  "fields": [{"id":"_id","type":"int"},{"id":"No.","type":"text"},{"id":"Funding Programme","type":"text"},{"id":"Local Authority","type":"text"},{"id":"Scheme/Project Name","type":"text"},{"id":"No. of Units","type":"numeric"},{"id":"Approved Housing Body","type":"text"},{"id":"Stage 1 Capital Appraisal","type":"text"},{"id":"Stage 2 Pre Planning","type":"text"},{"id":"Stage 3 Pre Tender design","type":"text"},{"id":"Stage 4 Tender Report or Final Turnkey/CALF approval","type":"text"},{"id":"On Site","type":"text"},{"id":"Completed","type":"text"}],
  "records": [
    [1,"","SHIP CONSTRUCTION TURNKEY","Carlow","Tullow Road, Carlow - Phase 1",24,"*N/A","","","","","Q4-2017",""],
    [2,"","SHIP CONSTRUCTION TURNKEY","Carlow","Tullow Road, Carlow - Phase 2",16,"*N/A","","","","","Q4-2017",""],
    [3,"","SHIP CONSTRUCTION TURNKEY","Carlow","Tullow Road, Carlow - Phase 3",23,"*N/A","","","","","Q4-2017",""],
    [4,"","SHIP CONSTRUCTION","Carlow","The Laurels, Carlow Town",5,"*N/A","","","","","Q3-2017",""],
    [5,"","SHIP CONSTRUCTION","Carlow","Ard na Greine, Tullow",16,"*N/A","","","","","Q4-2017",""],
    [6,"","SHIP CONSTRUCTION","Carlow","Dublin Road, Tullow",21,"*N/A","","","","","Q4-2017",""],
    [7,"","SHIP CONSTRUCTION","Carlow","Bagenalstown",42,"*N/A","","","","","Q4-2017",""],
    [8,"","SHIP CONSTRUCTION","Carlow","Bilboa",2,"*N/A","","","","","Q4-2017",""],
    [9,"","SHIP CONSTRUCTION","Carlow","Hacketstown",4,"*N/A","","","","","Q1-2018",""],
    [10,"","SHIP CONSTRUCTION","Carlow","Mount Leinster Park, Carlow",4,"*N/A","","","","","","Q4-2017"],
    [11,"","SHIP CONSTRUCTION","Carlow","Myshall",4,"*N/A","","","","","","Q1-2018"],
    [12,"","SHIP CONSTRUCTION","Carlow","Pound Lane, Borris",4,"*N/A","","","","","","Q3-2017"],
    [13,"","SHIP CONSTRUCTION","Carlow","Rathvilly",10,"*N/A","","","","","","Q2-2017"],
    [14,"","SHIP CONSTRUCTION","Carlow","Moneybeg, Bagenalstown",24,"*N/A","","","","","","Q3-2017"],
    [15,"","SHIP CONSTRUCTION","Carlow","Paulville, Tullow (SRD)",1,"*N/A","","","","","","Q3-2017"],
    [16,"","SHIP CONSTRUCTION","Carlow","Maryborough St., Carlow",5,"*N/A","","","","","","Q1-2018"],
    [17,"","SHIP CONSTRUCTION","Carlow","Drumin, St. Mullins (SRD)",1,"*N/A","","","","","Q4-2017",""],
    [18,"","CAS CONSTRUCTION","Carlow","Mill Race Court, Carlow Town",14,"Cluid Housing Association","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [19,"","CAS CONSTRUCTION","Carlow","Royal Oak Road, Bagenalstown",6,"Respond","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [20,"","CAS CONSTRUCTION","Carlow","Ballincarrig, Wexford Road",6,"Tintean Housing Association Ltd","","","","","","Q4-2016"],
    [21,"","CALF CONSTRUCTION TURNKEY","Carlow","Sleaty Street, Graigcullen, Carlow",26,"Cluid Housing Association","","","","","Q1-2018",""],
    [22,"","CALF CONSTRUCTION TURNKEY","Carlow","Barrett Street, Bagnalstown",10,"Tintean Housing Association","","","","","","Q1-2018"],
    [23,"","CALF CONSTRUCTION TURNKEY","Carlow","River Court,  Carlow 1/4*",10,"Co-operative Housing Ireland","","","","Scheme approved for funding Q1 - 2018","",""],
    [24,"","CALF CONSTRUCTION TURNKEY","Carlow","River Court,  Carlow 2/4",16,"Co-operative Housing Ireland","","","","Scheme approved for funding Q1 - 2018","",""],
    [25,"","CALF CONSTRUCTION TURNKEY","Carlow","Browneshill Wood, Browneshill Road, Chapelstown, Carlow 1/1",59,"Tath Housing Association Ltd","","","","","Q1-2018",""],
    [26,"","CALF CONSTRUCTION TURNKEY","Carlow","River Court,  Carlow 3/4",12,"Co-operative Housing Ireland","","","","Scheme approved for funding Q1 - 2018","",""],
    [27,"","CALF CONSTRUCTION TURNKEY","Carlow","River Court,  Carlow  4/4",9,"Co-operative Housing Ireland","","","","Scheme approved for funding Q1 - 2018","",""],
    [28,"","SHIP CONSTRUCTION","Cavan","Rosehill, Mullagh (Phase 6)",8,"*N/A","","","","","Q1-2018",""],
    [29,"","SHIP CONSTRUCTION","Cavan","Butlersbridge (Phase 2)",4,"*N/A","","","","","","Q1-2018"],
    [30,"","SHIP CONSTRUCTION","Cavan","Woodlands, Ballyhaise",8,"*N/A","","","","","Q4-2017",""],
    [31,"","SHIP CONSTRUCTION","Cavan","Butlersbridge (Phase 1)",2,"*N/A","","","","","","Q2-2017"],
    [32,"","SHIP CONSTRUCTION","Cavan","Clones Road, Butlersbridge",2,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [33,"","SHIP CONSTRUCTION","Cavan","Corstruce, Ballinagh",4,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [34,"","CALF CONSTRUCTION TURNKEY","Cavan","Cluain Dara, Kingscourt",16,"Cluid Housing Association","","","","","","Q4-2016"],
    [35,"","CALF CONSTRUCTION TURNKEY","Cavan","Drumalee Manor, Drumalee Phase 2",7,"Tath Housing Association","","","","","Q1-2017",""],
    [36,"","CALF CONSTRUCTION TURNKEY","Cavan","Drumalee Manor, Drumalee Phase 1",4,"Tath Housing Association","","","","","Q1-2017",""],
    [37,"","SHIP CONSTRUCTION TURNKEY","Clare","River View, School Road, Corofin",2,"*N/A","","","","","Q4-2017",""],
    [38,"","SHIP CONSTRUCTION","Clare","Roslevan, Ennis",8,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [39,"","SHIP CONSTRUCTION","Clare","Feakle",13,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [40,"","SHIP CONSTRUCTION","Clare","Glor Srutha, Knockbrack Lower, Clonlara",9,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [41,"","SHIP CONSTRUCTION","Clare","Seaview Park, Quilty",18,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [42,"","SHIP CONSTRUCTION","Clare","Tullyglass, Shannon",21,"*N/A","","Stage 2 approved in Q2-2016, full design/tender being prepared.","","","",""],
    [43,"","SHIP CONSTRUCTION","Clare","Ashline, Kilrush Road, Ennis",40,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [44,"","CAS CONSTRUCTION","Clare","Cahercalla, Ennis (Phase 2)",14,"Cuan an Chlair Ltd","Stage 1 approved in Q4-2016, outline design and costs are now being prepared.","","","","",""],
    [45,"","CAS CONSTRUCTION","Clare","Laurel Lodge, Clare Road, Ennis",3,"Society of Saint Vincent de Paul","","","","","","Q4-2016"],
    [46,"","CAS CONSTRUCTION","Clare","Haggard View, Clarecastle (Phase 1)",2,"Anvers Housing Association Ltd","","","","","","Q1-2018"],
    [47,"","CAS CONSTRUCTION","Clare","Haggard View, Clarecastle (Phase 2)",2,"Anvers Housing Association Ltd","","","","","Q3-2017",""],
    [48,"","CALF CONSTRUCTION TURNKEY","Clare","Lios Anama, Sixmilebridge",28,"Co operative Ireland","","","","","","Q4-2017"],
    [49,"","CALF CONSTRUCTION TURNKEY","Clare","Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  1/2",12,"Cluid Housing Association ","","","","","Q1-2018",""],
    [50,"","CALF CONSTRUCTION TURNKEY","Clare","Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare 2/2",18,"Cluid Housing Association ","","","","","Q1-2018",""],
    [51,"","CALF CONSTRUCTION","Clare","Bruachlan, Westbury",22,"Co-operative Housing Ireland","","","","Scheme approved for CALF funding Q2-2016","",""],
    [52,"","SHIP CONSTRUCTION TURNKEY","Cork City","Arus Mhuire",30,"*N/A","","","","","Q4-2017",""],
    [53,"","SHIP CONSTRUCTION TURNKEY","Cork City","1-4 Marble Lane",4,"*N/A","","","","","","Q4-2017"],
    [54,"","SHIP CONSTRUCTION TURNKEY","Cork City","Barack Street",32,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [55,"","SHIP CONSTRUCTION TURNKEY","Cork City","FaranFerris",5,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [56,"","SHIP CONSTRUCTION TURNKEY","Cork City","High Street",9,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [57,"","SHIP CONSTRUCTION TURNKEY","Cork City","Tramore Road",4,"*N/A","","","","","Q1-2018",""],
    [58,"","SHIP CONSTRUCTION TURNKEY","Cork City","Whites Street",43,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [59,"","SHIP CONSTRUCTION TURNKEY","Cork City","Woods Street",16,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [60,"","SHIP CONSTRUCTION TURNKEY","Cork City","Church Road",43,"*N/A","","","","","Q2-2017",""],
    [61,"","SHIP CONSTRUCTION TURNKEY","Cork City","Sheridan Park, Tramore Road",28,"*N/A","","","","","","Q4-2016"],
    [62,"","SHIP CONSTRUCTION TURNKEY","Cork City","Ard Aoibhinn, Banduff, Mayfield",5,"*N/A","","","","","Q3-2017",""],
    [63,"","SHIP CONSTRUCTION TURNKEY","Cork City","Corcorans Quay",3,"*N/A","","","","Stage 4 approved in Q1-2017, the scheme is now fully approved.","",""],
    [64,"","SHIP CONSTRUCTION TURNKEY","Cork City","Blarney Street",25,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [65,"","SHIP CONSTRUCTION TURNKEY","Cork City","37-39 Dublin Street, Blackpool, Cork",5,"*N/A","","","","","Q2-2017",""],
    [66,"","SHIP CONSTRUCTION","Cork City","The Meadows, Knocknacullen",1,"*N/A","","","","","","Q3-2016"],
    [67,"","SHIP CONSTRUCTION","Cork City","Boyces Street",51,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [68,"","SHIP CONSTRUCTION","Cork City","Shandon Street/John Philpott Curran Street",9,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [69,"","SHIP CONSTRUCTION","Cork City","St. Johns Well",6,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [70,"","SHIP CONSTRUCTION","Cork City","Churchfield Place East",3,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [71,"","SHIP CONSTRUCTION","Cork City","Deanrock, Togher",65,"*N/A","","","","","Q4-2016",""],
    [72,"","SHIP CONSTRUCTION","Cork City","Gerald Griffin Street",41,"*N/A","","","","","Q3-2017",""],
    [73,"","SHIP CONSTRUCTION","Cork City","Cappanoole",2,"*N/A","","","","","","Q4-2016"],
    [74,"","SHIP CONSTRUCTION","Cork City","258 & 259 Blarney Street",2,"*N/A","","","","","","Q1-2018"],
    [75,"","REGENERATION","Cork City","Phase 1 B Knocknaheeny",29,"*N/A","","","","","","Q4-2017"],
    [76,"","REGENERATION","Cork City","Phase 2 A Knocknaheeny",47,"*N/A","","","","","Q4-2017",""],
    [77,"","REGENERATION","Cork City","Phase 1 C Knocknaheeny",41,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [78,"","REGENERATION","Cork City","Phase 2 B Knocknaheeny",38,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [79,"","REGENERATION","Cork City","Phase 2C Knocknaheeny",24,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [80,"","CAS CONSTRUCTION","Cork City","Edel House, Grattan Street",33,"Good Shepherd Services Ltd","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [81,"","CAS CONSTRUCTION","Cork City","Saint Vincent's Convent, Vincent's Ave/St. Mary's Street",25,"Respond","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [82,"","CAS CONSTRUCTION","Cork City","Thomas Davis Street (Phase 1)",28,"Respond","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [83,"","CAS CONSTRUCTION","Cork City","Ceanncora Lawn, Ballinlough",1,"Cork Mental Health Voluntary Housing Association Ltd","","","","","Q2-2017",""],
    [84,"","CAS CONSTRUCTION","Cork City","St. Joachim & Anne's, Anglesea Street",8,"Simon Community : Cork Simon","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [85,"","CAS CONSTRUCTION","Cork City","27-29 Dublin Street, Blackpool",10,"Respond","","","","","Q4-2016",""],
    [86,"","CALF CONSTRUCTION TURNKEY","Cork City","the Meadows, Knopckacullen Ease, Gurranabraher, Cork 1/3",16,"Tath Housing Association","","","","","Q1-2018",""],
    [87,"","CALF CONSTRUCTION TURNKEY","Cork City","the Meadows, Knopckacullen Ease, Gurranabraher, Cork 2/3",15,"Tath Housing Association","","","","","Q1-2018",""],
    [88,"","CALF CONSTRUCTION TURNKEY","Cork City","the Meadows, Knopckacullen Ease, Gurranabraher, Cork 3/3",21,"Tath Housing Association","","","","","Q1-2018",""],
    [89,"","CALF CONSTRUCTION TURNKEY","Cork City","Millfield Cottages, Blackpool",18,"Respond!","","","","","Q1-2017",""],
    [90,"","CALF CONSTRUCTION TURNKEY","Cork City","Leitrim Street, Cork City",18,"Cluid Housing Association","","","","Scheme approved for CALF funding Q3-2016","",""],
    [91,"","CALF CONSTRUCTION TURNKEY","Cork City","Popes Road, Blackpool",7,"Cluid Housing Association","","","","","Q1-2017",""],
    [92,"","CALF CONSTRUCTION TURNKEY","Cork City","11 North Abbey Street, Cork City  /1/",6,"Respond!","","","","Scheme approved for CALF funding Q1-2018","",""],
    [93,"","CALF CONSTRUCTION","Cork City","Mile Stream, Shanakiel, Cork City ",50,"Co-operative Housing Ireland","","","","Scheme approved for CALF funding Q4-2017 ","",""],
    [94,"","CALF CONSTRUCTION","Cork City","124 Lr. Glanmire Road & 2 Breamer, Cork- Phase 2",3,"Galtan Ltd","","","","","Q1-2017",""],
    [95,"","CALF CONSTRUCTION","Cork City","124 Lr. Glanmire Road & 2 Breamer, Cork Phase 1",3,"Galtan Ltd","","","","","","Q1-2018"],
    [96,"","SHIP CONSTRUCTION TURNKEY","Cork County","Church Road/Station Road, Carrigtwohill",25,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [97,"","SHIP CONSTRUCTION TURNKEY","Cork County","Inis Alainn & Castleoaks, Bandon",11,"*N/A","","","","","","Q4-2017"],
    [98,"","SHIP CONSTRUCTION TURNKEY","Cork County","Gleann Tuairigh, Youghal",2,"*N/A","","","","","Q4-2017",""],
    [99,"","SHIP CONSTRUCTION TURNKEY","Cork County","Clondulane, Fermoy",2,"*N/A","","","","","","Q4-2017"],
    [100,"","SHIP CONSTRUCTION TURNKEY","Cork County","College Wood, Cobh",31,"*N/A","","","","","","Q4-2017"],
    [101,"","SHIP CONSTRUCTION TURNKEY","Cork County","Castletreasure, Douglas (Phase 3)",12,"*N/A","","","","","","Q4-2017"],
    [102,"","SHIP CONSTRUCTION TURNKEY","Cork County","Crann Ard, Fermoy",52,"*N/A","","","","","Q4-2017",""],
    [103,"","SHIP CONSTRUCTION TURNKEY","Cork County","CulAird Carraigtwohill",29,"*N/A","","","","","","Q4-2017"],
    [104,"","SHIP CONSTRUCTION TURNKEY","Cork County","Castletreasure, Douglas (Phase 1)",12,"*N/A","","","","","","Q1-2017"],
    [105,"","SHIP CONSTRUCTION TURNKEY","Cork County","Castletreasure, Douglas (Phase 2)",16,"*N/A","","","","","","Q1-2017"],
    [106,"","SHIP CONSTRUCTION TURNKEY","Cork County","Claragh Road, Millstreet",6,"*N/A","","","","","Q1-2018",""],
    [107,"","SHIP CONSTRUCTION TURNKEY","Cork County","Downeen Cross, Rosscarbery",7,"*N/A","","","","","Q1-2018",""],
    [108,"","SHIP CONSTRUCTION TURNKEY","Cork County","Glanworth, Fermoy",14,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [109,"","SHIP CONSTRUCTION TURNKEY","Cork County","Quartertown, Mallow",6,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [110,"","SHIP CONSTRUCTION TURNKEY","Cork County","Beacon Point, Baltimore",6,"*N/A","","","","","Q1-2018",""],
    [111,"","SHIP CONSTRUCTION TURNKEY","Cork County","Corrin View, Fermoy",6,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [112,"","SHIP CONSTRUCTION TURNKEY","Cork County","Chapel Court, Skibereen",4,"*N/A","","","","","Q1-2018",""],
    [113,"","SHIP CONSTRUCTION TURNKEY","Cork County","Cul Na Smear, Bandon",14,"*N/A","","","","","Q2-2017",""],
    [114,"","SHIP CONSTRUCTION TURNKEY","Cork County","Glen Dara,Ard Cashel, watergrasshill",6,"*N/A","","","","","Q1-2018",""],
    [115,"","SHIP CONSTRUCTION RAPID","Cork County","Abbeywood, Middelton",70,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [116,"","SHIP CONSTRUCTION RAPID","Cork County","Station Road, Blarney",18,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [117,"","SHIP CONSTRUCTION RAPID","Cork County","Bluepool, Kanturk",12,"*N/A","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [118,"","SHIP CONSTRUCTION","Cork County","Ard Na Greine, Cortmacsherry",15,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [119,"","SHIP CONSTRUCTION","Cork County","Tower View/Cirt na Siln, Cloyne, East Cork",9,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [120,"","SHIP CONSTRUCTION","Cork County","Beechgrove, Clonakilty",57,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [121,"","SHIP CONSTRUCTION","Cork County","Castletreasure Grove, Douglas",1,"*N/A","Stage 1 approved in Q3-2016, outline design and costs are now being prepared.","","","","",""],
    [122,"","SHIP CONSTRUCTION","Cork County","Poulavone, Ballincollig",57,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [123,"","SHIP CONSTRUCTION","Cork County","Newtown, Bantry",1,"*N/A","Stage 1 approved in Q2-2016, outline design and costs are now being prepared.","","","","",""],
    [124,"","SHIP CONSTRUCTION","Cork County","Fairfield, Masseytown, Macroom",7,"*N/A","","","","","Q4-2017",""],
    [125,"","SHIP CONSTRUCTION","Cork County","12 & 14 Droum, Castletownbere",2,"*N/A","","","","","Q4-2017",""],
    [126,"","SHIP CONSTRUCTION","Cork County","Kilnagleary, Carrigaline (Phase 4)",15,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [127,"","SHIP CONSTRUCTION","Cork County","Oliver Plunkett Hill, Fermoy",10,"*N/A","","","","","","Q2-2017"],
    [128,"","SHIP CONSTRUCTION","Cork County","Townsend Street, Skibbereen",6,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [129,"","SHIP CONSTRUCTION","Cork County","11/10 Harbour Hill, Cobh",1,"*N/A","","","","","Q4-2016",""],
    [130,"","SHIP CONSTRUCTION","Cork County","Kilnagleary Carrigaline (phase 1A & 1B)",15,"*N/A","","","","","Q4-2017",""],
    [131,"","SHIP CONSTRUCTION","Cork County","Kilnagleary Carrigaline (Phase 2/C)",16,"*N/A","","","","","Q4-2017",""],
    [132,"","SHIP CONSTRUCTION","Cork County","Kilnagleary Carrigaline (Phase 3/D)",18,"*N/A","","","","","Q4-2017",""],
    [133,"","CAS CONSTRUCTION","Cork County","Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay",16,"Cluid Housing Association","Stage 1 approved in Q3-2016, outline design and costs are now being prepared.","","","","",""],
    [134,"","CAS CONSTRUCTION","Cork County","Cuan Barra, Kilmore, Ballingeary",3,"Coiste Tithe Uibh Laoire Teoranta","","","","","Q4-2017",""],
    [135,"","CAS CONSTRUCTION","Cork County","Townlands, Rosscarbery",9,"Rosscarbery Housing Association Ltd","","","","","Q1-2018",""],
    [136,"","CAS CONSTRUCTION","Cork County","Avenue House, Bandon",9,"Bandon Geriatric ? Community Council","","","","","","Q1-2018"],
    [137,"","CAS CONSTRUCTION","Cork County","Church View, Love Lane, Charleville",4,"Charleville Care Project Ltd","","Stage 2 approved in Q3-2015, full design/tender being prepared.","","","",""],
    [138,"","CAS CONSTRUCTION","Cork County","Fellowship House, Togher",31,"Tabor Lodge Addiction ? Housing Services Ltd","","","","","Q1-2017",""],
    [139,"","CALF CONSTRUCTION TURNKEY","Cork County","Tanners Field, Bandon, Co Cork *",5,"Tath Housing Association Ltd","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [140,"","CALF CONSTRUCTION TURNKEY","Cork County","Tanners Field, Bandon, Co Cork *",6,"Tath Housing Association Ltd","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [141,"","CALF CONSTRUCTION TURNKEY","Cork County","College Manor, Cobh",10,"Tath Housing Association","","","","","","Q4-2016"],
    [142,"","CALF CONSTRUCTION TURNKEY","Cork County","Ticknock, Cobh",8,"Respond!","","","","","Q1-2017",""],
    [143,"","CALF CONSTRUCTION TURNKEY","Cork County","Beach Road, Passage West",3,"Cluid Housing Association","","","","","","Q4-2017"],
    [144,"","CALF CONSTRUCTION TURNKEY","Cork County","Lackaduff, Codrum, Macroom, Co Cork  1/1",5,"Tuath Housing Association Ltd","","","","Q1 2018","",""],
    [145,"","CALF CONSTRUCTION TURNKEY","Cork County","Weston, Carrigaline, Co. Cork *",7,"Respond!","","","","Q1 2018","",""],
    [146,"","CALF CONSTRUCTION ","Cork County","Church View, Enniskeane",12,"Cluid Housing Association","","","","","Q1-2017",""],
    [147,"","CALF CONSTRUCTION","Cork County","Cappagh, Ballynacubby, Kinsale, Co. Cork",40,"Cluid Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [148,"","CALF CONSTRUCTION","Cork County","Firgrove Harrisons Lane Charleville",6,"Co operative Ireland","","","","","","Q4-2017"],
    [149,"","SHIP CONSTRUCTION TURNKEY","DLR","Hazelbrook, Nutgrove, Churchtown",28,"*N/A","","","","","","Q4-2017"],
    [150,"","SHIP CONSTRUCTION RAPID","DLR","Glenamuck/Stillorgan (Rockville Drive)",14,"*N/A","","Stage 2 approved in Q4-2016, full design/tender being prepared.","","","",""],
    [151,"","SHIP CONSTRUCTION RAPID","DLR","George's Place",12,"*N/A","","","","","Q3-2017",""],
    [152,"","SHIP CONSTRUCTION","DLR","66 George's Street, Dun Laoghaire",4,"*N/A","","Stage 2 approved in Q4-2016, full design/tender being prepared.","","","",""],
    [153,"","SHIP CONSTRUCTION","DLR","132 Pottery Road, Dun Laoghaire",4,"*N/A","","","","","Q4-2017",""],
    [154,"","SHIP CONSTRUCTION","DLR","33,35, & 37 Temple Road",3,"*N/A","","","","","Q3-2017",""],
    [155,"","SHIP CONSTRUCTION","DLR","Assistant Harbour Master House",2,"*N/A","","","","","","Q3-2017"],
    [156,"","SHIP CONSTRUCTION","DLR","The Brambles Park Close Sallynoggin",10,"*N/A","","","","","Q1-2017",""],
    [157,"","SHIP CONSTRUCTION","DLR","49 The Mews Sallynoggin Park",4,"*N/A","","","","","","Q4-2017"],
    [158,"","SHIP CONSTRUCTION","DLR","Shanganagh Park Lodge",1,"*N/A","","","","","","Q2-2016"],
    [159,"","SHIP CONSTRUCTION","DLR","Rosemount Court",44,"*N/A","","","","","Q4-2016",""],
    [160,"","SHIP CONSTRUCTION","DLR","Broadford Rise",21,"*N/A","","","","","Q3-2017",""],
    [161,"","SHIP CONSTRUCTION","DLR","Fitzgerald Park",50,"*N/A","","","","","Q4-2016",""],
    [162,"","SHIP CONSTRUCTION","DLR","Rochestown House (Phase 3)",14,"*N/A","","","","","Q3-2016",""],
    [163,"","SHIP CONSTRUCTION","DLR","St Michael's Terrace",4,"*N/A","","","","","","Q3-2017"],
    [164,"","SHIP CONSTRUCTION","DLR","Clontibret House",4,"*N/A","","","","","","Q4-2016"],
    [165,"","SHIP CONSTRUCTION","DLR","Cromlech Close",15,"*N/A","","","","","","Q3-2016"],
    [166,"","SHIP CONSTRUCTION","DLR","Rochestown House (Phase 2)",34,"*N/A","","","","","","Q1-2016"],
    [167,"","SHIP CONSTRUCTION","DLR","41 Ballyogan Ave., Ballyogan, Co. Dublin",2,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [168,"","CAS CONSTRUCTION","DLR","30 Obelisk Walk, Blackrock",4,"St. John of God Housing Association Ltd","Stage 1 approved in Q4-2016, outline design and costs are now being prepared.","","","","",""],
    [169,"","CALF CONSTRUCTION TURNKEY","DLR","Respond & Tuath Project Dublin 18 area.",49,"Tath Housing Association","","","","Scheme approved for CALF funding Q1-2017","",""],
    [170,"","CALF CONSTRUCTION TURNKEY","DLR","Hyde Road, Belmont, Stepaside",8,"Respond!","","","","","Q3-2016",""],
    [171,"","CALF CONSTRUCTION TURNKEY","DLR","Bishops Gate, Kilternan, Dublin 18",6,"Cluid Housing Association","","","","","Q3-2017",""],
    [172,"","CALF CONSTRUCTION TURNKEY","DLR","The Avenue, Glenside, Carrickmines Green, Dublin 18 *",5,"Fold Ireland Housing Association","","","","","Q3-2017",""],
    [173,"","CALF CONSTRUCTION TURNKEY","DLR","Woodbank, Dublin Rd, Shankill *",4,"Cluid Housing Association","","","","","","Q3-2017"],
    [174,"","CALF CONSTRUCTION TURNKEY","DLR","Stillorgan Gate, Kilmacud Road Upper, Co. Dublin *",4,"Cluid Housing Association","","","","","","Q4-2017"],
    [175,"","CALF CONSTRUCTION ","DLR","Respond & Tuath Project Dublin 18 area.",56,"Respond!","","","","Scheme approved for CALF funding Q1-2017","",""],
    [176,"","CALF CONSTRUCTION","DLR","Clays Farm, Ballyogan Road (Phase 1)* ",44,"The Iveagh Trust","","","","","Q4-2017",""],
    [177,"","CALF CONSTRUCTION","DLR","Abbeyview House, Monkstown",8,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2015","",""],
    [178,"","SHIP CONSTRUCTION TURNKEY","Donegal","Gleann Na Greine, Mullindrait, Stranorlar",21,"*N/A","","","","","Q2-2017",""],
    [179,"","SHIP CONSTRUCTION TURNKEY","Donegal","Crievesmith, Letterkenny",34,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [180,"","SHIP CONSTRUCTION","Donegal","Carrigart (Phase 1)",17,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [181,"","SHIP CONSTRUCTION","Donegal","Meadow Hill, Raphoe",11,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [182,"","SHIP CONSTRUCTION","Donegal","Radharc na Tra Breige, Malin (Phase 3)",8,"*N/A","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [183,"","SHIP CONSTRUCTION","Donegal","Cois Abhainn, St Johnston (Phase 2)",6,"*N/A","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [184,"","SHIP CONSTRUCTION","Donegal","Emerald Drive, Killybegs (Phase 6)",9,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [185,"","SHIP CONSTRUCTION","Donegal","Long Lane, Letterkenny",29,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [186,"","SHIP CONSTRUCTION","Donegal","Rockytown, Buncrana (Phase 1)",21,"*N/A","","Stage 2 approved in Q4-2016, full design/tender being prepared.","","","",""],
    [187,"","SHIP CONSTRUCTION","Donegal","Manorcunningham (Phase 2)",8,"*N/A","","","","","Q3-2017",""],
    [188,"","SHIP CONSTRUCTION","Donegal","Abbots Wood, Carndonagh (Phase 2)",4,"*N/A","","","","","Q3-2017",""],
    [189,"","SHIP CONSTRUCTION","Donegal","Ardara (Phase 3)",8,"*N/A","","","","","","Q2-2017"],
    [190,"","SHIP CONSTRUCTION","Donegal","Newtoncunningham",7,"*N/A","","","","","Q1-2017",""],
    [191,"","SHIP CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",24,"*N/A","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [192,"","SHIP CONSTRUCTION","Donegal","Ard Connell, Ardara (SRD)",1,"*N/A","","","","","","Q1-2017"],
    [193,"","SHIP CONSTRUCTION","Donegal","Manorcunningham (Phase 1)",2,"*N/A","","","","","","Q2-2017"],
    [194,"","CAS CONSTRUCTION","Donegal","Glenrowan House, Drumkeen, Stranorlar",6,"Apex Housing Association","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [195,"","CAS CONSTRUCTION","Donegal","Willowbrook, Glencar, Letterkenny",40,"Apex Housing Association","Stage 1 approved in Q4-2016, outline design and costs are now being prepared.","","","","",""],
    [196,"","CAS CONSTRUCTION","Donegal","Meenmore, Dungloe",15,"County Donegal Parents and Friends Housing Association Ltd","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [197,"","CAS CONSTRUCTION","Donegal","Railway Park, Drumrooske, Donegal Town",10,"Oaklee Housing Trust","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [198,"","CAS CONSTRUCTION","Donegal","Dunshenny House, Derry Road, Carndonagh",5,"Apex Housing Association","","","","","Q2-2017",""],
    [199,"","CAS CONSTRUCTION","Donegal","Raphoe Road, Castlefinn",20,"Habinteg Housing Association (Ireland) Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [200,"","CALF CONSTRUCTION TURNKEY","Donegal","Ernedale Heights, Ballyshannon",11,"Cluid Housing Association","","","","","Q3-2017",""],
    [201,"","CALF CONSTRUCTION TURNKEY","Donegal","Forge Road, Donegal",4,"Cluid Housing Association","","","","","","Q3-2016"],
    [202,"","CALF CONSTRUCTION TURNKEY","Donegal","1-46 Ardrawer, Kiltoy, Letterkenny",46,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [203,"","CALF CONSTRUCTION","Donegal","Ballaghderg, Letterkenny, Co Donegal *",33,"Respond!","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [204,"","SHIP CONSTRUCTION TURNKEY","Dublin City","Prospecthill",58,"*N/A","","","","","","Q4-2017"],
    [205,"","SHIP CONSTRUCTION RAPID","Dublin City","Belcamp H, Dublin 17",38,"*N/A","","","","","","Q4-2017"],
    [206,"","SHIP CONSTRUCTION RAPID","Dublin City","Cherry Orchard, Ballyfermot",24,"*N/A","","","","","","Q4-2017"],
    [207,"","SHIP CONSTRUCTION RAPID","Dublin City","Mourne Road, Drimnagh",29,"*N/A","","","","","","Q4-2017"],
    [208,"","SHIP CONSTRUCTION RAPID","Dublin City","St Helena's Drive, Finglas",39,"*N/A","","","","","","Q3-2017"],
    [209,"","SHIP CONSTRUCTION RAPID","Dublin City","Poppintree, Ballymun",22,"*N/A","","","","","","Q2-2016"],
    [210,"","SHIP CONSTRUCTION RAPID","Dublin City","Cherry Orchard, Ballyfermot - Rathvilly & Woodbank Drive Finglas",70,"*N/A","","","","","Q4-2017",""],
    [211,"","SHIP CONSTRUCTION RAPID","Dublin City","Belcamp C, Dublin 17",16,"*N/A","","Stage 2 approved in Q3-2015, full design/tender being prepared.","","","",""],
    [212,"","SHIP CONSTRUCTION","Dublin City","Hampton Wood",25,"*N/A","","","","","","Q4-2016"],
    [213,"","SHIP CONSTRUCTION","Dublin City","Belcamp B, Dublin 17",12,"*N/A","","Stage 2 approved in Q3-2015, full design/tender being prepared.","","","",""],
    [214,"","SHIP CONSTRUCTION","Dublin City","Bunratty Road Phase 1c, Dublin 17",78,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [215,"","SHIP CONSTRUCTION","Dublin City","Cornamona, Ballyfermot, Dublin 12",61,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [216,"","SHIP CONSTRUCTION","Dublin City","Infirmary Road, Dublin 7",38,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [217,"","SHIP CONSTRUCTION","Dublin City","North King Street, Dublin 7",30,"*N/A","","","Stage 3 approved in Q3-2017, the scheme is now being tendered.","","",""],
    [218,"","SHIP CONSTRUCTION","Dublin City","Ballybough Road, Dublin 1",7,"*N/A","","","","","Q1-2017",""],
    [219,"","SHIP CONSTRUCTION","Dublin City","St. Finbar's Court, Kilkieran Road, Dublin 7",46,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [220,"","SHIP CONSTRUCTION","Dublin City","Priory Hall",9,"*N/A","","","","","","Q1-2017"],
    [221,"","SHIP CONSTRUCTION","Dublin City","Priory Hall",26,"*N/A","","","","","Q2-2017",""],
    [222,"","REGENERATION","Dublin City","St. Teresa's Gardens",50,"*N/A","Stage 1 approved in Q3-2013, outline design and costs are now being prepared.","","","","",""],
    [223,"","REGENERATION","Dublin City","Dolphin House, Dublin 8 (Phase 1)",100,"*N/A","","","","","Q4-2016",""],
    [224,"","REGENERATION","Dublin City","Dominick Street",72,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [225,"","REGENERATION","Dublin City","Sackville Avenue Cottages",12,"*N/A","Stage 1 approved in Q2-2016, outline design and costs are now being prepared.","","","","",""],
    [226,"","REGENERATION","Dublin City","O'Devaney Gardens",56,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [227,"","REGENERATION","Dublin City","Charlemont",79,"*N/A","","","","","","Q4-2017"],
    [228,"","REGENERATION","Dublin City","Maxwell Road",9,"*N/A","","","","","","Q2-2016"],
    [229,"","REGENERATION","Dublin City","Buttercup, Darndale",19,"*N/A","","","","","","Q4-2017"],
    [230,"","REGENERATION","Dublin City","Buttercup, Darndale",16,"*N/A","","","","","Q2-2017",""],
    [231,"","PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","Dublin City","Ayrfield, Malahide Road",150,"*N/A","","","Q1 2018","","",""],
    [232,"","PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","Dublin City","Scribblestown",70,"*N/A","","","Q1 2018","","",""],
    [233,"","CAS CONSTRUCTION","Dublin City","38/39 Bolton Street, Dublin 1",8,"Arlington Novas Ireland Ltd","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [234,"","CAS CONSTRUCTION","Dublin City","Beech Hill",19,"Royal Hospital Donnybrook Voluntary Housing Association Ltd","","","","","Q4-2017",""],
    [235,"","CAS CONSTRUCTION","Dublin City","Ellis Court, Dublin",23,"Tath Housing Association","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [236,"","CAS CONSTRUCTION","Dublin City","\"Martanna House\" High Park, Grace Park Road,Dublin 9",8,"Respond","","","","","Q4-2017",""],
    [237,"","CAS CONSTRUCTION","Dublin City","1 - 2 Rafter's Lane, Dublin 12",11,"Walkinston Housing Association Ltd (WALK)","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [238,"","CAS CONSTRUCTION","Dublin City","180-187 Townsend Street",18,"Peter McVerry Trust Ltd","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [239,"","CAS CONSTRUCTION","Dublin City","Old Kilmainham Road, Dublin 8",11,"Arlington Novas Ireland Ltd","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [240,"","CAS CONSTRUCTION","Dublin City","26 New Street South, Dublin 8",8,"Peter McVerry Trust Ltd","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [241,"","CAS CONSTRUCTION","Dublin City","Broome Lodge, Dunmanus, Dublin 7",10,"Cluid Housing Association","","","","","","Q4-2017"],
    [242,"","CAS CONSTRUCTION","Dublin City","St Agatha's Court, North William Street, Dublin 1",11,"Peter McVerry Trust Ltd","","","","","","Q2-2017"],
    [243,"","CAS CONSTRUCTION","Dublin City","55B Arbour Hill, Dublin 7",18,"Simon Community : Dublin Simon","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [244,"","CAS CONSTRUCTION","Dublin City","St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project ",52,"Circle Voluntary Housing Association Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [245,"","CAS CONSTRUCTION","Dublin City","61 & 63 Rathoath Avenue, Finglas, Dublin 11",6,"Arlington Novas Ireland Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [246,"","CAS CONSTRUCTION","Dublin City","Debtor's Prison, Green Street, Dublin 7",12,"Peter McVerry Trust Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [247,"","CAS CONSTRUCTION","Dublin City","Shaw Street, Dublin 2",12,"Peter McVerry Trust Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [248,"","CALF CONSTRUCTION TURNKEY","Dublin City","St Agnes Convent, Armagh Road, Crumlin, Dublin 12",97,"Fold Ireland Housing Association","","","","","Q1-2017",""],
    [249,"","CALF CONSTRUCTION TURNKEY","Dublin City","Clongriffin, Dublin 13",84,"The Iveagh Trust","","","","","Q3-2017",""],
    [250,"","CALF CONSTRUCTION TURNKEY","Dublin City","Long Mile Road, Dublin 12",61,"Respond!","","","","","Q2-2017",""],
    [251,"","CALF CONSTRUCTION TURNKEY","Dublin City","Thornwood, Beaumont - Phase 1",46,"Tath Housing Association","","","","","","Q3-2016"],
    [252,"","CALF CONSTRUCTION TURNKEY","Dublin City","Stormanstown Hall, Ballymun Road, (revised)",42,"Oaklee Housing Trust","","","","","Q4-2016",""],
    [253,"","CALF CONSTRUCTION TURNKEY","Dublin City","Thornwood, Beaumont - Final Phase",22,"Tath Housing Association","","","","","","Q1-2017"],
    [254,"","CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Phase 2",21,"Tath Housing Association","","","","","","Q1-2017"],
    [255,"","CALF CONSTRUCTION TURNKEY","Dublin City","Chanel College, Coolock Village, Malahide Road, Dublin 5",16,"Respond!","","","","","","Q4-2017"],
    [256,"","CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Phase 1",14,"Tath Housing Association","","","","","","Q4-2016"],
    [257,"","CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Phase 3",10,"Tath Housing Association","","","","","","Q2-2017"],
    [258,"","CALF CONSTRUCTION TURNKEY","Dublin City","175 176 North Strand Road, 5 Lamps, Dublin 1",10,"Co-operative Housing Ireland","","","","","Q1-2018",""],
    [259,"","CALF CONSTRUCTION TURNKEY","Dublin City","Milrose House, Bluebell Avenue, Dublin 12",8,"Cluid Housing Association","","","","","","Q4-2017"],
    [260,"","CALF CONSTRUCTION TURNKEY","Dublin City","Merville Court, Merville Avenue, Fairview",5,"Co operative Ireland","","","","","","Q1-2017"],
    [261,"","CALF CONSTRUCTION TURNKEY","Dublin City","Camac Place, Bluebell, Dublin 12",5,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q2-2017","",""],
    [262,"","CALF CONSTRUCTION TURNKEY","Dublin City","An Riasc, Farnham Drive, Finglas - Final Phase",3,"Tath Housing Association","","","","","","Q3-2017"],
    [263,"","CALF CONSTRUCTION TURNKEY","Dublin City","11 13 Crumlin Village, Dublin 12 Phase 1",3,"Cluid Housing Association","","","","","","Q2-2017"],
    [264,"","CALF CONSTRUCTION TURNKEY","Dublin City","11 13 Crumlin Village, Dublin 12 Phase 2",2,"Cluid Housing Association","","","","","","Q3-2017"],
    [265,"","CALF CONSTRUCTION","Dublin City","St Mary?s Mansions, Dublin 1",80,"Cluid Housing Association","","","","","Q4-2017",""],
    [266,"","CALF CONSTRUCTION","Dublin City","Orchard Lawns, Ballyfermot",72,"Co-operative Housing Ireland","","","","","Q4-2016",""],
    [267,"","CALF CONSTRUCTION","Dublin City","Annamore Court, Ballyfermot",70,"The Iveagh Trust","","","","","","Q2-2017"],
    [268,"","CALF CONSTRUCTION","Dublin City","Tonlegee Road, Dublin 5 ",47,"Fold Housing Association Ireland Ltd","","","","","Q4-2017",""],
    [269,"","CALF CONSTRUCTION","Dublin City","Dolphin Park, Rialto, Dublin 8",43,"Fold Ireland Housing Association","","","","Scheme approved for Revised CALF funding Q3-2017","",""],
    [270,"","CALF CONSTRUCTION","Dublin City","Richmond Road, Dublin 9",39,"Co-operative Housing Ireland","","","","","Q2-2017",""],
    [271,"","CALF CONSTRUCTION","Dublin City","Raleigh Court, Crumlin",33,"Tath Housing Association","","","","","Q2-2017",""],
    [272,"","CALF CONSTRUCTION","Dublin City","Broome Lodge, Dunmanus Court, Cabra",33,"Cluid Housing Association","","","","","","Q4-2017"],
    [273,"","CALF CONSTRUCTION","Dublin City","5 6 Johns Lane West, Dublin 8",31,"Focus Ireland","","","","","Q2-2017",""],
    [274,"","CALF CONSTRUCTION","Dublin City","84 North King Street, Dublin 7 ",30,"Co-operative Housing Ireland","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [275,"","CALF CONSTRUCTION","Dublin City","Poplar Row, Dublin 3",29,"Oaklee Housing Trust","","","","Scheme approved for revised CALF approval Q2-2017","",""],
    [276,"","CALF CONSTRUCTION","Dublin City","Harolds Cross, Dublin 6",28,"Focus Ireland","","","","","","Q4-2016"],
    [277,"","CALF CONSTRUCTION","Dublin City","Ballygall Road East - Phase 2",11,"Fold Ireland Housing Association","","","","","","Q1-2016"],
    [278,"","CALF CONSTRUCTION","Dublin City","Wad River Close, Ballymun, Dublin 9",9,"Cluid Housing Association","","","","Scheme re approved for approval Q3-2017","",""],
    [279,"","CALF CONSTRUCTION","Dublin City","Dominic Place, Dublin",9,"The Paddy McGrath Housing Project","","","","Scheme approved for CALF funding Q2-2017","",""],
    [280,"","SHIP CONSTRUCTION TURNKEY","Fingal","Blackmills Grove, Blakestown Road, Mulhuddard",10,"*N/A","","","","","","Q2-2017"],
    [281,"","SHIP CONSTRUCTION TURNKEY","Fingal","Balgriffin Grove, Malahide Road, Balgriffin",6,"*N/A","","","","","","Q1-2017"],
    [282,"","SHIP CONSTRUCTION TURNKEY","Fingal","Hansfield (Phase 1), Ongar, Dublin 15",16,"*N/A","","","","","","Q1-2018"],
    [283,"","SHIP CONSTRUCTION TURNKEY","Fingal","Hansfield (Phase 2), Ongar, Dublin 15",16,"*N/A","","","","","Q4-2017",""],
    [284,"","SHIP CONSTRUCTION RAPID","Fingal","Avondale, Mulhuddart, Dublin 15",42,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [285,"","SHIP CONSTRUCTION RAPID","Fingal","Hansfield, Ongar, Dublin 15",36,"*N/A","","","","","","Q3-2017"],
    [286,"","SHIP CONSTRUCTION RAPID","Fingal","Pinewood, Balbriggan",20,"*N/A","","","","","Q3-2017",""],
    [287,"","SHIP CONSTRUCTION RAPID","Fingal","Wellview, Mulhuddart",20,"*N/A","","","","","","Q4-2017"],
    [288,"","SHIP CONSTRUCTION RAPID","Fingal","Church Road, Mulhuddart, Dublin 15",22,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [289,"","SHIP CONSTRUCTION","Fingal","Rivermeade, St. Margarets",2,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [290,"","SHIP CONSTRUCTION","Fingal","Rowlestown",20,"*N/A","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [291,"","SHIP CONSTRUCTION","Fingal","Racecourse Common, Lusk (Phase 2.3)",34,"*N/A","","","","","Q4-2016",""],
    [292,"","SHIP CONSTRUCTION","Fingal","Cappaghfinn (Phase 2)",28,"*N/A","","","Stage 3 approved in Q4-2016.","","",""],
    [293,"","SHIP CONSTRUCTION","Fingal","Castlelands Part View (Phase 3)",24,"*N/A","","","","","Q1-2017",""],
    [294,"","SHIP CONSTRUCTION","Fingal","Rathbeale Road, Swords",24,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [295,"","SHIP CONSTRUCTION","Fingal","The Grange, Ballyboughal (Part 1)",2,"*N/A","","","","","","Q3-2017"],
    [296,"","SHIP CONSTRUCTION","Fingal","Cappaghfinn (Phase 1)",14,"*N/A","","","","","","Q2-2016"],
    [297,"","SHIP CONSTRUCTION","Fingal","St. Cronan's Green, Swords",14,"*N/A","","","","","","Q2-2016"],
    [298,"","SHIP CONSTRUCTION","Fingal","St. Conan's Cottages, Swords",1,"*N/A","","","","","","Q2-2016"],
    [299,"","SHIP CONSTRUCTION","Fingal","Racecourse Common, Lusk (Phase 2.1)",25,"*N/A","","","","","","Q4-2017"],
    [300,"","SHIP CONSTRUCTION","Fingal","The Grange, Ballyboughal (Part 2)",6,"*N/A","","","","","Q4-2016",""],
    [301,"","SHIP CONSTRUCTION","Fingal","Racecourse Commons, Lusk (Phase 2.2) ",15,"*N/A","","","","","","Q1-2018"],
    [302,"","CAS CONSTRUCTION","Fingal","Killhedge Lane Dun Emer",48,"Tath Housing Association","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [303,"","CAS CONSTRUCTION","Fingal","Ravenswood, North Road, Finglas",6,"Peter McVerry Trust Ltd","","","","","Q1-2018",""],
    [304,"","CAS CONSTRUCTION","Fingal","22 College Street, Baldoyle",4,"Cluid Housing Association","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [305,"","CAS CONSTRUCTION","Fingal","Darcystown, Ringfort, Balrothery",9,"North ? East Housing Association Ltd","","","","","","Q3-2017"],
    [306,"","CAS CONSTRUCTION","Fingal","Estuary Road, Malahide",8,"Society of Saint Vincent de Paul","","","","","Q2-2017",""],
    [307,"","CALF CONSTRUCTION TURNKEY","Fingal","The Hermitage, Balgriffin, Co. Dublin *",54,"Cluid Housing Association","","","","","","Q4-2017"],
    [308,"","CALF CONSTRUCTION TURNKEY","Fingal","The Gallery, Donabate",43,"Oaklee Housing Trust","","","","","Q2-2017",""],
    [309,"","CALF CONSTRUCTION TURNKEY","Fingal","Weavers Walk, Clonsilla Road, Dublin 15",33,"Co-operative Housing Ireland","","","","","Q3-2017",""],
    [310,"","CALF CONSTRUCTION TURNKEY","Fingal","Millers Glen, Oldtown, Swords",28,"The Iveagh Trust","","","","","Q1-2018",""],
    [311,"","CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange, Clonsilla - Phase 2",21,"Tath Housing Association","","","","","","Q1-2017"],
    [312,"","CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange, Clonsilla - Phase 1",19,"Tath Housing Association","","","","","","Q4-2016"],
    [313,"","CALF CONSTRUCTION TURNKEY","Fingal","St Werburghs Court, Drynam Rd, Swords*",18,"Tath Housing Association","","","","","","Q4-2017"],
    [314,"","CALF CONSTRUCTION TURNKEY","Fingal","St Marnock's Bay, Portmarnock *",10,"Cluid Housing Association","","","","","","Q4-2017"],
    [315,"","CALF CONSTRUCTION TURNKEY","Fingal","Castlegrange, Clonsilla - Phase 3",8,"Tath Housing Association","","","","","","Q2-2017"],
    [316,"","CALF CONSTRUCTION TURNKEY","Fingal","Ladyswell Road & Church Road, Mulhuddart, Dublin 15 ",43,"Cluid Housing Association","","","","Scheme approved for CALF funding Q4-2017 post tender proposal ","",""],
    [317,"","CALF CONSTRUCTION TURNKEY","Fingal","Millers Glen, Phase 3, Oldtown, Swords",14,"The Iveagh Trust","","","","Scheme approved for CALF funding Q1 2018","",""],
    [318,"","SHIP CONSTRUCTION","Galway City","Ballymoneen Road (Phase 2)",78,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [319,"","SHIP CONSTRUCTION","Galway City","Ballymoneen Road (Phase 1)",14,"*N/A","","","","","Q2-2017",""],
    [320,"","SHIP CONSTRUCTION","Galway City","Ballinfoile Park, Headford Road (Infill Units)",10,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [321,"","SHIP CONSTRUCTION","Galway City","Corrib Park (Infill Units)",4,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [322,"","SHIP CONSTRUCTION","Galway City","Castlepark, Ballybane (Infill Units)",4,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [323,"","SHIP CONSTRUCTION","Galway City","Monivea Road, Ballybaan More, Galway",57,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [324,"","CAS CONSTRUCTION","Galway City","97/98 Rockfield",4,"Carraig Dubh Housing Association","","","","","","Q1-2018"],
    [325,"","CAS CONSTRUCTION","Galway City","Cul Garrai, Rahoon",6,"Peter Triest Housing Association Ltd","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [326,"","CAS CONSTRUCTION","Galway City","47 Forster Street",9,"Cope Galway","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [327,"","CALF CONSTRUCTION TURNKEY","Galway City","Castlegar Road, Galway",81,"Respond!","","","","Scheme approved for CALF funding Q2-2017","",""],
    [328,"","CALF CONSTRUCTION TURNKEY","Galway City","Maigh Rua, Doughiska, Galway",23,"Co operative Ireland","","","","","","Q4-2017"],
    [329,"","CALF CONSTRUCTION TURNKEY","Galway City","Murrough, Renmore, Galway",20,"Cluid Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [330,"","CALF CONSTRUCTION TURNKEY","Galway City","Boireann Beag, Ros Cam, Galway",16,"Cluid Housing Association","","","","","","Q4-2016"],
    [331,"","CALF CONSTRUCTION TURNKEY","Galway City","Reilean, Roscam, Block 5 Galway *",12,"Tath Housing Association","","","","","","Q2-2017"],
    [332,"","CALF CONSTRUCTION TURNKEY","Galway City","Reilean, Roscam, Block 4 Galway *",12,"Tath Housing Association","","","","","","Q2-2017"],
    [333,"","CALF CONSTRUCTION TURNKEY","Galway City","Maoilin, Ballymoneen Road, Galway - Phase 2 *",4,"Tath Housing Association","","","","","","Q4-2017"],
    [334,"","CALF CONSTRUCTION TURNKEY","Galway City","Maoilin, Ballymoneen Road, Galway - Phase 1 *",2,"Tath Housing Association","","","","","","Q1-2017"],
    [335,"","CALF CONSTRUCTION TURNKEY","Galway City","Cnoc na R, clybaun Road, Galway *",2,"Cluid Housing Association","","","","","","Q3-2017"],
    [336,"","CALF CONSTRUCTION TURNKEY","Galway City","77, 80 and 81 Maoilin, Ballymoneen Road, Knocknacarra, Galway City",3,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [337,"","SHIP CONSTRUCTION TURNKEY","Galway County","Kinvara",6,"*N/A","","","","","","Q4-2017"],
    [338,"","SHIP CONSTRUCTION TURNKEY","Galway County","Athenry",14,"*N/A","","","","","","Q4-2017"],
    [339,"","SHIP CONSTRUCTION TURNKEY","Galway County","Portumna",10,"*N/A","","","","","","Q4-2017"],
    [340,"","SHIP CONSTRUCTION","Galway County","Esker Fields, Ballinasloe",2,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [341,"","SHIP CONSTRUCTION","Galway County","Garbally Drive, Ballinasloe",10,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [342,"","SHIP CONSTRUCTION","Galway County","Weir Road, Tuam",30,"*N/A","","","Stage 3 approved in Q3-2017, the scheme is now being tendered.","","",""],
    [343,"","SHIP CONSTRUCTION","Galway County","Culleen, Carraroe, Connemara",6,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [344,"","SHIP CONSTRUCTION","Galway County","Ardrahan (SRD)",1,"*N/A","","","","","","Q4-2017"],
    [345,"","SHIP CONSTRUCTION","Galway County","Callowfinish, Carna (SRD)",1,"*N/A","","","","","Q2-2017",""],
    [346,"","SHIP CONSTRUCTION","Galway County","Waterdale, Claregalway (SRD)",1,"*N/A","","","","","Q4-2017",""],
    [347,"","SHIP CONSTRUCTION","Galway County","Corndulla (SRD)",1,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [348,"","SHIP CONSTRUCTION","Galway County","Cill Ciarn (SRD)",1,"*N/A","","","","","Q3-2017",""],
    [349,"","SHIP CONSTRUCTION","Galway County","Kinvara (SRD)",1,"*N/A","","","","","Q2-2017",""],
    [350,"","SHIP CONSTRUCTION","Galway County","Roundstone",10,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [351,"","SHIP CONSTRUCTION","Galway County","Sruchain an Chlair, Oughterard",10,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [352,"","SHIP CONSTRUCTION","Galway County","St. Joseph's, Clifden",23,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [353,"","SHIP CONSTRUCTION","Galway County","Bridge Court, Ahascragh, Ballinasloe",16,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [354,"","SHIP CONSTRUCTION","Galway County","Gilmartin Road, Tuam",61,"*N/A","","","","","Q4-2017",""],
    [355,"","CAS CONSTRUCTION","Galway County","Letterfrack (Phase 2)",11,"Cluid Housing Association","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [356,"","CAS CONSTRUCTION","Galway County","Rossaveal Cottages, Ros a Mhl, South Connemara",8,"Tearmann Eanna Teoranta","Stage 1 approved in Q4-2016, outline design and costs are now being prepared.","","","","",""],
    [357,"","CAS CONSTRUCTION","Galway County","Cregboy, Claregalway",14,"Claregalway and District Day Care Centre","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [358,"","CAS CONSTRUCTION","Galway County","Eanach Mheain, Carraroe",13,"Tearmann Eanna Teoranta","","Stage 2 approved in Q2-2016, full design/tender being prepared.","","","",""],
    [359,"","CAS CONSTRUCTION","Galway County","Mountbellew",5,"Mountbellew Voluntary Homes Association","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [360,"","CAS CONSTRUCTION","Galway County","Springfield, Parkmore",4,"Peter Triest Housing Association Ltd","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [361,"","CAS CONSTRUCTION","Galway County","Letterfrack (Phase 1)",13,"Cluid Housing Association","","","","","","Q2-2016"],
    [362,"","CAS CONSTRUCTION","Galway County","Dunlo Hill, Ballinasloe",17,"Cluid Housing Association","","","Stage 3 approved in Q1-2016, the scheme is now being tendered.","","",""],
    [363,"","CAS CONSTRUCTION","Galway County","Caheroyn, Athenry",1,"Peter Triest Housing Association Ltd","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [364,"","CAS CONSTRUCTION","Galway County","Aggard More, Craughwell",5,"Peter Triest Housing Association Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [365,"","CAS CONSTRUCTION","Galway County","The Old Post Office, Inverin",4,"Tearmann Eanna Teoranta","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [366,"","CALF CONSTRUCTION TURNKEY","Galway County","Cnoc na Si, Portumna",10,"Co-operative Housing Ireland","","","","","Q4-2016",""],
    [367,"","CALF CONSTRUCTION TURNKEY","Galway County","Vicars Choral, Tuam, Co Galway ",13,"Co-operative Housing Ireland","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [368,"","CALF CONSTRUCTION TURNKEY","Galway County","Cnoc na Si, Portumna",3,"Co-operative Housing Ireland","","","","","Q4-2016",""],
    [369,"","CALF CONSTRUCTION","Galway County","Spiddal Cottages, Co Galway - Phase 1",23,"Cluid Housing Association","","","","","","Q3-2017"],
    [370,"","CALF CONSTRUCTION","Galway County","Spiddal Cottages, Co Galway - Phase 2",8,"Cluid Housing Association","","","","","Q1-2017",""],
    [371,"","SHIP CONSTRUCTION TURNKEY","Kerry","Ard Na Si, Lispole (Phase 2)",8,"*N/A","","","","","Q2-2017",""],
    [372,"","SHIP CONSTRUCTION TURNKEY","Kerry","Ard Na Si, Lispole (Phase 1)",2,"*N/A","","","","","","Q1-2018"],
    [373,"","SHIP CONSTRUCTION TURNKEY","Kerry","Cahirdown Wood, Listowel",38,"*N/A","","","","Stage 4 approved in Q3-2017, the scheme is now fully approved.","",""],
    [374,"","SHIP CONSTRUCTION TURNKEY","Kerry","1-4 Steeple Meadow View, Milltown",4,"*N/A","","","","","","Q4-2017"],
    [375,"","SHIP CONSTRUCTION TURNKEY","Kerry","1-9 Meadow Park, Milltown (Phase 2)",7,"*N/A","","","","","Q4-2017",""],
    [376,"","SHIP CONSTRUCTION TURNKEY","Kerry","1-9 Meadow Park, Milltown (Phase 1)",2,"*N/A","","","","","","Q1-2018"],
    [377,"","SHIP CONSTRUCTION","Kerry","Ardmoneel, Killorglin",14,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [378,"","SHIP CONSTRUCTION","Kerry","Rathmore/Barraduff",20,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [379,"","SHIP CONSTRUCTION","Kerry","Ardbhearna, Kenmare",22,"*N/A","","","","","Q4-2017",""],
    [380,"","SHIP CONSTRUCTION","Kerry","Bill Kinnerk Road, Tralee",4,"*N/A","","","","","","Q1-2018"],
    [381,"","SHIP CONSTRUCTION","Kerry","Milltown",8,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [382,"","SHIP CONSTRUCTION","Kerry","Killeen, Tralee",21,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [383,"","SHIP CONSTRUCTION","Kerry","Lixnaw",4,"*N/A","","","","","","Q4-2017"],
    [384,"","SHIP CONSTRUCTION","Kerry","The Park, Killarney",20,"*N/A","","","","","","Q1-2018"],
    [385,"","SHIP CONSTRUCTION","Kerry","Courthouse Lawn, Listowel",7,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [386,"","SHIP CONSTRUCTION","Kerry","Dreenagh, Ballyheigue (SRD)",1,"*N/A","","","","","","Q1-2017"],
    [387,"","SHIP CONSTRUCTION","Kerry","Marconi Avenue, Ballybunion",20,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [388,"","SHIP CONSTRUCTION","Kerry","Callinafercy, Milltown",1,"*N/A","","","","","Q1-2018",""],
    [389,"","SHIP CONSTRUCTION","Kerry","Cahernaboshina, Ventry",1,"*N/A","","","","","Q4-2017",""],
    [390,"","SHIP CONSTRUCTION","Kerry","Balloonagh, Tralee",28,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [391,"","SHIP CONSTRUCTION","Kerry","Pinewood Estate, Killarney",1,"*N/A","","","","","Q1-2018",""],
    [392,"","SHIP CONSTRUCTION","Kerry","Drom West, Glenbeigh",1,"*N/A","","","","","Q1-2018",""],
    [393,"","SHIP CONSTRUCTION","Kerry","Meanus, Killorglin",1,"*N/A","","","Stage 3 approved in Q3-2017, the scheme is now being tendered.","","",""],
    [394,"","SHIP CONSTRUCTION","Kerry","Tullig Beg, Killorglin",1,"*N/A","","","Stage 3 approved in Q3-2017, the scheme is now being tendered.","","",""],
    [395,"","SHIP CONSTRUCTION","Kerry","Owngarry, killorglin",1,"*N/A","","","","","Q1-2018",""],
    [396,"","SHIP CONSTRUCTION","Kerry","Lohercannon, Tralee",56,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [397,"","SHIP CONSTRUCTION","Kerry","BallinaKilly Lower, Glenbeigh",1,"*N/A","","","","","Q1-2018",""],
    [398,"","SHIP CONSTRUCTION","Kerry","Ashgrove, Listowel",1,"*N/A","","","","","","Q3-2017"],
    [399,"","SHIP CONSTRUCTION","Kerry","Cullenagh Upper, Beaufort",1,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [400,"","SHIP CONSTRUCTION","Kerry","Farranwilliam, Ardfert",24,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [401,"","REGENERATION","Kerry","Croilar Na Mistaelach, Tralee",11,"*N/A","","","","","Q2-2017",""],
    [402,"","REGENERATION","Kerry","Urban Terrace, Tralee",2,"*N/A","","","","","","Q4-2016"],
    [403,"","REGENERATION","Kerry","Clonmore Road, Tralee",3,"*N/A","","","","","","Q4-2016"],
    [404,"","REGENERATION","Kerry","St Martin's Park, Tralee",4,"*N/A","","","","","Q2-2017",""],
    [405,"","REGENERATION","Kerry","Dingle Road, Tralee",1,"*N/A","","","","","Q1-2017",""],
    [406,"","CAS CONSTRUCTION","Kerry","Armagh House, Killarney",6,"Cluid Housing Association","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [407,"","CAS CONSTRUCTION","Kerry","22 College Road, Castleisland",4,"Kerry Emigrant Support Housing Association Ltd","","","","","Q4-2017",""],
    [408,"","CAS CONSTRUCTION","Kerry","Mitchels-Boherbee",18,"Cluid Housing Association","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [409,"","CAS CONSTRUCTION","Kerry","The Parsonage, Caherciveen",5,"Caherciveen Social Services (Housing) Ltd","","","","","Q4-2017",""],
    [410,"","CAS CONSTRUCTION","Kerry","Hawley Park Apartemnts, St Martins Park, Mitchels Rd, Tralee",15,"Kingdom Voluntary Housing Association","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [411,"","CAS CONSTRUCTION","Kerry","The Presentation Convent, Rathmore",4,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [412,"","CALF CONSTRUCTION TURNKEY","Kerry","Cathair Lakes Farrantoreen Road, Killorglin",6,"Cluid Housing Association","","","","","","Q2-2016"],
    [413,"","CALF CONSTRUCTION TURNKEY","Kerry","Derreen, Killarney, Co. Kerry",61,"Cluid Housing Associatiion","","","","Q1 2018","",""],
    [414,"","SHIP CONSTRUCTION TURNKEY","Kildare","Bodkin Place, Kilmeague",16,"*N/A","","","","","","Q4-2017"],
    [415,"","SHIP CONSTRUCTION TURNKEY","Kildare","Drogheda Street (Cassidy's Court), Monasterevin",6,"*N/A","","","","","","Q4-2017"],
    [416,"","SHIP CONSTRUCTION TURNKEY","Kildare","Oaktree, Tully Road, Kildare Town",8,"*N/A","","","","","Q1-2018",""],
    [417,"","SHIP CONSTRUCTION TURNKEY","Kildare","Mossbrook, Prosperous",2,"*N/A","","","","","","Q1-2018"],
    [418,"","SHIP CONSTRUCTION TURNKEY","Kildare","Moore Abbey Court, Monasterevin",2,"*N/A","","","","","","Q1-2018"],
    [419,"","SHIP CONSTRUCTION TURNKEY","Kildare","Kilcock (Phase 2.2)",13,"*N/A","","","","","","Q1-2018"],
    [420,"","SHIP CONSTRUCTION TURNKEY","Kildare","Drogheda Street (Cassidy's Court), Monasterevin",7,"*N/A","","","","","","Q1-2018"],
    [421,"","SHIP CONSTRUCTION RAPID","Kildare","Old Greenfield Road, Maynooth",47,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [422,"","SHIP CONSTRUCTION","Kildare","Hillview Terrace, Narraghmore",4,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [423,"","SHIP CONSTRUCTION","Kildare","Athgarvan Village",20,"*N/A","Stage 1 approved in Q3-2016, outline design and costs are now being prepared.","","","","",""],
    [424,"","SHIP CONSTRUCTION","Kildare","Rathasker Road, Naas",48,"*N/A","Stage 1 approved in Q1-2016, outline design and costs are now being prepared.","","","","",""],
    [425,"","SHIP CONSTRUCTION","Kildare","Dunmurry Rise, Bishopsland",32,"*N/A","","","","","Q1-2018",""],
    [426,"","SHIP CONSTRUCTION","Kildare","Anne Street, Prosperous",12,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [427,"","SHIP CONSTRUCTION","Kildare","Beechgrove, Rathangan",18,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [428,"","SHIP CONSTRUCTION","Kildare","Kilcock (Phase 2.1)",6,"*N/A","","","","","","Q4-2017"],
    [429,"","SHIP CONSTRUCTION","Kildare","Athgarvan Road, Newbridge",13,"*N/A","","","","","Q2-2017",""],
    [430,"","SHIP CONSTRUCTION","Kildare","Dominican Church Site, Athy",30,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [431,"","SHIP CONSTRUCTION","Kildare","Newtown, Leixlip",4,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [432,"","SHIP CONSTRUCTION","Kildare","Coill Dubh, Co. Kildare",9,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [433,"","SHIP CONSTRUCTION","Kildare","Ardclough Road, Celbridge",36,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [434,"","PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","Kildare","Craddockstown, Naas",74,"*N/A","","","Q1 2018","","",""],
    [435,"","CAS CONSTRUCTION","Kildare","Craddockstown, Naas",3,"KARE Promoting Inclusion for People with Intellectual Disabilities","Stage 1 approved in Q3-2016, outline design and costs are now being prepared.","","","","",""],
    [436,"","CAS CONSTRUCTION","Kildare","Main St., Kilcullen",4,"Camphill Communities of Ireland","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [437,"","CAS CONSTRUCTION","Kildare","El Kantara, Newbridge",2,"KARE Promoting Inclusion for People with Intellectual Disabilities","Stage 1 approved in Q1-2016, outline design and costs are now being prepared.","","","","",""],
    [438,"","CAS CONSTRUCTION","Kildare","Mansfield Grove, Athy",4,"KARE Promoting Inclusion for People with Intellectual Disabilities","Stage 1 approved in Q1-2016, outline design and costs are now being prepared.","","","","",""],
    [439,"","CAS CONSTRUCTION","Kildare","Jigginstown House, Naas",12,"Homeless Care Ltd","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [440,"","CALF CONSTRUCTION TURNKEY","Kildare","Gallows Hill, Athy",24,"Respond!","","","","Scheme approved for CALF funding Q2-2017","",""],
    [441,"","CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge - Phase 3",16,"Tath Housing Association","","","","","","Q1-2018"],
    [442,"","CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge - Phase 2",16,"Tath Housing Association","","","","","","Q4-2017"],
    [443,"","CALF CONSTRUCTION TURNKEY","Kildare","Roseberry Hill, Newbridge - Phase 1",13,"Tath Housing Association","","","","","","Q2-2017"],
    [444,"","CALF CONSTRUCTION TURNKEY","Kildare","The Pike, Shenagun, Castledermot",6,"Respond!","","","","Scheme approved for CALF funding Q1-2017","",""],
    [445,"","CALF CONSTRUCTION TURNKEY","Kildare","Moorefield Road, Newbridge",2,"Co-operative Housing Ireland","","","","","Q2-2017",""],
    [446,"","CALF CONSTRUCTION TURNKEY","Kildare","Millfield Manor, Newbridge, Co. Kildare *",19,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [447,"","CALF CONSTRUCTION","Kildare","Rye Abbey, Kilcock, (Apts)",33,"Cluid Housing Association","","","","","","Q4-2017"],
    [448,"","CALF CONSTRUCTION","Kildare","Morristown, Newbridge, Co Kildare",14,"Cluid Housing Association","","","","","","Q1-2018"],
    [449,"","CALF CONSTRUCTION","Kildare","Rye Abbey, Kilcock, (houses)",4,"Cluid Housing Association","","","","","","Q4-2017"],
    [450,"","SHIP CONSTRUCTION TURNKEY","Kilkenny","Togher Way, Urlingford",11,"*N/A","","","","","","Q3-2017"],
    [451,"","SHIP CONSTRUCTION TURNKEY","Kilkenny","Newpark, Castlecomer Road, Kilkenny",7,"*N/A","","","","","","Q1-2017"],
    [452,"","SHIP CONSTRUCTION TURNKEY","Kilkenny","Abbeygate, Ferrybank (Phase 1)",8,"*N/A","","","","","","Q1-2018"],
    [453,"","SHIP CONSTRUCTION TURNKEY","Kilkenny","Togher Way, Urlingford",5,"*N/A","","","","","","Q4-2017"],
    [454,"","SHIP CONSTRUCTION TURNKEY","Kilkenny","Abbeygate, Ferrybank (Phase 2)",3,"*N/A","","","","","Q2-2017",""],
    [455,"","SHIP CONSTRUCTION","Kilkenny","Blackstaff House, Callan",4,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [456,"","SHIP CONSTRUCTION","Kilkenny","Barna, Freshford",1,"*N/A","","","","","Q4-2017",""],
    [457,"","SHIP CONSTRUCTION","Kilkenny","10 Golf Links Road, Kilkenny",7,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [458,"","SHIP CONSTRUCTION","Kilkenny","Crokers Hill, Pennyswell Road, Kilkenny",80,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [459,"","SHIP CONSTRUCTION","Kilkenny","Main Street, Piltown",17,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [460,"","SHIP CONSTRUCTION","Kilkenny","Station Road, Ballyragget",22,"*N/A","Stage 1 approved in Q4-2016, outline design and costs are now being prepared.","","","","",""],
    [461,"","SHIP CONSTRUCTION","Kilkenny","Abbeyquarter Vicar Street (Sweeney's Orchard), Kilkenny",30,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [462,"","SHIP CONSTRUCTION","Kilkenny","Bolton, Callan",38,"*N/A","","","","Stage 4 approved in Q3-2017, the scheme is now fully approved.","",""],
    [463,"","SHIP CONSTRUCTION","Kilkenny","Donaguile, Castlecomer",33,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [464,"","SHIP CONSTRUCTION","Kilkenny","Robertshill, Kilkenny",4,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [465,"","SHIP CONSTRUCTION","Kilkenny","The Butts, Kilkenny",22,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [466,"","SHIP CONSTRUCTION","Kilkenny","Rosehill, Kells Road, Kilkenny",6,"*N/A","","","","","","Q1-2017"],
    [467,"","SHIP CONSTRUCTION","Kilkenny","Gaol Road, Kilkenny",10,"*N/A","","","","","","Q3-2016"],
    [468,"","SHIP CONSTRUCTION","Kilkenny","Greensbridge House",5,"*N/A","","","","","Q1-2018",""],
    [469,"","SHIP CONSTRUCTION","Kilkenny","The Broguemaker, Kilkenny",15,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [470,"","CAS CONSTRUCTION","Kilkenny","Kingsriver, Ennisnag",2,"Kingsriver Housing Association Limited","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [471,"","CAS CONSTRUCTION","Kilkenny","Garrin Green",6,"SOS Kilkenny Housing Association Ltd","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [472,"","CAS CONSTRUCTION","Kilkenny","Hazelbrook, Newrath",2,"Waterford Dove Housing Association","","","","","","Q1-2018"],
    [473,"","CAS CONSTRUCTION","Kilkenny","Golf Links Road, Kilkenny",15,"Respond","Stage 1 approved in Q2-2016, outline design and costs are now being prepared.","","","","",""],
    [474,"","CAS CONSTRUCTION","Kilkenny","Ballytobin, Callan",4,"Camphill Communities of Ireland","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [475,"","CAS CONSTRUCTION","Kilkenny","Good Shepherd Centre - Wing 1952",12,"The Good Shepherd Centre (Kilkenny) Ltd","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [476,"","CAS CONSTRUCTION","Kilkenny","Nimble Spaces Project at Callan",15,"Camphill Communities of Ireland","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [477,"","CAS CONSTRUCTION","Kilkenny","\"Brooke House\", Thomastown",5,"Camphill Communities of Ireland","","","","","","Q3-2017"],
    [478,"","CAS CONSTRUCTION","Kilkenny","Friary Walk, Callan",12,"Cluid Housing Association","","","","","","Q3-2016"],
    [479,"","CAS CONSTRUCTION","Kilkenny","Camphill ~Communities Garden Cottage, The Workhouse, Callan",1,"Camphill Communities of Ireland","","","","","","Q4-2017"],
    [480,"","CAS CONSTRUCTION","Kilkenny","Kyle, Callan, Co. Kilkenny",4,"Camphill Communities of Ireland","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [481,"","CAS CONSTRUCTION","Kilkenny","\"Red Barn\" Patrick Street, Ballyragget",16,"Good Shepherd Services Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [482,"","CAS CONSTRUCTION","Kilkenny","Smith's Road, Ballyraggett Oaklee",4,"Oaklee Housing Trust","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [483,"","CAS CONSTRUCTION","Kilkenny","Fennelly's Lane Jerpoint",5,"Camphill Communities of Ireland","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [484,"","CALF CONSTRUCTION TURNKEY","Kilkenny","Logan Square, Thomastown, Co. Kilkenny*",16,"Oaklee","","","","","","Q4-2017"],
    [485,"","CALF CONSTRUCTION TURNKEY","Kilkenny","Moneenview side Rd, Moneenroe",9,"Oaklee Housing Trust","","","","","Q1-2017",""],
    [486,"","CALF CONSTRUCTION TURNKEY","Kilkenny","Chapel St. and New Road, Mooncoin, Co. Kilkenny",6,"Respond!","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [487,"","CALF CONSTRUCTION","Kilkenny","Golf Links Road, Kilkenny *",39,"Respond!","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [488,"","CALF CONSTRUCTION","Kilkenny","Friary Walk, Callan",16,"Cluid Housing Association","","","","","Q1-2018",""],
    [489,"","SHIP CONSTRUCTION","Laois","Main Street, Rathdowney",6,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [490,"","SHIP CONSTRUCTION","Laois","Harpurs Lane, Portlaoise",1,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [491,"","SHIP CONSTRUCTION","Laois","Ballymorris Road, Portarlington",22,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [492,"","SHIP CONSTRUCTION","Laois","Gleann na Glaise, Ballyroan",10,"*N/A","Stage 1 approved in Q3-2016, outline design and costs are now being prepared.","","","","",""],
    [493,"","SHIP CONSTRUCTION","Laois","Pattison Est. Mountmellick",10,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [494,"","SHIP CONSTRUCTION","Laois","Shannon Street, Mountrath",8,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [495,"","SHIP CONSTRUCTION","Laois","Conniberry Way, Old Knockmay Road, Portlaoise",33,"*N/A","","","","","Q4-2016",""],
    [496,"","CAS CONSTRUCTION","Laois","St. Fintan's Hospital, Dublin Road, Portlaoise",8,"Oaklee Housing Trust","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [497,"","CALF CONSTRUCTION","Laois","Cluin Inn Mountrath",11,"Oaklee Housing Trust","","","","","","Q1-2018"],
    [498,"","CALF CONSTRUCTION","Laois","55/56 Kirwan Park, Mountmellick",2,"Cluid Housing Association","","","","","Q1-2018",""],
    [499,"","CALF CONSTRUCTION TURNKEY","Laois ","31 36 Droimnin, Stradbally",6,"Cluid Housing Association","","","","","Q4-2017",""],
    [500,"","SHIP CONSTRUCTION","Leitrim","Summerhill, Carrick on Shannon",28,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [501,"","SHIP CONSTRUCTION","Leitrim","Taobh Tire, Manorhamilton (Phase 2)",7,"*N/A","","","","","Q2-2017",""],
    [502,"","CAS CONSTRUCTION","Leitrim","Ballinamore",2,"Society of Saint Vincent de Paul","","","","","","Q4-2017"],
    [503,"","SHIP CONSTRUCTION RAPID","Limerick","Deerpark, Adare",30,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [504,"","SHIP CONSTRUCTION RAPID","Limerick","Lisheen Park, Patrickswell",16,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [505,"","SHIP CONSTRUCTION RAPID","Limerick","Upper Carey's Road",11,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [506,"","SHIP CONSTRUCTION RAPID","Limerick","Old Christians Site, Rathbane",33,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [507,"","SHIP CONSTRUCTION RAPID","Limerick","Mountpelier",10,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [508,"","SHIP CONSTRUCTION RAPID","Limerick","Knocklong",10,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [509,"","SHIP CONSTRUCTION RAPID","Limerick","Patrickswell (Site 2)",28,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [510,"","SHIP CONSTRUCTION","Limerick","Patrick?s Villas, Castleconnell",4,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [511,"","SHIP CONSTRUCTION","Limerick","Ballysimon, Greenhill Road ",14,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [512,"","SHIP CONSTRUCTION","Limerick","Gough Place, Rosbrien Road, Limerick",7,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [513,"","SHIP CONSTRUCTION","Limerick","1-12 Burke Avenue, Limerick City",12,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [514,"","SHIP CONSTRUCTION","Limerick","Chas Flats, Limerick City",3,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [515,"","SHIP CONSTRUCTION","Limerick","Sexton Street North & Kileely Court",5,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [516,"","SHIP CONSTRUCTION","Limerick","Site Adj. to Athlunkard Boat Club, Limerick City",4,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [517,"","SHIP CONSTRUCTION","Limerick","Joseph Street, Limerick City",3,"*N/A","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [518,"","SHIP CONSTRUCTION","Limerick","Wallers Well, Limerick City (Phase 2)",11,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [519,"","SHIP CONSTRUCTION","Limerick","Clonmacken, Limerick City",38,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [520,"","SHIP CONSTRUCTION","Limerick","Glenview Drive, Hospital",20,"*N/A","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [521,"","SHIP CONSTRUCTION","Limerick","Clare Street, Limerick City",7,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [522,"","SHIP CONSTRUCTION","Limerick","Hasset Villas, Thomondgate",3,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [523,"","SHIP CONSTRUCTION","Limerick","Kilmurry Court, Garryowen",6,"*N/A","","","Stage 3 approved in Q3-2017, the scheme is now being tendered.","","",""],
    [524,"","SHIP CONSTRUCTION","Limerick","Vance's Lands, Limerick City",37,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [525,"","SHIP CONSTRUCTION","Limerick","Rathbane Road, Limerick City",2,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [526,"","SHIP CONSTRUCTION","Limerick","Sycamore Avenue, Limerick City",5,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [527,"","SHIP CONSTRUCTION","Limerick","Lower Carey's Road, Limerick City",11,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [528,"","SHIP CONSTRUCTION","Limerick","Ballygrennan Road, Moyross",3,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [529,"","SHIP CONSTRUCTION","Limerick","Kileely Road, Moyross",5,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [530,"","SHIP CONSTRUCTION","Limerick","Ballygreannan Road, Limerick City",2,"*N/A","","","","","","Q4-2017"],
    [531,"","SHIP CONSTRUCTION","Limerick","Clare Street, Limerick City",2,"*N/A","","","","","","Q4-2017"],
    [532,"","SHIP CONSTRUCTION","Limerick","Ballyhahill",4,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [533,"","SHIP CONSTRUCTION","Limerick","Knockalisheen Road, Moyross",6,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [534,"","SHIP CONSTRUCTION","Limerick","Colbert Terrace, Abbeyfeale",9,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [535,"","SHIP CONSTRUCTION","Limerick","St. Michael's Court, Watergate Flats, ",9,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [536,"","REGENERATION","Limerick","Lord Edward Street, P2: Main Contract",79,"*N/A","","","","","","Q4-2017"],
    [537,"","REGENERATION","Limerick","Lord Edward Street, P2: Main Contract",2,"*N/A","","","","","","Q1-2017"],
    [538,"","REGENERATION","Limerick","Gaol Lane",1,"*N/A","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [539,"","REGENERATION","Limerick","Sheep / Athlunkards Street",8,"*N/A","","Stage 2 approved in Q2-2014, full design/tender being prepared.","","","",""],
    [540,"","REGENERATION","Limerick","Churchfield (Phase 1A)",19,"*N/A","","","","","","Q1-2018"],
    [541,"","REGENERATION","Limerick","Churchfield (Phase 1B)",23,"*N/A","","","","","Q3-2016",""],
    [542,"","REGENERATION","Limerick","Churchfield (Phase 2)",38,"Circle Voluntary Housing Association Ltd","","Stage 2 approved in Q4-2014, full design/tender being prepared.","","","",""],
    [543,"","REGENERATION","Limerick","Cosgrave Park",30,"Co-operative Housing Ireland (Formerly NABCo)","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [544,"","REGENERATION","Limerick","Palm Court",27,"Respond","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [545,"","REGENERATION","Limerick","Orchard Site",26,"Oaklee Housing Trust","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [546,"","REGENERATION","Limerick","176 & 177 Cliona Park",2,"*N/A","","","","","","Q2-2016"],
    [547,"","REGENERATION","Limerick","Cliona Park (Phase 2)",10,"*N/A","","","","","","Q2-2017"],
    [548,"","REGENERATION","Limerick","8-10 Gaol Lane",3,"*N/A","","","","","","Q4-2016"],
    [549,"","REGENERATION","Limerick","1 3 Weston Gardens",3,"*N/A","","","","","","Q2-2016"],
    [550,"","REGENERATION","Limerick","2016 Moyross Rebuild",6,"*N/A","","","","","","Q4-2016"],
    [551,"","REGENERATION","Limerick","2016 Southhill Rebuild",8,"*N/A","","","","","","Q4-2016"],
    [552,"","REGENERATION","Limerick","2016 St. Mary's Park Rebuild",9,"*N/A","","","","","","Q4-2016"],
    [553,"","REGENERATION","Limerick","BCW Vacant Refurbs, Lot 1 & 2**",13,"*N/A","","","","","","Q4-2016"],
    [554,"","REGENERATION","Limerick","St. Mary's Park Infills",19,"Tath Housing Association","","","","","Q3-2017",""],
    [555,"","REGENERATION","Limerick","Cliona Park (Phase 3)",18,"Tath Housing Association","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [556,"","REGENERATION","Limerick","Carew Park",37,"*N/A","Stage 1 approved in Q1-2015, outline design and costs are now being prepared.","","","","",""],
    [557,"","REGENERATION","Limerick","45-46 Cliona Park",2,"*N/A","","Stage 2 approved in Q1-2016, full design/tender being prepared.","","","",""],
    [558,"","REGENERATION","Limerick","Dalgaish Park",24,"Cluid Housing Association","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [559,"","REGENERATION","Limerick","Markievicz Drive",13,"*N/A","Stage 1 approved in Q1-2015, outline design and costs are now being prepared.","","","","",""],
    [560,"","REGENERATION","Limerick","2017 St Mary's Park Rebuild",1,"*N/A","","","","","","Q4-2017"],
    [561,"","REGENERATION","Limerick","2017 Ballinacurra Weston Rebuild",1,"*N/A","","","","","","Q4-2017"],
    [562,"","REGENERATION","Limerick","2017 Southill Rebuilds",13,"*N/A","","","","","","Q4-2017"],
    [563,"","REGENERATION","Limerick","2017 Moyross Rebuild",1,"*N/A","","","","","","Q4-2017"],
    [564,"","CAS CONSTRUCTION","Limerick","Towerfield Crescent, Croom",10,"Croom Voluntary Housing Association Ltd","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [565,"","CAS CONSTRUCTION","Limerick","Cappamore",12,"Cappamore Housing Association Ltd","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [566,"","CAS CONSTRUCTION","Limerick","Speakers Corner, Limerick City",4,"Simon Community : Midwest Simon","","","","","Q1-2018",""],
    [567,"","CAS CONSTRUCTION","Limerick","Cuan Mhuire, Bruree",6,"Cuan Mhuire Teoranta","","","","","Q3-2017",""],
    [568,"","CAS CONSTRUCTION","Limerick","Mirth, Thomondgate",12,"Associated Charities Trust Ltd","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [569,"","CAS CONSTRUCTION","Limerick","Cois na Feile, Abbeyfeale ",12,"Cluid Housing Association","","","","","","Q4-2016"],
    [570,"","CAS CONSTRUCTION","Limerick","Convent Street, King's Island",2,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [571,"","CAS CONSTRUCTION","Limerick","2/3 Mallow Street",6,"Peter McVerry Trust Ltd","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [572,"","CALF CONSTRUCTION TURNKEY","Limerick","Cosgrave Park, Moyross, Limerick City (Regen)q2",21,"Co-operative Housing Ireland","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [573,"","CALF CONSTRUCTION TURNKEY","Limerick","Woodlawn Park, Ballysimon Road, Limerick",11,"Respond!","","","","","Q4-2017",""],
    [574,"","CALF CONSTRUCTION TURNKEY","Limerick","Ard Aulin, Mungret Phase 1",7,"Cluid Housing Association","","","","","","Q2-2017"],
    [575,"","CALF CONSTRUCTION TURNKEY","Limerick","Cluain Ard, Fedamore, 1/2",2,"Co-operative Housing Ireland","","","","","","Q1-2018"],
    [576,"","CALF CONSTRUCTION TURNKEY","Limerick","Cluain Ard, Fedamore 2/2",2,"Co-operative Housing Ireland","","","","","Q2-2017",""],
    [577,"","CALF CONSTRUCTION TURNKEY","Limerick","Ard Aulin, Mungret Phase 2",1,"Cluid Housing Association","","","","","Q4-2016",""],
    [578,"","CALF CONSTRUCTION","Limerick","1 20 Park View Row, Hyde Road, Limerick",20,"Cluid Housing Association","","","","","","Q1-2018"],
    [579,"","SHIP CONSTRUCTION TURNKEY","Longford","Mill Race Park, Drumlish (Phase 1)",14,"*N/A","","","","","","Q4-2017"],
    [580,"","SHIP CONSTRUCTION TURNKEY","Longford","Knock, Lanesborough",31,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [581,"","SHIP CONSTRUCTION TURNKEY","Longford","Mill Race Park, Drumlish (Phase 2)",2,"*N/A","","","","","","Q1-2018"],
    [582,"","SHIP CONSTRUCTION","Longford","Church View, Lanesborough",13,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [583,"","SHIP CONSTRUCTION","Longford","Rathcline Road, Lanesborough",4,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [584,"","SHIP CONSTRUCTION","Longford","Edgeworthstown Road, Ballymahon",4,"*N/A","","","","","","Q1-2018"],
    [585,"","SHIP CONSTRUCTION","Longford","Daroge, Ballymahon",1,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [586,"","SHIP CONSTRUCTION","Longford","Rose Cottage' Ballinalee",6,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [587,"","CALF CONSTRUCTION TURNKEY","Longford","Cartrun Breac, Lisbrack Rd, Longford",7,"Cluid Housing Association","","","","","","Q1-2017"],
    [588,"","SHIP CONSTRUCTION","Louth","55/57 Bothar Brugha, Drogheda",3,"*N/A","","","","","","Q4-2017"],
    [589,"","SHIP CONSTRUCTION","Louth","Drogheda (Derelicts Project)  Phase 1",4,"*N/A","","","","","","Q1-2018"],
    [590,"","SHIP CONSTRUCTION","Louth","Drogheda (Derelicts Project)  Phase 2",8,"*N/A","","","","","Q3-2017",""],
    [591,"","SHIP CONSTRUCTION","Louth","Dundalk B&R project (1)",7,"*N/A","","","","","","Q4-2016"],
    [592,"","SHIP CONSTRUCTION","Louth","Dundalk B&R project (2)",7,"*N/A","","","","","","Q2-2017"],
    [593,"","SHIP CONSTRUCTION","Louth","Dundalk B&R project (3)",9,"*N/A","","","","","","Q3-2017"],
    [594,"","SHIP CONSTRUCTION","Louth","Woodlands, Dunleer",4,"*N/A","","","","","","Q3-2016"],
    [595,"","SHIP CONSTRUCTION","Louth","Boice Court (Phase 2 - 4)",69,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [596,"","SHIP CONSTRUCTION","Louth","Father Finn Park (Phase 2)",17,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [597,"","SHIP CONSTRUCTION","Louth","Dundalk B&R project (4)",6,"*N/A","","","","","","Q4-2017"],
    [598,"","SHIP CONSTRUCTION","Louth","Mount Avenue, Dundalk",75,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [599,"","REGENERATION","Louth","Cox's Demesne Phase 2a",14,"*N/A","","","","","","Q4-2016"],
    [600,"","REGENERATION","Louth","Cox's Demesne Phase 2b",22,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [601,"","PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","Louth","Ravel Ardee Road, Dunleer",80,"*N/A","","","Q1 2018","","",""],
    [602,"","CAS CONSTRUCTION","Louth","5 Slieveroe Cresent, Dundalk",1,"Cluid Housing Association","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [603,"","CAS CONSTRUCTION","Louth","Castletowncooley, Riverstown, Dundalk",1,"Tath Housing Association","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [604,"","CAS CONSTRUCTION","Louth","Barrack Street, Dundalk",8,"Simon Community : Dundalk Simon","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [605,"","CAS CONSTRUCTION","Louth","Saltown, Dundalk",7,"North ? East Housing Association Ltd","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [606,"","CAS CONSTRUCTION","Louth","McArdle Green (Moneymore), Drogheda",1,"North ? East Housing Association Ltd","","","","","Q1-2018",""],
    [607,"","CAS CONSTRUCTION","Louth","Tierney Street, Ardee",7,"Oaklee Housing Trust","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [608,"","CAS CONSTRUCTION","Louth","Tredagh View, Drogheda",1,"Respond","","","","","","Q1-2017"],
    [609,"","CAS CONSTRUCTION","Louth","36 Strand, Clogherhead",4,"St. John of God Housing Association Ltd","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [610,"","CAS CONSTRUCTION","Louth","Coulter Park",6,"Tath Housing Association","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [611,"","CALF CONSTRUCTION TURNKEY","Louth","Castleguard, Ardee",29,"Tath Housing Association","","","","","","Q1-2018"],
    [612,"","CALF CONSTRUCTION TURNKEY","Louth","Caslteguard, Ardee",73,"Tath Housing Association","","","","","Q2-2017",""],
    [613,"","CALF CONSTRUCTION TURNKEY","Louth","Rathmullen Road, Drogheda",54,"North ? East Housing Association Ltd","","","","","Q4-2017",""],
    [614,"","CALF CONSTRUCTION TURNKEY","Louth","Rathmullen Road, Drogheda",51,"Tath Housing Association","","","","","Q4-2017",""],
    [615,"","CALF CONSTRUCTION TURNKEY","Louth","Avourwen Meadows, Drogheda",50,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q1-2017","",""],
    [616,"","CALF CONSTRUCTION TURNKEY","Louth","Liscorrie, Bog Lane, Drogheda ",41,"Tath Housing Association","","","","","","Q4-2017"],
    [617,"","CALF CONSTRUCTION TURNKEY","Louth","Mount Hamilton, Dundalk Phase 2",31,"Cluid Housing Association","","","","","Q4-2016",""],
    [618,"","CALF CONSTRUCTION TURNKEY","Louth","Mount Hamilton, Dundalk Phase 1",12,"Cluid Housing Association","","","","","","Q4-2017"],
    [619,"","CALF CONSTRUCTION TURNKEY","Louth","Coulter Place Armagh Road Dundalk Phase 2",12,"Cluid Housing Association","","","","","","Q3-2017"],
    [620,"","CALF CONSTRUCTION TURNKEY","Louth","Coulter Place Armagh Road Dundalk Phase 1",10,"Cluid Housing Association","","","","","","Q1-2017"],
    [621,"","CALF CONSTRUCTION TURNKEY","Louth","Castle Court, Castlebellingham - Phase 2",10,"Cluid Housing Association","","","","","","Q1-2017"],
    [622,"","CALF CONSTRUCTION TURNKEY","Louth","Aston Village",8,"Respond!","","","","","Q4-2017",""],
    [623,"","CALF CONSTRUCTION TURNKEY","Louth","Castle Court, Castlebellingham - Phase 1",4,"Cluid Housing Association","","","","","","Q1-2017"],
    [624,"","CALF CONSTRUCTION TURNKEY","Louth","Knock Shee, Old Golf Links road, Blackrock, Co. Louth",3,"Cluid Housing Association","","","","","","Q4-2017"],
    [625,"","CALF CONSTRUCTION","Louth","Scarlett Street, Drogheda",15,"North  East Housing Association Ltd","","","","","Q1-2018",""],
    [626,"","CALF CONSTRUCTION","Louth","Clos na Manach, Carlingford",10,"Tath Housing Association","","","","","Q2-2017",""],
    [627,"","CALF CONSTRUCTION","Louth","Rath na Gloinne",3,"Cluid Housing Association","","","","","","Q3-2016"],
    [628,"","CALF CONSTRUCTION","Louth","Bishops Court, Dundalk",2,"Tath Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [629,"","CALF CONSTRUCTION","Louth","2 Slieve Row Crescent, Dundalk",1,"Cluid Housing Association","","","","","","Q2-2016"],
    [630,"","SHIP CONSTRUCTION TURNKEY","Mayo","Slinaunroe, Clogher (SRD)",1,"*N/A","","","","","","Q2-2017"],
    [631,"","SHIP CONSTRUCTION RAPID","Mayo","Kilkelly Road, Knock (Phase 3)",4,"*N/A","","","","","Q3-2017",""],
    [632,"","SHIP CONSTRUCTION","Mayo","Market Street, Swinford",2,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [633,"","SHIP CONSTRUCTION","Mayo","Knocknageeha, Newport",1,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [634,"","SHIP CONSTRUCTION","Mayo","Kilmeena (Phase 2)",4,"*N/A","","","","","Q3-2017",""],
    [635,"","SHIP CONSTRUCTION","Mayo","Knockmore, Ballina",8,"*N/A","","","","","Q4-2017",""],
    [636,"","SHIP CONSTRUCTION","Mayo","Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)",4,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [637,"","SHIP CONSTRUCTION","Mayo","Sliabh Rua, Foxford - Phase 3",10,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [638,"","SHIP CONSTRUCTION","Mayo","Woodlands, Balla (Phase 3)",4,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [639,"","SHIP CONSTRUCTION","Mayo","Abbeyquarter, Ballyhaunis",18,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [640,"","SHIP CONSTRUCTION","Mayo","Tonragee West, Achill (Phase 2)",4,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [641,"","SHIP CONSTRUCTION","Mayo","Sli na Roba, Friarsquarter, Ballinrobe",16,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [642,"","SHIP CONSTRUCTION","Mayo","Single Rural Dwellings",7,"*N/A","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [643,"","SHIP CONSTRUCTION","Mayo","Marian Crescent, Ballina",4,"*N/A","","","","","Q2-2017",""],
    [644,"","SHIP CONSTRUCTION","Mayo","Tubberhill, Westport (Phase 3)",21,"*N/A","","","","","","Q1-2018"],
    [645,"","SHIP CONSTRUCTION","Mayo","7 St. Patrick's Tce., Westport",1,"*N/A","","","","","","Q2-2017"],
    [646,"","SHIP CONSTRUCTION","Mayo","Parke, Castlebar",8,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [647,"","SHIP CONSTRUCTION","Mayo","Killavally",8,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [648,"","SHIP CONSTRUCTION","Mayo","Lios na Circa, Saleen, Castlebar",22,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [649,"","SHIP CONSTRUCTION","Mayo","Kilkelly Road, Swinford",27,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [650,"","SHIP CONSTRUCTION","Mayo","Bothar Dubh, Claremorris",12,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [651,"","SHIP CONSTRUCTION","Mayo","Barhauve, Rossport (SRD)",1,"*N/A","","","","","Q4-2016",""],
    [652,"","SHIP CONSTRUCTION","Mayo","Glaggaun, Ballycroy (SRD)",1,"*N/A","","","","","","Q4-2017"],
    [653,"","SHIP CONSTRUCTION","Mayo","Glengad, Pollatomish (SRD)",1,"*N/A","","","","","Q4-2016",""],
    [654,"","SHIP CONSTRUCTION","Mayo","Gorthbrack, Inver (SRD)",1,"*N/A","","","","","","Q1-2018"],
    [655,"","CAS CONSTRUCTION","Mayo","Admiral Browne Road, Foxford (Phase 2)",4,"Society of Saint Vincent de Paul","","","","","","Q1-2018"],
    [656,"","CAS CONSTRUCTION","Mayo","Killosheehan, Ballinrobe",6,"Society of Saint Vincent de Paul","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [657,"","CAS CONSTRUCTION","Mayo","Admiral Browne Road, Foxford (Phase 1)",8,"Society of Saint Vincent de Paul","","","","","","Q3-2016"],
    [658,"","CAS CONSTRUCTION","Mayo","Logmore, Belmullet",7,"Irish Wheelchair Association Ltd","","","","","","Q2-2017"],
    [659,"","CALF CONSTRUCTION TURNKEY","Mayo","Ballina area",11,"Cluid Housing Association","","","","Scheme given revised CALF approval Q1 2018","",""],
    [660,"","CALF CONSTRUCTION TURNKEY","Mayo","Glenlara, Westport, Co Mayo ",10,"Co-operative Housing Ireland","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [661,"","SHIP CONSTRUCTION RAPID","Meath","Kilmainhamwood",4,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [662,"","SHIP CONSTRUCTION RAPID","Meath","Cortown",10,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [663,"","SHIP CONSTRUCTION RAPID","Meath","Oldcastle",15,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [664,"","SHIP CONSTRUCTION","Meath","Proudstown Road, Navan",4,"*N/A","","","","Stage 4 approved in Q2-2017, the scheme is now fully approved.","",""],
    [665,"","SHIP CONSTRUCTION","Meath","Bettystown (Phase 2)",15,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [666,"","SHIP CONSTRUCTION","Meath","Ratoath",17,"*N/A","","","","","Q1-2018",""],
    [667,"","SHIP CONSTRUCTION","Meath","Riverside, Kells",40,"*N/A","","","","Stage 4 approved in Q4-2017, the scheme is now being tendered.","",""],
    [668,"","SHIP CONSTRUCTION","Meath","Cherry Court, Summerhill",19,"*N/A","","","","","Q4-2017",""],
    [669,"","SHIP CONSTRUCTION","Meath","Connaught Grove, Athboy",32,"*N/A","","","","","Q3-2017",""],
    [670,"","SHIP CONSTRUCTION","Meath","Nobber",19,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [671,"","SHIP CONSTRUCTION","Meath","Carlanstown",13,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [672,"","SHIP CONSTRUCTION","Meath","Donore",20,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [673,"","SHIP CONSTRUCTION","Meath","Dunshaughlin",25,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [674,"","SHIP CONSTRUCTION","Meath","Bettystown (Phase 1)",16,"*N/A","","","","","","Q3-2017"],
    [675,"","SHIP CONSTRUCTION","Meath","Farganstown",42,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [676,"","CAS CONSTRUCTION","Meath","Blackcastle, Slane Road, Navan",17,"Tath Housing Association","","","","","Q4-2017",""],
    [677,"","CALF CONSTRUCTION TURNKEY","Meath","Dunville, Athlumney, Co. Meath phase 1",10,"Tath Housing Association","","","","","","Q1-2018"],
    [678,"","CALF CONSTRUCTION TURNKEY","Meath","Dunville, Athlumney, Co. Meath Phase 2 *",8,"Tath Housing Association","","","","","","Q1-2018"],
    [679,"","CALF CONSTRUCTION TURNKEY","Meath","Dunville, Athlumney, Co. Meath Phase 3",6,"Tath Housing Association","","","","","Q3-2017",""],
    [680,"","CALF CONSTRUCTION TURNKEY","Meath","Dunville, Athlumney, Co. Meath Phase 4 *",40,"Tath Housing Association","","","","","Q3-2017",""],
    [681,"","CALF CONSTRUCTION TURNKEY","Meath","Fitzherbert Wood, Slane Rd., Navan, Co. Meath",44,"Tath Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [682,"","CALF CONSTRUCTION TURNKEY","Meath","Dun Eimear, Bettytown",30,"Tath Housing Association","","","","","Q3-2017",""],
    [683,"","CALF CONSTRUCTION TURNKEY","Meath","Seabury Lawns, Mornington",25,"Cluid Housing Association","","","","","","Q3-2017"],
    [684,"","CALF CONSTRUCTION TURNKEY","Meath","Tubberclaire, Navan",23,"Cluid Housing Association","","","","","","Q2-2016"],
    [685,"","CALF CONSTRUCTION TURNKEY","Meath","Mill Lane, Flower Hill, Navan",20,"Oaklee Housing Trust","","","","","","Q1-2016"],
    [686,"","CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 4",20,"Cluid Housing Association","","","","","","Q4-2017"],
    [687,"","CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 3",18,"Cluid Housing Association","","","","","","Q4-2017"],
    [688,"","CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 2",18,"Cluid Housing Association","","","","","","Q4-2017"],
    [689,"","CALF CONSTRUCTION TURNKEY","Meath","Ashbourne area - Phase 1",11,"Cluid Housing Association","","","","","","Q1-2017"],
    [690,"","CALF CONSTRUCTION TURNKEY","Meath","Blackcastle, Slane Road, Navan",9,"Tath Housing Association","","","","","Q3-2017",""],
    [691,"","CALF CONSTRUCTION TURNKEY","Meath","Churchfields, Ashbourne *",8,"Tath Housing Association","","","","","","Q2-2017"],
    [692,"","CALF CONSTRUCTION TURNKEY","Meath","Grangehall, Dunshaughlin",7,"Tath Housing Association","","","","","Q1-2017",""],
    [693,"","CALF CONSTRUCTION TURNKEY","Meath","Seabury Lawns, Mornington",6,"Cluid Housing Association","","","","","","Q1-2018"],
    [694,"","CALF CONSTRUCTION TURNKEY","Meath","Royal Oaks, Enfield *",4,"Cluid Housing Association","","","","","","Q2-2017"],
    [695,"","CALF CONSTRUCTION TURNKEY","Meath","27 Ardmore Rise, Bettystown",1,"North ? East Housing Association Ltd","","","","","Q1-2017",""],
    [696,"","CALF CONSTRUCTION TURNKEY","Meath","Station Road, Dunboyne *",24,"Respond!","","","","Scheme approved for CALF funding Q1-2018","",""],
    [697,"","CALF CONSTRUCTION TURNKEY","Meath","Ceamach Close, Donacarney, Co. Meath *",7,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [698,"","CALF CONSTRUCTION TURNKEY","Meath","Ceamach Close, Donacarney, Co. Meath ",9,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [699,"","CALF CONSTRUCTION TURNKEY","Meath","Commons Road, Navan, Co. Meath",12,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [700,"","CALF CONSTRUCTION","Meath","Millrace Court, Emmet Street, Trim, Co Meath ",11,"North  East Housing Association Ltd","","","","Scheme approved for CALF funding Q4-2017 ","",""],
    [701,"","CALF CONSTRUCTION","Meath","Cherryvalley, Raghmoylan, Co. Meath",9,"Cluid Housing Association","","","","","","Q4-2017"],
    [702,"","CALF CONSTRUCTION","Meath","Kellets Grove, Dunshauglin, Co Meath *",6,"Tath Housing Association","","","","","","Q1-2018"],
    [703,"","SHIP CONSTRUCTION TURNKEY","Monaghan","Drumbear Wood, Monaghan Town",12,"*N/A","","","","","","Q4-2017"],
    [704,"","SHIP CONSTRUCTION TURNKEY","Monaghan","Knockroe Glen, Monaghan Town (Phase 3)",6,"*N/A","","","","","","Q4-2017"],
    [705,"","SHIP CONSTRUCTION TURNKEY","Monaghan","Knockroe Glen, Monaghan Town (Phase 2)",8,"*N/A","","","","","","Q2-2017"],
    [706,"","SHIP CONSTRUCTION TURNKEY","Monaghan","Knockroe Glen, Monaghan  Town (Phase 1)",8,"*N/A","","","","","","Q2-2017"],
    [707,"","SHIP CONSTRUCTION TURNKEY","Monaghan","Killycard, Bree, Castleblaney",4,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [708,"","SHIP CONSTRUCTION TURNKEY","Monaghan","The Meadows, Smithborough",5,"*N/A","","","","","","Q4-2017"],
    [709,"","SHIP CONSTRUCTION TURNKEY","Monaghan","Maple Grove, Smithborough",12,"*N/A","","","","Stage 4 approved in Q3-2017, the scheme is now fully approved.","",""],
    [710,"","SHIP CONSTRUCTION","Monaghan","Bree, Castleblayney",8,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [711,"","SHIP CONSTRUCTION","Monaghan","Latlorcan, Monaghan Town",43,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [712,"","SHIP CONSTRUCTION","Monaghan","Davy's & Adjacent Porperty, Fermanagh St., Clones",3,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [713,"","SHIP CONSTRUCTION","Monaghan","Boyle Sports Site, Fermanagh St., Clones",3,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [714,"","SHIP CONSTRUCTION","Monaghan","82 & 83 Fermanagh St., Clones",3,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [715,"","SHIP CONSTRUCTION","Monaghan","An Bonnan Bui & Flower Shop, Fermanagh St., Clones",6,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [716,"","SHIP CONSTRUCTION","Monaghan","2a & 3 Analore St., Clones",3,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [717,"","SHIP CONSTRUCTION","Monaghan","Abbey Gatehouse, Analore St., Clones",3,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [718,"","CAS CONSTRUCTION","Monaghan","Drumillard, Castleblayney (Phase 2)",2,"Castleblayney Care Housing Association Ltd","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [719,"","CAS CONSTRUCTION","Monaghan","Liseggerton, Clones",16,"Oaklee Housing Trust","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [720,"","CAS CONSTRUCTION","Monaghan","Convent Lands, Carrickmacross",7,"Respond","","","","","","Q2-2017"],
    [721,"","CALF CONSTRUCTION TURNKEY","Monaghan","Kingscourt Road, Carrickmacross, Co. Monaghan",50,"Respond!","","","","","Q3-2017",""],
    [722,"","CALF CONSTRUCTION TURNKEY","Monaghan","Magheross, Carrickmacross *",33,"Tath Housing Association","","","","","Q2-2017",""],
    [723,"","CALF CONSTRUCTION","Monaghan","Liseggerton Road, Clones",6,"Oaklee Housing Trust","","","","","Q2-2017",""],
    [724,"","SHIP CONSTRUCTION TURNKEY","Offaly","McGregol, Birr",12,"*N/A","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [725,"","SHIP CONSTRUCTION TURNKEY","Offaly","Mill Race, Ferbane",5,"*N/A","","","","","","Q4-2017"],
    [726,"","SHIP CONSTRUCTION TURNKEY","Offaly","Cluain na Spideoga, Cloghan",6,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [727,"","SHIP CONSTRUCTION TURNKEY","Offaly","Coolagarry, Walsh Island, ",4,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [728,"","SHIP CONSTRUCTION","Offaly","Chancery Lane, Tullamore",18,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [729,"","SHIP CONSTRUCTION","Offaly","Circular Road, Daingean",7,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [730,"","SHIP CONSTRUCTION","Offaly","Kylebeg, Banagher (Phase 2)",18,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [731,"","SHIP CONSTRUCTION","Offaly","Blundell Wood, Edenderry",33,"*N/A","","","","","Q4-2017",""],
    [732,"","CAS CONSTRUCTION","Offaly","Mountbolus",4,"Mid Offaly Housing Association Ltd","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [733,"","CAS CONSTRUCTION","Offaly","Killane Drive, Edenderry",2,"Tath Housing Association","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [734,"","CAS CONSTRUCTION","Offaly","Scurragh, Birr",6,"Cluid Housing Association","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [735,"","CAS CONSTRUCTION","Offaly","Clonminch, Tullamore",20,"Oaklee Housing Trust","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [736,"","CALF CONSTRUCTION","Offaly","Kearney's Field, Tullamore",53,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q1-2017","",""],
    [737,"","CALF CONSTRUCTION","Offaly","Killane Drive, Edenderry",25,"Tath Housing Association","","","","Scheme approved for CALF funding Q2-2017","",""],
    [738,"","SHIP CONSTRUCTION TURNKEY","Roscommon","Monksland, Athlone",10,"*N/A","","","","","Q1-2017",""],
    [739,"","SHIP CONSTRUCTION TURNKEY","Roscommon","Station Road, Termon, Boyle",10,"*N/A","","","","","Q1-2018",""],
    [740,"","SHIP CONSTRUCTION TURNKEY","Roscommon","Silveroe Meadows, Boyle",12,"*N/A","Stage 1 approved in Q2-2017, outline design and costs are now being prepared.","","","","",""],
    [741,"","SHIP CONSTRUCTION","Roscommon","Cloonfad",2,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [742,"","SHIP CONSTRUCTION","Roscommon","Greenfields, Blackstick Road, Roscommon Town",6,"*N/A","","","","","","Q3-2017"],
    [743,"","SHIP CONSTRUCTION","Roscommon","River Oaks, Ballaghaderreen",10,"*N/A","","","","","","Q4-2017"],
    [744,"","CALF CONSTRUCTION TURNKEY","Roscommon","Monksfield, Bealnamulla, Athlone",40,"Cluid Housing Association","","","","","Q3-2017",""],
    [745,"","CALF CONSTRUCTION TURNKEY","Roscommon","Monksfield Park, Tuam Road, Athlone",13,"Cluid Housing Association","","","","","Q1-2016",""],
    [746,"","CALF CONSTRUCTION TURNKEY","Roscommon","River Oaks, Kilcolman, Ballaghaderreen",12,"Respond!","","","","","","Q1-2018"],
    [747,"","SHIP CONSTRUCTION","Sligo","Colloney",15,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [748,"","SHIP CONSTRUCTION","Sligo","Knappagh Road",28,"*N/A","","Stage 2 approved in Q3-2016, full design/tender being prepared.","","","",""],
    [749,"","SHIP CONSTRUCTION","Sligo","Caltragh, Culleens",1,"*N/A","","","","","Q1-2018",""],
    [750,"","SHIP CONSTRUCTION","Sligo","Carrowbunnaun, Strandhill",20,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [751,"","SHIP CONSTRUCTION","Sligo","Fr. Flanagan Terrace (2)",14,"*N/A","","","","","Q1-2017",""],
    [752,"","SHIP CONSTRUCTION","Sligo","Daghloonagh, Keash - SRD",1,"*N/A","","","","","","Q4-2016"],
    [753,"","SHIP CONSTRUCTION","Sligo","Rosses Point",14,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [754,"","SHIP CONSTRUCTION","Sligo","Fr. Flanagan Terrace (1)",8,"*N/A","","","","","","Q4-2017"],
    [755,"","SHIP CONSTRUCTION","Sligo","Connolly Park, Tubbercurry",10,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [756,"","CAS CONSTRUCTION","Sligo","Cuan Iosa, Ballymote",8,"Society of Saint Vincent de Paul","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [757,"","SHIP CONSTRUCTION RAPID","South Dublin","Killininny Road, Firhouse (Old Mill, Old Bawn)",24,"*N/A","","","","","Q1-2018",""],
    [758,"","SHIP CONSTRUCTION RAPID","South Dublin","St Cuthbert's, Clondalkin",63,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [759,"","SHIP CONSTRUCTION RAPID","South Dublin","St Aidan's,  Brookfield, Tallaght (Phase 1)",47,"*N/A","","","","","Q3-2017",""],
    [760,"","SHIP CONSTRUCTION RAPID","South Dublin","St. Aidan's Brookfield, Tallaght (Phase 2)",38,"*N/A","","","","","Q3-2017",""],
    [761,"","SHIP CONSTRUCTION","South Dublin","Belgard Road, Tallaght",3,"*N/A","","","","","","Q1-2016"],
    [762,"","SHIP CONSTRUCTION","South Dublin","Killinarden, Tallaght",27,"*N/A","","","","","Q3-2017",""],
    [763,"","SHIP CONSTRUCTION","South Dublin","Letts Field, Neilstown, Clondalkin",37,"*N/A","","","","","Q3-2017",""],
    [764,"","SHIP CONSTRUCTION","South Dublin","Ballyboden,  Rathfarnham",40,"*N/A","","","","","Q3-2017",""],
    [765,"","SHIP CONSTRUCTION","South Dublin","Dromcarra, Tallaght",14,"*N/A","","","","","Q2-2017",""],
    [766,"","SHIP CONSTRUCTION","South Dublin","Fortunestown (MacUilliam)",28,"*N/A","","","","","Q2-2017",""],
    [767,"","SHIP CONSTRUCTION","South Dublin","Mayfield Estate, Clondalkin",17,"*N/A","","","","","Q1-2017",""],
    [768,"","SHIP CONSTRUCTION","South Dublin","St Marks Green, Clondalkin",11,"*N/A","","","","","Q2-2017",""],
    [769,"","SHIP CONSTRUCTION","South Dublin","Balgaddy F",50,"*N/A","Stage 1 approved in Q1-2015, outline design and costs are now being prepared.","","","","",""],
    [770,"","SHIP CONSTRUCTION","South Dublin","St Finians",2,"*N/A","","","","","","Q3-2016"],
    [771,"","SHIP CONSTRUCTION","South Dublin","Suncroft, Tallaght",10,"*N/A","","","","","","Q4-2016"],
    [772,"","PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","South Dublin","Corkage Grange (part of Kilcarbery)",109,"*N/A","","","Q1 2018","","",""],
    [773,"","CAS CONSTRUCTION","South Dublin","Collinstown Grove, Clondalkin",4,"Tath Housing Association","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [774,"","CAS CONSTRUCTION","South Dublin","Old Nangor Road, Clondalkin",10,"Simon Community : Dublin Simon","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [775,"","CALF CONSTRUCTION TURNKEY","South Dublin","Elder Heath, Kiltipper Road, Tallaght, Dublin 24 phase 1 *",18,"Cluid Housing Association","","","","","","Q1-2018"],
    [776,"","CALF CONSTRUCTION TURNKEY","South Dublin","Elder Heath, Kiltipper Road, Tallaght, Dublin 24 phase 2",10,"Cluid Housing Association","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [777,"","CALF CONSTRUCTION TURNKEY","South Dublin","Milford Manor, Clondalkin - Phase 1",25,"Cluid Housing Association","","","","","","Q1-2017"],
    [778,"","CALF CONSTRUCTION TURNKEY","South Dublin","Milford Manor, Clondalkin",25,"Cluid Housing Association","","","","","Q1-2017",""],
    [779,"","CALF CONSTRUCTION TURNKEY","South Dublin","New Bancroft, Tallaght, Dublin 24*",16,"Cluid Housing Association","","","","","","Q4-2017"],
    [780,"","CALF CONSTRUCTION TURNKEY","South Dublin","Milford Manor, Clondalkin - Final Phase ",15,"Cluid Housing Association","","","","","","Q3-2017"],
    [781,"","CALF CONSTRUCTION TURNKEY","South Dublin","Dodderbrook, Oldcourt Road, Ballycullen, Dublin 24 *",14,"Cluid Housing Association","","","","","","Q1-2018"],
    [782,"","CALF CONSTRUCTION TURNKEY","South Dublin","Broadfield Grove, Rathcoole-phase 1 *",10,"Oaklee Housing Trust","","","","","","Q3-2017"],
    [783,"","CALF CONSTRUCTION TURNKEY","South Dublin","Old Nangor Road, Clondalkin, Dublin 22",7,"Clanmil Housing Association","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [784,"","CALF CONSTRUCTION TURNKEY","South Dublin","Scholarstown Wood (Houses) *Phase 2 ",5,"Circle Voluntary Housing Association","","","","","Q3-2017",""],
    [785,"","CALF CONSTRUCTION TURNKEY","South Dublin","Broadfield Grove, Rathcoole - final phase *",4,"Oaklee Housing Trust","","","","","","Q3-2017"],
    [786,"","CALF CONSTRUCTION TURNKEY","South Dublin","Moyglas Glade, Lucan, Co Dublin*",1,"Respond!","","","","","","Q2-2017"],
    [787,"","CALF CONSTRUCTION TURNKEY","South Dublin","Palmerstown Way, Clondalkin *",6,"Circle Voluntary Housing Association","","","","Scheme approved for CALF funding Q1-2018","",""],
    [788,"","CALF CONSTRUCTION","South Dublin","Westpark, Garters Lane, Saggert, Co Dublin ",84,"Cluid Housing Association","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [789,"","CALF CONSTRUCTION","South Dublin","Scholarstown Wood (Apts)",6,"Circle Voluntary Housing Association","","","","","Q3-2017",""],
    [790,"","CALF CONSTRUCTION","South Dublin","Station Road, Clondalkin",5,"Respond!","","","","","","Q3-2017"],
    [791,"","CALF CONSTRUCTION","South Dublin","Scholarstown Wood (Houses) * Phase 1",3,"Circle Voluntary Housing Association","","","","","","Q4-2017"],
    [792,"","CALF CONSTRUCTION","South Dublin","Tullyhall, Lucan - Phase 1 *",2,"Tath Housing Association","","","","","","Q3-2017"],
    [793,"","CALF CONSTRUCTION","South Dublin","Tullyhall, Lucan - Final Phase*",2,"Tath Housing Association","","","","","Q2-2017",""],
    [794,"","CALF CONSTRUCTION","South Dublin","1 Hollyville Terrace, Palmerstown, Dublin",2,"Cluid Housing Association","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [795,"","SHIP CONSTRUCTION","Tipperary","Ard na Greine, Clonmel",2,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [796,"","SHIP CONSTRUCTION","Tipperary","Knockanrawley",28,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [797,"","SHIP CONSTRUCTION","Tipperary","Mill Road, Thurles",27,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [798,"","SHIP CONSTRUCTION","Tipperary","Mulkear View, Newport",9,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [799,"","SHIP CONSTRUCTION","Tipperary","Treacy Park, Carrick on Suir",1,"*N/A","","","Stage 3 approved in Q1-2017, the scheme is now being tendered.","","",""],
    [800,"","SHIP CONSTRUCTION","Tipperary","Templetouhy",6,"*N/A","Stage 1 approved in Q1-2016, outline design and costs are now being prepared.","","","","",""],
    [801,"","SHIP CONSTRUCTION","Tipperary","Borrisoleigh",12,"*N/A","Stage 1 approved in Q1-2016, outline design and costs are now being prepared.","","","","",""],
    [802,"","SHIP CONSTRUCTION","Tipperary","Killeanaule Road, Fethard",10,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [803,"","SHIP CONSTRUCTION","Tipperary","Abbey Street, Cahir",11,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [804,"","SHIP CONSTRUCTION","Tipperary","Borrisokane",16,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [805,"","SHIP CONSTRUCTION","Tipperary","Portroe, Nenagh",18,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [806,"","SHIP CONSTRUCTION","Tipperary","Cloughjordan",2,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [807,"","SHIP CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",26,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [808,"","SHIP CONSTRUCTION","Tipperary","Gortataggart, Thurles",2,"*N/A","","","Stage 3 approved in Q4-2015, the scheme is now being tendered.","","",""],
    [809,"","SHIP CONSTRUCTION","Tipperary","Kilcooly Way, Gortnahoe",5,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [810,"","SHIP CONSTRUCTION","Tipperary","Lacey Avenue, Templemore",3,"*N/A","","","","","","Q3-2016"],
    [811,"","SHIP CONSTRUCTION","Tipperary","Mitchel St., Thurles",1,"*N/A","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [812,"","SHIP CONSTRUCTION","Tipperary","Glencarrick, Roscrea",30,"*N/A","Stage 1 approved in Q2-2015, outline design and costs are now being prepared.","","","","",""],
    [813,"","SHIP CONSTRUCTION","Tipperary","Borrisoleigh",2,"*N/A","","","","","","Q4-2016"],
    [814,"","SHIP CONSTRUCTION","Tipperary","Lower Ballingarry",1,"*N/A","","","","","","Q2-2016"],
    [815,"","SHIP CONSTRUCTION","Tipperary","Poulamaleen, Faugheen",1,"*N/A","","","","","","Q2-2016"],
    [816,"","SHIP CONSTRUCTION","Tipperary","Cormack Drive, Nenagh",19,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [817,"","SHIP CONSTRUCTION","Tipperary","Lacey Avenue, Templemore",1,"*N/A","","","","","","Q3-2017"],
    [818,"","CAS CONSTRUCTION","Tipperary","Ballinagrana, Carrick on Suir",3,"Camphill Communities of Ireland","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [819,"","CAS CONSTRUCTION","Tipperary","Castle Street, Carrick on Suir",1,"Camphill Communities of Ireland","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [820,"","CAS CONSTRUCTION","Tipperary","The Strand, Carrick on Suir",3,"Camphill Communities of Ireland","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [821,"","CAS CONSTRUCTION","Tipperary","Fethard",4,"Belmont Park Housing Association Ltd","Stage 1 approved in Q3-2015, outline design and costs are now being prepared.","","","","",""],
    [822,"","CAS CONSTRUCTION","Tipperary","Glenconnor Road, Clonmel",9,"Cluid Housing Association","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [823,"","CAS CONSTRUCTION","Tipperary","Stanwix House, Kickham Street, Thurles",19,"Thurles Lions Trust Housing Assoc.","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [824,"","CALF CONSTRUCTION TURNKEY","Tipperary","Ashgrove, Monadreen, Thurles, Co Tipperary ",19,"Co-operative Housing Ireland","","","","Scheme approved for CALF funding Q4-2017 ","",""],
    [825,"","CALF CONSTRUCTION","Tipperary","Ashbury, Roscrea",12,"Cluid Housing Association","","","","","","Q2-2017"],
    [826,"","SHIP CONSTRUCTION TURNKEY","Waterford","Kilrush, Dungarvan",39,"*N/A","","","","","Q3-2017",""],
    [827,"","SHIP CONSTRUCTION TURNKEY","Waterford","Gibbethill, Gracedieu",5,"*N/A","","","","","Q3-2017",""],
    [828,"","SHIP CONSTRUCTION TURNKEY","Waterford","Carrickphierish, Gracedieu, Waterford",31,"*N/A","","","","","Q4-2017",""],
    [829,"","SHIP CONSTRUCTION TURNKEY","Waterford","Shandon, Dungarvan",5,"*N/A","","","","","Q4-2017",""],
    [830,"","SHIP CONSTRUCTION TURNKEY","Waterford","Airport Road, Waterford City",33,"*N/A","","","","","Q1-2018",""],
    [831,"","SHIP CONSTRUCTION","Waterford","An Garran, Crobally Upper, Tramore",50,"*N/A","","","","","Q4-2017",""],
    [832,"","SHIP CONSTRUCTION","Waterford","Alms Houses, Tallow",4,"*N/A","","","","","Q4-2017",""],
    [833,"","SHIP CONSTRUCTION","Waterford","Ballinroad, Dungarvan",21,"*N/A","","","","","Q4-2017",""],
    [834,"","SHIP CONSTRUCTION","Waterford","Barrack Street, Cappoquin",4,"*N/A","","","","","","Q4-2017"],
    [835,"","SHIP CONSTRUCTION","Waterford","Coolfin Woods, Portlaw",12,"*N/A","","","","","Q4-2017",""],
    [836,"","SHIP CONSTRUCTION","Waterford","Larchville, Waterford City",5,"*N/A","","","","Stage 4 approved in Q4-2017, the scheme is now fully approved.","",""],
    [837,"","SHIP CONSTRUCTION","Waterford","Patrick Street, Tramore",2,"*N/A","","","","","Q3-2017",""],
    [838,"","SHIP CONSTRUCTION","Waterford","Doyle Street, Waterford City",4,"*N/A","","","","","Q4-2017",""],
    [839,"","SHIP CONSTRUCTION","Waterford","Old Cinema Site, Dungarvan",15,"*N/A","","","","","","Q4-2016"],
    [840,"","SHIP CONSTRUCTION","Waterford","Lower Yellow Road, Waterford",8,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [841,"","SHIP CONSTRUCTION","Waterford","The Glen, Bridge St, Waterford",11,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [842,"","SHIP CONSTRUCTION","Waterford","Clarendon Court, Penrose Lane, Waterford",24,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [843,"","CAS CONSTRUCTION","Waterford","Convent Hill, Tramore",10,"Society of Saint Vincent de Paul","","","","","","Q1-2017"],
    [844,"","CAS CONSTRUCTION","Waterford","Powersfield, Hennessys Road, Waterford",3,"Focus Ireland","","","","","Q4-2017",""],
    [845,"","CAS CONSTRUCTION","Waterford","Wadding Manor, Ferrybank",10,"Respond","","","","","Q4-2017",""],
    [846,"","CAS CONSTRUCTION","Waterford","Gleann Ealach, Dunhill",8,"Gleann Ealach Housing Association","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [847,"","CAS CONSTRUCTION","Waterford","Ballycarnane, Tramore",18,"Tramore Voluntary Housing Association","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [848,"","CAS CONSTRUCTION","Waterford","The Paddocks, Williamstown Rd. Waterford",4,"Anvers Housing Association Ltd","","","","","Q4-2017",""],
    [849,"","CALF CONSTRUCTION TURNKEY","Waterford","Estuary Heights, Shandon Road, Dungarvan",20,"Co-operative Housing Ireland","","","","","Q1-2017",""],
    [850,"","CALF CONSTRUCTION","Waterford","St Johns College, Waterford",36,"Respond!","","","","","","Q1-2016"],
    [851,"","SHIP CONSTRUCTION TURNKEY","Westmeath","Belvedere Hills, Mullingar",21,"*N/A","","","","","","Q4-2017"],
    [852,"","SHIP CONSTRUCTION","Westmeath","St. Laurence's Terrace, Mullingar",9,"*N/A","","","","","Q2-2017",""],
    [853,"","SHIP CONSTRUCTION","Westmeath","16 Ennell Court",1,"*N/A","","","","","","Q1-2018"],
    [854,"","SHIP CONSTRUCTION","Westmeath","Clonbrusk, Athlone (Arcadia) - Site No. 2",33,"*N/A","","","Stage 3 approved in Q2-2017, the scheme is now being tendered.","","",""],
    [855,"","SHIP CONSTRUCTION","Westmeath","Ennell Court (Phase 2)",3,"*N/A","","","","","","Q2-2016"],
    [856,"","SHIP CONSTRUCTION","Westmeath","Grange Crescent, Mullingar",2,"*N/A","","","","","","Q1-2016"],
    [857,"","SHIP CONSTRUCTION","Westmeath","Ennell Court (Phase 3)",32,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [858,"","SHIP CONSTRUCTION","Westmeath","Cloghanboy, Athlone",10,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [859,"","SHIP CONSTRUCTION","Westmeath","Bishopsgate, Mullingar",4,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [860,"","CAS CONSTRUCTION","Westmeath","Farran, Mullingar",4,"Tath Housing Association","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [861,"","CALF CONSTRUCTION TURNKEY","Westmeath","Rahanine, Rochfortbridge, Co Westmeath*",12,"Tath Housing Association","","","","Scheme approved for CALF funding Q4-2017 ","",""],
    [862,"","CALF CONSTRUCTION TURNKEY","Westmeath","Cluain Mullen, Castlepollard",2,"Tath Housing Association","","","","","","Q2-2017"],
    [863,"","SHIP CONSTRUCTION TURNKEY","Wexford","Madeira Oaks, Wexford",8,"*N/A","","","","","","Q3-2017"],
    [864,"","SHIP CONSTRUCTION TURNKEY","Wexford","Gleann an Ghairdin (Phase 1), Ballytegan Road, Gorey",8,"*N/A","","","","","","Q1-2018"],
    [865,"","SHIP CONSTRUCTION TURNKEY","Wexford","Gleann an Ghairdin (Phase 2), Ballytegan Road, Gorey",14,"*N/A","","","","","Q1-2018",""],
    [866,"","SHIP CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock, Wexford",35,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [867,"","SHIP CONSTRUCTION","Wexford","Belvedere Road, Wexford",7,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [868,"","SHIP CONSTRUCTION","Wexford","SN Castlemoyle, New Ross",1,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [869,"","SHIP CONSTRUCTION","Wexford","King Street, Wexford",3,"*N/A","Stage 1 approved in Q3-2017, outline design and costs are now being prepared.","","","","",""],
    [870,"","SHIP CONSTRUCTION","Wexford","Cloghultagh, Taghmon",18,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [871,"","SHIP CONSTRUCTION","Wexford","Carricklawn, Coolcots, Wexford",14,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [872,"","SHIP CONSTRUCTION","Wexford","Coolcotts, Clonard",7,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [873,"","SHIP CONSTRUCTION","Wexford","Creagh, Gorey",10,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [874,"","SHIP CONSTRUCTION","Wexford","Danescastle",12,"*N/A","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [875,"","SHIP CONSTRUCTION","Wexford","Slippery Green, Wexford",10,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [876,"","SHIP CONSTRUCTION","Wexford","Whiterock Hill, Wexford",45,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [877,"","SHIP CONSTRUCTION","Wexford","Cois Mara",2,"*N/A","","","","","Q4-2017",""],
    [878,"","SHIP CONSTRUCTION","Wexford","Killeens, Wexford",34,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [879,"","SHIP CONSTRUCTION","Wexford","Oylegate",2,"*N/A","","","","","Q1-2017",""],
    [880,"","SHIP CONSTRUCTION","Wexford","Cherryorchard, Enniscorthy",8,"*N/A","","","","","Q3-2017",""],
    [881,"","SHIP CONSTRUCTION","Wexford","Clonard, Wexford",26,"*N/A","Stage 1 approved in Q1-2016, outline design and costs are now being prepared.","","","","",""],
    [882,"","SHIP CONSTRUCTION","Wexford","Ross Road, Enniscorthy",1,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [883,"","SHIP CONSTRUCTION","Wexford","Baile Eoghain, Gorey",9,"*N/A","","","","","Q4-2017",""],
    [884,"","SHIP CONSTRUCTION","Wexford","Baile an Tr, Riverchapel (Courtown Ardamine)",10,"*N/A","","","","","","Q2-2016"],
    [885,"","SHIP CONSTRUCTION","Wexford","Shanna Court, Coolcotts",8,"*N/A","","","","","","Q1-2016"],
    [886,"","SHIP CONSTRUCTION","Wexford","Francis Street, Wexford",1,"*N/A","","","","","","Q1-2017"],
    [887,"","SHIP CONSTRUCTION","Wexford","Commodore Barry",1,"*N/A","","","","","","Q2-2016"],
    [888,"","SHIP CONSTRUCTION","Wexford","Glentire, The Ballagh, Enniscorthy",6,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [889,"","SHIP CONSTRUCTION","Wexford","Ballywish, Castlebridge",11,"*N/A","Stage 1 approved in Q4-2017, outline design and costs are now being prepared.","","","","",""],
    [890,"","SHIP CONSTRUCTION","Wexford","Rosetown, Rosslare, Co Wexford",43,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [891,"","SHIP CONSTRUCTION","Wexford","Carley's Bridge, Enniscorthy, Co Wexford",17,"*N/A","Stage 1 approved in Q1-2018, outline design and costs are now being prepared.","","","","",""],
    [892,"","CAS CONSTRUCTION","Wexford","Barrystown",16,"Grantstown Voluntary Housing Association Ltd","","","Stage 3 approved in Q4-2017, the scheme is now being tendered.","","",""],
    [893,"","CAS CONSTRUCTION","Wexford","Westlands, Wexford",7,"Respond","","","","","Q4-2017",""],
    [894,"","CAS CONSTRUCTION","Wexford","Rathangan",7,"Rathangan Senior Citizens Housing Association Ltd","","","","","","Q3-2017"],
    [895,"","CALF CONSTRUCTION TURNKEY","Wexford","Enniscorthy",40,"Oaklee Housing Trust","","","","","Q3-2017",""],
    [896,"","CALF CONSTRUCTION TURNKEY","Wexford","Wexford",28,"Oaklee Housing Trust","","","","Scheme approved for CALF funding Q4-2016","",""],
    [897,"","CALF CONSTRUCTION TURNKEY","Wexford"," Hunters Green, Gorey - Phase 1",18,"Co operative Ireland","","","","","","Q2-2016"],
    [898,"","CALF CONSTRUCTION TURNKEY","Wexford","Hunters Green, Gorey - Phase 2",11,"Co operative Ireland","","","","","","Q1-2017"],
    [899,"","CALF CONSTRUCTION TURNKEY","Wexford","Ballyboggan, Castlebridge",10,"Co-operative Housing Ireland","","","","","Q4-2017",""],
    [900,"","CALF CONSTRUCTION TURNKEY","Wexford","Hunters Green, Gorey - Phase 3",9,"Co operative Ireland","","","","","","Q4-2017"],
    [901,"","CALF CONSTRUCTION TURNKEY","Wexford","Ard Uisce, Whiterock, Wexford*",6,"Tath Housing Association","","","","","","Q1-2017"],
    [902,"","CALF CONSTRUCTION TURNKEY","Wexford","6 units Ard uisce, Whiterock, Wexford ",6,"Tath Housing Association","","","","","","Q1-2018"],
    [903,"","CALF CONSTRUCTION TURNKEY","Wexford","5 units Ard Uisce, Whiterock",5,"Tath Housing Association","","","","","","Q4-2017"],
    [904,"","CALF CONSTRUCTION TURNKEY","Wexford","1 unit Ard Uisce, Whiterock, Wexford",1,"Tath Housing Association","","","","","","Q1-2018"],
    [905,"","CALF CONSTRUCTION","Wexford","Meadowfields ",12,"Co operative Ireland","","","","","","Q3-2016"],
    [906,"","SHIP CONSTRUCTION TURNKEY","Wicklow","Mill Court, Tinahely",4,"*N/A","","Stage 2 approved in Q1-2018, full design/tender being prepared.","","","",""],
    [907,"","SHIP CONSTRUCTION","Wicklow","Emoclew Road, Arklow (Phase 3)",21,"*N/A","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [908,"","SHIP CONSTRUCTION","Wicklow","10A Castle Villas, Greystones",1,"*N/A","","","Stage 3 approved in Q1-2018, the scheme is now being tendered.","","",""],
    [909,"","SHIP CONSTRUCTION","Wicklow","Ard Na Mara, Kilcoole",2,"*N/A","","","Stage 3 approved in Q3-2017, the scheme is now being tendered.","","",""],
    [910,"","SHIP CONSTRUCTION","Wicklow","Druids Brook, Kilcoole",2,"*N/A","","Stage 2 approved in Q4-2016, full design/tender being prepared.","","","",""],
    [911,"","SHIP CONSTRUCTION","Wicklow","Emoclew Road, Arklow (Phase 1)",17,"*N/A","","","","","Q4-2017",""],
    [912,"","SHIP CONSTRUCTION","Wicklow","Emoclew Road, Arklow (Phase 2)",26,"*N/A","","Stage 2 approved in Q2-2017, full design/tender being prepared.","","","",""],
    [913,"","SHIP CONSTRUCTION","Wicklow","FCA Hall, Wicklow Town",8,"*N/A","","Stage 2 approved in Q4-2016, full design/tender being prepared.","","","",""],
    [914,"","SHIP CONSTRUCTION","Wicklow","Kilmantain Place, Bray",4,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [915,"","SHIP CONSTRUCTION","Wicklow","O'Byrne Road, Bray",1,"*N/A","","","","","Q4-2017",""],
    [916,"","SHIP CONSTRUCTION","Wicklow","Old Library, Arklow",7,"*N/A","","","","","Q1-2018",""],
    [917,"","SHIP CONSTRUCTION","Wicklow","Sugarloaf View, Kilmacanogue",20,"*N/A","","Stage 2 approved in Q1-2017, full design/tender being prepared.","","","",""],
    [918,"","SHIP CONSTRUCTION","Wicklow","Avondale Heights, Rathdrum (Phase 2)",20,"*N/A","","","","","Q3-2017",""],
    [919,"","SHIP CONSTRUCTION","Wicklow","Kilbride Lane, Bray (Murphy's Lands)",42,"*N/A","","","","Stage 4 approved in Q1-2018, the scheme is now fully approved.","",""],
    [920,"","SHIP CONSTRUCTION","Wicklow","16A Oak Drive, Blessington",1,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [921,"","SHIP CONSTRUCTION","Wicklow","Carrig Eden,1 Marine Road, Greystones",30,"*N/A","Stage 1 approved in Q1-2017, outline design and costs are now being prepared.","","","","",""],
    [922,"","SHIP CONSTRUCTION","Wicklow","Farrankelly, Greystones (Phase 2)",24,"*N/A","","Stage 2 approved in Q4-2017, full design/tender being prepared.","","","",""],
    [923,"","PUBLIC PRIVATE PARTNERSHIP (Bundle 1)","Wicklow","Convent Lands",51,"*N/A","","","Q1 2018","","",""],
    [924,"","CAS CONSTRUCTION","Wicklow","Lathaleer, Baltinglass",5,"KARE Promoting Inclusion for People with Intellectual Disabilities","","Stage 2 approved in Q3-2017, full design/tender being prepared.","","","",""],
    [925,"","CALF CONSTRUCTION TURNKEY","Wicklow","Bollarney North, Wicklow Town, Wicklow",32,"Tath Housing Association","","","","Scheme approved for CALF Funding Q3-2017","",""],
    [926,"","CALF CONSTRUCTION TURNKEY","Wicklow","The Meadows, Ballynerrin, Wicklow Town",7,"Tath Housing Association","","","","Scheme approved for CALF Funding Q4-2017","",""],
    [927,"","CALF CONSTRUCTION TURNKEY","Wicklow","Abbey St, Wicklow",6,"Tath Housing Association","","","","","Q2-2017",""],
    [928,"","CALF CONSTRUCTION TURNKEY","Wicklow","Vale Road, Arklow, Co.  Wicklow",34,"Co-operative Housing Ireland","","","","Scheme approved for CALF Funding Q1-2018","",""],
    [929,"","CALF CONSTRUCTION TURNKEY","Wicklow","Glenheron, Greystones, Co.  Wicklow",5,"Tath Housing Association","","","","Scheme approved for CALF Funding Q1-2018","",""],
    [930,"","CALF CONSTRUCTION","Wicklow","St Ernan's View, Merrymeeting, Rathnew",45,"Cluid Housing Association","","","","Scheme approved for CALF funding Q1-2018 ","",""]
]}