  "fields": [{"id":"_id","type":"int"},{"id":"No.","type":"numeric"},{"id":"Funding Programme","type":"text"},{"id":"LA","type":"text"},{"id":"Scheme/Project Name","type":"text"},{"id":"No. of Units","type":"numeric"},{"id":"Approved Housing Body","type":"text"},{"id":"Stage 1 Capital Appraisal","type":"text"},{"id":"Stage 2 Pre Planning","type":"text"},{"id":"Stage 3 Pre Tender Design","type":"text"},{"id":"Stage 4 Tender Report or Final Turnkey/CALF Approval","type":"text"},{"id":"On Site","type":"text"},{"id":"Completed","type":"text"}],
  "records": [
    [1,1,"SHIP CONSTRUCTION TURNKEY","Carlow","Carrigbrook, Tullow Road, Carlow",16,"*N/A","","","","","","Q4-2021"],
    [2,2,"SHIP CONSTRUCTION TURNKEY","Carlow","Carrigbrook, Tullow Road, Carlow",13,"*N/A","","","","","","Q2-2021"],
    [3,3,"SHIP CONSTRUCTION TURNKEY","Carlow","Granville Court, Granby Row,Carlow",4,"*N/A","","","","","","Q4-2021"],
    [4,4,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","Ardattin, Co Carlow",6,"*N/A","","","","Stage 4 approved Q2-2019, the scheme is fully approved.","",""],
    [5,5,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","SRD: Brownbog, Hackettstown",1,"*N/A","","","","","Q1-2020",""],
    [6,6,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","St. Mary’s Court, Carlow",4,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [7,7,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","Drumphea, Garryhill, Bagenalstown",1,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [8,8,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","SRD - Constable Hill, Hackettstown",1,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [9,9,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","Lackabeg, Kildavin",3,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [10,10,"SHIP CONSTRUCTION SINGLE STAGE","Carlow","5 & 6 Staplestown Road, Carlow",2,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [11,11,"SHIP CONSTRUCTION RENEWAL","Carlow","Barrack Street, Carlow",7,"*N/A","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [12,12,"SHIP CONSTRUCTION RENEWAL","Carlow","Bog Lane, Borris, Co. Carlow",1,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [13,13,"SHIP CONSTRUCTION RENEWAL","Carlow","2a Chapel Street, Graiguecullen, Carlow",1,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [14,14,"SHIP CONSTRUCTION RENEWAL","Carlow","Breens Shop Units, Main Street, Borris, Co. Carlow",2,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [15,15,"SHIP CONSTRUCTION","Carlow","Pound Lane, Borris",9,"*N/A","","","","","","Q2-2021"],
    [16,16,"SHIP CONSTRUCTION","Carlow","Gleann na Bearu, Bagenalstown",22,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [17,17,"CAS CONSTRUCTION","Carlow","Gleann na Bearu, Royal Oak Road, Bagenalstown",6,"Respond","","","","","Q4-2020",""],
    [18,18,"CAS CONSTRUCTION","Carlow","Homefield, Blackbog Road, Carlow",3,"Carlow Voluntary Housing Association","","","","","","Q2-2021"],
    [19,19,"CALF TURNKEY","Carlow","Ballickmoyler, Graigcullen, Carlow (Phase 1)",22,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [20,20,"CALF TURNKEY","Carlow","Ballickmoyler, Graigcullen, Carlow (Phase 2)",35,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [21,21,"CALF TURNKEY","Carlow","Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 1)*",17,"Tuath Housing Association","","","","","","Q3-2021"],
    [22,22,"CALF TURNKEY","Carlow","Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 2)*",15,"Tuath Housing Association","","","","","","Q4-2021"],
    [23,23,"CALF TURNKEY","Carlow","Cois Dara, Tullow Road, Chapelstown, Carlow  (Phase 3)*",21,"Tuath Housing Association","","","","","","Q1-2022"],
    [24,24,"CALF TURNKEY","Carlow","Granite Court, Ballyknockan, Fenagh, Co Carlow (Phase 1)",8,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [25,25,"CALF TURNKEY","Carlow","Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 2)",6,"Tuath Housing Association","","","","","","Q2-2021"],
    [26,26,"CALF TURNKEY","Carlow","Rivercourt,  Carlow  (Phase 2)*",19,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2022"],
    [27,27,"CALF TURNKEY","Carlow","Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 1)",7,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [28,28,"CALF TURNKEY","Carlow","Sli Na Ri, Moneybeg, Bagenalstown, Co. Carlow (Phase 2)*",12,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [29,29,"CALF TURNKEY","Carlow","The Millrace, Burrin, Co. Carlow (Phase 1)*",22,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [30,30,"SHIP CONSTRUCTION TURNKEY","Cavan","Ashgrove, Derrylurgan, Ballyjamesduff",4,"*N/A","","","","","","Q4-2021"],
    [31,31,"SHIP CONSTRUCTION TURNKEY","Cavan","Woodlands, Killyfinla, Ballyjamesduff ",4,"*N/A","","","","","Q1-2021",""],
    [32,32,"SHIP CONSTRUCTION TURNKEY","Cavan","Woodlands, Killyfinla, Ballyjamesduff",8,"*N/A","","","","","Q4-2021",""],
    [33,33,"SHIP CONSTRUCTION TURNKEY","Cavan","Woodlands, Killyfinla, Ballyjamesduff",10,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [34,34,"SHIP CONSTRUCTION TURNKEY","Cavan","Woodlands, Killyfinla, Ballyjamesduff",10,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [35,35,"SHIP CONSTRUCTION TURNKEY","Cavan","Mullaghduff, Ballyconnell, Co. Cavan",8,"*N/A","","","","","Q2-2021",""],
    [36,36,"SHIP CONSTRUCTION TURNKEY","Cavan","Mullaghduff, Ballyconnell, Co. Cavan",12,"*N/A","","","","","Q2-2021",""],
    [37,37,"SHIP CONSTRUCTION TURNKEY","Cavan","Mullaghduff, Ballyconnell, Co. Cavan",11,"*N/A","","","","","Q2-2021",""],
    [38,38,"SHIP CONSTRUCTION TURNKEY","Cavan","Mullaghduff, Ballyconnell, Co. Cavan",12,"*N/A","","","","","Q2-2021",""],
    [39,39,"SHIP CONSTRUCTION TURNKEY","Cavan","Clankee Court, Lisdrumskea, Shercock",2,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [40,40,"SHIP CONSTRUCTION TURNKEY","Cavan","Abhainn Dubh, Rosehill, Mullagh",4,"*N/A","","","","","","Q4-2021"],
    [41,41,"SHIP CONSTRUCTION TURNKEY","Cavan","Kilnavara Heights, Cavan Town",2,"*N/A","","","","","Q1-2022",""],
    [42,42,"SHIP CONSTRUCTION RENEWAL","Cavan","Derrylurgan, Ballyjamesduff",12,"N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [43,43,"SHIP CONSTRUCTION","Cavan","Corstruce, Ballinagh",4,"*N/A","","","","","","Q2-2021"],
    [44,44,"SHIP CONSTRUCTION","Cavan","Main Street, Mullagh",19,"*N/A","","","","","Q4-2020",""],
    [45,45,"SHIP CONSTRUCTION","Cavan","Elm Grove, Main St, Cavan Town",13,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [46,46,"SHIP CONSTRUCTION","Cavan","Cavan Road, Ballinagh",15,"*N/A","","","","","Q2-2021",""],
    [47,47,"SHIP CONSTRUCTION","Cavan","Main St., Butlersbridge",6,"*N/A","","","","","Q2-2021",""],
    [48,48,"SHIP CONSTRUCTION","Cavan","Cluain Dara, Kingscourt",3,"*N/A","","","","","","Q4-2021"],
    [49,49,"SHIP CONSTRUCTION","Cavan","Fairymount Close, Kingscourt, Co. Cavan",3,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [50,50,"SHIP CONSTRUCTION","Cavan","St. Bridgets Terrace, Cavan Town (Infill)",20,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [51,51,"SHIP CONSTRUCTION","Cavan","Lime Park, Bailieborough",12,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [52,52,"SHIP CONSTRUCTION","Cavan","Duckin Stool, Main Street, Belturbet",3,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [53,53,"SHIP CONSTRUCTION","Cavan","The Widow's Row, Widow's House Lane, Belturbet",8,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [54,54,"SHIP CONSTRUCTION","Cavan","8 Units @ Ashgrove, Derrylurgan, Ballyjamesduff",8,"N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [55,55,"SHIP CONSTRUCTION","Cavan","Dunaree, Kingscourt Town Centre",3,"N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [56,56,"SHIP CONSTRUCTION","Cavan","Lime Park, Bailieborough",18,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [57,57,"SHIP CONSTRUCTION","Cavan","Lime Park, Bailieborough",15,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [58,58,"SHIP CONSTRUCTION","Cavan","Main St Lower, Kilnaleck, Co Cavan",2,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [59,59,"SHIP CONSTRUCTION","Cavan","157 Barrack Road, Kilnaleck",4,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [60,60,"CAS CONSTRUCTION","Cavan","St. Killian's Housing Association Ltd., Mullagh, Co. Cavan",4,"St. Killian's Housing Association, Mullagh, Co. Cavan","","","","","Q1-2021",""],
    [61,61,"CALF TURNKEY","Cavan","16 Units, Fairgreen Park, Mullagh, Co. Cavan (Phase 1)",16,"Clanmil Housing Association Ireland","","","","","","Q4-2021"],
    [62,62,"CALF TURNKEY","Cavan","Drumalee Manor, Drumalee, Co. Cavan (Phase 2)",13,"Tuath Housing Association","","","","","Q2-2021",""],
    [63,63,"CALF TURNKEY","Cavan","Rampart View, Virginia, Co. Cavan (Phase 1)",5,"Co - Operative Housing Ireland Society Limited","","","","","Q1-2020",""],
    [64,64,"CALF TURNKEY","Cavan","Rampart View, Virginia, Co. Cavan (Phase 3)",6,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [65,65,"CALF TURNKEY","Cavan","The Gallops, Cavan Town, Co. Cavan (Phase 2)",22,"Clúid Housing","","","","","Q4-2019",""],
    [66,66,"CALF TURNKEY","Cavan","The Gallops, Cavan Town, Co. Cavan (Phase 3)*",2,"Clúid Housing","","","","","Q4-2019",""],
    [67,67,"SHIP CONSTRUCTION TURNKEY","Clare","Shantraud Woods, Killaloe",4,"*N/A","","","","","","Q1-2022"],
    [68,68,"SHIP CONSTRUCTION TURNKEY","Clare","Cluain Greine, Drumcliff Rd., Ennis ",45,"N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [69,69,"SHIP CONSTRUCTION TURNKEY","Clare","Cluain Greine, Drumcliff Rd., Ennis ",16,"N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [70,70,"SHIP CONSTRUCTION SINGLE STAGE","Clare","Madden's Terrace, Clarecastle",2,"*N/A","","","","","Q2-2021",""],
    [71,71,"SHIP CONSTRUCTION SINGLE STAGE","Clare","Dun na Mara, Doonbeg",2,"*N/A","","","","","","Q2-2021"],
    [72,72,"SHIP CONSTRUCTION SINGLE STAGE","Clare","St Senan’s Terrace, Kilrush -No5-No 6",2,"*N/A","","","","","","Q3-2021"],
    [73,73,"SHIP CONSTRUCTION RENEWAL","Clare","Nagles Terrace, Kilrush",3,"N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [74,74,"SHIP CONSTRUCTION","Clare","Ashline, Kilrush Road, Ennis",40,"*N/A","","","","","Q3-2020",""],
    [75,75,"SHIP CONSTRUCTION","Clare","Ballard Rd,Miltown Malbay",27,"*N/A","","","","","Q3-2020",""],
    [76,76,"SHIP CONSTRUCTION","Clare","Doonaun, Tulla",25,"*N/A","","","","","Q4-2020",""],
    [77,77,"SHIP CONSTRUCTION","Clare","Boheraroan, Newmarket-on-Fergus",18,"*N/A","","","","","","Q1-2022"],
    [78,78,"SHIP CONSTRUCTION","Clare","Feakle Rd., Scariff",18,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [79,79,"SHIP CONSTRUCTION","Clare","Kilkee Road, Doonbeg",8,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [80,80,"SHIP CONSTRUCTION","Clare","Tulla Road, Roslevan, Ennis (Fannings site)",8,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [81,81,"SHIP CONSTRUCTION","Clare","Drumcliffe Road, Ennis",26,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [82,82,"SHIP CONSTRUCTION","Clare","Deerpark, Ennistymon",30,"*N/A","Stage 1 approved Q1-2021, outline design and costs being prepared.","","","","",""],
    [83,83,"SHIP CONSTRUCTION","Clare","Ballyliddan West, Sixmilebridge",15,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [84,84,"SHIP CONSTRUCTION","Clare","Gort Road Ennis",20,"N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [85,85,"CAS CONSTRUCTION TURNKEY","Clare","Market Sq., Ennis",14,"Peter McVerry Trust Ltd","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [86,86,"CAS CONSTRUCTION","Clare","Teach Rua, Edenvale Ennis",4,"Newgrove Housing Association Ltd","","","","","","Q2-2021"],
    [87,87,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Clare","Shannon East (Phase 1)",20,"*N/A","","","","","","Q2-2021"],
    [88,88,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Clare","Shannon East (Phase 2)",31,"*N/A","","","","","","Q3-2021"],
    [89,89,"CALF TURNKEY","Clare","Abbey View, Limerick Road, Ennis, Co. Clare (Phase 1)",9,"Clúid Housing","","","","","Q4-2021",""],
    [90,90,"CALF TURNKEY","Clare","Abbey View, Limerick Road, Ennis, Co. Clare (Phase 2)*",15,"Clúid Housing","","","","","Q4-2021",""],
    [91,91,"CALF TURNKEY","Clare","Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 2)*",2,"Clúid Housing","","","","","","Q1-2022"],
    [92,92,"CALF TURNKEY","Clare","Cluain Na Laoi, Kilkishen, Co. Clare (39 - 54) (Phase 1)*",14,"Circle Voluntary Housing Association Ltd","","","","Q1-2022","",""],
    [93,93,"CALF TURNKEY","Clare","Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 2)*",2,"Co - Operative Housing Ireland Society Limited","","","","","","Q3-2021"],
    [94,94,"CALF TURNKEY","Clare","Limerick Rd, Ennis, Co. Clare (Phase 1)*",18,"Inis Housing Association","","","","","Q1-2022",""],
    [95,95,"CALF CONSTRUCTION","Clare","Revised - Bruachlan, Westbury, Co Clare (Phase 1)",22,"Co - Operative Housing Ireland Society Limited","","","","Q2-2021","",""],
    [96,96,"CALF TURNKEY","Clare","Roslevan, Tulla Road, Ennis, County Clare (Phase 1)",14,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [97,97,"CALF TURNKEY","Clare","Roslevan, Tulla Road, Ennis, County Clare (Phase 2)*",15,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2022"],
    [98,98,"CALF TURNKEY","Clare","Roslevan, Tulla Road, Ennis, County Clare (Phase 3)*",24,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [99,99,"CALF TURNKEY","Clare","Roslevan, Tulla Road, Ennis, County Clare (Phase 4)*",16,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [100,100,"SHIP DIALOG","Cork City","Barrack Street",32,"*N/A","","","","","Q1-2019",""],
    [101,101,"SHIP DIALOG","Cork City","Woods Street",16,"*N/A","","","","","Q1-2019",""],
    [102,102,"SHIP DIALOG","Cork City","Corkeran's Quay",3,"*N/A","","","","","Q2-2018",""],
    [103,103,"SHIP DIALOG","Cork City","Skehard Road, Blackrock, Cork",16,"*N/A","","","","Stage 4 approved Q2-2019, the scheme is fully approved.","",""],
    [104,104,"SHIP DIALOG","Cork City","Coach Street, Cork",13,"*N/A","","","","Stage 4 approved Q2-2019, the scheme is fully approved.","",""],
    [105,105,"SHIP DIALOG","Cork City","Shanakiel Road, Cork",20,"*N/A","","","","Stage 4 approved Q2-2019, the scheme is fully approved.","",""],
    [106,106,"SHIP DIALOG","Cork City","Spring Lane, Blackpool, Cork",8,"*N/A","","","","Stage 4 approved Q2-2019, the scheme is fully approved.","",""],
    [107,107,"SHIP DIALOG","Cork City","Glen Ryan Road, Cork",9,"*N/A","","","","Stage 4 approved Q2-2019, the scheme is fully approved.","",""],
    [108,108,"SHIP DIALOG","Cork City","Pouladuff Road, Cork ",11,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [109,109,"SHIP DIALOG","Cork City","Watercourse Road, Blackpool, Cork",37,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [110,110,"SHIP DIALOG","Cork City","Denroche's Cross, Glasheen Road, Cork",43,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [111,111,"SHIP DIALOG","Cork City","Wolsey Court, Blackpool, Cork",49,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [112,112,"SHIP DIALOG","Cork City","Sunview, South Douglas Road, Douglas, Cork",25,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [113,113,"SHIP DIALOG","Cork City","Former Bolands Mill, Old Mallow Road",57,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [114,114,"SHIP CONSTRUCTION RENEWAL","Cork City","1 Evenus Ville, Albert Road, Cork City",1,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [115,115,"SHIP CONSTRUCTION DESIGN BUILD","Cork City","Clover Hill Court, Bessboro Road, Mahon, Cork",88,"*N/A","Stage 1 approved Q2-2019, outline design and costs being prepared.","","","","",""],
    [116,116,"SHIP CONSTRUCTION","Cork City","Poulavone, Ballincollig",64,"*N/A","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [117,117,"SHIP CONSTRUCTION","Cork City","Boyces Street",14,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [118,118,"SHIP CONSTRUCTION","Cork City","Madonna House, Ballincollig",6,"*N/A","","Stage 2 approved Q4-2019, full design/tender being prepared.","","","",""],
    [119,119,"SHIP CONSTRUCTION","Cork City","Bramble Cottages",4,"*N/A","","Stage 2 approved Q3-2019, full design/tender being prepared.","","","",""],
    [120,120,"SHIP CONSTRUCTION","Cork City","Errigal Heights, The Glen, Cork City",28,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [121,121,"SHIP CONSTRUCTION","Cork City","Glenamoy Lawn, Mayfield, Cork",3,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [122,122,"SHIP CONSTRUCTION","Cork City","Hollywood Estate Infill Housing, Blarney Road, Cork",7,"*N/A","","Stage 2 approved Q4-2019, full design/tender being prepared.","","","",""],
    [123,123,"SHIP CONSTRUCTION","Cork City","Westside, Model Farm Road, Cork",41,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [124,124,"SHIP CONSTRUCTION","Cork City","Gerald Griffin Apartments - Block 7, North Monastery Road / St. Vincent's Road, Cork",6,"*N/A","Stage 1 approved Q3-2019, outline design and costs being prepared.","","","","",""],
    [125,125,"SHIP CONSTRUCTION","Cork City","16A Kerry Road (former Slí Gartan), Mayfield, Cork ",1,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [126,126,"REGENERATION","Cork City","CNWQR Knocknaheeny Phase 1C",41,"*N/A","","","Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.","","",""],
    [127,127,"REGENERATION","Cork City","CNWQR Knocknaheeny Phase 2B",38,"*N/A","","","Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.","","",""],
    [128,128,"REGENERATION","Cork City","Foyle Avenue Infill Housing Development, Knocknaheeny, Cork",2,"*N/A","","","Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.","","",""],
    [129,129,"REGENERATION","Cork City","CNWQR Knocknaheeny Phase 3B",62,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [130,130,"REGENERATION","Cork City","CNWQR Knocknaheeny Phase 4A",43,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [131,131,"CAS CONSTRUCTION SINGLE STAGE","Cork City","Eastville, Albert Road, Cork",1,"Galtan Ltd","","","","","","Q1-2022"],
    [132,132,"CAS CONSTRUCTION SINGLE STAGE","Cork City","14 Glanmire Road Cork",2,"Galtan Ltd","","","","","","Q1-2022"],
    [133,133,"CAS CONSTRUCTION","Cork City","Saint Vincent's Convent, Vincent's Ave/St. Mary's Street",25,"Respond","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [134,134,"CAS CONSTRUCTION","Cork City","Ard na Ri, Closes Green, Farranree, Cork",20,"Farranree Sheltered Housing Association","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [135,135,"CAS CONSTRUCTION","Cork City","Apts 2 & 3 Cois Coille, Tivoli, Cork",2,"Galtan Ltd","","","","","","Q4-2021"],
    [136,136,"CAS CONSTRUCTION","Cork City","Aras Lean, Murphy’s Farm, Bishopstown, Co. Cork",25,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [137,137,"CAS CONSTRUCTION","Cork City","Gardiners Hill, St Lukes, Cork ",3,"Focus Ireland","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [138,138,"CALF TURNKEY","Cork City","12,14,15 Model Quarters, Tower, Blarney, Co Cork  (Phase 1)",3,"Circle Voluntary Housing Association Ltd","","","","","Q2-2019",""],
    [139,139,"CALF TURNKEY","Cork City","20 and 21 Kyle Street  (Phase 1)",6,"Focus Housing Association CLG","","","","","Q2-2021",""],
    [140,140,"CALF TURNKEY","Cork City","40-41 Grand Parade, Cork City (Phase 1)",7,"Focus Housing Association CLG","","","","","Q2-2021",""],
    [141,141,"CALF TURNKEY","Cork City","Baker Street, Ballincollig, Co Cork (Phase 1)*",14,"Clúid Housing","","","","Q2-2022","",""],
    [142,142,"CALF TURNKEY","Cork City","Barters Wood, Tower, Cork (Phase 1)*",3,"Tuath Housing Association","","","","","Q1-2020",""],
    [143,143,"CALF TURNKEY","Cork City","Barters Wood, Tower, Cork (Phase 2)*",3,"Tuath Housing Association","","","","","Q1-2020",""],
    [144,144,"CALF TURNKEY","Cork City","Block 10 Jacobs Island, Mahon, Cork (Phase 1)",59,"Respond","","","","Q1-2022","",""],
    [145,145,"CALF TURNKEY","Cork City","Boherboy Road, Silversprings Hill, Cork City  (Phase 1)*",15,"Respond","","","","","Q1-2022",""],
    [146,146,"CALF TURNKEY","Cork City","Brocklesby Street, Blackpool, Cork City (Phase 1)*",42,"Focus Housing Association CLG","","","","Q1-2022","",""],
    [147,147,"CALF TURNKEY","Cork City","Evergreen Road, Turners Cross, Cork  (Phase 1)*",28,"Respond","","","","","Q1-2021",""],
    [148,148,"CALF TURNKEY","Cork City","Fairfield Meadows, Upper Fair Hill, Cork (Phase 1)*",18,"Focus Housing Association CLG","","","","Q3-2021","",""],
    [149,149,"CALF TURNKEY","Cork City","Glanmire Village, Glanmire, Cork\n (Phase 1)",3,"Focus Housing Association CLG","","","","","Q2-2020",""],
    [150,150,"CALF CONSTRUCTION","Cork City","Green Lane, Blackpool, Cork City (Phase 1)",112,"Clúid Housing","","","","","Q4-2021",""],
    [151,151,"CALF TURNKEY","Cork City","Haig Gardens, Boreenamanna Road and Wallace Avenue, Ballintemple (Phase 1)*",27,"Respond","","","","","Q2-2021",""],
    [152,152,"CALF TURNKEY","Cork City","Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*",19,"Respond","","","","","Q1-2020",""],
    [153,153,"CALF TURNKEY","Cork City","Lancaster Gate, Western Road, Cork (Phase 1)",15,"Clúid Housing","","","","","Q3-2021",""],
    [154,154,"CALF TURNKEY","Cork City","Link Road, Ballincollig, Cork (Phase 1)*",40,"Respond","","","","","Q3-2021",""],
    [155,155,"CALF TURNKEY","Cork City","Miles Stream, Shanakiel, Cork (Phase 1)",14,"Tuath Housing Association","","","","","Q3-2021",""],
    [156,156,"CALF TURNKEY","Cork City","Miles Stream, Shanakiel, Cork (Phase 2)",14,"Tuath Housing Association","","","","","Q3-2021",""],
    [157,157,"CALF TURNKEY","Cork City","Miles Stream, Shanakiel, Cork (Phase 3)",14,"Tuath Housing Association","","","","","Q3-2021",""],
    [158,158,"CALF TURNKEY","Cork City","Millfield Cottages, Blackpool, Cork City (Phase 1)*",18,"Respond","","","","Q1-2022","",""],
    [159,159,"CALF TURNKEY","Cork City","Phase 2, 42 Grand Parade, Cork City (Phase 1)",9,"Focus Housing Association CLG","","","","","Q4-2021",""],
    [160,160,"CALF TURNKEY","Cork City","Redforge Road, Blackpool, Cork City (Phase 2)",31,"Respond","","","","","","Q4-2021"],
    [161,161,"CALF TURNKEY","Cork City","Redforge Road, Blackpool, Cork City (Phase 3)*",24,"Respond","","","","","Q1-2020",""],
    [162,162,"CALF TURNKEY","Cork City","Redforge Road, Blackpool, Cork City (Phase 4)",7,"Respond","","","","","Q1-2020",""],
    [163,163,"CALF TURNKEY","Cork City","Riverside Farm, Model Farm Road, Bishopstown, Cork (Phase 1)*",48,"Respond","","","","Q2-2022","",""],
    [164,164,"CALF TURNKEY","Cork City","Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 1)*",22,"Respond","","","","","Q4-2020",""],
    [165,165,"CALF TURNKEY","Cork City","Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 2)*",19,"Respond","","","","","Q4-2020",""],
    [166,166,"CALF TURNKEY","Cork City","Sarsfield Road, Doughcloyne, Wilton, Cork (Phase 3)",24,"Respond","","","","","Q4-2020",""],
    [167,167,"CALF TURNKEY","Cork City","Sarsfield Road, Doughcloyne, Wilton, Cork City (Phase 1)",4,"Respond","","","","Q2-2022","",""],
    [168,168,"CALF TURNKEY","Cork City","Springville House, Bulls Lane, Blackrock Road, Cork (Phase 1)",35,"Tuath Housing Association","","","","","Q4-2020",""],
    [169,169,"CALF CONSTRUCTION","Cork City","St Dominics, Middle Glanmire Road, Montenotte, Cork (Phase 1)",27,"Tuath Housing Association","","","","","Q1-2021",""],
    [170,170,"CALF TURNKEY","Cork City","Strawberry Hill, Blarney Street, Cork (Phase 1)*",16,"Respond","","","","Q1-2022","",""],
    [171,171,"CALF TURNKEY","Cork City","Summerville Place, Sunday’s Well, Cork (Phase 1)",10,"Respond","","","","","Q1-2021",""],
    [172,172,"CALF TURNKEY","Cork City","The Oaks, Frankfield, Douglas, Cork City (Phase 1)*",2,"Tuath Housing Association","","","","","","Q4-2021"],
    [173,173,"CALF TURNKEY","Cork City"," Tower Street, Cork City (Phase 1)",2,"Threshold Ltd","","","","Q2-2021","",""],
    [174,174,"SHIP CONSTRUCTION TURNKEY","Cork County","Claragh Road, Millstreet",5,"*N/A","","","","","","Q2-2021"],
    [175,175,"SHIP CONSTRUCTION TURNKEY","Cork County","Glanworth, Fermoy",13,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [176,176,"SHIP CONSTRUCTION TURNKEY","Cork County","Seafield, Bantry, ",3,"*N/A","","","","","Q3-2018",""],
    [177,177,"SHIP CONSTRUCTION TURNKEY","Cork County","Canon St, Rathcormac",3,"*N/A","","","","","Q1-2022",""],
    [178,178,"SHIP CONSTRUCTION TURNKEY","Cork County","Crann Ard, Fermoy",6,"*N/A","","","","","Q4-2017",""],
    [179,179,"SHIP CONSTRUCTION TURNKEY","Cork County","Sweetfields, Youghal",3,"*N/A","","","","","","Q4-2021"],
    [180,180,"SHIP CONSTRUCTION TURNKEY","Cork County","Copper Point, Schull",7,"*N/A","","","","","Q2-2021",""],
    [181,181,"SHIP CONSTRUCTION TURNKEY","Cork County","Mill Road, Avoncore, Bloomfield, Midleton",11,"*N/A","","","","","","Q1-2021"],
    [182,182,"SHIP CONSTRUCTION TURNKEY","Cork County","Mill Road, Avoncore, Bloomfield, Midleton",17,"*N/A","","","","","","Q2-2021"],
    [183,183,"SHIP CONSTRUCTION TURNKEY","Cork County","Copper Point, Schull",7,"*N/A","","","","","Q2-2021",""],
    [184,184,"SHIP CONSTRUCTION TURNKEY","Cork County","Millview Road, Kanturk",4,"*N/A","","","","","","Q1-2021"],
    [185,185,"SHIP CONSTRUCTION TURNKEY","Cork County","Ard an Bhaile, Creggane, Buttevant",6,"*N/A","","","","","Q1-2020",""],
    [186,186,"SHIP CONSTRUCTION TURNKEY","Cork County","Ballymacmoy, Killavullen, Co. Cork",13,"*N/A","","","","Stage 4 approved Q4-2019, the scheme is fully approved.","",""],
    [187,187,"SHIP CONSTRUCTION TURNKEY","Cork County","Meenane, Watergrasshill",4,"*N/A","","","","","","Q2-2021"],
    [188,188,"SHIP CONSTRUCTION TURNKEY","Cork County","Gortnaclohy, Skibbereen, Co. Cork",34,"*N/A","","","","Stage 4 approved Q4-2019, the scheme is fully approved.","",""],
    [189,189,"SHIP CONSTRUCTION TURNKEY","Cork County","Kilmoney, Carrigaline",12,"*N/A","","","","","Q1-2021",""],
    [190,190,"SHIP CONSTRUCTION TURNKEY","Cork County","Crann Ard, Fermoy",16,"*N/A","","","","","Q4-2017",""],
    [191,191,"SHIP CONSTRUCTION TURNKEY","Cork County","Caherdaniel, Bantry",10,"*N/A","","","","","Q1-2020",""],
    [192,192,"SHIP CONSTRUCTION TURNKEY","Cork County","An Goritin Rua, Millstreet Road, Macroom",14,"*N/A","","","","","","Q2-2021"],
    [193,193,"SHIP CONSTRUCTION TURNKEY","Cork County","Lyraneag, Rockchapel,",2,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [194,194,"SHIP CONSTRUCTION TURNKEY","Cork County","Curragh, Upper Aghada",2,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [195,195,"SHIP CONSTRUCTION TURNKEY","Cork County","Glebe Manor, Whitegate",12,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [196,196,"SHIP CONSTRUCTION TURNKEY","Cork County","Eyeries, Castletownbere",6,"*N/A","","","","","Q4-2020",""],
    [197,197,"SHIP CONSTRUCTION TURNKEY","Cork County","Lios Ard, Ballyhooly",6,"*N/A","","","","","","Q1-2021"],
    [198,198,"SHIP CONSTRUCTION TURNKEY","Cork County","Spa Glen,Ballyviniter, Mallow",18,"*N/A","","","","","","Q2-2021"],
    [199,199,"SHIP CONSTRUCTION TURNKEY","Cork County","Drakes Point, Knocknagore, Crosshaven",5,"*N/A","","","","","","Q3-2021"],
    [200,200,"SHIP CONSTRUCTION TURNKEY","Cork County","Caherdaniel, Bantry",6,"*N/A","","","","","Q1-2020",""],
    [201,201,"SHIP CONSTRUCTION TURNKEY","Cork County","Caherdaniel, Bantry",6,"*N/A","","","","","Q1-2020",""],
    [202,202,"SHIP CONSTRUCTION TURNKEY","Cork County","Abbeyfort, Kinsale",19,"*N/A","","","","","","Q4-2021"],
    [203,203,"SHIP CONSTRUCTION TURNKEY","Cork County","Clarendon Brooks, Carrs Hill, Douglas",4,"*N/A","","","","","","Q1-2021"],
    [204,204,"SHIP CONSTRUCTION TURNKEY","Cork County","Abbeyfort, Kinsale, Phase 2, Co. Cork",17,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [205,205,"SHIP CONSTRUCTION TURNKEY","Cork County","Ard Cashel, Watergrasshill",6,"*N/A","","","","","","Q1-2022"],
    [206,206,"SHIP CONSTRUCTION TURNKEY","Cork County","Lios Ard, Ballyhooly",6,"*N/A","","","","","","Q2-2021"],
    [207,207,"SHIP CONSTRUCTION TURNKEY","Cork County","Courtbrack, Tower",1,"*N/A","","","","","","Q4-2021"],
    [208,208,"SHIP CONSTRUCTION TURNKEY","Cork County","Sweetfields, Youghal",10,"*N/A","","","","Stage 4 approved Q2-2018, the scheme is fully approved.","",""],
    [209,209,"SHIP CONSTRUCTION TURNKEY","Cork County","Lisgoold, An Tui Units 5 & 6",2,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [210,210,"SHIP CONSTRUCTION TURNKEY","Cork County","Crann Ard, Fermoy",26,"*N/A","","","","","Q4-2017",""],
    [211,211,"SHIP CONSTRUCTION TURNKEY","Cork County","The Pastures, Charleville",4,"*N/A","","","","","","Q4-2021"],
    [212,212,"SHIP CONSTRUCTION TURNKEY","Cork County","Meenane, Watergrasshill",7,"*N/A","","","","","","Q2-2021"],
    [213,213,"SHIP CONSTRUCTION TURNKEY","Cork County","Meenane, Watergrasshill",7,"*N/A","","","","","Q3-2020",""],
    [214,214,"SHIP CONSTRUCTION TURNKEY","Cork County","Meenane, Watergrasshill",3,"*N/A","","","","","","Q1-2022"],
    [215,215,"SHIP CONSTRUCTION TURNKEY","Cork County","The Pastures, Charleville",12,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [216,216,"SHIP CONSTRUCTION TURNKEY","Cork County","Kilmoney, Carrigaline",21,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [217,217,"SHIP CONSTRUCTION TURNKEY","Cork County","Kilmoney, Carrigaline",11,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [218,218,"SHIP CONSTRUCTION TURNKEY","Cork County","Kilmoney, Carrigaline",14,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [219,219,"SHIP CONSTRUCTION TURNKEY","Cork County","Derrymihin, Castletownbere, Co. Cork",16,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [220,220,"SHIP CONSTRUCTION TURNKEY","Cork County","Meenane, Watergrasshill",4,"*N/A","","","","","","Q4-2021"],
    [221,221,"SHIP CONSTRUCTION TURNKEY","Cork County","The Meadows, Dunmanway, Co. Cork",4,"N/A","","","","","Q4-2021",""],
    [222,222,"SHIP CONSTRUCTION TURNKEY","Cork County","Sweetfields, Youghal",7,"N/A","","","","","","Q1-2022"],
    [223,223,"SHIP CONSTRUCTION TURNKEY","Cork County","Caherdaniel, Bantry",12,"*N/A","","","","","Q1-2020",""],
    [224,224,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","2A Glenview Terrace Lyre Co Cork",1,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [225,225,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","Cuirt Na Slini, Cloyne, East Cork ",2,"*N/A","","","","","Q3-2021",""],
    [226,226,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","81 Belmont Place, Cobh,",1,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [227,227,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","Main St. Dunmanway",1,"*N/A","","","","","","Q4-2021"],
    [228,228,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","Croke Place, Garranmacgarrett, Kilbrin, kanturk",2,"*N/A","","","","","Q3-2020",""],
    [229,229,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","High St., Sleaveen Hill, Macroom",1,"*N/A","","","","","Q2-2021",""],
    [230,230,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","49 Masseytown, Macroom",1,"*N/A","","","","","Q2-2021",""],
    [231,231,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","22 Aisling Ghael, Coolacoosane, Millview Road, Kanturk",1,"*N/A","","","","","Q3-2020",""],
    [232,232,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","Carrig Rossa Phase 2, Rossmore",2,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [233,233,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","Fana Na gCann, Co. Cork",2,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [234,234,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","3 Knockbrogan Park, Bandon",1,"*N/A","","","","","","Q4-2021"],
    [235,235,"SHIP CONSTRUCTION SINGLE STAGE","Cork County","87 Belmont, Cobh",1,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [236,236,"SHIP CONSTRUCTION","Cork County","Ard Na Greine, Cortmacsherry",17,"*N/A","","","","","Q3-2019",""],
    [237,237,"SHIP CONSTRUCTION","Cork County","Beechgrove, Clonakilty",51,"*N/A","","","","","","Q4-2021"],
    [238,238,"SHIP CONSTRUCTION","Cork County","Newtown House , Bantry",1,"*N/A","","","","","","Q4-2021"],
    [239,239,"SHIP CONSTRUCTION","Cork County","Kilnagleary, Carrigaline (Phase 4)",15,"*N/A","","","","","Q4-2019",""],
    [240,240,"SHIP CONSTRUCTION","Cork County","Townsend Street, Skibbereen",6,"*N/A","","","","","Q3-2019",""],
    [241,241,"SHIP CONSTRUCTION","Cork County","Kearney's field Dunmanway",5,"*N/A","","","","","Q3-2020",""],
    [242,242,"SHIP CONSTRUCTION","Cork County","Richmond Court, Bandon",6,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [243,243,"SHIP CONSTRUCTION","Cork County","Brigown Road, Mitchelstown",8,"*N/A","","Stage 2 approved Q3-2018, full design/tender being prepared.","","","",""],
    [244,244,"SHIP CONSTRUCTION","Cork County","Sleaveen East, Macroom",8,"*N/A","","","Stage 3 approved Q4-2020, the scheme is now approved to proceed to tender.","","",""],
    [245,245,"SHIP CONSTRUCTION","Cork County","Pound Lane, Kilworth ",7,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [246,246,"SHIP CONSTRUCTION","Cork County","Knocknagown, Rylane",1,"*N/A","","","","","","Q3-2021"],
    [247,247,"SHIP CONSTRUCTION","Cork County","Uplands (Phase 2), College Road,  Fermoy",11,"*N/A","","Stage 2 approved Q3-2019, full design/tender being prepared.","","","",""],
    [248,248,"SHIP CONSTRUCTION","Cork County","Lissoran, Ballinspittle",4,"*N/A","","","","","","Q4-2021"],
    [249,249,"SHIP CONSTRUCTION","Cork County","Convent Road, Doneraile",17,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [250,250,"SHIP CONSTRUCTION","Cork County","Kearney's field Dunmanway",13,"*N/A","","","","","Q3-2020",""],
    [251,251,"SHIP CONSTRUCTION","Cork County","Chapel Lane, Ballydehob, Co. Cork",12,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [252,252,"SHIP CONSTRUCTION","Cork County","Sleaveen East, Macroom",16,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [253,253,"SHIP CONSTRUCTION","Cork County","Old Barrack Road, Bantry, Co. Cork",6,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [254,254,"SHIP CONSTRUCTION","Cork County","Coastguard Cottages, Lower Roads, Crosshaven, Co. Cork",27,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [255,255,"SHIP CONSTRUCTION","Cork County","Beechgrove, Clonakilty",6,"N/A","","","","","Q3-2019",""],
    [256,256,"CAS CONSTRUCTION TURNKEY","Cork County","Ardmanagh, Schull",12,"Túath Housing Association Ltd","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [257,257,"CAS CONSTRUCTION","Cork County","Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay",18,"Cluid Housing Association","","","Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.","","",""],
    [258,258,"CAS CONSTRUCTION","Cork County","Masseytown, Macroom",14,"Túath Housing Association Ltd","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [259,259,"CAS CONSTRUCTION","Cork County","Baile Bhuire, Macroom",3,"*N/A","","","","","Q2-2020",""],
    [260,260,"CAS CONSTRUCTION","Cork County","Charleville, Church View, Love Lane, Charleville",9,"Charleville Care Project Ltd","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [261,261,"CAS CONSTRUCTION","Cork County","St. Michaels, 36 Main Street, Bandon, Co. Cork",6,"Bandon Geriatric ? Community Council","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [262,262,"CAS CONSTRUCTION","Cork County","Distillery Lane, Distillery Walk, Midleton",7,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [263,263,"CAS CONSTRUCTION","Cork County","Mardyke, Skibbereen",4,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [264,264,"CAS CONSTRUCTION","Cork County","Daniel O’Brien Terrace, Buttevant",7,"Túath Housing Association Ltd","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [265,265,"CAS CONSTRUCTION","Cork County","Lisheen Field, Kilbarry Road, Dunmanway, Co. Cork",16,"Cluid Housing Association","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [266,266,"CAS CONSTRUCTION","Cork County","8 Harbour Row. Cobh",5,"*N/A","","","","","Q1-2022",""],
    [267,267,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Cork County","The Miles, Clonakilty (Phase 1)",20,"*N/A","","","","","","Q2-2021"],
    [268,268,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Cork County","The Miles, Clonakilty (Phase 2)",32,"*N/A","","","","","","Q4-2021"],
    [269,269,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Cork County","Poundhill, Skibbereen (Phase 1)",35,"*N/A","","","","","","Q2-2021"],
    [270,270,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Cork County","Poundhill, Skibbereen (Phase 2)",15,"*N/A","","","","","","Q4-2021"],
    [271,271,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Cork County","Oakwood, Macroom (Phase 1)",37,"*N/A","","","","","","Q2-2021"],
    [272,272,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Cork County","Oakwood, Macroom (Phase 2)",13,"*N/A","","","","","","Q3-2021"],
    [273,273,"CALF TURNKEY","Cork County","Cascade Apartments, Castlelake, Carrigtwohill, Cork (Phase 1)",95,"Co - Operative Housing Ireland Society Limited","","","","","Q3-2021",""],
    [274,274,"CALF TURNKEY","Cork County","Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 1)",8,"Clúid Housing","","","","","Q2-2021",""],
    [275,275,"CALF TURNKEY","Cork County","Castle Heights, Kilmoney, Carrigaline, Co Cork (Phase 2)",4,"Clúid Housing","","","","","Q2-2021",""],
    [276,276,"CALF TURNKEY","Cork County","Chapel Court, Skibbereen, Cork (Phase 1)",8,"Clúid Housing","","","","","Q3-2021",""],
    [277,277,"CALF TURNKEY","Cork County","Chapel Court, Skibbereen, Cork (Phase 2)",8,"Clúid Housing","","","","","Q3-2021",""],
    [278,278,"CALF TURNKEY","Cork County","Church Hill, Carrigaline, Co Cork (Phase 1)*",37,"Respond","","","","","Q3-2021",""],
    [279,279,"CALF TURNKEY","Cork County","Harbour Heights, Passage West, Co Cork (Phase 1)",14,"Clúid Housing","","","","","Q4-2020",""],
    [280,280,"CALF TURNKEY","Cork County","Harbour Heights, Passage West, Co Cork (Phase 2)",13,"Clúid Housing","","","","","Q4-2020",""],
    [281,281,"CALF TURNKEY","Cork County","Hazel View, Hazel Brooke, Spa Glen, Mallow, Co Cork (Phase 1)",12,"Clúid Housing","","","","Q4-2021","",""],
    [282,282,"CALF TURNKEY","Cork County","Lough Beg, Loughbeg, Ringaskiddy, Cork (Phase 1)*",15,"Respond","","","","Q2-2022","",""],
    [283,283,"CALF TURNKEY","Cork County","Shambles Lane, Thomas Davis Street, Mallow, Co Cork (Phase 1)",6,"Focus Housing Association CLG","","","","Q1-2022","",""],
    [284,284,"CALF TURNKEY","Cork County","The Miles, Clonakilty, Co Cork  (Phase 1)",38,"Clúid Housing","","","","Q3-2021","",""],
    [285,285,"CALF TURNKEY","Cork County","Westview, Coolroe, Ballincollig, Co. Cork (Phase 2)",20,"Respond","","","","","","Q1-2021"],
    [286,286,"SHIP CONSTRUCTION TURNKEY","DLR","Kilternan Close",22,"*N/A","","","","","","Q1-2021"],
    [287,287,"SHIP CONSTRUCTION TURNKEY","DLR","George's Street Upper, Dun Laoghaire",5,"*N/A","","","","","","Q1-2021"],
    [288,288,"SHIP CONSTRUCTION TURNKEY","DLR","HazelBrook Square, Nutgrove, Churchtown",2,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [289,289,"SHIP CONSTRUCTION DESIGN BUILD","DLR","Ballyogan Square, Ballyogan",67,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [290,290,"SHIP CONSTRUCTION","DLR","Park House, 66 George's Street, Dun Laoghaire",4,"*N/A","","","Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.","","",""],
    [291,291,"SHIP CONSTRUCTION","DLR","Broadford Rise",21,"*N/A","","","","","","Q4-2021"],
    [292,292,"SHIP CONSTRUCTION","DLR","Ballyogan Avenue, Ballyogan",2,"*N/A","","","","","","Q2-2021"],
    [293,293,"SHIP CONSTRUCTION","DLR","St. Laurence’s Park, Stillorgan",89,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [294,294,"SHIP CONSTRUCTION","DLR","Moyola Court, Churchtown Lower, Dublin 14",4,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [295,295,"SHIP CONSTRUCTION","DLR","Shanganagh Castle",200,"*N/A","","","Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.","","",""],
    [296,296,"SHIP CONSTRUCTION","DLR","Site at Roebuck Road, Clonskeagh, Dublin 14",4,"*N/A","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [297,297,"SHIP CONSTRUCTION","DLR","37A Rollins Villas, Sallynoggin, Co. Dublin ",1,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [298,298,"SHIP CONSTRUCTION","DLR","Old Coastguard Cottages, Coal Harbour, Harbour Road",4,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [299,299,"SHIP CONSTRUCTION","DLR","Cross Avenue, Dún Laoghaire, Co. Dublin",4,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [300,300,"SHIP CONSTRUCTION","DLR","Infill Site Adjacent to 4 Rockville Drive, Glenamuck, Co. Dublin",1,"N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [301,301,"CAS CONSTRUCTION","DLR","30 Obelisk Walk, Blackrock",4,"St. John of God Housing Association Ltd","","","","","","Q4-2021"],
    [302,302,"CALF TURNKEY","DLR","Ardilea Crescent, Ardilea, Clonskeagh, Dublin 14, Co. Dublin (Phase 1)*",2,"Tuath Housing Association","","","","","","Q4-2021"],
    [303,303,"CALF TURNKEY","DLR","Ballybetagh Road, Kilternan, Co Dublin (Phase 1)*",22,"Clanmil Housing Association Ireland","","","","","Q3-2021",""],
    [304,304,"CALF TURNKEY","DLR","Cherrywood Town Centre, Dublin 18 (Phase 1)*",80,"Clúid Housing","","","","","Q4-2019",""],
    [305,305,"CALF TURNKEY","DLR","Cherrywood Town Centre, Dublin 18 (Phase 2)*",61,"Clúid Housing","","","","","Q4-2019",""],
    [306,306,"CALF TURNKEY","DLR","Egremont, Church Road, Killiney, Co. Dublin (Phase 1)*",4,"Circle Voluntary Housing Association Ltd","","","","","Q4-2019",""],
    [307,307,"CALF CONSTRUCTION","DLR","Enniskerry Road, Sandyford, Dublin 18 (Phase 1)",9,"Respond","","","","","","Q4-2021"],
    [308,308,"CALF CONSTRUCTION","DLR","Enniskerry Road, Sandyford, Dublin 18 (Phase 2)",22,"Respond","","","","","","Q1-2022"],
    [309,309,"CALF CONSTRUCTION","DLR","Enniskerry Road, Sandyford, Dublin 18 (Phase 3)",22,"Respond","","","","","","Q1-2022"],
    [310,310,"CALF CONSTRUCTION","DLR","Enniskerry Road, Sandyford, Dublin 19 (Phase 1)",18,"Tuath Housing Association","","","","","","Q4-2021"],
    [311,311,"CALF CONSTRUCTION","DLR","Enniskerry Road, Sandyford, Dublin 19 (Phase 2)",16,"Tuath Housing Association","","","","","","Q1-2022"],
    [312,312,"CALF CONSTRUCTION","DLR","Enniskerry Road, Sandyford, Dublin 19 (Phase 3)",18,"Tuath Housing Association","","","","","","Q1-2022"],
    [313,313,"CALF TURNKEY","DLR","Johnstown Place,Johnstown Road, Cabinteely, Dublin 18 (Formerly Johnstown Court) (Phase 1)*",51,"Clúid Housing","","","","","","Q2-2021"],
    [314,314,"CALF TURNKEY","DLR","Kiln View, Clay Farm Way, Leopardstown, Co Dublin (Phase 1)*",55,"The Iveagh Trust","","","","","Q4-2020",""],
    [315,315,"CALF TURNKEY","DLR","Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 1)*",14,"Tuath Housing Association","","","","","","Q1-2021"],
    [316,316,"CALF TURNKEY","DLR","Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 2)*",18,"Tuath Housing Association","","","","","","Q2-2021"],
    [317,317,"CALF TURNKEY","DLR","Oakton Court, Ballybrack, Co. Dublin (Phase 1)",5,"Circle Voluntary Housing Association Ltd","","","","","Q4-2021",""],
    [318,318,"CALF TURNKEY","DLR","Phase 2, Elmwood, Johnstown Road, Cabinteely, Dun Laoghaire, Co. Dublin (Phase 1)*",58,"Clúid Housing","","","","","","Q1-2022"],
    [319,319,"CALF TURNKEY","DLR","The Glen, Glenamuck Road, Carrickmines, Dublin 18 (Phase 1)*",48,"Respond","","","","","Q1-2021",""],
    [320,320,"CALF TURNKEY","DLR","Whinsfield, Sandyford Road, Dublin 18 (Phase 1)",59,"Respond","","","","","Q3-2020",""],
    [321,321,"CALF TURNKEY","DLR","Whinsfield, Sandyford Road, Dublin 18 (Phase 1)*",6,"Respond","","","","","Q3-2020",""],
    [322,322,"SHIP DIALOG","Donegal","Drumrooske West",36,"*N/A","","","","","Q2-2021",""],
    [323,323,"SHIP DIALOG","Donegal","Convent Road, Carndonagh",21,"*N/A","","","","","Q1-2021",""],
    [324,324,"SHIP DIALOG","Donegal","Meadowfield, Convoy",12,"*N/A","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [325,325,"SHIP DIALOG","Donegal","Donegal Road, Ballybofey",14,"*N/A","","","","","Q1-2021",""],
    [326,326,"SHIP DIALOG","Donegal","Admiran, Stranorlar",52,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [327,327,"SHIP DIALOG","Donegal","Rockview, Carrickboy, Ballyshannon",5,"*N/A","","","","","Q1-2021",""],
    [328,328,"SHIP DIALOG","Donegal","Glencrow, Moville",35,"*N/A","","","","","Q2-2021",""],
    [329,329,"SHIP DIALOG","Donegal","Ballyraine, Letterkenny",25,"*N/A","","","","","Q3-2021",""],
    [330,330,"SHIP DIALOG","Donegal","Lough Fern Heights, Milford",17,"*N/A","","","","","Q1-2021",""],
    [331,331,"SHIP DIALOG","Donegal","Convent Road, Carndonagh",18,"N/A","","","","","Q1-2021",""],
    [332,332,"SHIP DIALOG","Donegal","Convent Road, Carndonagh",14,"N/A","","","","","Q1-2021",""],
    [333,333,"SHIP DIALOG","Donegal","Meadowfield, Convoy",12,"*N/A","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [334,334,"SHIP DIALOG","Donegal","Cnoc Ard, Carnamuggagh, Letterkenny",6,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [335,335,"SHIP CONSTRUCTION TURNKEY","Donegal","Brookfield, Donegal Town",8,"*N/A","","","","","","Q1-2022"],
    [336,336,"SHIP CONSTRUCTION TURNKEY","Donegal","Brookfield, Donegal Town",12,"*N/A","","","","","Q4-2020",""],
    [337,337,"SHIP CONSTRUCTION TURNKEY","Donegal","Brookfield, Donegal Town",14,"*N/A","","","","","Q4-2020",""],
    [338,338,"SHIP CONSTRUCTION SINGLE STAGE","Donegal","SRD Loughanure Annagry",1,"*N/A","","","","","Q1-2021",""],
    [339,339,"SHIP CONSTRUCTION SINGLE STAGE","Donegal","SRD Meenderrynasloe, Annagry",1,"*N/A","","","","","Q1-2021",""],
    [340,340,"SHIP CONSTRUCTION SINGLE STAGE","Donegal","Knockamany Malin",1,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [341,341,"SHIP CONSTRUCTION SINGLE STAGE","Donegal","Largymore, Kilcar",1,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [342,342,"SHIP CONSTRUCTION","Donegal","Meadow Hill, Raphoe",11,"*N/A","","","","","Q3-2020",""],
    [343,343,"SHIP CONSTRUCTION","Donegal","Long Lane, Letterkenny",29,"*N/A","","","","","","Q2-2021"],
    [344,344,"SHIP CONSTRUCTION","Donegal","Rockytown, Buncrana (Phase 1)",21,"*N/A","","","","","Q4-2019",""],
    [345,345,"SHIP CONSTRUCTION","Donegal","Pound Street, Dunfanaghy",4,"*N/A","","","","","Q3-2020",""],
    [346,346,"SHIP CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",24,"*N/A","","","","","","Q2-2021"],
    [347,347,"SHIP CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",24,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [348,348,"SHIP CONSTRUCTION","Donegal","Trusk Road, Ballybofey",19,"*N/A","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [349,349,"SHIP CONSTRUCTION","Donegal","Crana Crescent, Buncrana",16,"*N/A","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [350,350,"SHIP CONSTRUCTION","Donegal","Drumacrin, Bundoran",42,"*N/A","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [351,351,"SHIP CONSTRUCTION","Donegal","Gallow's Lane, Lifford",29,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [352,352,"SHIP CONSTRUCTION","Donegal","Chapel Road, Dungloe",45,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [353,353,"SHIP CONSTRUCTION","Donegal","Kilmacrennan, Letterkenny",34,"*N/A","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [354,354,"CAS CONSTRUCTION","Donegal","Glenrowan House, Drumkeen, Stranorlar",5,"Apex Housing Association","","","","","Q4-2020",""],
    [355,355,"CAS CONSTRUCTION","Donegal","Cois Locha, Meenmore, Dungloe",15,"County Donegal Parents and Friends Housing Association Ltd","","","","","Q3-2020",""],
    [356,356,"CAS CONSTRUCTION","Donegal","Raphoe Road, Castlefinn",34,"Habinteg Housing Association (Ireland) Ltd","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [357,357,"CALF TURNKEY","Donegal","Ard na Gréine, Glencar Scotch, Letterkenny, Co. Donegal  (Phase 1)*",18,"Clúid Housing","","","","","Q2-2021",""],
    [358,358,"CALF TURNKEY","Donegal","Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*",33,"Respond","","","","","","Q1-2021"],
    [359,359,"SHIP DIALOG","Dublin City","O'Devaney Gardens - SH from Mixed Tenure Project",36,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [360,360,"SHIP DIALOG","Dublin City","O'Devaney Gardens - SH from Mixed Tenure Project",115,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [361,361,"SHIP DIALOG","Dublin City","O'Devaney Gardens - SH from Mixed Tenure Project",124,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [362,362,"SHIP CONSTRUCTION TURNKEY","Dublin City","88-89 Drimnagh Road Dublin 12",24,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [363,363,"SHIP CONSTRUCTION TURNKEY","Dublin City","St. Pancras, Harolds Cross, Dublin 6",4,"*N/A","","","","","","Q2-2021"],
    [364,364,"SHIP CONSTRUCTION TURNKEY","Dublin City","Core 4, Block 4 Charlemont Square, Dublin 2",15,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [365,365,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Belcamp B, Dublin 17",12,"*N/A","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [366,366,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Bunratty Road",78,"*N/A","","","","","Q4-2019",""],
    [367,367,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Bonham Street Dublin  8 ",57,"*N/A","","","","","Q4-2019",""],
    [368,368,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Cork Street/Chamber Street Dublin 8",55,"*N/A","","","","","Q1-2020",""],
    [369,369,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Springvale Chapelizod Dublin 8",71,"*N/A","","","","","Q1-2020",""],
    [370,370,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Cromcastle & Woodville, Coolock, Dublin 5",156,"*N/A","Stage 1 approved Q1-2021, outline design and costs being prepared.","","","","",""],
    [371,371,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","Crumlin Road - Rafters Lane, Dublin 12",47,"*N/A","Stage 1 approved Q4-2020, outline design and costs being prepared.","","","","",""],
    [372,372,"SHIP CONSTRUCTION DESIGN BUILD","Dublin City","St. Andrews Court, Dublin 2",37,"*N/A","Stage 1 approved Q4-2020, outline design and costs being prepared.","","","","",""],
    [373,373,"SHIP CONSTRUCTION","Dublin City","Cornamona, Ballyfermot, Dublin 12",61,"*N/A","","","","","Q2-2019",""],
    [374,374,"SHIP CONSTRUCTION","Dublin City","Infirmary Road, Dublin 7",38,"*N/A","","Stage 2 approved Q2-2019, full design/tender being prepared.","","","",""],
    [375,375,"SHIP CONSTRUCTION","Dublin City","North King Street, - Sean Foster Place, Dublin 7",30,"*N/A","","","","","Q2-2019",""],
    [376,376,"SHIP CONSTRUCTION","Dublin City","St. Finbar's Court, Kilkieran Road, Dublin 7",46,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [377,377,"SHIP CONSTRUCTION","Dublin City","Dominick Street (East side)",72,"*N/A","","","","","Q1-2018",""],
    [378,378,"SHIP CONSTRUCTION","Dublin City","O'Devaney Gardens - Phase 1A",56,"*N/A","","","","","Q3-2018",""],
    [379,379,"SHIP CONSTRUCTION","Dublin City","Glin Court, Coolock, Dublin 17",32,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [380,380,"SHIP CONSTRUCTION","Dublin City","Kildonan Road",75,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [381,381,"SHIP CONSTRUCTION","Dublin City","Lands at Emmet Road",112,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [382,382,"SHIP CONSTRUCTION","Dublin City","St. Anne's Court, All Saints Drive, Raheny, Dublin 5",102,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [383,383,"REGENERATION","Dublin City","Dolphin House Phase 1b",35,"*N/A","Stage 1 approved Q4-2019, outline design and costs being prepared.","","","","",""],
    [384,384,"REGENERATION","Dublin City","Dorset Street, Dublin 7",163,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [385,385,"REGENERATION","Dublin City","Matt Talbot Court",92,"*N/A","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [386,386,"REGENERATION","Dublin City","Constitution Hill Dublin 7",130,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [387,387,"REGENERATION","Dublin City","Pearse House, Sandwith Street Lower, Dublin 2 (Blocks L,M,N &P)",75,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [388,388,"REGENERATION","Dublin City","Bluebell Phase 1A",140,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [389,389,"REGENERATION","Dublin City","Liberties Cluster Phase 1, School Street, The Liberties, Dublin 8",115,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [390,390,"REGENERATION","Dublin City","Oliver Bond House, Oliver Bond Street, Dublin 8",48,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [391,391,"CAS CONSTRUCTION TURNKEY","Dublin City","Block 70, The Plaza, Parkwest, Dublin 12 ",43,"Túath Housing Association Ltd","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [392,392,"CAS CONSTRUCTION TURNKEY","Dublin City","Abbottstown Avenue, Finglas West, Dublin 11 ",4,"North ? East Housing Association Ltd","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [393,393,"CAS CONSTRUCTION SINGLE STAGE","Dublin City","61 & 63 Rathoath Avenue, Finglas, Dublin 11",6,"Arlington Novas Ireland Ltd","","","","","Q4-2020",""],
    [394,394,"CAS CONSTRUCTION SINGLE STAGE","Dublin City","88 Lower Drumcondra Road, Dublin 9 ",6,"Peter McVerry Trust Ltd","","","","","Q4-2021",""],
    [395,395,"CAS CONSTRUCTION SINGLE STAGE","Dublin City","190 -192 Moore Haven, Drumcondra Road Upper, Dublin 9.",8,"DePaul Housing","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [396,396,"CAS CONSTRUCTION RENEWAL","Dublin City","8 North Frederick Street, Dublin 1",12,"Peter McVerry Trust Ltd","","","","","","Q4-2021"],
    [397,397,"CAS CONSTRUCTION","Dublin City","Ellis Court, Dublin",22,"Túath Housing Association Ltd","","","","","Q3-2019",""],
    [398,398,"CAS CONSTRUCTION","Dublin City","180-187 Townsend Street, Dublin 2",20,"Peter McVerry Trust Ltd","","","Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.","","",""],
    [399,399,"CAS CONSTRUCTION","Dublin City","26 New Street South, Dublin 8",8,"Peter McVerry Trust Ltd","","","","","","Q1-2021"],
    [400,400,"CAS CONSTRUCTION","Dublin City","55B Arbour Hill, Dublin 7",14,"Simon Community : Dublin Simon","","","Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.","","",""],
    [401,401,"CAS CONSTRUCTION","Dublin City","St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project ",52,"Circle Voluntary Housing Association Ltd","","","Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.","","",""],
    [402,402,"CAS CONSTRUCTION","Dublin City","Shaw Street, Dublin 2",12,"Peter McVerry Trust Ltd","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [403,403,"CAS CONSTRUCTION","Dublin City","13A Casement Drive, Finglas, Dublin 11",2,"Arlington Novas Ireland Ltd","","","","","Q4-2021",""],
    [404,404,"CAS CONSTRUCTION","Dublin City","Sarsfield Road, Ballyfermot, Dublin 10",6,"Respond","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [405,405,"CAS CONSTRUCTION","Dublin City","25-26 Ushers Island Ushers Quay Dublin 8",0,"Simon Community : Dublin Simon","","","","","Q4-2021",""],
    [406,406,"CAS CONSTRUCTION","Dublin City","53a Keeper Road, Drimnagh, Dublin 12",9,"Respond","Stage 1 approved Q4-2020, outline design and costs being prepared.","","","","",""],
    [407,407,"CAS CONSTRUCTION","Dublin City","Barnamore Grove, Finglas, Dublin 11",2,"Arlington Novas Ireland Ltd","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [408,408,"CAS CONSTRUCTION","Dublin City","5-7 Halston Street, Dublin 7",12,"Peter McVerry Trust Ltd","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [409,409,"CAS CONSTRUCTION","Dublin City","307a Casement Road, Finglas, Co. Dublin ",1,"Arlington Novas Ireland Ltd","","Stage 2 approved Q3-2019, full design/tender being prepared.","","","",""],
    [410,410,"PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","Dublin City","Ayrfield, Malahide Road",150,"*N/A","","","","","","Q2-2021"],
    [411,411,"PUBLIC PRIVATE PARTNERSHIP (Bundle 3)","Dublin City","Ready Mix Site, East Wall, Dublin 3",68,"*N/A","","Q4-2021","","","",""],
    [412,412,"PUBLIC PRIVATE PARTNERSHIP (Bundle 3)","Dublin City","Shangan Road, Ballymun, Dublin 9*",93,"*N/A","","Q4-2021","","","",""],
    [413,413,"PUBLIC PRIVATE PARTNERSHIP (Bundle 3)","Dublin City","Collins Avenue, Whitehall, Dublin 9",83,"*N/A","","Q4-2021","","","",""],
    [414,414,"CALF TURNKEY","Dublin City","15 Richmond Avenue, Dublin 3 (Phase 1)",35,"Focus Housing Association CLG","","","","Q1-2022","",""],
    [415,415,"CALF TURNKEY","Dublin City","25-27 Bow Lane West, Dublin 8 (Phase 1)",27,"Focus Housing Association CLG","","","","Q1-2022","",""],
    [416,416,"CALF TURNKEY","Dublin City","Aughrim Street, Stoneybatter, Dublin 7 (Phase 1)",4,"Clanmil Housing Association Ireland","","","","","","Q2-2021"],
    [417,417,"CALF CONSTRUCTION","Dublin City","Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)",62,"Clúid Housing","","","","","Q4-2021",""],
    [418,418,"CALF TURNKEY","Dublin City","Blackbanks View, 754 Howth Road, Raheny, Dublin 5 (Phase 1)*",40,"Clúid Housing","","","","","","Q1-2021"],
    [419,419,"CALF TURNKEY","Dublin City","Bluebell Avenue, Bluebell, Dublin 12 (Phase 1)*",52,"Respond","","","","","Q4-2019",""],
    [420,420,"CALF TURNKEY","Dublin City","Camac Park, Bluebell, Dublin 12 (Phase 1)",3,"Tuath Housing Association","","","","","","Q4-2021"],
    [421,421,"CALF TURNKEY","Dublin City","Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*",65,"Respond","","","","","Q2-2019",""],
    [422,422,"CALF TURNKEY","Dublin City","Chanel Manor, Coolock, Dublin 5 (Phase 1)*",22,"Respond","","","","","Q4-2020",""],
    [423,423,"CALF TURNKEY","Dublin City","Charlemont Gate, Griffith Avenue, Dublin 9 (Phase 1)*",35,"Clúid Housing","","","","","Q2-2021",""],
    [424,424,"CALF TURNKEY","Dublin City","Clonshaugh Road, Clonshaugh, Dublin 17 (Phase 1)",9,"North and East Housing Association CLG","","","","","Q4-2021",""],
    [425,425,"CALF TURNKEY","Dublin City","Connaught Street, Phibsborough, Dublin 7 (Phase 1)",20,"Focus Housing Association CLG","","","","","Q2-2021",""],
    [426,426,"CALF TURNKEY","Dublin City","Donnybrook Gardens, Lands of Greenfield Park, Donnybrook, Dublin 4 (Phase 1)*",4,"RHD Housing","","","","","","Q2-2021"],
    [427,427,"CALF TURNKEY","Dublin City","Elanora Court, Long Mile Road, Walkinstown, Dublin 12 (Phase 1)*",153,"Respond","","","","","Q3-2020",""],
    [428,428,"CALF TURNKEY","Dublin City","Newtown Cottages Malahide Road Coolock Dublin 17 (Phase 1)",3,"Clanmil Housing Association Ireland","","","","","Q3-2020",""],
    [429,429,"CALF CONSTRUCTION","Dublin City","North Great Charles Street, Dublin 1 (Phase 1)",52,"Clúid Housing","","","","Q4-2021","",""],
    [430,430,"CALF CONSTRUCTION","Dublin City","North King Street, Dublin 7  (Phase 1)",30,"Co - Operative Housing Ireland Society Limited","","","","","Q4-2019",""],
    [431,431,"CALF TURNKEY","Dublin City","Park West Campus, Kileen Road, Dublin 12 (Phase 1)",43,"Tuath Housing Association","","","","","Q4-2020",""],
    [432,432,"CALF CONSTRUCTION","Dublin City","Railway Street, Dublin 1\n (Phase 1)",47,"Circle Voluntary Housing Association Ltd","","","","Q2-2022","",""],
    [433,433,"CALF CONSTRUCTION","Dublin City","Sean Mc Dermott Street, Dublin 1 (Phase 1)",8,"Simon Community: Dublin Simon","","","","Q1-2022","",""],
    [434,434,"CALF TURNKEY","Dublin City","St Canice’s Hall, Ballygall Road West, Finglas, Dublin 11 (Phase 1)*",32,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [435,435,"SHIP DIALOG","Fingal","Killhedge Lane, Dun Emer, Lusk",7,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [436,436,"SHIP DIALOG","Fingal","Ballymastone, Donabate",30,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [437,437,"SHIP DIALOG","Fingal","Ballymastone, Donabate",40,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [438,438,"SHIP DIALOG","Fingal","Ballymastone, Donabate",40,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [439,439,"SHIP DIALOG","Fingal","Ballymastone, Donabate",30,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [440,440,"SHIP CONSTRUCTION SINGLE STAGE","Fingal","Outlands, Rathbeale Road, Swords",11,"*N/A","","","","","Q1-2022",""],
    [441,441,"SHIP CONSTRUCTION","Fingal","Tucketts Lane, Howth",8,"*N/A","","","Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.","","",""],
    [442,442,"SHIP CONSTRUCTION","Fingal","Wellview",20,"*N/A","","","","","Q3-2020",""],
    [443,443,"SHIP CONSTRUCTION","Fingal","Cappaghfinn, Cappagh Road Finglas - Phase 3",69,"*N/A","","","","","Q1-2021",""],
    [444,444,"SHIP CONSTRUCTION","Fingal","Church Fields, Phase 2B, Mulhuddart, Dublin 15.",67,"*N/A","","","","","Q4-2021",""],
    [445,445,"SHIP CONSTRUCTION","Fingal","Leonards Garage, Lusk",10,"*N/A","","","","","Q1-2022",""],
    [446,446,"SHIP CONSTRUCTION","Fingal","Katie Hunt's Cottage, Church Road, Lusk",5,"*N/A","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [447,447,"SHIP CONSTRUCTION","Fingal","North Street, Swords",8,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [448,448,"CAS CONSTRUCTION","Fingal","Killhedge Lane Dun Emer",31,"Túath Housing Association Ltd","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [449,449,"CAS CONSTRUCTION","Fingal","22 College Street, Baldoyle",4,"Cluid Housing Association","","","","","","Q4-2021"],
    [450,450,"CAS CONSTRUCTION","Fingal","Garristown",6,"North ? East Housing Association Ltd","","","","","Q3-2021",""],
    [451,451,"CAS CONSTRUCTION","Fingal","63 Hollystown Park, Holystown, Dublin 15",5,"Daughters Of Charity Of St Vincent De Paul","","","","","","Q4-2021"],
    [452,452,"CALF TURNKEY","Fingal","Bellingsmore, Hollywoodrath, Dublin 15  (Phase 1)*",17,"Tuath Housing Association","","","","","","Q2-2021"],
    [453,453,"CALF TURNKEY","Fingal","Bellingsmore, Hollywoodrath, Dublin 15  (Phase 2)",21,"Tuath Housing Association","","","","","","Q4-2021"],
    [454,454,"CALF TURNKEY","Fingal","Beresford, Oakstown, Donabate, Co. Dublin (Phase 1)*",36,"Tuath Housing Association","","","","","Q3-2020",""],
    [455,455,"CALF TURNKEY","Fingal","Beresford, Oakstown, Donabate, Co. Dublin (Phase 2)*",4,"Tuath Housing Association","","","","","Q3-2020",""],
    [456,456,"CALF TURNKEY","Fingal","Blackwood Square, Northwood Avenue, Santry Dublin 9 (Phase 1)*",33,"Tuath Housing Association","","","","","Q4-2020",""],
    [457,457,"CALF TURNKEY","Fingal","Carrs Lane, Malahide Road, Dublin 17 (Phase 1)*",29,"Respond","","","","","","Q2-2021"],
    [458,458,"CALF TURNKEY","Fingal","Carrs Lane, Malahide Road, Dublin 17 (Phase 2)*",30,"Respond","","","","","","Q4-2021"],
    [459,459,"CALF TURNKEY","Fingal","Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 1)*",90,"Respond","","","","","","Q4-2021"],
    [460,460,"CALF TURNKEY","Fingal","Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 2)*",48,"Respond","","","","","","Q4-2021"],
    [461,461,"CALF TURNKEY","Fingal","Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 2)*",6,"Tuath Housing Association","","","","","","Q2-2021"],
    [462,462,"CALF CONSTRUCTION","Fingal","Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)",65,"Clúid Housing","","","","","","Q4-2021"],
    [463,463,"CALF TURNKEY","Fingal","Lusk Village, Lusk, Co. Dublin, Phase 2  (Phase 1)*",14,"Clúid Housing","","","","","","Q4-2021"],
    [464,464,"CALF TURNKEY","Fingal","Lusk Village, Lusk, Co. Dublin, Phase 2  (Phase 2)*",4,"Clúid Housing","","","","","Q3-2020",""],
    [465,465,"CALF CONSTRUCTION","Fingal","Old Coolock Lane, Santry, Dublin 9 (Phase 1)",28,"Circle Voluntary Housing Association Ltd","","","","Q1-2019","",""],
    [466,466,"CALF TURNKEY","Fingal","Old Corduff Road, Blanchardstown, Dublin 15 (Phase 2)*",10,"Respond","","","","","","Q2-2021"],
    [467,467,"CALF TURNKEY","Fingal","Oldtown, Swords, Co Dublin (Phase 1)",30,"Respond","","","","Q3-2021","",""],
    [468,468,"CALF TURNKEY","Fingal","Oldtown, Swords, Co Dublin (Phase 2)",30,"Respond","","","","Q3-2021","",""],
    [469,469,"CALF TURNKEY","Fingal","Oldtown, Swords, Co Dublin (Phase 3)",39,"Respond","","","","Q3-2021","",""],
    [470,470,"CALF TURNKEY","Fingal","Riverwood Square, Porterstown, Dublin 15 (Phase 1)*",24,"Clúid Housing","","","","","","Q3-2021"],
    [471,471,"CALF TURNKEY","Fingal","Semple Woods, Donabate, Co. Dublin (Phase 2)*",3,"Tuath Housing Association","","","","","Q4-2019",""],
    [472,472,"CALF TURNKEY","Fingal","St Josephs, Clonsilla, Dublin 15 (Phase 1)*",28,"Clúid Housing","","","","","","Q4-2021"],
    [473,473,"CALF TURNKEY","Fingal","Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*",8,"Circle Voluntary Housing Association Ltd","","","","","","Q4-2021"],
    [474,474,"CALF TURNKEY","Fingal","Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*",7,"Clúid Housing","","","","","","Q4-2021"],
    [475,475,"SHIP CONSTRUCTION TURNKEY","Galway City","Garraí Caol, (Coast Road Site) Dublin Road",26,"*N/A","","","","","Q1-2020",""],
    [476,476,"SHIP CONSTRUCTION TURNKEY","Galway City","Garraí Caol, (Coast Road Site) Dublin Road",22,"*N/A","","","","","Q1-2020",""],
    [477,477,"SHIP CONSTRUCTION","Galway City","An Cliathán, Old Monivea Road, Ballybaan Mór",15,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [478,478,"SHIP CONSTRUCTION","Galway City","Garraí Beag, Monivea Road, Ballybaan More",58,"*N/A","","","","","Q1-2020",""],
    [479,479,"SHIP CONSTRUCTION","Galway City","Headford Road, Castlegar",21,"*N/A","Stage 1 approved Q3-2018, outline design and costs being prepared.","","","","",""],
    [480,480,"SHIP CONSTRUCTION","Galway City","Keeraun, Ballymoneen Road",63,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [481,481,"SHIP CONSTRUCTION","Galway City","Tirellan Heights, Headford Road",1,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [482,482,"SHIP CONSTRUCTION","Galway City","Merlin Park Lands, Galway City",18,"*N/A","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [483,483,"SHIP CONSTRUCTION","Galway City","1 Munster Avenue, Galway city",4,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [484,484,"SHIP CONSTRUCTION","Galway City","Clybaun Road, Knocknacarra",28,"N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [485,485,"CAS CONSTRUCTION","Galway City","Cul Garrai, Rahoon",6,"Peter Triest Housing Association Ltd","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [486,486,"CAS CONSTRUCTION","Galway City","Doughiska, Galway City",7,"Respond","Stage 1 approved Q2-2019, outline design and costs being prepared.","","","","",""],
    [487,487,"CAS CONSTRUCTION","Galway City","111 Upper Newcastle Road, Galway City",10,"Simon Community : North West Simon","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [488,488,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Galway City","Ballyburke (Phase 1)",56,"*N/A","","","","","","Q2-2021"],
    [489,489,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Galway City","Ballyburke (Phase 2)",18,"*N/A","","","","","","Q3-2021"],
    [490,490,"CALF TURNKEY","Galway City","Ballybanemor Road, Ballybrit, Galway (Phase 1)*",52,"Respond","","","","","Q2-2021",""],
    [491,491,"CALF TURNKEY","Galway City","Ballybanemor Road, Ballybrit, Galway (Phase 2)",49,"Respond","","","","","Q2-2021",""],
    [492,492,"CALF TURNKEY","Galway City","Creig Ard, Roscam, Galway City  (Phase 2)",10,"Clúid Housing","","","","","","Q2-2021"],
    [493,493,"CALF TURNKEY","Galway City","Creig Ard, Roscam, Galway City, Co. Galway (Phase 1)*",17,"Clúid Housing","","","","","","Q4-2021"],
    [494,494,"CALF TURNKEY","Galway City","Cuirt Bhoirne, Roscam, Co Galway (Phase 1)*",12,"Clúid Housing","","","","","Q3-2020",""],
    [495,495,"CALF TURNKEY","Galway City","Fanan, Letteragh Road, Galway (Phase 1)*",4,"Tuath Housing Association","","","","","","Q4-2021"],
    [496,496,"CALF TURNKEY","Galway City","Fanan, Letteragh Road, Galway (Phase 2)*",3,"Tuath Housing Association","","","","","Q4-2019",""],
    [497,497,"CALF TURNKEY","Galway City","Fanan, Letteragh Road, Galway (Phase 3)*",3,"Tuath Housing Association","","","","","Q4-2019",""],
    [498,498,"CALF TURNKEY","Galway City","Gaelcarrig, Letteragh, Galway City (Phase 1)*",40,"Respond","","","","","Q3-2020",""],
    [499,499,"CALF TURNKEY","Galway City","Gaelcarrig, Letteragh, Galway City (Phase 2)",43,"Respond","","","","","Q3-2020",""],
    [500,500,"CALF TURNKEY","Galway City","Garrai Sheain, Roscam, Galway (Phase 1)",9,"Co - Operative Housing Ireland Society Limited","","","","Q2-2022","",""],
    [501,501,"CALF TURNKEY","Galway City","Glenn Na Mona, Ballymoneen Road, Kncoknacarra, Galway (Phase 1)*",16,"Clúid Housing","","","","","Q1-2021",""],
    [502,502,"CALF TURNKEY","Galway City","Leana Mor, Cappagh Road, Galway (Phase 1)*",14,"Respond","","","","","Q2-2021",""],
    [503,503,"CALF TURNKEY","Galway City","Leana Mor, Cappagh Road, Galway (Phase 2)*",28,"Respond","","","","","Q2-2021",""],
    [504,504,"CALF TURNKEY","Galway City","Letteragh Road, Rahoon, Galway City (Phase 1)*",10,"Clúid Housing","","","","","","Q3-2021"],
    [505,505,"CALF TURNKEY","Galway City","Letteragh Road, Rahoon, Galway City (Phase 2)",13,"Clúid Housing","","","","","","Q4-2021"],
    [506,506,"CALF TURNKEY","Galway City","Letteragh Road, Rahoon, Galway City (Phase 3)",16,"Clúid Housing","","","","","Q3-2020",""],
    [507,507,"CALF TURNKEY","Galway City","Letteragh Road, Rahoon, Galway City (Phase 4)*",25,"Clúid Housing","","","","","Q3-2020",""],
    [508,508,"SHIP CONSTRUCTION TURNKEY","Galway County","Kylebroughlan, Moycullen ",9,"*N/A","","","","","","Q1-2021"],
    [509,509,"SHIP CONSTRUCTION TURNKEY","Galway County","Kylebroughlan, Moycullen ",10,"*N/A","","","","","","Q1-2021"],
    [510,510,"SHIP CONSTRUCTION TURNKEY","Galway County","Garraí Mhic Aodha, Tubber Road, Gort (Phase 1)",9,"*N/A","","","","","","Q4-2021"],
    [511,511,"SHIP CONSTRUCTION TURNKEY","Galway County","Tullahill, Loughrea",9,"*N/A","","","","","","Q4-2021"],
    [512,512,"SHIP CONSTRUCTION TURNKEY","Galway County","Limehill, Dunlo, Ballinasloe (Corrán Eiscir Riada)",17,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [513,513,"SHIP CONSTRUCTION TURNKEY","Galway County","Garraí Mhic Aodha, Tubber Road, Gort (Phase 2)",18,"*N/A","","","","","","Q4-2021"],
    [514,514,"SHIP CONSTRUCTION TURNKEY","Galway County","Cullairbaun, Athenry",14,"*N/A","","","","","Q4-2021",""],
    [515,515,"SHIP CONSTRUCTION TURNKEY","Galway County","Limehill, Dunlo, Ballinasloe (Corrán Eiscir Riada)",15,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [516,516,"SHIP CONSTRUCTION TURNKEY","Galway County","Garraí Glas, Ballydavid South, Athenry",7,"N/A","","","","","Q2-2021",""],
    [517,517,"SHIP CONSTRUCTION TURNKEY","Galway County","Gort an Choirce, Tubber Road, Gort",5,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [518,518,"SHIP CONSTRUCTION TURNKEY","Galway County","Cullairbaun, Athenry",13,"*N/A","","","","","Q4-2021",""],
    [519,519,"SHIP CONSTRUCTION TURNKEY","Galway County","Circular Road & Dublin Road, Tuam",10,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [520,520,"SHIP CONSTRUCTION TURNKEY","Galway County","Gort an Choirce, Tubber Road, Gort",24,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [521,521,"SHIP CONSTRUCTION TURNKEY","Galway County","Gort an Choirce, Tubber Road, Gort",21,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [522,522,"SHIP CONSTRUCTION TURNKEY","Galway County","Gort an Choirce, Tubber Road, Gort",4,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [523,523,"SHIP CONSTRUCTION TURNKEY","Galway County","Gort an Choirce, Tubber Road, Gort",8,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [524,524,"SHIP CONSTRUCTION SINGLE STAGE","Galway County","Claremount, Oughterard",4,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [525,525,"SHIP CONSTRUCTION SINGLE STAGE","Galway County","Corralough, Williamstown (SRD)",1,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [526,526,"SHIP CONSTRUCTION RENEWAL","Galway County","Dunlo Hill, Ballinasloe",11,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [527,527,"SHIP CONSTRUCTION","Galway County","Weir Road, Tuam",30,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [528,528,"SHIP CONSTRUCTION","Galway County","Gort na gCloch, Hospital Road, Clifden",18,"*N/A","","","","","Q4-2020",""],
    [529,529,"SHIP CONSTRUCTION","Galway County","Bridge Court, Ahascragh, Ballinasloe",18,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [530,530,"SHIP CONSTRUCTION","Galway County","Caisleán Raithlín, Ardrahan",10,"*N/A","","Stage 2 approved Q2-2019, full design/tender being prepared.","","","",""],
    [531,531,"SHIP CONSTRUCTION","Galway County","Barrack Street, Loughrea",5,"*N/A","","","","","","Q3-2021"],
    [532,532,"SHIP CONSTRUCTION","Galway County","Garraí Ghuaire, Cartron, Kinvara",10,"*N/A","","","","","Q3-2021",""],
    [533,533,"SHIP CONSTRUCTION","Galway County","Fána Bhuí, Tuam (Phase 1 )",16,"*N/A","","","","","","Q4-2021"],
    [534,534,"SHIP CONSTRUCTION","Galway County","Cnoc na Carraige, Roundstone",6,"*N/A","","","","","","Q1-2021"],
    [535,535,"SHIP CONSTRUCTION","Galway County","Ballyglass, Ardrahan (SRD)",1,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [536,536,"SHIP CONSTRUCTION","Galway County","Woodpark, Portumna (SRD)",1,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [537,537,"SHIP CONSTRUCTION","Galway County","Carrowmore West, Clontuskert, Ballinasloe (SRD)",1,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [538,538,"SHIP CONSTRUCTION","Galway County","Woodfield, Dunmore (SRD)",1,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [539,539,"SHIP CONSTRUCTION","Galway County","Knockaloura West, Brownsgrove, Tuam (SRD)",1,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [540,540,"SHIP CONSTRUCTION","Galway County","Creggaturlough, Craughwell (SRD)",1,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [541,541,"SHIP CONSTRUCTION","Galway County","Gort na gCloch, Hospital Road, Clifden",8,"*N/A","","","","","Q4-2020",""],
    [542,542,"SHIP CONSTRUCTION","Galway County","Fána Bhuí, Tuam (Phase 2)",10,"*N/A","","","","","Q4-2020",""],
    [543,543,"SHIP CONSTRUCTION","Galway County","Fána Bhuí, Tuam (Phase 3)",22,"*N/A","","","","","Q4-2020",""],
    [544,544,"SHIP CONSTRUCTION","Galway County","Ballymoe",8,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [545,545,"SHIP CONSTRUCTION","Galway County","Droim na Gaoithe, Baile Chláir (Claregalway)",45,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [546,546,"SHIP CONSTRUCTION","Galway County","Cosmona, Loughrea",40,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [547,547,"CAS CONSTRUCTION","Galway County","Letterfrack (Phase 2)",11,"Cluid Housing Association","","","","","","Q1-2022"],
    [548,548,"CAS CONSTRUCTION","Galway County","Rossaveal Cottages, Ros a Mhíl, South Connemara",8,"Tearmann Eanna Teoranta","Stage 1 approved Q4-2016, outline design and costs being prepared.","","","","",""],
    [549,549,"CAS CONSTRUCTION","Galway County","Eanach Mheain, Carraroe",13,"Tearmann Eanna Teoranta","","Stage 2 approved Q4-2018, full design/tender being prepared.","","","",""],
    [550,550,"CAS CONSTRUCTION","Galway County","Mountbellew",5,"Túath Housing Association Ltd","","Stage 2 approved Q4-2019, full design/tender being prepared.","","","",""],
    [551,551,"CAS CONSTRUCTION","Galway County","Springfield, Parkmore, Ballinasloe",4,"Peter Triest Housing Association Ltd","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [552,552,"CAS CONSTRUCTION","Galway County","Shannon Road, Portumna",4,"Carraig Dubh Housing Association","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [553,553,"CALF TURNKEY","Galway County","Cuirt Dun Leo, Dunlo, Ballinasloe, Co Galway (Phase 1)",24,"Clúid Housing","","","","Q4-2021","",""],
    [554,554,"CALF TURNKEY","Galway County","Cuirt Dun Leo, Dunlo, Ballinasloe, Co Galway (Phase 2)",14,"Clúid Housing","","","","Q4-2021","",""],
    [555,555,"CALF TURNKEY","Galway County","Gort na Fuinse, Headford, Co. Galway (Phase 1)*",11,"Clúid Housing","","","","","Q2-2021",""],
    [556,556,"CALF TURNKEY","Galway County","Gort na Fuinse, Headford, Co. Galway (Phase 2)",14,"Clúid Housing","","","","","Q2-2021",""],
    [557,557,"CALF TURNKEY","Galway County","Oranhill, Oranmore, Co. Galway (Phase 1)*",22,"Clúid Housing","","","","Q1-2021","",""],
    [558,558,"CALF TURNKEY","Galway County","Riveroaks, Claregalway, Co Galway  (Phase 2)",12,"Clúid Housing","","","","","","Q1-2021"],
    [559,559,"CALF TURNKEY","Galway County","Riveroaks, Claregalway, Co Galway  (Phase 3)*",16,"Clúid Housing","","","","","","Q2-2021"],
    [560,560,"CALF TURNKEY","Galway County","Weir road, Tuam, Co. Galway (Phase 1)*",5,"Sophia Housing Association Ltd","","","","","Q3-2021",""],
    [561,561,"SHIP CONSTRUCTION TURNKEY","Kerry","Cnoc an Cairn, Chapel Lane, Dingle",2,"*N/A","","","","","","Q1-2022"],
    [562,562,"SHIP CONSTRUCTION SINGLE STAGE","Kerry","Glannagilliagh, Caragh Lake, Killorglin (SRD)",1,"*N/A","","","","","Q2-2021",""],
    [563,563,"SHIP CONSTRUCTION SINGLE STAGE","Kerry","Carrigcannon, Lyreacrumpane (SRD)",1,"*N/A","","","","","Q2-2021",""],
    [564,564,"SHIP CONSTRUCTION SINGLE STAGE","Kerry","Rahinnane, Ventry (SRD)",1,"*N/A","","","","","Q2-2021",""],
    [565,565,"SHIP CONSTRUCTION DESIGN BUILD","Kerry","Rathmore/Barraduff",20,"*N/A","","","","","","Q2-2021"],
    [566,566,"SHIP CONSTRUCTION","Kerry","Glenach, Ballybunion",20,"*N/A","","","","","","Q1-2021"],
    [567,567,"SHIP CONSTRUCTION","Kerry","Lohercannon, Tralee",61,"*N/A","","","","","Q3-2020",""],
    [568,568,"SHIP CONSTRUCTION","Kerry","Cullenagh Upper, Beaufort",1,"*N/A","","","","","","Q1-2021"],
    [569,569,"SHIP CONSTRUCTION","Kerry","Farranwilliam, Ardfert",22,"*N/A","","","","","","Q3-2021"],
    [570,570,"SHIP CONSTRUCTION","Kerry","Ballyrickard, Tralee",21,"*N/A","","","","","Q3-2020",""],
    [571,571,"SHIP CONSTRUCTION","Kerry","Croogorts, Tralee",30,"*N/A","","","","","Q3-2020",""],
    [572,572,"SHIP CONSTRUCTION","Kerry","Rock Rd., Killarney",10,"*N/A","","","","","Q3-2020",""],
    [573,573,"SHIP CONSTRUCTION","Kerry","Gortamullin, Kenmare (Phase 4)",14,"*N/A","","","","","","Q1-2021"],
    [574,574,"SHIP CONSTRUCTION","Kerry","Baile an Gharraí, Lixnaw (Phase 2)",10,"*N/A","","","","","","Q2-2021"],
    [575,575,"SHIP CONSTRUCTION","Kerry","Woodview Place, Tarbert",22,"*N/A","","","","","Q2-2021",""],
    [576,576,"SHIP CONSTRUCTION","Kerry","Marconi South, Ballybunion",14,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [577,577,"SHIP CONSTRUCTION","Kerry","Rahoonane, Tralee (New Site)",8,"*N/A","","","","","Q2-2021",""],
    [578,578,"SHIP CONSTRUCTION","Kerry","Rusheen, Ballylongford",7,"*N/A","","","","","Q4-2021",""],
    [579,579,"SHIP CONSTRUCTION","Kerry","Gortamullin, Kenmare (Phase 5)",14,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [580,580,"SHIP CONSTRUCTION","Kerry","Matt Talbot Road, Tralee",27,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [581,581,"SHIP CONSTRUCTION","Kerry","Locke's Shop, Mitchel's Rd, Tralee",8,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [582,582,"SHIP CONSTRUCTION","Kerry","Marian Terrace, Ballyheigue",9,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [583,583,"SHIP CONSTRUCTION","Kerry","Bridge Rd, Abbeydorney",1,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [584,584,"SHIP CONSTRUCTION","Kerry","Hawley Park Apartments, Tralee",16,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [585,585,"SHIP CONSTRUCTION","Kerry","SRD at Emlaghmore, Caherciveen, Co Kerry",1,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [586,586,"SHIP CONSTRUCTION","Kerry","SRD at Garfinny, Dingle, Co Kerry",1,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [587,587,"SHIP CONSTRUCTION","Kerry","SRD at Gortadrislig, Lixnaw, Co Kerry",1,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [588,588,"SHIP CONSTRUCTION","Kerry","SRD at Kells, Caherciveen, Co Kerry",1,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [589,589,"SHIP CONSTRUCTION","Kerry","Ballybeg, Dingle, Co Kerry",37,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [590,590,"CAS CONSTRUCTION TURNKEY","Kerry","Firies Hall, Firies",14,"Peter McVerry Trust Ltd","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [591,591,"CAS CONSTRUCTION TURNKEY","Kerry","Turnkey at Firies Hall, Firies, Co Kerry",4,"Peter McVerry Trust Ltd","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [592,592,"CAS CONSTRUCTION","Kerry","Armagh House, Killarney",6,"Cluid Housing Association","","","","","","Q1-2021"],
    [593,593,"CAS CONSTRUCTION","Kerry","Chamfers Place (Mitchels road, Tralee)",18,"Cluid Housing Association","","","","","Q2-2021",""],
    [594,594,"CALF TURNKEY","Kerry","Apts 52-66 Fels Point, Dan Spring Road, Tralee, Co Kerry (Phase 1)",15,"Focus Housing Association CLG","","","","Q2-2022","",""],
    [595,595,"CALF TURNKEY","Kerry","Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 1)",28,"Clúid Housing","","","","","Q4-2020",""],
    [596,596,"CALF TURNKEY","Kerry","Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 2)*",26,"Clúid Housing","","","","","Q4-2020",""],
    [597,597,"CALF TURNKEY","Kerry","Barraduff, Killarney, Co. Kerry (Phase 4)*",13,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2021"],
    [598,598,"CALF TURNKEY","Kerry","Cahirdown Wood, Listowel, Co. Kerry (Phase 1)*",12,"Clúid Housing","","","","","Q3-2020",""],
    [599,599,"CALF TURNKEY","Kerry","Cahirdown Wood, Listowel, Co. Kerry (Phase 2)",26,"Clúid Housing","","","","","Q3-2020",""],
    [600,600,"CALF TURNKEY","Kerry","Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 1)",16,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [601,601,"CALF TURNKEY","Kerry","Cashen Court, Dun Alainn, Listowel, Co Kerry (Phase 2)",23,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [602,602,"CALF TURNKEY","Kerry"," Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 4)",1,"Respond","","","","","","Q2-2021"],
    [603,603,"CALF TURNKEY","Kerry","Hunters Lodge, Hunters Wood, Ballyseedy, Tralee, Co. Kerry (Phase 1)",10,"Clúid Housing","","","","","Q3-2021",""],
    [604,604,"CALF TURNKEY","Kerry","Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 1)*",12,"Co - Operative Housing Ireland Society Limited","","","","","","Q3-2021"],
    [605,605,"CALF TURNKEY","Kerry","Lawlors Hill, (formerly Commons East)  Ardfert, Co. Kerry (Phase 2)",8,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [606,606,"CALF TURNKEY","Kerry","Lios Ard, Lisloose, Tralee, Co. Kerry (Phase 1)",28,"Clúid Housing","","","","","","Q3-2021"],
    [607,607,"CALF TURNKEY","Kerry","Moanmore, Pound Road, Castleisland, Co. Kerry (Phase 1)*",14,"Clúid Housing","","","","","","Q4-2021"],
    [608,608,"CALF TURNKEY","Kerry","Orglan Heights, Ardmoneel, Killorglin (Phase 1)*",30,"Clúid Housing","","","","Q3-2021","",""],
    [609,609,"SHIP CONSTRUCTION TURNKEY","Kildare","The Willows, Allenwood",1,"*N/A","","","","","","Q2-2021"],
    [610,610,"SHIP CONSTRUCTION TURNKEY","Kildare","Fitzgerald Close, Greenfield, Maynooth",1,"*N/A","","","","","","Q2-2021"],
    [611,611,"SHIP CONSTRUCTION TURNKEY","Kildare","Coolaghknock Green, Kildare Town",2,"*N/A","","","","","","Q1-2021"],
    [612,612,"SHIP CONSTRUCTION TURNKEY","Kildare","Abbotsfield Clane",1,"*N/A","","","","","","Q2-2021"],
    [613,613,"SHIP CONSTRUCTION TURNKEY","Kildare","Old Mill Race, Monasterevin",9,"*N/A","","","","","Q4-2019",""],
    [614,614,"SHIP CONSTRUCTION TURNKEY","Kildare","Hemmingway Park, Clane",13,"*N/A","","","","","","Q3-2021"],
    [615,615,"SHIP CONSTRUCTION TURNKEY","Kildare","Hemmingway Park, Clane",10,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [616,616,"SHIP CONSTRUCTION TURNKEY","Kildare","Coolaghknock Green, Kildare Town",2,"*N/A","","","","","","Q2-2021"],
    [617,617,"SHIP CONSTRUCTION TURNKEY","Kildare","Newtown, Ardclough Rd, Celbridge",49,"*N/A","","","","","Q2-2021",""],
    [618,618,"SHIP CONSTRUCTION TURNKEY","Kildare","Kildare Road, Rathangan",9,"*N/A","","","","","Q1-2021",""],
    [619,619,"SHIP CONSTRUCTION TURNKEY","Kildare","Abbotsfield, Clane",2,"*N/A","","","","","","Q3-2021"],
    [620,620,"SHIP CONSTRUCTION TURNKEY","Kildare","The Willows, Allenwood",1,"*N/A","","","","","","Q4-2021"],
    [621,621,"SHIP CONSTRUCTION TURNKEY","Kildare","Fitzgerald Close, Greenfield, Maynooth",1,"*N/A","","","","","","Q4-2021"],
    [622,622,"SHIP CONSTRUCTION TURNKEY","Kildare","Williams Grove, Ardclough",2,"*N/A","","","","","","Q4-2021"],
    [623,623,"SHIP CONSTRUCTION TURNKEY","Kildare","Millstream Court, Kilcullen",1,"*N/A","","","","","","Q4-2021"],
    [624,624,"SHIP CONSTRUCTION SINGLE STAGE","Kildare","Patrician Avenue, Naas",3,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [625,625,"SHIP CONSTRUCTION RENEWAL","Kildare","25 St. Corbans Place, Naas ",1,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [626,626,"SHIP CONSTRUCTION DESIGN BUILD","Kildare","Old Greenfield Road, Maynooth",65,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [627,627,"SHIP CONSTRUCTION","Kildare","Athgarvan Village",18,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [628,628,"SHIP CONSTRUCTION","Kildare","Newtown House, Leixlip",4,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [629,629,"SHIP CONSTRUCTION","Kildare","Coill Dubh",10,"*N/A","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [630,630,"SHIP CONSTRUCTION","Kildare","Ardclough Road, Celbridge",39,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [631,631,"SHIP CONSTRUCTION","Kildare","Ambassador Site, Kill",33,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [632,632,"SHIP CONSTRUCTION","Kildare","Carbury",5,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [633,633,"SHIP CONSTRUCTION","Kildare","St. Evins Park Monasterevin",16,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [634,634,"SHIP CONSTRUCTION","Kildare","Castle Park, Athy",5,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [635,635,"SHIP CONSTRUCTION","Kildare","Oldtown Mill, Celbridge",57,"*N/A","Stage 1 approved Q4-2020, outline design and costs being prepared.","","","","",""],
    [636,636,"SHIP CONSTRUCTION","Kildare","Old Caragh Road, Nass",58,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [637,637,"CAS CONSTRUCTION","Kildare","Craddockstown, Naas",3,"KARE Promoting Inclusion for People with Intellectual Disabilities","","Stage 2 approved Q2-2018, full design/tender being prepared.","","","",""],
    [638,638,"CAS CONSTRUCTION","Kildare","El Kantara, Newbridge",2,"KARE Promoting Inclusion for People with Intellectual Disabilities","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [639,639,"CAS CONSTRUCTION","Kildare","Jigginstown House, Naas",12,"Homeless Care Ltd","","","","","","Q2-2021"],
    [640,640,"CAS CONSTRUCTION","Kildare","St. John's Convent, New Street, Rathangan",27,"Sophia Housing Association Ltd","Stage 1 approved Q4-2019, outline design and costs being prepared.","","","","",""],
    [641,641,"CAS CONSTRUCTION","Kildare","Dominican Lands, Athy",34,"Cluid Housing Association","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [642,642,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Kildare","Butterstream, Clane",77,"*N/A","","","","","","Q4-2021"],
    [643,643,"PUBLIC PRIVATE PARTNERSHIP (Bundle 3)","Kildare","Ardrew, Athy, Co. Kildare",73,"*N/A","","Q4-2021","","","",""],
    [644,644,"CALF TURNKEY","Kildare","1 unit, Loughlion Green, Kildare Town (Phase 1)",1,"Co - Operative Housing Ireland Society Limited","","","","","","Q3-2021"],
    [645,645,"CALF TURNKEY","Kildare","15 units, Ledwill Park, Kilcock, Co. Kildare (Phase 1)",15,"Clúid Housing","","","","","","Q4-2021"],
    [646,646,"CALF TURNKEY","Kildare","2 units, Ledwill Park, Kilcock, Co. Kildare (Phase 1)",2,"Clúid Housing","","","","","","Q4-2021"],
    [647,647,"CALF TURNKEY","Kildare","Belin Woods, Newbridge, Co. Kildare (Phase 1)*",30,"Tuath Housing Association","","","","","Q3-2021",""],
    [648,648,"CALF TURNKEY","Kildare","Belin Woods, Newbridge, Co. Kildare (Phase 2)*",4,"Tuath Housing Association","","","","","Q3-2021",""],
    [649,649,"CALF CONSTRUCTION","Kildare","Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)",29,"Tuath Housing Association","","","","","Q1-2020",""],
    [650,650,"CALF TURNKEY","Kildare","Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 2)*",17,"Tuath Housing Association","","","","","","Q4-2021"],
    [651,651,"CALF CONSTRUCTION","Kildare","Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)",35,"Respond","","","","","Q1-2021",""],
    [652,652,"CALF TURNKEY","Kildare","Grand Canal Wood, Allenwood, Co. Kildare (Phase 1)*",21,"Clúid Housing","","","","","","Q1-2021"],
    [653,653,"CALF TURNKEY","Kildare","Grand Canal Wood, Allenwood, Co. Kildare (Phase 2)",19,"Clúid Housing","","","","","","Q2-2021"],
    [654,654,"CALF TURNKEY","Kildare","Kilbelin Abbey, Kildare, Phase 1 (Phase 1)*",4,"Clúid Housing","","","","","","Q1-2021"],
    [655,655,"CALF TURNKEY","Kildare","Kilbelin Abbey, Kildare, Phase 2 (Phase 1)*",4,"Clúid Housing","","","","","Q2-2019",""],
    [656,656,"CALF TURNKEY","Kildare","Ledwill Park, Kilcock, Co. Kildare (Phase 1)*",27,"Clúid Housing","","","","","","Q3-2021"],
    [657,657,"CALF TURNKEY","Kildare","Ledwill Park, Kilcock, Co. Kildare (Phase 1)*",3,"Clúid Housing","","","","","","Q4-2021"],
    [658,658,"CALF TURNKEY","Kildare","Leinster Square, Dublin Street, Kildare Town, Co Kildare (Phase 1)*",4,"Clanmil Housing Association Ireland","","","","","","Q3-2021"],
    [659,659,"CALF TURNKEY","Kildare","Loughlion, Kildare Town, Kildare (Phase 3)*",16,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2021"],
    [660,660,"CALF TURNKEY","Kildare","Loughlion, Kildare Town, Kildare (Phase 4)",16,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [661,661,"CALF TURNKEY","Kildare","Loughlion, Kildare Town, Kildare (Phase 5)*",16,"Co - Operative Housing Ireland Society Limited","","","","","","Q3-2021"],
    [662,662,"CALF TURNKEY","Kildare","Main Street, Prosperous, Clane, Co. Kildare (Phase 1)*",16,"Clanmil Housing Association Ireland","","","","","Q4-2020",""],
    [663,663,"CALF TURNKEY","Kildare","Mariavilla, Maynooth, Co. Kildare (Phase 1)*",11,"Tuath Housing Association","","","","","","Q4-2021"],
    [664,664,"CALF TURNKEY","Kildare","Melitta Road, Co. Kildare (Phase 1)",4,"Clanmil Housing Association Ireland","","","","Q2-2022","",""],
    [665,665,"CALF TURNKEY","Kildare","Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 1)*",9,"Tuath Housing Association","","","","","Q4-2019",""],
    [666,666,"CALF TURNKEY","Kildare","Mullen Park and Carton Grove, Maynooth, Co. Kildare (Phase 2)*",18,"Tuath Housing Association","","","","","Q4-2019",""],
    [667,667,"CALF TURNKEY","Kildare","Newtown, Kill, Co. Kildare (Phase 1)*",13,"Tuath Housing Association","","","","","Q4-2020",""],
    [668,668,"CALF TURNKEY","Kildare","Newtown, Kill, Co. Kildare (Phase 2)",24,"Tuath Housing Association","","","","","Q4-2020",""],
    [669,669,"CALF TURNKEY","Kildare","Newtown, Kill, Co. Kildare (Phase 3)*",2,"Tuath Housing Association","","","","","Q4-2020",""],
    [670,670,"CALF TURNKEY","Kildare","Old Dublin Road, Celbridge, Co. Kildare (Phase 1)",6,"Co - Operative Housing Ireland Society Limited","","","","","Q4-2020",""],
    [671,671,"CALF TURNKEY","Kildare","Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 1)*",32,"Clúid Housing","","","","","Q2-2021",""],
    [672,672,"CALF TURNKEY","Kildare","Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 2)",24,"Clúid Housing","","","","","Q2-2021",""],
    [673,673,"CALF TURNKEY","Kildare","Riverside Green, Riverside Manor,Kilcullen, Co. Kildare (Phase 3)*",8,"Clúid Housing","","","","","Q2-2021",""],
    [674,674,"CALF TURNKEY","Kildare","The Paddocks, Morristown, Newbridge, Kildare (Phase 3)*",16,"Clúid Housing","","","","","","Q2-2021"],
    [675,675,"CALF TURNKEY","Kildare","The Paddocks, Newbridge, Kildare  (Phase 1)",26,"Clúid Housing","","","","","","Q3-2021"],
    [676,676,"CALF TURNKEY","Kildare","The Paddocks, Newbridge, Kildare  (Phase 2)",33,"Clúid Housing","","","","","","Q4-2021"],
    [677,677,"CALF TURNKEY","Kildare","The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)*",18,"Respond","","","","","","Q2-2021"],
    [678,678,"CALF TURNKEY","Kildare","The Vestry, Glebelands, Athy, Co. Kildare (Phase 3) (Phase 1)",20,"Respond","","","","","Q4-2019",""],
    [679,679,"CALF TURNKEY","Kildare","Westfield, Leixlip, Co. Kildare (Phase 1)*",20,"Respond","","","","","","Q4-2021"],
    [680,680,"CALF TURNKEY","Kildare","Whitethorn, Naas, Co. Kildare (Phase 1)*",12,"Tuath Housing Association","","","","","","Q4-2021"],
    [681,681,"CALF TURNKEY","Kildare","Whitethorn, Naas, Co. Kildare (Phase 2)*",4,"Tuath Housing Association","","","","","","Q4-2021"],
    [682,682,"CALF TURNKEY","Kildare","Whitethorn, Naas, Co. Kildare (Phase 3)*",4,"Tuath Housing Association","","","","","Q2-2020",""],
    [683,683,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Pennefeather Court, Hebron Road, Kilkenny",8,"*N/A","","","","","","Q1-2022"],
    [684,684,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Pennefeather Green, Hebron Road, Kilkenny",26,"*N/A","","","","","","Q1-2022"],
    [685,685,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Blackwater Grove, Kilmacow",14,"*N/A","","","","","","Q2-2021"],
    [686,686,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Limegrove, Ferrybank, Co. Kilkenny",5,"*N/A","","","","","","Q4-2021"],
    [687,687,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Limegrove, Ferrybank",10,"*N/A","","","","","","Q1-2022"],
    [688,688,"SHIP CONSTRUCTION TURNKEY","Kilkenny","Pennefeather Green, Hebron Road, Kilkenny",26,"*N/A","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [689,689,"SHIP CONSTRUCTION SINGLE STAGE","Kilkenny","Inchacarron, Mullinavat",2,"*N/A","","","","","Q1-2022",""],
    [690,690,"SHIP CONSTRUCTION SINGLE STAGE","Kilkenny","Shanganny, Jenkinstown",2,"*N/A","","","","","Q4-2020",""],
    [691,691,"SHIP CONSTRUCTION SINGLE STAGE","Kilkenny","Ayrfield, Granges Road, Kilkenny",6,"*N/A","","","","","","Q2-2021"],
    [692,692,"SHIP CONSTRUCTION SINGLE STAGE","Kilkenny","Old Fire Station, Graiguenamanagh",2,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [693,693,"SHIP CONSTRUCTION SINGLE STAGE","Kilkenny","Ayrfield, Granges Road, Kilkenny",2,"*N/A","","","","","","Q1-2022"],
    [694,694,"SHIP CONSTRUCTION SINGLE STAGE","Kilkenny","Haggardsgreen, Callan",1,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [695,695,"SHIP CONSTRUCTION","Kilkenny","10 Golf Links Road, Kilkenny",6,"*N/A","","","","","Q1-2022",""],
    [696,696,"SHIP CONSTRUCTION","Kilkenny","Station Road, Ballyragget",22,"*N/A","","","","","","Q2-2021"],
    [697,697,"SHIP CONSTRUCTION","Kilkenny","Donaguile, Castlecomer",33,"*N/A","","","","","","Q2-2021"],
    [698,698,"SHIP CONSTRUCTION","Kilkenny","The Broguemaker, Kilkenny",18,"*N/A","","","","","","Q2-2021"],
    [699,699,"SHIP CONSTRUCTION","Kilkenny","Ladywell, Thomastown, Co. Kilkenny",25,"*N/A","","","","","Q4-2021",""],
    [700,700,"SHIP CONSTRUCTION","Kilkenny","Crokers Hill, Kennyswell Road, Kilkenny",88,"*N/A","","","Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.","","",""],
    [701,701,"SHIP CONSTRUCTION","Kilkenny","Canal Road, Johnstown, Co. Kilkenny Project 1",5,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [702,702,"SHIP CONSTRUCTION","Kilkenny","Canal Road Johnstown Project 2",2,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [703,703,"SHIP CONSTRUCTION","Kilkenny","Canal Road Johnstown Project 3",4,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [704,704,"SHIP CONSTRUCTION","Kilkenny","Ladywell, Newtown, Thomastown",33,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [705,705,"SHIP CONSTRUCTION","Kilkenny","Weather Station, Granges Road, Kilkenny",6,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [706,706,"CAS CONSTRUCTION TURNKEY","Kilkenny","Tinnypark, Callan Road, Kilkenny",6,"SOS Kilkenny Housing Association Ltd","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [707,707,"CAS CONSTRUCTION TURNKEY","Kilkenny","70-71 Upper Patrick Street, Kilkenny",4,"Clanmill Housing Association Ireland","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [708,708,"CAS CONSTRUCTION SINGLE STAGE","Kilkenny","Miltown Lodge Phase 2, Johnswell Road, Kilkenny",1,"SOS Kilkenny Housing Association Ltd","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [709,709,"CAS CONSTRUCTION","Kilkenny","Kingsriver, Ennisnag",4,"Kingsriver Housing Association Limited","","","","","Q2-2021",""],
    [710,710,"CAS CONSTRUCTION","Kilkenny","Red Barn, Patrick Street, Ballyragget",11,"Good Shepherd Services Ltd","","","Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.","","",""],
    [711,711,"CAS CONSTRUCTION","Kilkenny","8/9 Kilkenny Street, Castlecomer",3,"Good Shepherd Services Ltd","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [712,712,"CAS CONSTRUCTION","Kilkenny","19/21 Blackmill Street, Kilkenny",12,"Good Shepherd Services Ltd","","","","","Q4-2021",""],
    [713,713,"CAS CONSTRUCTION","Kilkenny","Brother Thomas Place, Church Lane, Kilkenny",12,"Good Shepherd Services Ltd","","","","","Q2-2021",""],
    [714,714,"CAS CONSTRUCTION","Kilkenny","Grennan Villa, Thomastown",5,"Camphill Communities of Ireland","","","","","Q3-2020",""],
    [715,715,"CAS CONSTRUCTION","Kilkenny","St. John of god Convent, College Road, Kilkenny",21,"Sophia Housing Association Ltd","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [716,716,"CAS CONSTRUCTION","Kilkenny","Ladywell Street, Thomastown, Co. Kilkenny",6,"Good Shepherd Services Ltd","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [717,717,"CAS CONSTRUCTION","Kilkenny","Mill Street, Callan, Co. Kilkenny",12,"Kilkenny Voluntary Housing Association","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [718,718,"CAS CONSTRUCTION","Kilkenny","Prague House Hall, Freshford, Co. Kilkenny",8,"Kilkenny Voluntary Housing Association","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [719,719,"CALF TURNKEY","Kilkenny","Cois Na Bearu, Graiguenemanagh, Kilkenny (Phase 1)",14,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2021"],
    [720,720,"CALF TURNKEY","Kilkenny","Margaret’s Field, Callan Road, Kilkenny City (Phase 1)",40,"Respond","","","","","","Q2-2021"],
    [721,721,"CALF TURNKEY","Kilkenny","Nuncio Road, Kilkenny (Phase 2)*",22,"Respond","","","","","Q4-2018",""],
    [722,722,"CALF TURNKEY","Kilkenny","Orchard Close, Kilkenny (Phase 1)*",23,"Clúid Housing","","","","","Q4-2020",""],
    [723,723,"SHIP CONSTRUCTION TURNKEY","Laois","Priory, Borris in Ossory",5,"*N/A","","","","","Q2-2020",""],
    [724,724,"SHIP CONSTRUCTION TURNKEY","Laois","Church Ave., Stradbally",20,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [725,725,"SHIP CONSTRUCTION TURNKEY","Laois","Bruach Na Habhainn, Killeen, Maganey",3,"*N/A","","","","","","Q1-2022"],
    [726,726,"SHIP CONSTRUCTION TURNKEY","Laois","The Orchard, Ballylynan",2,"N/A","","","","","","Q1-2022"],
    [727,727,"SHIP CONSTRUCTION TURNKEY","Laois","Market Square, Portarlington",18,"N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [728,728,"SHIP CONSTRUCTION TURNKEY","Laois","The Orchard Ballylynan",3,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [729,729,"SHIP CONSTRUCTION TURNKEY","Laois","Church Avenue, Stradbally",11,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [730,730,"SHIP CONSTRUCTION TURNKEY","Laois","Bruach Na Habhainn, Killeen, Maganey",1,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [731,731,"SHIP CONSTRUCTION SINGLE STAGE","Laois","Coolroe, Ballybrittas",1,"*N/A","","","","","Q4-2020",""],
    [732,732,"SHIP CONSTRUCTION RENEWAL","Laois","Oldcourt Ballylynan",1,"N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [733,733,"SHIP CONSTRUCTION","Laois","Moore Street, Rathdowney",6,"*N/A","","","","","Q3-2020",""],
    [734,734,"SHIP CONSTRUCTION","Laois","Ballymorris Road, Portarlington",22,"*N/A","","","","","","Q2-2021"],
    [735,735,"SHIP CONSTRUCTION","Laois","Gleann na Glaise, Ballyroan",10,"*N/A","","","","","Q4-2020",""],
    [736,736,"SHIP CONSTRUCTION","Laois","Pattison Est. Mountmellick",10,"*N/A","","","","","Q4-2020",""],
    [737,737,"SHIP CONSTRUCTION","Laois","Shannon Street, Mountrath",6,"*N/A","","","","","","Q2-2021"],
    [738,738,"SHIP CONSTRUCTION","Laois","Harbour Court, Mountmellick",6,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [739,739,"SHIP CONSTRUCTION","Laois","Mooreville, Rathdowney",7,"*N/A","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [740,740,"SHIP CONSTRUCTION","Laois","Sean Doire, Cork Road, Durrow",22,"*N/A","","","","","Q4-2020",""],
    [741,741,"SHIP CONSTRUCTION","Laois","St Kieran's Park, Errill",14,"*N/A","","","Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.","","",""],
    [742,742,"SHIP CONSTRUCTION","Laois","Clonrooske, Knockmay",11,"*N/A","Stage 1 approved Q3-2019, outline design and costs being prepared.","","","","",""],
    [743,743,"SHIP CONSTRUCTION","Laois","Carraig Glas, Stradbally",26,"*N/A","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [744,744,"SHIP CONSTRUCTION","Laois","Iona,Abbeyleix Rd., Portlaoise",9,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [745,745,"SHIP CONSTRUCTION","Laois","Ballyadams",1,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [746,746,"SHIP CONSTRUCTION","Laois","Doonane",12,"N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [747,747,"SHIP CONSTRUCTION","Laois","Durrow",18,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [748,748,"CAS CONSTRUCTION","Laois","Presentation Convent & Lands, Portlaoise, ",51,"Sophia Housing Association Ltd","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [749,749,"CAS CONSTRUCTION","Laois","County Hotel, Portlaoise",10,"Cluid Housing Association","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [750,750,"CALF TURNKEY","Laois","Ballymorris Green, Portarlington, Co Laois (Phase 1)",12,"Clúid Housing","","","","","Q2-2021",""],
    [751,751,"CALF TURNKEY","Laois","Ballymorris Green, Portarlington, Co Laois (Phase 2)",20,"Clúid Housing","","","","","Q2-2021",""],
    [752,752,"CALF TURNKEY","Laois","Ballymorris Green, Portarlington, Co Laois (Phase 3)",14,"Clúid Housing","","","","","Q2-2021",""],
    [753,753,"CALF TURNKEY","Laois","Bellingham, Portlaoise\n (Phase 4)*",9,"Clúid Housing","","","","","","Q1-2021"],
    [754,754,"CALF TURNKEY","Laois","Bellingham, Portlaoise\n (Phase 5)*",6,"Clúid Housing","","","","","","Q3-2021"],
    [755,755,"CALF TURNKEY","Laois","Borris Road, Portlaoise, Co. Laois (Phase 4)",9,"Tuath Housing Association","","","","","","Q1-2021"],
    [756,756,"CALF TURNKEY","Laois","Clonroosk Abbey, Portlaoise, Co. Laois (Phase 1)",14,"Clúid Housing","","","","","Q4-2018",""],
    [757,757,"CALF TURNKEY","Laois","Clonroosk Abbey, Portlaoise, Co. Laois (Phase 2)*",6,"Clúid Housing","","","","","Q4-2018",""],
    [758,758,"CALF TURNKEY","Laois","Clonroosk Abbey, Portlaoise, Co. Laois (Phase 3)",12,"Clúid Housing","","","","","Q4-2018",""],
    [759,759,"CALF CONSTRUCTION","Laois","Curragh na Mona, Abbeyleix Rd, Portlaoise, Co. Laois (Phase 1)",39,"Respond","","","","Q2-2022","",""],
    [760,760,"CALF TURNKEY","Laois","Doirinn Alainn, Ballylynan, Co. Laois (Phase 3)*",6,"North and East Housing Association CLG","","","","","","Q2-2021"],
    [761,761,"CALF TURNKEY","Laois","Goldencroft, Portlaoise, Co. Laois (Phase 1)",13,"Clúid Housing","","","","","Q3-2021",""],
    [762,762,"CALF TURNKEY","Laois","Goldencroft, Portlaoise, Co. Laois (Phase 2)",24,"Clúid Housing","","","","","Q3-2021",""],
    [763,763,"CALF TURNKEY","Laois","Goldencroft, Portlaoise, Co. Laois (Phase 3)",30,"Clúid Housing","","","","","Q3-2021",""],
    [764,764,"CALF TURNKEY","Laois","Harpurs Lane, Portlaoise, Co. Laois (Phase 1)*",44,"Respond","","","","","Q2-2021",""],
    [765,765,"CALF CONSTRUCTION","Laois","Hepburn Court, Ballyfin Rd, Maryborough, Portlaoise, Co. Laois (Phase 1)",54,"Clúid Housing","","","","Q2-2022","",""],
    [766,766,"CALF TURNKEY","Laois","Holdbrook, Portlaoise, Co. Laois (Phase 1)",10,"Clúid Housing","","","","","","Q3-2021"],
    [767,767,"CALF TURNKEY","Laois","Holdbrook, Portlaoise, Co. Laois (Phase 2)",10,"Clúid Housing","","","","","Q3-2018",""],
    [768,768,"CALF TURNKEY","Laois","Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 1)",10,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [769,769,"CALF TURNKEY","Laois","Phase 2 The Glen, Kilnacourt, Portarlington, Co Laois (Phase 1)",18,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [770,770,"CALF TURNKEY","Laois","Phase 3 The Glen, Kilnacourt, Portarlington, Co Laois. (Phase 1)",8,"Co - Operative Housing Ireland Society Limited","","","","","","Q3-2021"],
    [771,771,"CALF TURNKEY","Laois","Rathillion, Killeshin, Co. Laois (Phase 1)*",4,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [772,772,"CALF TURNKEY","Laois","South Dublin Road, Portlaoise, Co. Laois (Phase 1)",13,"Co - Operative Housing Ireland Society Limited","","","","","Q1-2020",""],
    [773,773,"CALF TURNKEY","Laois","South Dublin Road, Portlaoise, Co. Laois (Phase 2)",14,"Co - Operative Housing Ireland Society Limited","","","","","Q1-2020",""],
    [774,774,"CALF TURNKEY","Laois","South Dublin Road, Portlaoise, Co. Laois (Phase 3)*",9,"Co - Operative Housing Ireland Society Limited","","","","","Q1-2020",""],
    [775,775,"CALF TURNKEY","Laois","The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 1)*",15,"Clúid Housing","","","","","Q1-2020",""],
    [776,776,"CALF TURNKEY","Laois","The Maltings and Roselawn, Portlaoise, Co. Laois (Phase 2)*",40,"Clúid Housing","","","","","Q1-2020",""],
    [777,777,"CALF TURNKEY","Laois","The Meadows, Mountrath Road, Portlaoise, Co. Laois (Phase 1)*",48,"Clúid Housing","","","","","Q1-2022",""],
    [778,778,"CALF TURNKEY","Laois","The Springs, Kilminchy, Portlaoise, Co Laois (Phase 1)*",24,"Clúid Housing","","","","","Q2-2021",""],
    [779,779,"CALF TURNKEY","Laois","The Springs, Kilminchy, Portlaoise, Co Laois (Phase 2)",19,"Clúid Housing","","","","","Q2-2021",""],
    [780,780,"SHIP CONSTRUCTION TURNKEY","Leitrim","Church Lane, Ballinamore",9,"*N/A","","","","","","Q4-2021"],
    [781,781,"SHIP CONSTRUCTION TURNKEY","Leitrim","Druminshingore, Newtowngore",2,"*N/A","","","","","","Q4-2021"],
    [782,782,"SHIP CONSTRUCTION TURNKEY","Leitrim","Ard na Drise, Mohill",2,"*N/A","","","","","","Q1-2021"],
    [783,783,"SHIP CONSTRUCTION TURNKEY","Leitrim","Lough Meen Estate, Drumkeerin",2,"*N/A","","","","","","Q4-2021"],
    [784,784,"SHIP CONSTRUCTION TURNKEY","Leitrim","Commons Lane, Manorhamilton",4,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [785,785,"SHIP CONSTRUCTION TURNKEY","Leitrim","Cluain Oir, Liscara, Carrick on Shannon",2,"*N/A","","","","","","Q2-2021"],
    [786,786,"SHIP CONSTRUCTION TURNKEY","Leitrim","Manorhamilton & Carrigallen",2,"*N/A","","","","","","Q3-2021"],
    [787,787,"SHIP CONSTRUCTION SINGLE STAGE","Leitrim","Breffni Cres., 53 St. Patricks Park Site, Carrick on Shannon",2,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [788,788,"SHIP CONSTRUCTION SINGLE STAGE","Leitrim","Druminshingore Td., Newtowngore",3,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [789,789,"SHIP CONSTRUCTION SINGLE STAGE","Leitrim","Dromahair Td., Dromahair",4,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [790,790,"SHIP CONSTRUCTION RENEWAL","Leitrim","Sean McDermott St., Manorhamilton",4,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [791,791,"SHIP CONSTRUCTION","Leitrim","Autumn View, Summerhill, Carrick on Shannon",27,"*N/A","","","","","","Q4-2021"],
    [792,792,"SHIP CONSTRUCTION","Leitrim","Taobh Tire, Manorhamilton (Phase 3)",5,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [793,793,"SHIP CONSTRUCTION","Leitrim","Townparks, Carrick on Shannon",12,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [794,794,"SHIP CONSTRUCTION","Leitrim","Lahard, Ballinamore",10,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [795,795,"SHIP CONSTRUCTION","Leitrim","Kilboderry Td., Carrick on Shannon",18,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [796,796,"SHIP CONSTRUCTION TURNKEY","Limerick","Redgate Close, Old Cratloe Road, Limerick City",14,"*N/A","","","","","Q1-2020",""],
    [797,797,"SHIP CONSTRUCTION TURNKEY","Limerick","Gortboy, Charleville Road, KiImallock",24,"*N/A","","","","","","Q1-2022"],
    [798,798,"SHIP CONSTRUCTION TURNKEY","Limerick","Knocklong",5,"*N/A","","","","","Q2-2021",""],
    [799,799,"SHIP CONSTRUCTION TURNKEY","Limerick","Gortboy, Charleville Road, Killmallock, Co Limerick",9,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [800,800,"SHIP CONSTRUCTION DESIGN BUILD","Limerick","Old Christians Site, Rathbane",43,"*N/A","","","","","","Q2-2021"],
    [801,801,"SHIP CONSTRUCTION DESIGN BUILD","Limerick","Barnakyle, Patrickswell (Site 2)",24,"*N/A","Stage 1 approved Q1-2018, outline design and costs being prepared.","","","","",""],
    [802,802,"SHIP CONSTRUCTION","Limerick","Ballysimon, Greenhill Road ",14,"*N/A","","","","","","Q1-2022"],
    [803,803,"SHIP CONSTRUCTION","Limerick","Gough Place, Rosbrien Road, Limerick",17,"*N/A","","","","","Q4-2020",""],
    [804,804,"SHIP CONSTRUCTION","Limerick","Clonmacken, Limerick City",43,"*N/A","","","","","Q3-2019",""],
    [805,805,"SHIP CONSTRUCTION","Limerick","Deerpark, Adare",13,"*N/A","Stage 1 approved Q2-2015, outline design and costs being prepared.","","","","",""],
    [806,806,"SHIP CONSTRUCTION","Limerick","Glenview Drive, Hospital",20,"*N/A","","","","","Q3-2020",""],
    [807,807,"SHIP CONSTRUCTION","Limerick","Clare Street, Limerick City",7,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [808,808,"SHIP CONSTRUCTION","Limerick","Lower Carey's Road, Limerick City",11,"*N/A","","","","","","Q1-2021"],
    [809,809,"SHIP CONSTRUCTION","Limerick","Kileely Road, Moyross",5,"*N/A","","","","","","Q2-2021"],
    [810,810,"SHIP CONSTRUCTION","Limerick","Knocklong",12,"*N/A","","","","","Q3-2021",""],
    [811,811,"SHIP CONSTRUCTION","Limerick","Colbert Terrace, Abbeyfeale",4,"*N/A","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [812,812,"SHIP CONSTRUCTION","Limerick","St. Michael's Court, Watergate Flats, ",9,"*N/A","Stage 1 approved Q1-2018, outline design and costs being prepared.","","","","",""],
    [813,813,"SHIP CONSTRUCTION","Limerick","Ballysimon, Greenhills Road",3,"*N/A","","","","","","Q1-2022"],
    [814,814,"SHIP CONSTRUCTION","Limerick","Clueing Dara, Broadford, Limerick",18,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [815,815,"SHIP CONSTRUCTION","Limerick","Sycamore Crescent, Newcastle West, Co Limerick",21,"*N/A","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [816,816,"SHIP CONSTRUCTION","Limerick","Radharc an Ghleanna, Mountcollins",4,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [817,817,"SHIP CONSTRUCTION","Limerick","O’Connor Park, Ardagh, Co. Limerick",8,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [818,818,"SHIP CONSTRUCTION","Limerick","Church Glen, Ballylanders, Co. Limerick",9,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [819,819,"SHIP CONSTRUCTION","Limerick","Radharc Cillin, Kilfinane, Co. Limerick",10,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [820,820,"SHIP CONSTRUCTION","Limerick","Ballycummin Road, Raheen, Co. Limerick",19,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [821,821,"SHIP CONSTRUCTION","Limerick","Brugh na Deise, Bruff, Co Limerick",17,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [822,822,"SHIP CONSTRUCTION","Limerick","Quinns Cross, Skehacreggaun, Mungret, Limerik.",24,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [823,823,"SHIP CONSTRUCTION","Limerick","Deerpark, Adare, Co Limerick",18,"*N/A","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [824,824,"SHIP CONSTRUCTION","Limerick","Sycamore Crescent, Newcastle West, Co Limerick",10,"*N/A","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [825,825,"REGENERATION","Limerick","Sheep / Athlunkards Street",8,"Túath Housing Association Ltd","","","Stage 3 approved Q1-2021, the scheme is now approved to proceed to tender.","","",""],
    [826,826,"REGENERATION","Limerick","Churchfield (Phase 2)",38,"Cluid Housing Association","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [827,827,"REGENERATION","Limerick","Cosgrave Park",30,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [828,828,"REGENERATION","Limerick","Orchard Site",27,"Oaklee Housing Trust","","","Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.","","",""],
    [829,829,"REGENERATION","Limerick","Cliona Park (Phase 3)",18,"Túath Housing Association Ltd","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [830,830,"REGENERATION","Limerick","45A-46A Cliona Park",2,"*N/A","","","","","","Q3-2021"],
    [831,831,"REGENERATION","Limerick","Dalgaish Park",27,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [832,832,"CAS CONSTRUCTION","Limerick","Towerfield Crescent, Croom",16,"Croom Voluntary Housing Association Ltd","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [833,833,"CAS CONSTRUCTION","Limerick","Cappamore",10,"Cappamore Housing Association Ltd","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [834,834,"CAS CONSTRUCTION","Limerick","Mirth, Thomondgate",18,"Associated Charities Trust Ltd","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [835,835,"CAS CONSTRUCTION","Limerick","2/3 Mallow Street",12,"Peter McVerry Trust Ltd","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [836,836,"CAS CONSTRUCTION","Limerick","St. Pauls Convent, Kilfinane",9,"Sophia Housing Association Ltd","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [837,837,"CAS CONSTRUCTION","Limerick","McGarry House, 7 Alphonsus Street",8,"Arlington Novas Ireland Ltd","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [838,838,"CAS CONSTRUCTION","Limerick","47 & 48 Main Street, Croom, Limerick",4,"Croom Voluntary Housing Association Ltd","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [839,839,"CAS CONSTRUCTION","Limerick","58 Henry Street",5,"Simon Community : Midwest Simon","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [840,840,"CAS CONSTRUCTION","Limerick","Infills Carew Park, Southhill and Moyross ",14,"Peter McVerry Trust Ltd","","","","","Q1-2021",""],
    [841,841,"CAS CONSTRUCTION","Limerick","28/29 Lower Gerald Griffin Street, Limerick",4,"Peter McVerry Trust Ltd","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [842,842,"CAS CONSTRUCTION","Limerick","42 St Joseph's Street, Limerick",3,"Peter McVerry Trust Ltd","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [843,843,"CAS CONSTRUCTION","Limerick","Nunan's Corner, Tullaha, Broadford, Co Limerick",7,"Broadford Voluntary Housing and Community Childcare CLG","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [844,844,"CAS CONSTRUCTION","Limerick","Infills Carew Park, Southill and Moyross",24,"Peter McVerry Trust Ltd","","","","","Q1-2021",""],
    [845,845,"CALF TURNKEY","Limerick","19 and 20 Castleview Shopping Centre Castleconnell  Limerick (Phase 1)",2,"Focus Housing Association CLG","","","","","","Q4-2021"],
    [846,846,"CALF TURNKEY","Limerick","Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 2)*",25,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [847,847,"CALF TURNKEY","Limerick","Bloodmill Road, Singland, Limerick (Phase 1)*",52,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [848,848,"CALF TURNKEY","Limerick","Bloodmill Road, Singland, Limerick (Phase 2)",32,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2020",""],
    [849,849,"CALF TURNKEY","Limerick","Bloodmill Road, Singland, Limerick (Phase 3)*",19,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2020",""],
    [850,850,"CALF TURNKEY","Limerick","Bloodmill Road, Singland, Limerick (Phase 4)*",34,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2020",""],
    [851,851,"CALF TURNKEY","Limerick","Clonmacken, Condell Road, Limerick (Phase 1)*",35,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [852,852,"CALF TURNKEY","Limerick","Clonmacken, Condell Road, Limerick (Phase 3)*",29,"Co - Operative Housing Ireland Society Limited","","","","","Q3-2020",""],
    [853,853,"CALF TURNKEY","Limerick","Clonmacken, Condell Road, Limerick (Phase 4)*",12,"Co - Operative Housing Ireland Society Limited","","","","","Q3-2020",""],
    [854,854,"CALF TURNKEY","Limerick","Clonmacken, Condell Road, Limerick (Phase 5)*",22,"Co - Operative Housing Ireland Society Limited","","","","","Q3-2020",""],
    [855,855,"CALF TURNKEY","Limerick","Dromsally Woods, Cappamore, Co. Limerick (Phase 1)",5,"Focus Housing Association CLG","","","","","Q3-2020",""],
    [856,856,"CALF TURNKEY","Limerick","Mungret Gate, Baunacloka, Mungret, Limerick (Phase 1)",8,"Clúid Housing","","","","","","Q2-2021"],
    [857,857,"CALF TURNKEY","Limerick","Mungret Gate, Baunacloka, Mungret, Limerick (Phase 2)*",23,"Clúid Housing","","","","","Q3-2018",""],
    [858,858,"CALF TURNKEY","Limerick","Newtown, Castletroy, Limerick (Phase 1)*",31,"Clúid Housing","","","","Q2-2021","",""],
    [859,859,"CALF TURNKEY","Limerick","Phase 2 Newtown Meadows, Castletroy, Limerick (Phase 1)*",32,"Clúid Housing","","","","Q4-2021","",""],
    [860,860,"CALF TURNKEY","Limerick","Toormore, Main Street, Bruree, Co. Limerick (Phase 1)",16,"Clúid Housing","","","","","","Q2-2021"],
    [861,861,"CALF CONSTRUCTION","Limerick","Turragh Crescent, Cappamore, Limerick (Phase 1)",15,"Clúid Housing","","","","Q3-2021","",""],
    [862,862,"CALF TURNKEY","Limerick","Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 1)*",19,"Clúid Housing","","","","","Q3-2020",""],
    [863,863,"CALF TURNKEY","Limerick","Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 2)",11,"Clúid Housing","","","","","Q3-2020",""],
    [864,864,"SHIP CONSTRUCTION TURNKEY","Longford","Slí Corglass, Legga",4,"*N/A","","","","","","Q1-2021"],
    [865,865,"SHIP CONSTRUCTION TURNKEY","Longford","Farnagh Hill, Longford Town",8,"*N/A","","","","","","Q1-2021"],
    [866,866,"SHIP CONSTRUCTION TURNKEY","Longford","Campbell's Drive, Campbell's Lane, Longford",6,"*N/A","","","","","","Q3-2021"],
    [867,867,"SHIP CONSTRUCTION TURNKEY","Longford","O'Hara Site, Connaught Rd.,Longford",14,"*N/A","","","","","Q1-2021",""],
    [868,868,"SHIP CONSTRUCTION TURNKEY","Longford","Alder Field, Farnagh Hill (Phase 2)",4,"*N/A","","","","","","Q4-2021"],
    [869,869,"SHIP CONSTRUCTION TURNKEY","Longford","Slí Corglass, Legga",4,"*N/A","","","","","","Q2-2021"],
    [870,870,"SHIP CONSTRUCTION TURNKEY","Longford","Campbell's Drive, Campbell's Lane, Longford",4,"*N/A","","","","","","Q2-2021"],
    [871,871,"SHIP CONSTRUCTION TURNKEY","Longford","Slí Corglass, Legga ",1,"*N/A","","","","","","Q3-2021"],
    [872,872,"SHIP CONSTRUCTION TURNKEY","Longford","Campbell's Lane, Longford",5,"*N/A","","","","","","Q2-2021"],
    [873,873,"SHIP CONSTRUCTION TURNKEY","Longford","St. Patricks Ct., Ballinamuck",8,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [874,874,"SHIP CONSTRUCTION TURNKEY","Longford","Alder Field, Farnagh Hill",12,"N/A","","","","","","Q3-2021"],
    [875,875,"SHIP CONSTRUCTION TURNKEY","Longford","Campbell's Drive, Campbell's Lane, Longford",6,"N/A","","","","","","Q4-2021"],
    [876,876,"SHIP CONSTRUCTION TURNKEY","Longford","Alder Field, Farnagh Hill",4,"N/A","","","","","","Q4-2021"],
    [877,877,"SHIP CONSTRUCTION TURNKEY","Longford","Alder Field, Farnagh Hill",3,"N/A","","","","","","Q4-2021"],
    [878,878,"SHIP CONSTRUCTION TURNKEY","Longford","Campbell's Drive, Campbell's Lane Longford",2,"N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [879,879,"SHIP CONSTRUCTION SINGLE STAGE","Longford","24B Congress Terrace, Longford",1,"N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [880,880,"SHIP CONSTRUCTION","Longford","'Rose Cottage', Ballinalee",6,"*N/A","","","","","","Q4-2021"],
    [881,881,"SHIP CONSTRUCTION","Longford","St.Rita's, Park Road, Longford",11,"*N/A","","Stage 2 approved Q1-2020, full design/tender being prepared.","","","",""],
    [882,882,"SHIP CONSTRUCTION","Longford","Fairgreen View, Longford Town",1,"*N/A","","","","","","Q2-2021"],
    [883,883,"SHIP CONSTRUCTION","Longford","Cranleymore, Abbeylara",3,"*N/A","","","Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.","","",""],
    [884,884,"SHIP CONSTRUCTION","Longford","Cloonahard, Edgeworthstown",1,"*N/A","","","","","","Q2-2021"],
    [885,885,"SHIP CONSTRUCTION","Longford","Woodlands Path, Keenagh",4,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [886,886,"SHIP CONSTRUCTION","Longford","Clough Dillons, Keenagh",4,"N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [887,887,"SHIP CONSTRUCTION","Longford","Radharc Na Muileann, Lanesborough",22,"N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [888,888,"SHIP CONSTRUCTION","Longford","Cnoc Na Gréine, Granard",6,"N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [889,889,"CALF CONSTRUCTION","Longford","Colmcille Terrace, Granard, Co. Longford. (Phase 1)",21,"Tuath Housing Association","","","","Q2-2018","",""],
    [890,890,"SHIP CONSTRUCTION TURNKEY","Louth","‘Gort Bui’, Ballymakenny Road, Drogheda",10,"*N/A","","","","","","Q1-2021"],
    [891,891,"SHIP CONSTRUCTION TURNKEY","Louth","‘Gort Bui’, Ballymakenny Road, Drogheda",9,"*N/A","","","","","","Q2-2021"],
    [892,892,"SHIP CONSTRUCTION TURNKEY","Louth","‘Gort Bui’, Ballymakenny Road, Drogheda",8,"*N/A","","","","","","Q2-2021"],
    [893,893,"SHIP CONSTRUCTION TURNKEY","Louth","Glyde View, Tallanstown",2,"*N/A","","","","","","Q2-2021"],
    [894,894,"SHIP CONSTRUCTION TURNKEY","Louth","Termon River, Termonfeckin",1,"*N/A","","","","","","Q4-2021"],
    [895,895,"SHIP CONSTRUCTION TURNKEY","Louth","Ellwood, Ballymakenny Road, Drogheda",8,"*N/A","","","","","Q1-2022",""],
    [896,896,"SHIP CONSTRUCTION TURNKEY","Louth","Ellwood, Ballymakenny Road, Drogheda",5,"*N/A","","","","","Q1-2022",""],
    [897,897,"SHIP CONSTRUCTION TURNKEY","Louth","Ellwood, Ballymakenny Road, Drogheda",5,"*N/A","","","","","Q1-2022",""],
    [898,898,"SHIP CONSTRUCTION TURNKEY","Louth","Ellwood, Ballymakenny Road, Drogheda",17,"*N/A","","","","","Q1-2022",""],
    [899,899,"SHIP CONSTRUCTION SINGLE STAGE","Louth","Moneymore, Drogheda",1,"*N/A","","","","","Q2-2020",""],
    [900,900,"SHIP CONSTRUCTION SINGLE STAGE","Louth","Gort Uaine, Clogherhead",1,"*N/A","","","","","Q3-2020",""],
    [901,901,"SHIP CONSTRUCTION SINGLE STAGE","Louth","School Lane, Dunleer",1,"*N/A","","","","","Q3-2020",""],
    [902,902,"SHIP CONSTRUCTION SINGLE STAGE","Louth","Doire Beag, Collon",6,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [903,903,"SHIP CONSTRUCTION RENEWAL","Louth","CPO Bundle 5 - 26 Castle Road, Dundalk",1,"*N/A","","","","","","Q1-2021"],
    [904,904,"SHIP CONSTRUCTION RENEWAL","Louth","CPO Bundle 6 - 6 Moorehall, Ardee",1,"*N/A","","","","","","Q1-2021"],
    [905,905,"SHIP CONSTRUCTION","Louth","Boice Court (Phase 2), Drogheda",72,"*N/A","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [906,906,"SHIP CONSTRUCTION","Louth","Father Finn Park (Phase 2)",17,"*N/A","","","","","","Q2-2021"],
    [907,907,"SHIP CONSTRUCTION","Louth","Mount Avenue, Dundalk",93,"*N/A","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [908,908,"SHIP CONSTRUCTION","Louth","Muirhevnamor, Dundalk (Phase 1)",11,"*N/A","","","","","Q1-2021",""],
    [909,909,"SHIP CONSTRUCTION","Louth","Rathmullen Park, Drogheda",6,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [910,910,"REGENERATION","Louth","Cox's Demesne Phase 2b",22,"*N/A","","","","","Q1-2020",""],
    [911,911,"CAS CONSTRUCTION TURNKEY","Louth","Liscorrie, Bog Road, Drogheda",12,"Túath Housing Association Ltd","","","","","","Q2-2021"],
    [912,912,"CAS CONSTRUCTION","Louth","6 Slieveroe Crescent, Dundalk",1,"Cluid Housing Association","","","","","","Q4-2021"],
    [913,913,"CAS CONSTRUCTION","Louth","Barrack Street, Dundalk",21,"Simon Community : Dundalk Simon","","","","","Q4-2021",""],
    [914,914,"CAS CONSTRUCTION","Louth","Tierney Street, Ardee",7,"Oaklee Housing Trust","","","Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.","","",""],
    [915,915,"CAS CONSTRUCTION","Louth","Coulter Park, Dundalk",7,"Túath Housing Association Ltd","","","","","Q3-2021",""],
    [916,916,"CAS CONSTRUCTION","Louth","Four Winds, Mullacapple, Collon",1,"St. John of God Housing Association Ltd","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [917,917,"CAS CONSTRUCTION","Louth","St. John's Home, Peter's Hill, Drogheda",4,"North ? East Housing Association Ltd","","","Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.","","",""],
    [918,918,"CAS CONSTRUCTION","Louth","Riverwell Close, Dundalk",1,"Respond","","Stage 2 approved Q2-2019, full design/tender being prepared.","","","",""],
    [919,919,"CAS CONSTRUCTION","Louth","Highfield, Newry Road, Dundalk (Domestic Violence Refuge)",12,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [920,920,"CAS CONSTRUCTION","Louth","10-16 The Alleys, St. Peter's Place, Drogheda",14,"Peter McVerry Trust Ltd","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [921,921,"CAS CONSTRUCTION","Louth","St Finian's Park, Drogheda",1,"St. John of God Housing Association Ltd","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [922,922,"CALF TURNKEY","Louth","Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 1)*",16,"Tuath Housing Association","","","","","","Q1-2021"],
    [923,923,"CALF TURNKEY","Louth","Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 2)",10,"Tuath Housing Association","","","","","","Q2-2021"],
    [924,924,"CALF TURNKEY","Louth","Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 3)",16,"Tuath Housing Association","","","","","","Q4-2021"],
    [925,925,"CALF TURNKEY","Louth","Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 4)",11,"Tuath Housing Association","","","","","","Q4-2021"],
    [926,926,"CALF TURNKEY","Louth","Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 5)",12,"Tuath Housing Association","","","","","Q1-2020",""],
    [927,927,"CALF TURNKEY","Louth","Clonmore Close, Ardee, Co. Louth (Phase 1)",12,"Clúid Housing","","","","","","Q1-2021"],
    [928,928,"CALF TURNKEY","Louth","Clonmore Close, Ardee, Co. Louth (Phase 2)*",15,"Clúid Housing","","","","","","Q3-2021"],
    [929,929,"CALF TURNKEY","Louth","Clonmore Close, Ardee, Co. Louth (Phase 3)",15,"Clúid Housing","","","","","","Q4-2021"],
    [930,930,"CALF TURNKEY","Louth","Clonmore Close, Ardee, Co. Louth (Phase 4)",13,"Clúid Housing","","","","","","Q4-2021"],
    [931,931,"CALF TURNKEY","Louth","Connolly Field, Dundalk, Co. Louth (Phase 1)*",30,"Fold Housing Association Ireland Ltd","","","","Q2-2022","",""],
    [932,932,"CALF TURNKEY","Louth","Connolly Field, Dundalk, Co. Louth (Phase 2)",40,"Fold Housing Association Ireland Ltd","","","","Q2-2022","",""],
    [933,933,"CALF TURNKEY","Louth","Donore Road, Drogheda, Co. Louth (Phase 1)",66,"Clúid Housing","","","","","Q2-2021",""],
    [934,934,"CALF TURNKEY","Louth","Dublin Road, Dundalk, Co. Louth (Phase 1)*",65,"Respond","","","","","Q4-2020",""],
    [935,935,"CALF TURNKEY","Louth","Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 1)*",87,"Clúid Housing","","","","","Q4-2020",""],
    [936,936,"CALF TURNKEY","Louth","Duiche Roden (formerly The Kitchen Garden)Desmesne Road, Dundalk, Co. Louth (Phase 2)",43,"Clúid Housing","","","","","Q4-2020",""],
    [937,937,"CALF TURNKEY","Louth","Fairways Gardens, Dundalk Co Louth (Phase 1)",8,"Clúid Housing","","","","","","Q4-2021"],
    [938,938,"CALF TURNKEY","Louth","Halliday Mills, Quay Street, Dundalk, Co. Louth (Phase 1)*",85,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [939,939,"CALF TURNKEY","Louth","Harbour View, Coulter Place, Dundalk (Phase 1)",24,"Clúid Housing","","","","","","Q3-2021"],
    [940,940,"CALF TURNKEY","Louth","Lismullen Grove, Dundalk, Co. Louth (Phase 2)",8,"Tuath Housing Association","","","","","","Q1-2021"],
    [941,941,"CALF TURNKEY","Louth","Newfoundwell Road, Drogheda, Co Louth (Phase 1)*",55,"Clúid Housing","","","","","","Q1-2022"],
    [942,942,"CALF TURNKEY","Louth","Newfoundwell Road, Drogheda, Co Louth (Phase 2)",39,"Clúid Housing","","","","","Q3-2020",""],
    [943,943,"CALF TURNKEY","Louth","Newtown, Marsh Road, Drogheda, Co. Louth (Phase 1)*",17,"Respond","","","","","Q4-2020",""],
    [944,944,"CALF TURNKEY","Louth","Newtown, Marsh Road, Drogheda, Co. Louth (Phase 2)*",23,"Respond","","","","","Q4-2020",""],
    [945,945,"CALF TURNKEY","Louth","Newtown, Marsh Road, Drogheda, Co. Louth (Phase 3)*",46,"Respond","","","","","Q4-2020",""],
    [946,946,"CALF TURNKEY","Louth","Newtown, Marsh Road, Drogheda, Co. Louth (Phase 4)*",47,"Respond","","","","","Q4-2020",""],
    [947,947,"CALF TURNKEY","Louth","Oriel Heights, Collon, Co. Louth (Phase 1)*",13,"North and East Housing Association CLG","","","","Q3-2021","",""],
    [948,948,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 1)",6,"Clanmil Housing Association Ireland","","","","","Q1-2019",""],
    [949,949,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 2)",9,"Clanmil Housing Association Ireland","","","","","Q1-2019",""],
    [950,950,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 3)",8,"Clanmil Housing Association Ireland","","","","","Q1-2019",""],
    [951,951,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 4)*",10,"Clanmil Housing Association Ireland","","","","","Q1-2019",""],
    [952,952,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 5)*",6,"Clanmil Housing Association Ireland","","","","","Q1-2019",""],
    [953,953,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 6)*",6,"Clanmil Housing Association Ireland","","","","","Q1-2019",""],
    [954,954,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 3)*",13,"Tuath Housing Association","","","","","Q1-2019",""],
    [955,955,"CALF TURNKEY","Louth","Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 4)",12,"Tuath Housing Association","","","","","Q1-2019",""],
    [956,956,"CALF TURNKEY","Louth","Scotch Hall, Drogheda, Co Louth  (Phase 1)",21,"Respond","","","","Q3-2021","",""],
    [957,957,"CALF TURNKEY","Louth","Tierney Street, Ardee, Co. Louth (Phase 1)",5,"Circle Voluntary Housing Association Ltd","","","","","Q3-2021",""],
    [958,958,"CALF TURNKEY","Louth","Tierney Street, Ardee, Co. Louth (Phase 2)",6,"Circle Voluntary Housing Association Ltd","","","","","Q3-2021",""],
    [959,959,"CALF TURNKEY","Louth","Tullybrook, Drogheda, Co. Louth  (Phase 1)*",85,"Clúid Housing","","","","","Q1-2021",""],
    [960,960,"SHIP CONSTRUCTION TURNKEY","Mayo","Bunree, Ballina",3,"*N/A","","","","","Q4-2019",""],
    [961,961,"SHIP CONSTRUCTION TURNKEY","Mayo","Silver Springs, Claremorris",20,"*N/A","","","","","Q3-2020",""],
    [962,962,"SHIP CONSTRUCTION TURNKEY","Mayo","Main St., Charlestown",2,"*N/A","","","","","","Q4-2021"],
    [963,963,"SHIP CONSTRUCTION SINGLE STAGE","Mayo","The Boreen, Crossmolina",3,"*N/A","","","","","","Q4-2021"],
    [964,964,"SHIP CONSTRUCTION SINGLE STAGE","Mayo","Deel Court, Crossmolina",3,"*N/A","","","","","","Q4-2021"],
    [965,965,"SHIP CONSTRUCTION SINGLE STAGE","Mayo","Knockroe, Moygownagh",3,"*N/A","","","","","","Q4-2021"],
    [966,966,"SHIP CONSTRUCTION SINGLE STAGE","Mayo","Low Park, Charlestown",3,"*N/A","","","","","","Q4-2021"],
    [967,967,"SHIP CONSTRUCTION RENEWAL","Mayo","Main St., Hollymount",1,"N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [968,968,"SHIP CONSTRUCTION DESIGN BUILD","Mayo","Murrevagh, Mulranney",16,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [969,969,"SHIP CONSTRUCTION","Mayo","Lios na Circa, Saleen, Castlebar - Phase 2",22,"*N/A","","","","","Q1-2022",""],
    [970,970,"SHIP CONSTRUCTION","Mayo","Cross",15,"*N/A","","Stage 2 approved Q2-2021, full design/tender being prepared.","","","",""],
    [971,971,"SHIP CONSTRUCTION","Mayo","Bonniconlon",5,"*N/A","","","","","","Q4-2021"],
    [972,972,"SHIP CONSTRUCTION","Mayo","Cloonkeadagh Road, Kiltimagh",21,"*N/A","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [973,973,"SHIP CONSTRUCTION","Mayo","Rehins Fort, Ballina",20,"*N/A","","","","","Q3-2021",""],
    [974,974,"SHIP CONSTRUCTION","Mayo","50 Units @ Golf Course Rd., Westport",50,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [975,975,"SHIP CONSTRUCTION","Mayo","Ballyglass, Carnacon, Claremorris",5,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [976,976,"SHIP CONSTRUCTION","Mayo","Lios na Circe, Saleen, Castlebar - Phase 3",14,"*N/A","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [977,977,"SHIP CONSTRUCTION","Mayo","Atlantic Drive ,Belmullet",4,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [978,978,"SHIP CONSTRUCTION","Mayo","Liskilleen, Ballinrobe,",1,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [979,979,"SHIP CONSTRUCTION","Mayo","Walsh St., Ballina",9,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [980,980,"SHIP CONSTRUCTION","Mayo","Main Street, Ballyvary",12,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [981,981,"SHIP CONSTRUCTION","Mayo","Rehins Fort, Foxford Rd., Ballina",30,"*N/A","","","","","Q3-2021",""],
    [982,982,"SHIP CONSTRUCTION","Mayo","AchilL Sound",20,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [983,983,"CAS CONSTRUCTION","Mayo","Kilbride, Swinford",5,"Sophia Housing Association Ltd","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [984,984,"CAS CONSTRUCTION","Mayo","Mount St Mary's Convent, Westport",17,"Túath Housing Association Ltd","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [985,985,"CAS CONSTRUCTION","Mayo","Ellison House, Ellison St., Castlebar",8,"Peter McVerry Trust Ltd","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [986,986,"CALF TURNKEY","Mayo","Chestnut Grove, Castlebar, Co. Mayo (Phase 1)",4,"Tuath Housing Association","","","","","Q3-2020",""],
    [987,987,"CALF TURNKEY","Mayo","Chestnut Grove, Castlebar, Co. Mayo (Phase 2)",4,"Tuath Housing Association","","","","","Q3-2020",""],
    [988,988,"CALF TURNKEY","Mayo","Humbert Way, Castlebar, Co. Mayo (Phase 1)",20,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2020",""],
    [989,989,"CALF TURNKEY","Mayo","The Sycamores, Ballina (Phase 1)",11,"Clúid Housing","","","","","","Q2-2021"],
    [990,990,"SHIP CONSTRUCTION TURNKEY","Meath","The Brambles, Longford rd., Duleek",16,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [991,991,"SHIP CONSTRUCTION TURNKEY","Meath","Connaught Street, Athboy",5,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [992,992,"SHIP CONSTRUCTION TURNKEY","Meath","Connaught Street, Athboy",2,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [993,993,"SHIP CONSTRUCTION RENEWAL","Meath","Carrick St., Kells",47,"*N/A","Stage 1 approved Q1-2019, outline design and costs being prepared.","","","","",""],
    [994,994,"SHIP CONSTRUCTION RENEWAL","Meath","Broville, Corballis, Laytown",1,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [995,995,"SHIP CONSTRUCTION RENEWAL","Meath","11 Glenidan Court, Enfield",1,"*N/A","","","","","","Q1-2022"],
    [996,996,"SHIP CONSTRUCTION RENEWAL","Meath","25 Carrick Street, Kells",1,"*N/A","","","","Stage 4 approved Q4-2019, the scheme is fully approved.","",""],
    [997,997,"SHIP CONSTRUCTION","Meath","Staleen Park, Donore",21,"*N/A","","","","","Q4-2020",""],
    [998,998,"SHIP CONSTRUCTION","Meath","Dunshaughlin",26,"*N/A","","","","","","Q4-2021"],
    [999,999,"SHIP CONSTRUCTION","Meath","Farganstown, Navan",84,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [1000,1000,"SHIP CONSTRUCTION","Meath","Blackhill Crescent, Donacarney",2,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1001,1001,"SHIP CONSTRUCTION","Meath","Archdeaconary Glebe, Kells",22,"*N/A","","Stage 2 approved Q1-2020, full design/tender being prepared.","","","",""],
    [1002,1002,"SHIP CONSTRUCTION","Meath","Nangle Court, Navan",15,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1003,1003,"SHIP CONSTRUCTION","Meath","Castle Street, Ashbourne - Dept of Education Site",74,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [1004,1004,"SHIP CONSTRUCTION","Meath","Church View, Rathmolyon",22,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1005,1005,"SHIP CONSTRUCTION","Meath","Church Street, Kells, Co. Meath",3,"*N/A","Stage 1 approved Q3-2019, outline design and costs being prepared.","","","","",""],
    [1006,1006,"SHIP CONSTRUCTION","Meath","Haggard Street, Trim, Co. Meath",4,"*N/A","Stage 1 approved Q3-2019, outline design and costs being prepared.","","","","",""],
    [1007,1007,"SHIP CONSTRUCTION","Meath","Pitcher Lane, Kells, Co. Meath",4,"*N/A","Stage 1 approved Q3-2019, outline design and costs being prepared.","","","","",""],
    [1008,1008,"SHIP CONSTRUCTION","Meath","Swan Lane, Balreask",6,"*N/A","Stage 1 approved Q4-2019, outline design and costs being prepared.","","","","",""],
    [1009,1009,"SHIP CONSTRUCTION","Meath","Lagore, Dunshaughlin",42,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1010,1010,"SHIP CONSTRUCTION","Meath","Convent Lands, Kildalkey, Athboy",28,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [1011,1011,"SHIP CONSTRUCTION","Meath","Ratholdren Court, Navan",26,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1012,1012,"SHIP CONSTRUCTION","Meath","Brews Hill, Navan",12,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1013,1013,"SHIP CONSTRUCTION","Meath","Newtown, Drumconrath",1,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [1014,1014,"SHIP CONSTRUCTION","Meath","New Lane, Abbey Lands, Navan, Co. Meath",4,"*N/A","Stage 1 approved Q1-2020, outline design and costs being prepared.","","","","",""],
    [1015,1015,"CAS CONSTRUCTION TURNKEY","Meath","Bridge Street, Ashbourne, Co Meath  ",20,"Peter McVerry Trust Ltd","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1016,1016,"CAS CONSTRUCTION TURNKEY","Meath","Gainsfield, (Gort Fionnbarra) Commons Road, Navan Co. Meath",6,"Túath Housing Association Ltd","","","","","","Q2-2021"],
    [1017,1017,"CAS CONSTRUCTION TURNKEY","Meath","6-7 Knightsbrook Close, Iffernock, Trim",2,"Túath Housing Association Ltd","","","","","","Q4-2021"],
    [1018,1018,"CAS CONSTRUCTION","Meath","Women's Refuge, Tailteann Drive, Windtown, Navan",8,"Meath Women’s Housing Association CLG","Stage 1 approved Q2-2020, outline design and costs being prepared.","","","","",""],
    [1019,1019,"CAS CONSTRUCTION","Meath","Park Avenue, Church Street, Oldcastle",5,"Society of Saint Vincent de Paul","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [1020,1020,"CALF TURNKEY","Meath","Applewood Court, Beaufort Place, Navan, Co. Meath (Phase 1)*",21,"Tuath Housing Association","","","","","Q3-2020",""],
    [1021,1021,"CALF TURNKEY","Meath","Ashewood, Ashbourne, Co Meath (Phase 1)",11,"Clúid Housing","","","","","","Q4-2021"],
    [1022,1022,"CALF TURNKEY","Meath","Athboy Road, Navan, Co. Meath (Phase 1)*",63,"Respond","","","","","Q1-2020",""],
    [1023,1023,"CALF TURNKEY","Meath","Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 1)*",24,"Tuath Housing Association","","","","","Q1-2021",""],
    [1024,1024,"CALF TURNKEY","Meath","Bryanstown Wood, Beamore Road, Drogheda, Co. Meath (Phase 2)*",4,"Tuath Housing Association","","","","","Q1-2021",""],
    [1025,1025,"CALF TURNKEY","Meath","Colliers Place, Abbey Road, Commons, Duleek, Co. Meath (Phase 1)*",17,"North and East Housing Association CLG","","","","","Q1-2021",""],
    [1026,1026,"CALF TURNKEY","Meath","Colliers Place, Abbey Road, Commons, Duleek, Co. Meath (Phase 2)",5,"North and East Housing Association CLG","","","","","Q1-2021",""],
    [1027,1027,"CALF TURNKEY","Meath","Frederick Manor, Ashbourne, Co. Meath (Phase 1)*",11,"Clúid Housing","","","","","","Q1-2021"],
    [1028,1028,"CALF TURNKEY","Meath","Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)",7,"Tuath Housing Association","","","","","","Q1-2021"],
    [1029,1029,"CALF TURNKEY","Meath","Gainsfield, Commons Road, Navan, Co. Meath (Phase 4)",9,"Tuath Housing Association","","","","","","Q2-2021"],
    [1030,1030,"CALF TURNKEY","Meath","Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 1)",19,"Tuath Housing Association","","","","","","Q4-2021"],
    [1031,1031,"CALF TURNKEY","Meath","Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 2)",15,"Tuath Housing Association","","","","","Q4-2020",""],
    [1032,1032,"CALF TURNKEY","Meath","Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 3)",15,"Tuath Housing Association","","","","","Q4-2020",""],
    [1033,1033,"CALF TURNKEY","Meath","Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 1)",5,"Tuath Housing Association","","","","","","Q3-2021"],
    [1034,1034,"CALF TURNKEY","Meath","Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 2)",5,"Tuath Housing Association","","","","","","Q3-2021"],
    [1035,1035,"CALF TURNKEY","Meath","Knightsbrook Close, Iffernock, Trim, Co. Meath (Phase 3)",6,"Tuath Housing Association","","","","","","Q4-2021"],
    [1036,1036,"CALF TURNKEY","Meath","Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 1)*",11,"Tuath Housing Association","","","","","Q3-2021",""],
    [1037,1037,"CALF TURNKEY","Meath","Knightsbrook Close, Phase 2, Iffernock, Trim, Co. Meath (Phase 2)*",11,"Tuath Housing Association","","","","","Q3-2021",""],
    [1038,1038,"CALF TURNKEY","Meath","Maudlin Vale,  Trim, Co. Meath (Phase 1)",12,"Tuath Housing Association","","","","Q2-2022","",""],
    [1039,1039,"CALF TURNKEY","Meath","Maudlin Vale,  Trim, Co. Meath (Phase 2)",14,"Tuath Housing Association","","","","Q2-2022","",""],
    [1040,1040,"CALF TURNKEY","Meath","Maudlin Vale,  Trim, Co. Meath (Phase 3)",13,"Tuath Housing Association","","","","Q2-2022","",""],
    [1041,1041,"CALF TURNKEY","Meath","Maydenhayes, Donacarney, Co. Meath (Phase 1)*",12,"Clúid Housing","","","","","","Q3-2021"],
    [1042,1042,"CALF TURNKEY","Meath","Narrow Ways, Bettystown, Co. Meath (Phase 1)",6,"Tuath Housing Association","","","","","","Q1-2022"],
    [1043,1043,"CALF TURNKEY","Meath","Narrow Ways, Bettystown, Co. Meath (Phase 2)",6,"Tuath Housing Association","","","","","","Q1-2022"],
    [1044,1044,"CALF TURNKEY","Meath","Oak Hall, Ardee Road, Carlanstown, Co. Meath (Phase 1)",8,"Tuath Housing Association","","","","Q2-2022","",""],
    [1045,1045,"CALF TURNKEY","Meath","Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 2)*",14,"Clúid Housing","","","","","","Q2-2021"],
    [1046,1046,"CALF TURNKEY","Meath","Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 3)",16,"Clúid Housing","","","","","Q4-2019",""],
    [1047,1047,"CALF TURNKEY","Meath","Ruxton Oaks, Navan, Co. Meath (Phase 1)*",20,"Clúid Housing","","","","","","Q4-2021"],
    [1048,1048,"CALF TURNKEY","Meath","St Marys Dunboyne, Co. Meath (Phase 1)",16,"Co - Operative Housing Ireland Society Limited","","","","","","Q2-2021"],
    [1049,1049,"CALF TURNKEY","Meath","The Maudlins, Trim, Co. Meath (Phase 1)",9,"Clúid Housing","","","","","","Q1-2021"],
    [1050,1050,"CALF TURNKEY","Meath","The Willows, Dunshaughlin, Co. Meath (Phase 1)*",96,"Clúid Housing","","","","","Q2-2021",""],
    [1051,1051,"CALF TURNKEY","Meath","Whitefield Hall, Bettystown, Co. Meath (Phase 3)",2,"Tuath Housing Association","","","","","","Q3-2021"],
    [1052,1052,"SHIP CONSTRUCTION TURNKEY","Monaghan","Ard na Radhairc, Carrickmacross",6,"*N/A","","","","","","Q4-2021"],
    [1053,1053,"SHIP CONSTRUCTION TURNKEY","Monaghan","Coill Darach, Bree, Castleblayney",30,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [1054,1054,"SHIP CONSTRUCTION TURNKEY","Monaghan","Coill an Ri, Carrickmacross",30,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1055,1055,"SHIP CONSTRUCTION TURNKEY","Monaghan","Knockcarrick, Annyalla",30,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1056,1056,"SHIP CONSTRUCTION TURNKEY","Monaghan","Ard na Radhairc, Carrickmacross",35,"*N/A","","","","","Q3-2019",""],
    [1057,1057,"SHIP CONSTRUCTION SINGLE STAGE","Monaghan","Folly Court, Ballybay",6,"*N/A","","","","","","Q4-2021"],
    [1058,1058,"SHIP CONSTRUCTION RENEWAL","Monaghan","Fermanagh St., Clones",3,"*N/A","","","","","Q3-2019",""],
    [1059,1059,"SHIP CONSTRUCTION RENEWAL","Monaghan","An Bonnan Bui & Flower Shop, Fermanagh St., Clones",6,"*N/A","","","","","Q3-2019",""],
    [1060,1060,"SHIP CONSTRUCTION RENEWAL","Monaghan","2a & 3 Analore St., Clones",2,"*N/A","","","","","Q3-2019",""],
    [1061,1061,"SHIP CONSTRUCTION RENEWAL","Monaghan","Abbey Gatehouse, Analore St., Clones",4,"*N/A","","","","","Q3-2019",""],
    [1062,1062,"SHIP CONSTRUCTION RENEWAL","Monaghan","63 Fermanagh St., Clones",3,"*N/A","","","","","Q1-2020",""],
    [1063,1063,"SHIP CONSTRUCTION","Monaghan","Lui Na Greine, Scotstown",6,"*N/A","","","","","","Q4-2021"],
    [1064,1064,"SHIP CONSTRUCTION","Monaghan","12 Church St., Ballybay",2,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1065,1065,"SHIP CONSTRUCTION","Monaghan","Church Hill, Clones",2,"*N/A","","","","","Q2-2021",""],
    [1066,1066,"SHIP CONSTRUCTION","Monaghan","13 McCurtain Street, Clones",1,"*N/A","","","","","Q1-2021",""],
    [1067,1067,"SHIP CONSTRUCTION","Monaghan","Lui na Greine, Scotstown",26,"*N/A","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [1068,1068,"SHIP CONSTRUCTION","Monaghan","An Clós, Cornamucklaglass, Ballybay ",7,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1069,1069,"CAS CONSTRUCTION","Monaghan","Drumillard, Castleblayney (Phase 2)",2,"Castleblayney Care Housing Association Ltd","","","","","Q1-2021",""],
    [1070,1070,"CAS CONSTRUCTION","Monaghan","Liseggerton, Clones",19,"Oaklee Housing Trust","","","","","","Q2-2021"],
    [1071,1071,"CAS CONSTRUCTION","Monaghan","Birch Court Apts., 34 Main Street, Ballybay",4,"North ? East Housing Association Ltd","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1072,1072,"CALF TURNKEY","Monaghan","Bree, Castleblayney \n (Phase 2)",6,"Tuath Housing Association","","","","","","Q2-2021"],
    [1073,1073,"CALF TURNKEY","Monaghan","Bree, Castleblayney \n (Phase 3)",8,"Tuath Housing Association","","","","","","Q3-2021"],
    [1074,1074,"CALF TURNKEY","Monaghan","Bree, Castleblayney \n (Phase 5)",3,"Tuath Housing Association","","","","","Q2-2019",""],
    [1075,1075,"CALF TURNKEY","Monaghan","Bree, Castleblayney \n (Phase 6)",2,"Tuath Housing Association","","","","","Q2-2019",""],
    [1076,1076,"CALF TURNKEY","Monaghan","Drumbear Wood, Monaghan, Co. Monaghan  (Phase 1)*",17,"Co - Operative Housing Ireland Society Limited","","","","","Q1-2022",""],
    [1077,1077,"CALF TURNKEY","Monaghan","Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 1)*",20,"Tuath Housing Association","","","","Q2-2021","",""],
    [1078,1078,"CALF TURNKEY","Monaghan","Macartan View,  Latlorcan, Dublin Road, Monaghan (Phase 2)*",21,"Tuath Housing Association","","","","Q2-2021","",""],
    [1079,1079,"CALF TURNKEY","Monaghan","Magheross, Carrickmacross, Co Monaghan (Phase 1)",7,"Tuath Housing Association","","","","","","Q2-2021"],
    [1080,1080,"CALF TURNKEY","Monaghan","Magheross, Carrickmacross, Co Monaghan (Phase 2)",6,"Tuath Housing Association","","","","","Q3-2019",""],
    [1081,1081,"CALF TURNKEY","Monaghan","Magheross, Carrickmacross, Co Monaghan (Phase 3)",6,"Tuath Housing Association","","","","","Q3-2019",""],
    [1082,1082,"CALF TURNKEY","Monaghan","Magheross, Carrickmacross, Co Monaghan (Phase 4)",14,"Tuath Housing Association","","","","","Q3-2019",""],
    [1083,1083,"CALF TURNKEY","Monaghan","Part 2, Radharc An Bhri, Bree, Castleblayney, Co. Monaghan (Phase 1)*",2,"Tuath Housing Association","","","","","Q4-2021",""],
    [1084,1084,"CALF TURNKEY","Monaghan","Part 2, Radharc An Bhri, Bree, Castleblayney, Co. Monaghan (Phase 2)",8,"Tuath Housing Association","","","","","Q4-2021",""],
    [1085,1085,"CALF TURNKEY","Monaghan","Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 1)",8,"Tuath Housing Association","","","","","Q3-2020",""],
    [1086,1086,"CALF TURNKEY","Monaghan","Railway View, Kilnacloy, Monaghan, Co. Monaghan (Phase 2)*",8,"Tuath Housing Association","","","","","Q3-2020",""],
    [1087,1087,"CALF TURNKEY","Monaghan","The Meadows, Emy, Emyvale, Co. Monaghan (Phase 1)*",14,"Tuath Housing Association","","","","","Q2-2021",""],
    [1088,1088,"SHIP CONSTRUCTION TURNKEY","Offaly","Main Street, Daingean",8,"*N/A","","","","","","Q4-2021"],
    [1089,1089,"SHIP CONSTRUCTION TURNKEY","Offaly","Woodfield, Birr",5,"*N/A","","","","","","Q4-2021"],
    [1090,1090,"SHIP CONSTRUCTION TURNKEY","Offaly","Cluain na Greine, Clonygowan",2,"*N/A","","","","","","Q2-2021"],
    [1091,1091,"SHIP CONSTRUCTION TURNKEY","Offaly","Coolgarry, Walsh Island ",4,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [1092,1092,"SHIP CONSTRUCTION TURNKEY","Offaly","Mucklagh, Tullamore",8,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [1093,1093,"SHIP CONSTRUCTION TURNKEY","Offaly","MacRegol Pairc, Birr",2,"*N/A","","","","","","Q1-2021"],
    [1094,1094,"SHIP CONSTRUCTION TURNKEY","Offaly","Bog Road, Portarlington",28,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [1095,1095,"SHIP CONSTRUCTION TURNKEY","Offaly","MacRegol Pairc, Birr",4,"*N/A","","","","","","Q2-2021"],
    [1096,1096,"SHIP CONSTRUCTION TURNKEY","Offaly","Woodfield, Birr",25,"*N/A","","","","Stage 4 approved Q4-2020, the scheme is fully approved.","",""],
    [1097,1097,"SHIP CONSTRUCTION TURNKEY","Offaly","Woodfield, Birr",5,"*N/A","","","","","","Q1-2022"],
    [1098,1098,"SHIP CONSTRUCTION RENEWAL","Offaly","1 Newbridge St., Birr",1,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1099,1099,"SHIP CONSTRUCTION RENEWAL","Offaly","78 & 110 Church Hill, Tullamore",2,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1100,1100,"SHIP CONSTRUCTION","Offaly","Beechwood Drive, Circular Road, Daingean",9,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1101,1101,"SHIP CONSTRUCTION","Offaly","Kylebeg, Banagher (Phase 2)",18,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1102,1102,"SHIP CONSTRUCTION","Offaly","Beechgrove, Belmont",7,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1103,1103,"SHIP CONSTRUCTION","Offaly","Raheen ,Clara",38,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1104,1104,"SHIP CONSTRUCTION","Offaly","Elderberry Drive, Moneygall",4,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1105,1105,"SHIP CONSTRUCTION","Offaly","Sr. Senan Avenue, Edenderry",4,"*N/A","","","Stage 3 approved Q3-2021, the scheme is now approved to proceed to tender.","","",""],
    [1106,1106,"SHIP CONSTRUCTION","Offaly","Dargan Drive, Chancery Lane, Tullamore (Phase 2)",20,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1107,1107,"SHIP CONSTRUCTION","Offaly","Sycamore Drive, Ballycumber",8,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1108,1108,"SHIP CONSTRUCTION","Offaly","Circular Road, Daingean Phase 2",9,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1109,1109,"CAS CONSTRUCTION","Offaly","Killane Court, Edenderry",2,"Túath Housing Association Ltd","","","","","","Q2-2021"],
    [1110,1110,"CAS CONSTRUCTION","Offaly","Clonminch, Tullamore",19,"Oaklee Housing Trust","","","","","Q1-2021",""],
    [1111,1111,"CAS CONSTRUCTION","Offaly","Presentation Convent, Portarlington",39,"Sophia Housing Association Ltd","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1112,1112,"CAS CONSTRUCTION","Offaly","Clonamore Hotel, Tullamore",17,"Sophia Housing Association Ltd","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [1113,1113,"CALF TURNKEY","Offaly","3 units, An Corran, Crinkle, Birr, Co. Offaly (Phase 1)",3,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2021"],
    [1114,1114,"CALF CONSTRUCTION","Offaly","Kearney’s Field, Tullamore, Co. Offaly (Phase 1)",41,"Oaklee Housing","","","","","Q2-2021",""],
    [1115,1115,"CALF CONSTRUCTION","Offaly","Killane Drive, Edenderry, Co Offaly (Phase 1)",25,"Tuath Housing Association","","","","","","Q2-2021"],
    [1116,1116,"CALF TURNKEY","Offaly","Rahan Road, Tullamore, Co. Offaly (Phase 1)*",26,"Clúid Housing","","","","","Q4-2020",""],
    [1117,1117,"CALF TURNKEY","Offaly","The Hawthorns, Arden Road, Tullamore, Co. Offaly (Phase 1)",16,"Clúid Housing","","","","","Q1-2020",""],
    [1118,1118,"SHIP CONSTRUCTION TURNKEY","Roscommon","Esker Lawns, Old Tuam Rd, Monksland,",27,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1119,1119,"SHIP CONSTRUCTION SINGLE STAGE","Roscommon","The Meadows, Castlerea ",2,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1120,1120,"SHIP CONSTRUCTION RENEWAL","Roscommon","Ardnanagh ,Roscommon Town",1,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1121,1121,"SHIP CONSTRUCTION","Roscommon","Cloonfad",3,"*N/A","","","","","","Q2-2021"],
    [1122,1122,"SHIP CONSTRUCTION","Roscommon","Cluain Fraoigh, Cloonbeirne",7,"*N/A","","","","","","Q1-2021"],
    [1123,1123,"SHIP CONSTRUCTION","Roscommon","Meadowbrook, Ballyclare Td., Ballyleague",16,"*N/A","","","","","","Q4-2021"],
    [1124,1124,"SHIP CONSTRUCTION","Roscommon","Lisroyne Td., Strokestown",10,"*N/A","","","","","","Q4-2021"],
    [1125,1125,"SHIP CONSTRUCTION","Roscommon","Windmill Road, Elphin Road",10,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [1126,1126,"SHIP CONSTRUCTION","Roscommon","Lakeview Heights, Bellspark Td., Boyle",6,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [1127,1127,"SHIP CONSTRUCTION","Roscommon","Lisnamult, Ardnanagh Td., Roscommon Town",13,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1128,1128,"SHIP CONSTRUCTION","Roscommon","Station Rd., Cortober, Ck on Shannon, Co Roscommon",7,"N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1129,1129,"SHIP CONSTRUCTION","Roscommon","Curlew View, Boyle, Co Roscommon",14,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1130,1130,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Roscommon","The Walk, Roscommon Town",53,"*N/A","","","","","","Q2-2021"],
    [1131,1131,"CALF TURNKEY","Roscommon","Monksland, Athlone, Co. Roscommon (Phase 1)*",35,"Tuath Housing Association","","","","","Q4-2019",""],
    [1132,1132,"SHIP CONSTRUCTION TURNKEY","Sligo","Ursuline Convent",12,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1133,1133,"SHIP CONSTRUCTION TURNKEY","Sligo","Ursuline Convent",15,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1134,1134,"SHIP CONSTRUCTION TURNKEY","Sligo","Ursuline Convent",26,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1135,1135,"SHIP CONSTRUCTION TURNKEY","Sligo","Ursuline Convent",13,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1136,1136,"SHIP CONSTRUCTION","Sligo","Connolly Park, Tubbercurry (Phase 1)",10,"*N/A","","","","","","Q4-2021"],
    [1137,1137,"SHIP CONSTRUCTION","Sligo","Dromore West ",10,"*N/A","","","","","","Q4-2021"],
    [1138,1138,"SHIP CONSTRUCTION","Sligo","Robbers' Lane, Maugheraboy, Sligo",62,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [1139,1139,"SHIP CONSTRUCTION","Sligo","SRD at Crowagh, Dromore West",1,"*N/A","","","","","","Q4-2021"],
    [1140,1140,"SHIP CONSTRUCTION","Sligo","Gormley Park, Bunnanadden",6,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1141,1141,"SHIP CONSTRUCTION","Sligo","Connolly Park, Tubbercurry (Phase 2) & The Green Rd,",19,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1142,1142,"SHIP CONSTRUCTION","Sligo","Geldof Drive & Centre Park, Cranmore, Sligo",30,"*N/A","Stage 1 approved Q4-2020, outline design and costs being prepared.","","","","",""],
    [1143,1143,"CAS CONSTRUCTION TURNKEY","Sligo","Avena, Ballisodare, Co Sligo",6,"Túath Housing Association Ltd","","","","","","Q1-2022"],
    [1144,1144,"CAS CONSTRUCTION","Sligo","Killeshin, First Sea Road, Sligo",5,"Newgrove Housing Association Ltd","","","","","Q4-2020",""],
    [1145,1145,"PUBLIC PRIVATE PARTNERSHIP (Bundle 3)","Sligo","Rathellen, Finisklin, Co. Sligo",63,"*N/A","","Q4-2021","","","",""],
    [1146,1146,"SHIP CONSTRUCTION SINGLE STAGE","South Dublin","37 Greenfort Gardens, Clondalkin",2,"*N/A","","","","","","Q4-2021"],
    [1147,1147,"SHIP CONSTRUCTION DESIGN BUILD","South Dublin","St. Marks Avenue, Clondalkin",41,"*N/A","","","","","Q3-2020",""],
    [1148,1148,"SHIP CONSTRUCTION DESIGN BUILD","South Dublin","Riversdale, Clondalkin, Dublin 22",22,"*N/A","","","","","Q4-2020",""],
    [1149,1149,"SHIP CONSTRUCTION DESIGN BUILD","South Dublin","Riverside Cottages, Templeogue",10,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1150,1150,"SHIP CONSTRUCTION DESIGN BUILD","South Dublin","Riversdale, Clondalkin, Dublin 22",21,"*N/A","","","","","Q4-2020",""],
    [1151,1151,"SHIP CONSTRUCTION DESIGN BUILD","South Dublin","Grand Canal, Lindisfarne, Clondalkin,",19,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [1152,1152,"SHIP CONSTRUCTION","South Dublin","Balgaddy F, Griffeen Avenue, Lucan Co. Dublin",69,"*N/A","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [1153,1153,"SHIP CONSTRUCTION","South Dublin","St. Catherine’s, Knockmore Avenue, Killinarden, Tallaght",12,"*N/A","","","","","Q4-2020",""],
    [1154,1154,"SHIP CONSTRUCTION","South Dublin","Homeville, Knocklyon, Dublin 16",16,"*N/A","","","","","Q4-2020",""],
    [1155,1155,"SHIP CONSTRUCTION","South Dublin","Nangor Road, Clondalkin, Dublin 22",93,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1156,1156,"CAS CONSTRUCTION TURNKEY","South Dublin","Oakridge, Ballynakelly,Edge, Newcastle, Co. Dublin",3,"Túath Housing Association Ltd","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1157,1157,"CAS CONSTRUCTION TURNKEY","South Dublin","3 Cornerpark Rise",1,"Arlington Novas Ireland Ltd","","","","","","Q4-2021"],
    [1158,1158,"CALF TURNKEY","South Dublin","Ballynakelly Rise, Newcastle Boulevard and Graydon Park, Newcastle, County Dublin (Phase 1)*",8,"Tuath Housing Association","","","","","Q1-2020",""],
    [1159,1159,"CALF TURNKEY","South Dublin","Ballynakelly Rise, Newcastle Boulevard and Graydon Park, Newcastle, County Dublin (Phase 2)*",8,"Tuath Housing Association","","","","","Q1-2020",""],
    [1160,1160,"CALF TURNKEY","South Dublin","Citywest Quarter, Citywest, Dublin 24 (Phase 1)*",32,"Tuath Housing Association","","","","","","Q2-2021"],
    [1161,1161,"CALF TURNKEY","South Dublin","Citywest Village House, Citywest Village, D24 (Phase 1)*",36,"Fold Housing Association Ireland Ltd","","","","","","Q1-2022"],
    [1162,1162,"CALF TURNKEY","South Dublin","Cloverhill Lodge, Cloverhill Rd, Clondalkin, D22 (Phase 1)*",40,"Oaklee Housing","","","","","Q2-2021",""],
    [1163,1163,"CALF TURNKEY","South Dublin","Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 2)*",9,"Clúid Housing","","","","","","Q1-2021"],
    [1164,1164,"CALF CONSTRUCTION","South Dublin","Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)",40,"Clúid Housing","","","","","Q3-2020",""],
    [1165,1165,"CALF TURNKEY","South Dublin","Finians Way, Newcastle South, Newcastle, Co. Dublin (Phase 1)*",2,"Clanmil Housing Association Ireland","","","","","","Q4-2021"],
    [1166,1166,"CALF TURNKEY","South Dublin","Finnstown, Lucan, Co. Dublin (Phase 1)",32,"Respond","","","","","","Q3-2021"],
    [1167,1167,"CALF TURNKEY","South Dublin","Finnstown, Lucan, Co. Dublin (Phase 2)",38,"Respond","","","","","","Q3-2021"],
    [1168,1168,"CALF TURNKEY","South Dublin","Finnstown, Lucan, Co. Dublin (Phase 3)*",24,"Respond","","","","","","Q4-2021"],
    [1169,1169,"CALF TURNKEY","South Dublin","Graydon, Newcastle, Co. Dublin (Phase 1)*",8,"Tuath Housing Association","","","","","","Q4-2021"],
    [1170,1170,"CALF TURNKEY","South Dublin","Hallwell, Tubber Lane, Adamstown, Co Dublin (Phase 1)*",45,"The Iveagh Trust","","","","","","Q4-2021"],
    [1171,1171,"CALF TURNKEY","South Dublin","Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*",24,"Respond","","","","","","Q4-2021"],
    [1172,1172,"CALF TURNKEY","South Dublin","Mountain Gate, Kiltipper Rd., Dublin 24 (Phase 1)*",22,"Co - Operative Housing Ireland Society Limited","","","","Q1-2022","",""],
    [1173,1173,"CALF CONSTRUCTION","South Dublin","Old Lucan Road, Palmerstown, Dublin 20 (Phase 1)",4,"Tuath Housing Association","","","","Q3-2021","",""],
    [1174,1174,"CALF TURNKEY","South Dublin","Phase 2, Aylmer Drive, Aylmer Heath, Newcastle, Co. Dublin (Phase 1)*",17,"Respond","","","","","","Q2-2021"],
    [1175,1175,"CALF TURNKEY","South Dublin","Sallypark, Clondalkin, Dublin 22 (Phase 1)*",85,"Clúid Housing","","","","","Q4-2020",""],
    [1176,1176,"CALF TURNKEY","South Dublin","San Guida, New Road, Clondalkin, Dublin 22 (Phase 1)*",21,"Clúid Housing","","","","","Q3-2021",""],
    [1177,1177,"CALF TURNKEY","South Dublin","Scholarstown Road, Rathfarnham, Dublin 16\n\n\n (Phase 1)*",14,"Circle Voluntary Housing Association Ltd","","","","","","Q1-2022"],
    [1178,1178,"CALF CONSTRUCTION","South Dublin","St. Catherine’s, Knockmore Avenue, Killinarden, Tallaght, Dublin 24 (Phase 1)",2,"Sophia Housing Association Ltd","","","","","Q2-2021",""],
    [1179,1179,"CALF CONSTRUCTION","South Dublin","The Weir, Whitestown Way, Tallaght, Dublin 24 (Phase 1)",81,"Clúid Housing","","","","","Q2-2021",""],
    [1180,1180,"CALF TURNKEY","South Dublin","Willowview, Ballyboden Road, Rathfarnham, Dublin 14 (Phase 1)*",12,"Clúid Housing","","","","","","Q2-2021"],
    [1181,1181,"SHIP CONSTRUCTION TURNKEY","Tipperary","Prior Park, Clonmel",18,"*N/A","","","","","Q3-2020",""],
    [1182,1182,"SHIP CONSTRUCTION TURNKEY","Tipperary","Ma Charoin, Manna South, Templemore",13,"*N/A","","","","","Q1-2021",""],
    [1183,1183,"SHIP CONSTRUCTION TURNKEY","Tipperary","Prior Park, Clonmel",23,"*N/A","","","","","Q3-2020",""],
    [1184,1184,"SHIP CONSTRUCTION TURNKEY","Tipperary","Glenconnor Road, Clonmel",10,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1185,1185,"SHIP CONSTRUCTION TURNKEY","Tipperary","Rosanna Close, Tipperary Town",1,"*N/A","","","","","Q3-2020",""],
    [1186,1186,"SHIP CONSTRUCTION TURNKEY","Tipperary","Hazel Close, Carrick on Suir",14,"*N/A","","","","","","Q4-2021"],
    [1187,1187,"SHIP CONSTRUCTION TURNKEY","Tipperary","Glenconnor",2,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1188,1188,"SHIP CONSTRUCTION TURNKEY","Tipperary","Cois Abhainn, Mullinahone",3,"*N/A","","","","","","Q4-2021"],
    [1189,1189,"SHIP CONSTRUCTION TURNKEY","Tipperary","Glentara, Roscrea",2,"*N/A","","","","","","Q4-2021"],
    [1190,1190,"SHIP CONSTRUCTION TURNKEY","Tipperary","Glenconnor Road, Clonmel",11,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1191,1191,"SHIP CONSTRUCTION TURNKEY","Tipperary","Carrick Beg, Carrick on Suir",22,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1192,1192,"SHIP CONSTRUCTION RENEWAL","Tipperary","Ard na Greine, Clonmel",2,"*N/A","","","","","Q4-2020",""],
    [1193,1193,"SHIP CONSTRUCTION RENEWAL","Tipperary","Boherclough Street, Cashel",9,"*N/A","","","Stage 3 approved Q4-2021, the scheme is now approved to proceed to tender.","","",""],
    [1194,1194,"SHIP CONSTRUCTION","Tipperary","Knockanrawley",14,"*N/A","","","","","","Q1-2021"],
    [1195,1195,"SHIP CONSTRUCTION","Tipperary","Mill Road, Thurles",14,"*N/A","","","","","","Q4-2021"],
    [1196,1196,"SHIP CONSTRUCTION","Tipperary","Mulkear View, Newport",10,"*N/A","","","","","","Q4-2021"],
    [1197,1197,"SHIP CONSTRUCTION","Tipperary","Templetouhy",10,"*N/A","","","","","","Q4-2021"],
    [1198,1198,"SHIP CONSTRUCTION","Tipperary","Abbey Street, Cahir",10,"*N/A","","","","","Q3-2020",""],
    [1199,1199,"SHIP CONSTRUCTION","Tipperary","Borrisokane",14,"*N/A","","","","","","Q4-2021"],
    [1200,1200,"SHIP CONSTRUCTION","Tipperary","Portroe, Nenagh",14,"*N/A","","","","","Q4-2021",""],
    [1201,1201,"SHIP CONSTRUCTION","Tipperary","Cloughjordan",2,"*N/A","","","","","","Q2-2021"],
    [1202,1202,"SHIP CONSTRUCTION","Tipperary","Mitchel St., Thurles",1,"*N/A","","","","","","Q4-2021"],
    [1203,1203,"SHIP CONSTRUCTION","Tipperary","Cormack Drive, Nenagh",12,"*N/A","","","","","Q3-2020",""],
    [1204,1204,"SHIP CONSTRUCTION","Tipperary","Bansha",14,"*N/A","","","","","Q3-2021",""],
    [1205,1205,"SHIP CONSTRUCTION","Tipperary","Ned Hayes Drive, Twomileborris, Thurles",22,"*N/A","","","","","Q3-2021",""],
    [1206,1206,"SHIP CONSTRUCTION","Tipperary","Donohill",8,"*N/A","","","","","Q3-2021",""],
    [1207,1207,"SHIP CONSTRUCTION","Tipperary","Mullinahone",10,"*N/A","","","","","Q1-2021",""],
    [1208,1208,"SHIP CONSTRUCTION","Tipperary","Ballyclerihan",14,"*N/A","","","","","Q3-2021",""],
    [1209,1209,"SHIP CONSTRUCTION","Tipperary","Ard Alainn, Moyne",9,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1210,1210,"SHIP CONSTRUCTION","Tipperary","Ardcroney",4,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1211,1211,"SHIP CONSTRUCTION","Tipperary","Comeragh Drive, Clonmel",2,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1212,1212,"SHIP CONSTRUCTION","Tipperary","Church Street, Templemore",2,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1213,1213,"SHIP CONSTRUCTION","Tipperary","Woodview Close, Castle Crescent,  Nenagh",10,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1214,1214,"SHIP CONSTRUCTION","Tipperary","Grove Street. Roscrea",6,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1215,1215,"SHIP CONSTRUCTION","Tipperary","William Street, Clonmel",4,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1216,1216,"SHIP CONSTRUCTION","Tipperary","Glencarrick, Roscrea",26,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1217,1217,"SHIP CONSTRUCTION","Tipperary","Knockanrawley",14,"*N/A","","","","","","Q2-2021"],
    [1218,1218,"SHIP CONSTRUCTION","Tipperary","Mill Road, Thurles",14,"*N/A","","","","","Q2-2020",""],
    [1219,1219,"SHIP CONSTRUCTION","Tipperary","Mulkear View, Newport",1,"*N/A","","","","","","Q1-2022"],
    [1220,1220,"SHIP CONSTRUCTION","Tipperary","Mountain View, Cahir",23,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1221,1221,"SHIP CONSTRUCTION","Tipperary","Glencarrick, Roscrea",20,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1222,1222,"SHIP CONSTRUCTION","Tipperary","William Street, Nenagh",7,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1223,1223,"SHIP CONSTRUCTION","Tipperary","Borrisokane",1,"*N/A","","","","","","Q1-2022"],
    [1224,1224,"SHIP CONSTRUCTION","Tipperary","Ashbury, Roscrea",10,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1225,1225,"SHIP CONSTRUCTION","Tipperary","Fr. Mathew Street, Tipperary Town",4,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1226,1226,"SHIP CONSTRUCTION","Tipperary","Mountain View Drive, Cahir",20,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1227,1227,"SHIP CONSTRUCTION","Tipperary","Borrisokane",1,"N/A","","","","","Q3-2020",""],
    [1228,1228,"CAS CONSTRUCTION TURNKEY","Tipperary","Kichham Street, Carrick en Suir",12,"Túath Housing Association Ltd","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1229,1229,"CAS CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",9,"Cluid Housing Association","","","","","Q2-2021",""],
    [1230,1230,"CAS CONSTRUCTION","Tipperary","Stanwix House, Kickham Street, Thurles",19,"Thurles Lions Trust Housing Assoc.","","","","","Q2-2021",""],
    [1231,1231,"CAS CONSTRUCTION","Tipperary","Main Street, Templemore",14,"Templemore Voluntary Housing Association","Stage 1 approved Q4-2019, outline design and costs being prepared.","","","","",""],
    [1232,1232,"CAS CONSTRUCTION","Tipperary","Deerpark Road, Ashwell's Lot",2,"SPADE – St. Patrick’s Dwellings for the Elderly","","","","","Q2-2021",""],
    [1233,1233,"CAS CONSTRUCTION","Tipperary","Gort an Oir, Fethard",7,"Belmont Park Housing Association Ltd","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1234,1234,"CALF TURNKEY","Tipperary","Abbey Court Lodges, Old Dublin Road, Nenagh, Co Tipperary (Phase 1)",12,"Focus Housing Association CLG","","","","","","Q1-2022"],
    [1235,1235,"CALF TURNKEY","Tipperary","Abbey Court Lodges, Old Dublin Road, Nenagh, Co Tipperary (Phase 2)",4,"Focus Housing Association CLG","","","","","Q4-2021",""],
    [1236,1236,"CALF TURNKEY","Tipperary","Ballygraigue Court, Ballygraigue Road, Nenagh (Phase 1)",5,"Clúid Housing","","","","","Q4-2020",""],
    [1237,1237,"CALF TURNKEY","Tipperary","Coopers Lot, Cashel, Co. Tipperary (Phase 1)*",44,"Respond","","","","Q1-2022","",""],
    [1238,1238,"CALF TURNKEY","Tipperary","Farranlahassery, Cahir, Co. Tipperary (Phase 1)*",48,"Respond","","","","Q2-2022","",""],
    [1239,1239,"CALF TURNKEY","Tipperary","Wallers Lot, East Cashel, Co. Tipperary (Phase 1)*",40,"Tuath Housing Association","","","","","Q4-2021",""],
    [1240,1240,"SHIP CONSTRUCTION TURNKEY","Waterford","Mount William, Williamstown, Waterford City",13,"*N/A","","","","","","Q1-2021"],
    [1241,1241,"SHIP CONSTRUCTION TURNKEY","Waterford","Mount William, Williamstown, Waterford City",10,"*N/A","","","","","","Q2-2021"],
    [1242,1242,"SHIP CONSTRUCTION TURNKEY","Waterford","Mount William, Williamstown, Waterford City",23,"*N/A","","","","","","Q2-2021"],
    [1243,1243,"SHIP CONSTRUCTION TURNKEY","Waterford","The Courtyard, Morrissons Road, Waterford City",8,"*N/A","","","","","","Q2-2021"],
    [1244,1244,"SHIP CONSTRUCTION TURNKEY","Waterford","Bounds Court, Airport Road, Waterford",15,"N/A","","","","","","Q1-2022"],
    [1245,1245,"SHIP CONSTRUCTION TURNKEY","Waterford","Brideview Close, Tallow; Main Street, Aglish, Co. Waterford",6,"N/A","","","","","","Q4-2021"],
    [1246,1246,"SHIP CONSTRUCTION TURNKEY","Waterford","Bye Lane, Kilmacthomas",3,"*N/A","","","","","Q1-2021",""],
    [1247,1247,"SHIP CONSTRUCTION SINGLE STAGE","Waterford","Apt 1 and Apt 2 Rivercourt, Grattan Quay, Waterford City",2,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [1248,1248,"SHIP CONSTRUCTION RENEWAL","Waterford","29 The Glen, Waterford City",4,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1249,1249,"SHIP CONSTRUCTION RENEWAL","Waterford","22 and 23 Thomas Hill, Waterford",3,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1250,1250,"SHIP CONSTRUCTION RENEWAL","Waterford","70 and 71 O'Connell Street, Waterford",5,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1251,1251,"SHIP CONSTRUCTION DESIGN BUILD","Waterford","Ballygunner, Waterford City",49,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1252,1252,"SHIP CONSTRUCTION DESIGN BUILD","Waterford","Ballynaneashagh, Waterford City",22,"*N/A","","Stage 2 approved Q2-2020, full design/tender being prepared.","","","",""],
    [1253,1253,"SHIP CONSTRUCTION","Waterford","An Garrán, Crobally Upper, Tramore",50,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1254,1254,"SHIP CONSTRUCTION","Waterford","Larchville, Waterford City",5,"*N/A","","","","","","Q2-2021"],
    [1255,1255,"SHIP CONSTRUCTION","Waterford","Doyles Street, Waterford City",4,"*N/A","","","","","","Q4-2021"],
    [1256,1256,"SHIP CONSTRUCTION","Waterford","The Glen, Bridge St, Waterford",17,"*N/A","","","","","Q3-2021",""],
    [1257,1257,"SHIP CONSTRUCTION","Waterford","Clarendon Court, Penrose Lane, Waterford",24,"*N/A","Stage 1 approved Q1-2018, outline design and costs being prepared.","","","","",""],
    [1258,1258,"SHIP CONSTRUCTION","Waterford","Summerland Square, Waterford",12,"*N/A","","","Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.","","",""],
    [1259,1259,"SHIP CONSTRUCTION TURNKEY","Waterford","Radharc na Siuire",3,"N/A","","","","","","Q1-2022"],
    [1260,1260,"SHIP CONSTRUCTION","Waterford","Graigueshoneen, Kilmacthomas",16,"*N/A","","","","","","Q1-2022"],
    [1261,1261,"SHIP CONSTRUCTION","Waterford","Mount Esker, Ballytruckle Road, Waterford City",14,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1262,1262,"SHIP CONSTRUCTION","Waterford","Newgate Street, Waterford City",36,"*N/A","Stage 1 approved Q3-2020, outline design and costs being prepared.","","","","",""],
    [1263,1263,"SHIP CONSTRUCTION","Waterford","Fountain Street, Ferrybank, Waterford",14,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [1264,1264,"SHIP CONSTRUCTION","Waterford","Meeting House Lane, Waterford City",6,"N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [1265,1265,"SHIP CONSTRUCTION","Waterford","50-53 Ballytruckle Road, Waterford",11,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1266,1266,"CAS CONSTRUCTION","Waterford","Wadding Manor, Ferrybank",10,"Respond","","","","","","Q2-2021"],
    [1267,1267,"CAS CONSTRUCTION","Waterford","Ballycarnane, Tramore",18,"Oaklee Housing Trust","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1268,1268,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Waterford","Slievekeale, Waterford City (Phase 1)",24,"*N/A","","","","","","Q2-2021"],
    [1269,1269,"PUBLIC PRIVATE PARTNERSHIP (Bundle 2)","Waterford","Slievekeale, Waterford City (Phase 2)",34,"*N/A","","","","","","Q3-2021"],
    [1270,1270,"CALF TURNKEY","Waterford","Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 1)",26,"Circle Voluntary Housing Association Ltd","","","","","","Q4-2021"],
    [1271,1271,"CALF TURNKEY","Waterford","Mount Neil, Carrickphierish, Gracedieu, Co. Waterford (Phase 2)",31,"Circle Voluntary Housing Association Ltd","","","","","Q3-2019",""],
    [1272,1272,"CALF TURNKEY","Waterford","Slí na Coille, Tramore, Co Waterford (Phase 1)*",27,"Clúid Housing","","","","","Q1-2021",""],
    [1273,1273,"SHIP DIALOG","Westmeath","Lissywollen, Athlone",55,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1274,1274,"SHIP DIALOG","Westmeath","Lissywollen, Athlone",55,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1275,1275,"SHIP DIALOG","Westmeath","Lissywollen, Athlone",38,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1276,1276,"SHIP DIALOG","Westmeath","Lissywollen, Athlone",22,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1277,1277,"SHIP CONSTRUCTION TURNKEY","Westmeath","Austin Friars Street, Mullingar",4,"*N/A","","","","","Q3-2020",""],
    [1278,1278,"SHIP CONSTRUCTION TURNKEY","Westmeath","Oakcrest, Ballinderry, Mullingar",8,"*N/A","","","","","Q2-2021",""],
    [1279,1279,"SHIP CONSTRUCTION TURNKEY","Westmeath","St. Marys Place, Athlone",9,"*N/A","","","","","Q2-2021",""],
    [1280,1280,"SHIP CONSTRUCTION TURNKEY","Westmeath","Rathgarve Green, Castlepollard",1,"*N/A","","","","","","Q2-2021"],
    [1281,1281,"SHIP CONSTRUCTION TURNKEY","Westmeath","Bellaugh, Athlone",17,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1282,1282,"SHIP CONSTRUCTION TURNKEY","Westmeath","The Cedars, Lakepoint, Mullingar",7,"*N/A","","","","","Q2-2021",""],
    [1283,1283,"SHIP CONSTRUCTION TURNKEY","Westmeath","The Cedars, Lakepoint, Mullingar",10,"*N/A","","","","","Q2-2021",""],
    [1284,1284,"SHIP CONSTRUCTION TURNKEY","Westmeath","The Cedars, Lakepoint, Mullingar",11,"*N/A","","","","","Q2-2021",""],
    [1285,1285,"SHIP CONSTRUCTION TURNKEY","Westmeath","Austin Friar Street, Mullingar",6,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1286,1286,"SHIP CONSTRUCTION TURNKEY","Westmeath","Athboy Rd, Delvin",6,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1287,1287,"SHIP CONSTRUCTION TURNKEY","Westmeath","Kileenboylegan, Moate",6,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1288,1288,"SHIP CONSTRUCTION TURNKEY","Westmeath","Mount Carmel Drive, Moate, Westmeath",9,"N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1289,1289,"SHIP CONSTRUCTION DESIGN BUILD","Westmeath","O'Growney Green, Mullingar",22,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1290,1290,"SHIP CONSTRUCTION DESIGN BUILD","Westmeath","Dalton Park, Mullingar",17,"*N/A","","","","","Q1-2022",""],
    [1291,1291,"SHIP CONSTRUCTION DESIGN BUILD","Westmeath","Water Street, Castlepollard",8,"*N/A","","","","","Q1-2022",""],
    [1292,1292,"SHIP CONSTRUCTION DESIGN BUILD","Westmeath","Ennell Court, Mullingar (Phase 1)",15,"*N/A","","","","","Q1-2022",""],
    [1293,1293,"SHIP CONSTRUCTION","Westmeath","Bun Daire, Kinnegad (Phase 3)",8,"*N/A","","","","","","Q2-2021"],
    [1294,1294,"SHIP CONSTRUCTION","Westmeath","Ennell Court, Mullingar",31,"*N/A","","","","","Q2-2021",""],
    [1295,1295,"SHIP CONSTRUCTION","Westmeath","Quinlan Park, Athlone",10,"*N/A","","","","","Q4-2021",""],
    [1296,1296,"SHIP CONSTRUCTION","Westmeath","Bishopsgate, Mullingar",2,"*N/A","","","","","","Q2-2021"],
    [1297,1297,"SHIP CONSTRUCTION","Westmeath","Arcadia, Athlone (Phase 2)",24,"*N/A","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [1298,1298,"SHIP CONSTRUCTION","Westmeath","Canal Avenue, Mullingar",32,"*N/A","","Stage 2 approved Q4-2020, full design/tender being prepared.","","","",""],
    [1299,1299,"SHIP CONSTRUCTION","Westmeath","Bun Daire, Kinnegad (Phase 3)",4,"*N/A","","","","","","Q3-2021"],
    [1300,1300,"SHIP CONSTRUCTION","Westmeath","Bishopsgate, Mullingar",2,"*N/A","","","","","","Q4-2021"],
    [1301,1301,"SHIP CONSTRUCTION","Westmeath","Kilmacaugh Rd, Athlone",1,"N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1302,1302,"SHIP CONSTRUCTION","Westmeath","Cornamaddy, Athlone",108,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1303,1303,"SHIP CONSTRUCTION","Westmeath","Water Street, Castlepollard ",1,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1304,1304,"SHIP CONSTRUCTION","Westmeath","Belvedere Orphanage, Tyrellspass",6,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1305,1305,"CAS CONSTRUCTION TURNKEY","Westmeath","Elm Row, Royal Canal, Mullingar",10,"Túath Housing Association Ltd","","","","","","Q1-2021"],
    [1306,1306,"CAS CONSTRUCTION TURNKEY","Westmeath","Elm Row, Royal Canal, Mullingar",17,"Túath Housing Association Ltd","","","","","Q4-2019",""],
    [1307,1307,"CAS CONSTRUCTION TURNKEY","Westmeath","Elm Row, Royal Canal, Mullingar",9,"Túath Housing Association Ltd","","","","","Q4-2019",""],
    [1308,1308,"CAS CONSTRUCTION","Westmeath","Farran, Mullingar",4,"Túath Housing Association Ltd","","","","","","Q3-2021"],
    [1309,1309,"CALF TURNKEY","Westmeath","Ashe Road, Mullingar, Co. Westmeath (Phase 1)*",18,"Clúid Housing","","","","","Q2-2021",""],
    [1310,1310,"CALF TURNKEY","Westmeath","Athlone Road, Moate, Co. Westmeath (Phase 1)*",14,"Oaklee Housing","","","","","","Q2-2021"],
    [1311,1311,"CALF TURNKEY","Westmeath","Bower Hill, Lower Road, Athlone, Co. Westmeath (Phase 1)*",15,"Clúid Housing","","","","","Q2-2021",""],
    [1312,1312,"CALF TURNKEY","Westmeath","Charlestown, Mullingar (Phase 1)*",37,"Respond","","","","","Q4-2021",""],
    [1313,1313,"CALF TURNKEY","Westmeath","Charlestown, Mullingar (Phase 2)*",62,"Respond","","","","","Q4-2021",""],
    [1314,1314,"CALF TURNKEY","Westmeath","Coill Rua, Mullingar, Co. Westmeath (Phase 2)*",23,"Clúid Housing","","","","","","Q1-2021"],
    [1315,1315,"CALF TURNKEY","Westmeath","Coill Rua, Mullingar, Co. Westmeath (Phase 3)",8,"Clúid Housing","","","","","","Q2-2021"],
    [1316,1316,"CALF TURNKEY","Westmeath","Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 1)*",35,"Respond","","","","","Q4-2021",""],
    [1317,1317,"CALF TURNKEY","Westmeath","Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 2)*",27,"Respond","","","","","Q4-2021",""],
    [1318,1318,"CALF TURNKEY","Westmeath","Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 3)*",7,"Respond","","","","","Q4-2021",""],
    [1319,1319,"CALF TURNKEY","Westmeath","Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 4)*",49,"Respond","","","","","Q4-2021",""],
    [1320,1320,"CALF TURNKEY","Westmeath","Dun na Ri, Coosan, Athlone, Westmeath, Co. Westmeath  (Phase 5)*",12,"Respond","","","","","Q4-2021",""],
    [1321,1321,"CALF CONSTRUCTION","Westmeath","Farran, Mullingar, Co. Westmeath (Phase 1)",10,"Tuath Housing Association","","","","","","Q3-2021"],
    [1322,1322,"CALF TURNKEY","Westmeath","Garran Geal, Kinnegad, Westmeath (Phase 1)*",24,"Tuath Housing Association","","","","","Q4-2020",""],
    [1323,1323,"CALF TURNKEY","Westmeath","Rahanine, Rochfortbridge, Co Westmeath (Phase 1)*",12,"Tuath Housing Association","","","","","","Q2-2021"],
    [1324,1324,"CALF TURNKEY","Westmeath","Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 1)",4,"Tuath Housing Association","","","","","","Q1-2021"],
    [1325,1325,"CALF TURNKEY","Westmeath","Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 2)",4,"Tuath Housing Association","","","","","Q3-2019",""],
    [1326,1326,"CALF TURNKEY","Westmeath","Springfield Cottages, Mullingar, Co. Westmeath (Phase 1)*",13,"Clúid Housing","","","","","Q4-2021",""],
    [1327,1327,"SHIP CONSTRUCTION TURNKEY","Wexford","Airhill, Belvedere Rd, Wexford",7,"*N/A","","","","","","Q3-2021"],
    [1328,1328,"SHIP CONSTRUCTION TURNKEY","Wexford","Michael Street, New Ross ",3,"*N/A","","","","","","Q2-2021"],
    [1329,1329,"SHIP CONSTRUCTION TURNKEY","Wexford","Ballynaglough, Blackwater",4,"*N/A","","","","","Q4-2019",""],
    [1330,1330,"SHIP CONSTRUCTION TURNKEY","Wexford","Tobar Muire, Creagh Gorey",10,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [1331,1331,"SHIP CONSTRUCTION TURNKEY","Wexford","Gleann an Ghairdin, Gorey - Phase 2",4,"*N/A","","","","","","Q4-2021"],
    [1332,1332,"SHIP CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock Hill, Wexford",5,"*N/A","","","","","","Q2-2021"],
    [1333,1333,"SHIP CONSTRUCTION TURNKEY","Wexford","Cluain Beag, Clonard, Wexford",5,"*N/A","","","","","","Q4-2021"],
    [1334,1334,"SHIP CONSTRUCTION TURNKEY","Wexford","Cluain Beag, Clonard, Wexford",6,"*N/A","","","","","","Q4-2021"],
    [1335,1335,"SHIP CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock, Wexford",2,"*N/A","","","","","","Q2-2021"],
    [1336,1336,"SHIP CONSTRUCTION TURNKEY","Wexford","Ard an Bhile, Healysland, New Ross, Co. Wexford",22,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1337,1337,"SHIP CONSTRUCTION TURNKEY","Wexford","Tobar Muire, Creagh Gorey",29,"*N/A","","","","Stage 4 approved Q2-2020, the scheme is fully approved.","",""],
    [1338,1338,"SHIP CONSTRUCTION TURNKEY","Wexford","Ballynaglough, Blackwater",12,"*N/A","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [1339,1339,"SHIP CONSTRUCTION TURNKEY","Wexford","Roxborough Manor",3,"*N/A","","","","","Q2-2021",""],
    [1340,1340,"SHIP CONSTRUCTION TURNKEY","Wexford","Roxborough Manor",3,"*N/A","","","","","Q2-2021",""],
    [1341,1341,"SHIP CONSTRUCTION TURNKEY","Wexford","Roxborough Manor",4,"*N/A","","","","","Q2-2021",""],
    [1342,1342,"SHIP CONSTRUCTION TURNKEY","Wexford","Roxborough Manor",3,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1343,1343,"SHIP CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock, Wexford",2,"*N/A","","","","","","Q2-2021"],
    [1344,1344,"SHIP CONSTRUCTION TURNKEY","Wexford","Clonard Little, Wexford ",9,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1345,1345,"SHIP CONSTRUCTION TURNKEY","Wexford","Ard an Bhile, Healysland, New Ross, Co. Wexford",21,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1346,1346,"SHIP CONSTRUCTION TURNKEY","Wexford","Cluain Beag, Clonard, Wexford",7,"*N/A","","","","","","Q1-2022"],
    [1347,1347,"SHIP CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock Hill, Wexford",8,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1348,1348,"SHIP CONSTRUCTION TURNKEY","Wexford","Haughton Place, New Ross, Co. Wexford",12,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1349,1349,"SHIP CONSTRUCTION TURNKEY","Wexford","Castlelands, Ferns, Co. Wexford",20,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1350,1350,"SHIP CONSTRUCTION TURNKEY","Wexford","Cluain Beag, Clonard, Wexford",2,"*N/A","","","","Stage 4 approved Q3-2020, the scheme is fully approved.","",""],
    [1351,1351,"SHIP CONSTRUCTION RENEWAL","Wexford","Ard na Naoimh, Gorey Hill",4,"*N/A","Stage 1 approved Q1-2022, outline design and costs being prepared.","","","","",""],
    [1352,1352,"SHIP CONSTRUCTION","Wexford","Whiterock Hill, Wexford",22,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1353,1353,"SHIP CONSTRUCTION","Wexford","Killeens, Wexford",40,"*N/A","Stage 1 approved Q1-2018, outline design and costs being prepared.","","","","",""],
    [1354,1354,"SHIP CONSTRUCTION","Wexford","Ross Road, Enniscorthy",1,"*N/A","","","","","","Q4-2021"],
    [1355,1355,"SHIP CONSTRUCTION","Wexford","Glentire, The Ballagh, Enniscorthy",6,"*N/A","","","","","Q2-2019",""],
    [1356,1356,"SHIP CONSTRUCTION","Wexford","Rosetown, Rosslare, Co Wexford, Phase 1",23,"*N/A","","","","","Q2-2019",""],
    [1357,1357,"SHIP CONSTRUCTION","Wexford","Carley's Bridge, Enniscorthy",17,"*N/A","","","","","","Q1-2022"],
    [1358,1358,"SHIP CONSTRUCTION","Wexford","Creagh, Gorey",12,"*N/A","Stage 1 approved Q2-2018, outline design and costs being prepared.","","","","",""],
    [1359,1359,"SHIP CONSTRUCTION","Wexford","Wexford Street, Gorey",30,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1360,1360,"SHIP CONSTRUCTION","Wexford","Bullawn, Irishtown, New Ross",3,"*N/A","","","","","Q3-2021",""],
    [1361,1361,"SHIP CONSTRUCTION","Wexford","Ballyhine, Barntown",7,"*N/A","","Stage 2 approved Q1-2021, full design/tender being prepared.","","","",""],
    [1362,1362,"SHIP CONSTRUCTION","Wexford","Whiterock Hill, Wexford",22,"*N/A","","","Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.","","",""],
    [1363,1363,"SHIP CONSTRUCTION","Wexford","Doire Moling estate at Monamolin, Gorey, Co. Wexford",5,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [1364,1364,"SHIP CONSTRUCTION","Wexford","20 Francis Street, Wexford",2,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1365,1365,"SHIP CONSTRUCTION","Wexford","Ballygillane Big, Rosslare Harbour, Co. Wexford",5,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1366,1366,"SHIP CONSTRUCTION","Wexford","Grogan’s Road, Wexford Town ",3,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1367,1367,"CAS CONSTRUCTION TURNKEY","Wexford","Clonattin, Gorey",6,"Túath Housing Association Ltd","","","","","","Q2-2021"],
    [1368,1368,"CAS CONSTRUCTION","Wexford","Wexford Women's Refuge, Maudlintown",13,"N/A","","Stage 2 approved Q3-2020, full design/tender being prepared.","","","",""],
    [1369,1369,"CALF TURNKEY","Wexford","67 units, Coolcotts, Wexford (Phase 1)*",67,"Clúid Housing","","","","","Q3-2020",""],
    [1370,1370,"CALF TURNKEY","Wexford","9 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)",9,"Tuath Housing Association","","","","","","Q2-2021"],
    [1371,1371,"CALF TURNKEY","Wexford","Cuil na Dara, Coolcotts, Wexford  (Phase 1)*",25,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2022",""],
    [1372,1372,"CALF TURNKEY","Wexford","Forgelands, Enniscorthy Co. Wexford. (Phase 1)",10,"Tuath Housing Association","","","","","Q3-2020",""],
    [1373,1373,"CALF TURNKEY","Wexford","Forgelands, Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)*",18,"Tuath Housing Association","","","","","","Q3-2021"],
    [1374,1374,"CALF TURNKEY","Wexford","Gleann an Ghairdin, Gorey, Co Wexford (Phase 1)",24,"Tuath Housing Association","","","","","Q3-2021",""],
    [1375,1375,"CALF CONSTRUCTION","Wexford","Hewitsland, New Ross, County Wexford (Phase 1)",48,"Clúid Housing","","","","Q2-2022","",""],
    [1376,1376,"CALF TURNKEY","Wexford","Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 3)",16,"Tuath Housing Association","","","","","","Q1-2021"],
    [1377,1377,"CALF TURNKEY","Wexford","Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 4)*",27,"Tuath Housing Association","","","","","","Q2-2021"],
    [1378,1378,"CALF TURNKEY","Wexford","Mill Heights, Castlebridge, Wexford (Phase 1)",12,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [1379,1379,"CALF TURNKEY","Wexford","Mill Heights, Castlebridge, Wexford (Phase 2)*",13,"Co - Operative Housing Ireland Society Limited","","","","","","Q1-2022"],
    [1380,1380,"CALF TURNKEY","Wexford","Moongate, Townspark, Co Wexford (Phase 1)*",17,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2022",""],
    [1381,1381,"CALF TURNKEY","Wexford","Moongate, Townspark, Co Wexford (Phase 2)*",21,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2022",""],
    [1382,1382,"CALF TURNKEY","Wexford","Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*",8,"Tuath Housing Association","","","","","","Q1-2021"],
    [1383,1383,"CALF TURNKEY","Wexford","Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 4)*",8,"Tuath Housing Association","","","","","","Q2-2021"],
    [1384,1384,"CALF TURNKEY","Wexford","Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 1)*",15,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [1385,1385,"CALF TURNKEY","Wexford","Pairc na Dara, Coolcotts, Wexford, Co. Wexford (Phase 2)",19,"Co - Operative Housing Ireland Society Limited","","","","","","Q4-2021"],
    [1386,1386,"CALF TURNKEY","Wexford","Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*",16,"Clúid Housing","","","","","","Q3-2021"],
    [1387,1387,"CALF TURNKEY","Wexford","Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 2)*",14,"Clúid Housing","","","","","","Q3-2021"],
    [1388,1388,"CALF TURNKEY","Wexford","Páirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 3)",22,"Clúid Housing","","","","","","Q4-2021"],
    [1389,1389,"CALF TURNKEY","Wexford","Ramstown, Gorey, Wexford (Phase 1)",24,"Tuath Housing Association","","","","","Q2-2021",""],
    [1390,1390,"CALF TURNKEY","Wexford","Ramstown, Gorey, Wexford (Phase 2)",20,"Tuath Housing Association","","","","","Q2-2021",""],
    [1391,1391,"CALF TURNKEY","Wexford","Ramstown, Gorey, Wexford (Phase 3)*",24,"Tuath Housing Association","","","","","Q2-2021",""],
    [1392,1392,"CALF TURNKEY","Wexford","Tobar Mhuire, Creagh, Gorey, Wexford (Phase 1)*",17,"Clúid Housing","","","","","Q4-2021",""],
    [1393,1393,"SHIP CONSTRUCTION TURNKEY","Wicklow","Weaver Square, Baltinglass, Co. Wicklow",2,"*N/A","","","","Stage 4 approved Q1-2020, the scheme is fully approved.","",""],
    [1394,1394,"SHIP CONSTRUCTION TURNKEY","Wicklow","The Birches, Ballinaclash",2,"*N/A","","","","","","Q2-2021"],
    [1395,1395,"SHIP CONSTRUCTION TURNKEY","Wicklow","Bramble Hill, Lugduff, Tinahely",2,"*N/A","","","","","","Q1-2021"],
    [1396,1396,"SHIP CONSTRUCTION TURNKEY","Wicklow","Vartry Heights, Roundwood, Co. Wicklow",3,"*N/A","","","","Stage 4 approved Q1-2021, the scheme is fully approved.","",""],
    [1397,1397,"SHIP CONSTRUCTION TURNKEY","Wicklow","Avonmore View, Rathdrum",13,"*N/A","","","","Stage 4 approved Q2-2021, the scheme is fully approved.","",""],
    [1398,1398,"SHIP CONSTRUCTION TURNKEY","Wicklow","Bramble Hill, Lugduff, Tinahely",1,"*N/A","","","","","","Q2-2021"],
    [1399,1399,"SHIP CONSTRUCTION TURNKEY","Wicklow","95 Waverley Drive, Broomhall, Rathnew",1,"*N/A","","","","","","Q1-2022"],
    [1400,1400,"SHIP CONSTRUCTION TURNKEY","Wicklow","Waverley Drive, Broomhall, Rathnew",3,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1401,1401,"SHIP CONSTRUCTION TURNKEY","Wicklow","Waverley Drive, Broomhall, Rathnew",3,"N/A","","","","","","Q1-2022"],
    [1402,1402,"SHIP CONSTRUCTION TURNKEY","Wicklow","Waverley Drive, Broomhall, Rathnew",1,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1403,1403,"SHIP CONSTRUCTION TURNKEY","Wicklow","Waverley Drive, Broomhall, Rathnew",2,"*N/A","","","","Stage 4 approved Q4-2021, the scheme is fully approved.","",""],
    [1404,1404,"SHIP CONSTRUCTION SINGLE STAGE","Wicklow","Church Lane, Newcastle",1,"*N/A","","","","Stage 4 approved Q3-2021, the scheme is fully approved.","",""],
    [1405,1405,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Merrymeeting View, Rathnew",46,"*N/A","","","","","","Q2-2021"],
    [1406,1406,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Shillelagh Phase 4",20,"*N/A","","","Stage 3 approved Q2-2021, the scheme is now approved to proceed to tender.","","",""],
    [1407,1407,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Ashtown Lane, Wicklow Town",40,"*N/A","","","","","Q3-2020",""],
    [1408,1408,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Ard na Greine, West Ward, Bray",31,"*N/A","","","","","","Q1-2022"],
    [1409,1409,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Avondale Heights, Rathdrum",20,"*N/A","","","","","Q3-2021",""],
    [1410,1410,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Sheehan Court, Back Street, Arklow",7,"*N/A","","","","","Q2-2021",""],
    [1411,1411,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Mountainview, Moneycarroll, Newtownmountkennedy, Co. Wicklow",22,"*N/A","","","","","Q3-2020",""],
    [1412,1412,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Three Trouts, Greystones",41,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [1413,1413,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Greenhill Road, Wicklow Town",36,"*N/A","","","","","Q2-2021",""],
    [1414,1414,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Cedar Court, Schools Road, Bray",14,"*N/A","","","","","Q1-2022",""],
    [1415,1415,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Coolattin Oaks, Carnew (Phase 4)",8,"*N/A","","","","","","Q1-2021"],
    [1416,1416,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Rathnew, Merrymeeting, Co. Wicklow (Phase 2)",21,"*N/A","","","","Stage 4 approved Q1-2022, the scheme is fully approved.","",""],
    [1417,1417,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Tinahely, Lugduff, Co Wicklow",20,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1418,1418,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Carrigoona, Bray",20,"*N/A","Stage 1 approved Q3-2021, outline design and costs being prepared.","","","","",""],
    [1419,1419,"SHIP CONSTRUCTION DESIGN BUILD","Wicklow","Lott Lane, Kilcoole",75,"*N/A","Stage 1 approved Q4-2021, outline design and costs being prepared.","","","","",""],
    [1420,1420,"SHIP CONSTRUCTION","Wicklow","Delaney Park, Emoclew Road, Arklow (Phase 3)",10,"*N/A","","","","","","Q1-2022"],
    [1421,1421,"SHIP CONSTRUCTION","Wicklow","10A & 10 B Castle Villas, Greystones",2,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [1422,1422,"SHIP CONSTRUCTION","Wicklow","Delaney Park, Emoclew Road, Arklow (Phase 2)",37,"*N/A","","","","","","Q4-2021"],
    [1423,1423,"SHIP CONSTRUCTION","Wicklow","Blackhills, Glenealy, Co. Wicklow",2,"*N/A","","","","","Q4-2021",""],
    [1424,1424,"SHIP CONSTRUCTION","Wicklow","Age Friendly Apartments at Main St, Kilcoole, Greystones",4,"*N/A","","Stage 2 approved Q3-2021, full design/tender being prepared.","","","",""],
    [1425,1425,"SHIP CONSTRUCTION","Wicklow","Mill Road, Killincarrig, Greystones",2,"*N/A","","","Stage 3 approved Q1-2022, the scheme is now approved to proceed to tender.","","",""],
    [1426,1426,"SHIP CONSTRUCTION","Wicklow","Carraig Eden, Greysones (Phase 3)",14,"*N/A","","Stage 2 approved Q4-2021, full design/tender being prepared.","","","",""],
    [1427,1427,"SHIP CONSTRUCTION","Wicklow","Kilbride Lane, Bray (Murphy's Lands)",19,"*N/A","","","","","","Q2-2021"],
    [1428,1428,"SHIP CONSTRUCTION","Wicklow","Knockroe, Delgany, Co. Wicklow",2,"*N/A","","Stage 2 approved Q1-2022, full design/tender being prepared.","","","",""],
    [1429,1429,"SHIP CONSTRUCTION","Wicklow","Ard Rua, Barndarraig, Arklow, Co. Wicklow",12,"*N/A","Stage 1 approved Q2-2021, outline design and costs being prepared.","","","","",""],
    [1430,1430,"CAS CONSTRUCTION TURNKEY","Wicklow","Rathcoran Square, Baltinglass",8,"Peter McVerry Trust Ltd","","","","","","Q2-2021"],
    [1431,1431,"CAS CONSTRUCTION SINGLE STAGE","Wicklow","Hollybrook Park, Bray, Co. Wicklow",4,"St. John of God Housing Association Ltd","","","","Stage 4 approved Q3-2019, the scheme is fully approved.","",""],
    [1432,1432,"PUBLIC PRIVATE PARTNERSHIP (Bundle 3)","Wicklow","Burgage More, Blessington, Co. Wicklow",106,"*N/A","","Q4-2021","","","",""],
    [1433,1433,"CALF TURNKEY","Wicklow","Adelaide Apartments, St Laurence’s Terrace, Bray, Co. Wicklow (Phase 1)*",18,"Respond","","","","","Q2-2021",""],
    [1434,1434,"CALF TURNKEY","Wicklow","Avondale Grange, Ballygannon, Rathdrum, Co. Wicklow (Phase 1)*",36,"Respond","","","","","Q2-2021",""],
    [1435,1435,"CALF TURNKEY","Wicklow","Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 1)*",40,"Circle Voluntary Housing Association Ltd","","","","","","Q3-2021"],
    [1436,1436,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow (Phase 1)",11,"Tuath Housing Association","","","","","Q2-2021",""],
    [1437,1437,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow (Phase 2)",18,"Tuath Housing Association","","","","","Q2-2021",""],
    [1438,1438,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow (Phase 3)",13,"Tuath Housing Association","","","","","Q2-2021",""],
    [1439,1439,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow (Phase 4)",17,"Tuath Housing Association","","","","","Q2-2021",""],
    [1440,1440,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow (Phase 5)*",29,"Tuath Housing Association","","","","","Q2-2021",""],
    [1441,1441,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)",15,"Tuath Housing Association","","","","","","Q4-2021"],
    [1442,1442,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)",10,"Tuath Housing Association","","","","","","Q1-2022"],
    [1443,1443,"CALF TURNKEY","Wicklow","Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 3)",3,"Tuath Housing Association","","","","","Q4-2020",""],
    [1444,1444,"CALF TURNKEY","Wicklow","Lower Main Street, Arklow, Co. Wicklow (Phase 1)",4,"Clanmil Housing Association Ireland","","","","","Q2-2021",""],
    [1445,1445,"CALF TURNKEY","Wicklow","Main Street, Blessington, Co. Wicklow (Phase 1)*",22,"Circle Voluntary Housing Association Ltd","","","","Q2-2022","",""],
    [1446,1446,"CALF TURNKEY","Wicklow","Main Street, Blessington, Co. Wicklow (Phase 2)*",36,"Circle Voluntary Housing Association Ltd","","","","Q2-2022","",""],
    [1447,1447,"CALF TURNKEY","Wicklow","Oak Springs, Rathdrum, County Wicklow  (Phase 1)*",5,"Tuath Housing Association","","","","","Q3-2020",""],
    [1448,1448,"CALF TURNKEY","Wicklow","Phase 2, Southern Cross, Bray, Co. Wicklow (Phase 1)",80,"Co - Operative Housing Ireland Society Limited","","","","","Q4-2020",""],
    [1449,1449,"CALF TURNKEY","Wicklow","Phase 3, Southern Cross, Bray, Co. Wicklow (Phase 1)*",80,"Co - Operative Housing Ireland Society Limited","","","","","Q4-2020",""],
    [1450,1450,"CALF TURNKEY","Wicklow","Rathcoran House, Baltinglass, Co. Wicklow (Phase 2)*",24,"Respond","","","","","","Q2-2021"],
    [1451,1451,"CALF TURNKEY","Wicklow","Rathcoran House, Baltinglass, Co. Wicklow (Phase 3)",16,"Respond","","","","","","Q3-2021"],
    [1452,1452,"CALF TURNKEY","Wicklow","Southern Cross, Bray, Co. Wicklow\n (Phase 1)*",30,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [1453,1453,"CALF TURNKEY","Wicklow","Southern Cross, Bray, Co. Wicklow\n (Phase 2)*",18,"Co - Operative Housing Ireland Society Limited","","","","","Q2-2021",""],
    [1454,1454,"CALF TURNKEY","Wicklow","The Old Rectory, Blessington, Co. Wicklow (Phase 1)*",45,"Co - Operative Housing Ireland Society Limited","","","","","Q3-2020",""],
    [1455,1455,"CALF TURNKEY","Wicklow","Vartry Wood, Ashford, Co. Wicklow (Phase 1)*",16,"Clúid Housing","","","","","Q2-2021",""]
]}