1	1	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	16	*N/A	""	""	""	""	""	Q4-2021
2	2	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	13	*N/A	""	""	""	""	""	Q2-2021
3	3	SHIP CONSTRUCTION TURNKEY	Carlow	Granville Court, Granby Row,Carlow	4	*N/A	""	""	""	""	""	Q4-2021
4	4	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Ardattin, Co Carlow	6	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
5	5	SHIP CONSTRUCTION SINGLE STAGE	Carlow	SRD: Brownbog, Hackettstown	1	*N/A	""	""	""	""	Q1-2020	""
6	6	SHIP CONSTRUCTION SINGLE STAGE	Carlow	St. Mary’s Court, Carlow	4	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
7	7	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Drumphea, Garryhill, Bagenalstown	1	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
8	8	SHIP CONSTRUCTION SINGLE STAGE	Carlow	SRD - Constable Hill, Hackettstown	1	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
9	9	SHIP CONSTRUCTION SINGLE STAGE	Carlow	Lackabeg, Kildavin	3	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
10	10	SHIP CONSTRUCTION SINGLE STAGE	Carlow	5 & 6 Staplestown Road, Carlow	2	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
11	11	SHIP CONSTRUCTION RENEWAL	Carlow	Barrack Street, Carlow	7	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
12	12	SHIP CONSTRUCTION RENEWAL	Carlow	Bog Lane, Borris, Co. Carlow	1	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
13	13	SHIP CONSTRUCTION RENEWAL	Carlow	2a Chapel Street, Graiguecullen, Carlow	1	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
14	14	SHIP CONSTRUCTION RENEWAL	Carlow	Breens Shop Units, Main Street, Borris, Co. Carlow	2	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
15	15	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	9	*N/A	""	""	""	""	""	Q2-2021
16	16	SHIP CONSTRUCTION	Carlow	Gleann na Bearu, Bagenalstown	22	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
17	17	CAS CONSTRUCTION	Carlow	Gleann na Bearu, Royal Oak Road, Bagenalstown	6	Respond	""	""	""	""	Q4-2020	""
18	18	CAS CONSTRUCTION	Carlow	Homefield, Blackbog Road, Carlow	3	Carlow Voluntary Housing Association	""	""	""	""	""	Q2-2021
19	19	CALF TURNKEY	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
20	20	CALF TURNKEY	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 2)	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
21	21	CALF TURNKEY	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 1)*	17	Tuath Housing Association	""	""	""	""	""	Q3-2021
22	22	CALF TURNKEY	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 2)*	15	Tuath Housing Association	""	""	""	""	""	Q4-2021
23	23	CALF TURNKEY	Carlow	Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 3)*	21	Tuath Housing Association	""	""	""	""	""	Q1-2022
24	24	CALF TURNKEY	Carlow	Granite Court, Ballyknockan, Fenagh, Co Carlow (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
25	25	CALF TURNKEY	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q2-2021
26	26	CALF TURNKEY	Carlow	Rivercourt,  Carlow  (Phase 2)*	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2022
27	27	CALF TURNKEY	Carlow	Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 1)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
28	28	CALF TURNKEY	Carlow	Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 2)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
29	29	CALF TURNKEY	Carlow	The Millrace, Burrin, Co. Carlow (Phase 1)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
30	30	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	4	*N/A	""	""	""	""	""	Q4-2021
31	31	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff 	4	*N/A	""	""	""	""	Q1-2021	""
32	32	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	8	*N/A	""	""	""	""	Q4-2021	""
33	33	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
34	34	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
35	35	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	8	*N/A	""	""	""	""	Q2-2021	""
36	36	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	12	*N/A	""	""	""	""	Q2-2021	""
37	37	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	11	*N/A	""	""	""	""	Q2-2021	""
38	38	SHIP CONSTRUCTION TURNKEY	Cavan	Mullaghduff, Ballyconnell, Co. Cavan	12	*N/A	""	""	""	""	Q2-2021	""
39	39	SHIP CONSTRUCTION TURNKEY	Cavan	Clankee Court, Lisdrumskea, Shercock	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
40	40	SHIP CONSTRUCTION TURNKEY	Cavan	Abhainn Dubh, Rosehill, Mullagh	4	*N/A	""	""	""	""	""	Q4-2021
41	41	SHIP CONSTRUCTION TURNKEY	Cavan	Kilnavara Heights, Cavan Town	2	*N/A	""	""	""	""	Q1-2022	""
42	42	SHIP CONSTRUCTION RENEWAL	Cavan	Derrylurgan, Ballyjamesduff	12	N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
43	43	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	""	""	""	""	Q2-2021
44	44	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	""	""	""	""	Q4-2020	""
45	45	SHIP CONSTRUCTION	Cavan	Elm Grove, Main St, Cavan Town	13	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
46	46	SHIP CONSTRUCTION	Cavan	Cavan Road, Ballinagh	15	*N/A	""	""	""	""	Q2-2021	""
47	47	SHIP CONSTRUCTION	Cavan	Main St., Butlersbridge	6	*N/A	""	""	""	""	Q2-2021	""
48	48	SHIP CONSTRUCTION	Cavan	Cluain Dara, Kingscourt	3	*N/A	""	""	""	""	""	Q4-2021
49	49	SHIP CONSTRUCTION	Cavan	Fairymount Close, Kingscourt, Co. Cavan	3	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
50	50	SHIP CONSTRUCTION	Cavan	St. Bridgets Terrace, Cavan Town (Infill)	20	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
51	51	SHIP CONSTRUCTION	Cavan	Lime Park, Bailieborough	12	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
52	52	SHIP CONSTRUCTION	Cavan	Duckin Stool, Main Street, Belturbet	3	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
53	53	SHIP CONSTRUCTION	Cavan	The Widow's Row, Widow's House Lane, Belturbet	8	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
54	54	SHIP CONSTRUCTION	Cavan	8 Units @ Ashgrove, Derrylurgan, Ballyjamesduff	8	N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
55	55	SHIP CONSTRUCTION	Cavan	Dunaree, Kingscourt Town Centre	3	N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
56	56	SHIP CONSTRUCTION	Cavan	Lime Park, Bailieborough	18	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
57	57	SHIP CONSTRUCTION	Cavan	Lime Park, Bailieborough	15	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
58	58	SHIP CONSTRUCTION	Cavan	Main St Lower, Kilnaleck, Co Cavan	2	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
59	59	SHIP CONSTRUCTION	Cavan	157 Barrack Road, Kilnaleck	4	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
60	60	CAS CONSTRUCTION	Cavan	St. Killian's Housing Association Ltd., Mullagh, Co. Cavan	4	St. Killian's Housing Association, Mullagh, Co. Cavan	""	""	""	""	Q1-2021	""
61	61	CALF TURNKEY	Cavan	16 Units, Fairgreen Park, Mullagh, Co. Cavan (Phase 1)	16	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2021
62	62	CALF TURNKEY	Cavan	Drumalee Manor, Drumalee, Co. Cavan (Phase 2)	13	Tuath Housing Association	""	""	""	""	Q2-2021	""
63	63	CALF TURNKEY	Cavan	Rampart View, Virginia, Co. Cavan (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
64	64	CALF TURNKEY	Cavan	Rampart View, Virginia, Co. Cavan (Phase 3)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
65	65	CALF TURNKEY	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 2)	22	Clúid Housing	""	""	""	""	Q4-2019	""
66	66	CALF TURNKEY	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 3)*	2	Clúid Housing	""	""	""	""	Q4-2019	""
67	67	SHIP CONSTRUCTION TURNKEY	Clare	Shantraud Woods, Killaloe	4	*N/A	""	""	""	""	""	Q1-2022
68	68	SHIP CONSTRUCTION TURNKEY	Clare	Cluain Greine, Drumcliff Rd., Ennis 	45	N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
69	69	SHIP CONSTRUCTION TURNKEY	Clare	Cluain Greine, Drumcliff Rd., Ennis 	16	N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
70	70	SHIP CONSTRUCTION SINGLE STAGE	Clare	Madden's Terrace, Clarecastle	2	*N/A	""	""	""	""	Q2-2021	""
71	71	SHIP CONSTRUCTION SINGLE STAGE	Clare	Dun na Mara, Doonbeg	2	*N/A	""	""	""	""	""	Q2-2021
72	72	SHIP CONSTRUCTION SINGLE STAGE	Clare	St Senan’s Terrace, Kilrush -No5-No 6	2	*N/A	""	""	""	""	""	Q3-2021
73	73	SHIP CONSTRUCTION RENEWAL	Clare	Nagles Terrace, Kilrush	3	N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
74	74	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	""	""	""	""	Q3-2020	""
75	75	SHIP CONSTRUCTION	Clare	Ballard Rd,Miltown Malbay	27	*N/A	""	""	""	""	Q3-2020	""
76	76	SHIP CONSTRUCTION	Clare	Doonaun, Tulla	25	*N/A	""	""	""	""	Q4-2020	""
77	77	SHIP CONSTRUCTION	Clare	Boheraroan, Newmarket-on-Fergus	18	*N/A	""	""	""	""	""	Q1-2022
78	78	SHIP CONSTRUCTION	Clare	Feakle Rd., Scariff	18	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
79	79	SHIP CONSTRUCTION	Clare	Kilkee Road, Doonbeg	8	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
80	80	SHIP CONSTRUCTION	Clare	Tulla Road, Roslevan, Ennis (Fannings site)	8	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
81	81	SHIP CONSTRUCTION	Clare	Drumcliffe Road, Ennis	26	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
82	82	SHIP CONSTRUCTION	Clare	Deerpark, Ennistymon	30	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
83	83	SHIP CONSTRUCTION	Clare	Ballyliddan West, Sixmilebridge	15	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
84	84	SHIP CONSTRUCTION	Clare	Gort Road Ennis	20	N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
85	85	CAS CONSTRUCTION TURNKEY	Clare	Market Sq., Ennis	14	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
86	86	CAS CONSTRUCTION	Clare	Teach Rua, Edenvale Ennis	4	Newgrove Housing Association Ltd	""	""	""	""	""	Q2-2021
87	87	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East (Phase 1)	20	*N/A	""	""	""	""	""	Q2-2021
88	88	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East (Phase 2)	31	*N/A	""	""	""	""	""	Q3-2021
89	89	CALF TURNKEY	Clare	Abbey View, Limerick Road, Ennis, Co. Clare (Phase 1)	9	Clúid Housing	""	""	""	""	Q4-2021	""
90	90	CALF TURNKEY	Clare	Abbey View, Limerick Road, Ennis, Co. Clare (Phase 2)*	15	Clúid Housing	""	""	""	""	Q4-2021	""
91	91	CALF TURNKEY	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 2)*	2	Clúid Housing	""	""	""	""	""	Q1-2022
92	92	CALF TURNKEY	Clare	Cluain Na Laoi, Kilkishen, Co. Clare (39 - 54) (Phase 1)*	14	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2022	""	""
93	93	CALF TURNKEY	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 2)*	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
94	94	CALF TURNKEY	Clare	Limerick Rd, Ennis, Co. Clare (Phase 1)*	18	Inis Housing Association	""	""	""	""	Q1-2022	""
95	95	CALF CONSTRUCTION	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	Q2-2021	""	""
96	96	CALF TURNKEY	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
97	97	CALF TURNKEY	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 2)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2022
98	98	CALF TURNKEY	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 3)*	24	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
99	99	CALF TURNKEY	Clare	Roslevan, Tulla Road, Ennis, County Clare (Phase 4)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
100	100	SHIP DIALOG	Cork City	Barrack Street	32	*N/A	""	""	""	""	Q1-2019	""
101	101	SHIP DIALOG	Cork City	Woods Street	16	*N/A	""	""	""	""	Q1-2019	""
102	102	SHIP DIALOG	Cork City	Corkeran's Quay	3	*N/A	""	""	""	""	Q2-2018	""
103	103	SHIP DIALOG	Cork City	Skehard Road, Blackrock, Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
104	104	SHIP DIALOG	Cork City	Coach Street, Cork	13	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
105	105	SHIP DIALOG	Cork City	Shanakiel Road, Cork	20	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
106	106	SHIP DIALOG	Cork City	Spring Lane, Blackpool, Cork	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
107	107	SHIP DIALOG	Cork City	Glen Ryan Road, Cork	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
108	108	SHIP DIALOG	Cork City	Pouladuff Road, Cork 	11	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
109	109	SHIP DIALOG	Cork City	Watercourse Road, Blackpool, Cork	37	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
110	110	SHIP DIALOG	Cork City	Denroche's Cross, Glasheen Road, Cork	43	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
111	111	SHIP DIALOG	Cork City	Wolsey Court, Blackpool, Cork	49	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
112	112	SHIP DIALOG	Cork City	Sunview, South Douglas Road, Douglas, Cork	25	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
113	113	SHIP DIALOG	Cork City	Former Bolands Mill, Old Mallow Road	57	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
114	114	SHIP CONSTRUCTION RENEWAL	Cork City	1 Evenus Ville, Albert Road, Cork City	1	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
115	115	SHIP CONSTRUCTION DESIGN BUILD	Cork City	Clover Hill Court, Bessboro Road, Mahon, Cork	88	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
116	116	SHIP CONSTRUCTION	Cork City	Poulavone, Ballincollig	64	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
117	117	SHIP CONSTRUCTION	Cork City	Boyces Street	14	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
118	118	SHIP CONSTRUCTION	Cork City	Madonna House, Ballincollig	6	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
119	119	SHIP CONSTRUCTION	Cork City	Bramble Cottages	4	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
120	120	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	28	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
121	121	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	3	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
122	122	SHIP CONSTRUCTION	Cork City	Hollywood Estate Infill Housing, Blarney Road, Cork	7	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
123	123	SHIP CONSTRUCTION	Cork City	Westside, Model Farm Road, Cork	41	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
124	124	SHIP CONSTRUCTION	Cork City	Gerald Griffin Apartments - Block 7, North Monastery Road / St. Vincent's Road, Cork	6	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
125	125	SHIP CONSTRUCTION	Cork City	16A Kerry Road (former Slí Gartan), Mayfield, Cork 	1	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
126	126	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 1C	41	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
127	127	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 2B	38	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
128	128	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Knocknaheeny, Cork	2	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
129	129	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 3B	62	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
130	130	REGENERATION	Cork City	CNWQR Knocknaheeny Phase 4A	43	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
131	131	CAS CONSTRUCTION SINGLE STAGE	Cork City	Eastville, Albert Road, Cork	1	Galtan Ltd	""	""	""	""	""	Q1-2022
132	132	CAS CONSTRUCTION SINGLE STAGE	Cork City	14 Glanmire Road Cork	2	Galtan Ltd	""	""	""	""	""	Q1-2022
133	133	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
134	134	CAS CONSTRUCTION	Cork City	Ard na Ri, Closes Green, Farranree, Cork	20	Farranree Sheltered Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
135	135	CAS CONSTRUCTION	Cork City	Apts 2 & 3 Cois Coille, Tivoli, Cork	2	Galtan Ltd	""	""	""	""	""	Q4-2021
136	136	CAS CONSTRUCTION	Cork City	Aras Lean, Murphy’s Farm, Bishopstown, Co. Cork	25	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
137	137	CAS CONSTRUCTION	Cork City	Gardiners Hill, St Lukes, Cork 	3	Focus Ireland	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
138	138	CALF TURNKEY	Cork City	12,14,15 Model Quarters, Tower, Blarney, Co Cork  (Phase 1)	3	Circle Voluntary Housing Association Ltd	""	""	""	""	Q2-2019	""
139	139	CALF TURNKEY	Cork City	20 and 21 Kyle Street  (Phase 1)	6	Focus Housing Association CLG	""	""	""	""	Q2-2021	""
140	140	CALF TURNKEY	Cork City	40-41 Grand Parade, Cork City (Phase 1)	7	Focus Housing Association CLG	""	""	""	""	Q2-2021	""
141	141	CALF TURNKEY	Cork City	Baker Street, Ballincollig, Co Cork (Phase 1)*	14	Clúid Housing	""	""	""	Q2-2022	""	""
142	142	CALF TURNKEY	Cork City	Barters Wood, Tower, Cork (Phase 1)*	3	Tuath Housing Association	""	""	""	""	Q1-2020	""
143	143	CALF TURNKEY	Cork City	Barters Wood, Tower, Cork (Phase 2)*	3	Tuath Housing Association	""	""	""	""	Q1-2020	""
144	144	CALF TURNKEY	Cork City	Block 10 Jacobs Island, Mahon, Cork (Phase 1)	59	Respond	""	""	""	Q1-2022	""	""
145	145	CALF TURNKEY	Cork City	Boherboy Road, Silversprings Hill, Cork City  (Phase 1)*	15	Respond	""	""	""	""	Q1-2022	""
146	146	CALF TURNKEY	Cork City	Brocklesby Street, Blackpool, Cork City (Phase 1)*	42	Focus Housing Association CLG	""	""	""	Q1-2022	""	""
147	147	CALF TURNKEY	Cork City	Evergreen Road, Turners Cross, Cork  (Phase 1)*	28	Respond	""	""	""	""	Q1-2021	""
148	148	CALF TURNKEY	Cork City	Fairfield Meadows, Upper Fair Hill, Cork (Phase 1)*	18	Focus Housing Association CLG	""	""	""	Q3-2021	""	""
149	149	CALF TURNKEY	Cork City	"Glanmire Village, Glanmire, Cork
 (Phase 1)"	3	Focus Housing Association CLG	""	""	""	""	Q2-2020	""
150	150	CALF CONSTRUCTION	Cork City	Green Lane, Blackpool, Cork City (Phase 1)	112	Clúid Housing	""	""	""	""	Q4-2021	""
151	151	CALF TURNKEY	Cork City	Haig Gardens, Boreenamanna Road and Wallace Avenue, Ballintemple (Phase 1)*	27	Respond	""	""	""	""	Q2-2021	""
152	152	CALF TURNKEY	Cork City	Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*	19	Respond	""	""	""	""	Q1-2020	""
153	153	CALF TURNKEY	Cork City	Lancaster Gate, Western Road, Cork (Phase 1)	15	Clúid Housing	""	""	""	""	Q3-2021	""
154	154	CALF TURNKEY	Cork City	Link Road, Ballincollig, Cork (Phase 1)*	40	Respond	""	""	""	""	Q3-2021	""
155	155	CALF TURNKEY	Cork City	Miles Stream, Shanakiel, Cork (Phase 1)	14	Tuath Housing Association	""	""	""	""	Q3-2021	""
156	156	CALF TURNKEY	Cork City	Miles Stream, Shanakiel, Cork (Phase 2)	14	Tuath Housing Association	""	""	""	""	Q3-2021	""
157	157	CALF TURNKEY	Cork City	Miles Stream, Shanakiel, Cork (Phase 3)	14	Tuath Housing Association	""	""	""	""	Q3-2021	""
158	158	CALF TURNKEY	Cork City	Millfield Cottages, Blackpool, Cork City (Phase 1)*	18	Respond	""	""	""	Q1-2022	""	""
159	159	CALF TURNKEY	Cork City	Phase 2, 42 Grand Parade, Cork City (Phase 1)	9	Focus Housing Association CLG	""	""	""	""	Q4-2021	""
160	160	CALF TURNKEY	Cork City	Redforge Road, Blackpool, Cork City (Phase 2)	31	Respond	""	""	""	""	""	Q4-2021
161	161	CALF TURNKEY	Cork City	Redforge Road, Blackpool, Cork City (Phase 3)*	24	Respond	""	""	""	""	Q1-2020	""
162	162	CALF TURNKEY	Cork City	Redforge Road, Blackpool, Cork City (Phase 4)	7	Respond	""	""	""	""	Q1-2020	""
163	163	CALF TURNKEY	Cork City	Riverside Farm, Model Farm Road, Bishopstown, Cork (Phase 1)*	48	Respond	""	""	""	Q2-2022	""	""
164	164	CALF TURNKEY	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 1)*	22	Respond	""	""	""	""	Q4-2020	""
165	165	CALF TURNKEY	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 2)*	19	Respond	""	""	""	""	Q4-2020	""
166	166	CALF TURNKEY	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 3)	24	Respond	""	""	""	""	Q4-2020	""
167	167	CALF TURNKEY	Cork City	Sarsfield Road, Doughcloyne, Wilton, Cork City (Phase 1)	4	Respond	""	""	""	Q2-2022	""	""
168	168	CALF TURNKEY	Cork City	Springville House, Bulls Lane, Blackrock Road, Cork (Phase 1)	35	Tuath Housing Association	""	""	""	""	Q4-2020	""
169	169	CALF CONSTRUCTION	Cork City	St Dominics, Middle Glanmire Road, Montenotte, Cork (Phase 1)	27	Tuath Housing Association	""	""	""	""	Q1-2021	""
170	170	CALF TURNKEY	Cork City	Strawberry Hill, Blarney Street, Cork (Phase 1)*	16	Respond	""	""	""	Q1-2022	""	""
171	171	CALF TURNKEY	Cork City	Summerville Place, Sunday’s Well, Cork (Phase 1)	10	Respond	""	""	""	""	Q1-2021	""
172	172	CALF TURNKEY	Cork City	The Oaks, Frankfield, Douglas, Cork City (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q4-2021
173	173	CALF TURNKEY	Cork City	 Tower Street, Cork City (Phase 1)	2	Threshold Ltd	""	""	""	Q2-2021	""	""
174	174	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	5	*N/A	""	""	""	""	""	Q2-2021
175	175	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	13	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
176	176	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
177	177	SHIP CONSTRUCTION TURNKEY	Cork County	Canon St, Rathcormac	3	*N/A	""	""	""	""	Q1-2022	""
178	178	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	6	*N/A	""	""	""	""	Q4-2017	""
179	179	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	3	*N/A	""	""	""	""	""	Q4-2021
180	180	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull	7	*N/A	""	""	""	""	Q2-2021	""
181	181	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	11	*N/A	""	""	""	""	""	Q1-2021
182	182	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	17	*N/A	""	""	""	""	""	Q2-2021
183	183	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull	7	*N/A	""	""	""	""	Q2-2021	""
184	184	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	4	*N/A	""	""	""	""	""	Q1-2021
185	185	SHIP CONSTRUCTION TURNKEY	Cork County	Ard an Bhaile, Creggane, Buttevant	6	*N/A	""	""	""	""	Q1-2020	""
186	186	SHIP CONSTRUCTION TURNKEY	Cork County	Ballymacmoy, Killavullen, Co. Cork	13	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
187	187	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	4	*N/A	""	""	""	""	""	Q2-2021
188	188	SHIP CONSTRUCTION TURNKEY	Cork County	Gortnaclohy, Skibbereen, Co. Cork	34	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
189	189	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	12	*N/A	""	""	""	""	Q1-2021	""
190	190	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	16	*N/A	""	""	""	""	Q4-2017	""
191	191	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	10	*N/A	""	""	""	""	Q1-2020	""
192	192	SHIP CONSTRUCTION TURNKEY	Cork County	An Goritin Rua, Millstreet Road, Macroom	14	*N/A	""	""	""	""	""	Q2-2021
193	193	SHIP CONSTRUCTION TURNKEY	Cork County	Lyraneag, Rockchapel,	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
194	194	SHIP CONSTRUCTION TURNKEY	Cork County	Curragh, Upper Aghada	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
195	195	SHIP CONSTRUCTION TURNKEY	Cork County	Glebe Manor, Whitegate	12	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
196	196	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere	6	*N/A	""	""	""	""	Q4-2020	""
197	197	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard, Ballyhooly	6	*N/A	""	""	""	""	""	Q1-2021
198	198	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	18	*N/A	""	""	""	""	""	Q2-2021
199	199	SHIP CONSTRUCTION TURNKEY	Cork County	Drakes Point, Knocknagore, Crosshaven	5	*N/A	""	""	""	""	""	Q3-2021
200	200	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	6	*N/A	""	""	""	""	Q1-2020	""
201	201	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	6	*N/A	""	""	""	""	Q1-2020	""
202	202	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale	19	*N/A	""	""	""	""	""	Q4-2021
203	203	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	4	*N/A	""	""	""	""	""	Q1-2021
204	204	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale, Phase 2, Co. Cork	17	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
205	205	SHIP CONSTRUCTION TURNKEY	Cork County	Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q1-2022
206	206	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard, Ballyhooly	6	*N/A	""	""	""	""	""	Q2-2021
207	207	SHIP CONSTRUCTION TURNKEY	Cork County	Courtbrack, Tower	1	*N/A	""	""	""	""	""	Q4-2021
208	208	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	10	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
209	209	SHIP CONSTRUCTION TURNKEY	Cork County	Lisgoold, An Tui Units 5 & 6	2	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
210	210	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	26	*N/A	""	""	""	""	Q4-2017	""
211	211	SHIP CONSTRUCTION TURNKEY	Cork County	The Pastures, Charleville	4	*N/A	""	""	""	""	""	Q4-2021
212	212	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	7	*N/A	""	""	""	""	""	Q2-2021
213	213	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	7	*N/A	""	""	""	""	Q3-2020	""
214	214	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	3	*N/A	""	""	""	""	""	Q1-2022
215	215	SHIP CONSTRUCTION TURNKEY	Cork County	The Pastures, Charleville	12	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
216	216	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	21	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
217	217	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	11	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
218	218	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmoney, Carrigaline	14	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
219	219	SHIP CONSTRUCTION TURNKEY	Cork County	Derrymihin, Castletownbere, Co. Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
220	220	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill	4	*N/A	""	""	""	""	""	Q4-2021
221	221	SHIP CONSTRUCTION TURNKEY	Cork County	The Meadows, Dunmanway, Co. Cork	4	N/A	""	""	""	""	Q4-2021	""
222	222	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	7	N/A	""	""	""	""	""	Q1-2022
223	223	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry	12	*N/A	""	""	""	""	Q1-2020	""
224	224	SHIP CONSTRUCTION SINGLE STAGE	Cork County	2A Glenview Terrace Lyre Co Cork	1	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
225	225	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Cuirt Na Slini, Cloyne, East Cork 	2	*N/A	""	""	""	""	Q3-2021	""
226	226	SHIP CONSTRUCTION SINGLE STAGE	Cork County	81 Belmont Place, Cobh,	1	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
227	227	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Main St. Dunmanway	1	*N/A	""	""	""	""	""	Q4-2021
228	228	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Croke Place, Garranmacgarrett, Kilbrin, kanturk	2	*N/A	""	""	""	""	Q3-2020	""
229	229	SHIP CONSTRUCTION SINGLE STAGE	Cork County	High St., Sleaveen Hill, Macroom	1	*N/A	""	""	""	""	Q2-2021	""
230	230	SHIP CONSTRUCTION SINGLE STAGE	Cork County	49 Masseytown, Macroom	1	*N/A	""	""	""	""	Q2-2021	""
231	231	SHIP CONSTRUCTION SINGLE STAGE	Cork County	22 Aisling Ghael, Coolacoosane, Millview Road, Kanturk	1	*N/A	""	""	""	""	Q3-2020	""
232	232	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Carrig Rossa Phase 2, Rossmore	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
233	233	SHIP CONSTRUCTION SINGLE STAGE	Cork County	Fana Na gCann, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
234	234	SHIP CONSTRUCTION SINGLE STAGE	Cork County	3 Knockbrogan Park, Bandon	1	*N/A	""	""	""	""	""	Q4-2021
235	235	SHIP CONSTRUCTION SINGLE STAGE	Cork County	87 Belmont, Cobh	1	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
236	236	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	17	*N/A	""	""	""	""	Q3-2019	""
237	237	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	51	*N/A	""	""	""	""	""	Q4-2021
238	238	SHIP CONSTRUCTION	Cork County	Newtown House , Bantry	1	*N/A	""	""	""	""	""	Q4-2021
239	239	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	""	""	""	""	Q4-2019	""
240	240	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	""	""	""	Q3-2019	""
241	241	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	5	*N/A	""	""	""	""	Q3-2020	""
242	242	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	6	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
243	243	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
244	244	SHIP CONSTRUCTION	Cork County	Sleaveen East, Macroom	8	*N/A	""	""	Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.	""	""	""
245	245	SHIP CONSTRUCTION	Cork County	Pound Lane, Kilworth 	7	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
246	246	SHIP CONSTRUCTION	Cork County	Knocknagown, Rylane	1	*N/A	""	""	""	""	""	Q3-2021
247	247	SHIP CONSTRUCTION	Cork County	Uplands (Phase 2), College Road,  Fermoy	11	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
248	248	SHIP CONSTRUCTION	Cork County	Lissoran, Ballinspittle	4	*N/A	""	""	""	""	""	Q4-2021
249	249	SHIP CONSTRUCTION	Cork County	Convent Road, Doneraile	17	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
250	250	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	13	*N/A	""	""	""	""	Q3-2020	""
251	251	SHIP CONSTRUCTION	Cork County	Chapel Lane, Ballydehob, Co. Cork	12	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
252	252	SHIP CONSTRUCTION	Cork County	Sleaveen East, Macroom	16	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
253	253	SHIP CONSTRUCTION	Cork County	Old Barrack Road, Bantry, Co. Cork	6	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
254	254	SHIP CONSTRUCTION	Cork County	Coastguard Cottages, Lower Roads, Crosshaven, Co. Cork	27	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
255	255	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	6	N/A	""	""	""	""	Q3-2019	""
256	256	CAS CONSTRUCTION TURNKEY	Cork County	Ardmanagh, Schull	12	Túath Housing Association Ltd	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
257	257	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	18	Cluid Housing Association	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
258	258	CAS CONSTRUCTION	Cork County	Masseytown, Macroom	14	Túath Housing Association Ltd	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
259	259	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	""	""	""	Q2-2020	""
260	260	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	9	Charleville Care Project Ltd	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
261	261	CAS CONSTRUCTION	Cork County	St. Michaels, 36 Main Street, Bandon, Co. Cork	6	Bandon Geriatric ? Community Council	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
262	262	CAS CONSTRUCTION	Cork County	Distillery Lane, Distillery Walk, Midleton	7	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
263	263	CAS CONSTRUCTION	Cork County	Mardyke, Skibbereen	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
264	264	CAS CONSTRUCTION	Cork County	Daniel O’Brien Terrace, Buttevant	7	Túath Housing Association Ltd	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
265	265	CAS CONSTRUCTION	Cork County	Lisheen Field, Kilbarry Road, Dunmanway, Co. Cork	16	Cluid Housing Association	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
266	266	CAS CONSTRUCTION	Cork County	8 Harbour Row. Cobh	5	*N/A	""	""	""	""	Q1-2022	""
267	267	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty (Phase 1)	20	*N/A	""	""	""	""	""	Q2-2021
268	268	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty (Phase 2)	32	*N/A	""	""	""	""	""	Q4-2021
269	269	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen (Phase 1)	35	*N/A	""	""	""	""	""	Q2-2021
270	270	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen (Phase 2)	15	*N/A	""	""	""	""	""	Q4-2021
271	271	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom (Phase 1)	37	*N/A	""	""	""	""	""	Q2-2021
272	272	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom (Phase 2)	13	*N/A	""	""	""	""	""	Q3-2021
273	273	CALF TURNKEY	Cork County	Cascade Apartments, Castlelake, Carrigtwohill, Cork (Phase 1)	95	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2021	""
274	274	CALF TURNKEY	Cork County	Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 1)	8	Clúid Housing	""	""	""	""	Q2-2021	""
275	275	CALF TURNKEY	Cork County	Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 2)	4	Clúid Housing	""	""	""	""	Q2-2021	""
276	276	CALF TURNKEY	Cork County	Chapel Court, Skibbereen, Cork (Phase 1)	8	Clúid Housing	""	""	""	""	Q3-2021	""
277	277	CALF TURNKEY	Cork County	Chapel Court, Skibbereen, Cork (Phase 2)	8	Clúid Housing	""	""	""	""	Q3-2021	""
278	278	CALF TURNKEY	Cork County	Church Hill, Carrigaline, Co Cork (Phase 1)*	37	Respond	""	""	""	""	Q3-2021	""
279	279	CALF TURNKEY	Cork County	Harbour Heights, Passage West, Co Cork (Phase 1)	14	Clúid Housing	""	""	""	""	Q4-2020	""
280	280	CALF TURNKEY	Cork County	Harbour Heights, Passage West, Co Cork (Phase 2)	13	Clúid Housing	""	""	""	""	Q4-2020	""
281	281	CALF TURNKEY	Cork County	Hazel View, Hazel Brooke, Spa Glen, Mallow, Co Cork (Phase 1)	12	Clúid Housing	""	""	""	Q4-2021	""	""
282	282	CALF TURNKEY	Cork County	Lough Beg, Loughbeg, Ringaskiddy, Cork (Phase 1)*	15	Respond	""	""	""	Q2-2022	""	""
283	283	CALF TURNKEY	Cork County	Shambles Lane, Thomas Davis Street, Mallow, Co Cork (Phase 1)	6	Focus Housing Association CLG	""	""	""	Q1-2022	""	""
284	284	CALF TURNKEY	Cork County	The Miles, Clonakilty, Co Cork  (Phase 1)	38	Clúid Housing	""	""	""	Q3-2021	""	""
285	285	CALF TURNKEY	Cork County	Westview, Coolroe, Ballincollig, Co. Cork (Phase 2)	20	Respond	""	""	""	""	""	Q1-2021
286	286	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	22	*N/A	""	""	""	""	""	Q1-2021
287	287	SHIP CONSTRUCTION TURNKEY	DLR	George's Street Upper, Dun Laoghaire	5	*N/A	""	""	""	""	""	Q1-2021
288	288	SHIP CONSTRUCTION TURNKEY	DLR	HazelBrook Square, Nutgrove, Churchtown	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
289	289	SHIP CONSTRUCTION DESIGN BUILD	DLR	Ballyogan Square, Ballyogan	67	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
290	290	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
291	291	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	""	Q4-2021
292	292	SHIP CONSTRUCTION	DLR	Ballyogan Avenue, Ballyogan	2	*N/A	""	""	""	""	""	Q2-2021
293	293	SHIP CONSTRUCTION	DLR	St. Laurence’s Park, Stillorgan	89	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
294	294	SHIP CONSTRUCTION	DLR	Moyola Court, Churchtown Lower, Dublin 14	4	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
295	295	SHIP CONSTRUCTION	DLR	Shanganagh Castle	200	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
296	296	SHIP CONSTRUCTION	DLR	Site at Roebuck Road, Clonskeagh, Dublin 14	4	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
297	297	SHIP CONSTRUCTION	DLR	37A Rollins Villas, Sallynoggin, Co. Dublin 	1	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
298	298	SHIP CONSTRUCTION	DLR	Old Coastguard Cottages, Coal Harbour, Harbour Road	4	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
299	299	SHIP CONSTRUCTION	DLR	Cross Avenue, Dún Laoghaire, Co. Dublin	4	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
300	300	SHIP CONSTRUCTION	DLR	Infill Site Adjacent to 4 Rockville Drive, Glenamuck, Co. Dublin	1	N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
301	301	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	""	""	""	Q4-2021
302	302	CALF TURNKEY	DLR	Ardilea Crescent, Ardilea, Clonskeagh, Dublin 14, Co. Dublin (Phase 1)*	2	Tuath Housing Association	""	""	""	""	""	Q4-2021
303	303	CALF TURNKEY	DLR	Ballybetagh Road, Kilternan, Co Dublin (Phase 1)*	22	Clanmil Housing Association Ireland	""	""	""	""	Q3-2021	""
304	304	CALF TURNKEY	DLR	Cherrywood Town Centre, Dublin 18 (Phase 1)*	80	Clúid Housing	""	""	""	""	Q4-2019	""
305	305	CALF TURNKEY	DLR	Cherrywood Town Centre, Dublin 18 (Phase 2)*	61	Clúid Housing	""	""	""	""	Q4-2019	""
306	306	CALF TURNKEY	DLR	Egremont, Church Road, Killiney, Co. Dublin (Phase 1)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2019	""
307	307	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	9	Respond	""	""	""	""	""	Q4-2021
308	308	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 2)	22	Respond	""	""	""	""	""	Q1-2022
309	309	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 3)	22	Respond	""	""	""	""	""	Q1-2022
310	310	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 19 (Phase 1)	18	Tuath Housing Association	""	""	""	""	""	Q4-2021
311	311	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 19 (Phase 2)	16	Tuath Housing Association	""	""	""	""	""	Q1-2022
312	312	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 19 (Phase 3)	18	Tuath Housing Association	""	""	""	""	""	Q1-2022
313	313	CALF TURNKEY	DLR	Johnstown Place,Johnstown Road, Cabinteely, Dublin 18 (Formerly Johnstown Court) (Phase 1)*	51	Clúid Housing	""	""	""	""	""	Q2-2021
314	314	CALF TURNKEY	DLR	Kiln View, Clay Farm Way, Leopardstown, Co Dublin (Phase 1)*	55	The Iveagh Trust	""	""	""	""	Q4-2020	""
315	315	CALF TURNKEY	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 1)*	14	Tuath Housing Association	""	""	""	""	""	Q1-2021
316	316	CALF TURNKEY	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 2)*	18	Tuath Housing Association	""	""	""	""	""	Q2-2021
317	317	CALF TURNKEY	DLR	Oakton Court, Ballybrack, Co. Dublin (Phase 1)	5	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2021	""
318	318	CALF TURNKEY	DLR	Phase 2, Elmwood, Johnstown Road, Cabinteely, Dun Laoghaire, Co. Dublin (Phase 1)*	58	Clúid Housing	""	""	""	""	""	Q1-2022
319	319	CALF TURNKEY	DLR	The Glen, Glenamuck Road, Carrickmines, Dublin 18 (Phase 1)*	48	Respond	""	""	""	""	Q1-2021	""
320	320	CALF TURNKEY	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)	59	Respond	""	""	""	""	Q3-2020	""
321	321	CALF TURNKEY	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)*	6	Respond	""	""	""	""	Q3-2020	""
322	322	SHIP DIALOG	Donegal	Drumrooske West	36	*N/A	""	""	""	""	Q2-2021	""
323	323	SHIP DIALOG	Donegal	Convent Road, Carndonagh	21	*N/A	""	""	""	""	Q1-2021	""
324	324	SHIP DIALOG	Donegal	Meadowfield, Convoy	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
325	325	SHIP DIALOG	Donegal	Donegal Road, Ballybofey	14	*N/A	""	""	""	""	Q1-2021	""
326	326	SHIP DIALOG	Donegal	Admiran, Stranorlar	52	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
327	327	SHIP DIALOG	Donegal	Rockview, Carrickboy, Ballyshannon	5	*N/A	""	""	""	""	Q1-2021	""
328	328	SHIP DIALOG	Donegal	Glencrow, Moville	35	*N/A	""	""	""	""	Q2-2021	""
329	329	SHIP DIALOG	Donegal	Ballyraine, Letterkenny	25	*N/A	""	""	""	""	Q3-2021	""
330	330	SHIP DIALOG	Donegal	Lough Fern Heights, Milford	17	*N/A	""	""	""	""	Q1-2021	""
331	331	SHIP DIALOG	Donegal	Convent Road, Carndonagh	18	N/A	""	""	""	""	Q1-2021	""
332	332	SHIP DIALOG	Donegal	Convent Road, Carndonagh	14	N/A	""	""	""	""	Q1-2021	""
333	333	SHIP DIALOG	Donegal	Meadowfield, Convoy	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
334	334	SHIP DIALOG	Donegal	Cnoc Ard, Carnamuggagh, Letterkenny	6	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
335	335	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	8	*N/A	""	""	""	""	""	Q1-2022
336	336	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	12	*N/A	""	""	""	""	Q4-2020	""
337	337	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	14	*N/A	""	""	""	""	Q4-2020	""
338	338	SHIP CONSTRUCTION SINGLE STAGE	Donegal	SRD Loughanure Annagry	1	*N/A	""	""	""	""	Q1-2021	""
339	339	SHIP CONSTRUCTION SINGLE STAGE	Donegal	SRD Meenderrynasloe, Annagry	1	*N/A	""	""	""	""	Q1-2021	""
340	340	SHIP CONSTRUCTION SINGLE STAGE	Donegal	Knockamany Malin	1	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
341	341	SHIP CONSTRUCTION SINGLE STAGE	Donegal	Largymore, Kilcar	1	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
342	342	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	""	""	Q3-2020	""
343	343	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	""	""	""	Q2-2021
344	344	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	""	""	""	Q4-2019	""
345	345	SHIP CONSTRUCTION	Donegal	Pound Street, Dunfanaghy	4	*N/A	""	""	""	""	Q3-2020	""
346	346	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	""	""	""	Q2-2021
347	347	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
348	348	SHIP CONSTRUCTION	Donegal	Trusk Road, Ballybofey	19	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
349	349	SHIP CONSTRUCTION	Donegal	Crana Crescent, Buncrana	16	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
350	350	SHIP CONSTRUCTION	Donegal	Drumacrin, Bundoran	42	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
351	351	SHIP CONSTRUCTION	Donegal	Gallow's Lane, Lifford	29	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
352	352	SHIP CONSTRUCTION	Donegal	Chapel Road, Dungloe	45	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
353	353	SHIP CONSTRUCTION	Donegal	Kilmacrennan, Letterkenny	34	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
354	354	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	""	""	Q4-2020	""
355	355	CAS CONSTRUCTION	Donegal	Cois Locha, Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	""	""	Q3-2020	""
356	356	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	34	Habinteg Housing Association (Ireland) Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
357	357	CALF TURNKEY	Donegal	Ard na Gréine, Glencar Scotch, Letterkenny, Co. Donegal  (Phase 1)*	18	Clúid Housing	""	""	""	""	Q2-2021	""
358	358	CALF TURNKEY	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	""	Q1-2021
359	359	SHIP DIALOG	Dublin City	O'Devaney Gardens - SH from Mixed Tenure Project	36	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
360	360	SHIP DIALOG	Dublin City	O'Devaney Gardens - SH from Mixed Tenure Project	115	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
361	361	SHIP DIALOG	Dublin City	O'Devaney Gardens - SH from Mixed Tenure Project	124	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
362	362	SHIP CONSTRUCTION TURNKEY	Dublin City	88-89 Drimnagh Road Dublin 12	24	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
363	363	SHIP CONSTRUCTION TURNKEY	Dublin City	St. Pancras, Harolds Cross, Dublin 6	4	*N/A	""	""	""	""	""	Q2-2021
364	364	SHIP CONSTRUCTION TURNKEY	Dublin City	Core 4, Block 4 Charlemont Square, Dublin 2	15	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
365	365	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
366	366	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Bunratty Road	78	*N/A	""	""	""	""	Q4-2019	""
367	367	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Bonham Street Dublin  8 	57	*N/A	""	""	""	""	Q4-2019	""
368	368	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Cork Street/Chamber Street Dublin 8	55	*N/A	""	""	""	""	Q1-2020	""
369	369	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Springvale Chapelizod Dublin 8	71	*N/A	""	""	""	""	Q1-2020	""
370	370	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Cromcastle & Woodville, Coolock, Dublin 5	156	*N/A	Stage 1 approved Q1-2021, outline design and costs being prepared.	""	""	""	""	""
371	371	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	Crumlin Road - Rafters Lane, Dublin 12	47	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
372	372	SHIP CONSTRUCTION DESIGN BUILD	Dublin City	St. Andrews Court, Dublin 2	37	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
373	373	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	""	Q2-2019	""
374	374	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
375	375	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q2-2019	""
376	376	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
377	377	SHIP CONSTRUCTION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q1-2018	""
378	378	SHIP CONSTRUCTION	Dublin City	O'Devaney Gardens - Phase 1A	56	*N/A	""	""	""	""	Q3-2018	""
379	379	SHIP CONSTRUCTION	Dublin City	Glin Court, Coolock, Dublin 17	32	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
380	380	SHIP CONSTRUCTION	Dublin City	Kildonan Road	75	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
381	381	SHIP CONSTRUCTION	Dublin City	Lands at Emmet Road	112	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
382	382	SHIP CONSTRUCTION	Dublin City	St. Anne's Court, All Saints Drive, Raheny, Dublin 5	102	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
383	383	REGENERATION	Dublin City	Dolphin House Phase 1b	35	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
384	384	REGENERATION	Dublin City	Dorset Street, Dublin 7	163	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
385	385	REGENERATION	Dublin City	Matt Talbot Court	92	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
386	386	REGENERATION	Dublin City	Constitution Hill Dublin 7	130	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
387	387	REGENERATION	Dublin City	Pearse House, Sandwith Street Lower, Dublin 2 (Blocks L,M,N &P)	75	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
388	388	REGENERATION	Dublin City	Bluebell Phase 1A	140	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
389	389	REGENERATION	Dublin City	Liberties Cluster Phase 1, School Street, The Liberties, Dublin 8	115	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
390	390	REGENERATION	Dublin City	Oliver Bond House, Oliver Bond Street, Dublin 8	48	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
391	391	CAS CONSTRUCTION TURNKEY	Dublin City	Block 70, The Plaza, Parkwest, Dublin 12 	43	Túath Housing Association Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
392	392	CAS CONSTRUCTION TURNKEY	Dublin City	Abbottstown Avenue, Finglas West, Dublin 11 	4	North ? East Housing Association Ltd	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
393	393	CAS CONSTRUCTION SINGLE STAGE	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	""	Q4-2020	""
394	394	CAS CONSTRUCTION SINGLE STAGE	Dublin City	88 Lower Drumcondra Road, Dublin 9 	6	Peter McVerry Trust Ltd	""	""	""	""	Q4-2021	""
395	395	CAS CONSTRUCTION SINGLE STAGE	Dublin City	190 -192 Moore Haven, Drumcondra Road Upper, Dublin 9.	8	DePaul Housing	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
396	396	CAS CONSTRUCTION RENEWAL	Dublin City	8 North Frederick Street, Dublin 1	12	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2021
397	397	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	22	Túath Housing Association Ltd	""	""	""	""	Q3-2019	""
398	398	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street, Dublin 2	20	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
399	399	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	""	""	""	""	Q1-2021
400	400	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	14	Simon Community : Dublin Simon	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
401	401	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
402	402	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
403	403	CAS CONSTRUCTION	Dublin City	13A Casement Drive, Finglas, Dublin 11	2	Arlington Novas Ireland Ltd	""	""	""	""	Q4-2021	""
404	404	CAS CONSTRUCTION	Dublin City	Sarsfield Road, Ballyfermot, Dublin 10	6	Respond	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
405	405	CAS CONSTRUCTION	Dublin City	25-26 Ushers Island Ushers Quay Dublin 8	0	Simon Community : Dublin Simon	""	""	""	""	Q4-2021	""
406	406	CAS CONSTRUCTION	Dublin City	53a Keeper Road, Drimnagh, Dublin 12	9	Respond	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
407	407	CAS CONSTRUCTION	Dublin City	Barnamore Grove, Finglas, Dublin 11	2	Arlington Novas Ireland Ltd	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
408	408	CAS CONSTRUCTION	Dublin City	5-7 Halston Street, Dublin 7	12	Peter McVerry Trust Ltd	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
409	409	CAS CONSTRUCTION	Dublin City	307a Casement Road, Finglas, Co. Dublin 	1	Arlington Novas Ireland Ltd	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
410	410	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	""	""	Q2-2021
411	411	PUBLIC PRIVATE PARTNERSHIP (Bundle 3)	Dublin City	Ready Mix Site, East Wall, Dublin 3	68	*N/A	""	Q4-2021	""	""	""	""
412	412	PUBLIC PRIVATE PARTNERSHIP (Bundle 3)	Dublin City	Shangan Road, Ballymun, Dublin 9*	93	*N/A	""	Q4-2021	""	""	""	""
413	413	PUBLIC PRIVATE PARTNERSHIP (Bundle 3)	Dublin City	Collins Avenue, Whitehall, Dublin 9	83	*N/A	""	Q4-2021	""	""	""	""
414	414	CALF TURNKEY	Dublin City	15 Richmond Avenue, Dublin 3 (Phase 1)	35	Focus Housing Association CLG	""	""	""	Q1-2022	""	""
415	415	CALF TURNKEY	Dublin City	25-27 Bow Lane West, Dublin 8 (Phase 1)	27	Focus Housing Association CLG	""	""	""	Q1-2022	""	""
416	416	CALF TURNKEY	Dublin City	Aughrim Street, Stoneybatter, Dublin 7 (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	""	""	Q2-2021
417	417	CALF CONSTRUCTION	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	62	Clúid Housing	""	""	""	""	Q4-2021	""
418	418	CALF TURNKEY	Dublin City	Blackbanks View, 754 Howth Road, Raheny, Dublin 5 (Phase 1)*	40	Clúid Housing	""	""	""	""	""	Q1-2021
419	419	CALF TURNKEY	Dublin City	Bluebell Avenue, Bluebell, Dublin 12 (Phase 1)*	52	Respond	""	""	""	""	Q4-2019	""
420	420	CALF TURNKEY	Dublin City	Camac Park, Bluebell, Dublin 12 (Phase 1)	3	Tuath Housing Association	""	""	""	""	""	Q4-2021
421	421	CALF TURNKEY	Dublin City	Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*	65	Respond	""	""	""	""	Q2-2019	""
422	422	CALF TURNKEY	Dublin City	Chanel Manor, Coolock, Dublin 5 (Phase 1)*	22	Respond	""	""	""	""	Q4-2020	""
423	423	CALF TURNKEY	Dublin City	Charlemont Gate, Griffith Avenue, Dublin 9 (Phase 1)*	35	Clúid Housing	""	""	""	""	Q2-2021	""
424	424	CALF TURNKEY	Dublin City	Clonshaugh Road, Clonshaugh, Dublin 17 (Phase 1)	9	North and East Housing Association CLG	""	""	""	""	Q4-2021	""
425	425	CALF TURNKEY	Dublin City	Connaught Street, Phibsborough, Dublin 7 (Phase 1)	20	Focus Housing Association CLG	""	""	""	""	Q2-2021	""
426	426	CALF TURNKEY	Dublin City	Donnybrook Gardens, Lands of Greenfield Park, Donnybrook, Dublin 4 (Phase 1)*	4	RHD Housing	""	""	""	""	""	Q2-2021
427	427	CALF TURNKEY	Dublin City	Elanora Court, Long Mile Road, Walkinstown, Dublin 12 (Phase 1)*	153	Respond	""	""	""	""	Q3-2020	""
428	428	CALF TURNKEY	Dublin City	Newtown Cottages Malahide Road Coolock Dublin 17 (Phase 1)	3	Clanmil Housing Association Ireland	""	""	""	""	Q3-2020	""
429	429	CALF CONSTRUCTION	Dublin City	North Great Charles Street, Dublin 1 (Phase 1)	52	Clúid Housing	""	""	""	Q4-2021	""	""
430	430	CALF CONSTRUCTION	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
431	431	CALF TURNKEY	Dublin City	Park West Campus, Kileen Road, Dublin 12 (Phase 1)	43	Tuath Housing Association	""	""	""	""	Q4-2020	""
432	432	CALF CONSTRUCTION	Dublin City	"Railway Street, Dublin 1
 (Phase 1)"	47	Circle Voluntary Housing Association Ltd	""	""	""	Q2-2022	""	""
433	433	CALF CONSTRUCTION	Dublin City	Sean Mc Dermott Street, Dublin 1 (Phase 1)	8	Simon Community: Dublin Simon	""	""	""	Q1-2022	""	""
434	434	CALF TURNKEY	Dublin City	St Canice’s Hall, Ballygall Road West, Finglas, Dublin 11 (Phase 1)*	32	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
435	435	SHIP DIALOG	Fingal	Killhedge Lane, Dun Emer, Lusk	7	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
436	436	SHIP DIALOG	Fingal	Ballymastone, Donabate	30	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
437	437	SHIP DIALOG	Fingal	Ballymastone, Donabate	40	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
438	438	SHIP DIALOG	Fingal	Ballymastone, Donabate	40	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
439	439	SHIP DIALOG	Fingal	Ballymastone, Donabate	30	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
440	440	SHIP CONSTRUCTION SINGLE STAGE	Fingal	Outlands, Rathbeale Road, Swords	11	*N/A	""	""	""	""	Q1-2022	""
441	441	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth	8	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
442	442	SHIP CONSTRUCTION	Fingal	Wellview	20	*N/A	""	""	""	""	Q3-2020	""
443	443	SHIP CONSTRUCTION	Fingal	Cappaghfinn, Cappagh Road Finglas - Phase 3	69	*N/A	""	""	""	""	Q1-2021	""
444	444	SHIP CONSTRUCTION	Fingal	Church Fields, Phase 2B, Mulhuddart, Dublin 15.	67	*N/A	""	""	""	""	Q4-2021	""
445	445	SHIP CONSTRUCTION	Fingal	Leonards Garage, Lusk	10	*N/A	""	""	""	""	Q1-2022	""
446	446	SHIP CONSTRUCTION	Fingal	Katie Hunt's Cottage, Church Road, Lusk	5	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
447	447	SHIP CONSTRUCTION	Fingal	North Street, Swords	8	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
448	448	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	31	Túath Housing Association Ltd	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
449	449	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	""	""	""	Q4-2021
450	450	CAS CONSTRUCTION	Fingal	Garristown	6	North ? East Housing Association Ltd	""	""	""	""	Q3-2021	""
451	451	CAS CONSTRUCTION	Fingal	63 Hollystown Park, Holystown, Dublin 15	5	Daughters Of Charity Of St Vincent De Paul	""	""	""	""	""	Q4-2021
452	452	CALF TURNKEY	Fingal	Bellingsmore, Hollywoodrath, Dublin 15  (Phase 1)*	17	Tuath Housing Association	""	""	""	""	""	Q2-2021
453	453	CALF TURNKEY	Fingal	Bellingsmore, Hollywoodrath, Dublin 15  (Phase 2)	21	Tuath Housing Association	""	""	""	""	""	Q4-2021
454	454	CALF TURNKEY	Fingal	Beresford, Oakstown, Donabate, Co. Dublin (Phase 1)*	36	Tuath Housing Association	""	""	""	""	Q3-2020	""
455	455	CALF TURNKEY	Fingal	Beresford, Oakstown, Donabate, Co. Dublin (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q3-2020	""
456	456	CALF TURNKEY	Fingal	Blackwood Square, Northwood Avenue, Santry Dublin 9 (Phase 1)*	33	Tuath Housing Association	""	""	""	""	Q4-2020	""
457	457	CALF TURNKEY	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 1)*	29	Respond	""	""	""	""	""	Q2-2021
458	458	CALF TURNKEY	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 2)*	30	Respond	""	""	""	""	""	Q4-2021
459	459	CALF TURNKEY	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 1)*	90	Respond	""	""	""	""	""	Q4-2021
460	460	CALF TURNKEY	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 2)*	48	Respond	""	""	""	""	""	Q4-2021
461	461	CALF TURNKEY	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 2)*	6	Tuath Housing Association	""	""	""	""	""	Q2-2021
462	462	CALF CONSTRUCTION	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Clúid Housing	""	""	""	""	""	Q4-2021
463	463	CALF TURNKEY	Fingal	Lusk Village, Lusk, Co. Dublin, Phase 2  (Phase 1)*	14	Clúid Housing	""	""	""	""	""	Q4-2021
464	464	CALF TURNKEY	Fingal	Lusk Village, Lusk, Co. Dublin, Phase 2  (Phase 2)*	4	Clúid Housing	""	""	""	""	Q3-2020	""
465	465	CALF CONSTRUCTION	Fingal	Old Coolock Lane, Santry, Dublin 9 (Phase 1)	28	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2019	""	""
466	466	CALF TURNKEY	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 2)*	10	Respond	""	""	""	""	""	Q2-2021
467	467	CALF TURNKEY	Fingal	Oldtown, Swords, Co Dublin (Phase 1)	30	Respond	""	""	""	Q3-2021	""	""
468	468	CALF TURNKEY	Fingal	Oldtown, Swords, Co Dublin (Phase 2)	30	Respond	""	""	""	Q3-2021	""	""
469	469	CALF TURNKEY	Fingal	Oldtown, Swords, Co Dublin (Phase 3)	39	Respond	""	""	""	Q3-2021	""	""
470	470	CALF TURNKEY	Fingal	Riverwood Square, Porterstown, Dublin 15 (Phase 1)*	24	Clúid Housing	""	""	""	""	""	Q3-2021
471	471	CALF TURNKEY	Fingal	Semple Woods, Donabate, Co. Dublin (Phase 2)*	3	Tuath Housing Association	""	""	""	""	Q4-2019	""
472	472	CALF TURNKEY	Fingal	St Josephs, Clonsilla, Dublin 15 (Phase 1)*	28	Clúid Housing	""	""	""	""	""	Q4-2021
473	473	CALF TURNKEY	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2021
474	474	CALF TURNKEY	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	7	Clúid Housing	""	""	""	""	""	Q4-2021
475	475	SHIP CONSTRUCTION TURNKEY	Galway City	Garraí Caol, (Coast Road Site) Dublin Road	26	*N/A	""	""	""	""	Q1-2020	""
476	476	SHIP CONSTRUCTION TURNKEY	Galway City	Garraí Caol, (Coast Road Site) Dublin Road	22	*N/A	""	""	""	""	Q1-2020	""
477	477	SHIP CONSTRUCTION	Galway City	An Cliathán, Old Monivea Road, Ballybaan Mór	15	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
478	478	SHIP CONSTRUCTION	Galway City	Garraí Beag, Monivea Road, Ballybaan More	58	*N/A	""	""	""	""	Q1-2020	""
479	479	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	21	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
480	480	SHIP CONSTRUCTION	Galway City	Keeraun, Ballymoneen Road	63	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
481	481	SHIP CONSTRUCTION	Galway City	Tirellan Heights, Headford Road	1	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
482	482	SHIP CONSTRUCTION	Galway City	Merlin Park Lands, Galway City	18	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
483	483	SHIP CONSTRUCTION	Galway City	1 Munster Avenue, Galway city	4	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
484	484	SHIP CONSTRUCTION	Galway City	Clybaun Road, Knocknacarra	28	N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
485	485	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
486	486	CAS CONSTRUCTION	Galway City	Doughiska, Galway City	7	Respond	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
487	487	CAS CONSTRUCTION	Galway City	111 Upper Newcastle Road, Galway City	10	Simon Community : North West Simon	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
488	488	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke (Phase 1)	56	*N/A	""	""	""	""	""	Q2-2021
489	489	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke (Phase 2)	18	*N/A	""	""	""	""	""	Q3-2021
490	490	CALF TURNKEY	Galway City	Ballybanemor Road, Ballybrit, Galway (Phase 1)*	52	Respond	""	""	""	""	Q2-2021	""
491	491	CALF TURNKEY	Galway City	Ballybanemor Road, Ballybrit, Galway (Phase 2)	49	Respond	""	""	""	""	Q2-2021	""
492	492	CALF TURNKEY	Galway City	Creig Ard, Roscam, Galway City  (Phase 2)	10	Clúid Housing	""	""	""	""	""	Q2-2021
493	493	CALF TURNKEY	Galway City	Creig Ard, Roscam, Galway City, Co. Galway (Phase 1)*	17	Clúid Housing	""	""	""	""	""	Q4-2021
494	494	CALF TURNKEY	Galway City	Cuirt Bhoirne, Roscam, Co Galway (Phase 1)*	12	Clúid Housing	""	""	""	""	Q3-2020	""
495	495	CALF TURNKEY	Galway City	Fanan, Letteragh Road, Galway (Phase 1)*	4	Tuath Housing Association	""	""	""	""	""	Q4-2021
496	496	CALF TURNKEY	Galway City	Fanan, Letteragh Road, Galway (Phase 2)*	3	Tuath Housing Association	""	""	""	""	Q4-2019	""
497	497	CALF TURNKEY	Galway City	Fanan, Letteragh Road, Galway (Phase 3)*	3	Tuath Housing Association	""	""	""	""	Q4-2019	""
498	498	CALF TURNKEY	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 1)*	40	Respond	""	""	""	""	Q3-2020	""
499	499	CALF TURNKEY	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 2)	43	Respond	""	""	""	""	Q3-2020	""
500	500	CALF TURNKEY	Galway City	Garrai Sheain, Roscam, Galway (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	Q2-2022	""	""
501	501	CALF TURNKEY	Galway City	Glenn Na Mona, Ballymoneen Road, Kncoknacarra, Galway (Phase 1)*	16	Clúid Housing	""	""	""	""	Q1-2021	""
502	502	CALF TURNKEY	Galway City	Leana Mor, Cappagh Road, Galway (Phase 1)*	14	Respond	""	""	""	""	Q2-2021	""
503	503	CALF TURNKEY	Galway City	Leana Mor, Cappagh Road, Galway (Phase 2)*	28	Respond	""	""	""	""	Q2-2021	""
504	504	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 1)*	10	Clúid Housing	""	""	""	""	""	Q3-2021
505	505	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 2)	13	Clúid Housing	""	""	""	""	""	Q4-2021
506	506	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 3)	16	Clúid Housing	""	""	""	""	Q3-2020	""
507	507	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 4)*	25	Clúid Housing	""	""	""	""	Q3-2020	""
508	508	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	9	*N/A	""	""	""	""	""	Q1-2021
509	509	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	""	Q1-2021
510	510	SHIP CONSTRUCTION TURNKEY	Galway County	Garraí Mhic Aodha, Tubber Road, Gort (Phase 1)	9	*N/A	""	""	""	""	""	Q4-2021
511	511	SHIP CONSTRUCTION TURNKEY	Galway County	Tullahill, Loughrea	9	*N/A	""	""	""	""	""	Q4-2021
512	512	SHIP CONSTRUCTION TURNKEY	Galway County	Limehill, Dunlo, Ballinasloe (Corrán Eiscir Riada)	17	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
513	513	SHIP CONSTRUCTION TURNKEY	Galway County	Garraí Mhic Aodha, Tubber Road, Gort (Phase 2)	18	*N/A	""	""	""	""	""	Q4-2021
514	514	SHIP CONSTRUCTION TURNKEY	Galway County	Cullairbaun, Athenry	14	*N/A	""	""	""	""	Q4-2021	""
515	515	SHIP CONSTRUCTION TURNKEY	Galway County	Limehill, Dunlo, Ballinasloe (Corrán Eiscir Riada)	15	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
516	516	SHIP CONSTRUCTION TURNKEY	Galway County	Garraí Glas, Ballydavid South, Athenry	7	N/A	""	""	""	""	Q2-2021	""
517	517	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	5	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
518	518	SHIP CONSTRUCTION TURNKEY	Galway County	Cullairbaun, Athenry	13	*N/A	""	""	""	""	Q4-2021	""
519	519	SHIP CONSTRUCTION TURNKEY	Galway County	Circular Road & Dublin Road, Tuam	10	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
520	520	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	24	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
521	521	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	21	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
522	522	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	4	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
523	523	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	8	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
524	524	SHIP CONSTRUCTION SINGLE STAGE	Galway County	Claremount, Oughterard	4	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
525	525	SHIP CONSTRUCTION SINGLE STAGE	Galway County	Corralough, Williamstown (SRD)	1	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
526	526	SHIP CONSTRUCTION RENEWAL	Galway County	Dunlo Hill, Ballinasloe	11	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
527	527	SHIP CONSTRUCTION	Galway County	Weir Road, Tuam	30	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
528	528	SHIP CONSTRUCTION	Galway County	Gort na gCloch, Hospital Road, Clifden	18	*N/A	""	""	""	""	Q4-2020	""
529	529	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	18	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
530	530	SHIP CONSTRUCTION	Galway County	Caisleán Raithlín, Ardrahan	10	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
531	531	SHIP CONSTRUCTION	Galway County	Barrack Street, Loughrea	5	*N/A	""	""	""	""	""	Q3-2021
532	532	SHIP CONSTRUCTION	Galway County	Garraí Ghuaire, Cartron, Kinvara	10	*N/A	""	""	""	""	Q3-2021	""
533	533	SHIP CONSTRUCTION	Galway County	Fána Bhuí, Tuam (Phase 1 )	16	*N/A	""	""	""	""	""	Q4-2021
534	534	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige, Roundstone	6	*N/A	""	""	""	""	""	Q1-2021
535	535	SHIP CONSTRUCTION	Galway County	Ballyglass, Ardrahan (SRD)	1	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
536	536	SHIP CONSTRUCTION	Galway County	Woodpark, Portumna (SRD)	1	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
537	537	SHIP CONSTRUCTION	Galway County	Carrowmore West, Clontuskert, Ballinasloe (SRD)	1	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
538	538	SHIP CONSTRUCTION	Galway County	Woodfield, Dunmore (SRD)	1	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
539	539	SHIP CONSTRUCTION	Galway County	Knockaloura West, Brownsgrove, Tuam (SRD)	1	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
540	540	SHIP CONSTRUCTION	Galway County	Creggaturlough, Craughwell (SRD)	1	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
541	541	SHIP CONSTRUCTION	Galway County	Gort na gCloch, Hospital Road, Clifden	8	*N/A	""	""	""	""	Q4-2020	""
542	542	SHIP CONSTRUCTION	Galway County	Fána Bhuí, Tuam (Phase 2)	10	*N/A	""	""	""	""	Q4-2020	""
543	543	SHIP CONSTRUCTION	Galway County	Fána Bhuí, Tuam (Phase 3)	22	*N/A	""	""	""	""	Q4-2020	""
544	544	SHIP CONSTRUCTION	Galway County	Ballymoe	8	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
545	545	SHIP CONSTRUCTION	Galway County	Droim na Gaoithe, Baile Chláir (Claregalway)	45	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
546	546	SHIP CONSTRUCTION	Galway County	Cosmona, Loughrea	40	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
547	547	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	""	""	""	""	Q1-2022
548	548	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhíl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
549	549	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
550	550	CAS CONSTRUCTION	Galway County	Mountbellew	5	Túath Housing Association Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
551	551	CAS CONSTRUCTION	Galway County	Springfield, Parkmore, Ballinasloe	4	Peter Triest Housing Association Ltd	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
552	552	CAS CONSTRUCTION	Galway County	Shannon Road, Portumna	4	Carraig Dubh Housing Association	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
553	553	CALF TURNKEY	Galway County	Cuirt Dun Leo, Dunlo, Ballinasloe, Co Galway (Phase 1)	24	Clúid Housing	""	""	""	Q4-2021	""	""
554	554	CALF TURNKEY	Galway County	Cuirt Dun Leo, Dunlo, Ballinasloe, Co Galway (Phase 2)	14	Clúid Housing	""	""	""	Q4-2021	""	""
555	555	CALF TURNKEY	Galway County	Gort na Fuinse, Headford, Co. Galway (Phase 1)*	11	Clúid Housing	""	""	""	""	Q2-2021	""
556	556	CALF TURNKEY	Galway County	Gort na Fuinse, Headford, Co. Galway (Phase 2)	14	Clúid Housing	""	""	""	""	Q2-2021	""
557	557	CALF TURNKEY	Galway County	Oranhill, Oranmore, Co. Galway (Phase 1)*	22	Clúid Housing	""	""	""	Q1-2021	""	""
558	558	CALF TURNKEY	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 2)	12	Clúid Housing	""	""	""	""	""	Q1-2021
559	559	CALF TURNKEY	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 3)*	16	Clúid Housing	""	""	""	""	""	Q2-2021
560	560	CALF TURNKEY	Galway County	Weir road, Tuam, Co. Galway (Phase 1)*	5	Sophia Housing Association Ltd	""	""	""	""	Q3-2021	""
561	561	SHIP CONSTRUCTION TURNKEY	Kerry	Cnoc an Cairn, Chapel Lane, Dingle	2	*N/A	""	""	""	""	""	Q1-2022
562	562	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Glannagilliagh, Caragh Lake, Killorglin (SRD)	1	*N/A	""	""	""	""	Q2-2021	""
563	563	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Carrigcannon, Lyreacrumpane (SRD)	1	*N/A	""	""	""	""	Q2-2021	""
564	564	SHIP CONSTRUCTION SINGLE STAGE	Kerry	Rahinnane, Ventry (SRD)	1	*N/A	""	""	""	""	Q2-2021	""
565	565	SHIP CONSTRUCTION DESIGN BUILD	Kerry	Rathmore/Barraduff	20	*N/A	""	""	""	""	""	Q2-2021
566	566	SHIP CONSTRUCTION	Kerry	Glenach, Ballybunion	20	*N/A	""	""	""	""	""	Q1-2021
567	567	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	61	*N/A	""	""	""	""	Q3-2020	""
568	568	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	""	""	""	Q1-2021
569	569	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	22	*N/A	""	""	""	""	""	Q3-2021
570	570	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	21	*N/A	""	""	""	""	Q3-2020	""
571	571	SHIP CONSTRUCTION	Kerry	Croogorts, Tralee	30	*N/A	""	""	""	""	Q3-2020	""
572	572	SHIP CONSTRUCTION	Kerry	Rock Rd., Killarney	10	*N/A	""	""	""	""	Q3-2020	""
573	573	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 4)	14	*N/A	""	""	""	""	""	Q1-2021
574	574	SHIP CONSTRUCTION	Kerry	Baile an Gharraí, Lixnaw (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2021
575	575	SHIP CONSTRUCTION	Kerry	Woodview Place, Tarbert	22	*N/A	""	""	""	""	Q2-2021	""
576	576	SHIP CONSTRUCTION	Kerry	Marconi South, Ballybunion	14	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
577	577	SHIP CONSTRUCTION	Kerry	Rahoonane, Tralee (New Site)	8	*N/A	""	""	""	""	Q2-2021	""
578	578	SHIP CONSTRUCTION	Kerry	Rusheen, Ballylongford	7	*N/A	""	""	""	""	Q4-2021	""
579	579	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 5)	14	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
580	580	SHIP CONSTRUCTION	Kerry	Matt Talbot Road, Tralee	27	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
581	581	SHIP CONSTRUCTION	Kerry	Locke's Shop, Mitchel's Rd, Tralee	8	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
582	582	SHIP CONSTRUCTION	Kerry	Marian Terrace, Ballyheigue	9	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
583	583	SHIP CONSTRUCTION	Kerry	Bridge Rd, Abbeydorney	1	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
584	584	SHIP CONSTRUCTION	Kerry	Hawley Park Apartments, Tralee	16	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
585	585	SHIP CONSTRUCTION	Kerry	SRD at Emlaghmore, Caherciveen, Co Kerry	1	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
586	586	SHIP CONSTRUCTION	Kerry	SRD at Garfinny, Dingle, Co Kerry	1	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
587	587	SHIP CONSTRUCTION	Kerry	SRD at Gortadrislig, Lixnaw, Co Kerry	1	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
588	588	SHIP CONSTRUCTION	Kerry	SRD at Kells, Caherciveen, Co Kerry	1	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
589	589	SHIP CONSTRUCTION	Kerry	Ballybeg, Dingle, Co Kerry	37	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
590	590	CAS CONSTRUCTION TURNKEY	Kerry	Firies Hall, Firies	14	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
591	591	CAS CONSTRUCTION TURNKEY	Kerry	Turnkey at Firies Hall, Firies, Co Kerry	4	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
592	592	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	""	""	""	Q1-2021
593	593	CAS CONSTRUCTION	Kerry	Chamfers Place (Mitchels road, Tralee)	18	Cluid Housing Association	""	""	""	""	Q2-2021	""
594	594	CALF TURNKEY	Kerry	Apts 52-66 Fels Point, Dan Spring Road, Tralee, Co Kerry (Phase 1)	15	Focus Housing Association CLG	""	""	""	Q2-2022	""	""
595	595	CALF TURNKEY	Kerry	Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 1)	28	Clúid Housing	""	""	""	""	Q4-2020	""
596	596	CALF TURNKEY	Kerry	Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 2)*	26	Clúid Housing	""	""	""	""	Q4-2020	""
597	597	CALF TURNKEY	Kerry	Barraduff, Killarney, Co. Kerry (Phase 4)*	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
598	598	CALF TURNKEY	Kerry	Cahirdown Wood, Listowel, Co. Kerry (Phase 1)*	12	Clúid Housing	""	""	""	""	Q3-2020	""
599	599	CALF TURNKEY	Kerry	Cahirdown Wood, Listowel, Co. Kerry (Phase 2)	26	Clúid Housing	""	""	""	""	Q3-2020	""
600	600	CALF TURNKEY	Kerry	Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 1)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
601	601	CALF TURNKEY	Kerry	Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 2)	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
602	602	CALF TURNKEY	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 4)	1	Respond	""	""	""	""	""	Q2-2021
603	603	CALF TURNKEY	Kerry	Hunters Lodge, Hunters Wood, Ballyseedy, Tralee, Co. Kerry (Phase 1)	10	Clúid Housing	""	""	""	""	Q3-2021	""
604	604	CALF TURNKEY	Kerry	Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 1)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
605	605	CALF TURNKEY	Kerry	Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 2)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
606	606	CALF TURNKEY	Kerry	Lios Ard, Lisloose, Tralee, Co. Kerry (Phase 1)	28	Clúid Housing	""	""	""	""	""	Q3-2021
607	607	CALF TURNKEY	Kerry	Moanmore, Pound Road, Castleisland, Co. Kerry (Phase 1)*	14	Clúid Housing	""	""	""	""	""	Q4-2021
608	608	CALF TURNKEY	Kerry	Orglan Heights, Ardmoneel, Killorglin (Phase 1)*	30	Clúid Housing	""	""	""	Q3-2021	""	""
609	609	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q2-2021
610	610	SHIP CONSTRUCTION TURNKEY	Kildare	Fitzgerald Close, Greenfield, Maynooth	1	*N/A	""	""	""	""	""	Q2-2021
611	611	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	2	*N/A	""	""	""	""	""	Q1-2021
612	612	SHIP CONSTRUCTION TURNKEY	Kildare	Abbotsfield Clane	1	*N/A	""	""	""	""	""	Q2-2021
613	613	SHIP CONSTRUCTION TURNKEY	Kildare	Old Mill Race, Monasterevin	9	*N/A	""	""	""	""	Q4-2019	""
614	614	SHIP CONSTRUCTION TURNKEY	Kildare	Hemmingway Park, Clane	13	*N/A	""	""	""	""	""	Q3-2021
615	615	SHIP CONSTRUCTION TURNKEY	Kildare	Hemmingway Park, Clane	10	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
616	616	SHIP CONSTRUCTION TURNKEY	Kildare	Coolaghknock Green, Kildare Town	2	*N/A	""	""	""	""	""	Q2-2021
617	617	SHIP CONSTRUCTION TURNKEY	Kildare	Newtown, Ardclough Rd, Celbridge	49	*N/A	""	""	""	""	Q2-2021	""
618	618	SHIP CONSTRUCTION TURNKEY	Kildare	Kildare Road, Rathangan	9	*N/A	""	""	""	""	Q1-2021	""
619	619	SHIP CONSTRUCTION TURNKEY	Kildare	Abbotsfield, Clane	2	*N/A	""	""	""	""	""	Q3-2021
620	620	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q4-2021
621	621	SHIP CONSTRUCTION TURNKEY	Kildare	Fitzgerald Close, Greenfield, Maynooth	1	*N/A	""	""	""	""	""	Q4-2021
622	622	SHIP CONSTRUCTION TURNKEY	Kildare	Williams Grove, Ardclough	2	*N/A	""	""	""	""	""	Q4-2021
623	623	SHIP CONSTRUCTION TURNKEY	Kildare	Millstream Court, Kilcullen	1	*N/A	""	""	""	""	""	Q4-2021
624	624	SHIP CONSTRUCTION SINGLE STAGE	Kildare	Patrician Avenue, Naas	3	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
625	625	SHIP CONSTRUCTION RENEWAL	Kildare	25 St. Corbans Place, Naas 	1	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
626	626	SHIP CONSTRUCTION DESIGN BUILD	Kildare	Old Greenfield Road, Maynooth	65	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
627	627	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
628	628	SHIP CONSTRUCTION	Kildare	Newtown House, Leixlip	4	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
629	629	SHIP CONSTRUCTION	Kildare	Coill Dubh	10	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
630	630	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	39	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
631	631	SHIP CONSTRUCTION	Kildare	Ambassador Site, Kill	33	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
632	632	SHIP CONSTRUCTION	Kildare	Carbury	5	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
633	633	SHIP CONSTRUCTION	Kildare	St. Evins Park Monasterevin	16	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
634	634	SHIP CONSTRUCTION	Kildare	Castle Park, Athy	5	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
635	635	SHIP CONSTRUCTION	Kildare	Oldtown Mill, Celbridge	57	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
636	636	SHIP CONSTRUCTION	Kildare	Old Caragh Road, Nass	58	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
637	637	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
638	638	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
639	639	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	""	""	""	Q2-2021
640	640	CAS CONSTRUCTION	Kildare	St. John's Convent, New Street, Rathangan	27	Sophia Housing Association Ltd	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
641	641	CAS CONSTRUCTION	Kildare	Dominican Lands, Athy	34	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
642	642	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	""	""	""	Q4-2021
643	643	PUBLIC PRIVATE PARTNERSHIP (Bundle 3)	Kildare	Ardrew, Athy, Co. Kildare	73	*N/A	""	Q4-2021	""	""	""	""
644	644	CALF TURNKEY	Kildare	1 unit, Loughlion Green, Kildare Town (Phase 1)	1	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
645	645	CALF TURNKEY	Kildare	15 units, Ledwill Park, Kilcock, Co. Kildare (Phase 1)	15	Clúid Housing	""	""	""	""	""	Q4-2021
646	646	CALF TURNKEY	Kildare	2 units, Ledwill Park, Kilcock, Co. Kildare (Phase 1)	2	Clúid Housing	""	""	""	""	""	Q4-2021
647	647	CALF TURNKEY	Kildare	Belin Woods, Newbridge, Co. Kildare (Phase 1)*	30	Tuath Housing Association	""	""	""	""	Q3-2021	""
648	648	CALF TURNKEY	Kildare	Belin Woods, Newbridge, Co. Kildare (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q3-2021	""
649	649	CALF CONSTRUCTION	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	Tuath Housing Association	""	""	""	""	Q1-2020	""
650	650	CALF TURNKEY	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 2)*	17	Tuath Housing Association	""	""	""	""	""	Q4-2021
651	651	CALF CONSTRUCTION	Kildare	Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)	35	Respond	""	""	""	""	Q1-2021	""
652	652	CALF TURNKEY	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 1)*	21	Clúid Housing	""	""	""	""	""	Q1-2021
653	653	CALF TURNKEY	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 2)	19	Clúid Housing	""	""	""	""	""	Q2-2021
654	654	CALF TURNKEY	Kildare	Kilbelin Abbey, Kildare, Phase 1 (Phase 1)*	4	Clúid Housing	""	""	""	""	""	Q1-2021
655	655	CALF TURNKEY	Kildare	Kilbelin Abbey, Kildare, Phase 2 (Phase 1)*	4	Clúid Housing	""	""	""	""	Q2-2019	""
656	656	CALF TURNKEY	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	27	Clúid Housing	""	""	""	""	""	Q3-2021
657	657	CALF TURNKEY	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	3	Clúid Housing	""	""	""	""	""	Q4-2021
658	658	CALF TURNKEY	Kildare	Leinster Square, Dublin Street, Kildare Town, Co Kildare (Phase 1)*	4	Clanmil Housing Association Ireland	""	""	""	""	""	Q3-2021
659	659	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 3)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
660	660	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 4)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
661	661	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 5)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
662	662	CALF TURNKEY	Kildare	Main Street, Prosperous, Clane, Co. Kildare (Phase 1)*	16	Clanmil Housing Association Ireland	""	""	""	""	Q4-2020	""
663	663	CALF TURNKEY	Kildare	Mariavilla, Maynooth, Co. Kildare (Phase 1)*	11	Tuath Housing Association	""	""	""	""	""	Q4-2021
664	664	CALF TURNKEY	Kildare	Melitta Road, Co. Kildare (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	Q2-2022	""	""
665	665	CALF TURNKEY	Kildare	Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 1)*	9	Tuath Housing Association	""	""	""	""	Q4-2019	""
666	666	CALF TURNKEY	Kildare	Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 2)*	18	Tuath Housing Association	""	""	""	""	Q4-2019	""
667	667	CALF TURNKEY	Kildare	Newtown, Kill, Co. Kildare (Phase 1)*	13	Tuath Housing Association	""	""	""	""	Q4-2020	""
668	668	CALF TURNKEY	Kildare	Newtown, Kill, Co. Kildare (Phase 2)	24	Tuath Housing Association	""	""	""	""	Q4-2020	""
669	669	CALF TURNKEY	Kildare	Newtown, Kill, Co. Kildare (Phase 3)*	2	Tuath Housing Association	""	""	""	""	Q4-2020	""
670	670	CALF TURNKEY	Kildare	Old Dublin Road, Celbridge, Co. Kildare (Phase 1)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2020	""
671	671	CALF TURNKEY	Kildare	Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 1)*	32	Clúid Housing	""	""	""	""	Q2-2021	""
672	672	CALF TURNKEY	Kildare	Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 2)	24	Clúid Housing	""	""	""	""	Q2-2021	""
673	673	CALF TURNKEY	Kildare	Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 3)*	8	Clúid Housing	""	""	""	""	Q2-2021	""
674	674	CALF TURNKEY	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 3)*	16	Clúid Housing	""	""	""	""	""	Q2-2021
675	675	CALF TURNKEY	Kildare	The Paddocks, Newbridge, Kildare  (Phase 1)	26	Clúid Housing	""	""	""	""	""	Q3-2021
676	676	CALF TURNKEY	Kildare	The Paddocks, Newbridge, Kildare  (Phase 2)	33	Clúid Housing	""	""	""	""	""	Q4-2021
677	677	CALF TURNKEY	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)*	18	Respond	""	""	""	""	""	Q2-2021
678	678	CALF TURNKEY	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 3) (Phase 1)	20	Respond	""	""	""	""	Q4-2019	""
679	679	CALF TURNKEY	Kildare	Westfield, Leixlip, Co. Kildare (Phase 1)*	20	Respond	""	""	""	""	""	Q4-2021
680	680	CALF TURNKEY	Kildare	Whitethorn, Naas, Co. Kildare (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q4-2021
681	681	CALF TURNKEY	Kildare	Whitethorn, Naas, Co. Kildare (Phase 2)*	4	Tuath Housing Association	""	""	""	""	""	Q4-2021
682	682	CALF TURNKEY	Kildare	Whitethorn, Naas, Co. Kildare (Phase 3)*	4	Tuath Housing Association	""	""	""	""	Q2-2020	""
683	683	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Court, Hebron Road, Kilkenny	8	*N/A	""	""	""	""	""	Q1-2022
684	684	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Green, Hebron Road, Kilkenny	26	*N/A	""	""	""	""	""	Q1-2022
685	685	SHIP CONSTRUCTION TURNKEY	Kilkenny	Blackwater Grove, Kilmacow	14	*N/A	""	""	""	""	""	Q2-2021
686	686	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Ferrybank, Co. Kilkenny	5	*N/A	""	""	""	""	""	Q4-2021
687	687	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Ferrybank	10	*N/A	""	""	""	""	""	Q1-2022
688	688	SHIP CONSTRUCTION TURNKEY	Kilkenny	Pennefeather Green, Hebron Road, Kilkenny	26	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
689	689	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Inchacarron, Mullinavat	2	*N/A	""	""	""	""	Q1-2022	""
690	690	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Shanganny, Jenkinstown	2	*N/A	""	""	""	""	Q4-2020	""
691	691	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Ayrfield, Granges Road, Kilkenny	6	*N/A	""	""	""	""	""	Q2-2021
692	692	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Old Fire Station, Graiguenamanagh	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
693	693	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Ayrfield, Granges Road, Kilkenny	2	*N/A	""	""	""	""	""	Q1-2022
694	694	SHIP CONSTRUCTION SINGLE STAGE	Kilkenny	Haggardsgreen, Callan	1	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
695	695	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	6	*N/A	""	""	""	""	Q1-2022	""
696	696	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	""	""	""	Q2-2021
697	697	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	""	Q2-2021
698	698	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	18	*N/A	""	""	""	""	""	Q2-2021
699	699	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown, Co. Kilkenny	25	*N/A	""	""	""	""	Q4-2021	""
700	700	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Kennyswell Road, Kilkenny	88	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
701	701	SHIP CONSTRUCTION	Kilkenny	Canal Road, Johnstown, Co. Kilkenny Project 1	5	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
702	702	SHIP CONSTRUCTION	Kilkenny	Canal Road Johnstown Project 2	2	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
703	703	SHIP CONSTRUCTION	Kilkenny	Canal Road Johnstown Project 3	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
704	704	SHIP CONSTRUCTION	Kilkenny	Ladywell, Newtown, Thomastown	33	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
705	705	SHIP CONSTRUCTION	Kilkenny	Weather Station, Granges Road, Kilkenny	6	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
706	706	CAS CONSTRUCTION TURNKEY	Kilkenny	Tinnypark, Callan Road, Kilkenny	6	SOS Kilkenny Housing Association Ltd	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
707	707	CAS CONSTRUCTION TURNKEY	Kilkenny	70-71 Upper Patrick Street, Kilkenny	4	Clanmill Housing Association Ireland	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
708	708	CAS CONSTRUCTION SINGLE STAGE	Kilkenny	Miltown Lodge Phase 2, Johnswell Road, Kilkenny	1	SOS Kilkenny Housing Association Ltd	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
709	709	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	4	Kingsriver Housing Association Limited	""	""	""	""	Q2-2021	""
710	710	CAS CONSTRUCTION	Kilkenny	Red Barn, Patrick Street, Ballyragget	11	Good Shepherd Services Ltd	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
711	711	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	3	Good Shepherd Services Ltd	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
712	712	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	""	""	""	""	Q4-2021	""
713	713	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, Kilkenny	12	Good Shepherd Services Ltd	""	""	""	""	Q2-2021	""
714	714	CAS CONSTRUCTION	Kilkenny	Grennan Villa, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	Q3-2020	""
715	715	CAS CONSTRUCTION	Kilkenny	St. John of god Convent, College Road, Kilkenny	21	Sophia Housing Association Ltd	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
716	716	CAS CONSTRUCTION	Kilkenny	Ladywell Street, Thomastown, Co. Kilkenny	6	Good Shepherd Services Ltd	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
717	717	CAS CONSTRUCTION	Kilkenny	Mill Street, Callan, Co. Kilkenny	12	Kilkenny Voluntary Housing Association	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
718	718	CAS CONSTRUCTION	Kilkenny	Prague House Hall, Freshford, Co. Kilkenny	8	Kilkenny Voluntary Housing Association	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
719	719	CALF TURNKEY	Kilkenny	Cois Na Bearu, Graiguenemanagh, Kilkenny (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
720	720	CALF TURNKEY	Kilkenny	Margaret’s Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	""	""	Q2-2021
721	721	CALF TURNKEY	Kilkenny	Nuncio Road, Kilkenny (Phase 2)*	22	Respond	""	""	""	""	Q4-2018	""
722	722	CALF TURNKEY	Kilkenny	Orchard Close, Kilkenny (Phase 1)*	23	Clúid Housing	""	""	""	""	Q4-2020	""
723	723	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	5	*N/A	""	""	""	""	Q2-2020	""
724	724	SHIP CONSTRUCTION TURNKEY	Laois	Church Ave., Stradbally	20	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
725	725	SHIP CONSTRUCTION TURNKEY	Laois	Bruach Na Habhainn, Killeen, Maganey	3	*N/A	""	""	""	""	""	Q1-2022
726	726	SHIP CONSTRUCTION TURNKEY	Laois	The Orchard, Ballylynan	2	N/A	""	""	""	""	""	Q1-2022
727	727	SHIP CONSTRUCTION TURNKEY	Laois	Market Square, Portarlington	18	N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
728	728	SHIP CONSTRUCTION TURNKEY	Laois	The Orchard Ballylynan	3	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
729	729	SHIP CONSTRUCTION TURNKEY	Laois	Church Avenue, Stradbally	11	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
730	730	SHIP CONSTRUCTION TURNKEY	Laois	Bruach Na Habhainn, Killeen, Maganey	1	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
731	731	SHIP CONSTRUCTION SINGLE STAGE	Laois	Coolroe, Ballybrittas	1	*N/A	""	""	""	""	Q4-2020	""
732	732	SHIP CONSTRUCTION RENEWAL	Laois	Oldcourt Ballylynan	1	N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
733	733	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	""	""	""	Q3-2020	""
734	734	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	""	""	""	""	Q2-2021
735	735	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	""	""	""	Q4-2020	""
736	736	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	""	""	""	Q4-2020	""
737	737	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	""	""	""	Q2-2021
738	738	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
739	739	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	7	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
740	740	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	""	""	""	""	Q4-2020	""
741	741	SHIP CONSTRUCTION	Laois	St Kieran's Park, Errill	14	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
742	742	SHIP CONSTRUCTION	Laois	Clonrooske, Knockmay	11	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
743	743	SHIP CONSTRUCTION	Laois	Carraig Glas, Stradbally	26	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
744	744	SHIP CONSTRUCTION	Laois	Iona,Abbeyleix Rd., Portlaoise	9	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
745	745	SHIP CONSTRUCTION	Laois	Ballyadams	1	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
746	746	SHIP CONSTRUCTION	Laois	Doonane	12	N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
747	747	SHIP CONSTRUCTION	Laois	Durrow	18	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
748	748	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	51	Sophia Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
749	749	CAS CONSTRUCTION	Laois	County Hotel, Portlaoise	10	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
750	750	CALF TURNKEY	Laois	Ballymorris Green, Portarlington, Co Laois (Phase 1)	12	Clúid Housing	""	""	""	""	Q2-2021	""
751	751	CALF TURNKEY	Laois	Ballymorris Green, Portarlington, Co Laois (Phase 2)	20	Clúid Housing	""	""	""	""	Q2-2021	""
752	752	CALF TURNKEY	Laois	Ballymorris Green, Portarlington, Co Laois (Phase 3)	14	Clúid Housing	""	""	""	""	Q2-2021	""
753	753	CALF TURNKEY	Laois	"Bellingham, Portlaoise
 (Phase 4)*"	9	Clúid Housing	""	""	""	""	""	Q1-2021
754	754	CALF TURNKEY	Laois	"Bellingham, Portlaoise
 (Phase 5)*"	6	Clúid Housing	""	""	""	""	""	Q3-2021
755	755	CALF TURNKEY	Laois	Borris Road, Portlaoise, Co. Laois (Phase 4)	9	Tuath Housing Association	""	""	""	""	""	Q1-2021
756	756	CALF TURNKEY	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 1)	14	Clúid Housing	""	""	""	""	Q4-2018	""
757	757	CALF TURNKEY	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 2)*	6	Clúid Housing	""	""	""	""	Q4-2018	""
758	758	CALF TURNKEY	Laois	Clonroosk Abbey, Portlaoise, Co. Laois (Phase 3)	12	Clúid Housing	""	""	""	""	Q4-2018	""
759	759	CALF CONSTRUCTION	Laois	Curragh na Mona, Abbeyleix Rd, Portlaoise, Co. Laois (Phase 1)	39	Respond	""	""	""	Q2-2022	""	""
760	760	CALF TURNKEY	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 3)*	6	North and East Housing Association CLG	""	""	""	""	""	Q2-2021
761	761	CALF TURNKEY	Laois	Goldencroft, Portlaoise, Co. Laois (Phase 1)	13	Clúid Housing	""	""	""	""	Q3-2021	""
762	762	CALF TURNKEY	Laois	Goldencroft, Portlaoise, Co. Laois (Phase 2)	24	Clúid Housing	""	""	""	""	Q3-2021	""
763	763	CALF TURNKEY	Laois	Goldencroft, Portlaoise, Co. Laois (Phase 3)	30	Clúid Housing	""	""	""	""	Q3-2021	""
764	764	CALF TURNKEY	Laois	Harpurs Lane, Portlaoise, Co. Laois (Phase 1)*	44	Respond	""	""	""	""	Q2-2021	""
765	765	CALF CONSTRUCTION	Laois	Hepburn Court, Ballyfin Rd, Maryborough, Portlaoise, Co. Laois (Phase 1)	54	Clúid Housing	""	""	""	Q2-2022	""	""
766	766	CALF TURNKEY	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 1)	10	Clúid Housing	""	""	""	""	""	Q3-2021
767	767	CALF TURNKEY	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 2)	10	Clúid Housing	""	""	""	""	Q3-2018	""
768	768	CALF TURNKEY	Laois	Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
769	769	CALF TURNKEY	Laois	Phase 2 The Glen, Kilnacourt, Portarlington, Co Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
770	770	CALF TURNKEY	Laois	Phase 3 The Glen, Kilnacourt, Portarlington, Co Laois. (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2021
771	771	CALF TURNKEY	Laois	Rathillion, Killeshin, Co. Laois (Phase 1)*	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
772	772	CALF TURNKEY	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 1)	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
773	773	CALF TURNKEY	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 2)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
774	774	CALF TURNKEY	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 3)*	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
775	775	CALF TURNKEY	Laois	The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 1)*	15	Clúid Housing	""	""	""	""	Q1-2020	""
776	776	CALF TURNKEY	Laois	The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 2)*	40	Clúid Housing	""	""	""	""	Q1-2020	""
777	777	CALF TURNKEY	Laois	The Meadows, Mountrath Road, Portlaoise, Co. Laois (Phase 1)*	48	Clúid Housing	""	""	""	""	Q1-2022	""
778	778	CALF TURNKEY	Laois	The Springs, Kilminchy, Portlaoise, Co Laois (Phase 1)*	24	Clúid Housing	""	""	""	""	Q2-2021	""
779	779	CALF TURNKEY	Laois	The Springs, Kilminchy, Portlaoise, Co Laois (Phase 2)	19	Clúid Housing	""	""	""	""	Q2-2021	""
780	780	SHIP CONSTRUCTION TURNKEY	Leitrim	Church Lane, Ballinamore	9	*N/A	""	""	""	""	""	Q4-2021
781	781	SHIP CONSTRUCTION TURNKEY	Leitrim	Druminshingore, Newtowngore	2	*N/A	""	""	""	""	""	Q4-2021
782	782	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Mohill	2	*N/A	""	""	""	""	""	Q1-2021
783	783	SHIP CONSTRUCTION TURNKEY	Leitrim	Lough Meen Estate, Drumkeerin	2	*N/A	""	""	""	""	""	Q4-2021
784	784	SHIP CONSTRUCTION TURNKEY	Leitrim	Commons Lane, Manorhamilton	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
785	785	SHIP CONSTRUCTION TURNKEY	Leitrim	Cluain Oir, Liscara, Carrick on Shannon	2	*N/A	""	""	""	""	""	Q2-2021
786	786	SHIP CONSTRUCTION TURNKEY	Leitrim	Manorhamilton & Carrigallen	2	*N/A	""	""	""	""	""	Q3-2021
787	787	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	Breffni Cres., 53 St. Patricks Park Site, Carrick on Shannon	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
788	788	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	Druminshingore Td., Newtowngore	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
789	789	SHIP CONSTRUCTION SINGLE STAGE	Leitrim	Dromahair Td., Dromahair	4	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
790	790	SHIP CONSTRUCTION RENEWAL	Leitrim	Sean McDermott St., Manorhamilton	4	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
791	791	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	""	""	""	Q4-2021
792	792	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 3)	5	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
793	793	SHIP CONSTRUCTION	Leitrim	Townparks, Carrick on Shannon	12	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
794	794	SHIP CONSTRUCTION	Leitrim	Lahard, Ballinamore	10	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
795	795	SHIP CONSTRUCTION	Leitrim	Kilboderry Td., Carrick on Shannon	18	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
796	796	SHIP CONSTRUCTION TURNKEY	Limerick	Redgate Close, Old Cratloe Road, Limerick City	14	*N/A	""	""	""	""	Q1-2020	""
797	797	SHIP CONSTRUCTION TURNKEY	Limerick	Gortboy, Charleville Road, KiImallock	24	*N/A	""	""	""	""	""	Q1-2022
798	798	SHIP CONSTRUCTION TURNKEY	Limerick	Knocklong	5	*N/A	""	""	""	""	Q2-2021	""
799	799	SHIP CONSTRUCTION TURNKEY	Limerick	Gortboy, Charleville Road, Killmallock, Co Limerick	9	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
800	800	SHIP CONSTRUCTION DESIGN BUILD	Limerick	Old Christians Site, Rathbane	43	*N/A	""	""	""	""	""	Q2-2021
801	801	SHIP CONSTRUCTION DESIGN BUILD	Limerick	Barnakyle, Patrickswell (Site 2)	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
802	802	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	""	""	""	Q1-2022
803	803	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	""	""	""	Q4-2020	""
804	804	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	""	""	""	Q3-2019	""
805	805	SHIP CONSTRUCTION	Limerick	Deerpark, Adare	13	*N/A	Stage 1 approved Q2-2015, outline design and costs being prepared.	""	""	""	""	""
806	806	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	""	""	Q3-2020	""
807	807	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
808	808	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	""	""	""	""	Q1-2021
809	809	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	""	""	""	""	Q2-2021
810	810	SHIP CONSTRUCTION	Limerick	Knocklong	12	*N/A	""	""	""	""	Q3-2021	""
811	811	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	4	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
812	812	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
813	813	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhills Road	3	*N/A	""	""	""	""	""	Q1-2022
814	814	SHIP CONSTRUCTION	Limerick	Clueing Dara, Broadford, Limerick	18	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
815	815	SHIP CONSTRUCTION	Limerick	Sycamore Crescent, Newcastle West, Co Limerick	21	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
816	816	SHIP CONSTRUCTION	Limerick	Radharc an Ghleanna, Mountcollins	4	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
817	817	SHIP CONSTRUCTION	Limerick	O’Connor Park, Ardagh, Co. Limerick	8	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
818	818	SHIP CONSTRUCTION	Limerick	Church Glen, Ballylanders, Co. Limerick	9	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
819	819	SHIP CONSTRUCTION	Limerick	Radharc Cillin, Kilfinane, Co. Limerick	10	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
820	820	SHIP CONSTRUCTION	Limerick	Ballycummin Road, Raheen, Co. Limerick	19	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
821	821	SHIP CONSTRUCTION	Limerick	Brugh na Deise, Bruff, Co Limerick	17	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
822	822	SHIP CONSTRUCTION	Limerick	Quinns Cross, Skehacreggaun, Mungret, Limerik.	24	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
823	823	SHIP CONSTRUCTION	Limerick	Deerpark, Adare, Co Limerick	18	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
824	824	SHIP CONSTRUCTION	Limerick	Sycamore Crescent, Newcastle West, Co Limerick	10	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
825	825	REGENERATION	Limerick	Sheep / Athlunkards Street	8	Túath Housing Association Ltd	""	""	Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.	""	""	""
826	826	REGENERATION	Limerick	Churchfield (Phase 2)	38	Cluid Housing Association	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
827	827	REGENERATION	Limerick	Cosgrave Park	30	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
828	828	REGENERATION	Limerick	Orchard Site	27	Oaklee Housing Trust	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
829	829	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Túath Housing Association Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
830	830	REGENERATION	Limerick	45A-46A Cliona Park	2	*N/A	""	""	""	""	""	Q3-2021
831	831	REGENERATION	Limerick	Dalgaish Park	27	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
832	832	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	16	Croom Voluntary Housing Association Ltd	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
833	833	CAS CONSTRUCTION	Limerick	Cappamore	10	Cappamore Housing Association Ltd	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
834	834	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
835	835	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	12	Peter McVerry Trust Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
836	836	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
837	837	CAS CONSTRUCTION	Limerick	McGarry House, 7 Alphonsus Street	8	Arlington Novas Ireland Ltd	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
838	838	CAS CONSTRUCTION	Limerick	47 & 48 Main Street, Croom, Limerick	4	Croom Voluntary Housing Association Ltd	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
839	839	CAS CONSTRUCTION	Limerick	58 Henry Street	5	Simon Community : Midwest Simon	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
840	840	CAS CONSTRUCTION	Limerick	Infills Carew Park, Southhill and Moyross 	14	Peter McVerry Trust Ltd	""	""	""	""	Q1-2021	""
841	841	CAS CONSTRUCTION	Limerick	28/29 Lower Gerald Griffin Street, Limerick	4	Peter McVerry Trust Ltd	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
842	842	CAS CONSTRUCTION	Limerick	42 St Joseph's Street, Limerick	3	Peter McVerry Trust Ltd	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
843	843	CAS CONSTRUCTION	Limerick	Nunan's Corner, Tullaha, Broadford, Co Limerick	7	Broadford Voluntary Housing and Community Childcare CLG	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
844	844	CAS CONSTRUCTION	Limerick	Infills Carew Park, Southill and Moyross	24	Peter McVerry Trust Ltd	""	""	""	""	Q1-2021	""
845	845	CALF TURNKEY	Limerick	19 and 20 Castleview Shopping Centre Castleconnell  Limerick (Phase 1)	2	Focus Housing Association CLG	""	""	""	""	""	Q4-2021
846	846	CALF TURNKEY	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 2)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
847	847	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 1)*	52	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
848	848	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 2)	32	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
849	849	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 3)*	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
850	850	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 4)*	34	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
851	851	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 1)*	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
852	852	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 3)*	29	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
853	853	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 4)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
854	854	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 5)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
855	855	CALF TURNKEY	Limerick	Dromsally Woods, Cappamore, Co. Limerick (Phase 1)	5	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
856	856	CALF TURNKEY	Limerick	Mungret Gate, Baunacloka, Mungret, Limerick (Phase 1)	8	Clúid Housing	""	""	""	""	""	Q2-2021
857	857	CALF TURNKEY	Limerick	Mungret Gate, Baunacloka, Mungret, Limerick (Phase 2)*	23	Clúid Housing	""	""	""	""	Q3-2018	""
858	858	CALF TURNKEY	Limerick	Newtown, Castletroy, Limerick (Phase 1)*	31	Clúid Housing	""	""	""	Q2-2021	""	""
859	859	CALF TURNKEY	Limerick	Phase 2 Newtown Meadows, Castletroy, Limerick (Phase 1)*	32	Clúid Housing	""	""	""	Q4-2021	""	""
860	860	CALF TURNKEY	Limerick	Toormore, Main Street, Bruree, Co. Limerick (Phase 1)	16	Clúid Housing	""	""	""	""	""	Q2-2021
861	861	CALF CONSTRUCTION	Limerick	Turragh Crescent, Cappamore, Limerick (Phase 1)	15	Clúid Housing	""	""	""	Q3-2021	""	""
862	862	CALF TURNKEY	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 1)*	19	Clúid Housing	""	""	""	""	Q3-2020	""
863	863	CALF TURNKEY	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 2)	11	Clúid Housing	""	""	""	""	Q3-2020	""
864	864	SHIP CONSTRUCTION TURNKEY	Longford	Slí Corglass, Legga	4	*N/A	""	""	""	""	""	Q1-2021
865	865	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town	8	*N/A	""	""	""	""	""	Q1-2021
866	866	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane, Longford	6	*N/A	""	""	""	""	""	Q3-2021
867	867	SHIP CONSTRUCTION TURNKEY	Longford	O'Hara Site, Connaught Rd.,Longford	14	*N/A	""	""	""	""	Q1-2021	""
868	868	SHIP CONSTRUCTION TURNKEY	Longford	Alder Field, Farnagh Hill (Phase 2)	4	*N/A	""	""	""	""	""	Q4-2021
869	869	SHIP CONSTRUCTION TURNKEY	Longford	Slí Corglass, Legga	4	*N/A	""	""	""	""	""	Q2-2021
870	870	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane, Longford	4	*N/A	""	""	""	""	""	Q2-2021
871	871	SHIP CONSTRUCTION TURNKEY	Longford	Slí Corglass, Legga 	1	*N/A	""	""	""	""	""	Q3-2021
872	872	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Lane, Longford	5	*N/A	""	""	""	""	""	Q2-2021
873	873	SHIP CONSTRUCTION TURNKEY	Longford	St. Patricks Ct., Ballinamuck	8	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
874	874	SHIP CONSTRUCTION TURNKEY	Longford	Alder Field, Farnagh Hill	12	N/A	""	""	""	""	""	Q3-2021
875	875	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane, Longford	6	N/A	""	""	""	""	""	Q4-2021
876	876	SHIP CONSTRUCTION TURNKEY	Longford	Alder Field, Farnagh Hill	4	N/A	""	""	""	""	""	Q4-2021
877	877	SHIP CONSTRUCTION TURNKEY	Longford	Alder Field, Farnagh Hill	3	N/A	""	""	""	""	""	Q4-2021
878	878	SHIP CONSTRUCTION TURNKEY	Longford	Campbell's Drive, Campbell's Lane Longford	2	N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
879	879	SHIP CONSTRUCTION SINGLE STAGE	Longford	24B Congress Terrace, Longford	1	N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
880	880	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	""	""	""	""	Q4-2021
881	881	SHIP CONSTRUCTION	Longford	St.Rita's, Park Road, Longford	11	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
882	882	SHIP CONSTRUCTION	Longford	Fairgreen View, Longford Town	1	*N/A	""	""	""	""	""	Q2-2021
883	883	SHIP CONSTRUCTION	Longford	Cranleymore, Abbeylara	3	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
884	884	SHIP CONSTRUCTION	Longford	Cloonahard, Edgeworthstown	1	*N/A	""	""	""	""	""	Q2-2021
885	885	SHIP CONSTRUCTION	Longford	Woodlands Path, Keenagh	4	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
886	886	SHIP CONSTRUCTION	Longford	Clough Dillons, Keenagh	4	N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
887	887	SHIP CONSTRUCTION	Longford	Radharc Na Muileann, Lanesborough	22	N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
888	888	SHIP CONSTRUCTION	Longford	Cnoc Na Gréine, Granard	6	N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
889	889	CALF CONSTRUCTION	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Tuath Housing Association	""	""	""	Q2-2018	""	""
890	890	SHIP CONSTRUCTION TURNKEY	Louth	‘Gort Bui’, Ballymakenny Road, Drogheda	10	*N/A	""	""	""	""	""	Q1-2021
891	891	SHIP CONSTRUCTION TURNKEY	Louth	‘Gort Bui’, Ballymakenny Road, Drogheda	9	*N/A	""	""	""	""	""	Q2-2021
892	892	SHIP CONSTRUCTION TURNKEY	Louth	‘Gort Bui’, Ballymakenny Road, Drogheda	8	*N/A	""	""	""	""	""	Q2-2021
893	893	SHIP CONSTRUCTION TURNKEY	Louth	Glyde View, Tallanstown	2	*N/A	""	""	""	""	""	Q2-2021
894	894	SHIP CONSTRUCTION TURNKEY	Louth	Termon River, Termonfeckin	1	*N/A	""	""	""	""	""	Q4-2021
895	895	SHIP CONSTRUCTION TURNKEY	Louth	Ellwood, Ballymakenny Road, Drogheda	8	*N/A	""	""	""	""	Q1-2022	""
896	896	SHIP CONSTRUCTION TURNKEY	Louth	Ellwood, Ballymakenny Road, Drogheda	5	*N/A	""	""	""	""	Q1-2022	""
897	897	SHIP CONSTRUCTION TURNKEY	Louth	Ellwood, Ballymakenny Road, Drogheda	5	*N/A	""	""	""	""	Q1-2022	""
898	898	SHIP CONSTRUCTION TURNKEY	Louth	Ellwood, Ballymakenny Road, Drogheda	17	*N/A	""	""	""	""	Q1-2022	""
899	899	SHIP CONSTRUCTION SINGLE STAGE	Louth	Moneymore, Drogheda	1	*N/A	""	""	""	""	Q2-2020	""
900	900	SHIP CONSTRUCTION SINGLE STAGE	Louth	Gort Uaine, Clogherhead	1	*N/A	""	""	""	""	Q3-2020	""
901	901	SHIP CONSTRUCTION SINGLE STAGE	Louth	School Lane, Dunleer	1	*N/A	""	""	""	""	Q3-2020	""
902	902	SHIP CONSTRUCTION SINGLE STAGE	Louth	Doire Beag, Collon	6	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
903	903	SHIP CONSTRUCTION RENEWAL	Louth	CPO Bundle 5 - 26 Castle Road, Dundalk	1	*N/A	""	""	""	""	""	Q1-2021
904	904	SHIP CONSTRUCTION RENEWAL	Louth	CPO Bundle 6 - 6 Moorehall, Ardee	1	*N/A	""	""	""	""	""	Q1-2021
905	905	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2), Drogheda	72	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
906	906	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	""	""	""	""	Q2-2021
907	907	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	93	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
908	908	SHIP CONSTRUCTION	Louth	Muirhevnamor, Dundalk (Phase 1)	11	*N/A	""	""	""	""	Q1-2021	""
909	909	SHIP CONSTRUCTION	Louth	Rathmullen Park, Drogheda	6	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
910	910	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	""	""	""	Q1-2020	""
911	911	CAS CONSTRUCTION TURNKEY	Louth	Liscorrie, Bog Road, Drogheda	12	Túath Housing Association Ltd	""	""	""	""	""	Q2-2021
912	912	CAS CONSTRUCTION	Louth	6 Slieveroe Crescent, Dundalk	1	Cluid Housing Association	""	""	""	""	""	Q4-2021
913	913	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	""	""	""	Q4-2021	""
914	914	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
915	915	CAS CONSTRUCTION	Louth	Coulter Park, Dundalk	7	Túath Housing Association Ltd	""	""	""	""	Q3-2021	""
916	916	CAS CONSTRUCTION	Louth	Four Winds, Mullacapple, Collon	1	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
917	917	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda	4	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
918	918	CAS CONSTRUCTION	Louth	Riverwell Close, Dundalk	1	Respond	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
919	919	CAS CONSTRUCTION	Louth	Highfield, Newry Road, Dundalk (Domestic Violence Refuge)	12	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
920	920	CAS CONSTRUCTION	Louth	10-16 The Alleys, St. Peter's Place, Drogheda	14	Peter McVerry Trust Ltd	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
921	921	CAS CONSTRUCTION	Louth	St Finian's Park, Drogheda	1	St. John of God Housing Association Ltd	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
922	922	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 1)*	16	Tuath Housing Association	""	""	""	""	""	Q1-2021
923	923	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 2)	10	Tuath Housing Association	""	""	""	""	""	Q2-2021
924	924	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 3)	16	Tuath Housing Association	""	""	""	""	""	Q4-2021
925	925	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 4)	11	Tuath Housing Association	""	""	""	""	""	Q4-2021
926	926	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 5)	12	Tuath Housing Association	""	""	""	""	Q1-2020	""
927	927	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 1)	12	Clúid Housing	""	""	""	""	""	Q1-2021
928	928	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 2)*	15	Clúid Housing	""	""	""	""	""	Q3-2021
929	929	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 3)	15	Clúid Housing	""	""	""	""	""	Q4-2021
930	930	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 4)	13	Clúid Housing	""	""	""	""	""	Q4-2021
931	931	CALF TURNKEY	Louth	Connolly Field, Dundalk, Co. Louth (Phase 1)*	30	Fold Housing Association Ireland Ltd	""	""	""	Q2-2022	""	""
932	932	CALF TURNKEY	Louth	Connolly Field, Dundalk, Co. Louth (Phase 2)	40	Fold Housing Association Ireland Ltd	""	""	""	Q2-2022	""	""
933	933	CALF TURNKEY	Louth	Donore Road, Drogheda, Co. Louth (Phase 1)	66	Clúid Housing	""	""	""	""	Q2-2021	""
934	934	CALF TURNKEY	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)*	65	Respond	""	""	""	""	Q4-2020	""
935	935	CALF TURNKEY	Louth	Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 1)*	87	Clúid Housing	""	""	""	""	Q4-2020	""
936	936	CALF TURNKEY	Louth	Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 2)	43	Clúid Housing	""	""	""	""	Q4-2020	""
937	937	CALF TURNKEY	Louth	Fairways Gardens, Dundalk Co Louth (Phase 1)	8	Clúid Housing	""	""	""	""	""	Q4-2021
938	938	CALF TURNKEY	Louth	Halliday Mills, Quay Street, Dundalk, Co. Louth (Phase 1)*	85	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
939	939	CALF TURNKEY	Louth	Harbour View, Coulter Place, Dundalk (Phase 1)	24	Clúid Housing	""	""	""	""	""	Q3-2021
940	940	CALF TURNKEY	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 2)	8	Tuath Housing Association	""	""	""	""	""	Q1-2021
941	941	CALF TURNKEY	Louth	Newfoundwell Road, Drogheda, Co Louth (Phase 1)*	55	Clúid Housing	""	""	""	""	""	Q1-2022
942	942	CALF TURNKEY	Louth	Newfoundwell Road, Drogheda, Co Louth (Phase 2)	39	Clúid Housing	""	""	""	""	Q3-2020	""
943	943	CALF TURNKEY	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 1)*	17	Respond	""	""	""	""	Q4-2020	""
944	944	CALF TURNKEY	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 2)*	23	Respond	""	""	""	""	Q4-2020	""
945	945	CALF TURNKEY	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 3)*	46	Respond	""	""	""	""	Q4-2020	""
946	946	CALF TURNKEY	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 4)*	47	Respond	""	""	""	""	Q4-2020	""
947	947	CALF TURNKEY	Louth	Oriel Heights, Collon, Co. Louth (Phase 1)*	13	North and East Housing Association CLG	""	""	""	Q3-2021	""	""
948	948	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 1)	6	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
949	949	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 2)	9	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
950	950	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 3)	8	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
951	951	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 4)*	10	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
952	952	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 5)*	6	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
953	953	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 6)*	6	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
954	954	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 3)*	13	Tuath Housing Association	""	""	""	""	Q1-2019	""
955	955	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 4)	12	Tuath Housing Association	""	""	""	""	Q1-2019	""
956	956	CALF TURNKEY	Louth	Scotch Hall, Drogheda, Co Louth  (Phase 1)	21	Respond	""	""	""	Q3-2021	""	""
957	957	CALF TURNKEY	Louth	Tierney Street, Ardee, Co. Louth (Phase 1)	5	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2021	""
958	958	CALF TURNKEY	Louth	Tierney Street, Ardee, Co. Louth (Phase 2)	6	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2021	""
959	959	CALF TURNKEY	Louth	Tullybrook, Drogheda, Co. Louth  (Phase 1)*	85	Clúid Housing	""	""	""	""	Q1-2021	""
960	960	SHIP CONSTRUCTION TURNKEY	Mayo	Bunree, Ballina	3	*N/A	""	""	""	""	Q4-2019	""
961	961	SHIP CONSTRUCTION TURNKEY	Mayo	Silver Springs, Claremorris	20	*N/A	""	""	""	""	Q3-2020	""
962	962	SHIP CONSTRUCTION TURNKEY	Mayo	Main St., Charlestown	2	*N/A	""	""	""	""	""	Q4-2021
963	963	SHIP CONSTRUCTION SINGLE STAGE	Mayo	The Boreen, Crossmolina	3	*N/A	""	""	""	""	""	Q4-2021
964	964	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Deel Court, Crossmolina	3	*N/A	""	""	""	""	""	Q4-2021
965	965	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Knockroe, Moygownagh	3	*N/A	""	""	""	""	""	Q4-2021
966	966	SHIP CONSTRUCTION SINGLE STAGE	Mayo	Low Park, Charlestown	3	*N/A	""	""	""	""	""	Q4-2021
967	967	SHIP CONSTRUCTION RENEWAL	Mayo	Main St., Hollymount	1	N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
968	968	SHIP CONSTRUCTION DESIGN BUILD	Mayo	Murrevagh, Mulranney	16	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
969	969	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar - Phase 2	22	*N/A	""	""	""	""	Q1-2022	""
970	970	SHIP CONSTRUCTION	Mayo	Cross	15	*N/A	""	Stage 2 approved Q2-2021, full design/tender being prepared.	""	""	""	""
971	971	SHIP CONSTRUCTION	Mayo	Bonniconlon	5	*N/A	""	""	""	""	""	Q4-2021
972	972	SHIP CONSTRUCTION	Mayo	Cloonkeadagh Road, Kiltimagh	21	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
973	973	SHIP CONSTRUCTION	Mayo	Rehins Fort, Ballina	20	*N/A	""	""	""	""	Q3-2021	""
974	974	SHIP CONSTRUCTION	Mayo	50 Units @ Golf Course Rd., Westport	50	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
975	975	SHIP CONSTRUCTION	Mayo	Ballyglass, Carnacon, Claremorris	5	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
976	976	SHIP CONSTRUCTION	Mayo	Lios na Circe, Saleen, Castlebar - Phase 3	14	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
977	977	SHIP CONSTRUCTION	Mayo	Atlantic Drive ,Belmullet	4	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
978	978	SHIP CONSTRUCTION	Mayo	Liskilleen, Ballinrobe,	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
979	979	SHIP CONSTRUCTION	Mayo	Walsh St., Ballina	9	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
980	980	SHIP CONSTRUCTION	Mayo	Main Street, Ballyvary	12	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
981	981	SHIP CONSTRUCTION	Mayo	Rehins Fort, Foxford Rd., Ballina	30	*N/A	""	""	""	""	Q3-2021	""
982	982	SHIP CONSTRUCTION	Mayo	AchilL Sound	20	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
983	983	CAS CONSTRUCTION	Mayo	Kilbride, Swinford	5	Sophia Housing Association Ltd	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
984	984	CAS CONSTRUCTION	Mayo	Mount St Mary's Convent, Westport	17	Túath Housing Association Ltd	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
985	985	CAS CONSTRUCTION	Mayo	Ellison House, Ellison St., Castlebar	8	Peter McVerry Trust Ltd	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
986	986	CALF TURNKEY	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 1)	4	Tuath Housing Association	""	""	""	""	Q3-2020	""
987	987	CALF TURNKEY	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 2)	4	Tuath Housing Association	""	""	""	""	Q3-2020	""
988	988	CALF TURNKEY	Mayo	Humbert Way, Castlebar, Co. Mayo (Phase 1)	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
989	989	CALF TURNKEY	Mayo	The Sycamores, Ballina (Phase 1)	11	Clúid Housing	""	""	""	""	""	Q2-2021
990	990	SHIP CONSTRUCTION TURNKEY	Meath	The Brambles, Longford rd., Duleek	16	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
991	991	SHIP CONSTRUCTION TURNKEY	Meath	Connaught Street, Athboy	5	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
992	992	SHIP CONSTRUCTION TURNKEY	Meath	Connaught Street, Athboy	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
993	993	SHIP CONSTRUCTION RENEWAL	Meath	Carrick St., Kells	47	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
994	994	SHIP CONSTRUCTION RENEWAL	Meath	Broville, Corballis, Laytown	1	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
995	995	SHIP CONSTRUCTION RENEWAL	Meath	11 Glenidan Court, Enfield	1	*N/A	""	""	""	""	""	Q1-2022
996	996	SHIP CONSTRUCTION RENEWAL	Meath	25 Carrick Street, Kells	1	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
997	997	SHIP CONSTRUCTION	Meath	Staleen Park, Donore	21	*N/A	""	""	""	""	Q4-2020	""
998	998	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	""	""	""	""	Q4-2021
999	999	SHIP CONSTRUCTION	Meath	Farganstown, Navan	84	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
1000	1000	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1001	1001	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	22	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1002	1002	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	15	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1003	1003	SHIP CONSTRUCTION	Meath	Castle Street, Ashbourne - Dept of Education Site	74	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
1004	1004	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	22	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1005	1005	SHIP CONSTRUCTION	Meath	Church Street, Kells, Co. Meath	3	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1006	1006	SHIP CONSTRUCTION	Meath	Haggard Street, Trim, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1007	1007	SHIP CONSTRUCTION	Meath	Pitcher Lane, Kells, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1008	1008	SHIP CONSTRUCTION	Meath	Swan Lane, Balreask	6	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1009	1009	SHIP CONSTRUCTION	Meath	Lagore, Dunshaughlin	42	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1010	1010	SHIP CONSTRUCTION	Meath	Convent Lands, Kildalkey, Athboy	28	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
1011	1011	SHIP CONSTRUCTION	Meath	Ratholdren Court, Navan	26	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1012	1012	SHIP CONSTRUCTION	Meath	Brews Hill, Navan	12	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1013	1013	SHIP CONSTRUCTION	Meath	Newtown, Drumconrath	1	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1014	1014	SHIP CONSTRUCTION	Meath	New Lane, Abbey Lands, Navan, Co. Meath	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1015	1015	CAS CONSTRUCTION TURNKEY	Meath	Bridge Street, Ashbourne, Co Meath  	20	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1016	1016	CAS CONSTRUCTION TURNKEY	Meath	Gainsfield, (Gort Fionnbarra) Commons Road, Navan Co. Meath	6	Túath Housing Association Ltd	""	""	""	""	""	Q2-2021
1017	1017	CAS CONSTRUCTION TURNKEY	Meath	6-7 Knightsbrook Close, Iffernock, Trim	2	Túath Housing Association Ltd	""	""	""	""	""	Q4-2021
1018	1018	CAS CONSTRUCTION	Meath	Women's Refuge, Tailteann Drive, Windtown, Navan	8	Meath Women’s Housing Association CLG	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1019	1019	CAS CONSTRUCTION	Meath	Park Avenue, Church Street, Oldcastle	5	Society of Saint Vincent de Paul	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1020	1020	CALF TURNKEY	Meath	Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 1)*	21	Tuath Housing Association	""	""	""	""	Q3-2020	""
1021	1021	CALF TURNKEY	Meath	Ashewood, Ashbourne, Co Meath (Phase 1)	11	Clúid Housing	""	""	""	""	""	Q4-2021
1022	1022	CALF TURNKEY	Meath	Athboy Road, Navan, Co. Meath (Phase 1)*	63	Respond	""	""	""	""	Q1-2020	""
1023	1023	CALF TURNKEY	Meath	Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 1)*	24	Tuath Housing Association	""	""	""	""	Q1-2021	""
1024	1024	CALF TURNKEY	Meath	Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 2)*	4	Tuath Housing Association	""	""	""	""	Q1-2021	""
1025	1025	CALF TURNKEY	Meath	Colliers Place, Abbey Road, Commons, Duleek, Co. Meath (Phase 1)*	17	North and East Housing Association CLG	""	""	""	""	Q1-2021	""
1026	1026	CALF TURNKEY	Meath	Colliers Place, Abbey Road, Commons, Duleek, Co. Meath (Phase 2)	5	North and East Housing Association CLG	""	""	""	""	Q1-2021	""
1027	1027	CALF TURNKEY	Meath	Frederick Manor, Ashbourne, Co. Meath (Phase 1)*	11	Clúid Housing	""	""	""	""	""	Q1-2021
1028	1028	CALF TURNKEY	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)	7	Tuath Housing Association	""	""	""	""	""	Q1-2021
1029	1029	CALF TURNKEY	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 4)	9	Tuath Housing Association	""	""	""	""	""	Q2-2021
1030	1030	CALF TURNKEY	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 1)	19	Tuath Housing Association	""	""	""	""	""	Q4-2021
1031	1031	CALF TURNKEY	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 2)	15	Tuath Housing Association	""	""	""	""	Q4-2020	""
1032	1032	CALF TURNKEY	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 3)	15	Tuath Housing Association	""	""	""	""	Q4-2020	""
1033	1033	CALF TURNKEY	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 1)	5	Tuath Housing Association	""	""	""	""	""	Q3-2021
1034	1034	CALF TURNKEY	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 2)	5	Tuath Housing Association	""	""	""	""	""	Q3-2021
1035	1035	CALF TURNKEY	Meath	Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 3)	6	Tuath Housing Association	""	""	""	""	""	Q4-2021
1036	1036	CALF TURNKEY	Meath	Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 1)*	11	Tuath Housing Association	""	""	""	""	Q3-2021	""
1037	1037	CALF TURNKEY	Meath	Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 2)*	11	Tuath Housing Association	""	""	""	""	Q3-2021	""
1038	1038	CALF TURNKEY	Meath	Maudlin Vale,  Trim, Co. Meath (Phase 1)	12	Tuath Housing Association	""	""	""	Q2-2022	""	""
1039	1039	CALF TURNKEY	Meath	Maudlin Vale,  Trim, Co. Meath (Phase 2)	14	Tuath Housing Association	""	""	""	Q2-2022	""	""
1040	1040	CALF TURNKEY	Meath	Maudlin Vale,  Trim, Co. Meath (Phase 3)	13	Tuath Housing Association	""	""	""	Q2-2022	""	""
1041	1041	CALF TURNKEY	Meath	Maydenhayes, Donacarney, Co. Meath (Phase 1)*	12	Clúid Housing	""	""	""	""	""	Q3-2021
1042	1042	CALF TURNKEY	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 1)	6	Tuath Housing Association	""	""	""	""	""	Q1-2022
1043	1043	CALF TURNKEY	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 2)	6	Tuath Housing Association	""	""	""	""	""	Q1-2022
1044	1044	CALF TURNKEY	Meath	Oak Hall, Ardee Road, Carlanstown, Co. Meath (Phase 1)	8	Tuath Housing Association	""	""	""	Q2-2022	""	""
1045	1045	CALF TURNKEY	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 2)*	14	Clúid Housing	""	""	""	""	""	Q2-2021
1046	1046	CALF TURNKEY	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 3)	16	Clúid Housing	""	""	""	""	Q4-2019	""
1047	1047	CALF TURNKEY	Meath	Ruxton Oaks, Navan, Co. Meath (Phase 1)*	20	Clúid Housing	""	""	""	""	""	Q4-2021
1048	1048	CALF TURNKEY	Meath	St Marys Dunboyne, Co. Meath (Phase 1)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2021
1049	1049	CALF TURNKEY	Meath	The Maudlins, Trim, Co. Meath (Phase 1)	9	Clúid Housing	""	""	""	""	""	Q1-2021
1050	1050	CALF TURNKEY	Meath	The Willows, Dunshaughlin, Co. Meath (Phase 1)*	96	Clúid Housing	""	""	""	""	Q2-2021	""
1051	1051	CALF TURNKEY	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 3)	2	Tuath Housing Association	""	""	""	""	""	Q3-2021
1052	1052	SHIP CONSTRUCTION TURNKEY	Monaghan	Ard na Radhairc, Carrickmacross	6	*N/A	""	""	""	""	""	Q4-2021
1053	1053	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill Darach, Bree, Castleblayney	30	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1054	1054	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	30	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1055	1055	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockcarrick, Annyalla	30	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1056	1056	SHIP CONSTRUCTION TURNKEY	Monaghan	Ard na Radhairc, Carrickmacross	35	*N/A	""	""	""	""	Q3-2019	""
1057	1057	SHIP CONSTRUCTION SINGLE STAGE	Monaghan	Folly Court, Ballybay	6	*N/A	""	""	""	""	""	Q4-2021
1058	1058	SHIP CONSTRUCTION RENEWAL	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q3-2019	""
1059	1059	SHIP CONSTRUCTION RENEWAL	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	""	""	""	""	Q3-2019	""
1060	1060	SHIP CONSTRUCTION RENEWAL	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	""	""	""	Q3-2019	""
1061	1061	SHIP CONSTRUCTION RENEWAL	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	""	""	""	Q3-2019	""
1062	1062	SHIP CONSTRUCTION RENEWAL	Monaghan	63 Fermanagh St., Clones	3	*N/A	""	""	""	""	Q1-2020	""
1063	1063	SHIP CONSTRUCTION	Monaghan	Lui Na Greine, Scotstown	6	*N/A	""	""	""	""	""	Q4-2021
1064	1064	SHIP CONSTRUCTION	Monaghan	12 Church St., Ballybay	2	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1065	1065	SHIP CONSTRUCTION	Monaghan	Church Hill, Clones	2	*N/A	""	""	""	""	Q2-2021	""
1066	1066	SHIP CONSTRUCTION	Monaghan	13 McCurtain Street, Clones	1	*N/A	""	""	""	""	Q1-2021	""
1067	1067	SHIP CONSTRUCTION	Monaghan	Lui na Greine, Scotstown	26	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1068	1068	SHIP CONSTRUCTION	Monaghan	An Clós, Cornamucklaglass, Ballybay 	7	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1069	1069	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	""	""	Q1-2021	""
1070	1070	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	19	Oaklee Housing Trust	""	""	""	""	""	Q2-2021
1071	1071	CAS CONSTRUCTION	Monaghan	Birch Court Apts., 34 Main Street, Ballybay	4	North ? East Housing Association Ltd	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1072	1072	CALF TURNKEY	Monaghan	"Bree, Castleblayney 
 (Phase 2)"	6	Tuath Housing Association	""	""	""	""	""	Q2-2021
1073	1073	CALF TURNKEY	Monaghan	"Bree, Castleblayney 
 (Phase 3)"	8	Tuath Housing Association	""	""	""	""	""	Q3-2021
1074	1074	CALF TURNKEY	Monaghan	"Bree, Castleblayney 
 (Phase 5)"	3	Tuath Housing Association	""	""	""	""	Q2-2019	""
1075	1075	CALF TURNKEY	Monaghan	"Bree, Castleblayney 
 (Phase 6)"	2	Tuath Housing Association	""	""	""	""	Q2-2019	""
1076	1076	CALF TURNKEY	Monaghan	Drumbear Wood, Monaghan, Co. Monaghan  (Phase 1)*	17	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2022	""
1077	1077	CALF TURNKEY	Monaghan	Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 1)*	20	Tuath Housing Association	""	""	""	Q2-2021	""	""
1078	1078	CALF TURNKEY	Monaghan	Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 2)*	21	Tuath Housing Association	""	""	""	Q2-2021	""	""
1079	1079	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Tuath Housing Association	""	""	""	""	""	Q2-2021
1080	1080	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	6	Tuath Housing Association	""	""	""	""	Q3-2019	""
1081	1081	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	6	Tuath Housing Association	""	""	""	""	Q3-2019	""
1082	1082	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 4)	14	Tuath Housing Association	""	""	""	""	Q3-2019	""
1083	1083	CALF TURNKEY	Monaghan	Part 2, Radharc An Bhri, Bree, Castleblayney, Co. Monaghan (Phase 1)*	2	Tuath Housing Association	""	""	""	""	Q4-2021	""
1084	1084	CALF TURNKEY	Monaghan	Part 2, Radharc An Bhri, Bree, Castleblayney, Co. Monaghan (Phase 2)	8	Tuath Housing Association	""	""	""	""	Q4-2021	""
1085	1085	CALF TURNKEY	Monaghan	Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 1)	8	Tuath Housing Association	""	""	""	""	Q3-2020	""
1086	1086	CALF TURNKEY	Monaghan	Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 2)*	8	Tuath Housing Association	""	""	""	""	Q3-2020	""
1087	1087	CALF TURNKEY	Monaghan	The Meadows, Emy, Emyvale, Co. Monaghan (Phase 1)*	14	Tuath Housing Association	""	""	""	""	Q2-2021	""
1088	1088	SHIP CONSTRUCTION TURNKEY	Offaly	Main Street, Daingean	8	*N/A	""	""	""	""	""	Q4-2021
1089	1089	SHIP CONSTRUCTION TURNKEY	Offaly	Woodfield, Birr	5	*N/A	""	""	""	""	""	Q4-2021
1090	1090	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Clonygowan	2	*N/A	""	""	""	""	""	Q2-2021
1091	1091	SHIP CONSTRUCTION TURNKEY	Offaly	Coolgarry, Walsh Island 	4	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1092	1092	SHIP CONSTRUCTION TURNKEY	Offaly	Mucklagh, Tullamore	8	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1093	1093	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	2	*N/A	""	""	""	""	""	Q1-2021
1094	1094	SHIP CONSTRUCTION TURNKEY	Offaly	Bog Road, Portarlington	28	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1095	1095	SHIP CONSTRUCTION TURNKEY	Offaly	MacRegol Pairc, Birr	4	*N/A	""	""	""	""	""	Q2-2021
1096	1096	SHIP CONSTRUCTION TURNKEY	Offaly	Woodfield, Birr	25	*N/A	""	""	""	Stage 4 approved Q4-2020, the scheme is fully approved.	""	""
1097	1097	SHIP CONSTRUCTION TURNKEY	Offaly	Woodfield, Birr	5	*N/A	""	""	""	""	""	Q1-2022
1098	1098	SHIP CONSTRUCTION RENEWAL	Offaly	1 Newbridge St., Birr	1	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1099	1099	SHIP CONSTRUCTION RENEWAL	Offaly	78 & 110 Church Hill, Tullamore	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1100	1100	SHIP CONSTRUCTION	Offaly	Beechwood Drive, Circular Road, Daingean	9	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1101	1101	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1102	1102	SHIP CONSTRUCTION	Offaly	Beechgrove, Belmont	7	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1103	1103	SHIP CONSTRUCTION	Offaly	Raheen ,Clara	38	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1104	1104	SHIP CONSTRUCTION	Offaly	Elderberry Drive, Moneygall	4	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1105	1105	SHIP CONSTRUCTION	Offaly	Sr. Senan Avenue, Edenderry	4	*N/A	""	""	Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.	""	""	""
1106	1106	SHIP CONSTRUCTION	Offaly	Dargan Drive, Chancery Lane, Tullamore (Phase 2)	20	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1107	1107	SHIP CONSTRUCTION	Offaly	Sycamore Drive, Ballycumber	8	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1108	1108	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean Phase 2	9	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1109	1109	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	Túath Housing Association Ltd	""	""	""	""	""	Q2-2021
1110	1110	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	""	""	""	Q1-2021	""
1111	1111	CAS CONSTRUCTION	Offaly	Presentation Convent, Portarlington	39	Sophia Housing Association Ltd	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1112	1112	CAS CONSTRUCTION	Offaly	Clonamore Hotel, Tullamore	17	Sophia Housing Association Ltd	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
1113	1113	CALF TURNKEY	Offaly	3 units, An Corran, Crinkle, Birr, Co. Offaly (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2021
1114	1114	CALF CONSTRUCTION	Offaly	Kearney’s Field, Tullamore, Co. Offaly (Phase 1)	41	Oaklee Housing	""	""	""	""	Q2-2021	""
1115	1115	CALF CONSTRUCTION	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	Tuath Housing Association	""	""	""	""	""	Q2-2021
1116	1116	CALF TURNKEY	Offaly	Rahan Road, Tullamore, Co. Offaly (Phase 1)*	26	Clúid Housing	""	""	""	""	Q4-2020	""
1117	1117	CALF TURNKEY	Offaly	The Hawthorns, Arden Road, Tullamore, Co. Offaly (Phase 1)	16	Clúid Housing	""	""	""	""	Q1-2020	""
1118	1118	SHIP CONSTRUCTION TURNKEY	Roscommon	Esker Lawns, Old Tuam Rd, Monksland,	27	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1119	1119	SHIP CONSTRUCTION SINGLE STAGE	Roscommon	The Meadows, Castlerea 	2	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1120	1120	SHIP CONSTRUCTION RENEWAL	Roscommon	Ardnanagh ,Roscommon Town	1	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1121	1121	SHIP CONSTRUCTION	Roscommon	Cloonfad	3	*N/A	""	""	""	""	""	Q2-2021
1122	1122	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	""	""	""	""	Q1-2021
1123	1123	SHIP CONSTRUCTION	Roscommon	Meadowbrook, Ballyclare Td., Ballyleague	16	*N/A	""	""	""	""	""	Q4-2021
1124	1124	SHIP CONSTRUCTION	Roscommon	Lisroyne Td., Strokestown	10	*N/A	""	""	""	""	""	Q4-2021
1125	1125	SHIP CONSTRUCTION	Roscommon	Windmill Road, Elphin Road	10	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
1126	1126	SHIP CONSTRUCTION	Roscommon	Lakeview Heights, Bellspark Td., Boyle	6	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
1127	1127	SHIP CONSTRUCTION	Roscommon	Lisnamult, Ardnanagh Td., Roscommon Town	13	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1128	1128	SHIP CONSTRUCTION	Roscommon	Station Rd., Cortober, Ck on Shannon, Co Roscommon	7	N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1129	1129	SHIP CONSTRUCTION	Roscommon	Curlew View, Boyle, Co Roscommon	14	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1130	1130	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	""	""	""	Q2-2021
1131	1131	CALF TURNKEY	Roscommon	Monksland, Athlone, Co. Roscommon (Phase 1)*	35	Tuath Housing Association	""	""	""	""	Q4-2019	""
1132	1132	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	12	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1133	1133	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	15	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1134	1134	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	26	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1135	1135	SHIP CONSTRUCTION TURNKEY	Sligo	Ursuline Convent	13	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1136	1136	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry (Phase 1)	10	*N/A	""	""	""	""	""	Q4-2021
1137	1137	SHIP CONSTRUCTION	Sligo	Dromore West 	10	*N/A	""	""	""	""	""	Q4-2021
1138	1138	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
1139	1139	SHIP CONSTRUCTION	Sligo	SRD at Crowagh, Dromore West	1	*N/A	""	""	""	""	""	Q4-2021
1140	1140	SHIP CONSTRUCTION	Sligo	Gormley Park, Bunnanadden	6	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1141	1141	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry (Phase 2) & The Green Rd,	19	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1142	1142	SHIP CONSTRUCTION	Sligo	Geldof Drive & Centre Park, Cranmore, Sligo	30	*N/A	Stage 1 approved Q4-2020, outline design and costs being prepared.	""	""	""	""	""
1143	1143	CAS CONSTRUCTION TURNKEY	Sligo	Avena, Ballisodare, Co Sligo	6	Túath Housing Association Ltd	""	""	""	""	""	Q1-2022
1144	1144	CAS CONSTRUCTION	Sligo	Killeshin, First Sea Road, Sligo	5	Newgrove Housing Association Ltd	""	""	""	""	Q4-2020	""
1145	1145	PUBLIC PRIVATE PARTNERSHIP (Bundle 3)	Sligo	Rathellen, Finisklin, Co. Sligo	63	*N/A	""	Q4-2021	""	""	""	""
1146	1146	SHIP CONSTRUCTION SINGLE STAGE	South Dublin	37 Greenfort Gardens, Clondalkin	2	*N/A	""	""	""	""	""	Q4-2021
1147	1147	SHIP CONSTRUCTION DESIGN BUILD	South Dublin	St. Marks Avenue, Clondalkin	41	*N/A	""	""	""	""	Q3-2020	""
1148	1148	SHIP CONSTRUCTION DESIGN BUILD	South Dublin	Riversdale, Clondalkin, Dublin 22	22	*N/A	""	""	""	""	Q4-2020	""
1149	1149	SHIP CONSTRUCTION DESIGN BUILD	South Dublin	Riverside Cottages, Templeogue	10	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1150	1150	SHIP CONSTRUCTION DESIGN BUILD	South Dublin	Riversdale, Clondalkin, Dublin 22	21	*N/A	""	""	""	""	Q4-2020	""
1151	1151	SHIP CONSTRUCTION DESIGN BUILD	South Dublin	Grand Canal, Lindisfarne, Clondalkin,	19	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
1152	1152	SHIP CONSTRUCTION	South Dublin	Balgaddy F, Griffeen Avenue, Lucan Co. Dublin	69	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1153	1153	SHIP CONSTRUCTION	South Dublin	St. Catherine’s, Knockmore Avenue, Killinarden, Tallaght	12	*N/A	""	""	""	""	Q4-2020	""
1154	1154	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	""	""	""	Q4-2020	""
1155	1155	SHIP CONSTRUCTION	South Dublin	Nangor Road, Clondalkin, Dublin 22	93	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1156	1156	CAS CONSTRUCTION TURNKEY	South Dublin	Oakridge, Ballynakelly,Edge, Newcastle, Co. Dublin	3	Túath Housing Association Ltd	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1157	1157	CAS CONSTRUCTION TURNKEY	South Dublin	3 Cornerpark Rise	1	Arlington Novas Ireland Ltd	""	""	""	""	""	Q4-2021
1158	1158	CALF TURNKEY	South Dublin	Ballynakelly Rise, Newcastle Boulevard and Graydon Park, Newcastle, County Dublin (Phase 1)*	8	Tuath Housing Association	""	""	""	""	Q1-2020	""
1159	1159	CALF TURNKEY	South Dublin	Ballynakelly Rise, Newcastle Boulevard and Graydon Park, Newcastle, County Dublin (Phase 2)*	8	Tuath Housing Association	""	""	""	""	Q1-2020	""
1160	1160	CALF TURNKEY	South Dublin	Citywest Quarter, Citywest, Dublin 24 (Phase 1)*	32	Tuath Housing Association	""	""	""	""	""	Q2-2021
1161	1161	CALF TURNKEY	South Dublin	Citywest Village House, Citywest Village, D24 (Phase 1)*	36	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2022
1162	1162	CALF TURNKEY	South Dublin	Cloverhill Lodge, Cloverhill Rd, Clondalkin, D22 (Phase 1)*	40	Oaklee Housing	""	""	""	""	Q2-2021	""
1163	1163	CALF TURNKEY	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 2)*	9	Clúid Housing	""	""	""	""	""	Q1-2021
1164	1164	CALF CONSTRUCTION	South Dublin	Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)	40	Clúid Housing	""	""	""	""	Q3-2020	""
1165	1165	CALF TURNKEY	South Dublin	Finians Way, Newcastle South, Newcastle, Co. Dublin (Phase 1)*	2	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2021
1166	1166	CALF TURNKEY	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)	32	Respond	""	""	""	""	""	Q3-2021
1167	1167	CALF TURNKEY	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 2)	38	Respond	""	""	""	""	""	Q3-2021
1168	1168	CALF TURNKEY	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 3)*	24	Respond	""	""	""	""	""	Q4-2021
1169	1169	CALF TURNKEY	South Dublin	Graydon, Newcastle, Co. Dublin (Phase 1)*	8	Tuath Housing Association	""	""	""	""	""	Q4-2021
1170	1170	CALF TURNKEY	South Dublin	Hallwell, Tubber Lane, Adamstown, Co Dublin (Phase 1)*	45	The Iveagh Trust	""	""	""	""	""	Q4-2021
1171	1171	CALF TURNKEY	South Dublin	Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*	24	Respond	""	""	""	""	""	Q4-2021
1172	1172	CALF TURNKEY	South Dublin	Mountain Gate, Kiltipper Rd., Dublin 24 (Phase 1)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	Q1-2022	""	""
1173	1173	CALF CONSTRUCTION	South Dublin	Old Lucan Road, Palmerstown, Dublin 20 (Phase 1)	4	Tuath Housing Association	""	""	""	Q3-2021	""	""
1174	1174	CALF TURNKEY	South Dublin	Phase 2, Aylmer Drive, Aylmer Heath, Newcastle, Co. Dublin (Phase 1)*	17	Respond	""	""	""	""	""	Q2-2021
1175	1175	CALF TURNKEY	South Dublin	Sallypark, Clondalkin, Dublin 22 (Phase 1)*	85	Clúid Housing	""	""	""	""	Q4-2020	""
1176	1176	CALF TURNKEY	South Dublin	San Guida, New Road, Clondalkin, Dublin 22 (Phase 1)*	21	Clúid Housing	""	""	""	""	Q3-2021	""
1177	1177	CALF TURNKEY	South Dublin	"Scholarstown Road, Rathfarnham, Dublin 16


 (Phase 1)*"	14	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q1-2022
1178	1178	CALF CONSTRUCTION	South Dublin	St. Catherine’s, Knockmore Avenue, Killinarden, Tallaght, Dublin 24 (Phase 1)	2	Sophia Housing Association Ltd	""	""	""	""	Q2-2021	""
1179	1179	CALF CONSTRUCTION	South Dublin	The Weir, Whitestown Way, Tallaght, Dublin 24 (Phase 1)	81	Clúid Housing	""	""	""	""	Q2-2021	""
1180	1180	CALF TURNKEY	South Dublin	Willowview, Ballyboden Road, Rathfarnham, Dublin 14 (Phase 1)*	12	Clúid Housing	""	""	""	""	""	Q2-2021
1181	1181	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	18	*N/A	""	""	""	""	Q3-2020	""
1182	1182	SHIP CONSTRUCTION TURNKEY	Tipperary	Ma Charoin, Manna South, Templemore	13	*N/A	""	""	""	""	Q1-2021	""
1183	1183	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	23	*N/A	""	""	""	""	Q3-2020	""
1184	1184	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor Road, Clonmel	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1185	1185	SHIP CONSTRUCTION TURNKEY	Tipperary	Rosanna Close, Tipperary Town	1	*N/A	""	""	""	""	Q3-2020	""
1186	1186	SHIP CONSTRUCTION TURNKEY	Tipperary	Hazel Close, Carrick on Suir	14	*N/A	""	""	""	""	""	Q4-2021
1187	1187	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor	2	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1188	1188	SHIP CONSTRUCTION TURNKEY	Tipperary	Cois Abhainn, Mullinahone	3	*N/A	""	""	""	""	""	Q4-2021
1189	1189	SHIP CONSTRUCTION TURNKEY	Tipperary	Glentara, Roscrea	2	*N/A	""	""	""	""	""	Q4-2021
1190	1190	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor Road, Clonmel	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1191	1191	SHIP CONSTRUCTION TURNKEY	Tipperary	Carrick Beg, Carrick on Suir	22	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1192	1192	SHIP CONSTRUCTION RENEWAL	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	""	""	""	Q4-2020	""
1193	1193	SHIP CONSTRUCTION RENEWAL	Tipperary	Boherclough Street, Cashel	9	*N/A	""	""	Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.	""	""	""
1194	1194	SHIP CONSTRUCTION	Tipperary	Knockanrawley	14	*N/A	""	""	""	""	""	Q1-2021
1195	1195	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	14	*N/A	""	""	""	""	""	Q4-2021
1196	1196	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	10	*N/A	""	""	""	""	""	Q4-2021
1197	1197	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	""	""	""	""	Q4-2021
1198	1198	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	""	""	""	Q3-2020	""
1199	1199	SHIP CONSTRUCTION	Tipperary	Borrisokane	14	*N/A	""	""	""	""	""	Q4-2021
1200	1200	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	""	""	""	Q4-2021	""
1201	1201	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	""	""	""	Q2-2021
1202	1202	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	""	""	""	Q4-2021
1203	1203	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	12	*N/A	""	""	""	""	Q3-2020	""
1204	1204	SHIP CONSTRUCTION	Tipperary	Bansha	14	*N/A	""	""	""	""	Q3-2021	""
1205	1205	SHIP CONSTRUCTION	Tipperary	Ned Hayes Drive, Twomileborris, Thurles	22	*N/A	""	""	""	""	Q3-2021	""
1206	1206	SHIP CONSTRUCTION	Tipperary	Donohill	8	*N/A	""	""	""	""	Q3-2021	""
1207	1207	SHIP CONSTRUCTION	Tipperary	Mullinahone	10	*N/A	""	""	""	""	Q1-2021	""
1208	1208	SHIP CONSTRUCTION	Tipperary	Ballyclerihan	14	*N/A	""	""	""	""	Q3-2021	""
1209	1209	SHIP CONSTRUCTION	Tipperary	Ard Alainn, Moyne	9	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1210	1210	SHIP CONSTRUCTION	Tipperary	Ardcroney	4	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1211	1211	SHIP CONSTRUCTION	Tipperary	Comeragh Drive, Clonmel	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1212	1212	SHIP CONSTRUCTION	Tipperary	Church Street, Templemore	2	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1213	1213	SHIP CONSTRUCTION	Tipperary	Woodview Close, Castle Crescent,  Nenagh	10	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1214	1214	SHIP CONSTRUCTION	Tipperary	Grove Street. Roscrea	6	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1215	1215	SHIP CONSTRUCTION	Tipperary	William Street, Clonmel	4	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1216	1216	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	26	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1217	1217	SHIP CONSTRUCTION	Tipperary	Knockanrawley	14	*N/A	""	""	""	""	""	Q2-2021
1218	1218	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	14	*N/A	""	""	""	""	Q2-2020	""
1219	1219	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	1	*N/A	""	""	""	""	""	Q1-2022
1220	1220	SHIP CONSTRUCTION	Tipperary	Mountain View, Cahir	23	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1221	1221	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	20	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1222	1222	SHIP CONSTRUCTION	Tipperary	William Street, Nenagh	7	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1223	1223	SHIP CONSTRUCTION	Tipperary	Borrisokane	1	*N/A	""	""	""	""	""	Q1-2022
1224	1224	SHIP CONSTRUCTION	Tipperary	Ashbury, Roscrea	10	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1225	1225	SHIP CONSTRUCTION	Tipperary	Fr. Mathew Street, Tipperary Town	4	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1226	1226	SHIP CONSTRUCTION	Tipperary	Mountain View Drive, Cahir	20	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1227	1227	SHIP CONSTRUCTION	Tipperary	Borrisokane	1	N/A	""	""	""	""	Q3-2020	""
1228	1228	CAS CONSTRUCTION TURNKEY	Tipperary	Kichham Street, Carrick en Suir	12	Túath Housing Association Ltd	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1229	1229	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	""	""	""	Q2-2021	""
1230	1230	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	""	""	""	Q2-2021	""
1231	1231	CAS CONSTRUCTION	Tipperary	Main Street, Templemore	14	Templemore Voluntary Housing Association	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1232	1232	CAS CONSTRUCTION	Tipperary	Deerpark Road, Ashwell's Lot	2	SPADE – St. Patrick’s Dwellings for the Elderly	""	""	""	""	Q2-2021	""
1233	1233	CAS CONSTRUCTION	Tipperary	Gort an Oir, Fethard	7	Belmont Park Housing Association Ltd	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1234	1234	CALF TURNKEY	Tipperary	Abbey Court Lodges, Old Dublin Road, Nenagh, Co Tipperary (Phase 1)	12	Focus Housing Association CLG	""	""	""	""	""	Q1-2022
1235	1235	CALF TURNKEY	Tipperary	Abbey Court Lodges, Old Dublin Road, Nenagh, Co Tipperary (Phase 2)	4	Focus Housing Association CLG	""	""	""	""	Q4-2021	""
1236	1236	CALF TURNKEY	Tipperary	Ballygraigue Court, Ballygraigue Road, Nenagh (Phase 1)	5	Clúid Housing	""	""	""	""	Q4-2020	""
1237	1237	CALF TURNKEY	Tipperary	Coopers Lot, Cashel, Co. Tipperary (Phase 1)*	44	Respond	""	""	""	Q1-2022	""	""
1238	1238	CALF TURNKEY	Tipperary	Farranlahassery, Cahir, Co. Tipperary (Phase 1)*	48	Respond	""	""	""	Q2-2022	""	""
1239	1239	CALF TURNKEY	Tipperary	Wallers Lot, East Cashel, Co. Tipperary (Phase 1)*	40	Tuath Housing Association	""	""	""	""	Q4-2021	""
1240	1240	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	13	*N/A	""	""	""	""	""	Q1-2021
1241	1241	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	10	*N/A	""	""	""	""	""	Q2-2021
1242	1242	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	23	*N/A	""	""	""	""	""	Q2-2021
1243	1243	SHIP CONSTRUCTION TURNKEY	Waterford	The Courtyard, Morrissons Road, Waterford City	8	*N/A	""	""	""	""	""	Q2-2021
1244	1244	SHIP CONSTRUCTION TURNKEY	Waterford	Bounds Court, Airport Road, Waterford	15	N/A	""	""	""	""	""	Q1-2022
1245	1245	SHIP CONSTRUCTION TURNKEY	Waterford	Brideview Close, Tallow; Main Street, Aglish, Co. Waterford	6	N/A	""	""	""	""	""	Q4-2021
1246	1246	SHIP CONSTRUCTION TURNKEY	Waterford	Bye Lane, Kilmacthomas	3	*N/A	""	""	""	""	Q1-2021	""
1247	1247	SHIP CONSTRUCTION SINGLE STAGE	Waterford	Apt 1 and Apt 2 Rivercourt, Grattan Quay, Waterford City	2	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1248	1248	SHIP CONSTRUCTION RENEWAL	Waterford	29 The Glen, Waterford City	4	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1249	1249	SHIP CONSTRUCTION RENEWAL	Waterford	22 and 23 Thomas Hill, Waterford	3	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1250	1250	SHIP CONSTRUCTION RENEWAL	Waterford	70 and 71 O'Connell Street, Waterford	5	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1251	1251	SHIP CONSTRUCTION DESIGN BUILD	Waterford	Ballygunner, Waterford City	49	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1252	1252	SHIP CONSTRUCTION DESIGN BUILD	Waterford	Ballynaneashagh, Waterford City	22	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1253	1253	SHIP CONSTRUCTION	Waterford	An Garrán, Crobally Upper, Tramore	50	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1254	1254	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	""	""	""	Q2-2021
1255	1255	SHIP CONSTRUCTION	Waterford	Doyles Street, Waterford City	4	*N/A	""	""	""	""	""	Q4-2021
1256	1256	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	17	*N/A	""	""	""	""	Q3-2021	""
1257	1257	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1258	1258	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
1259	1259	SHIP CONSTRUCTION TURNKEY	Waterford	Radharc na Siuire	3	N/A	""	""	""	""	""	Q1-2022
1260	1260	SHIP CONSTRUCTION	Waterford	Graigueshoneen, Kilmacthomas	16	*N/A	""	""	""	""	""	Q1-2022
1261	1261	SHIP CONSTRUCTION	Waterford	Mount Esker, Ballytruckle Road, Waterford City	14	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1262	1262	SHIP CONSTRUCTION	Waterford	Newgate Street, Waterford City	36	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1263	1263	SHIP CONSTRUCTION	Waterford	Fountain Street, Ferrybank, Waterford	14	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
1264	1264	SHIP CONSTRUCTION	Waterford	Meeting House Lane, Waterford City	6	N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1265	1265	SHIP CONSTRUCTION	Waterford	50-53 Ballytruckle Road, Waterford	11	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1266	1266	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	""	""	Q2-2021
1267	1267	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Oaklee Housing Trust	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1268	1268	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City (Phase 1)	24	*N/A	""	""	""	""	""	Q2-2021
1269	1269	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2021
1270	1270	CALF TURNKEY	Waterford	Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 1)	26	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2021
1271	1271	CALF TURNKEY	Waterford	Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 2)	31	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2019	""
1272	1272	CALF TURNKEY	Waterford	Slí na Coille, Tramore, Co Waterford (Phase 1)*	27	Clúid Housing	""	""	""	""	Q1-2021	""
1273	1273	SHIP DIALOG	Westmeath	Lissywollen, Athlone	55	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1274	1274	SHIP DIALOG	Westmeath	Lissywollen, Athlone	55	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1275	1275	SHIP DIALOG	Westmeath	Lissywollen, Athlone	38	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1276	1276	SHIP DIALOG	Westmeath	Lissywollen, Athlone	22	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1277	1277	SHIP CONSTRUCTION TURNKEY	Westmeath	Austin Friars Street, Mullingar	4	*N/A	""	""	""	""	Q3-2020	""
1278	1278	SHIP CONSTRUCTION TURNKEY	Westmeath	Oakcrest, Ballinderry, Mullingar	8	*N/A	""	""	""	""	Q2-2021	""
1279	1279	SHIP CONSTRUCTION TURNKEY	Westmeath	St. Marys Place, Athlone	9	*N/A	""	""	""	""	Q2-2021	""
1280	1280	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	1	*N/A	""	""	""	""	""	Q2-2021
1281	1281	SHIP CONSTRUCTION TURNKEY	Westmeath	Bellaugh, Athlone	17	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1282	1282	SHIP CONSTRUCTION TURNKEY	Westmeath	The Cedars, Lakepoint, Mullingar	7	*N/A	""	""	""	""	Q2-2021	""
1283	1283	SHIP CONSTRUCTION TURNKEY	Westmeath	The Cedars, Lakepoint, Mullingar	10	*N/A	""	""	""	""	Q2-2021	""
1284	1284	SHIP CONSTRUCTION TURNKEY	Westmeath	The Cedars, Lakepoint, Mullingar	11	*N/A	""	""	""	""	Q2-2021	""
1285	1285	SHIP CONSTRUCTION TURNKEY	Westmeath	Austin Friar Street, Mullingar	6	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1286	1286	SHIP CONSTRUCTION TURNKEY	Westmeath	Athboy Rd, Delvin	6	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1287	1287	SHIP CONSTRUCTION TURNKEY	Westmeath	Kileenboylegan, Moate	6	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1288	1288	SHIP CONSTRUCTION TURNKEY	Westmeath	Mount Carmel Drive, Moate, Westmeath	9	N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1289	1289	SHIP CONSTRUCTION DESIGN BUILD	Westmeath	O'Growney Green, Mullingar	22	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1290	1290	SHIP CONSTRUCTION DESIGN BUILD	Westmeath	Dalton Park, Mullingar	17	*N/A	""	""	""	""	Q1-2022	""
1291	1291	SHIP CONSTRUCTION DESIGN BUILD	Westmeath	Water Street, Castlepollard	8	*N/A	""	""	""	""	Q1-2022	""
1292	1292	SHIP CONSTRUCTION DESIGN BUILD	Westmeath	Ennell Court, Mullingar (Phase 1)	15	*N/A	""	""	""	""	Q1-2022	""
1293	1293	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2021
1294	1294	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	31	*N/A	""	""	""	""	Q2-2021	""
1295	1295	SHIP CONSTRUCTION	Westmeath	Quinlan Park, Athlone	10	*N/A	""	""	""	""	Q4-2021	""
1296	1296	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	2	*N/A	""	""	""	""	""	Q2-2021
1297	1297	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 2)	24	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1298	1298	SHIP CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	32	*N/A	""	Stage 2 approved Q4-2020, full design/tender being prepared.	""	""	""	""
1299	1299	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2021
1300	1300	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	2	*N/A	""	""	""	""	""	Q4-2021
1301	1301	SHIP CONSTRUCTION	Westmeath	Kilmacaugh Rd, Athlone	1	N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1302	1302	SHIP CONSTRUCTION	Westmeath	Cornamaddy, Athlone	108	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1303	1303	SHIP CONSTRUCTION	Westmeath	Water Street, Castlepollard 	1	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1304	1304	SHIP CONSTRUCTION	Westmeath	Belvedere Orphanage, Tyrellspass	6	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1305	1305	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	10	Túath Housing Association Ltd	""	""	""	""	""	Q1-2021
1306	1306	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	17	Túath Housing Association Ltd	""	""	""	""	Q4-2019	""
1307	1307	CAS CONSTRUCTION TURNKEY	Westmeath	Elm Row, Royal Canal, Mullingar	9	Túath Housing Association Ltd	""	""	""	""	Q4-2019	""
1308	1308	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Túath Housing Association Ltd	""	""	""	""	""	Q3-2021
1309	1309	CALF TURNKEY	Westmeath	Ashe Road, Mullingar, Co. Westmeath (Phase 1)*	18	Clúid Housing	""	""	""	""	Q2-2021	""
1310	1310	CALF TURNKEY	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q2-2021
1311	1311	CALF TURNKEY	Westmeath	Bower Hill, Lower Road, Athlone, Co. Westmeath (Phase 1)*	15	Clúid Housing	""	""	""	""	Q2-2021	""
1312	1312	CALF TURNKEY	Westmeath	Charlestown, Mullingar (Phase 1)*	37	Respond	""	""	""	""	Q4-2021	""
1313	1313	CALF TURNKEY	Westmeath	Charlestown, Mullingar (Phase 2)*	62	Respond	""	""	""	""	Q4-2021	""
1314	1314	CALF TURNKEY	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 2)*	23	Clúid Housing	""	""	""	""	""	Q1-2021
1315	1315	CALF TURNKEY	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 3)	8	Clúid Housing	""	""	""	""	""	Q2-2021
1316	1316	CALF TURNKEY	Westmeath	Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 1)*	35	Respond	""	""	""	""	Q4-2021	""
1317	1317	CALF TURNKEY	Westmeath	Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 2)*	27	Respond	""	""	""	""	Q4-2021	""
1318	1318	CALF TURNKEY	Westmeath	Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 3)*	7	Respond	""	""	""	""	Q4-2021	""
1319	1319	CALF TURNKEY	Westmeath	Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 4)*	49	Respond	""	""	""	""	Q4-2021	""
1320	1320	CALF TURNKEY	Westmeath	Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 5)*	12	Respond	""	""	""	""	Q4-2021	""
1321	1321	CALF CONSTRUCTION	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	10	Tuath Housing Association	""	""	""	""	""	Q3-2021
1322	1322	CALF TURNKEY	Westmeath	Garran Geal, Kinnegad, Westmeath (Phase 1)*	24	Tuath Housing Association	""	""	""	""	Q4-2020	""
1323	1323	CALF TURNKEY	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)*	12	Tuath Housing Association	""	""	""	""	""	Q2-2021
1324	1324	CALF TURNKEY	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 1)	4	Tuath Housing Association	""	""	""	""	""	Q1-2021
1325	1325	CALF TURNKEY	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 2)	4	Tuath Housing Association	""	""	""	""	Q3-2019	""
1326	1326	CALF TURNKEY	Westmeath	Springfield Cottages, Mullingar, Co. Westmeath (Phase 1)*	13	Clúid Housing	""	""	""	""	Q4-2021	""
1327	1327	SHIP CONSTRUCTION TURNKEY	Wexford	Airhill, Belvedere Rd, Wexford	7	*N/A	""	""	""	""	""	Q3-2021
1328	1328	SHIP CONSTRUCTION TURNKEY	Wexford	Michael Street, New Ross 	3	*N/A	""	""	""	""	""	Q2-2021
1329	1329	SHIP CONSTRUCTION TURNKEY	Wexford	Ballynaglough, Blackwater	4	*N/A	""	""	""	""	Q4-2019	""
1330	1330	SHIP CONSTRUCTION TURNKEY	Wexford	Tobar Muire, Creagh Gorey	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1331	1331	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Gorey - Phase 2	4	*N/A	""	""	""	""	""	Q4-2021
1332	1332	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock Hill, Wexford	5	*N/A	""	""	""	""	""	Q2-2021
1333	1333	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	5	*N/A	""	""	""	""	""	Q4-2021
1334	1334	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	6	*N/A	""	""	""	""	""	Q4-2021
1335	1335	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	2	*N/A	""	""	""	""	""	Q2-2021
1336	1336	SHIP CONSTRUCTION TURNKEY	Wexford	Ard an Bhile, Healysland, New Ross, Co. Wexford	22	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1337	1337	SHIP CONSTRUCTION TURNKEY	Wexford	Tobar Muire, Creagh Gorey	29	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1338	1338	SHIP CONSTRUCTION TURNKEY	Wexford	Ballynaglough, Blackwater	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1339	1339	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	3	*N/A	""	""	""	""	Q2-2021	""
1340	1340	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	3	*N/A	""	""	""	""	Q2-2021	""
1341	1341	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	4	*N/A	""	""	""	""	Q2-2021	""
1342	1342	SHIP CONSTRUCTION TURNKEY	Wexford	Roxborough Manor	3	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1343	1343	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	2	*N/A	""	""	""	""	""	Q2-2021
1344	1344	SHIP CONSTRUCTION TURNKEY	Wexford	Clonard Little, Wexford 	9	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1345	1345	SHIP CONSTRUCTION TURNKEY	Wexford	Ard an Bhile, Healysland, New Ross, Co. Wexford	21	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1346	1346	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	7	*N/A	""	""	""	""	""	Q1-2022
1347	1347	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock Hill, Wexford	8	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1348	1348	SHIP CONSTRUCTION TURNKEY	Wexford	Haughton Place, New Ross, Co. Wexford	12	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1349	1349	SHIP CONSTRUCTION TURNKEY	Wexford	Castlelands, Ferns, Co. Wexford	20	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1350	1350	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1351	1351	SHIP CONSTRUCTION RENEWAL	Wexford	Ard na Naoimh, Gorey Hill	4	*N/A	Stage 1 approved Q1-2022, outline design and costs being prepared.	""	""	""	""	""
1352	1352	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	22	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1353	1353	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	40	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1354	1354	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	""	Q4-2021
1355	1355	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	6	*N/A	""	""	""	""	Q2-2019	""
1356	1356	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford, Phase 1	23	*N/A	""	""	""	""	Q2-2019	""
1357	1357	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy	17	*N/A	""	""	""	""	""	Q1-2022
1358	1358	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	12	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
1359	1359	SHIP CONSTRUCTION	Wexford	Wexford Street, Gorey	30	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1360	1360	SHIP CONSTRUCTION	Wexford	Bullawn, Irishtown, New Ross	3	*N/A	""	""	""	""	Q3-2021	""
1361	1361	SHIP CONSTRUCTION	Wexford	Ballyhine, Barntown	7	*N/A	""	Stage 2 approved Q1-2021, full design/tender being prepared.	""	""	""	""
1362	1362	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	22	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1363	1363	SHIP CONSTRUCTION	Wexford	Doire Moling estate at Monamolin, Gorey, Co. Wexford	5	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1364	1364	SHIP CONSTRUCTION	Wexford	20 Francis Street, Wexford	2	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1365	1365	SHIP CONSTRUCTION	Wexford	Ballygillane Big, Rosslare Harbour, Co. Wexford	5	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1366	1366	SHIP CONSTRUCTION	Wexford	Grogan’s Road, Wexford Town 	3	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1367	1367	CAS CONSTRUCTION TURNKEY	Wexford	Clonattin, Gorey	6	Túath Housing Association Ltd	""	""	""	""	""	Q2-2021
1368	1368	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown	13	N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1369	1369	CALF TURNKEY	Wexford	67 units, Coolcotts, Wexford (Phase 1)*	67	Clúid Housing	""	""	""	""	Q3-2020	""
1370	1370	CALF TURNKEY	Wexford	9 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	9	Tuath Housing Association	""	""	""	""	""	Q2-2021
1371	1371	CALF TURNKEY	Wexford	Cuil na Dara, Coolcotts, Wexford  (Phase 1)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2022	""
1372	1372	CALF TURNKEY	Wexford	Forgelands, Enniscorthy Co. Wexford. (Phase 1)	10	Tuath Housing Association	""	""	""	""	Q3-2020	""
1373	1373	CALF TURNKEY	Wexford	Forgelands, Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)*	18	Tuath Housing Association	""	""	""	""	""	Q3-2021
1374	1374	CALF TURNKEY	Wexford	Gleann an Ghairdin, Gorey, Co Wexford (Phase 1)	24	Tuath Housing Association	""	""	""	""	Q3-2021	""
1375	1375	CALF CONSTRUCTION	Wexford	Hewitsland, New Ross, County Wexford (Phase 1)	48	Clúid Housing	""	""	""	Q2-2022	""	""
1376	1376	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 3)	16	Tuath Housing Association	""	""	""	""	""	Q1-2021
1377	1377	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 4)*	27	Tuath Housing Association	""	""	""	""	""	Q2-2021
1378	1378	CALF TURNKEY	Wexford	Mill Heights, Castlebridge, Wexford (Phase 1)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
1379	1379	CALF TURNKEY	Wexford	Mill Heights, Castlebridge, Wexford (Phase 2)*	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2022
1380	1380	CALF TURNKEY	Wexford	Moongate, Townspark, Co Wexford (Phase 1)*	17	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2022	""
1381	1381	CALF TURNKEY	Wexford	Moongate, Townspark, Co Wexford (Phase 2)*	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2022	""
1382	1382	CALF TURNKEY	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*	8	Tuath Housing Association	""	""	""	""	""	Q1-2021
1383	1383	CALF TURNKEY	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 4)*	8	Tuath Housing Association	""	""	""	""	""	Q2-2021
1384	1384	CALF TURNKEY	Wexford	Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
1385	1385	CALF TURNKEY	Wexford	Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 2)	19	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2021
1386	1386	CALF TURNKEY	Wexford	Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*	16	Clúid Housing	""	""	""	""	""	Q3-2021
1387	1387	CALF TURNKEY	Wexford	Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 2)*	14	Clúid Housing	""	""	""	""	""	Q3-2021
1388	1388	CALF TURNKEY	Wexford	Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 3)	22	Clúid Housing	""	""	""	""	""	Q4-2021
1389	1389	CALF TURNKEY	Wexford	Ramstown, Gorey, Wexford (Phase 1)	24	Tuath Housing Association	""	""	""	""	Q2-2021	""
1390	1390	CALF TURNKEY	Wexford	Ramstown, Gorey, Wexford (Phase 2)	20	Tuath Housing Association	""	""	""	""	Q2-2021	""
1391	1391	CALF TURNKEY	Wexford	Ramstown, Gorey, Wexford (Phase 3)*	24	Tuath Housing Association	""	""	""	""	Q2-2021	""
1392	1392	CALF TURNKEY	Wexford	Tobar Mhuire, Creagh, Gorey, Wexford (Phase 1)*	17	Clúid Housing	""	""	""	""	Q4-2021	""
1393	1393	SHIP CONSTRUCTION TURNKEY	Wicklow	Weaver Square, Baltinglass, Co. Wicklow	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1394	1394	SHIP CONSTRUCTION TURNKEY	Wicklow	The Birches, Ballinaclash	2	*N/A	""	""	""	""	""	Q2-2021
1395	1395	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	2	*N/A	""	""	""	""	""	Q1-2021
1396	1396	SHIP CONSTRUCTION TURNKEY	Wicklow	Vartry Heights, Roundwood, Co. Wicklow	3	*N/A	""	""	""	Stage 4 approved Q1-2021, the scheme is fully approved.	""	""
1397	1397	SHIP CONSTRUCTION TURNKEY	Wicklow	Avonmore View, Rathdrum	13	*N/A	""	""	""	Stage 4 approved Q2-2021, the scheme is fully approved.	""	""
1398	1398	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely	1	*N/A	""	""	""	""	""	Q2-2021
1399	1399	SHIP CONSTRUCTION TURNKEY	Wicklow	95 Waverley Drive, Broomhall, Rathnew	1	*N/A	""	""	""	""	""	Q1-2022
1400	1400	SHIP CONSTRUCTION TURNKEY	Wicklow	Waverley Drive, Broomhall, Rathnew	3	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1401	1401	SHIP CONSTRUCTION TURNKEY	Wicklow	Waverley Drive, Broomhall, Rathnew	3	N/A	""	""	""	""	""	Q1-2022
1402	1402	SHIP CONSTRUCTION TURNKEY	Wicklow	Waverley Drive, Broomhall, Rathnew	1	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1403	1403	SHIP CONSTRUCTION TURNKEY	Wicklow	Waverley Drive, Broomhall, Rathnew	2	*N/A	""	""	""	Stage 4 approved Q4-2021, the scheme is fully approved.	""	""
1404	1404	SHIP CONSTRUCTION SINGLE STAGE	Wicklow	Church Lane, Newcastle	1	*N/A	""	""	""	Stage 4 approved Q3-2021, the scheme is fully approved.	""	""
1405	1405	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Merrymeeting View, Rathnew	46	*N/A	""	""	""	""	""	Q2-2021
1406	1406	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Shillelagh Phase 4	20	*N/A	""	""	Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.	""	""	""
1407	1407	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Ashtown Lane, Wicklow Town	40	*N/A	""	""	""	""	Q3-2020	""
1408	1408	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Ard na Greine, West Ward, Bray	31	*N/A	""	""	""	""	""	Q1-2022
1409	1409	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	Q3-2021	""
1410	1410	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Sheehan Court, Back Street, Arklow	7	*N/A	""	""	""	""	Q2-2021	""
1411	1411	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Mountainview, Moneycarroll, Newtownmountkennedy, Co. Wicklow	22	*N/A	""	""	""	""	Q3-2020	""
1412	1412	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Three Trouts, Greystones	41	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
1413	1413	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Greenhill Road, Wicklow Town	36	*N/A	""	""	""	""	Q2-2021	""
1414	1414	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Cedar Court, Schools Road, Bray	14	*N/A	""	""	""	""	Q1-2022	""
1415	1415	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Coolattin Oaks, Carnew (Phase 4)	8	*N/A	""	""	""	""	""	Q1-2021
1416	1416	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Rathnew, Merrymeeting, Co. Wicklow (Phase 2)	21	*N/A	""	""	""	Stage 4 approved Q1-2022, the scheme is fully approved.	""	""
1417	1417	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Tinahely, Lugduff, Co Wicklow	20	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1418	1418	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Carrigoona, Bray	20	*N/A	Stage 1 approved Q3-2021, outline design and costs being prepared.	""	""	""	""	""
1419	1419	SHIP CONSTRUCTION DESIGN BUILD	Wicklow	Lott Lane, Kilcoole	75	*N/A	Stage 1 approved Q4-2021, outline design and costs being prepared.	""	""	""	""	""
1420	1420	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 3)	10	*N/A	""	""	""	""	""	Q1-2022
1421	1421	SHIP CONSTRUCTION	Wicklow	10A & 10 B Castle Villas, Greystones	2	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
1422	1422	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 2)	37	*N/A	""	""	""	""	""	Q4-2021
1423	1423	SHIP CONSTRUCTION	Wicklow	Blackhills, Glenealy, Co. Wicklow	2	*N/A	""	""	""	""	Q4-2021	""
1424	1424	SHIP CONSTRUCTION	Wicklow	Age Friendly Apartments at Main St, Kilcoole, Greystones	4	*N/A	""	Stage 2 approved Q3-2021, full design/tender being prepared.	""	""	""	""
1425	1425	SHIP CONSTRUCTION	Wicklow	Mill Road, Killincarrig, Greystones	2	*N/A	""	""	Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.	""	""	""
1426	1426	SHIP CONSTRUCTION	Wicklow	Carraig Eden, Greysones (Phase 3)	14	*N/A	""	Stage 2 approved Q4-2021, full design/tender being prepared.	""	""	""	""
1427	1427	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	19	*N/A	""	""	""	""	""	Q2-2021
1428	1428	SHIP CONSTRUCTION	Wicklow	Knockroe, Delgany, Co. Wicklow	2	*N/A	""	Stage 2 approved Q1-2022, full design/tender being prepared.	""	""	""	""
1429	1429	SHIP CONSTRUCTION	Wicklow	Ard Rua, Barndarraig, Arklow, Co. Wicklow	12	*N/A	Stage 1 approved Q2-2021, outline design and costs being prepared.	""	""	""	""	""
1430	1430	CAS CONSTRUCTION TURNKEY	Wicklow	Rathcoran Square, Baltinglass	8	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2021
1431	1431	CAS CONSTRUCTION SINGLE STAGE	Wicklow	Hollybrook Park, Bray, Co. Wicklow	4	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1432	1432	PUBLIC PRIVATE PARTNERSHIP (Bundle 3)	Wicklow	Burgage More, Blessington, Co. Wicklow	106	*N/A	""	Q4-2021	""	""	""	""
1433	1433	CALF TURNKEY	Wicklow	Adelaide Apartments, St Laurence’s Terrace, Bray, Co. Wicklow (Phase 1)*	18	Respond	""	""	""	""	Q2-2021	""
1434	1434	CALF TURNKEY	Wicklow	Avondale Grange, Ballygannon, Rathdrum, Co. Wicklow (Phase 1)*	36	Respond	""	""	""	""	Q2-2021	""
1435	1435	CALF TURNKEY	Wicklow	Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 1)*	40	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2021
1436	1436	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow (Phase 1)	11	Tuath Housing Association	""	""	""	""	Q2-2021	""
1437	1437	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow (Phase 2)	18	Tuath Housing Association	""	""	""	""	Q2-2021	""
1438	1438	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow (Phase 3)	13	Tuath Housing Association	""	""	""	""	Q2-2021	""
1439	1439	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow (Phase 4)	17	Tuath Housing Association	""	""	""	""	Q2-2021	""
1440	1440	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow (Phase 5)*	29	Tuath Housing Association	""	""	""	""	Q2-2021	""
1441	1441	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)	15	Tuath Housing Association	""	""	""	""	""	Q4-2021
1442	1442	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)	10	Tuath Housing Association	""	""	""	""	""	Q1-2022
1443	1443	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 3)	3	Tuath Housing Association	""	""	""	""	Q4-2020	""
1444	1444	CALF TURNKEY	Wicklow	Lower Main Street, Arklow, Co. Wicklow (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	""	Q2-2021	""
1445	1445	CALF TURNKEY	Wicklow	Main Street, Blessington, Co. Wicklow (Phase 1)*	22	Circle Voluntary Housing Association Ltd	""	""	""	Q2-2022	""	""
1446	1446	CALF TURNKEY	Wicklow	Main Street, Blessington, Co. Wicklow (Phase 2)*	36	Circle Voluntary Housing Association Ltd	""	""	""	Q2-2022	""	""
1447	1447	CALF TURNKEY	Wicklow	Oak Springs, Rathdrum, County Wicklow  (Phase 1)*	5	Tuath Housing Association	""	""	""	""	Q3-2020	""
1448	1448	CALF TURNKEY	Wicklow	Phase 2, Southern Cross, Bray, Co. Wicklow (Phase 1)	80	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2020	""
1449	1449	CALF TURNKEY	Wicklow	Phase 3, Southern Cross, Bray, Co. Wicklow (Phase 1)*	80	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2020	""
1450	1450	CALF TURNKEY	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 2)*	24	Respond	""	""	""	""	""	Q2-2021
1451	1451	CALF TURNKEY	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 3)	16	Respond	""	""	""	""	""	Q3-2021
1452	1452	CALF TURNKEY	Wicklow	"Southern Cross, Bray, Co. Wicklow
 (Phase 1)*"	30	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
1453	1453	CALF TURNKEY	Wicklow	"Southern Cross, Bray, Co. Wicklow
 (Phase 2)*"	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2021	""
1454	1454	CALF TURNKEY	Wicklow	The Old Rectory, Blessington, Co. Wicklow (Phase 1)*	45	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1455	1455	CALF TURNKEY	Wicklow	Vartry Wood, Ashford, Co. Wicklow (Phase 1)*	16	Clúid Housing	""	""	""	""	Q2-2021	""