1	""	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow - Phase 1	24	*N/A	""	""	""	""	Q4-2017	""
2	""	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow - Phase 2	16	*N/A	""	""	""	""	Q4-2017	""
3	""	SHIP CONSTRUCTION TURNKEY	Carlow	Tullow Road, Carlow - Phase 3	23	*N/A	""	""	""	""	Q4-2017	""
4	""	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	Q3-2017	""
5	""	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	Q4-2017	""
6	""	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	""	""	Q4-2017	""
7	""	SHIP CONSTRUCTION	Carlow	Bagenalstown	42	*N/A	""	""	""	""	Q4-2017	""
8	""	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	Q4-2017	""
9	""	SHIP CONSTRUCTION	Carlow	Hacketstown	4	*N/A	""	""	""	""	Q1-2018	""
10	""	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
11	""	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
12	""	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
13	""	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
14	""	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
15	""	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
16	""	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
17	""	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
18	""	CAS CONSTRUCTION	Carlow	Mill Race Court, Carlow Town	14	Cluid Housing Association	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
19	""	CAS CONSTRUCTION	Carlow	Royal Oak Road, Bagenalstown	6	Respond	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
20	""	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
21	""	CALF CONSTRUCTION TURNKEY	Carlow	Sleaty Street, Graigcullen, Carlow	26	Cluid Housing Association	""	""	""	""	Q1-2018	""
22	""	CALF CONSTRUCTION TURNKEY	Carlow	Barrett Street, Bagnalstown	10	Tintean Housing Association	""	""	""	""	""	Q1-2018
23	""	CALF CONSTRUCTION TURNKEY	Carlow	River Court,  Carlow 1/4*	10	Co-operative Housing Ireland	""	""	""	Scheme approved for funding Q1 - 2018	""	""
24	""	CALF CONSTRUCTION TURNKEY	Carlow	River Court,  Carlow 2/4	16	Co-operative Housing Ireland	""	""	""	Scheme approved for funding Q1 - 2018	""	""
25	""	CALF CONSTRUCTION TURNKEY	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow 1/1	59	Tath Housing Association Ltd	""	""	""	""	Q1-2018	""
26	""	CALF CONSTRUCTION TURNKEY	Carlow	River Court,  Carlow 3/4	12	Co-operative Housing Ireland	""	""	""	Scheme approved for funding Q1 - 2018	""	""
27	""	CALF CONSTRUCTION TURNKEY	Carlow	River Court,  Carlow  4/4	9	Co-operative Housing Ireland	""	""	""	Scheme approved for funding Q1 - 2018	""	""
28	""	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	Q1-2018	""
29	""	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2018
30	""	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	Q4-2017	""
31	""	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
32	""	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
33	""	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
34	""	CALF CONSTRUCTION TURNKEY	Cavan	Cluain Dara, Kingscourt	16	Cluid Housing Association	""	""	""	""	""	Q4-2016
35	""	CALF CONSTRUCTION TURNKEY	Cavan	Drumalee Manor, Drumalee Phase 2	7	Tath Housing Association	""	""	""	""	Q1-2017	""
36	""	CALF CONSTRUCTION TURNKEY	Cavan	Drumalee Manor, Drumalee Phase 1	4	Tath Housing Association	""	""	""	""	Q1-2017	""
37	""	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	Q4-2017	""
38	""	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
39	""	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
40	""	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
41	""	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
42	""	SHIP CONSTRUCTION	Clare	Tullyglass, Shannon	21	*N/A	""	Stage 2 approved in Q2-2016, full design/tender being prepared.	""	""	""	""
43	""	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
44	""	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	14	Cuan an Chlair Ltd	Stage 1 approved in Q4-2016, outline design and costs are now being prepared.	""	""	""	""	""
45	""	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
46	""	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
47	""	CAS CONSTRUCTION	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	Q3-2017	""
48	""	CALF CONSTRUCTION TURNKEY	Clare	Lios Anama, Sixmilebridge	28	Co operative Ireland	""	""	""	""	""	Q4-2017
49	""	CALF CONSTRUCTION TURNKEY	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  1/2	12	Cluid Housing Association 	""	""	""	""	Q1-2018	""
50	""	CALF CONSTRUCTION TURNKEY	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare 2/2	18	Cluid Housing Association 	""	""	""	""	Q1-2018	""
51	""	CALF CONSTRUCTION	Clare	Bruachlan, Westbury	22	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q2-2016	""	""
52	""	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	Q4-2017	""
53	""	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
54	""	SHIP CONSTRUCTION TURNKEY	Cork City	Barack Street	32	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
55	""	SHIP CONSTRUCTION TURNKEY	Cork City	FaranFerris	5	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
56	""	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
57	""	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	""	Q1-2018	""
58	""	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
59	""	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
60	""	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road	43	*N/A	""	""	""	""	Q2-2017	""
61	""	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
62	""	SHIP CONSTRUCTION TURNKEY	Cork City	Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	Q3-2017	""
63	""	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	Stage 4 approved in Q1-2017, the scheme is now fully approved.	""	""
64	""	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street	25	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
65	""	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	Q2-2017	""
66	""	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
67	""	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
68	""	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
69	""	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
70	""	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
71	""	SHIP CONSTRUCTION	Cork City	Deanrock, Togher	65	*N/A	""	""	""	""	Q4-2016	""
72	""	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	41	*N/A	""	""	""	""	Q3-2017	""
73	""	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
74	""	SHIP CONSTRUCTION	Cork City	258 & 259 Blarney Street	2	*N/A	""	""	""	""	""	Q1-2018
75	""	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
76	""	REGENERATION	Cork City	Phase 2 A Knocknaheeny	47	*N/A	""	""	""	""	Q4-2017	""
77	""	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
78	""	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
79	""	REGENERATION	Cork City	Phase 2C Knocknaheeny	24	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
80	""	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	33	Good Shepherd Services Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
81	""	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	25	Respond	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
82	""	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
83	""	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	Q2-2017	""
84	""	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
85	""	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	Q4-2016	""
86	""	CALF CONSTRUCTION TURNKEY	Cork City	the Meadows, Knopckacullen Ease, Gurranabraher, Cork 1/3	16	Tath Housing Association	""	""	""	""	Q1-2018	""
87	""	CALF CONSTRUCTION TURNKEY	Cork City	the Meadows, Knopckacullen Ease, Gurranabraher, Cork 2/3	15	Tath Housing Association	""	""	""	""	Q1-2018	""
88	""	CALF CONSTRUCTION TURNKEY	Cork City	the Meadows, Knopckacullen Ease, Gurranabraher, Cork 3/3	21	Tath Housing Association	""	""	""	""	Q1-2018	""
89	""	CALF CONSTRUCTION TURNKEY	Cork City	Millfield Cottages, Blackpool	18	Respond!	""	""	""	""	Q1-2017	""
90	""	CALF CONSTRUCTION TURNKEY	Cork City	Leitrim Street, Cork City	18	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q3-2016	""	""
91	""	CALF CONSTRUCTION TURNKEY	Cork City	Popes Road, Blackpool	7	Cluid Housing Association	""	""	""	""	Q1-2017	""
92	""	CALF CONSTRUCTION TURNKEY	Cork City	11 North Abbey Street, Cork City  /1/	6	Respond!	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
93	""	CALF CONSTRUCTION	Cork City	Mile Stream, Shanakiel, Cork City 	50	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q4-2017 	""	""
94	""	CALF CONSTRUCTION	Cork City	124 Lr. Glanmire Road & 2 Breamer, Cork- Phase 2	3	Galtan Ltd	""	""	""	""	Q1-2017	""
95	""	CALF CONSTRUCTION	Cork City	124 Lr. Glanmire Road & 2 Breamer, Cork Phase 1	3	Galtan Ltd	""	""	""	""	""	Q1-2018
96	""	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	25	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
97	""	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
98	""	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	2	*N/A	""	""	""	""	Q4-2017	""
99	""	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
100	""	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
101	""	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 3)	12	*N/A	""	""	""	""	""	Q4-2017
102	""	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	52	*N/A	""	""	""	""	Q4-2017	""
103	""	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
104	""	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 1)	12	*N/A	""	""	""	""	""	Q1-2017
105	""	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas (Phase 2)	16	*N/A	""	""	""	""	""	Q1-2017
106	""	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	6	*N/A	""	""	""	""	Q1-2018	""
107	""	SHIP CONSTRUCTION TURNKEY	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	Q1-2018	""
108	""	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	14	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
109	""	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	6	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
110	""	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	Q1-2018	""
111	""	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
112	""	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibereen	4	*N/A	""	""	""	""	Q1-2018	""
113	""	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	Q2-2017	""
114	""	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara,Ard Cashel, watergrasshill	6	*N/A	""	""	""	""	Q1-2018	""
115	""	SHIP CONSTRUCTION RAPID	Cork County	Abbeywood, Middelton	70	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
116	""	SHIP CONSTRUCTION RAPID	Cork County	Station Road, Blarney	18	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
117	""	SHIP CONSTRUCTION RAPID	Cork County	Bluepool, Kanturk	12	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
118	""	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	15	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
119	""	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork	9	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
120	""	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
121	""	SHIP CONSTRUCTION	Cork County	Castletreasure Grove, Douglas	1	*N/A	Stage 1 approved in Q3-2016, outline design and costs are now being prepared.	""	""	""	""	""
122	""	SHIP CONSTRUCTION	Cork County	Poulavone, Ballincollig	57	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
123	""	SHIP CONSTRUCTION	Cork County	Newtown, Bantry	1	*N/A	Stage 1 approved in Q2-2016, outline design and costs are now being prepared.	""	""	""	""	""
124	""	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	Q4-2017	""
125	""	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	Q4-2017	""
126	""	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
127	""	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
128	""	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
129	""	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	Q4-2016	""
130	""	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (phase 1A & 1B)	15	*N/A	""	""	""	""	Q4-2017	""
131	""	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 2/C)	16	*N/A	""	""	""	""	Q4-2017	""
132	""	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 3/D)	18	*N/A	""	""	""	""	Q4-2017	""
133	""	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	Stage 1 approved in Q3-2016, outline design and costs are now being prepared.	""	""	""	""	""
134	""	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	Q4-2017	""
135	""	CAS CONSTRUCTION	Cork County	Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	Q1-2018	""
136	""	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
137	""	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	Stage 2 approved in Q3-2015, full design/tender being prepared.	""	""	""	""
138	""	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	Q1-2017	""
139	""	CALF CONSTRUCTION TURNKEY	Cork County	Tanners Field, Bandon, Co Cork *	5	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
140	""	CALF CONSTRUCTION TURNKEY	Cork County	Tanners Field, Bandon, Co Cork *	6	Tath Housing Association Ltd	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
141	""	CALF CONSTRUCTION TURNKEY	Cork County	College Manor, Cobh	10	Tath Housing Association	""	""	""	""	""	Q4-2016
142	""	CALF CONSTRUCTION TURNKEY	Cork County	Ticknock, Cobh	8	Respond!	""	""	""	""	Q1-2017	""
143	""	CALF CONSTRUCTION TURNKEY	Cork County	Beach Road, Passage West	3	Cluid Housing Association	""	""	""	""	""	Q4-2017
144	""	CALF CONSTRUCTION TURNKEY	Cork County	Lackaduff, Codrum, Macroom, Co Cork  1/1	5	Tuath Housing Association Ltd	""	""	""	Q1 2018	""	""
145	""	CALF CONSTRUCTION TURNKEY	Cork County	Weston, Carrigaline, Co. Cork *	7	Respond!	""	""	""	Q1 2018	""	""
146	""	CALF CONSTRUCTION 	Cork County	Church View, Enniskeane	12	Cluid Housing Association	""	""	""	""	Q1-2017	""
147	""	CALF CONSTRUCTION	Cork County	Cappagh, Ballynacubby, Kinsale, Co. Cork	40	Cluid Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
148	""	CALF CONSTRUCTION	Cork County	Firgrove Harrisons Lane Charleville	6	Co operative Ireland	""	""	""	""	""	Q4-2017
149	""	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
150	""	SHIP CONSTRUCTION RAPID	DLR	Glenamuck/Stillorgan (Rockville Drive)	14	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
151	""	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	Q3-2017	""
152	""	SHIP CONSTRUCTION	DLR	66 George's Street, Dun Laoghaire	4	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
153	""	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	Q4-2017	""
154	""	SHIP CONSTRUCTION	DLR	33,35, & 37 Temple Road	3	*N/A	""	""	""	""	Q3-2017	""
155	""	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
156	""	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	Q1-2017	""
157	""	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
158	""	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
159	""	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	Q4-2016	""
160	""	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
161	""	SHIP CONSTRUCTION	DLR	Fitzgerald Park	50	*N/A	""	""	""	""	Q4-2016	""
162	""	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	Q3-2016	""
163	""	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
164	""	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
165	""	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
166	""	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q1-2016
167	""	SHIP CONSTRUCTION	DLR	41 Ballyogan Ave., Ballyogan, Co. Dublin	2	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
168	""	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	Stage 1 approved in Q4-2016, outline design and costs are now being prepared.	""	""	""	""	""
169	""	CALF CONSTRUCTION TURNKEY	DLR	Respond & Tuath Project Dublin 18 area.	49	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
170	""	CALF CONSTRUCTION TURNKEY	DLR	Hyde Road, Belmont, Stepaside	8	Respond!	""	""	""	""	Q3-2016	""
171	""	CALF CONSTRUCTION TURNKEY	DLR	Bishops Gate, Kilternan, Dublin 18	6	Cluid Housing Association	""	""	""	""	Q3-2017	""
172	""	CALF CONSTRUCTION TURNKEY	DLR	The Avenue, Glenside, Carrickmines Green, Dublin 18 *	5	Fold Ireland Housing Association	""	""	""	""	Q3-2017	""
173	""	CALF CONSTRUCTION TURNKEY	DLR	Woodbank, Dublin Rd, Shankill *	4	Cluid Housing Association	""	""	""	""	""	Q3-2017
174	""	CALF CONSTRUCTION TURNKEY	DLR	Stillorgan Gate, Kilmacud Road Upper, Co. Dublin *	4	Cluid Housing Association	""	""	""	""	""	Q4-2017
175	""	CALF CONSTRUCTION 	DLR	Respond & Tuath Project Dublin 18 area.	56	Respond!	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
176	""	CALF CONSTRUCTION	DLR	Clays Farm, Ballyogan Road (Phase 1)* 	44	The Iveagh Trust	""	""	""	""	Q4-2017	""
177	""	CALF CONSTRUCTION	DLR	Abbeyview House, Monkstown	8	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2015	""	""
178	""	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	Q2-2017	""
179	""	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	34	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
180	""	SHIP CONSTRUCTION	Donegal	Carrigart (Phase 1)	17	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
181	""	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
182	""	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
183	""	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
184	""	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
185	""	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
186	""	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
187	""	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	Q3-2017	""
188	""	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
189	""	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
190	""	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	Q1-2017	""
191	""	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
192	""	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
193	""	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
194	""	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	6	Apex Housing Association	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
195	""	CAS CONSTRUCTION	Donegal	Willowbrook, Glencar, Letterkenny	40	Apex Housing Association	Stage 1 approved in Q4-2016, outline design and costs are now being prepared.	""	""	""	""	""
196	""	CAS CONSTRUCTION	Donegal	Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
197	""	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	10	Oaklee Housing Trust	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
198	""	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	Q2-2017	""
199	""	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	20	Habinteg Housing Association (Ireland) Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
200	""	CALF CONSTRUCTION TURNKEY	Donegal	Ernedale Heights, Ballyshannon	11	Cluid Housing Association	""	""	""	""	Q3-2017	""
201	""	CALF CONSTRUCTION TURNKEY	Donegal	Forge Road, Donegal	4	Cluid Housing Association	""	""	""	""	""	Q3-2016
202	""	CALF CONSTRUCTION TURNKEY	Donegal	1-46 Ardrawer, Kiltoy, Letterkenny	46	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
203	""	CALF CONSTRUCTION	Donegal	Ballaghderg, Letterkenny, Co Donegal *	33	Respond!	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
204	""	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospecthill	58	*N/A	""	""	""	""	""	Q4-2017
205	""	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
206	""	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
207	""	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
208	""	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
209	""	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
210	""	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas	70	*N/A	""	""	""	""	Q4-2017	""
211	""	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp C, Dublin 17	16	*N/A	""	Stage 2 approved in Q3-2015, full design/tender being prepared.	""	""	""	""
212	""	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
213	""	SHIP CONSTRUCTION	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved in Q3-2015, full design/tender being prepared.	""	""	""	""
214	""	SHIP CONSTRUCTION	Dublin City	Bunratty Road Phase 1c, Dublin 17	78	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
215	""	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
216	""	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
217	""	SHIP CONSTRUCTION	Dublin City	North King Street, Dublin 7	30	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is now being tendered.	""	""	""
218	""	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	7	*N/A	""	""	""	""	Q1-2017	""
219	""	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
220	""	SHIP CONSTRUCTION	Dublin City	Priory Hall	9	*N/A	""	""	""	""	""	Q1-2017
221	""	SHIP CONSTRUCTION	Dublin City	Priory Hall	26	*N/A	""	""	""	""	Q2-2017	""
222	""	REGENERATION	Dublin City	St. Teresa's Gardens	50	*N/A	Stage 1 approved in Q3-2013, outline design and costs are now being prepared.	""	""	""	""	""
223	""	REGENERATION	Dublin City	Dolphin House, Dublin 8 (Phase 1)	100	*N/A	""	""	""	""	Q4-2016	""
224	""	REGENERATION	Dublin City	Dominick Street	72	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
225	""	REGENERATION	Dublin City	Sackville Avenue Cottages	12	*N/A	Stage 1 approved in Q2-2016, outline design and costs are now being prepared.	""	""	""	""	""
226	""	REGENERATION	Dublin City	O'Devaney Gardens	56	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
227	""	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
228	""	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
229	""	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
230	""	REGENERATION	Dublin City	Buttercup, Darndale	16	*N/A	""	""	""	""	Q2-2017	""
231	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	Q1 2018	""	""	""
232	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	Q1 2018	""	""	""
233	""	CAS CONSTRUCTION	Dublin City	38/39 Bolton Street, Dublin 1	8	Arlington Novas Ireland Ltd	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
234	""	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
235	""	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	23	Tath Housing Association	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
236	""	CAS CONSTRUCTION	Dublin City	"""Martanna House"" High Park, Grace Park Road,Dublin 9"	8	Respond	""	""	""	""	Q4-2017	""
237	""	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
238	""	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	18	Peter McVerry Trust Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
239	""	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
240	""	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
241	""	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
242	""	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
243	""	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	18	Simon Community : Dublin Simon	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
244	""	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
245	""	CAS CONSTRUCTION	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
246	""	CAS CONSTRUCTION	Dublin City	Debtor's Prison, Green Street, Dublin 7	12	Peter McVerry Trust Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
247	""	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
248	""	CALF CONSTRUCTION TURNKEY	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12	97	Fold Ireland Housing Association	""	""	""	""	Q1-2017	""
249	""	CALF CONSTRUCTION TURNKEY	Dublin City	Clongriffin, Dublin 13	84	The Iveagh Trust	""	""	""	""	Q3-2017	""
250	""	CALF CONSTRUCTION TURNKEY	Dublin City	Long Mile Road, Dublin 12	61	Respond!	""	""	""	""	Q2-2017	""
251	""	CALF CONSTRUCTION TURNKEY	Dublin City	Thornwood, Beaumont - Phase 1	46	Tath Housing Association	""	""	""	""	""	Q3-2016
252	""	CALF CONSTRUCTION TURNKEY	Dublin City	Stormanstown Hall, Ballymun Road, (revised)	42	Oaklee Housing Trust	""	""	""	""	Q4-2016	""
253	""	CALF CONSTRUCTION TURNKEY	Dublin City	Thornwood, Beaumont - Final Phase	22	Tath Housing Association	""	""	""	""	""	Q1-2017
254	""	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Phase 2	21	Tath Housing Association	""	""	""	""	""	Q1-2017
255	""	CALF CONSTRUCTION TURNKEY	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5	16	Respond!	""	""	""	""	""	Q4-2017
256	""	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Phase 1	14	Tath Housing Association	""	""	""	""	""	Q4-2016
257	""	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Phase 3	10	Tath Housing Association	""	""	""	""	""	Q2-2017
258	""	CALF CONSTRUCTION TURNKEY	Dublin City	175 176 North Strand Road, 5 Lamps, Dublin 1	10	Co-operative Housing Ireland	""	""	""	""	Q1-2018	""
259	""	CALF CONSTRUCTION TURNKEY	Dublin City	Milrose House, Bluebell Avenue, Dublin 12	8	Cluid Housing Association	""	""	""	""	""	Q4-2017
260	""	CALF CONSTRUCTION TURNKEY	Dublin City	Merville Court, Merville Avenue, Fairview	5	Co operative Ireland	""	""	""	""	""	Q1-2017
261	""	CALF CONSTRUCTION TURNKEY	Dublin City	Camac Place, Bluebell, Dublin 12	5	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
262	""	CALF CONSTRUCTION TURNKEY	Dublin City	An Riasc, Farnham Drive, Finglas - Final Phase	3	Tath Housing Association	""	""	""	""	""	Q3-2017
263	""	CALF CONSTRUCTION TURNKEY	Dublin City	11 13 Crumlin Village, Dublin 12 Phase 1	3	Cluid Housing Association	""	""	""	""	""	Q2-2017
264	""	CALF CONSTRUCTION TURNKEY	Dublin City	11 13 Crumlin Village, Dublin 12 Phase 2	2	Cluid Housing Association	""	""	""	""	""	Q3-2017
265	""	CALF CONSTRUCTION	Dublin City	St Mary?s Mansions, Dublin 1	80	Cluid Housing Association	""	""	""	""	Q4-2017	""
266	""	CALF CONSTRUCTION	Dublin City	Orchard Lawns, Ballyfermot	72	Co-operative Housing Ireland	""	""	""	""	Q4-2016	""
267	""	CALF CONSTRUCTION	Dublin City	Annamore Court, Ballyfermot	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
268	""	CALF CONSTRUCTION	Dublin City	Tonlegee Road, Dublin 5 	47	Fold Housing Association Ireland Ltd	""	""	""	""	Q4-2017	""
269	""	CALF CONSTRUCTION	Dublin City	Dolphin Park, Rialto, Dublin 8	43	Fold Ireland Housing Association	""	""	""	Scheme approved for Revised CALF funding Q3-2017	""	""
270	""	CALF CONSTRUCTION	Dublin City	Richmond Road, Dublin 9	39	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
271	""	CALF CONSTRUCTION	Dublin City	Raleigh Court, Crumlin	33	Tath Housing Association	""	""	""	""	Q2-2017	""
272	""	CALF CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus Court, Cabra	33	Cluid Housing Association	""	""	""	""	""	Q4-2017
273	""	CALF CONSTRUCTION	Dublin City	5 6 Johns Lane West, Dublin 8	31	Focus Ireland	""	""	""	""	Q2-2017	""
274	""	CALF CONSTRUCTION	Dublin City	84 North King Street, Dublin 7 	30	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
275	""	CALF CONSTRUCTION	Dublin City	Poplar Row, Dublin 3	29	Oaklee Housing Trust	""	""	""	Scheme approved for revised CALF approval Q2-2017	""	""
276	""	CALF CONSTRUCTION	Dublin City	Harolds Cross, Dublin 6	28	Focus Ireland	""	""	""	""	""	Q4-2016
277	""	CALF CONSTRUCTION	Dublin City	Ballygall Road East - Phase 2	11	Fold Ireland Housing Association	""	""	""	""	""	Q1-2016
278	""	CALF CONSTRUCTION	Dublin City	Wad River Close, Ballymun, Dublin 9	9	Cluid Housing Association	""	""	""	Scheme re approved for approval Q3-2017	""	""
279	""	CALF CONSTRUCTION	Dublin City	Dominic Place, Dublin	9	The Paddy McGrath Housing Project	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
280	""	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
281	""	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
282	""	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 1), Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
283	""	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield (Phase 2), Ongar, Dublin 15	16	*N/A	""	""	""	""	Q4-2017	""
284	""	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
285	""	SHIP CONSTRUCTION RAPID	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
286	""	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	Q3-2017	""
287	""	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
288	""	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
289	""	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
290	""	SHIP CONSTRUCTION	Fingal	Rowlestown	20	*N/A	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
291	""	SHIP CONSTRUCTION	Fingal	Racecourse Common, Lusk (Phase 2.3)	34	*N/A	""	""	""	""	Q4-2016	""
292	""	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 2)	28	*N/A	""	""	Stage 3 approved in Q4-2016.	""	""	""
293	""	SHIP CONSTRUCTION	Fingal	Castlelands Part View (Phase 3)	24	*N/A	""	""	""	""	Q1-2017	""
294	""	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
295	""	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 1)	2	*N/A	""	""	""	""	""	Q3-2017
296	""	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
297	""	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
298	""	SHIP CONSTRUCTION	Fingal	St. Conan's Cottages, Swords	1	*N/A	""	""	""	""	""	Q2-2016
299	""	SHIP CONSTRUCTION	Fingal	Racecourse Common, Lusk (Phase 2.1)	25	*N/A	""	""	""	""	""	Q4-2017
300	""	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal (Part 2)	6	*N/A	""	""	""	""	Q4-2016	""
301	""	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk (Phase 2.2) 	15	*N/A	""	""	""	""	""	Q1-2018
302	""	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Tath Housing Association	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
303	""	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas	6	Peter McVerry Trust Ltd	""	""	""	""	Q1-2018	""
304	""	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
305	""	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
306	""	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	Q2-2017	""
307	""	CALF CONSTRUCTION TURNKEY	Fingal	The Hermitage, Balgriffin, Co. Dublin *	54	Cluid Housing Association	""	""	""	""	""	Q4-2017
308	""	CALF CONSTRUCTION TURNKEY	Fingal	The Gallery, Donabate	43	Oaklee Housing Trust	""	""	""	""	Q2-2017	""
309	""	CALF CONSTRUCTION TURNKEY	Fingal	Weavers Walk, Clonsilla Road, Dublin 15	33	Co-operative Housing Ireland	""	""	""	""	Q3-2017	""
310	""	CALF CONSTRUCTION TURNKEY	Fingal	Millers Glen, Oldtown, Swords	28	The Iveagh Trust	""	""	""	""	Q1-2018	""
311	""	CALF CONSTRUCTION TURNKEY	Fingal	Castlegrange, Clonsilla - Phase 2	21	Tath Housing Association	""	""	""	""	""	Q1-2017
312	""	CALF CONSTRUCTION TURNKEY	Fingal	Castlegrange, Clonsilla - Phase 1	19	Tath Housing Association	""	""	""	""	""	Q4-2016
313	""	CALF CONSTRUCTION TURNKEY	Fingal	St Werburghs Court, Drynam Rd, Swords*	18	Tath Housing Association	""	""	""	""	""	Q4-2017
314	""	CALF CONSTRUCTION TURNKEY	Fingal	St Marnock's Bay, Portmarnock *	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
315	""	CALF CONSTRUCTION TURNKEY	Fingal	Castlegrange, Clonsilla - Phase 3	8	Tath Housing Association	""	""	""	""	""	Q2-2017
316	""	CALF CONSTRUCTION TURNKEY	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15 	43	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q4-2017 post tender proposal 	""	""
317	""	CALF CONSTRUCTION TURNKEY	Fingal	Millers Glen, Phase 3, Oldtown, Swords	14	The Iveagh Trust	""	""	""	Scheme approved for CALF funding Q1 2018	""	""
318	""	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 2)	78	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
319	""	SHIP CONSTRUCTION	Galway City	Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	Q2-2017	""
320	""	SHIP CONSTRUCTION	Galway City	Ballinfoile Park, Headford Road (Infill Units)	10	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
321	""	SHIP CONSTRUCTION	Galway City	Corrib Park (Infill Units)	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
322	""	SHIP CONSTRUCTION	Galway City	Castlepark, Ballybane (Infill Units)	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
323	""	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More, Galway	57	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
324	""	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
325	""	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
326	""	CAS CONSTRUCTION	Galway City	47 Forster Street	9	Cope Galway	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
327	""	CALF CONSTRUCTION TURNKEY	Galway City	Castlegar Road, Galway	81	Respond!	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
328	""	CALF CONSTRUCTION TURNKEY	Galway City	Maigh Rua, Doughiska, Galway	23	Co operative Ireland	""	""	""	""	""	Q4-2017
329	""	CALF CONSTRUCTION TURNKEY	Galway City	Murrough, Renmore, Galway	20	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
330	""	CALF CONSTRUCTION TURNKEY	Galway City	Boireann Beag, Ros Cam, Galway	16	Cluid Housing Association	""	""	""	""	""	Q4-2016
331	""	CALF CONSTRUCTION TURNKEY	Galway City	Reilean, Roscam, Block 5 Galway *	12	Tath Housing Association	""	""	""	""	""	Q2-2017
332	""	CALF CONSTRUCTION TURNKEY	Galway City	Reilean, Roscam, Block 4 Galway *	12	Tath Housing Association	""	""	""	""	""	Q2-2017
333	""	CALF CONSTRUCTION TURNKEY	Galway City	Maoilin, Ballymoneen Road, Galway - Phase 2 *	4	Tath Housing Association	""	""	""	""	""	Q4-2017
334	""	CALF CONSTRUCTION TURNKEY	Galway City	Maoilin, Ballymoneen Road, Galway - Phase 1 *	2	Tath Housing Association	""	""	""	""	""	Q1-2017
335	""	CALF CONSTRUCTION TURNKEY	Galway City	Cnoc na R, clybaun Road, Galway *	2	Cluid Housing Association	""	""	""	""	""	Q3-2017
336	""	CALF CONSTRUCTION TURNKEY	Galway City	77, 80 and 81 Maoilin, Ballymoneen Road, Knocknacarra, Galway City	3	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
337	""	SHIP CONSTRUCTION TURNKEY	Galway County	Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
338	""	SHIP CONSTRUCTION TURNKEY	Galway County	Athenry	14	*N/A	""	""	""	""	""	Q4-2017
339	""	SHIP CONSTRUCTION TURNKEY	Galway County	Portumna	10	*N/A	""	""	""	""	""	Q4-2017
340	""	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
341	""	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
342	""	SHIP CONSTRUCTION	Galway County	Weir Road, Tuam	30	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is now being tendered.	""	""	""
343	""	SHIP CONSTRUCTION	Galway County	Culleen, Carraroe, Connemara	6	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
344	""	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
345	""	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	Q2-2017	""
346	""	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	Q4-2017	""
347	""	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
348	""	SHIP CONSTRUCTION	Galway County	Cill Ciarn (SRD)	1	*N/A	""	""	""	""	Q3-2017	""
349	""	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	Q2-2017	""
350	""	SHIP CONSTRUCTION	Galway County	Roundstone	10	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
351	""	SHIP CONSTRUCTION	Galway County	Sruchain an Chlair, Oughterard	10	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
352	""	SHIP CONSTRUCTION	Galway County	St. Joseph's, Clifden	23	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
353	""	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	16	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
354	""	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	61	*N/A	""	""	""	""	Q4-2017	""
355	""	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
356	""	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved in Q4-2016, outline design and costs are now being prepared.	""	""	""	""	""
357	""	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
358	""	CAS CONSTRUCTION	Galway County	Eanach Mheain, Carraroe	13	Tearmann Eanna Teoranta	""	Stage 2 approved in Q2-2016, full design/tender being prepared.	""	""	""	""
359	""	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
360	""	CAS CONSTRUCTION	Galway County	Springfield, Parkmore	4	Peter Triest Housing Association Ltd	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
361	""	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
362	""	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	17	Cluid Housing Association	""	""	Stage 3 approved in Q1-2016, the scheme is now being tendered.	""	""	""
363	""	CAS CONSTRUCTION	Galway County	Caheroyn, Athenry	1	Peter Triest Housing Association Ltd	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
364	""	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	5	Peter Triest Housing Association Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
365	""	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
366	""	CALF CONSTRUCTION TURNKEY	Galway County	Cnoc na Si, Portumna	10	Co-operative Housing Ireland	""	""	""	""	Q4-2016	""
367	""	CALF CONSTRUCTION TURNKEY	Galway County	Vicars Choral, Tuam, Co Galway 	13	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
368	""	CALF CONSTRUCTION TURNKEY	Galway County	Cnoc na Si, Portumna	3	Co-operative Housing Ireland	""	""	""	""	Q4-2016	""
369	""	CALF CONSTRUCTION	Galway County	Spiddal Cottages, Co Galway - Phase 1	23	Cluid Housing Association	""	""	""	""	""	Q3-2017
370	""	CALF CONSTRUCTION	Galway County	Spiddal Cottages, Co Galway - Phase 2	8	Cluid Housing Association	""	""	""	""	Q1-2017	""
371	""	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole (Phase 2)	8	*N/A	""	""	""	""	Q2-2017	""
372	""	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole (Phase 1)	2	*N/A	""	""	""	""	""	Q1-2018
373	""	SHIP CONSTRUCTION TURNKEY	Kerry	Cahirdown Wood, Listowel	38	*N/A	""	""	""	Stage 4 approved in Q3-2017, the scheme is now fully approved.	""	""
374	""	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
375	""	SHIP CONSTRUCTION TURNKEY	Kerry	1-9 Meadow Park, Milltown (Phase 2)	7	*N/A	""	""	""	""	Q4-2017	""
376	""	SHIP CONSTRUCTION TURNKEY	Kerry	1-9 Meadow Park, Milltown (Phase 1)	2	*N/A	""	""	""	""	""	Q1-2018
377	""	SHIP CONSTRUCTION	Kerry	Ardmoneel, Killorglin	14	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
378	""	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
379	""	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	Q4-2017	""
380	""	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
381	""	SHIP CONSTRUCTION	Kerry	Milltown	8	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
382	""	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
383	""	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
384	""	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
385	""	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
386	""	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
387	""	SHIP CONSTRUCTION	Kerry	Marconi Avenue, Ballybunion	20	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
388	""	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	Q1-2018	""
389	""	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	Q4-2017	""
390	""	SHIP CONSTRUCTION	Kerry	Balloonagh, Tralee	28	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
391	""	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	Q1-2018	""
392	""	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	""	""	Q1-2018	""
393	""	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is now being tendered.	""	""	""
394	""	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is now being tendered.	""	""	""
395	""	SHIP CONSTRUCTION	Kerry	Owngarry, killorglin	1	*N/A	""	""	""	""	Q1-2018	""
396	""	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	56	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
397	""	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	""	""	Q1-2018	""
398	""	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
399	""	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
400	""	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	24	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
401	""	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	Q2-2017	""
402	""	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
403	""	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
404	""	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	Q2-2017	""
405	""	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	Q1-2017	""
406	""	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
407	""	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	Q4-2017	""
408	""	CAS CONSTRUCTION	Kerry	Mitchels-Boherbee	18	Cluid Housing Association	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
409	""	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	Q4-2017	""
410	""	CAS CONSTRUCTION	Kerry	Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee	15	Kingdom Voluntary Housing Association	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
411	""	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
412	""	CALF CONSTRUCTION TURNKEY	Kerry	Cathair Lakes Farrantoreen Road, Killorglin	6	Cluid Housing Association	""	""	""	""	""	Q2-2016
413	""	CALF CONSTRUCTION TURNKEY	Kerry	Derreen, Killarney, Co. Kerry	61	Cluid Housing Associatiion	""	""	""	Q1 2018	""	""
414	""	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
415	""	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
416	""	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	Q1-2018	""
417	""	SHIP CONSTRUCTION TURNKEY	Kildare	Mossbrook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
418	""	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
419	""	SHIP CONSTRUCTION TURNKEY	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
420	""	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street (Cassidy's Court), Monasterevin	7	*N/A	""	""	""	""	""	Q1-2018
421	""	SHIP CONSTRUCTION RAPID	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
422	""	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
423	""	SHIP CONSTRUCTION	Kildare	Athgarvan Village	20	*N/A	Stage 1 approved in Q3-2016, outline design and costs are now being prepared.	""	""	""	""	""
424	""	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved in Q1-2016, outline design and costs are now being prepared.	""	""	""	""	""
425	""	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland	32	*N/A	""	""	""	""	Q1-2018	""
426	""	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
427	""	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
428	""	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
429	""	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	Q2-2017	""
430	""	SHIP CONSTRUCTION	Kildare	Dominican Church Site, Athy	30	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
431	""	SHIP CONSTRUCTION	Kildare	Newtown, Leixlip	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
432	""	SHIP CONSTRUCTION	Kildare	Coill Dubh, Co. Kildare	9	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
433	""	SHIP CONSTRUCTION	Kildare	Ardclough Road, Celbridge	36	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
434	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas	74	*N/A	""	""	Q1 2018	""	""	""
435	""	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q3-2016, outline design and costs are now being prepared.	""	""	""	""	""
436	""	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
437	""	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q1-2016, outline design and costs are now being prepared.	""	""	""	""	""
438	""	CAS CONSTRUCTION	Kildare	Mansfield Grove, Athy	4	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved in Q1-2016, outline design and costs are now being prepared.	""	""	""	""	""
439	""	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
440	""	CALF CONSTRUCTION TURNKEY	Kildare	Gallows Hill, Athy	24	Respond!	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
441	""	CALF CONSTRUCTION TURNKEY	Kildare	Roseberry Hill, Newbridge - Phase 3	16	Tath Housing Association	""	""	""	""	""	Q1-2018
442	""	CALF CONSTRUCTION TURNKEY	Kildare	Roseberry Hill, Newbridge - Phase 2	16	Tath Housing Association	""	""	""	""	""	Q4-2017
443	""	CALF CONSTRUCTION TURNKEY	Kildare	Roseberry Hill, Newbridge - Phase 1	13	Tath Housing Association	""	""	""	""	""	Q2-2017
444	""	CALF CONSTRUCTION TURNKEY	Kildare	The Pike, Shenagun, Castledermot	6	Respond!	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
445	""	CALF CONSTRUCTION TURNKEY	Kildare	Moorefield Road, Newbridge	2	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
446	""	CALF CONSTRUCTION TURNKEY	Kildare	Millfield Manor, Newbridge, Co. Kildare *	19	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
447	""	CALF CONSTRUCTION	Kildare	Rye Abbey, Kilcock, (Apts)	33	Cluid Housing Association	""	""	""	""	""	Q4-2017
448	""	CALF CONSTRUCTION	Kildare	Morristown, Newbridge, Co Kildare	14	Cluid Housing Association	""	""	""	""	""	Q1-2018
449	""	CALF CONSTRUCTION	Kildare	Rye Abbey, Kilcock, (houses)	4	Cluid Housing Association	""	""	""	""	""	Q4-2017
450	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q3-2017
451	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
452	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 1)	8	*N/A	""	""	""	""	""	Q1-2018
453	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
454	""	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	3	*N/A	""	""	""	""	Q2-2017	""
455	""	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
456	""	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	Q4-2017	""
457	""	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	7	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
458	""	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Pennyswell Road, Kilkenny	80	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
459	""	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
460	""	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	Stage 1 approved in Q4-2016, outline design and costs are now being prepared.	""	""	""	""	""
461	""	SHIP CONSTRUCTION	Kilkenny	Abbeyquarter Vicar Street (Sweeney's Orchard), Kilkenny	30	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
462	""	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	Stage 4 approved in Q3-2017, the scheme is now fully approved.	""	""
463	""	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
464	""	SHIP CONSTRUCTION	Kilkenny	Robertshill, Kilkenny	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
465	""	SHIP CONSTRUCTION	Kilkenny	The Butts, Kilkenny	22	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
466	""	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
467	""	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
468	""	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	Q1-2018	""
469	""	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	15	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
470	""	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	2	Kingsriver Housing Association Limited	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
471	""	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
472	""	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
473	""	CAS CONSTRUCTION	Kilkenny	Golf Links Road, Kilkenny	15	Respond	Stage 1 approved in Q2-2016, outline design and costs are now being prepared.	""	""	""	""	""
474	""	CAS CONSTRUCTION	Kilkenny	Ballytobin, Callan	4	Camphill Communities of Ireland	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
475	""	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
476	""	CAS CONSTRUCTION	Kilkenny	Nimble Spaces Project at Callan	15	Camphill Communities of Ireland	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
477	""	CAS CONSTRUCTION	Kilkenny	"""Brooke House"", Thomastown"	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
478	""	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
479	""	CAS CONSTRUCTION	Kilkenny	Camphill ~Communities Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
480	""	CAS CONSTRUCTION	Kilkenny	Kyle, Callan, Co. Kilkenny	4	Camphill Communities of Ireland	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
481	""	CAS CONSTRUCTION	Kilkenny	"""Red Barn"" Patrick Street, Ballyragget"	16	Good Shepherd Services Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
482	""	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett Oaklee	4	Oaklee Housing Trust	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
483	""	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	5	Camphill Communities of Ireland	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
484	""	CALF CONSTRUCTION TURNKEY	Kilkenny	Logan Square, Thomastown, Co. Kilkenny*	16	Oaklee	""	""	""	""	""	Q4-2017
485	""	CALF CONSTRUCTION TURNKEY	Kilkenny	Moneenview side Rd, Moneenroe	9	Oaklee Housing Trust	""	""	""	""	Q1-2017	""
486	""	CALF CONSTRUCTION TURNKEY	Kilkenny	Chapel St. and New Road, Mooncoin, Co. Kilkenny	6	Respond!	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
487	""	CALF CONSTRUCTION	Kilkenny	Golf Links Road, Kilkenny *	39	Respond!	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
488	""	CALF CONSTRUCTION	Kilkenny	Friary Walk, Callan	16	Cluid Housing Association	""	""	""	""	Q1-2018	""
489	""	SHIP CONSTRUCTION	Laois	Main Street, Rathdowney	6	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
490	""	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
491	""	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
492	""	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	Stage 1 approved in Q3-2016, outline design and costs are now being prepared.	""	""	""	""	""
493	""	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
494	""	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	8	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
495	""	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	Q4-2016	""
496	""	CAS CONSTRUCTION	Laois	St. Fintan's Hospital, Dublin Road, Portlaoise	8	Oaklee Housing Trust	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
497	""	CALF CONSTRUCTION	Laois	Cluin Inn Mountrath	11	Oaklee Housing Trust	""	""	""	""	""	Q1-2018
498	""	CALF CONSTRUCTION	Laois	55/56 Kirwan Park, Mountmellick	2	Cluid Housing Association	""	""	""	""	Q1-2018	""
499	""	CALF CONSTRUCTION TURNKEY	Laois 	31 36 Droimnin, Stradbally	6	Cluid Housing Association	""	""	""	""	Q4-2017	""
500	""	SHIP CONSTRUCTION	Leitrim	Summerhill, Carrick on Shannon	28	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
501	""	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	Q2-2017	""
502	""	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
503	""	SHIP CONSTRUCTION RAPID	Limerick	Deerpark, Adare	30	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
504	""	SHIP CONSTRUCTION RAPID	Limerick	Lisheen Park, Patrickswell	16	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
505	""	SHIP CONSTRUCTION RAPID	Limerick	Upper Carey's Road	11	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
506	""	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	33	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
507	""	SHIP CONSTRUCTION RAPID	Limerick	Mountpelier	10	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
508	""	SHIP CONSTRUCTION RAPID	Limerick	Knocklong	10	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
509	""	SHIP CONSTRUCTION RAPID	Limerick	Patrickswell (Site 2)	28	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
510	""	SHIP CONSTRUCTION	Limerick	Patrick?s Villas, Castleconnell	4	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
511	""	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
512	""	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	7	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
513	""	SHIP CONSTRUCTION	Limerick	1-12 Burke Avenue, Limerick City	12	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
514	""	SHIP CONSTRUCTION	Limerick	Chas Flats, Limerick City	3	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
515	""	SHIP CONSTRUCTION	Limerick	Sexton Street North & Kileely Court	5	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
516	""	SHIP CONSTRUCTION	Limerick	Site Adj. to Athlunkard Boat Club, Limerick City	4	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
517	""	SHIP CONSTRUCTION	Limerick	Joseph Street, Limerick City	3	*N/A	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
518	""	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	11	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
519	""	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	38	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
520	""	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
521	""	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
522	""	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
523	""	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	6	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is now being tendered.	""	""	""
524	""	SHIP CONSTRUCTION	Limerick	Vance's Lands, Limerick City	37	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
525	""	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
526	""	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
527	""	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
528	""	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Moyross	3	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
529	""	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
530	""	SHIP CONSTRUCTION	Limerick	Ballygreannan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
531	""	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
532	""	SHIP CONSTRUCTION	Limerick	Ballyhahill	4	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
533	""	SHIP CONSTRUCTION	Limerick	Knockalisheen Road, Moyross	6	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
534	""	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	9	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
535	""	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
536	""	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
537	""	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
538	""	REGENERATION	Limerick	Gaol Lane	1	*N/A	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
539	""	REGENERATION	Limerick	Sheep / Athlunkards Street	8	*N/A	""	Stage 2 approved in Q2-2014, full design/tender being prepared.	""	""	""	""
540	""	REGENERATION	Limerick	Churchfield (Phase 1A)	19	*N/A	""	""	""	""	""	Q1-2018
541	""	REGENERATION	Limerick	Churchfield (Phase 1B)	23	*N/A	""	""	""	""	Q3-2016	""
542	""	REGENERATION	Limerick	Churchfield (Phase 2)	38	Circle Voluntary Housing Association Ltd	""	Stage 2 approved in Q4-2014, full design/tender being prepared.	""	""	""	""
543	""	REGENERATION	Limerick	Cosgrave Park	30	Co-operative Housing Ireland (Formerly NABCo)	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
544	""	REGENERATION	Limerick	Palm Court	27	Respond	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
545	""	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
546	""	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
547	""	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
548	""	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
549	""	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
550	""	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
551	""	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
552	""	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
553	""	REGENERATION	Limerick	BCW Vacant Refurbs, Lot 1 & 2**	13	*N/A	""	""	""	""	""	Q4-2016
554	""	REGENERATION	Limerick	St. Mary's Park Infills	19	Tath Housing Association	""	""	""	""	Q3-2017	""
555	""	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Tath Housing Association	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
556	""	REGENERATION	Limerick	Carew Park	37	*N/A	Stage 1 approved in Q1-2015, outline design and costs are now being prepared.	""	""	""	""	""
557	""	REGENERATION	Limerick	45-46 Cliona Park	2	*N/A	""	Stage 2 approved in Q1-2016, full design/tender being prepared.	""	""	""	""
558	""	REGENERATION	Limerick	Dalgaish Park	24	Cluid Housing Association	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
559	""	REGENERATION	Limerick	Markievicz Drive	13	*N/A	Stage 1 approved in Q1-2015, outline design and costs are now being prepared.	""	""	""	""	""
560	""	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
561	""	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
562	""	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
563	""	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
564	""	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	10	Croom Voluntary Housing Association Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
565	""	CAS CONSTRUCTION	Limerick	Cappamore	12	Cappamore Housing Association Ltd	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
566	""	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	Q1-2018	""
567	""	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	Q3-2017	""
568	""	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	12	Associated Charities Trust Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
569	""	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
570	""	CAS CONSTRUCTION	Limerick	Convent Street, King's Island	2	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
571	""	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	6	Peter McVerry Trust Ltd	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
572	""	CALF CONSTRUCTION TURNKEY	Limerick	Cosgrave Park, Moyross, Limerick City (Regen)q2	21	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
573	""	CALF CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	11	Respond!	""	""	""	""	Q4-2017	""
574	""	CALF CONSTRUCTION TURNKEY	Limerick	Ard Aulin, Mungret Phase 1	7	Cluid Housing Association	""	""	""	""	""	Q2-2017
575	""	CALF CONSTRUCTION TURNKEY	Limerick	Cluain Ard, Fedamore, 1/2	2	Co-operative Housing Ireland	""	""	""	""	""	Q1-2018
576	""	CALF CONSTRUCTION TURNKEY	Limerick	Cluain Ard, Fedamore 2/2	2	Co-operative Housing Ireland	""	""	""	""	Q2-2017	""
577	""	CALF CONSTRUCTION TURNKEY	Limerick	Ard Aulin, Mungret Phase 2	1	Cluid Housing Association	""	""	""	""	Q4-2016	""
578	""	CALF CONSTRUCTION	Limerick	1 20 Park View Row, Hyde Road, Limerick	20	Cluid Housing Association	""	""	""	""	""	Q1-2018
579	""	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 1)	14	*N/A	""	""	""	""	""	Q4-2017
580	""	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough	31	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
581	""	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
582	""	SHIP CONSTRUCTION	Longford	Church View, Lanesborough	13	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
583	""	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
584	""	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
585	""	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
586	""	SHIP CONSTRUCTION	Longford	Rose Cottage' Ballinalee	6	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
587	""	CALF CONSTRUCTION TURNKEY	Longford	Cartrun Breac, Lisbrack Rd, Longford	7	Cluid Housing Association	""	""	""	""	""	Q1-2017
588	""	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
589	""	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project)  Phase 1	4	*N/A	""	""	""	""	""	Q1-2018
590	""	SHIP CONSTRUCTION	Louth	Drogheda (Derelicts Project)  Phase 2	8	*N/A	""	""	""	""	Q3-2017	""
591	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (1)	7	*N/A	""	""	""	""	""	Q4-2016
592	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (2)	7	*N/A	""	""	""	""	""	Q2-2017
593	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (3)	9	*N/A	""	""	""	""	""	Q3-2017
594	""	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q3-2016
595	""	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2 - 4)	69	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
596	""	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
597	""	SHIP CONSTRUCTION	Louth	Dundalk B&R project (4)	6	*N/A	""	""	""	""	""	Q4-2017
598	""	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	75	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
599	""	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
600	""	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
601	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	Q1 2018	""	""	""
602	""	CAS CONSTRUCTION	Louth	5 Slieveroe Cresent, Dundalk	1	Cluid Housing Association	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
603	""	CAS CONSTRUCTION	Louth	Castletowncooley, Riverstown, Dundalk	1	Tath Housing Association	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
604	""	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	8	Simon Community : Dundalk Simon	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
605	""	CAS CONSTRUCTION	Louth	Saltown, Dundalk	7	North ? East Housing Association Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
606	""	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	Q1-2018	""
607	""	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
608	""	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
609	""	CAS CONSTRUCTION	Louth	36 Strand, Clogherhead	4	St. John of God Housing Association Ltd	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
610	""	CAS CONSTRUCTION	Louth	Coulter Park	6	Tath Housing Association	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
611	""	CALF CONSTRUCTION TURNKEY	Louth	Castleguard, Ardee	29	Tath Housing Association	""	""	""	""	""	Q1-2018
612	""	CALF CONSTRUCTION TURNKEY	Louth	Caslteguard, Ardee	73	Tath Housing Association	""	""	""	""	Q2-2017	""
613	""	CALF CONSTRUCTION TURNKEY	Louth	Rathmullen Road, Drogheda	54	North ? East Housing Association Ltd	""	""	""	""	Q4-2017	""
614	""	CALF CONSTRUCTION TURNKEY	Louth	Rathmullen Road, Drogheda	51	Tath Housing Association	""	""	""	""	Q4-2017	""
615	""	CALF CONSTRUCTION TURNKEY	Louth	Avourwen Meadows, Drogheda	50	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
616	""	CALF CONSTRUCTION TURNKEY	Louth	Liscorrie, Bog Lane, Drogheda 	41	Tath Housing Association	""	""	""	""	""	Q4-2017
617	""	CALF CONSTRUCTION TURNKEY	Louth	Mount Hamilton, Dundalk Phase 2	31	Cluid Housing Association	""	""	""	""	Q4-2016	""
618	""	CALF CONSTRUCTION TURNKEY	Louth	Mount Hamilton, Dundalk Phase 1	12	Cluid Housing Association	""	""	""	""	""	Q4-2017
619	""	CALF CONSTRUCTION TURNKEY	Louth	Coulter Place Armagh Road Dundalk Phase 2	12	Cluid Housing Association	""	""	""	""	""	Q3-2017
620	""	CALF CONSTRUCTION TURNKEY	Louth	Coulter Place Armagh Road Dundalk Phase 1	10	Cluid Housing Association	""	""	""	""	""	Q1-2017
621	""	CALF CONSTRUCTION TURNKEY	Louth	Castle Court, Castlebellingham - Phase 2	10	Cluid Housing Association	""	""	""	""	""	Q1-2017
622	""	CALF CONSTRUCTION TURNKEY	Louth	Aston Village	8	Respond!	""	""	""	""	Q4-2017	""
623	""	CALF CONSTRUCTION TURNKEY	Louth	Castle Court, Castlebellingham - Phase 1	4	Cluid Housing Association	""	""	""	""	""	Q1-2017
624	""	CALF CONSTRUCTION TURNKEY	Louth	Knock Shee, Old Golf Links road, Blackrock, Co. Louth	3	Cluid Housing Association	""	""	""	""	""	Q4-2017
625	""	CALF CONSTRUCTION	Louth	Scarlett Street, Drogheda	15	North  East Housing Association Ltd	""	""	""	""	Q1-2018	""
626	""	CALF CONSTRUCTION	Louth	Clos na Manach, Carlingford	10	Tath Housing Association	""	""	""	""	Q2-2017	""
627	""	CALF CONSTRUCTION	Louth	Rath na Gloinne	3	Cluid Housing Association	""	""	""	""	""	Q3-2016
628	""	CALF CONSTRUCTION	Louth	Bishops Court, Dundalk	2	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
629	""	CALF CONSTRUCTION	Louth	2 Slieve Row Crescent, Dundalk	1	Cluid Housing Association	""	""	""	""	""	Q2-2016
630	""	SHIP CONSTRUCTION TURNKEY	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
631	""	SHIP CONSTRUCTION RAPID	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	Q3-2017	""
632	""	SHIP CONSTRUCTION	Mayo	Market Street, Swinford	2	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
633	""	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
634	""	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	Q3-2017	""
635	""	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	Q4-2017	""
636	""	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
637	""	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford - Phase 3	10	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
638	""	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
639	""	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
640	""	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
641	""	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
642	""	SHIP CONSTRUCTION	Mayo	Single Rural Dwellings	7	*N/A	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
643	""	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	Q2-2017	""
644	""	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
645	""	SHIP CONSTRUCTION	Mayo	7 St. Patrick's Tce., Westport	1	*N/A	""	""	""	""	""	Q2-2017
646	""	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
647	""	SHIP CONSTRUCTION	Mayo	Killavally	8	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
648	""	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar	22	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
649	""	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
650	""	SHIP CONSTRUCTION	Mayo	Bothar Dubh, Claremorris	12	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
651	""	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	Q4-2016	""
652	""	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
653	""	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	Q4-2016	""
654	""	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
655	""	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
656	""	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
657	""	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 1)	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
658	""	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
659	""	CALF CONSTRUCTION TURNKEY	Mayo	Ballina area	11	Cluid Housing Association	""	""	""	Scheme given revised CALF approval Q1 2018	""	""
660	""	CALF CONSTRUCTION TURNKEY	Mayo	Glenlara, Westport, Co Mayo 	10	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
661	""	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
662	""	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
663	""	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	15	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
664	""	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	Stage 4 approved in Q2-2017, the scheme is now fully approved.	""	""
665	""	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
666	""	SHIP CONSTRUCTION	Meath	Ratoath	17	*N/A	""	""	""	""	Q1-2018	""
667	""	SHIP CONSTRUCTION	Meath	Riverside, Kells	40	*N/A	""	""	""	Stage 4 approved in Q4-2017, the scheme is now being tendered.	""	""
668	""	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	Q4-2017	""
669	""	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	Q3-2017	""
670	""	SHIP CONSTRUCTION	Meath	Nobber	19	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
671	""	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
672	""	SHIP CONSTRUCTION	Meath	Donore	20	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
673	""	SHIP CONSTRUCTION	Meath	Dunshaughlin	25	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
674	""	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
675	""	SHIP CONSTRUCTION	Meath	Farganstown	42	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
676	""	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	Tath Housing Association	""	""	""	""	Q4-2017	""
677	""	CALF CONSTRUCTION TURNKEY	Meath	Dunville, Athlumney, Co. Meath phase 1	10	Tath Housing Association	""	""	""	""	""	Q1-2018
678	""	CALF CONSTRUCTION TURNKEY	Meath	Dunville, Athlumney, Co. Meath Phase 2 *	8	Tath Housing Association	""	""	""	""	""	Q1-2018
679	""	CALF CONSTRUCTION TURNKEY	Meath	Dunville, Athlumney, Co. Meath Phase 3	6	Tath Housing Association	""	""	""	""	Q3-2017	""
680	""	CALF CONSTRUCTION TURNKEY	Meath	Dunville, Athlumney, Co. Meath Phase 4 *	40	Tath Housing Association	""	""	""	""	Q3-2017	""
681	""	CALF CONSTRUCTION TURNKEY	Meath	Fitzherbert Wood, Slane Rd., Navan, Co. Meath	44	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
682	""	CALF CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettytown	30	Tath Housing Association	""	""	""	""	Q3-2017	""
683	""	CALF CONSTRUCTION TURNKEY	Meath	Seabury Lawns, Mornington	25	Cluid Housing Association	""	""	""	""	""	Q3-2017
684	""	CALF CONSTRUCTION TURNKEY	Meath	Tubberclaire, Navan	23	Cluid Housing Association	""	""	""	""	""	Q2-2016
685	""	CALF CONSTRUCTION TURNKEY	Meath	Mill Lane, Flower Hill, Navan	20	Oaklee Housing Trust	""	""	""	""	""	Q1-2016
686	""	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 4	20	Cluid Housing Association	""	""	""	""	""	Q4-2017
687	""	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 3	18	Cluid Housing Association	""	""	""	""	""	Q4-2017
688	""	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 2	18	Cluid Housing Association	""	""	""	""	""	Q4-2017
689	""	CALF CONSTRUCTION TURNKEY	Meath	Ashbourne area - Phase 1	11	Cluid Housing Association	""	""	""	""	""	Q1-2017
690	""	CALF CONSTRUCTION TURNKEY	Meath	Blackcastle, Slane Road, Navan	9	Tath Housing Association	""	""	""	""	Q3-2017	""
691	""	CALF CONSTRUCTION TURNKEY	Meath	Churchfields, Ashbourne *	8	Tath Housing Association	""	""	""	""	""	Q2-2017
692	""	CALF CONSTRUCTION TURNKEY	Meath	Grangehall, Dunshaughlin	7	Tath Housing Association	""	""	""	""	Q1-2017	""
693	""	CALF CONSTRUCTION TURNKEY	Meath	Seabury Lawns, Mornington	6	Cluid Housing Association	""	""	""	""	""	Q1-2018
694	""	CALF CONSTRUCTION TURNKEY	Meath	Royal Oaks, Enfield *	4	Cluid Housing Association	""	""	""	""	""	Q2-2017
695	""	CALF CONSTRUCTION TURNKEY	Meath	27 Ardmore Rise, Bettystown	1	North ? East Housing Association Ltd	""	""	""	""	Q1-2017	""
696	""	CALF CONSTRUCTION TURNKEY	Meath	Station Road, Dunboyne *	24	Respond!	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
697	""	CALF CONSTRUCTION TURNKEY	Meath	Ceamach Close, Donacarney, Co. Meath *	7	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
698	""	CALF CONSTRUCTION TURNKEY	Meath	Ceamach Close, Donacarney, Co. Meath 	9	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
699	""	CALF CONSTRUCTION TURNKEY	Meath	Commons Road, Navan, Co. Meath	12	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
700	""	CALF CONSTRUCTION	Meath	Millrace Court, Emmet Street, Trim, Co Meath 	11	North  East Housing Association Ltd	""	""	""	Scheme approved for CALF funding Q4-2017 	""	""
701	""	CALF CONSTRUCTION	Meath	Cherryvalley, Raghmoylan, Co. Meath	9	Cluid Housing Association	""	""	""	""	""	Q4-2017
702	""	CALF CONSTRUCTION	Meath	Kellets Grove, Dunshauglin, Co Meath *	6	Tath Housing Association	""	""	""	""	""	Q1-2018
703	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
704	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2017
705	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
706	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan  Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
707	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
708	""	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
709	""	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	12	*N/A	""	""	""	Stage 4 approved in Q3-2017, the scheme is now fully approved.	""	""
710	""	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
711	""	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
712	""	SHIP CONSTRUCTION	Monaghan	Davy's & Adjacent Porperty, Fermanagh St., Clones	3	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
713	""	SHIP CONSTRUCTION	Monaghan	Boyle Sports Site, Fermanagh St., Clones	3	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
714	""	SHIP CONSTRUCTION	Monaghan	82 & 83 Fermanagh St., Clones	3	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
715	""	SHIP CONSTRUCTION	Monaghan	An Bonnan Bui & Flower Shop, Fermanagh St., Clones	6	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
716	""	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	3	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
717	""	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	3	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
718	""	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
719	""	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	16	Oaklee Housing Trust	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
720	""	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
721	""	CALF CONSTRUCTION TURNKEY	Monaghan	Kingscourt Road, Carrickmacross, Co. Monaghan	50	Respond!	""	""	""	""	Q3-2017	""
722	""	CALF CONSTRUCTION TURNKEY	Monaghan	Magheross, Carrickmacross *	33	Tath Housing Association	""	""	""	""	Q2-2017	""
723	""	CALF CONSTRUCTION	Monaghan	Liseggerton Road, Clones	6	Oaklee Housing Trust	""	""	""	""	Q2-2017	""
724	""	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr	12	*N/A	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
725	""	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
726	""	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
727	""	SHIP CONSTRUCTION TURNKEY	Offaly	Coolagarry, Walsh Island, 	4	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
728	""	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	18	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
729	""	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
730	""	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
731	""	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	Q4-2017	""
732	""	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
733	""	CAS CONSTRUCTION	Offaly	Killane Drive, Edenderry	2	Tath Housing Association	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
734	""	CAS CONSTRUCTION	Offaly	Scurragh, Birr	6	Cluid Housing Association	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
735	""	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	20	Oaklee Housing Trust	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
736	""	CALF CONSTRUCTION	Offaly	Kearney's Field, Tullamore	53	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q1-2017	""	""
737	""	CALF CONSTRUCTION	Offaly	Killane Drive, Edenderry	25	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q2-2017	""	""
738	""	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	Q1-2017	""
739	""	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	Q1-2018	""
740	""	SHIP CONSTRUCTION TURNKEY	Roscommon	Silveroe Meadows, Boyle	12	*N/A	Stage 1 approved in Q2-2017, outline design and costs are now being prepared.	""	""	""	""	""
741	""	SHIP CONSTRUCTION	Roscommon	Cloonfad	2	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
742	""	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
743	""	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
744	""	CALF CONSTRUCTION TURNKEY	Roscommon	Monksfield, Bealnamulla, Athlone	40	Cluid Housing Association	""	""	""	""	Q3-2017	""
745	""	CALF CONSTRUCTION TURNKEY	Roscommon	Monksfield Park, Tuam Road, Athlone	13	Cluid Housing Association	""	""	""	""	Q1-2016	""
746	""	CALF CONSTRUCTION TURNKEY	Roscommon	River Oaks, Kilcolman, Ballaghaderreen	12	Respond!	""	""	""	""	""	Q1-2018
747	""	SHIP CONSTRUCTION	Sligo	Colloney	15	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
748	""	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	Stage 2 approved in Q3-2016, full design/tender being prepared.	""	""	""	""
749	""	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	Q1-2018	""
750	""	SHIP CONSTRUCTION	Sligo	Carrowbunnaun, Strandhill	20	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
751	""	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (2)	14	*N/A	""	""	""	""	Q1-2017	""
752	""	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
753	""	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
754	""	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace (1)	8	*N/A	""	""	""	""	""	Q4-2017
755	""	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
756	""	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
757	""	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	Q1-2018	""
758	""	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin	63	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
759	""	SHIP CONSTRUCTION RAPID	South Dublin	St Aidan's,  Brookfield, Tallaght (Phase 1)	47	*N/A	""	""	""	""	Q3-2017	""
760	""	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght (Phase 2)	38	*N/A	""	""	""	""	Q3-2017	""
761	""	SHIP CONSTRUCTION	South Dublin	Belgard Road, Tallaght	3	*N/A	""	""	""	""	""	Q1-2016
762	""	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	27	*N/A	""	""	""	""	Q3-2017	""
763	""	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	Q3-2017	""
764	""	SHIP CONSTRUCTION	South Dublin	Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	Q3-2017	""
765	""	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	Q2-2017	""
766	""	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	Q2-2017	""
767	""	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	Q1-2017	""
768	""	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	Q2-2017	""
769	""	SHIP CONSTRUCTION	South Dublin	Balgaddy F	50	*N/A	Stage 1 approved in Q1-2015, outline design and costs are now being prepared.	""	""	""	""	""
770	""	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
771	""	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
772	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	Q1 2018	""	""	""
773	""	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tath Housing Association	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
774	""	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
775	""	CALF CONSTRUCTION TURNKEY	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24 phase 1 *	18	Cluid Housing Association	""	""	""	""	""	Q1-2018
776	""	CALF CONSTRUCTION TURNKEY	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24 phase 2	10	Cluid Housing Association	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
777	""	CALF CONSTRUCTION TURNKEY	South Dublin	Milford Manor, Clondalkin - Phase 1	25	Cluid Housing Association	""	""	""	""	""	Q1-2017
778	""	CALF CONSTRUCTION TURNKEY	South Dublin	Milford Manor, Clondalkin	25	Cluid Housing Association	""	""	""	""	Q1-2017	""
779	""	CALF CONSTRUCTION TURNKEY	South Dublin	New Bancroft, Tallaght, Dublin 24*	16	Cluid Housing Association	""	""	""	""	""	Q4-2017
780	""	CALF CONSTRUCTION TURNKEY	South Dublin	Milford Manor, Clondalkin - Final Phase 	15	Cluid Housing Association	""	""	""	""	""	Q3-2017
781	""	CALF CONSTRUCTION TURNKEY	South Dublin	Dodderbrook, Oldcourt Road, Ballycullen, Dublin 24 *	14	Cluid Housing Association	""	""	""	""	""	Q1-2018
782	""	CALF CONSTRUCTION TURNKEY	South Dublin	Broadfield Grove, Rathcoole-phase 1 *	10	Oaklee Housing Trust	""	""	""	""	""	Q3-2017
783	""	CALF CONSTRUCTION TURNKEY	South Dublin	Old Nangor Road, Clondalkin, Dublin 22	7	Clanmil Housing Association	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
784	""	CALF CONSTRUCTION TURNKEY	South Dublin	Scholarstown Wood (Houses) *Phase 2 	5	Circle Voluntary Housing Association	""	""	""	""	Q3-2017	""
785	""	CALF CONSTRUCTION TURNKEY	South Dublin	Broadfield Grove, Rathcoole - final phase *	4	Oaklee Housing Trust	""	""	""	""	""	Q3-2017
786	""	CALF CONSTRUCTION TURNKEY	South Dublin	Moyglas Glade, Lucan, Co Dublin*	1	Respond!	""	""	""	""	""	Q2-2017
787	""	CALF CONSTRUCTION TURNKEY	South Dublin	Palmerstown Way, Clondalkin *	6	Circle Voluntary Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018	""	""
788	""	CALF CONSTRUCTION	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin 	84	Cluid Housing Association	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
789	""	CALF CONSTRUCTION	South Dublin	Scholarstown Wood (Apts)	6	Circle Voluntary Housing Association	""	""	""	""	Q3-2017	""
790	""	CALF CONSTRUCTION	South Dublin	Station Road, Clondalkin	5	Respond!	""	""	""	""	""	Q3-2017
791	""	CALF CONSTRUCTION	South Dublin	Scholarstown Wood (Houses) * Phase 1	3	Circle Voluntary Housing Association	""	""	""	""	""	Q4-2017
792	""	CALF CONSTRUCTION	South Dublin	Tullyhall, Lucan - Phase 1 *	2	Tath Housing Association	""	""	""	""	""	Q3-2017
793	""	CALF CONSTRUCTION	South Dublin	Tullyhall, Lucan - Final Phase*	2	Tath Housing Association	""	""	""	""	Q2-2017	""
794	""	CALF CONSTRUCTION	South Dublin	1 Hollyville Terrace, Palmerstown, Dublin	2	Cluid Housing Association	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
795	""	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
796	""	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
797	""	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	27	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
798	""	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	9	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
799	""	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	Stage 3 approved in Q1-2017, the scheme is now being tendered.	""	""	""
800	""	SHIP CONSTRUCTION	Tipperary	Templetouhy	6	*N/A	Stage 1 approved in Q1-2016, outline design and costs are now being prepared.	""	""	""	""	""
801	""	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	Stage 1 approved in Q1-2016, outline design and costs are now being prepared.	""	""	""	""	""
802	""	SHIP CONSTRUCTION	Tipperary	Killeanaule Road, Fethard	10	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
803	""	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	11	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
804	""	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
805	""	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	18	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
806	""	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
807	""	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
808	""	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	Stage 3 approved in Q4-2015, the scheme is now being tendered.	""	""	""
809	""	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
810	""	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
811	""	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
812	""	SHIP CONSTRUCTION	Tipperary	Glencarrick, Roscrea	30	*N/A	Stage 1 approved in Q2-2015, outline design and costs are now being prepared.	""	""	""	""	""
813	""	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	2	*N/A	""	""	""	""	""	Q4-2016
814	""	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
815	""	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
816	""	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	19	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
817	""	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
818	""	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
819	""	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
820	""	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
821	""	CAS CONSTRUCTION	Tipperary	Fethard	4	Belmont Park Housing Association Ltd	Stage 1 approved in Q3-2015, outline design and costs are now being prepared.	""	""	""	""	""
822	""	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
823	""	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
824	""	CALF CONSTRUCTION TURNKEY	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary 	19	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF funding Q4-2017 	""	""
825	""	CALF CONSTRUCTION	Tipperary	Ashbury, Roscrea	12	Cluid Housing Association	""	""	""	""	""	Q2-2017
826	""	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	39	*N/A	""	""	""	""	Q3-2017	""
827	""	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	Q3-2017	""
828	""	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	Q4-2017	""
829	""	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	Q4-2017	""
830	""	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	Q1-2018	""
831	""	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	""	""	""	Q4-2017	""
832	""	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	Q4-2017	""
833	""	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	""	Q4-2017	""
834	""	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
835	""	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	Q4-2017	""
836	""	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	""	Stage 4 approved in Q4-2017, the scheme is now fully approved.	""	""
837	""	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	Q3-2017	""
838	""	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	""	""	""	""	Q4-2017	""
839	""	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
840	""	SHIP CONSTRUCTION	Waterford	Lower Yellow Road, Waterford	8	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
841	""	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	11	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
842	""	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
843	""	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
844	""	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	""	""	""	Q4-2017	""
845	""	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	""	Q4-2017	""
846	""	CAS CONSTRUCTION	Waterford	Gleann Ealach, Dunhill	8	Gleann Ealach Housing Association	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
847	""	CAS CONSTRUCTION	Waterford	Ballycarnane, Tramore	18	Tramore Voluntary Housing Association	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
848	""	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford	4	Anvers Housing Association Ltd	""	""	""	""	Q4-2017	""
849	""	CALF CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon Road, Dungarvan	20	Co-operative Housing Ireland	""	""	""	""	Q1-2017	""
850	""	CALF CONSTRUCTION	Waterford	St Johns College, Waterford	36	Respond!	""	""	""	""	""	Q1-2016
851	""	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
852	""	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	Q2-2017	""
853	""	SHIP CONSTRUCTION	Westmeath	16 Ennell Court	1	*N/A	""	""	""	""	""	Q1-2018
854	""	SHIP CONSTRUCTION	Westmeath	Clonbrusk, Athlone (Arcadia) - Site No. 2	33	*N/A	""	""	Stage 3 approved in Q2-2017, the scheme is now being tendered.	""	""	""
855	""	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
856	""	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
857	""	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 3)	32	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
858	""	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
859	""	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
860	""	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Tath Housing Association	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
861	""	CALF CONSTRUCTION TURNKEY	Westmeath	Rahanine, Rochfortbridge, Co Westmeath*	12	Tath Housing Association	""	""	""	Scheme approved for CALF funding Q4-2017 	""	""
862	""	CALF CONSTRUCTION TURNKEY	Westmeath	Cluain Mullen, Castlepollard	2	Tath Housing Association	""	""	""	""	""	Q2-2017
863	""	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
864	""	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin (Phase 1), Ballytegan Road, Gorey	8	*N/A	""	""	""	""	""	Q1-2018
865	""	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin (Phase 2), Ballytegan Road, Gorey	14	*N/A	""	""	""	""	Q1-2018	""
866	""	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	35	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
867	""	SHIP CONSTRUCTION	Wexford	Belvedere Road, Wexford	7	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
868	""	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
869	""	SHIP CONSTRUCTION	Wexford	King Street, Wexford	3	*N/A	Stage 1 approved in Q3-2017, outline design and costs are now being prepared.	""	""	""	""	""
870	""	SHIP CONSTRUCTION	Wexford	Cloghultagh, Taghmon	18	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
871	""	SHIP CONSTRUCTION	Wexford	Carricklawn, Coolcots, Wexford	14	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
872	""	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
873	""	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
874	""	SHIP CONSTRUCTION	Wexford	Danescastle	12	*N/A	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
875	""	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
876	""	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford	45	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
877	""	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	Q4-2017	""
878	""	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	34	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
879	""	SHIP CONSTRUCTION	Wexford	Oylegate	2	*N/A	""	""	""	""	Q1-2017	""
880	""	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	Q3-2017	""
881	""	SHIP CONSTRUCTION	Wexford	Clonard, Wexford	26	*N/A	Stage 1 approved in Q1-2016, outline design and costs are now being prepared.	""	""	""	""	""
882	""	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
883	""	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	9	*N/A	""	""	""	""	Q4-2017	""
884	""	SHIP CONSTRUCTION	Wexford	Baile an Tr, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
885	""	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
886	""	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
887	""	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
888	""	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	6	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
889	""	SHIP CONSTRUCTION	Wexford	Ballywish, Castlebridge	11	*N/A	Stage 1 approved in Q4-2017, outline design and costs are now being prepared.	""	""	""	""	""
890	""	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford	43	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
891	""	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy, Co Wexford	17	*N/A	Stage 1 approved in Q1-2018, outline design and costs are now being prepared.	""	""	""	""	""
892	""	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	""	Stage 3 approved in Q4-2017, the scheme is now being tendered.	""	""	""
893	""	CAS CONSTRUCTION	Wexford	Westlands, Wexford	7	Respond	""	""	""	""	Q4-2017	""
894	""	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
895	""	CALF CONSTRUCTION TURNKEY	Wexford	Enniscorthy	40	Oaklee Housing Trust	""	""	""	""	Q3-2017	""
896	""	CALF CONSTRUCTION TURNKEY	Wexford	Wexford	28	Oaklee Housing Trust	""	""	""	Scheme approved for CALF funding Q4-2016	""	""
897	""	CALF CONSTRUCTION TURNKEY	Wexford	 Hunters Green, Gorey - Phase 1	18	Co operative Ireland	""	""	""	""	""	Q2-2016
898	""	CALF CONSTRUCTION TURNKEY	Wexford	Hunters Green, Gorey - Phase 2	11	Co operative Ireland	""	""	""	""	""	Q1-2017
899	""	CALF CONSTRUCTION TURNKEY	Wexford	Ballyboggan, Castlebridge	10	Co-operative Housing Ireland	""	""	""	""	Q4-2017	""
900	""	CALF CONSTRUCTION TURNKEY	Wexford	Hunters Green, Gorey - Phase 3	9	Co operative Ireland	""	""	""	""	""	Q4-2017
901	""	CALF CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford*	6	Tath Housing Association	""	""	""	""	""	Q1-2017
902	""	CALF CONSTRUCTION TURNKEY	Wexford	6 units Ard uisce, Whiterock, Wexford 	6	Tath Housing Association	""	""	""	""	""	Q1-2018
903	""	CALF CONSTRUCTION TURNKEY	Wexford	5 units Ard Uisce, Whiterock	5	Tath Housing Association	""	""	""	""	""	Q4-2017
904	""	CALF CONSTRUCTION TURNKEY	Wexford	1 unit Ard Uisce, Whiterock, Wexford	1	Tath Housing Association	""	""	""	""	""	Q1-2018
905	""	CALF CONSTRUCTION	Wexford	Meadowfields 	12	Co operative Ireland	""	""	""	""	""	Q3-2016
906	""	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely	4	*N/A	""	Stage 2 approved in Q1-2018, full design/tender being prepared.	""	""	""	""
907	""	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 3)	21	*N/A	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
908	""	SHIP CONSTRUCTION	Wicklow	10A Castle Villas, Greystones	1	*N/A	""	""	Stage 3 approved in Q1-2018, the scheme is now being tendered.	""	""	""
909	""	SHIP CONSTRUCTION	Wicklow	Ard Na Mara, Kilcoole	2	*N/A	""	""	Stage 3 approved in Q3-2017, the scheme is now being tendered.	""	""	""
910	""	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
911	""	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 1)	17	*N/A	""	""	""	""	Q4-2017	""
912	""	SHIP CONSTRUCTION	Wicklow	Emoclew Road, Arklow (Phase 2)	26	*N/A	""	Stage 2 approved in Q2-2017, full design/tender being prepared.	""	""	""	""
913	""	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	Stage 2 approved in Q4-2016, full design/tender being prepared.	""	""	""	""
914	""	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
915	""	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	Q4-2017	""
916	""	SHIP CONSTRUCTION	Wicklow	Old Library, Arklow	7	*N/A	""	""	""	""	Q1-2018	""
917	""	SHIP CONSTRUCTION	Wicklow	Sugarloaf View, Kilmacanogue	20	*N/A	""	Stage 2 approved in Q1-2017, full design/tender being prepared.	""	""	""	""
918	""	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum (Phase 2)	20	*N/A	""	""	""	""	Q3-2017	""
919	""	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	""	Stage 4 approved in Q1-2018, the scheme is now fully approved.	""	""
920	""	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
921	""	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	30	*N/A	Stage 1 approved in Q1-2017, outline design and costs are now being prepared.	""	""	""	""	""
922	""	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	Stage 2 approved in Q4-2017, full design/tender being prepared.	""	""	""	""
923	""	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Wicklow	Convent Lands	51	*N/A	""	""	Q1 2018	""	""	""
924	""	CAS CONSTRUCTION	Wicklow	Lathaleer, Baltinglass	5	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved in Q3-2017, full design/tender being prepared.	""	""	""	""
925	""	CALF CONSTRUCTION TURNKEY	Wicklow	Bollarney North, Wicklow Town, Wicklow	32	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q3-2017	""	""
926	""	CALF CONSTRUCTION TURNKEY	Wicklow	The Meadows, Ballynerrin, Wicklow Town	7	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q4-2017	""	""
927	""	CALF CONSTRUCTION TURNKEY	Wicklow	Abbey St, Wicklow	6	Tath Housing Association	""	""	""	""	Q2-2017	""
928	""	CALF CONSTRUCTION TURNKEY	Wicklow	Vale Road, Arklow, Co.  Wicklow	34	Co-operative Housing Ireland	""	""	""	Scheme approved for CALF Funding Q1-2018	""	""
929	""	CALF CONSTRUCTION TURNKEY	Wicklow	Glenheron, Greystones, Co.  Wicklow	5	Tath Housing Association	""	""	""	Scheme approved for CALF Funding Q1-2018	""	""
930	""	CALF CONSTRUCTION	Wicklow	St Ernan's View, Merrymeeting, Rathnew	45	Cluid Housing Association	""	""	""	Scheme approved for CALF funding Q1-2018 	""	""