHIP CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",26,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [671,671,"SHIP CONSTRUCTION","Tipperary","Gortataggart, Thurles",2,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [672,672,"SHIP CONSTRUCTION","Tipperary","Kilcooly Way, Gortnahoe",5,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [673,673,"SHIP CONSTRUCTION","Tipperary","Lacey Avenue, Templemore",3,"*N/A","","","","","","Q4-2016"],
    [674,674,"SHIP CONSTRUCTION","Tipperary","Mitchels St., Thurles",1,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [675,675,"SHIP CONSTRUCTION","Tipperary","Waller's Lot, Cashel",10,"*N/A","Stage 1 approved in Q2-2015 - outline design and costs are now being prepared","","","","",""],
    [676,676,"SHIP CONSTRUCTION","Tipperary","Glencarrick, Roscrea",10,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [677,677,"SHIP CONSTRUCTION","Tipperary","Borrisoleigh",2,"*N/A","","","","","","Q4-2016"],
    [678,678,"SHIP CONSTRUCTION","Tipperary","Lower Ballingarry",1,"*N/A","","","","","","Q2-2016"],
    [679,679,"SHIP CONSTRUCTION","Tipperary","Poulamaleen, Faugheen",1,"*N/A","","","","","","Q2-2016"],
    [680,680,"SHIP CONSTRUCTION","Tipperary","Lacey Avenue, Templemore",1,"*N/A","","","","","","Q3-2017"],
    [681,681,"CALF CONSTRUCTION TURNKEY","Tipperary ","Ashbury, Roscrea",12,"Cluid Housing Association","","","","","","Q2-2017"],
    [682,682,"CALF CONSTRUCTION","Waterford","St Johns College, Waterford",36,"Respond!","","","","","","Q1-2016"],
    [683,683,"CALF CONSTRUCTION TURNKEY","Waterford","Estuary Heights, Shandon Road, Dungarvan",20,"Co operative Ireland","","","","","Q1-2017",""],
    [684,684,"CAS CONSTRUCTION","Waterford","Convent Hill, Tramore",10,"Society of Saint Vincent de Paul","","","","","","Q1-2017"],
    [685,685,"CAS CONSTRUCTION","Waterford","Powersfield, Hennessys Road, Waterford",3,"Focus Ireland","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [686,686,"CAS CONSTRUCTION","Waterford","Wadding Manor, Ferrybank",10,"Respond!","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [687,687,"CAS CONSTRUCTION","Waterford","Gleann Ealach, Dunhill",8,"Gleann Ealach Housing Association","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [688,688,"CAS CONSTRUCTION","Waterford","Ballycarnane, Tramore",18,"Tramore Voluntary Housing Association","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [689,689,"CAS CONSTRUCTION","Waterford","The Paddocks, Williamstown Rd. Waterford",6,"Anvers Housing Association Ltd","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [690,690,"SHIP CONSTRUCTION","Waterford","Avondale, Kilcohan",21,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [691,691,"SHIP CONSTRUCTION","Waterford","An Garran, Tramore",32,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [692,692,"SHIP CONSTRUCTION","Waterford","Alms Houses, Tallow",4,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [693,693,"SHIP CONSTRUCTION","Waterford","Ardmore Park/Priory Lawn, Waterford City",8,"*N/A","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [694,694,"SHIP CONSTRUCTION","Waterford","Ballinroad, Dungarvan",20,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [695,695,"SHIP CONSTRUCTION","Waterford","Barrack Street, Cappoquin",4,"*N/A","","","","","Q4-2016",""],
    [696,696,"SHIP CONSTRUCTION","Waterford","Coolfin Woods, Portlaw",12,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [697,697,"SHIP CONSTRUCTION","Waterford","Larchville, Waterford City",5,"*N/A","","Stage 2 approved in Q2-2016 - full design/tender being prepared","","","",""],
    [698,698,"SHIP CONSTRUCTION","Waterford","Patrick Street, Tramore",2,"*N/A","","","","","Q3-2017",""],
    [699,699,"SHIP CONSTRUCTION","Waterford","Doyle Street, Waterford City",4,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [700,700,"SHIP CONSTRUCTION","Waterford","Old Cinema Site, Dungarvan",15,"*N/A","","","","","","Q4-2016"],
    [701,701,"SHIP CONSTRUCTION TURNKEY","Waterford","Kilrush, Dungarvan",39,"*N/A","","","","","Q3-2017",""],
    [702,702,"SHIP CONSTRUCTION TURNKEY","Waterford","Gibbethill, Gracedieu",5,"*N/A","","","","","Q3-2017",""],
    [703,703,"CALF CONSTRUCTION TURNKEY","Westmeath","Cluain Mullen, Castlepollard",2,"Tath Housing Association","","","","","","Q2-2017"],
    [704,704,"CAS CONSTRUCTION","Westmeath","Farran, Mullingar",3,"Tath Housing Association Ltd","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [705,705,"CAS CONSTRUCTION","Westmeath","Canal Avenue, Mullingar",9,"Tath Housing Association Ltd","Stage 1 approved in Q3-2015 - outline design and costs are now being prepared","","","","",""],
    [706,706,"CAS CONSTRUCTION","Westmeath","Springfield, Mullingar",12,"Tath Housing Association Ltd","Stage 1 approved in Q1-2014 - outline design and costs are now being prepared","","","","",""],
    [707,707,"SHIP CONSTRUCTION","Westmeath","Bun Daire, Kinnegad (Phase 3)",28,"*N/A","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [708,708,"SHIP CONSTRUCTION","Westmeath","St. Laurence's Terrace, Mullingar",9,"*N/A","","","","","Q2-2017",""],
    [709,709,"SHIP CONSTRUCTION","Westmeath","16 Ennell Court",1,"*N/A","","","","","Q2-2017",""],
    [710,710,"SHIP CONSTRUCTION","Westmeath","Clonbrusk, Athlone (Arcadia) - Site No. 2",33,"*N/A","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [711,711,"SHIP CONSTRUCTION","Westmeath","Ennell Court (Phase 2)",3,"*N/A","","","","","","Q2-2016"],
    [712,712,"SHIP CONSTRUCTION","Westmeath","Grange Crescent, Mullingar",2,"*N/A","","","","","","Q1-2016"],
    [713,713,"SHIP CONSTRUCTION","Westmeath","Ennell Court (Phase 3)",33,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [714,714,"SHIP CONSTRUCTION","Westmeath","Cloghanboy, Athlone",10,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [715,715,"CALF CONSTRUCTION","Wexford","Meadowfields ",12,"Co operative Ireland","","","","","","Q3-2016"],
    [716,716,"CALF CONSTRUCTION TURNKEY","Wexford","Wexford",28,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q4-2016","",""],
    [717,717,"CALF CONSTRUCTION TURNKEY","Wexford","Unit No's 238, 239, 240, 241, 245 Ard Uisce, Whiterock",5,"Tath Housing Association","","","","","Q4-2016",""],
    [718,718,"CALF CONSTRUCTION TURNKEY","Wexford","Hunters Green, Gorey - Phase 3",9,"Co operative Ireland","","","","","Q1-2015",""],
    [719,719,"CALF CONSTRUCTION TURNKEY","Wexford","Hunters Green, Gorey - Phase 2",11,"Co operative Ireland","","","","","","Q1-2017"],
    [720,720,"CALF CONSTRUCTION TURNKEY","Wexford","Enniscorthy",40,"Oaklee Housing Trust","","","","","Q3-2017",""],
    [721,721,"CALF CONSTRUCTION TURNKEY","Wexford","Ballyboggan, Castlebridge",10,"Co operative Ireland","","","","Scheme approved for CALF funding Q2-2017","",""],
    [722,722,"CALF CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock, Wexford",6,"Tath Housing Association","","","","","","Q1-2017"],
    [723,723,"CALF CONSTRUCTION TURNKEY","Wexford","233-253 Ard uisce, Whiterock, Wexford *",6,"Tath Housing Association","","","","","Q3-2017",""],
    [724,724,"CALF CONSTRUCTION TURNKEY","Wexford"," Hunters Green, Gorey - Phase 1",18,"Co operative Ireland","","","","","","Q2-2016"],
    [725,725,"CAS CONSTRUCTION","Wexford","Barrystown",16,"Grantstown Voluntary Housing Association Ltd","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [726,726,"CAS CONSTRUCTION","Wexford","Westlands, Wexford",7,"Respond!","","","Stage 3 approved in Q2-2017 - the scheme is now being tendered","","",""],
    [727,727,"CAS CONSTRUCTION","Wexford","Rathangan",7,"Rathangan Senior Citizens Housing Association Ltd","","","","","","Q3-2017"],
    [728,728,"SHIP CONSTRUCTION","Wexford","Belvedere Road, Wexford",7,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [729,729,"SHIP CONSTRUCTION","Wexford","SN Castlemoyle, New Ross",1,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [730,730,"SHIP CONSTRUCTION","Wexford","King Street, Wexford",3,"*N/A","Stage 1 approved in Q3-2017 - outline design and costs are now being prepared","","","","",""],
    [731,731,"SHIP CONSTRUCTION","Wexford","Cloghultagh, Taghmon",18,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [732,732,"SHIP CONSTRUCTION","Wexford","Carricklawn, Coolcots, Wexford",14,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [733,733,"SHIP CONSTRUCTION","Wexford","Coolcotts, Clonard",7,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [734,734,"SHIP CONSTRUCTION","Wexford","Maudlintown, Wexford",5,"*N/A","Stage 1 approved in Q1-2017 - outline design and costs are now being prepared","","","","",""],
    [735,735,"SHIP CONSTRUCTION","Wexford","41 St Martins Park",1,"*N/A","","","","","Q1-2017",""],
    [736,736,"SHIP CONSTRUCTION","Wexford","5 Mountain View",1,"*N/A","","","","","Q1-2017",""],
    [737,737,"SHIP CONSTRUCTION","Wexford","Creagh, Gorey",10,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [738,738,"SHIP CONSTRUCTION","Wexford","Danescastle",12,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [739,739,"SHIP CONSTRUCTION","Wexford","Slippery Green, Wexford",10,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [740,740,"SHIP CONSTRUCTION","Wexford","Whiterock Hill, Wexford",36,"*N/A","Stage 1 approved in Q4-2016 - outline design and costs are now being prepared","","","","",""],
    [741,741,"SHIP CONSTRUCTION","Wexford","Cois Mara",2,"*N/A","","","","Stage 4 approved in Q2-2017 - the scheme is now fully approved","",""],
    [742,742,"SHIP CONSTRUCTION","Wexford","Killeens, Wexford",14,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""],
    [743,743,"SHIP CONSTRUCTION","Wexford","Oylegate",2,"*N/A","","","","","Q1-2017",""],
    [744,744,"SHIP CONSTRUCTION","Wexford","Cherryorchard, Enniscorthy",8,"*N/A","","","","","Q3-2017",""],
    [745,745,"SHIP CONSTRUCTION","Wexford","Clonard, Wexford",26,"*N/A","Stage 1 approved in Q1-2016 - outline design and costs are now being prepared","","","","",""],
    [746,746,"SHIP CONSTRUCTION","Wexford","Ross Road, Enniscorthy",1,"*N/A","","","Stage 3 approved in Q3-2016 - the scheme is now being tendered","","",""],
    [747,747,"SHIP CONSTRUCTION","Wexford","Baile Eoghain, Gorey",9,"*N/A","","","Stage 3 approved in Q1-2017 - the scheme is now being tendered","","",""],
    [748,748,"SHIP CONSTRUCTION","Wexford","Baile an Tr, Riverchapel (Courtown Ardamine)",10,"*N/A","","","","","","Q2-2016"],
    [749,749,"SHIP CONSTRUCTION","Wexford","Shanna Court, Coolcotts",8,"*N/A","","","","","","Q1-2016"],
    [750,750,"SHIP CONSTRUCTION","Wexford","Francis Street, Wexford",1,"*N/A","","","","","","Q1-2017"],
    [751,751,"SHIP CONSTRUCTION","Wexford","Commodore Barry",1,"*N/A","","","","","","Q2-2016"],
    [752,752,"SHIP CONSTRUCTION TURNKEY","Wexford","Madeira Oaks, Wexford",8,"*N/A","","","","","","Q3-2017"],
    [753,753,"CALF CONSTRUCTION","Wicklow","St Ernan's View, Merrymeeting, Rathnew",45,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2017","",""],
    [754,754,"CALF CONSTRUCTION TURNKEY","Wicklow","Bollarney North, Wicklow Town, Wicklow",32,"Tath Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [755,755,"CALF CONSTRUCTION TURNKEY","Wicklow","Abbey St, Wicklow",6,"Tath Housing Association","","","","","Q2-2017",""],
    [756,756,"CAS CONSTRUCTION","Wicklow","Lathaleer, Baltinglass",5,"KARE Promoting Inclusion for People with Intellectual Disabilities","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [757,757,"SHIP CONSTRUCTION","Wicklow","Emoclew (Phase 3)",21,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [758,758,"SHIP CONSTRUCTION","Wicklow","10A Castle Villas, Greystones",1,"*N/A","","Stage 2 approved in Q3-2017 - full design/tender being prepared","","","",""],
    [759,759,"SHIP CONSTRUCTION","Wicklow","Ard Na Mara, Kilcoole",2,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [760,760,"SHIP CONSTRUCTION","Wicklow","Druids Brook, Kilcoole",2,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [761,761,"SHIP CONSTRUCTION","Wicklow","Emoclew Road, Arklow (Phase 1)",17,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [762,762,"SHIP CONSTRUCTION","Wicklow","Emoclew Road, Arklow (Phase 2)",26,"*N/A","","Stage 2 approved in Q2-2017 - full design/tender being prepared","","","",""],
    [763,763,"SHIP CONSTRUCTION","Wicklow","FCA Hall, Wicklow Town",8,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [764,764,"SHIP CONSTRUCTION","Wicklow","Kilmantain Place, Bray",4,"*N/A","","Stage 2 approved in Q4-2016 - full design/tender being prepared","","","",""],
    [765,765,"SHIP CONSTRUCTION","Wicklow","O'Byrne Road, Bray",1,"*N/A","","","","","Q3-2017",""],
    [766,766,"SHIP CONSTRUCTION","Wicklow","Old Library, Arklow",7,"*N/A","","","","Stage 4 approved in Q3-2017 - the scheme is now fully approved","",""],
    [767,767,"SHIP CONSTRUCTION","Wicklow","Sugarloaf View, Kilmacanogue",20,"*N/A","","Stage 2 approved in Q1-2017 - full design/tender being prepared","","","",""],
    [768,768,"SHIP CONSTRUCTION","Wicklow","Avondale Heights, Rathdrum (Phase 2)",20,"*N/A","","","","","Q3-2017",""],
    [769,769,"SHIP CONSTRUCTION","Wicklow","Kilbride Lane, Bray (Murphy's Lands)",42,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [770,770,"SHIP CONSTRUCTION","Wicklow","16A Oak Drive, Blessington",1,"*N/A","Stage 1 approved in Q2-2017 - outline design and costs are now being prepared","","","","",""],
    [771,771,"SHIP CONSTRUCTION","Wicklow","Carrig Eden,1 Marine Road, Greystones",30,"*N/A","","","Stage 3 approved in Q3-2017 - the scheme is now being tendered","","",""],
    [772,772,"SHIP CONSTRUCTION","Wicklow","Farrankelly, Greystones (Phase 2)",24,"*N/A","Stage 1 approved in Q3-2016 - outline design and costs are now being prepared","","","","",""]
]}