﻿_id	No_	Funding Programme	LA	Scheme/Project Name	No_ of Units	Approved Housing Body	Stage 1 Capital Appraisal	Stage 2 Pre Planning	Stage 3 Pre Tender design	Stage 4 Tender Report or Final Turnkey/CALF approval	On Site	Completed
1	1	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	6	*N/A	""	""	""	""	""	Q3-2019
2	2	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	6	*N/A	""	""	""	""	""	Q3-2019
3	3	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	12	*N/A	""	""	""	""	""	Q3-2020
4	4	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	10	*N/A	""	""	""	""	Q4-2017	""
5	5	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	10	*N/A	""	""	""	""	Q4-2017	""
6	6	SHIP CONSTRUCTION TURNKEY	Carlow	Carrigbrook, Tullow Road, Carlow	19	*N/A	""	""	""	""	Q4-2017	""
7	7	SHIP CONSTRUCTION	Carlow	Father Flood Avenue, Rathvilly	8	*N/A	""	""	""	""	""	Q4-2019
8	8	SHIP CONSTRUCTION	Carlow	St. Oliver's Crescent, Myshall	4	*N/A	""	""	""	""	""	Q4-2019
9	9	SHIP CONSTRUCTION	Carlow	St. Mary's Court & Dereen Heights	6	*N/A	""	""	""	""	Q1-2020	""
10	10	SHIP CONSTRUCTION	Carlow	Crowsgrove, Kildavin	1	*N/A	""	""	""	""	""	Q1-2020
11	11	SHIP CONSTRUCTION	Carlow	Ardattin	6	*N/A	""	""	""	""	Q1-2020	""
12	12	SHIP CONSTRUCTION	Carlow	Brownbog, Hackettstown	1	*N/A	""	""	""	""	Q1-2020	""
13	13	SHIP CONSTRUCTION	Carlow	Spahill, Borris, Co. Carlow	1	*N/A	""	""	""	""	Q1-2020	""
14	14	SHIP CONSTRUCTION	Carlow	Rural Ballypierce, Kildavin	1	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
15	15	SHIP CONSTRUCTION	Carlow	The Laurels, Carlow Town	5	*N/A	""	""	""	""	""	Q2-2018
16	16	SHIP CONSTRUCTION	Carlow	Ard na Greine, Tullow	16	*N/A	""	""	""	""	""	Q4-2018
17	17	SHIP CONSTRUCTION	Carlow	Dublin Road, Tullow	21	*N/A	""	""	""	""	""	Q3-2019
18	18	SHIP CONSTRUCTION	Carlow	Bagenalstown	20	*N/A	""	""	""	""	""	Q3-2020
19	19	SHIP CONSTRUCTION	Carlow	Bilboa	2	*N/A	""	""	""	""	""	Q3-2018
20	20	SHIP CONSTRUCTION	Carlow	Slate Row, Hacketstown	4	*N/A	""	""	""	""	""	Q4-2018
21	21	SHIP CONSTRUCTION	Carlow	Mount Leinster Park, Carlow	4	*N/A	""	""	""	""	""	Q4-2017
22	22	SHIP CONSTRUCTION	Carlow	Myshall	4	*N/A	""	""	""	""	""	Q1-2018
23	23	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris	4	*N/A	""	""	""	""	""	Q3-2017
24	24	SHIP CONSTRUCTION	Carlow	Rathvilly	10	*N/A	""	""	""	""	""	Q2-2017
25	25	SHIP CONSTRUCTION	Carlow	Moneybeg, Bagenalstown	24	*N/A	""	""	""	""	""	Q3-2017
26	26	SHIP CONSTRUCTION	Carlow	Paulville, Tullow (SRD)	1	*N/A	""	""	""	""	""	Q3-2017
27	27	SHIP CONSTRUCTION	Carlow	Maryborough St., Carlow	5	*N/A	""	""	""	""	""	Q1-2018
28	28	SHIP CONSTRUCTION	Carlow	Drumin, St. Mullins (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
29	29	SHIP CONSTRUCTION	Carlow	Pound Lane, Borris, Co. Carlow	9	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
30	30	SHIP CONSTRUCTION	Carlow	Barrack Street, carlow	7	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
31	31	CAS CONSTRUCTION TURNKEY	Carlow	Pollerton Big, Carlow	6	Tintean Housing Association Ltd	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
32	32	CAS CONSTRUCTION	Carlow	Gleann na Bearu, Royal Oak Road, Bagenalstown	6	Respond	""	""	Stage 3 approved Q4-2017, the scheme is now approved to proceed to tender.	""	""	""
33	33	CAS CONSTRUCTION	Carlow	Ballincarrig, Wexford Road	6	Tintean Housing Association Ltd	""	""	""	""	""	Q4-2016
34	34	CAS CONSTRUCTION	Carlow	Homefield, Blackbog Road, Carlow	3	Carlow Voluntary Housing Association	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
35	35	CALF TURNKEY	Carlow	7 units, Rivercourt, Carlow (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
36	36	CALF TURNKEY	Carlow	7 units, Rivercourt, Carlow (Phase 2)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
37	37	CALF TURNKEY	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 1)	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
38	38	CALF TURNKEY	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 2)	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
39	39	CALF TURNKEY	Carlow	Ballickmoyler, Graigcullen, Carlow (Phase 3)	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
40	40	CALF TURNKEY	Carlow	Barrett Street, Bagnalstown, Co. Carlow (Phase 1)	10	Tintean Housing Association Ltd	""	""	""	""	""	Q1-2018
41	41	CALF TURNKEY	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 1)	15	Tath Housing Association	""	""	""	""	""	Q4-2018
42	42	CALF TURNKEY	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 2)	12	Tath Housing Association	""	""	""	""	""	Q2-2019
43	43	CALF TURNKEY	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q2-2019
44	44	CALF TURNKEY	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 4)	6	Tath Housing Association	""	""	""	""	""	Q3-2019
45	45	CALF TURNKEY	Carlow	Browneshill Rise, Browneshill Road, Chapelstown, Carlow (Phase 5)	16	Tath Housing Association	""	""	""	""	""	Q4-2019
46	46	CALF TURNKEY	Carlow	Browneshill Wood, Browneshill Road, Chapelstown, Carlow (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2018
47	47	CALF TURNKEY	Carlow	Greenhills, Leighlin Road, Graiguecullen, Carlow (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
48	48	CALF TURNKEY	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 1)	3	Tath Housing Association	""	""	""	""	Q4-2019	""
49	49	CALF TURNKEY	Carlow	Mill Race, Paupish Lane, Carlow, Co. Carlow (Phase 2)	6	Tath Housing Association	""	""	""	""	Q4-2019	""
50	50	CALF TURNKEY	Carlow	Rivercourt,  Carlow  (Phase 1)*	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
51	51	CALF TURNKEY	Carlow	Rivercourt,  Carlow  (Phase 2)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
52	52	CALF TURNKEY	Carlow	Rivercourt,  Carlow  (Phase 3)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
53	53	CALF TURNKEY	Carlow	Rivercourt,  Carlow  (Phase 4)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
54	54	CALF TURNKEY	Carlow	Rivercourt,  Carlow  (Phase 5)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
55	55	CALF TURNKEY	Carlow	Sleaty Street, Graigcullen, Carlow  (Phase 1)	26	Cluid Housing	""	""	""	""	""	Q1-2019
56	56	CALF TURNKEY	Carlow	Tanner Hall, Athy Road, Carlow (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2007	""
57	57	CALF TURNKEY	Carlow	The Millrace, Burrin, Co. Carlow (Phase 1)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
58	58	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff	3	*N/A	""	""	""	""	""	Q4-2019
59	59	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2020
60	60	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 3)	3	*N/A	""	""	""	""	Q2-2019	""
61	61	SHIP CONSTRUCTION TURNKEY	Cavan	Ashgrove, Derrylurgan, Ballyjamesduff (Phase 4)	4	*N/A	""	""	""	""	Q2-2019	""
62	62	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff 	4	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
63	63	SHIP CONSTRUCTION TURNKEY	Cavan	Woodsland, Killyfinla, Ballyjamesduff	8	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
64	64	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
65	65	SHIP CONSTRUCTION TURNKEY	Cavan	Woodlands, Killyfinla, Ballyjamesduff	10	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
66	66	SHIP CONSTRUCTION TURNKEY	Cavan	Lakeland Close, Swellan, Cavan Town	2	*N/A	""	""	""	""	Q1-2020	""
67	67	SHIP CONSTRUCTION	Cavan	Rosehill, Mullagh (Phase 6)	8	*N/A	""	""	""	""	""	Q1-2019
68	68	SHIP CONSTRUCTION	Cavan	Butlersbridge	4	*N/A	""	""	""	""	""	Q1-2018
69	69	SHIP CONSTRUCTION	Cavan	Woodlands, Ballyhaise	8	*N/A	""	""	""	""	""	Q4-2018
70	70	SHIP CONSTRUCTION	Cavan	Butlersbridge (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
71	71	SHIP CONSTRUCTION	Cavan	Clones Road, Butlersbridge	2	*N/A	""	""	""	""	""	Q3-2020
72	72	SHIP CONSTRUCTION	Cavan	Corstruce, Ballinagh	4	*N/A	""	""	""	""	Q1-2020	""
73	73	SHIP CONSTRUCTION	Cavan	Main Street, Mullagh	19	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
74	74	SHIP CONSTRUCTION	Cavan	Elm Grove, Main St, Cavan Town	13	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
75	75	SHIP CONSTRUCTION	Cavan	Cavan Road, Ballinagh	15	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
76	76	SHIP CONSTRUCTION	Cavan	Main St., Butlersbridge	6	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
77	77	SHIP CONSTRUCTION	Cavan	Cluain Dara, Kingscourt	3	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
78	78	SHIP CONSTRUCTION	Cavan	Magheranure, Cootehill, Co. Cavan	22	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
79	79	SHIP CONSTRUCTION	Cavan	Fairymount Close, Kingscourt, Co. Cavan	3	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
80	80	SHIP CONSTRUCTION	Cavan	St. Bridgets Terrace, Cavan Town (Infill)	12	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
81	81	SHIP CONSTRUCTION	Cavan	Beckscourt, Eastboro, Bailieborough	47	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
82	82	CAS CONSTRUCTION TURNKEY	Cavan	Castlemanor Village, Cavan Town	29	Tath Housing Association Ltd	""	""	""	""	""	Q3-2019
83	83	CAS CONSTRUCTION	Cavan	St. Killian's Housing Association Ltd., Mullagh, Co. Cavan	4	St. Killian's Housing Association, Mullagh, Co. Cavan	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
84	84	CALF TURNKEY	Cavan	16 Units, Fairgreen Park, Mullagh, Co. Cavan (Phase 1)	16	Clanmil Housing Association Ireland	""	""	""	""	Q1-2020	""
85	85	CALF TURNKEY	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 1)	12	Tath Housing Association	""	""	""	Q4-2020	""	""
86	86	CALF TURNKEY	Cavan	25 units, Drumalee Manor, Drumalee, Co. Cavan (Phase 2)	13	Tath Housing Association	""	""	""	Q4-2020	""	""
87	87	CALF TURNKEY	Cavan	Cluain Dara, Kingscourt, Co Cavan (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
88	88	CALF TURNKEY	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q2-2018
89	89	CALF TURNKEY	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 2)	5	Tath Housing Association	""	""	""	""	""	Q3-2018
90	90	CALF TURNKEY	Cavan	Drumalee Manor, Drumalee, Cavan (Phase 3)	2	Tath Housing Association	""	""	""	""	""	Q4-2018
91	91	CALF TURNKEY	Cavan	Rampart View, Virginia, Co. Cavan (Phase 1)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
92	92	CALF TURNKEY	Cavan	Rampart View, Virginia, Co. Cavan (Phase 2)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
93	93	CALF TURNKEY	Cavan	Rampart View, Virginia, Co. Cavan (Phase 3)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2019	""
94	94	CALF TURNKEY	Cavan	Rampart View, Virginia, Co. Cavan (Phase 4)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2019	""
95	95	CALF TURNKEY	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 1)	12	Cluid Housing	""	""	""	""	Q4-2019	""
96	96	CALF TURNKEY	Cavan	The Gallops, Cavan Town, Co. Cavan (Phase 2)*	22	Cluid Housing	""	""	""	""	Q4-2019	""
97	97	SHIP CONSTRUCTION TURNKEY	Clare	River View, School Road, Corofin	2	*N/A	""	""	""	""	""	Q4-2018
98	98	SHIP CONSTRUCTION TURNKEY	Clare	Cloughleigh Road + Shallee Drive, Ennis	4	*N/A	""	""	""	""	Q2-2020	""
99	99	SHIP CONSTRUCTION TURNKEY	Clare	Shantraud Woods, Killaloe	4	*N/A	""	""	""	""	Q3-2020	""
100	100	SHIP CONSTRUCTION	Clare	Cappagh Lodge, Sixmilebridge	2	*N/A	""	""	""	""	Q1-2020	""
101	101	SHIP CONSTRUCTION	Clare	St. Michaels Place, Kilmihil	2	*N/A	""	""	""	""	Q1-2020	""
102	102	SHIP CONSTRUCTION	Clare	Madden's Terrace, Clarecastle	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
103	103	SHIP CONSTRUCTION	Clare	Roslevan, Ennis	8	*N/A	""	""	""	""	""	Q2-2020
104	104	SHIP CONSTRUCTION	Clare	Feakle	13	*N/A	""	""	""	""	""	Q4-2019
105	105	SHIP CONSTRUCTION	Clare	Glor Srutha, Knockbrack Lower, Clonlara	9	*N/A	""	""	""	""	""	Q4-2019
106	106	SHIP CONSTRUCTION	Clare	Seaview Park, Quilty	18	*N/A	""	""	""	""	Q2-2019	""
107	107	SHIP CONSTRUCTION	Clare	Ashline, Kilrush Road, Ennis	40	*N/A	""	""	""	""	Q3-2020	""
108	108	SHIP CONSTRUCTION	Clare	Miltown Malbay	27	*N/A	""	""	""	""	Q3-2020	""
109	109	SHIP CONSTRUCTION	Clare	Doonaun, Tulla	25	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
110	110	SHIP CONSTRUCTION	Clare	Boheraroan, Newmarket-on-Fergus	18	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
111	111	SHIP CONSTRUCTION	Clare	Scariff	18	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
112	112	SHIP CONSTRUCTION	Clare	Kilkee Road, Doonbeg	8	*N/A	""	""	""	""	Q1-2020	""
113	113	SHIP CONSTRUCTION	Clare	Tulla Road, Roslevan, Ennis	8	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
114	114	SHIP CONSTRUCTION	Clare	St Senan's Terrace, Kilrush	3	*N/A	""	""	""	""	""	Q4-2019
115	115	SHIP CONSTRUCTION	Clare	Drumcliffe Road, Ennis, Co. Clare	26	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
116	116	SHIP CONSTRUCTION	Clare	Ballyliddan West, Sixmilebridge	16	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
117	117	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 2)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q2-2018
118	118	CAS CONSTRUCTION TURNKEY	Clare	Haggard View, Clarecastle (Phase 1)	2	Anvers Housing Association Ltd	""	""	""	""	""	Q1-2018
119	119	CAS CONSTRUCTION	Clare	Cahercalla, Ennis (Phase 2)	15	Cuan an Chlair Ltd	""	""	""	""	Q3-2019	""
120	120	CAS CONSTRUCTION	Clare	Laurel Lodge, Clare Road, Ennis	3	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2016
121	121	CAS CONSTRUCTION	Clare	Monaskeha Heights	4	Newgrove Housing Association Ltd	""	""	""	""	""	Q3-2019
122	122	CAS CONSTRUCTION	Clare	Roo East	4	Thomond Housing Association Ltd	""	""	""	""	""	Q4-2018
123	123	CAS CONSTRUCTION	Clare	9 Elmwood, Ballycannon Heights, Meelick	4	Thomond Housing Association Ltd	""	""	""	""	""	Q1-2019
124	124	CAS CONSTRUCTION	Clare	Teach Rua, Edenvale Ennis	4	Newgrove Housing Association Ltd	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
125	125	CALF TURNKEY	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2018
126	126	CALF TURNKEY	Clare	Acha Bhile, Loughville, Lahinch Road, Ennis, Co Clare  (Phase 2)	18	Cluid Housing	""	""	""	""	""	Q4-2018
127	127	CALF TURNKEY	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 1)*	2	Cluid Housing	""	""	""	""	Q2-2019	""
128	128	CALF TURNKEY	Clare	Cahercalla, Drumbiggle, Ennis, Co. Clare (Phase 2)*	2	Cluid Housing	""	""	""	""	Q2-2019	""
129	129	CALF TURNKEY	Clare	Cluain Fia, Crusheen, Co. Clare (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q2-2020
130	130	CALF TURNKEY	Clare	Cluain Fia, Crusheen, Co. Clare (Phase 2)*	2	Cluid Housing	""	""	""	""	Q1-2019	""
131	131	CALF TURNKEY	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
132	132	CALF TURNKEY	Clare	Cluain Ros Leamhan, Roslevan, Tulla Road, Ennis, Co. Clare (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2019
133	133	CALF TURNKEY	Clare	Gleann Cora, Newmarket on Fergus, Co. Clare (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2019	""
134	134	CALF TURNKEY	Clare	Lios Anama, Sixmilebridge, Clare (Phase 1)	28	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
135	135	CALF CONSTRUCTION	Clare	Revised - Bruachlan, Westbury, Co Clare (Phase 1)	22	Co - Operative Housing Ireland Society Limited	""	""	""	Q1-2017	""	""
136	136	CALF TURNKEY	Clare	Sycamore Drive, Ennis, Co. Clare (Phase 1)*	3	Cluid Housing	""	""	""	""	""	Q4-2019
137	137	CALF TURNKEY	Clare	Sycamore Drive, Ennis, Co. Clare (Phase 2)*	2	Cluid Housing	""	""	""	""	Q3-2018	""
138	138	CALF TURNKEY	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
139	139	CALF TURNKEY	Clare	Tullyvarraga, Shannon, Co. Clare (Phase 2)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
140	140	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Clare	Shannon East	51	*N/A	""	""	""	""	Q4-2019	""
141	141	SHIP CONSTRUCTION TURNKEY	Cork City	Arus Mhuire	30	*N/A	""	""	""	""	""	Q4-2018
142	142	SHIP CONSTRUCTION TURNKEY	Cork City	Barrack Street	32	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
143	143	SHIP CONSTRUCTION TURNKEY	Cork City	FaranFerris	5	*N/A	""	""	""	""	""	Q4-2019
144	144	SHIP CONSTRUCTION TURNKEY	Cork City	High Street	9	*N/A	""	""	""	""	""	Q4-2019
145	145	SHIP CONSTRUCTION TURNKEY	Cork City	Tramore Road	4	*N/A	""	""	""	""	""	Q4-2018
146	146	SHIP CONSTRUCTION TURNKEY	Cork City	Whites Street	43	*N/A	""	""	""	""	""	Q4-2019
147	147	SHIP CONSTRUCTION TURNKEY	Cork City	Woods Street	16	*N/A	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
148	148	SHIP CONSTRUCTION TURNKEY	Cork City	Church Road, Blackrock	43	*N/A	""	""	""	""	""	Q3-2018
149	149	SHIP CONSTRUCTION TURNKEY	Cork City	1-5, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q3-2018
150	150	SHIP CONSTRUCTION TURNKEY	Cork City	Corcorans Quay	3	*N/A	""	""	""	""	Q2-2018	""
151	151	SHIP CONSTRUCTION TURNKEY	Cork City	Blarney Street	25	*N/A	""	""	""	""	""	Q4-2019
152	152	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinure Road, Cork City	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
153	153	SHIP CONSTRUCTION TURNKEY	Cork City	Moss Lane, Riverway, Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2018, the scheme is fully approved.	""	""
154	154	SHIP CONSTRUCTION TURNKEY	Cork City	7-11 Gerald Griffin Street, Cork	13	*N/A	""	""	""	""	Q2-2019	""
155	155	SHIP CONSTRUCTION TURNKEY	Cork City	29/30 Lower John Street, Cork	17	*N/A	""	""	""	""	Q1-2019	""
156	156	SHIP CONSTRUCTION TURNKEY	Cork City	Skehard Road, Blackrock, Cork	16	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
157	157	SHIP CONSTRUCTION TURNKEY	Cork City	Coach Street, Cork	12	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
158	158	SHIP CONSTRUCTION TURNKEY	Cork City	Shanakiel Road, Cork	20	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
159	159	SHIP CONSTRUCTION TURNKEY	Cork City	Spring Lane, Blackpool, Cork	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
160	160	SHIP CONSTRUCTION TURNKEY	Cork City	Glen Ryan Road, Cork	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
161	161	SHIP CONSTRUCTION TURNKEY	Cork City	Pouladuff Road, Cork 	11	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
162	162	SHIP CONSTRUCTION TURNKEY	Cork City	Watercourse Road, Blackpool, Cork	37	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
163	163	SHIP CONSTRUCTION TURNKEY	Cork City	Denroche's Cross, Glasheen Road, Cork	43	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
164	164	SHIP CONSTRUCTION TURNKEY	Cork City	1-4 Marble Lane	4	*N/A	""	""	""	""	""	Q4-2017
165	165	SHIP CONSTRUCTION TURNKEY	Cork City	Sheridan Park, Tramore Road	28	*N/A	""	""	""	""	""	Q4-2016
166	166	SHIP CONSTRUCTION TURNKEY	Cork City	37-39 Dublin Street, Blackpool, Cork	5	*N/A	""	""	""	""	""	Q2-2018
167	167	SHIP CONSTRUCTION TURNKEY	Cork City	6-10, Ard Aoibhinn, Banduff, Mayfield	5	*N/A	""	""	""	""	""	Q4-2018
168	168	SHIP CONSTRUCTION TURNKEY	Cork City	2 Deanrock Cottages, Togher	4	*N/A	""	""	""	""	""	Q4-2018
169	169	SHIP CONSTRUCTION TURNKEY	Cork City	258 & 259 Blarney Street, Cork	2	*N/A	""	""	""	""	""	Q1-2018
170	170	SHIP CONSTRUCTION TURNKEY	Cork City	1 & 2 The Groves, Skehard Road, Cork	2	*N/A	""	""	""	""	""	Q2-2018
171	171	SHIP CONSTRUCTION TURNKEY	Cork City	3B & 9B South Terrace Court, South Terrace, Cork	2	*N/A	""	""	""	""	""	Q4-2018
172	172	SHIP CONSTRUCTION TURNKEY	Cork City	Ballinlough Road / Knockrea Lawn, Ballinlough, Cork	6	*N/A	""	""	""	""	""	Q2-2019
173	173	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork	10	*N/A	""	""	""	""	""	Q4-2019
174	174	SHIP CONSTRUCTION TURNKEY	Cork City	Gearney's Boreen, Commons Road, Cork	3	*N/A	""	""	""	""	""	Q4-2019
175	175	SHIP CONSTRUCTION TURNKEY	Cork City	Ard na Ri, Banduff Road, Cork (Phase 2)	10	*N/A	""	""	""	""	""	Q4-2019
176	176	SHIP CONSTRUCTION TURNKEY	Cork City	Eagle Valley, Sarsfield Road	1	*N/A	""	""	""	""	""	Q4-2019
177	177	SHIP CONSTRUCTION TURNKEY	Cork City	Knockfree Avenue, Glengarriff Road, Fairhill, Cork	2	*N/A	""	""	""	""	""	Q4-2019
178	178	SHIP CONSTRUCTION TURNKEY	Cork City	3-10 Herbert Lawn, Belmont, Rochestown, Cork	8	*N/A	""	""	""	""	""	Q4-2019
179	179	SHIP CONSTRUCTION TURNKEY	Cork City	Elton Wood & Herbert Lawn, Rochestown, Cork 	8	*N/A	""	""	""	""	""	Q4-2019
180	180	SHIP CONSTRUCTION TURNKEY	Cork City	Aspen Drive, Maryborough Hill, Cork 	29	*N/A	""	""	""	""	""	Q4-2019
181	181	SHIP CONSTRUCTION TURNKEY	Cork City	5 Fairfield Heights, Upper Fairhill, Cork 	3	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
182	182	SHIP CONSTRUCTION TURNKEY	Cork City	20 & 22, Ringcroft Avenue, Ringmahon Road, Mahon, Cork	2	*N/A	""	""	""	""	Q3-2020	""
183	183	SHIP CONSTRUCTION	Cork City	Poulavone, Ballincollig	57	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
184	184	SHIP CONSTRUCTION	Cork City	The Meadows, Knocknacullen	1	*N/A	""	""	""	""	""	Q3-2016
185	185	SHIP CONSTRUCTION	Cork City	Boyces Street	51	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
186	186	SHIP CONSTRUCTION	Cork City	Shandon Street/John Philpott Curran Street	9	*N/A	""	""	""	""	Q4-2019	""
187	187	SHIP CONSTRUCTION	Cork City	St. Johns Well	6	*N/A	""	""	""	""	""	Q4-2019
188	188	SHIP CONSTRUCTION	Cork City	Churchfield Place East	3	*N/A	""	""	""	""	""	Q4-2018
189	189	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 1)	8	*N/A	""	""	""	""	""	Q4-2018
190	190	SHIP CONSTRUCTION	Cork City	Gerald Griffin Street	43	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
191	191	SHIP CONSTRUCTION	Cork City	Cappanoole	2	*N/A	""	""	""	""	""	Q4-2016
192	192	SHIP CONSTRUCTION	Cork City	Madonna House, Ballincollig (Phase 2)	6	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
193	193	SHIP CONSTRUCTION	Cork City	Bramble Cottages	5	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
194	194	SHIP CONSTRUCTION	Cork City	Errigal Heights, The Glen, Cork City	32	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
195	195	SHIP CONSTRUCTION	Cork City	Glenamoy Lawn, Mayfield, Cork	3	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
196	196	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 2)	7	*N/A	""	""	""	""	""	Q1-2019
197	197	SHIP CONSTRUCTION	Cork City	Hollywood Estate Infill Housing, Blarney Road, Cork	7	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
198	198	SHIP CONSTRUCTION	Cork City	Deanrock, Togher (Phase 3)	50	*N/A	""	""	""	""	""	Q3-2019
199	199	SHIP CONSTRUCTION	Cork City	Clover Hill Court, Bessboro Road, Mahon, Cork	51	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
200	200	SHIP CONSTRUCTION	Cork City	Westside, Model Farm Road, Cork	32	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
201	201	SHIP CONSTRUCTION	Cork City	Gerald Griffin Apartments - Block 7, North Monastery Road / St. Vincent's Road, Cork	6	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
202	202	SHIP CONSTRUCTION	Cork City	Sli Gartan, Mayfield, Cork 	1	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
203	203	REGENERATION	Cork City	Phase 1 B Knocknaheeny	29	*N/A	""	""	""	""	""	Q4-2017
204	204	REGENERATION	Cork City	Phase 2 A Knocknaheeny	47	*N/A	""	""	""	""	""	Q4-2019
205	205	REGENERATION	Cork City	Phase 1 C Knocknaheeny	41	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
206	206	REGENERATION	Cork City	Phase 2 B Knocknaheeny	38	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
207	207	REGENERATION	Cork City	Phase 2 C Knocknaheeny	24	*N/A	""	""	""	""	Q4-2019	""
208	208	REGENERATION	Cork City	Foyle Avenue Infill Housing Development, Foyle Avenue, Knocknaheeny, Cork	2	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
209	209	REGENERATION	Cork City	Ardmore Avenue, Knocknaheeny, Cork	1	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
210	210	REGENERATION	Cork City	Phase 3 B Knocknaheeny	62	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
211	211	REGENERATION	Cork City	Phase 4A	43	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
212	212	CAS CONSTRUCTION	Cork City	Edel House, Grattan Street	37	Good Shepherd Services Ltd	""	""	""	""	Q2-2019	""
213	213	CAS CONSTRUCTION	Cork City	Saint Vincent's Convent, Vincent's Ave/St. Mary's Street	20	Respond	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
214	214	CAS CONSTRUCTION	Cork City	Thomas Davis Street (Phase 1)	28	Respond	""	""	Stage 3 approved Q4-2019, the scheme is now approved to proceed to tender.	""	""	""
215	215	CAS CONSTRUCTION	Cork City	Ceanncora Lawn, Ballinlough	1	Cork Mental Health Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2018
216	216	CAS CONSTRUCTION	Cork City	St. Joachim & Anne's, Anglesea Street	8	Simon Community : Cork Simon	""	""	""	""	Q3-2019	""
217	217	CAS CONSTRUCTION	Cork City	27-29 Dublin Street, Blackpool	10	Respond	""	""	""	""	""	Q3-2018
218	218	CAS CONSTRUCTION	Cork City	Ard na Ri, Closes Green, Farranree, Cork	20	Farranree Sheltered Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
219	219	CALF TURNKEY	Cork City	5 units, Shandon Street, Cork (Phase 1)	5	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q3-2019
220	220	CALF TURNKEY	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 1)*	37	Tath Housing Association	""	""	""	""	""	Q4-2019
221	221	CALF TURNKEY	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 2)*	39	Tath Housing Association	""	""	""	""	Q3-2019	""
222	222	CALF TURNKEY	Cork City	Bishops Avenue, Farrenferris, Fairhill, Cork (Phase 3)	10	Tath Housing Association	""	""	""	""	Q3-2019	""
223	223	CALF TURNKEY	Cork City	Convent Gardens, Blackrock Villas, Blackrock, Co. Cork (Phase 1)	1	Tath Housing Association	""	""	""	""	""	Q4-2019
224	224	CALF TURNKEY	Cork City	Crawford Gate, Bessboro, Blackrock, Co. Cork (Phase 1)	4	Tath Housing Association	""	""	""	""	Q4-2019	""
225	225	CALF TURNKEY	Cork City	Crawford Gate, Bessboro, Blackrock, Co. Cork (Phase 2)	2	Tath Housing Association	""	""	""	""	Q4-2019	""
226	226	CALF TURNKEY	Cork City	Croppy Boy, Fairhill, Cork (Phase 1)	7	Tath Housing Association	""	""	""	""	""	Q3-2020
227	227	CALF TURNKEY	Cork City	Croppy Boy, Fairhill, Cork (Phase 2)*	14	Tath Housing Association	""	""	""	""	Q3-2019	""
228	228	CALF CONSTRUCTION	Cork City	Green Lane, Blackpool, Cork City (Phase 1)	112	Cluid Housing	""	""	""	Q2-2019	""	""
229	229	CALF TURNKEY	Cork City	Hereford Place, Ballymacthomas Street, Cork City (Phase 1)*	19	Respond	""	""	""	""	Q1-2020	""
230	230	CALF TURNKEY	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 1)	72	Cluid Housing	""	""	""	""	""	Q4-2018
231	231	CALF TURNKEY	Cork City	Leeside Apartments, Bachelors Quay, Cork City (Phase 2)	6	Cluid Housing	""	""	""	""	""	Q3-2019
232	232	CALF TURNKEY	Cork City	Lios Cara, Rathpeacon, Killeens, Cork (Phase 1)	12	Cluid Housing	""	""	""	Q4-2019	""	""
233	233	CALF CONSTRUCTION	Cork City	Lower Glanmire Road, Cork City (Phase 1)	8	Galtan Ltd	""	""	""	""	""	Q4-2019
234	234	CALF CONSTRUCTION	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 1)	3	Galtan Ltd	""	""	""	""	""	Q1-2018
235	235	CALF CONSTRUCTION	Cork City	Lr. Glanmire Road & 2 Braemer, Cork (Phase 2)	3	Galtan Ltd	""	""	""	""	""	Q4-2018
236	236	CALF TURNKEY	Cork City	Maryborough Ridge & Blackrock  Villas\n (Phase 1)*	57	Tath Housing Association	""	""	""	""	""	Q4-2019
237	237	CALF TURNKEY	Cork City	Millerd Street, Cork (Phase 1)	25	Respond	""	""	""	""	Q1-2019	""
238	238	CALF TURNKEY	Cork City	North Abbey Street, Cork City  (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
239	239	CALF TURNKEY	Cork City	Redforge Road, Blackpool, Cork City (Phase 1)*	80	Respond	""	""	""	""	Q1-2020	""
240	240	CALF TURNKEY	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 1)	31	Tath Housing Association	""	""	""	""	""	Q4-2018
241	241	CALF TURNKEY	Cork City	Revised-The Meadows, Knocknacullen East, Gurranabraher, Cork  (Phase 2)	21	Tath Housing Association	""	""	""	""	""	Q4-2019
242	242	CALF TURNKEY	Cork City	Springville House, Bulls Lane, Blackrock Road, Cork (Phase 1)	35	Tath Housing Association	""	""	""	Q2-2020	""	""
243	243	CALF TURNKEY	Cork City	The Meadows (Phase 2) Gurranabraher, Cork City  (Phase 1)	17	Tath Housing Association	""	""	""	""	""	Q4-2019
244	244	CALF TURNKEY	Cork City	 Tower Street, Cork City (Phase 1)	2	Threshold Ltd	""	""	""	Q4-2020	""	""
245	245	CALF TURNKEY	Cork City	Woodside, Kerry Pike, Cork (Phase 1)*	12	Cluid Housing	""	""	""	""	Q4-2019	""
246	246	CALF TURNKEY	Cork City	Woodside, Kerry Pike, Cork (Phase 2)*	10	Cluid Housing	""	""	""	""	Q4-2019	""
247	247	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill	18	*N/A	""	""	""	""	""	Q2-2018
248	248	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Alainn & Castleoaks, Bandon	11	*N/A	""	""	""	""	""	Q4-2017
249	249	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Tuairigh, Youghal	3	*N/A	""	""	""	""	""	Q4-2018
250	250	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk	11	*N/A	""	""	""	""	""	Q4-2019
251	251	SHIP CONSTRUCTION TURNKEY	Cork County	Clondulane, Fermoy	2	*N/A	""	""	""	""	""	Q4-2017
252	252	SHIP CONSTRUCTION TURNKEY	Cork County	College Wood, Cobh	31	*N/A	""	""	""	""	""	Q4-2017
253	253	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	12	*N/A	""	""	""	""	""	Q4-2017
254	254	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy	4	*N/A	""	""	""	""	""	Q4-2019
255	255	SHIP CONSTRUCTION TURNKEY	Cork County	CulAird Carraigtwohill	29	*N/A	""	""	""	""	""	Q4-2017
256	256	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	12	*N/A	""	""	""	""	""	Q1-2017
257	257	SHIP CONSTRUCTION TURNKEY	Cork County	Castletreasure, Douglas	16	*N/A	""	""	""	""	""	Q1-2017
258	258	SHIP CONSTRUCTION TURNKEY	Cork County	Claragh Road, Millstreet	5	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
259	259	SHIP CONSTRUCTION TURNKEY	Cork County	St. Marys Road, Dunmanway Phase 2	7	*N/A	""	""	""	""	""	Q3-2020
260	260	SHIP CONSTRUCTION TURNKEY	Cork County	Glanworth, Fermoy	10	*N/A	""	""	""	""	Q1-2020	""
261	261	SHIP CONSTRUCTION TURNKEY	Cork County	Quartertown, Mallow	5	*N/A	""	""	""	""	""	Q4-2019
262	262	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q4-2019
263	263	SHIP CONSTRUCTION TURNKEY	Cork County	Beacon Point, Baltimore	6	*N/A	""	""	""	""	""	Q2-2019
264	264	SHIP CONSTRUCTION TURNKEY	Cork County	Corrin View, Fermoy	6	*N/A	""	""	""	""	""	Q2-2019
265	265	SHIP CONSTRUCTION TURNKEY	Cork County	No. 43 & No. 50 Chapel Court, Skibbereen 	2	*N/A	""	""	""	""	""	Q3-2018
266	266	SHIP CONSTRUCTION TURNKEY	Cork County	Cul Na Smear, Bandon	14	*N/A	""	""	""	""	""	Q4-2018
267	267	SHIP CONSTRUCTION TURNKEY	Cork County	Glen Dara, Ard Cashel, Watergrasshill	6	*N/A	""	""	""	""	""	Q4-2018
268	268	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas	9	*N/A	""	""	""	""	""	Q2-2019
269	269	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal	15	*N/A	""	""	""	""	Q1-2019	""
270	270	SHIP CONSTRUCTION TURNKEY	Cork County	Lismire	4	*N/A	""	""	""	""	""	Q4-2018
271	271	SHIP CONSTRUCTION TURNKEY	Cork County	Rylane, Mount Rivers, Co. Cork.	3	*N/A	""	""	""	Stage 4 approved Q2-2018, the scheme is fully approved.	""	""
272	272	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 3	21	*N/A	""	""	""	""	Q1-2019	""
273	273	SHIP CONSTRUCTION TURNKEY	Cork County	Seafield, Bantry, 	3	*N/A	""	""	""	""	Q3-2018	""
274	274	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal	13	*N/A	""	""	""	""	""	Q4-2018
275	275	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	2	*N/A	""	""	""	""	""	Q4-2019
276	276	SHIP CONSTRUCTION TURNKEY	Cork County	No.9 and No.10  Chapel Court, Skibbereen,	2	*N/A	""	""	""	""	""	Q4-2018
277	277	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton	8	*N/A	""	""	""	""	""	Q4-2018
278	278	SHIP CONSTRUCTION TURNKEY	Cork County	College Mews, Cobh	6	*N/A	""	""	""	""	""	Q4-2018
279	279	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac	4	*N/A	""	""	""	""	""	Q4-2018
280	280	SHIP CONSTRUCTION TURNKEY	Cork County	Fairgreen, Mallow	10	*N/A	""	""	""	""	""	Q4-2019
281	281	SHIP CONSTRUCTION TURNKEY	Cork County	Tir Cluain, Midleton (Phase 2)	14	*N/A	""	""	""	""	""	Q3-2019
282	282	SHIP CONSTRUCTION TURNKEY	Cork County	Church Road/Station Road, Carrigtwohill (2)	7	*N/A	""	""	""	""	""	Q3-2018
283	283	SHIP CONSTRUCTION TURNKEY	Cork County	Percival St, Kanturk	2	*N/A	""	""	""	""	""	Q4-2018
284	284	SHIP CONSTRUCTION TURNKEY	Cork County	9 & 9a Main Street, Boherbue	2	*N/A	""	""	""	""	""	Q4-2018
285	285	SHIP CONSTRUCTION TURNKEY	Cork County	Parklands, Youghal - Phase 2	6	*N/A	""	""	""	""	""	Q2-2019
286	286	SHIP CONSTRUCTION TURNKEY	Cork County	Rathcormac Phase 2	4	*N/A	""	""	""	""	""	Q2-2019
287	287	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fil, Curraclough, Bandon	13	*N/A	""	""	""	""	""	Q4-2019
288	288	SHIP CONSTRUCTION TURNKEY	Cork County	Maple Woods, Midleton	6	*N/A	""	""	""	""	""	Q4-2018
289	289	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy - Phase 3	8	*N/A	""	""	""	""	Q4-2017	""
290	290	SHIP CONSTRUCTION TURNKEY	Cork County	St. Mary's Road, Dunmanway Phase 3	6	*N/A	""	""	""	""	""	Q3-2020
291	291	SHIP CONSTRUCTION TURNKEY	Cork County	Sweetfields, Youghal, Phase 2	20	*N/A	""	""	""	""	Q1-2019	""
292	292	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull, Co. Cork	7	*N/A	""	""	""	""	Q2-2019	""
293	293	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore, Bloomfield, Midleton	10	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
294	294	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Broomfield, Midleton - Phase 2	8	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
295	295	SHIP CONSTRUCTION TURNKEY	Cork County	Mill Road, Avoncore,  Bloomfield, Midleton - Phase 3	22	*N/A	""	""	""	Stage 4 approved Q1-2019, the scheme is fully approved.	""	""
296	296	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	2	*N/A	""	""	""	""	""	Q3-2019
297	297	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow 	6	*N/A	""	""	""	""	""	Q2-2020
298	298	SHIP CONSTRUCTION TURNKEY	Cork County	Gleann Orga, Ballinhassig	4	*N/A	""	""	""	""	""	Q4-2019
299	299	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard Ballyhooly	8	*N/A	""	""	""	""	Q1-2020	""
300	300	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Ard, Cobh	6	*N/A	""	""	""	""	""	Q3-2019
301	301	SHIP CONSTRUCTION TURNKEY	Cork County	Baltimore, West Cork	12	*N/A	""	""	""	""	""	Q4-2019
302	302	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	2	*N/A	""	""	""	""	""	Q4-2019
303	303	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Ard, Freemount	4	*N/A	""	""	""	""	""	Q4-2019
304	304	SHIP CONSTRUCTION TURNKEY	Cork County	Glengarriff	5	*N/A	""	""	""	""	""	Q4-2019
305	305	SHIP CONSTRUCTION TURNKEY	Cork County	The Cove, Glandore	4	*N/A	""	""	""	""	""	Q4-2019
306	306	SHIP CONSTRUCTION TURNKEY	Cork County	Copper Point, Schull, Co. Cork	7	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
307	307	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Lisgoold, Leamlara	3	*N/A	""	""	""	""	""	Q4-2019
308	308	SHIP CONSTRUCTION TURNKEY	Cork County	Millstreet Road, Macroom	12	*N/A	""	""	""	""	Q1-2020	""
309	309	SHIP CONSTRUCTION TURNKEY	Cork County	Clarendon Brooks, Carrs Hill, Douglas Phase 2	14	*N/A	""	""	""	""	""	Q4-2019
310	310	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	12	*N/A	""	""	""	""	Q2-2019	""
311	311	SHIP CONSTRUCTION TURNKEY	Cork County	Glenbeg The Beeches, Boherbue	4	*N/A	""	""	""	""	""	Q4-2019
312	312	SHIP CONSTRUCTION TURNKEY	Cork County	Chapel Court, Skibbereen	3	*N/A	""	""	""	""	""	Q4-2019
313	313	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk - Phase 3	4	*N/A	""	""	""	""	Q3-2018	""
314	314	SHIP CONSTRUCTION TURNKEY	Cork County	An Tui, Lisgoold, Leamlara	1	*N/A	""	""	""	""	""	Q2-2020
315	315	SHIP CONSTRUCTION TURNKEY	Cork County	Bruhenny, Churchtown	6	*N/A	""	""	""	""	""	Q4-2019
316	316	SHIP CONSTRUCTION TURNKEY	Cork County	Ard Bhaile, Buttevant, Co. Cork	6	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
317	317	SHIP CONSTRUCTION TURNKEY	Cork County	Cecilstown, Mallow, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
318	318	SHIP CONSTRUCTION TURNKEY	Cork County	Ballymacmoy, Killavullen, Co. Cork	13	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
319	319	SHIP CONSTRUCTION TURNKEY	Cork County	Meenane, Watergrasshill, Co. Cork 	25	*N/A	""	""	""	""	Q3-2020	""
320	320	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow	8	*N/A	""	""	""	""	""	Q3-2019
321	321	SHIP CONSTRUCTION TURNKEY	Cork County	Gortnaclohy, Skibbereen, Co. Cork	34	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
322	322	SHIP CONSTRUCTION TURNKEY	Cork County	Castle Heights, Carrigaline	3	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
323	323	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road, Carrigtwohill	7	*N/A	""	""	""	""	""	Q4-2019
324	324	SHIP CONSTRUCTION TURNKEY	Cork County	The Court, Ard Cashel, Watergrasshill	4	*N/A	""	""	""	""	""	Q4-2019
325	325	SHIP CONSTRUCTION TURNKEY	Cork County	Millview Road, Kanturk - Phase 2	10	*N/A	""	""	""	""	Q3-2018	""
326	326	SHIP CONSTRUCTION TURNKEY	Cork County	Glenbeg, The Beeches, Boherbue	8	*N/A	""	""	""	""	Q1-2019	""
327	327	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	3	*N/A	""	""	""	""	Q3-2018	""
328	328	SHIP CONSTRUCTION TURNKEY	Cork County	Crann Ard, Fermoy - Phase 2	40	*N/A	""	""	""	""	Q4-2017	""
329	329	SHIP CONSTRUCTION TURNKEY	Cork County	Inis Fil, Curraclough, Bandon	17	*N/A	""	""	""	""	""	Q3-2020
330	330	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry, Co. Cork	10	*N/A	""	""	""	""	Q1-2020	""
331	331	SHIP CONSTRUCTION TURNKEY	Cork County	St. Marys Road, Dunmanway 	7	*N/A	""	""	""	""	""	Q4-2019
332	332	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Cairn, Station Road Carrigtwohill	7	*N/A	""	""	""	""	Q2-2019	""
333	333	SHIP CONSTRUCTION TURNKEY	Cork County	An Goritin Rua, Millstreet Road, Macroom, Co. Cork	14	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
334	334	SHIP CONSTRUCTION TURNKEY	Cork County	King St, Mitchelstown, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
335	335	SHIP CONSTRUCTION TURNKEY	Cork County	Lyraneag, Rockchapel, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
336	336	SHIP CONSTRUCTION TURNKEY	Cork County	Cluain Reidh, Ballyvourney	1	*N/A	""	""	""	""	""	Q4-2019
337	337	SHIP CONSTRUCTION TURNKEY	Cork County	Curragh, Upper Aghada, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
338	338	SHIP CONSTRUCTION TURNKEY	Cork County	Glebe Manor, Whitegate	12	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
339	339	SHIP CONSTRUCTION TURNKEY	Cork County	Eyeries, Castletownbere, Co. Cork	6	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
340	340	SHIP CONSTRUCTION TURNKEY	Cork County	Kilmorna, Mallow, Co. Cork	1	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
341	341	SHIP CONSTRUCTION TURNKEY	Cork County	Lios Ard Ballhooly	12	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
342	342	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow 	20	*N/A	""	""	""	""	Q1-2019	""
343	343	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter, Mallow 	18	*N/A	""	""	""	""	Q1-2019	""
344	344	SHIP CONSTRUCTION TURNKEY	Cork County	Fana Na gCann, Co. Cork	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
345	345	SHIP CONSTRUCTION TURNKEY	Cork County	Drakes Point, Knocknagore, Crosshaven, Co. Cork	5	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
346	346	SHIP CONSTRUCTION TURNKEY	Cork County	Scarteen, Newmarket, Co. Cork	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
347	347	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale, Co. Cork	16	*N/A	""	""	""	""	Q4-2019	""
348	348	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry, Co. Cork	6	*N/A	""	""	""	""	Q1-2020	""
349	349	SHIP CONSTRUCTION TURNKEY	Cork County	Caherdaniel, Bantry, Co. Cork	18	*N/A	""	""	""	""	Q1-2020	""
350	350	SHIP CONSTRUCTION TURNKEY	Cork County	Abbeyfort, Kinsale, Co. Cork	17	*N/A	""	""	""	""	Q4-2019	""
351	351	SHIP CONSTRUCTION TURNKEY	Cork County	Oliver Plunkett Place, Doneraile	1	*N/A	""	""	""	""	""	Q3-2020
352	352	SHIP CONSTRUCTION TURNKEY	Cork County	Spa Glen,Ballyviniter,Mallow	8	*N/A	""	""	""	""	""	Q3-2020
353	353	SHIP CONSTRUCTION	Cork County	Model Village, Dripsey	6	*N/A	""	""	""	""	Q2-2019	""
354	354	SHIP CONSTRUCTION	Cork County	Castletreasure Grove, Douglas	2	*N/A	""	""	""	""	""	Q4-2019
355	355	SHIP CONSTRUCTION	Cork County	Seaview Cottages, Derrymihan, Castletownbere	3	*N/A	""	""	""	""	Q3-2019	""
356	356	SHIP CONSTRUCTION	Cork County	Curraleigh, Inniscarra	1	*N/A	""	""	""	""	""	Q3-2019
357	357	SHIP CONSTRUCTION	Cork County	Refurbihsment/Extension  Main St. Dunmanway	1	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
358	358	SHIP CONSTRUCTION	Cork County	Thomas Kent Street, Cobh	1	*N/A	""	""	""	""	Q1-2020	""
359	359	SHIP CONSTRUCTION	Cork County	Croke Place, Garranmacgarrett, Kilbrin, kanturk	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
360	360	SHIP CONSTRUCTION	Cork County	22 Aisling Ghael, Coolacoosane, Millview Road, Kanturk, Co. Cork	1	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
361	361	SHIP CONSTRUCTION	Cork County	Mullaghroe South, Cullen	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
362	362	SHIP CONSTRUCTION	Cork County	Downeen Cross, Rosscarbery	7	*N/A	""	""	""	""	""	Q4-2019
363	363	SHIP CONSTRUCTION	Cork County	Ard Na Greine, Cortmacsherry	17	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
364	364	SHIP CONSTRUCTION	Cork County	Station Road, Blarney	18	*N/A	""	""	""	""	Q3-2019	""
365	365	SHIP CONSTRUCTION	Cork County	Bluepool, Kanturk	12	*N/A	""	""	""	""	Q4-2019	""
366	366	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork Phase 1	7	*N/A	""	""	""	""	""	Q3-2019
367	367	SHIP CONSTRUCTION	Cork County	Beechgrove, Clonakilty	57	*N/A	""	""	""	""	Q3-2019	""
368	368	SHIP CONSTRUCTION	Cork County	Newtown House , Bantry	1	*N/A	""	""	""	""	Q3-2020	""
369	369	SHIP CONSTRUCTION	Cork County	Fairfield, Masseytown, Macroom	7	*N/A	""	""	""	""	""	Q4-2018
370	370	SHIP CONSTRUCTION	Cork County	12 & 14 Droum, Castletownbere	2	*N/A	""	""	""	""	""	Q4-2018
371	371	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline (Phase 4)	15	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
372	372	SHIP CONSTRUCTION	Cork County	Oliver Plunkett Hill, Fermoy	10	*N/A	""	""	""	""	""	Q2-2017
373	373	SHIP CONSTRUCTION	Cork County	Townsend Street, Skibbereen	6	*N/A	""	""	""	""	Q3-2019	""
374	374	SHIP CONSTRUCTION	Cork County	Forest View, Mallow	10	*N/A	""	""	""	""	Q4-2019	""
375	375	SHIP CONSTRUCTION	Cork County	11/10 Harbour Hill, Cobh	1	*N/A	""	""	""	""	""	Q2-2018
376	376	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline	10	*N/A	""	""	""	""	""	Q4-2018
377	377	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1A & 1B (ii))	16	*N/A	""	""	""	""	""	Q1-2019
378	378	SHIP CONSTRUCTION	Cork County	Kilnagleary Carrigaline (Phase 1C)	18	*N/A	""	""	""	""	""	Q1-2019
379	379	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	5	*N/A	""	""	""	""	Q3-2020	""
380	380	SHIP CONSTRUCTION	Cork County	Richmond Court, Bandon	6	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
381	381	SHIP CONSTRUCTION	Cork County	Brigown Road, Mitchelstown	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
382	382	SHIP CONSTRUCTION	Cork County	Sleaveen East, Macroom	8	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
383	383	SHIP CONSTRUCTION	Cork County	Kilnagleary, Carrigaline Phase 1B	5	*N/A	""	""	""	""	""	Q4-2018
384	384	SHIP CONSTRUCTION	Cork County	Tudor Grove, Ballincollig	16	*N/A	""	""	""	""	""	Q4-2019
385	385	SHIP CONSTRUCTION	Cork County	Pound Lane, Kilworth 	7	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
386	386	SHIP CONSTRUCTION	Cork County	24 Glenview Terrace Lyre Co Cork	1	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
387	387	SHIP CONSTRUCTION	Cork County	Broomfield West, Avoncore, Midelton	10	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
388	388	SHIP CONSTRUCTION	Cork County	Knocknagown, Rylane	1	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
389	389	SHIP CONSTRUCTION	Cork County	Uplands (Phase 2), College Road,  Fermoy	11	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
390	390	SHIP CONSTRUCTION	Cork County	Lissoran, Ballinspittle	4	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
391	391	SHIP CONSTRUCTION	Cork County	Tower View/Cirt na Siln, Cloyne, East Cork - Phase 2	2	*N/A	""	""	""	""	Q3-2018	""
392	392	SHIP CONSTRUCTION	Cork County	Convent Road, Doneraile	17	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
393	393	SHIP CONSTRUCTION	Cork County	Kearney's field Dunmanway	13	*N/A	""	""	""	""	Q3-2020	""
394	394	SHIP CONSTRUCTION	Cork County	High St., Sleaveen Hill, Macroom, Co. Cork	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
395	395	SHIP CONSTRUCTION	Cork County	49 Masseytown, Macroom, Co. Cork 	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
396	396	SHIP CONSTRUCTION	Cork County	St. Gobnaits, Ballyvourney, Co. Cork	20	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
397	397	CAS CONSTRUCTION TURNKEY	Cork County	Ardmanagh, Schull	12	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
398	398	CAS CONSTRUCTION	Cork County	Sisters of Mercy Church and Convent at Knocknamuck, Bantry Bay	16	Cluid Housing Association	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
399	399	CAS CONSTRUCTION	Cork County	Cuan Barra, Kilmore, Ballingeary	3	Coiste Tithe Uibh Laoire Teoranta	""	""	""	""	""	Q3-2018
400	400	CAS CONSTRUCTION	Cork County	Caim Hill, Townlands, Rosscarbery	9	Rosscarbery Housing Association Ltd	""	""	""	""	""	Q1-2019
401	401	CAS CONSTRUCTION	Cork County	Avenue House, Bandon	9	Bandon Geriatric ? Community Council	""	""	""	""	""	Q1-2018
402	402	CAS CONSTRUCTION	Cork County	Church View, Love Lane, Charleville	4	Charleville Care Project Ltd	""	""	""	""	""	Q4-2019
403	403	CAS CONSTRUCTION	Cork County	Fellowship House, Togher	31	Tabor Lodge Addiction ? Housing Services Ltd	""	""	""	""	""	Q2-2018
404	404	CAS CONSTRUCTION	Cork County	Care Home Facility, Masseytown, Macroom	1	Tath Housing Association Ltd	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
405	405	CAS CONSTRUCTION	Cork County	Baile Bhuire, Macroom	3	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
406	406	CAS CONSTRUCTION	Cork County	Charleville, Church View, Love Lane, Charleville	9	Charleville Care Project Ltd	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
407	407	CAS CONSTRUCTION	Cork County	St. Michaels, 36 Main Street, Bandon, Co. Cork	6	Bandon Geriatric ? Community Council	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
408	408	CAS CONSTRUCTION	Cork County	Distillery Lane, Distillery Walk, Midleton	7	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
409	409	CAS CONSTRUCTION	Cork County	Mardyke, Skibbereen, Co. Cork	4	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
410	410	CAS CONSTRUCTION	Cork County	Lisheen Field, Kilbarry Road, Dunmanway, Co. Cork	16	Cluid Housing Association	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
411	411	CALF TURNKEY	Cork County	3 units, Mullavale, Castletownroche, Co. Cork (Phase 1)	3	Respond	""	""	""	""	""	Q2-2019
412	412	CALF TURNKEY	Cork County	Beach Road, Passage West, Co. Cork (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
413	413	CALF TURNKEY	Cork County	Brookhill (5 Units), Carrigaline, Cork (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
414	414	CALF TURNKEY	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
415	415	CALF TURNKEY	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 1)*	31	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
416	416	CALF TURNKEY	Cork County	Brookhill, Carrigaline, Co. Cork (Phase 2)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
417	417	CALF TURNKEY	Cork County	Cluain Reidh, Ballymakeera, Co. Cork (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q3-2020
418	418	CALF TURNKEY	Cork County	Codrum, Macroom, Co. Cork (Phase 1)	5	Tath Housing Association	""	""	""	""	Q1-2020	""
419	419	CALF TURNKEY	Cork County	College Manor, Cobh (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q4-2016
420	420	CALF TURNKEY	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 1)*	24	Respond	""	""	""	""	Q3-2019	""
421	421	CALF TURNKEY	Cork County	Coolroe, Ballincollig, Co. Cork (Phase 2)	20	Respond	""	""	""	""	Q3-2019	""
422	422	CALF CONSTRUCTION	Cork County	Duntahane, Fermoy, Co. Cork (Phase 1)	46	Respond	""	""	""	""	Q4-2018	""
423	423	CALF CONSTRUCTION	Cork County	Firgrove Harrisons lane (Phase 1)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
424	424	CALF TURNKEY	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 1)	20	Respond	""	""	""	""	""	Q4-2019
425	425	CALF TURNKEY	Cork County	Market Green, Knockgriffin, Midleton, Co. Cork (Phase 2)*	22	Respond	""	""	""	""	Q4-2018	""
426	426	CALF TURNKEY	Cork County	Mullavale, Castletownroche, Co. Cork (Phase 1)	6	Respond	""	""	""	""	""	Q4-2018
427	427	CALF CONSTRUCTION	Cork County	Post Tender - Radharc An tSaile, Cappagh, Ballynacubby, Kinsale, Co Cork (Phase 1)	40	Cluid Housing	""	""	""	""	""	Q3-2020
428	428	CALF TURNKEY	Cork County	Radharc Na Tuaithe, Knockraha, Cork (Phase 1)*	7	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
429	429	CALF TURNKEY	Cork County	Sunville, Church Road, Carrigaline, Co. Cork (Phase 1)	6	Focus Housing Association CLG	""	""	""	""	Q1-2020	""
430	430	CALF TURNKEY	Cork County	Tanners Field, Bandon, Co Cork  (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q3-2019
431	431	CALF TURNKEY	Cork County	Ticknock, Cobh, Cork (Phase 1)	8	Respond	""	""	""	""	""	Q4-2018
432	432	CALF TURNKEY	Cork County	Togher Cross, Lehenaghmore, Co. Cork (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2019
433	433	CALF TURNKEY	Cork County	Weston, Carrigaline, Co. Cork (Phase 1)	7	Respond	""	""	""	""	""	Q2-2018
434	434	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	The Miles, Clonakilty	52	*N/A	""	""	""	""	Q4-2019	""
435	435	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Poundhill, Skibbereen	50	*N/A	""	""	""	""	Q4-2019	""
436	436	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Cork County	Oakwood, Macroom	50	*N/A	""	""	""	""	Q4-2019	""
437	437	SHIP CONSTRUCTION TURNKEY	DLR	Hazelbrook, Nutgrove, Churchtown	28	*N/A	""	""	""	""	""	Q4-2017
438	438	SHIP CONSTRUCTION TURNKEY	DLR	Dunedin Terrace, Monkstown	14	*N/A	""	""	""	""	""	Q4-2018
439	439	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	22	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
440	440	SHIP CONSTRUCTION TURNKEY	DLR	Kilternan Close	33	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
441	441	SHIP CONSTRUCTION RAPID	DLR	Rockville Drive (Glenamuck Cottages)	13	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
442	442	SHIP CONSTRUCTION RAPID	DLR	George's Place	12	*N/A	""	""	""	""	""	Q2-2018
443	443	SHIP CONSTRUCTION RAPID	DLR	Ballyogan Court, Ballyogan	67	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
444	444	SHIP CONSTRUCTION	DLR	Park House, 66 George's Street, Dun Laoghaire	4	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
445	445	SHIP CONSTRUCTION	DLR	132 Pottery Road, Dun Laoghaire	4	*N/A	""	""	""	""	""	Q3-2018
446	446	SHIP CONSTRUCTION	DLR	Temple Road	3	*N/A	""	""	""	""	""	Q2-2018
447	447	SHIP CONSTRUCTION	DLR	Assistant Harbour Master House	2	*N/A	""	""	""	""	""	Q3-2017
448	448	SHIP CONSTRUCTION	DLR	The Brambles Park Close Sallynoggin	10	*N/A	""	""	""	""	""	Q2-2018
449	449	SHIP CONSTRUCTION	DLR	49 The Mews Sallynoggin Park	4	*N/A	""	""	""	""	""	Q4-2017
450	450	SHIP CONSTRUCTION	DLR	Shanganagh Park Lodge	1	*N/A	""	""	""	""	""	Q2-2016
451	451	SHIP CONSTRUCTION	DLR	Rosemount Court	44	*N/A	""	""	""	""	""	Q4-2018
452	452	SHIP CONSTRUCTION	DLR	Broadford Rise	21	*N/A	""	""	""	""	Q3-2017	""
453	453	SHIP CONSTRUCTION	DLR	Fitzgerald Park	33	*N/A	""	""	""	""	""	Q4-2018
454	454	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 3)	14	*N/A	""	""	""	""	""	Q3-2018
455	455	SHIP CONSTRUCTION	DLR	St Michael's Terrace	4	*N/A	""	""	""	""	""	Q3-2017
456	456	SHIP CONSTRUCTION	DLR	Clontibret House	4	*N/A	""	""	""	""	""	Q4-2016
457	457	SHIP CONSTRUCTION	DLR	Cromlech Close	15	*N/A	""	""	""	""	""	Q3-2016
458	458	SHIP CONSTRUCTION	DLR	Rochestown House (Phase 2)	34	*N/A	""	""	""	""	""	Q3-2016
459	459	SHIP CONSTRUCTION	DLR	Ballyogan Avenue, Ballyogan	2	*N/A	""	""	""	""	Q1-2020	""
460	460	SHIP CONSTRUCTION	DLR	St. Laurences Park, Stillorgan	89	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
461	461	SHIP CONSTRUCTION	DLR	Fitzgerald Park	17	*N/A	""	""	""	""	""	Q1-2019
462	462	SHIP CONSTRUCTION	DLR	Moyola Court, Churchtown Lower, Dublin 14	4	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
463	463	SHIP CONSTRUCTION	DLR	Ballyogan Court, Ballyogan	52	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
464	464	SHIP CONSTRUCTION	DLR	Site at Roebuck Road, Clonskeagh, Dublin 14	3	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
465	465	SHIP CONSTRUCTION	DLR	37A Rollins Villas, Sallynoggin, Co. Dublin 	1	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
466	466	SHIP CONSTRUCTION	DLR	Old Coastguard Cottages, Coal Harbour, Harbour Road	4	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
467	467	CAS CONSTRUCTION	DLR	30 Obelisk Walk, Blackrock	4	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
468	468	CALF CONSTRUCTION	DLR	Abbeyview House, Monkstown, Dublin (Phase 1)	11	Cluid Housing	""	""	""	""	Q3-2019	""
469	469	CALF TURNKEY	DLR	Ardilea Crescent, Clonskeagh, Dublin 14 (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q4-2018
470	470	CALF TURNKEY	DLR	Ballybetagh Road, Kilternan, Co Dublin (Phase 1)	7	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
471	471	CALF TURNKEY	DLR	Ballybetagh Road, Kilternan, Co Dublin (Phase 2)*	8	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
472	472	CALF TURNKEY	DLR	Ballybetagh Road, Kilternan, Co Dublin (Phase 3)	7	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
473	473	CALF TURNKEY	DLR	Belarmine Drive, Belarmine, Stepaside, Dublin 18 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q4-2019
474	474	CALF TURNKEY	DLR	Bishops Gate, Enniskerry Rd., Dublin 18 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2019
475	475	CALF TURNKEY	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
476	476	CALF TURNKEY	DLR	Bishops Gate, Kilternan, Dublin 18  (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q3-2018
477	477	CALF TURNKEY	DLR	Block C, Abbey Road, Monkstown, (Phase 1)*	3	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
478	478	CALF TURNKEY	DLR	Clay Farm (Block E3), Ballyogan Road, Leopardstown, Dublin 18 (Phase 1)*	24	The Iveagh Trust	""	""	""	""	""	Q4-2019
479	479	CALF TURNKEY	DLR	Clays Farm, Ballyogan Road (Phase 1)  (Phase 1)*	44	The Iveagh Trust	""	""	""	""	""	Q2-2019
480	480	CALF CONSTRUCTION	DLR	Cromlech Fields, Loughlinstown, Ballybrack, Dublin (Phase 1)	34	Co - Operative Housing Ireland Society Limited	""	""	""	Q1-2019	""	""
481	481	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 18 (Phase 1)	53	Respond	""	""	""	""	Q3-2019	""
482	482	CALF CONSTRUCTION	DLR	Enniskerry Road, Sandyford, Dublin 19, (Phase 1)	52	Tath Housing Association	""	""	""	""	Q3-2019	""
483	483	CALF TURNKEY	DLR	Eustace Court, Upper Glenageary Road, Dun Laoghaire, Rathdown, Co. Dublin (Phase 1)	4	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2019
484	484	CALF TURNKEY	DLR	Garrison Mews, The Ramparts, Cabinteely, Co. Dublin (Phase 1)*	5	Focus Housing Association CLG	""	""	""	Q4-2019	""	""
485	485	CALF TURNKEY	DLR	Greenbank House, Upper Glenageary Road, Dun Laoghaire, Co. Dublin (Phase 1)	1	St John of God Housing Association Ltd	""	""	""	""	""	Q4-2018
486	486	CALF TURNKEY	DLR	Hyde Road, Belmont, Stepaside, Co. Dublin (Phase 1)*	8	Respond	""	""	""	""	""	Q4-2018
487	487	CALF TURNKEY	DLR	Johnstown Court, Cabinteely, Dublin 18 (Phase 1)*	51	Cluid Housing	""	""	""	""	Q2-2019	""
488	488	CALF TURNKEY	DLR	Johnstown Court, Cabinteely, Dublin 18 (Phase 2)*	50	Cluid Housing	""	""	""	""	Q2-2019	""
489	489	CALF TURNKEY	DLR	Knockrabo, Mount Anville Road, Goatstown, Dublin 14 (Phase 1)*	6	Oaklee Housing	""	""	""	""	Q3-2016	""
490	490	CALF TURNKEY	DLR	Marine Walk, Marine Road, Dun Laoghaire (Phase 1)*	2	Oaklee Housing	""	""	""	""	Q1-2016	""
491	491	CALF TURNKEY	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 1)*	18	Tath Housing Association	""	""	""	""	Q4-2019	""
492	492	CALF TURNKEY	DLR	Mount Eagle, Kilgobbin Road, Sandyford, Dublin 18 (Phase 2)*	14	Tath Housing Association	""	""	""	""	Q4-2019	""
493	493	CALF TURNKEY	DLR	Our Ladys Grove, Goatstown, Dublin 14 (Phase 1)*	2	Respond	""	""	""	""	""	Q4-2018
494	494	CALF TURNKEY	DLR	Rockville Hall, Glenamuck Road, Dunlaoghaire, Dublin 18 (Phase 1)*	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
495	495	CALF TURNKEY	DLR	Stillorgan Gate, Kilmacud Road Upper, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2017
496	496	CALF TURNKEY	DLR	Stillorgan Gate, Kilmacud Road Upper, Stillorgan, Co. Dublin (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
497	497	CALF TURNKEY	DLR	The Avenue, Glenside,  Carrickmines Green, Dublin 18 (Phase 1)*	5	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
498	498	CALF TURNKEY	DLR	The Glen, Glenamuck Road, Carrickmines, Dublin 18 (Phase 1)*	48	Respond	""	""	""	Q3-2020	""	""
499	499	CALF TURNKEY	DLR	Whinsfield, Sandyford Road, Dublin 18 (Phase 1)	59	Respond	""	""	""	""	Q4-2019	""
500	500	CALF TURNKEY	DLR	Woodbank, Dublin Rd, Shankill, Co Dublin  (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2017
501	501	SHIP CONSTRUCTION TURNKEY	Donegal	Drumrooske West	36	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
502	502	SHIP CONSTRUCTION TURNKEY	Donegal	Convent Road, Carndonagh	53	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
503	503	SHIP CONSTRUCTION TURNKEY	Donegal	Convoy	24	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
504	504	SHIP CONSTRUCTION TURNKEY	Donegal	Donegal Road, Ballybofey	14	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
505	505	SHIP CONSTRUCTION TURNKEY	Donegal	Admiran, Stranorlar	52	*N/A	""	""	Stage 3 approved Q4-2019, the scheme is now approved to proceed to tender.	""	""	""
506	506	SHIP CONSTRUCTION TURNKEY	Donegal	Rockview, Carrickboy	5	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
507	507	SHIP CONSTRUCTION TURNKEY	Donegal	Ardaravan, Buncrana	4	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
508	508	SHIP CONSTRUCTION TURNKEY	Donegal	Glencrow, Moville	35	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
509	509	SHIP CONSTRUCTION TURNKEY	Donegal	Ballyraine, Letterkenny	25	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
510	510	SHIP CONSTRUCTION TURNKEY	Donegal	Gleann Na Greine, Mullindrait, Stranorlar	21	*N/A	""	""	""	""	""	Q2-2018
511	511	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny	18	*N/A	""	""	""	""	""	Q4-2018
512	512	SHIP CONSTRUCTION TURNKEY	Donegal	Radharc an Chuain, Ramelton	18	*N/A	""	""	""	""	Q3-2020	""
513	513	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 2)	8	*N/A	""	""	""	""	""	Q1-2019
514	514	SHIP CONSTRUCTION TURNKEY	Donegal	Carnamuggagh, Letterkenny	30	*N/A	""	""	""	""	Q2-2018	""
515	515	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	10	*N/A	""	""	""	""	""	Q4-2019
516	516	SHIP CONSTRUCTION TURNKEY	Donegal	Crievesmith, Letterkenny (Phase 3)	10	*N/A	""	""	""	""	""	Q2-2019
517	517	SHIP CONSTRUCTION TURNKEY	Donegal	Hattersly Park, Carndonagh	21	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
518	518	SHIP CONSTRUCTION TURNKEY	Donegal	Brookfield, Donegal Town	34	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
519	519	SHIP CONSTRUCTION TURNKEY	Donegal	Stisin an Chirt, Falcarragh Phase 1	6	*N/A	""	""	""	""	""	Q4-2019
520	520	SHIP CONSTRUCTION TURNKEY	Donegal	Staisin An Chirt, Falcarragh - (Phase 2)	6	*N/A	""	""	""	""	Q2-2020	""
521	521	SHIP CONSTRUCTION TURNKEY	Donegal	Heathhill, Newtowncunningham	9	*N/A	""	""	""	""	""	Q3-2020
522	522	SHIP CONSTRUCTION	Donegal	Figart, Dunfanaghy	8	*N/A	""	""	""	""	""	Q4-2019
523	523	SHIP CONSTRUCTION	Donegal	Meadow Hill, Raphoe	11	*N/A	""	""	""	""	Q3-2020	""
524	524	SHIP CONSTRUCTION	Donegal	Radharc na Tra Breige, Malin (Phase 3)	8	*N/A	""	""	""	""	""	Q4-2019
525	525	SHIP CONSTRUCTION	Donegal	Cois Abhainn, St Johnston (Phase 2)	6	*N/A	""	""	""	""	Q1-2019	""
526	526	SHIP CONSTRUCTION	Donegal	Emerald Drive, Killybegs (Phase 6)	9	*N/A	""	""	""	""	""	Q4-2019
527	527	SHIP CONSTRUCTION	Donegal	Long Lane, Letterkenny	29	*N/A	""	""	""	""	Q3-2019	""
528	528	SHIP CONSTRUCTION	Donegal	Rockytown, Buncrana (Phase 1)	21	*N/A	""	""	""	""	Q4-2019	""
529	529	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 2)	8	*N/A	""	""	""	""	""	Q4-2018
530	530	SHIP CONSTRUCTION	Donegal	Abbots Wood, Carndonagh (Ph 2)	4	*N/A	""	""	""	""	""	Q4-2018
531	531	SHIP CONSTRUCTION	Donegal	Pound Street, Dunfanaghy	4	*N/A	""	""	""	""	Q3-2020	""
532	532	SHIP CONSTRUCTION	Donegal	Ardara (Phase 3)	8	*N/A	""	""	""	""	""	Q2-2017
533	533	SHIP CONSTRUCTION	Donegal	Newtoncunningham	7	*N/A	""	""	""	""	""	Q4-2018
534	534	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	""	""	""	Q3-2019	""
535	535	SHIP CONSTRUCTION	Donegal	Ard Connell, Ardara (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
536	536	SHIP CONSTRUCTION	Donegal	Manorcunningham (Phase 1)	2	*N/A	""	""	""	""	""	Q2-2017
537	537	SHIP CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	24	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
538	538	SHIP CONSTRUCTION	Donegal	Trusk Road, Ballybofey	19	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
539	539	SHIP CONSTRUCTION	Donegal	Crana Crescent, Buncrana	16	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
540	540	SHIP CONSTRUCTION	Donegal	Drumacrin, Bundoran	42	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
541	541	SHIP CONSTRUCTION	Donegal	Gallow's Lane, Lifford	29	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
542	542	CAS CONSTRUCTION TURNKEY	Donegal	Ballaghderg, Letterkenny	14	Respond	""	""	""	""	Q3-2019	""
543	543	CAS CONSTRUCTION	Donegal	Glenrowan House, Drumkeen, Stranorlar	5	Apex Housing Association	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
544	544	CAS CONSTRUCTION	Donegal	Cois Locha, Meenmore, Dungloe	15	County Donegal Parents and Friends Housing Association Ltd	""	""	""	""	Q3-2020	""
545	545	CAS CONSTRUCTION	Donegal	Railway Park, Drumrooske, Donegal Town	8	Oaklee Housing Trust	""	""	""	""	Q2-2019	""
546	546	CAS CONSTRUCTION	Donegal	Dunshenny House, Derry Road, Carndonagh	5	Apex Housing Association	""	""	""	""	""	Q2-2018
547	547	CAS CONSTRUCTION	Donegal	Raphoe Road, Castlefinn	34	Habinteg Housing Association (Ireland) Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
548	548	CALF TURNKEY	Donegal	Ballaghderg, Letterkenny, Co Donegal  (Phase 1)*	33	Respond	""	""	""	""	Q4-2017	""
549	549	CALF TURNKEY	Donegal	Forge Road, Donegal (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2016
550	550	CALF CONSTRUCTION	Donegal	Post Tender - Ernedale Ballyshannon (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q4-2018
551	551	SHIP CONSTRUCTION TURNKEY	Dublin City	Prospect Hill	58	*N/A	""	""	""	""	""	Q4-2017
552	552	SHIP CONSTRUCTION TURNKEY	Dublin City	Parkside, Balgriffin, Dublin 13	16	*N/A	""	""	""	""	""	Q4-2018
553	553	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	47	*N/A	""	""	""	""	""	Q4-2018
554	554	SHIP CONSTRUCTION TURNKEY	Dublin City	Hampton Wood, Finglas	45	*N/A	""	""	""	""	""	Q4-2019
555	555	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp B, Dublin 17	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
556	556	SHIP CONSTRUCTION RAPID	Dublin City	Bunratty Road	78	*N/A	""	""	""	""	Q4-2019	""
557	557	SHIP CONSTRUCTION RAPID	Dublin City	Bonham Street Dublin  8	57	*N/A	""	""	""	""	Q4-2019	""
558	558	SHIP CONSTRUCTION RAPID	Dublin City	Cork Street/Chamber Street Dublin 8	55	*N/A	""	""	""	""	Q1-2020	""
559	559	SHIP CONSTRUCTION RAPID	Dublin City	Springvale Chapelizod Dublin 8	71	*N/A	""	""	""	""	Q1-2020	""
560	560	SHIP CONSTRUCTION RAPID	Dublin City	Belcamp H, Dublin 17	38	*N/A	""	""	""	""	""	Q4-2017
561	561	SHIP CONSTRUCTION RAPID	Dublin City	Cherry Orchard, Ballyfermot	24	*N/A	""	""	""	""	""	Q4-2017
562	562	SHIP CONSTRUCTION RAPID	Dublin City	Mourne Road, Drimnagh	29	*N/A	""	""	""	""	""	Q4-2017
563	563	SHIP CONSTRUCTION RAPID	Dublin City	St Helena's Drive, Finglas	39	*N/A	""	""	""	""	""	Q3-2017
564	564	SHIP CONSTRUCTION RAPID	Dublin City	Poppintree, Ballymun	22	*N/A	""	""	""	""	""	Q2-2016
565	565	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	53	*N/A	""	""	""	""	""	Q4-2018
566	566	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	13	*N/A	""	""	""	""	""	Q3-2018
567	567	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	3	*N/A	""	""	""	""	""	Q3-2018
568	568	SHIP CONSTRUCTION RAPID	Dublin City	Rapids at Ballyfermot, Rathvilly, Woodbank Drive	19	*N/A	""	""	""	""	""	Q4-2019
569	569	SHIP CONSTRUCTION	Dublin City	Hampton Wood	25	*N/A	""	""	""	""	""	Q4-2016
570	570	SHIP CONSTRUCTION	Dublin City	Cornamona, Ballyfermot, Dublin 12	61	*N/A	""	""	""	""	Q2-2019	""
571	571	SHIP CONSTRUCTION	Dublin City	Infirmary Road, Dublin 7	38	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
572	572	SHIP CONSTRUCTION	Dublin City	North King Street, - Sean Foster Place, Dublin 7	30	*N/A	""	""	""	""	Q2-2019	""
573	573	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	5	*N/A	""	""	""	""	""	Q4-2018
574	574	SHIP CONSTRUCTION	Dublin City	St. Finbar's Court, Kilkieran Road, Dublin 7	46	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
575	575	SHIP CONSTRUCTION	Dublin City	Dominick Street (East side)	72	*N/A	""	""	""	""	Q1-2018	""
576	576	SHIP CONSTRUCTION	Dublin City	O'Devaney Gardens - Phase 1A	56	*N/A	""	""	""	""	Q3-2018	""
577	577	SHIP CONSTRUCTION	Dublin City	Priory Hall	9	*N/A	""	""	""	""	""	Q1-2017
578	578	SHIP CONSTRUCTION	Dublin City	Priory Hall	24	*N/A	""	""	""	""	""	Q4-2019
579	579	SHIP CONSTRUCTION	Dublin City	Ballybough Road, Dublin 1	2	*N/A	""	""	""	""	""	Q4-2019
580	580	SHIP CONSTRUCTION	Dublin City	Glin Court, Coolock, Dublin 17	25	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
581	581	SHIP CONSTRUCTION	Dublin City	Matt Talbot Court	92	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
582	582	SHIP CONSTRUCTION	Dublin City	Kildonan Road	75	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
583	583	SHIP CONSTRUCTION	Dublin City	Lands at Emmet Road	109	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
584	584	REGENERATION	Dublin City	St. Teresa's Gardens - initial project	54	*N/A	""	""	""	""	Q1-2019	""
585	585	REGENERATION	Dublin City	Dolphin House, Dublin 8	100	*N/A	""	""	""	""	""	Q3-2018
586	586	REGENERATION	Dublin City	Sackville Avenue Cottages	14	*N/A	""	""	Stage 3 approved Q3-2019, the scheme is now approved to proceed to tender.	""	""	""
587	587	REGENERATION	Dublin City	Charlemont	79	*N/A	""	""	""	""	""	Q4-2017
588	588	REGENERATION	Dublin City	Maxwell Road	9	*N/A	""	""	""	""	""	Q2-2016
589	589	REGENERATION	Dublin City	Buttercup, Darndale	19	*N/A	""	""	""	""	""	Q4-2017
590	590	REGENERATION	Dublin City	Buttercup, Darndale	9	*N/A	""	""	""	""	""	Q1-2018
591	591	REGENERATION	Dublin City	Buttercup, Darndale	7	*N/A	""	""	""	""	""	Q2-2018
592	592	REGENERATION	Dublin City	St. Bricins Park	11	*N/A	""	""	""	""	""	Q4-2018
593	593	REGENERATION	Dublin City	Dorset Streeet, Dublin 7	115	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
594	594	REGENERATION	Dublin City	Constitution Hill Dublin 7	130	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
595	595	CAS CONSTRUCTION TURNKEY	Dublin City	Block 70, The Plaza, Parkwest, Dublin 12 	43	Tath Housing Association Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
596	596	CAS CONSTRUCTION TURNKEY	Dublin City	5A & 5B Willow Park Crescent	2	Tath Housing Association Ltd	""	""	""	""	""	Q3-2020
597	597	CAS CONSTRUCTION SINGLE STAGE	Dublin City	61 & 63 Rathoath Avenue, Finglas, Dublin 11	6	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q1-2018, the scheme is fully approved.	""	""
598	598	CAS CONSTRUCTION SINGLE STAGE	Dublin City	13A Casement Drive / 307A Casement Road, Finglas, Dublin 11	4	Arlington Novas Ireland Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
599	599	CAS CONSTRUCTION SINGLE STAGE	Dublin City	88 Lower Drumcondra Road, Dublin 9 	6	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
600	600	CAS CONSTRUCTION	Dublin City	Beech Hill	19	Royal Hospital Donnybrook Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2018
601	601	CAS CONSTRUCTION	Dublin City	Ellis Court, Dublin	22	Tath Housing Association Ltd	""	""	""	""	Q3-2019	""
602	602	CAS CONSTRUCTION	Dublin City	Martanna House, High Park, Grace Park Road,Dublin 9	8	Respond	""	""	""	""	""	Q4-2018
603	603	CAS CONSTRUCTION	Dublin City	1 - 2 Rafter's Lane, Dublin 12	11	Walkinston Housing Association Ltd (WALK)	""	""	""	""	""	Q4-2019
604	604	CAS CONSTRUCTION	Dublin City	180-187 Townsend Street	20	Peter McVerry Trust Ltd	""	""	Stage 3 approved Q4-2018, the scheme is now approved to proceed to tender.	""	""	""
605	605	CAS CONSTRUCTION	Dublin City	Old Kilmainham Road, Dublin 8	11	Arlington Novas Ireland Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
606	606	CAS CONSTRUCTION	Dublin City	26 New Street South, Dublin 8	8	Peter McVerry Trust Ltd	""	""	""	""	Q4-2019	""
607	607	CAS CONSTRUCTION	Dublin City	Broome Lodge, Dunmanus, Dublin 7	10	Cluid Housing Association	""	""	""	""	""	Q4-2017
608	608	CAS CONSTRUCTION	Dublin City	St Agatha's Court, North William Street, Dublin 1	11	Peter McVerry Trust Ltd	""	""	""	""	""	Q2-2017
609	609	CAS CONSTRUCTION	Dublin City	55B Arbour Hill, Dublin 7	14	Simon Community : Dublin Simon	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
610	610	CAS CONSTRUCTION	Dublin City	St. Michael's Estate, Inchicore, Dublin 8 - Housing Pilot Project 	52	Circle Voluntary Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
611	611	CAS CONSTRUCTION	Dublin City	Shaw Street, Dublin 2	12	Peter McVerry Trust Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
612	612	CAS CONSTRUCTION	Dublin City	Sarsfield Road, Ballyfermot, Dublin 10	6	Respond	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
613	613	CALF CONSTRUCTION	Dublin City	3 units, Block A Jamestown Court, Dublin 8 (Phase 1)	3	ALONE	""	""	""	""	Q2-2019	""
614	614	CALF TURNKEY	Dublin City	9 units Dorset Street, Dublin 1 (Phase 1)	9	Clanmil Housing Association Ireland	""	""	""	""	Q2-2019	""
615	615	CALF TURNKEY	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2016
616	616	CALF TURNKEY	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 2)	21	Tath Housing Association	""	""	""	""	""	Q1-2017
617	617	CALF TURNKEY	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q2-2017
618	618	CALF TURNKEY	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 4)	3	Tath Housing Association	""	""	""	""	""	Q3-2017
619	619	CALF TURNKEY	Dublin City	An Riasc, Finglas, Phase 1,2,3 and 4 (Phase 5)	1	Tath Housing Association	""	""	""	""	""	Q4-2018
620	620	CALF CONSTRUCTION	Dublin City	Annamore Court, Ballyfermot (Phase 1)	70	The Iveagh Trust	""	""	""	""	""	Q2-2017
621	621	CALF TURNKEY	Dublin City	Aughrim Street, Stoneybatter, Dublin 7 (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	""	Q3-2019	""
622	622	CALF TURNKEY	Dublin City	Balfe Road, Crumlin, Dublin 12 (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2018
623	623	CALF CONSTRUCTION	Dublin City	Ballygall Road East Phase 2 (Phase 1)	11	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q1-2016
624	624	CALF CONSTRUCTION	Dublin City	Bethany House, Gilford Road, Sandymount, Dublin 4 (Phase 1)	62	Cluid Housing	""	""	""	Q2-2018	""	""
625	625	CALF TURNKEY	Dublin City	Block A Northbank, Castleforbes, Dublin 1  (Phase 1)*	26	Tath Housing Association	""	""	""	""	""	Q2-2018
626	626	CALF CONSTRUCTION	Dublin City	Block A, Jamestown Court, Dublin 8 (Phase 1)	9	ALONE	""	""	""	""	Q2-2019	""
627	627	CALF TURNKEY	Dublin City	Bluebell Avenue, Bluebell, Dublin 12 (Phase 1)*	52	Respond	""	""	""	""	Q4-2019	""
628	628	CALF TURNKEY	Dublin City	Bluebell Avenue, Dublin 12 (Phase 1)	7	Tath Housing Association	""	""	""	""	""	Q4-2018
629	629	CALF CONSTRUCTION	Dublin City	Broome Lodge,\nDunmanus Court, Cabra (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q4-2017
630	630	CALF TURNKEY	Dublin City	Camac Park, Bluebell, Dublin 12 (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q2-2020
631	631	CALF TURNKEY	Dublin City	Canal Meadows, Bluebell, Dublin 12 (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q1-2019
632	632	CALF TURNKEY	Dublin City	Chanel College, Coolock Village, Malahide Road, Dublin 5  (Phase 1)*	16	Respond	""	""	""	""	""	Q4-2017
633	633	CALF TURNKEY	Dublin City	Chanel Manor Apartments, Coolock, Dublin 5. (Phase 1)*	65	Respond	""	""	""	""	Q2-2019	""
634	634	CALF TURNKEY	Dublin City	Clongriffin, Dublin 13 (Phase 1)*	84	The Iveagh Trust	""	""	""	""	""	Q2-2019
635	635	CALF TURNKEY	Dublin City	Connaught Street, Phibsborough, Dublin 7 (Phase 1)	20	Focus Housing Association CLG	""	""	""	Q3-2020	""	""
636	636	CALF TURNKEY	Dublin City	Cromwellsfort Court, Cromwellsfort Road, Walkinstown, Dublin 12 (Phase 1)*	12	Oaklee Housing	""	""	""	""	""	Q3-2020
637	637	CALF TURNKEY	Dublin City	Crumlin Village, Dublin 12 (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2017
638	638	CALF TURNKEY	Dublin City	Crumlin Village, Dublin 12 (Phase 2)	2	Cluid Housing	""	""	""	""	""	Q3-2017
639	639	CALF CONSTRUCTION	Dublin City	Dolphin Park, Rialto, Dublin 8 (Phase 1)	43	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
640	640	CALF TURNKEY	Dublin City	Donnybrook Gardens, Lands of Greenfield Park, Donnybrook, Dublin 4 (Phase 1)*	4	RHD Housing	""	""	""	""	Q1-2018	""
641	641	CALF TURNKEY	Dublin City	Elanora Court, Long Mile Road, Walkinstown, Dublin 12 (Phase 1)*	153	Respond	""	""	""	""	Q3-2020	""
642	642	CALF CONSTRUCTION	Dublin City	Harolds Cross, Dublin 6 (Phase 1)	28	Focus Housing Association CLG	""	""	""	""	""	Q4-2016
643	643	CALF TURNKEY	Dublin City	Harolds Cross, Dublin 6W (Phase 1)	12	Respond	""	""	""	Q2-2020	""	""
644	644	CALF TURNKEY	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 1)	1	Tath Housing Association	""	""	""	""	""	Q4-2019
645	645	CALF TURNKEY	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 2)	2	Tath Housing Association	""	""	""	""	Q4-2019	""
646	646	CALF TURNKEY	Dublin City	Lough Conn Road, Ballyfermot, Dublin 10 (Phase 3)	2	Tath Housing Association	""	""	""	""	Q4-2019	""
647	647	CALF TURNKEY	Dublin City	Merville Court, Merville Avenue, Fairview (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2017
648	648	CALF TURNKEY	Dublin City	Millrose House, Bluebell Avenue, Dublin 12 (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q4-2017
649	649	CALF TURNKEY	Dublin City	Mountjoy Square North, Dublin 1 (Phase 1)	31	Respond	""	""	""	""	""	Q4-2019
650	650	CALF CONSTRUCTION	Dublin City	North King Street, Dublin 7  (Phase 1)	30	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
651	651	CALF TURNKEY	Dublin City	Old School House Lane, Magenta Crescent, Santry, Dublin 9 (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2019
652	652	CALF CONSTRUCTION	Dublin City	Orchard Lawns, Ballyfermot (Phase 1)	36	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
653	653	CALF CONSTRUCTION	Dublin City	Orchard Lawns, Ballyfermot (Phase 2)	36	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
654	654	CALF CONSTRUCTION	Dublin City	Post Tender - Wad River Close Phase 2, Ballymun, Dublin 9  (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2019
655	655	CALF CONSTRUCTION	Dublin City	Post Tender Johns Lane West Dublin 8 (Phase 1)	31	Focus Housing Association CLG	""	""	""	""	""	Q4-2018
656	656	CALF CONSTRUCTION	Dublin City	POST TENDER, Poplar Row, Ballybough, Dublin 3 (Phase 1)	29	Oaklee Housing	""	""	""	""	""	Q4-2019
657	657	CALF TURNKEY	Dublin City	Ravensdale Court, Kimmage, Dublin 12. (Phase 1)	12	Tath Housing Association	""	""	""	Q2-2020	""	""
658	658	CALF CONSTRUCTION	Dublin City	Revised - Dominic Place, Dublin (Phase 1)	9	The Paddy McGrath Housing Project	""	""	""	""	""	Q3-2020
659	659	CALF CONSTRUCTION	Dublin City	Revised Post Tender - Raleigh Square, Crumlin (Phase 1)	33	Tath Housing Association	""	""	""	""	""	Q4-2019
660	660	CALF CONSTRUCTION	Dublin City	Revised, St Marys Mansions, Dublin 1 (Phase 1)	80	Cluid Housing	""	""	""	""	""	Q4-2019
661	661	CALF CONSTRUCTION	Dublin City	Richmond Road, Dublin 9 (Phase 1)	40	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
662	662	CALF TURNKEY	Dublin City	Royal Canal Crescent, Rathborne Park, Rathborne, Dublin15 (Phase 1)*	16	Cluid Housing	""	""	""	""	Q1-2019	""
663	663	CALF TURNKEY	Dublin City	Royal Canal Park, Ashtown, Dublin 15 (Phase 1)*	46	Respond	""	""	""	""	Q1-2019	""
664	664	CALF TURNKEY	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	44	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
665	665	CALF TURNKEY	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 1)	6	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2018	""
666	666	CALF TURNKEY	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 2)	42	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q2-2020
667	667	CALF TURNKEY	Dublin City	St Agnes Convent, Armagh Road, Crumlin, Dublin 12 (Phase 3)	11	Fold Housing Association Ireland Ltd	""	""	""	""	Q1-2018	""
668	668	CALF TURNKEY	Dublin City	Stormanstown Hall, Ballymun Road, (revised) (Phase 1)	42	Oaklee Housing	""	""	""	""	""	Q3-2018
669	669	CALF TURNKEY	Dublin City	Sundrive Mews, Kimmage, Dublin 12 (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2019
670	670	CALF TURNKEY	Dublin City	Thornwood, Beaumont (Phase 1)	28	Tath Housing Association	""	""	""	""	""	Q2-2016
671	671	CALF TURNKEY	Dublin City	Thornwood, Beaumont (Phase 2)	18	Tath Housing Association	""	""	""	""	""	Q4-2016
672	672	CALF TURNKEY	Dublin City	Thornwood, Beaumont (Phase 3)	14	Tath Housing Association	""	""	""	""	""	Q1-2017
673	673	CALF TURNKEY	Dublin City	Thornwood, Beaumont (Phase 4)	8	Tath Housing Association	""	""	""	""	""	Q1-2017
674	674	CALF TURNKEY	Dublin City	Tonlegee Road, Dublin 5  (Phase 1)	47	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2018
675	675	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Ayrfield, Malahide Road	150	*N/A	""	""	""	""	Q1-2019	""
676	676	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Dublin City	Scribblestown	70	*N/A	""	""	""	""	Q1-2019	""
677	677	SHIP CONSTRUCTION TURNKEY	Fingal	Blackmills Grove, Blakestown Road, Mulhuddard	10	*N/A	""	""	""	""	""	Q2-2017
678	678	SHIP CONSTRUCTION TURNKEY	Fingal	Balgriffin Grove, Malahide Road, Balgriffin	6	*N/A	""	""	""	""	""	Q1-2017
679	679	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	36	*N/A	""	""	""	""	""	Q3-2017
680	680	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q1-2018
681	681	SHIP CONSTRUCTION TURNKEY	Fingal	Hansfield, Ongar, Dublin 15	16	*N/A	""	""	""	""	""	Q2-2018
682	682	SHIP CONSTRUCTION TURNKEY	Fingal	Ravenswood, North Road, Finglas	2	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
683	683	SHIP CONSTRUCTION TURNKEY	Fingal	Boroimhe, Swords	6	*N/A	""	""	""	""	""	Q3-2018
684	684	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
685	685	SHIP CONSTRUCTION TURNKEY	Fingal	Kenure Gate, Park Road, Rush	4	*N/A	""	""	""	""	""	Q4-2018
686	686	SHIP CONSTRUCTION TURNKEY	Fingal	Glaslinn, Donabate	3	*N/A	""	""	""	""	""	Q4-2018
687	687	SHIP CONSTRUCTION TURNKEY	Fingal	Bremore Pastures Park, Balbriggan	4	*N/A	""	""	""	""	""	Q4-2018
688	688	SHIP CONSTRUCTION TURNKEY	Fingal	Northwood Green, Santry, Dublin 9	37	*N/A	""	""	""	""	""	Q4-2018
689	689	SHIP CONSTRUCTION TURNKEY	Fingal	Hollytown Cottages	4	*N/A	""	""	""	""	""	Q4-2019
690	690	SHIP CONSTRUCTION TURNKEY	Fingal	Cnoc Dubh Ballyboughal Co. Dublin	5	*N/A	""	""	""	""	""	Q3-2019
691	691	SHIP CONSTRUCTION TURNKEY	Fingal	Rahillion, Donabate	1	*N/A	""	""	""	""	""	Q4-2019
692	692	SHIP CONSTRUCTION TURNKEY	Fingal	Bay Meadows, Hollystown, Dublin 15	10	*N/A	""	""	""	""	""	Q3-2020
693	693	SHIP CONSTRUCTION	Fingal	Outlands, Rathbeale Road, Swords, Co.Dublin	11	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
694	694	SHIP CONSTRUCTION RAPID	Fingal	Avondale, Mulhuddart, Dublin 15	42	*N/A	""	""	""	""	""	Q4-2019
695	695	SHIP CONSTRUCTION RAPID	Fingal	Pinewood, Balbriggan	20	*N/A	""	""	""	""	""	Q2-2018
696	696	SHIP CONSTRUCTION RAPID	Fingal	Wellview, Mulhuddart	20	*N/A	""	""	""	""	""	Q4-2017
697	697	SHIP CONSTRUCTION RAPID	Fingal	Church Road, Mulhuddart, Dublin 15	22	*N/A	""	""	""	""	""	Q4-2019
698	698	SHIP CONSTRUCTION RAPID	Fingal	Churchfields, Phase 2B, Mulhuddart, Dublin 15.	51	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
699	699	SHIP CONSTRUCTION	Fingal	Rivermeade, St. Margarets	2	*N/A	""	""	""	""	""	Q2-2019
700	700	SHIP CONSTRUCTION	Fingal	Rowlestown	10	*N/A	""	""	""	""	""	Q2-2019
701	701	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	5	*N/A	""	""	""	""	""	Q2-2018
702	702	SHIP CONSTRUCTION	Fingal	Castlelands, Park View, Balbriggan (Phase 3)	24	*N/A	""	""	""	""	""	Q1-2019
703	703	SHIP CONSTRUCTION	Fingal	Rathbeale Road, Swords	24	*N/A	""	""	""	""	""	Q2-2020
704	704	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	2	*N/A	""	""	""	""	""	Q3-2017
705	705	SHIP CONSTRUCTION	Fingal	Cappaghfinn (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2016
706	706	SHIP CONSTRUCTION	Fingal	St. Cronan's Green, Swords	14	*N/A	""	""	""	""	""	Q2-2016
707	707	SHIP CONSTRUCTION	Fingal	St. Cronan's Cottages, Swords - Infill	1	*N/A	""	""	""	""	""	Q2-2016
708	708	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	25	*N/A	""	""	""	""	""	Q4-2017
709	709	SHIP CONSTRUCTION	Fingal	The Grange, Ballyboughal	6	*N/A	""	""	""	""	""	Q4-2018
710	710	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	15	*N/A	""	""	""	""	""	Q1-2018
711	711	SHIP CONSTRUCTION	Fingal	Redevelopment of Community Centre, Pinewood, Balbriggan	2	*N/A	""	""	""	""	""	Q3-2019
712	712	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	4	*N/A	""	""	""	""	""	Q3-2018
713	713	SHIP CONSTRUCTION	Fingal	Racecourse Commons, Lusk	25	*N/A	""	""	""	""	""	Q4-2018
714	714	SHIP CONSTRUCTION	Fingal	Tucketts Lane, Howth, Co Dublin	8	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
715	715	SHIP CONSTRUCTION	Fingal	Wellview Infill	20	*N/A	""	""	""	""	Q3-2020	""
716	716	SHIP CONSTRUCTION	Fingal	Rowlestown	6	*N/A	""	""	""	""	""	Q4-2019
717	717	SHIP CONSTRUCTION	Fingal	Rowlestown	6	*N/A	""	""	""	""	""	Q4-2019
718	718	SHIP CONSTRUCTION	Fingal	Cappagh Lands, Cappagh Road Finglas	69	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
719	719	SHIP CONSTRUCTION	Fingal	Rowlestown	4	*N/A	""	""	""	""	""	Q3-2019
720	720	SHIP CONSTRUCTION	Fingal	Leonards Garage, Lusk, Co. Dublin	10	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
721	721	SHIP CONSTRUCTION	Fingal	Church Road, Lusk	5	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
722	722	SHIP CONSTRUCTION	Fingal	Churchfields, Phase 2B, Mulhuddart, Dublin 15.	19	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
723	723	CAS CONSTRUCTION	Fingal	Killhedge Lane Dun Emer	48	Tath Housing Association Ltd	Stage 1 approved Q1-2017, outline design and costs being prepared.	""	""	""	""	""
724	724	CAS CONSTRUCTION	Fingal	Ravenswood, North Road, Finglas	6	Peter McVerry Trust Ltd	""	""	""	""	""	Q4-2018
725	725	CAS CONSTRUCTION	Fingal	22 College Street, Baldoyle	4	Cluid Housing Association	""	""	""	""	Q3-2020	""
726	726	CAS CONSTRUCTION	Fingal	Darcystown, Ringfort, Balrothery	9	North ? East Housing Association Ltd	""	""	""	""	""	Q3-2017
727	727	CAS CONSTRUCTION	Fingal	Estuary Road, Malahide	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q2-2018
728	728	CAS CONSTRUCTION	Fingal	Garristown, Co. Dublin	5	North ? East Housing Association Ltd	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
729	729	CALF TURNKEY	Fingal	4 units, Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
730	730	CALF TURNKEY	Fingal	Allendale Square, Clonsilla, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	""	Q2-2020
731	731	CALF TURNKEY	Fingal	An Muileann, Kettles Lane, Swords, Dublin (Phase 1)	24	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
732	732	CALF TURNKEY	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q4-2018
733	733	CALF TURNKEY	Fingal	Barnwell Woods, Hansfield, Dublin 15 (Phase 2)*	12	Tath Housing Association	""	""	""	""	""	Q4-2018
734	734	CALF TURNKEY	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 1)	18	Tath Housing Association	""	""	""	""	Q4-2019	""
735	735	CALF TURNKEY	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 2)	15	Tath Housing Association	""	""	""	""	Q4-2019	""
736	736	CALF TURNKEY	Fingal	Belcamp Manor, Malahide Road, Balgriffin, Dublin 13 (Phase 3)	16	Tath Housing Association	""	""	""	""	Q4-2019	""
737	737	CALF TURNKEY	Fingal	Carrs Lane, Malahide Road, Dublin 17 (Phase 1)*	59	Respond	""	""	""	""	Q4-2019	""
738	738	CALF TURNKEY	Fingal	Castlegrange Park (2) Clonsilla (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q2-2016
739	739	CALF TURNKEY	Fingal	Castlegrange Park (2) Clonsilla (Phase 2)	7	Tath Housing Association	""	""	""	""	""	Q3-2016
740	740	CALF TURNKEY	Fingal	Castlegrange Park (2) Clonsilla (Phase 3)	7	Tath Housing Association	""	""	""	""	""	Q4-2016
741	741	CALF TURNKEY	Fingal	Castlegrange Park (2) Clonsilla (Phase 4)	21	Tath Housing Association	""	""	""	""	""	Q1-2017
742	742	CALF TURNKEY	Fingal	Castlegrange Park (2) Clonsilla (Phase 5)	8	Tath Housing Association	""	""	""	""	""	Q2-2017
743	743	CALF TURNKEY	Fingal	Charlestown Centre, Charlestown Place & St., Margarets Road, Dublin 11 (Phase 1)*	138	Respond	""	""	""	""	Q3-2019	""
744	744	CALF TURNKEY	Fingal	Cois Sruthan, Ballyboughal, Co.Dublin (Phase 1)*	17	Oaklee Housing	""	""	""	""	""	Q3-2020
745	745	CALF TURNKEY	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2019
746	746	CALF TURNKEY	Fingal	Drynam Heath, Feltrim Road, Swords, Co. Dublin (Phase 2)*	6	Tath Housing Association	""	""	""	""	Q1-2019	""
747	747	CALF TURNKEY	Fingal	Dun Si, St. Marnock Bay, Station Road, Portmarnock, Co. Dublin\n\n (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q2-2020
748	748	CALF TURNKEY	Fingal	Dun Si, St. Marnock Bay, Station Road, Portmarnock, Co. Dublin\n\n (Phase 2)*	5	Cluid Housing	""	""	""	""	Q3-2018	""
749	749	CALF TURNKEY	Fingal	Knightsgate, Rush, Co. Dublin (Phase 1)*	38	Cluid Housing	""	""	""	""	""	Q4-2019
750	750	CALF TURNKEY	Fingal	Knightsgate, Rush, Co. Dublin (phase 2) (Phase 1)	19	Cluid Housing	""	""	""	""	""	Q3-2020
751	751	CALF CONSTRUCTION	Fingal	Ladyswell Road & Church Road, Mulhuddart, Dublin 15  (Phase 1)	65	Cluid Housing	""	""	""	""	Q4-2018	""
752	752	CALF TURNKEY	Fingal	Lanesborough Close, Finglas, Dublin 11 (Phase 1)*	21	Cluid Housing	""	""	""	""	""	Q4-2018
753	753	CALF TURNKEY	Fingal	Martello Place, Balbriggan, Co Dublin  (Phase 1)	18	Respond	""	""	""	""	""	Q3-2018
754	754	CALF TURNKEY	Fingal	Millers Glen, Oldtown, Swords, Co. Dublin (Phase 1)*	28	The Iveagh Trust	""	""	""	""	Q3-2018	""
755	755	CALF TURNKEY	Fingal	Millers Glen, Phase 3, Oldtown, Swords (Phase 1)*	14	The Iveagh Trust	""	""	""	""	""	Q4-2019
756	756	CALF TURNKEY	Fingal	Norseman's Court, Norseman's Walk, Lusk Village, Lusk, Co. Dublin (Phase 1)*	18	Cluid Housing	""	""	""	""	Q4-2018	""
757	757	CALF TURNKEY	Fingal	Northwood Green, Santry, Dublin 9 (Phase 1)*	6	Respond	""	""	""	""	""	Q4-2018
758	758	CALF TURNKEY	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 1)	48	Respond	""	""	""	""	""	Q4-2019
759	759	CALF TURNKEY	Fingal	Northwood, Ballymun Cross, Santry, Dublin 9 (Phase 2)*	7	Respond	""	""	""	""	""	Q2-2020
760	760	CALF CONSTRUCTION	Fingal	Old Coolock Lane, Santry, Dublin 9 (Phase 1)	28	Circle Voluntary Housing Association Ltd	""	""	""	Q1-2019	""	""
761	761	CALF TURNKEY	Fingal	Old Corduff Road, Blanchardstown, Dublin 15 (Phase 1)*	28	Respond	""	""	""	""	Q4-2018	""
762	762	CALF TURNKEY	Fingal	Pappan Grove, Northwood, Santry, Dublin 9 (Phase 1)*	35	Tath Housing Association	""	""	""	""	""	Q3-2019
763	763	CALF TURNKEY	Fingal	Phoenix Park Avenue, Castleknock, Dublin 15 (Phase 1)*	31	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
764	764	CALF TURNKEY	Fingal	Riverwood Square, Dublin 15 (Phase 1)*	24	Cluid Housing	""	""	""	""	Q4-2019	""
765	765	CALF TURNKEY	Fingal	Seamus Ennis Terrace, Naul, Co. Dublin (Phase 1)	2	Respond	""	""	""	""	Q3-2017	""
766	766	CALF TURNKEY	Fingal	Semple Woods, Donabate, North County Dublin (Phase 1)*	30	Tath Housing Association	""	""	""	""	""	Q4-2019
767	767	CALF TURNKEY	Fingal	St Marnocks Bay, Portmarnock, Co Dublin   (Phase 1)*	10	Cluid Housing	""	""	""	""	""	Q4-2017
768	768	CALF TURNKEY	Fingal	St Werburghs Court Drynam Rd Swords Co Dublin (Phase 1)*	18	Tath Housing Association	""	""	""	""	""	Q4-2017
769	769	CALF TURNKEY	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
770	770	CALF TURNKEY	Fingal	Station Manor, Station Road, Portmarnock, Co. Dublin (Phase 2)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	Q4-2017	""
771	771	CALF TURNKEY	Fingal	Taylor Hill Crescent, Balbriggan, Co. Dublin (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q4-2018
772	772	CALF TURNKEY	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)	21	Cluid Housing	""	""	""	""	""	Q2-2020
773	773	CALF TURNKEY	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2018
774	774	CALF TURNKEY	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 1)*	24	Cluid Housing	""	""	""	""	""	Q4-2019
775	775	CALF TURNKEY	Fingal	Taylor Hill, Balbriggan, Co. Dublin (Phase 2)	1	Cluid Housing	""	""	""	""	Q1-2019	""
776	776	CALF TURNKEY	Fingal	The Forge, Lusk, Co. Dublin (Phase 1)	8	Oaklee Housing	""	""	""	""	""	Q4-2019
777	777	CALF TURNKEY	Fingal	The Hermitage, Balgriffin, Co Dublin  (Phase 1)*	54	Cluid Housing	""	""	""	""	""	Q4-2017
778	778	CALF TURNKEY	Fingal	Waterside, Malahide, Dublin (Phase 1)	5	Cluid Housing	""	""	""	""	Q3-2017	""
779	779	CALF TURNKEY	Fingal	Weavers Wood, Clonsilla Road, Clonsilla, Dublin 15  (Phase 1)*	33	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
780	780	CALF TURNKEY	Fingal	Weston, Feltrim Road, Swords, North County Dublin (Phase 1)	24	Oaklee Housing	""	""	""	""	""	Q4-2019
781	781	CALF TURNKEY	Fingal	Weston, Feltrim Road, Swords, North County Dublin (Phase 2)*	10	Oaklee Housing	""	""	""	""	""	Q3-2020
782	782	CALF TURNKEY	Fingal	 Wrens Hill, (Formerly The Galleries),  Donabate, Co. Dublin (Phase 1)	43	Oaklee Housing	""	""	""	""	""	Q4-2019
783	783	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine, (Glasshouse Site) Monivea Road (Phase 1)	6	*N/A	""	""	""	""	""	Q3-2019
784	784	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 2)	16	*N/A	""	""	""	""	""	Q4-2019
785	785	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 3)	7	*N/A	""	""	""	""	""	Q4-2019
786	786	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 4)	13	*N/A	""	""	""	""	""	Q3-2020
787	787	SHIP CONSTRUCTION TURNKEY	Galway City	Radharc na Grine (Glasshouse Site), Monivea Road - (Phase 5)	8	*N/A	""	""	""	""	Q4-2018	""
788	788	SHIP CONSTRUCTION TURNKEY	Galway City	Garra Caol, (Coast Road Site) Dublin Road	27	*N/A	""	""	""	""	Q1-2020	""
789	789	SHIP CONSTRUCTION TURNKEY	Galway City	Garra Caol (Coast Road Site) Dublin Road	26	*N/A	""	""	""	""	Q1-2020	""
790	790	SHIP CONSTRUCTION	Galway City	Ard Cr, Ballymoneen Road (Phase 2)	78	*N/A	""	""	""	""	Q2-2019	""
791	791	SHIP CONSTRUCTION	Galway City	Ard Cr, Ballymoneen Road (Phase 1)	14	*N/A	""	""	""	""	""	Q2-2018
792	792	SHIP CONSTRUCTION	Galway City	Monivea Road, Ballybaan More	15	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
793	793	SHIP CONSTRUCTION	Galway City	Garra Beag, Monivea Road, Ballybaan More	58	*N/A	""	""	""	""	Q1-2020	""
794	794	SHIP CONSTRUCTION	Galway City	Headford Road, Castlegar	69	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
795	795	SHIP CONSTRUCTION	Galway City	Keeraun, Ballymoneen Road	60	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
796	796	SHIP CONSTRUCTION	Galway City	Clareview Park, Ballybaan	5	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
797	797	SHIP CONSTRUCTION	Galway City	Merlin Park Lands, Galway City	18	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
798	798	CAS CONSTRUCTION	Galway City	97/98 Rockfield	4	Carraig Dubh Housing Association	""	""	""	""	""	Q1-2018
799	799	CAS CONSTRUCTION	Galway City	Cul Garrai, Rahoon	6	Peter Triest Housing Association Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
800	800	CAS CONSTRUCTION	Galway City	47 Forster Street, Galway City (Domestic Violence Refuge)	9	Cope Galway	""	""	""	""	""	Q4-2019
801	801	CAS CONSTRUCTION	Galway City	Doughiska, Galway City	7	Respond	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
802	802	CALF TURNKEY	Galway City	Belmont, Renmore, Galway City (Phase 1)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
803	803	CALF TURNKEY	Galway City	Block C, Sraith Fhada, Doughiska, Galway (Phase 1)	11	Tath Housing Association	""	""	""	""	Q2-2008	""
804	804	CALF TURNKEY	Galway City	Block D, Sraith Fhada, Doughiska, Galway (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q4-2019
805	805	CALF TURNKEY	Galway City	Boireann Beag, Ros Cam, Galway (Phase 1)	16	Cluid Housing	""	""	""	""	""	Q4-2016
806	806	CALF TURNKEY	Galway City	Breacan, Letteragh Road, Galway City (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q4-2019
807	807	CALF TURNKEY	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 1)	7	Respond	""	""	""	""	""	Q4-2019
808	808	CALF TURNKEY	Galway City	Caireal Mor (Phase 2), Headford Road, Castlegar, Galway (Phase 2)*	8	Respond	""	""	""	""	""	Q3-2020
809	809	CALF TURNKEY	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 1)	10	Respond	""	""	""	""	""	Q4-2019
810	810	CALF TURNKEY	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 2)	63	Respond	""	""	""	""	Q2-2018	""
811	811	CALF TURNKEY	Galway City	Caireal Mor, Castlegar Road, Galway (Phase 3)	8	Respond	""	""	""	""	Q2-2018	""
812	812	CALF TURNKEY	Galway City	Cnoc na Ri, Clybaun Road, Galway  (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q3-2017
813	813	CALF TURNKEY	Galway City	Creig Ard, Roscam, Galway City  (Phase 1)	9	Cluid Housing	""	""	""	""	Q4-2019	""
814	814	CALF TURNKEY	Galway City	Creig Ard, Roscam, Galway City  (Phase 2)	10	Cluid Housing	""	""	""	""	Q4-2019	""
815	815	CALF TURNKEY	Galway City	Creig Ard, Roscam, Galway City, Co. Galway (Phase 1)*	17	Cluid Housing	""	""	""	""	Q4-2019	""
816	816	CALF TURNKEY	Galway City	Gaelcarrig, Letteragh, Galway City (Phase 1)*	83	Respond	""	""	""	""	Q3-2020	""
817	817	CALF TURNKEY	Galway City	Leana Theas, Cappagh Road, Galway City (Phase 1)*	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
818	818	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 1)*	10	Cluid Housing	""	""	""	""	Q3-2020	""
819	819	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 2)	13	Cluid Housing	""	""	""	""	Q3-2020	""
820	820	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 3)	16	Cluid Housing	""	""	""	""	Q3-2020	""
821	821	CALF TURNKEY	Galway City	Letteragh Road, Rahoon, Galway City (Phase 4)*	25	Cluid Housing	""	""	""	""	Q3-2020	""
822	822	CALF TURNKEY	Galway City	Maigh Rua, Doughiska, Galway  (Phase 1)	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
823	823	CALF TURNKEY	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q1-2017
824	824	CALF TURNKEY	Galway City	Maoilin, Ballymoneen Road, Galway (Phase 2)*	4	Tath Housing Association	""	""	""	""	""	Q4-2017
825	825	CALF TURNKEY	Galway City	Maoilin, Ballymoneen Road, Knocknacarra, Galway CIty (Phase 1)*	3	Tath Housing Association	""	""	""	""	""	Q3-2018
826	826	CALF TURNKEY	Galway City	Reilean, Roscam, Block 5 Galway (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q2-2017
827	827	CALF TURNKEY	Galway City	Reilean, Roscam,Block 4 Galway (Phase 1)*	12	Tath Housing Association	""	""	""	""	""	Q2-2017
828	828	CALF TURNKEY	Galway City	Revised Murrough, Renmore, Galway  (Phase 1)*	20	Cluid Housing	""	""	""	""	""	Q1-2019
829	829	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Galway City	Ballyburke	74	*N/A	""	""	""	""	Q4-2019	""
830	830	SHIP CONSTRUCTION TURNKEY	Galway County	Lorro Gate, Prospect, Athenry	14	*N/A	""	""	""	""	""	Q4-2017
831	831	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	6	*N/A	""	""	""	""	""	Q4-2017
832	832	SHIP CONSTRUCTION TURNKEY	Galway County	Castlecourt, Abbey Street, Portumna	10	*N/A	""	""	""	""	""	Q4-2017
833	833	SHIP CONSTRUCTION TURNKEY	Galway County	Ashthorn Avenue, Headford	10	*N/A	""	""	""	""	""	Q4-2018
834	834	SHIP CONSTRUCTION TURNKEY	Galway County	Cuirt na hAbhann, Claregalway 	8	*N/A	""	""	""	""	""	Q4-2018
835	835	SHIP CONSTRUCTION TURNKEY	Galway County	Tulaigh na Grine, Tullahill, Loughrea	19	*N/A	""	""	""	""	""	Q4-2019
836	836	SHIP CONSTRUCTION TURNKEY	Galway County	Gort na dTulach, Tullahill, Loughrea - Phase 2A	17	*N/A	""	""	""	""	""	Q4-2019
837	837	SHIP CONSTRUCTION TURNKEY	Galway County	Arvough, Kinvara	4	*N/A	""	""	""	""	""	Q4-2019
838	838	SHIP CONSTRUCTION TURNKEY	Galway County	Gort an Choirce, Tubber Road, Gort	53	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
839	839	SHIP CONSTRUCTION TURNKEY	Galway County	Cois na hAbhainn, Tuam	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
840	840	SHIP CONSTRUCTION TURNKEY	Galway County	Pirc an Triantin, Tullahill, Loughrea, - Phase 3	10	*N/A	""	""	""	""	Q3-2018	""
841	841	SHIP CONSTRUCTION TURNKEY	Galway County	Gort na dTulach, Tullahill, Loughrea - Phase 2B	15	*N/A	""	""	""	""	Q3-2018	""
842	842	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	8	*N/A	""	""	""	""	Q3-2019	""
843	843	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	Q3-2019	""
844	844	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	8	*N/A	""	""	""	""	Q3-2019	""
845	845	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	8	*N/A	""	""	""	""	Q3-2019	""
846	846	SHIP CONSTRUCTION TURNKEY	Galway County	Kylebroughlan, Moycullen 	10	*N/A	""	""	""	""	Q3-2019	""
847	847	SHIP CONSTRUCTION TURNKEY	Galway County	Garra Mhic Aodha, Tubber Road, Gort 	31	*N/A	""	""	""	""	Q2-2019	""
848	848	SHIP CONSTRUCTION	Galway County	Esker Fields, Ballinasloe	2	*N/A	""	""	""	""	""	Q4-2019
849	849	SHIP CONSTRUCTION	Galway County	Garbally Drive, Ballinasloe	10	*N/A	""	""	""	""	""	Q3-2019
850	850	SHIP CONSTRUCTION	Galway County	Na Clocha Rua, An Cheathr Rua	4	*N/A	""	""	""	""	""	Q4-2019
851	851	SHIP CONSTRUCTION	Galway County	Ardrahan (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
852	852	SHIP CONSTRUCTION	Galway County	Callowfinish, Carna (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
853	853	SHIP CONSTRUCTION	Galway County	Waterdale, Claregalway (SRD)	1	*N/A	""	""	""	""	""	Q4-2018
854	854	SHIP CONSTRUCTION	Galway County	Corndulla (SRD)	1	*N/A	""	""	""	""	""	Q1-2019
855	855	SHIP CONSTRUCTION	Galway County	Cill Ciarn (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
856	856	SHIP CONSTRUCTION	Galway County	Kinvara (SRD)	1	*N/A	""	""	""	""	""	Q3-2018
857	857	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige, Roundstone	8	*N/A	""	""	""	""	Q3-2019	""
858	858	SHIP CONSTRUCTION	Galway County	Hospital Road, Clifden	16	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
859	859	SHIP CONSTRUCTION	Galway County	Bridge Court, Ahascragh, Ballinasloe	18	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
860	860	SHIP CONSTRUCTION	Galway County	Caislen Raithln, Ardrahan	12	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
861	861	SHIP CONSTRUCTION	Galway County	Barrack Street, Loughrea	5	*N/A	""	""	""	""	Q2-2020	""
862	862	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam - Phase 2	24	*N/A	""	""	""	""	""	Q3-2019
863	863	SHIP CONSTRUCTION	Galway County	Cartron, Kinvara	10	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
864	864	SHIP CONSTRUCTION	Galway County	Gort U Lochlainn, Moycullen	31	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
865	865	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam	16	*N/A	""	""	""	""	""	Q4-2018
866	866	SHIP CONSTRUCTION	Galway County	Fna Bhu, Tuam	18	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
867	867	SHIP CONSTRUCTION	Galway County	Gilmartin Road, Tuam - Phase 3	19	*N/A	""	""	""	""	""	Q4-2019
868	868	SHIP CONSTRUCTION	Galway County	Cnoc na Carraige , Roundstone	6	*N/A	""	""	""	""	Q3-2019	""
869	869	SHIP CONSTRUCTION	Galway County	Ballyglass, Ardrahan (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
870	870	SHIP CONSTRUCTION	Galway County	Woodpark, Portumna (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
871	871	SHIP CONSTRUCTION	Galway County	Carrowmore West, Clontuskert, Ballinasloe (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
872	872	SHIP CONSTRUCTION	Galway County	Cooralough, Williamstown (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
873	873	SHIP CONSTRUCTION	Galway County	Woodfireld, Dunmore (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
874	874	SHIP CONSTRUCTION	Galway County	Knockaloura West, Brownsgrove, Tuam (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
875	875	SHIP CONSTRUCTION	Galway County	Creggaturlough, Craughwell (SRD)	1	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
876	876	SHIP CONSTRUCTION	Galway County	Hospital Road, Clifden	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
877	877	SHIP CONSTRUCTION	Galway County	Fna Bhu, Tuam	13	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
878	878	SHIP CONSTRUCTION	Galway County	Fna Bhu, Tuam	18	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
879	879	CAS CONSTRUCTION TURNKEY	Galway County	Tubber Road, Gort	11	Inis Housing Association Ltd	""	""	""	""	Q2-2020	""
880	880	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 2)	11	Cluid Housing Association	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
881	881	CAS CONSTRUCTION	Galway County	Rossaveal Cottages, Ros a Mhl, South Connemara	8	Tearmann Eanna Teoranta	Stage 1 approved Q4-2016, outline design and costs being prepared.	""	""	""	""	""
882	882	CAS CONSTRUCTION	Galway County	Cregboy, Claregalway	14	Claregalway and District Day Care Centre	""	""	""	""	""	Q3-2019
883	883	CAS CONSTRUCTION	Galway County	Mountbellew	5	Mountbellew Voluntary Homes Association	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
884	884	CAS CONSTRUCTION	Galway County	Springfield, Parkmore, Ballinasloe	4	Peter Triest Housing Association Ltd	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
885	885	CAS CONSTRUCTION	Galway County	Letterfrack (Phase 1)	13	Cluid Housing Association	""	""	""	""	""	Q2-2016
886	886	CAS CONSTRUCTION	Galway County	Dunlo Hill, Ballinasloe	18	Cluid Housing Association	""	""	""	""	""	Q3-2020
887	887	CAS CONSTRUCTION	Galway County	Aggard More, Craughwell	4	Peter Triest Housing Association Ltd	""	""	""	""	""	Q4-2019
888	888	CAS CONSTRUCTION	Galway County	The Old Post Office, Inverin	4	Tearmann Eanna Teoranta	""	""	""	""	Q4-2019	""
889	889	CAS CONSTRUCTION	Galway County	Shannon Road, Portumna	4	Carraig Dubh Housing Association	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
890	890	CALF TURNKEY	Galway County	Cnoc na Si, Portumna, Co Galway (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2018
891	891	CALF TURNKEY	Galway County	Dunloe Street, Ballinasloe, Co. Galway (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
892	892	CALF TURNKEY	Galway County	Oranhill, Oranmore, Co. Galway (Phase 1)*	22	Cluid Housing	""	""	""	Q2-2020	""	""
893	893	CALF TURNKEY	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 1)	11	Cluid Housing	""	""	""	""	Q4-2019	""
894	894	CALF TURNKEY	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 2)	12	Cluid Housing	""	""	""	""	Q4-2019	""
895	895	CALF TURNKEY	Galway County	Riveroaks, Claregalway, Co Galway  (Phase 3)*	16	Cluid Housing	""	""	""	""	Q4-2019	""
896	896	CALF CONSTRUCTION	Galway County	Spiddal Cottages, Co Galway (Phase 1)	23	Cluid Housing	""	""	""	""	""	Q3-2017
897	897	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole	2	*N/A	""	""	""	""	""	Q1-2018
898	898	SHIP CONSTRUCTION TURNKEY	Kerry	1-4 Steeple Meadow View, Milltown	4	*N/A	""	""	""	""	""	Q4-2017
899	899	SHIP CONSTRUCTION TURNKEY	Kerry	Meadow Park, Milltown	9	*N/A	""	""	""	""	""	Q2-2018
900	900	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 2	5	*N/A	""	""	""	""	""	Q3-2018
901	901	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin	3	*N/A	""	""	""	""	""	Q4-2018
902	902	SHIP CONSTRUCTION TURNKEY	Kerry	47 Woodview, Cahirdown, Listowel	1	*N/A	""	""	""	""	""	Q2-2018
903	903	SHIP CONSTRUCTION TURNKEY	Kerry	Dromin Upper, Listowel	8	*N/A	""	""	""	""	Q4-2019	""
904	904	SHIP CONSTRUCTION TURNKEY	Kerry	Ard Na Si, Lispole, Phase 3	3	*N/A	""	""	""	""	""	Q4-2018
905	905	SHIP CONSTRUCTION TURNKEY	Kerry	Ardmoniel Heights, Killorglin - Phase 2	1	*N/A	""	""	""	""	""	Q2-2019
906	906	SHIP CONSTRUCTION TURNKEY	Kerry	Ballygologue, Road, Listowel	2	*N/A	""	""	""	""	""	Q4-2019
907	907	SHIP CONSTRUCTION TURNKEY	Kerry	Marian Terrace, Ballyheigue	9	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
908	908	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	6	*N/A	""	""	""	""	""	Q4-2019
909	909	SHIP CONSTRUCTION	Kerry	Glannagilliagh, Caragh Lake, Killorglin (SRD)	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
910	910	SHIP CONSTRUCTION	Kerry	Knockawinna, Brosna, Co Kerry	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
911	911	SHIP CONSTRUCTION	Kerry	Carrigcannon, Lyreacrumpane (SRD)	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
912	912	SHIP CONSTRUCTION	Kerry	Cois Gallain, Killorglin	14	*N/A	""	""	""	""	""	Q4-2019
913	913	SHIP CONSTRUCTION	Kerry	Rathmore/Barraduff	20	*N/A	""	""	""	""	Q4-2019	""
914	914	SHIP CONSTRUCTION	Kerry	Ardbhearna, Kenmare	22	*N/A	""	""	""	""	""	Q4-2018
915	915	SHIP CONSTRUCTION	Kerry	Bill Kinnerk Road, Tralee	4	*N/A	""	""	""	""	""	Q1-2018
916	916	SHIP CONSTRUCTION	Kerry	Cuirt Eaglaise, Milltown	8	*N/A	""	""	""	""	""	Q4-2019
917	917	SHIP CONSTRUCTION	Kerry	Killeen, Tralee	21	*N/A	""	""	""	""	""	Q3-2019
918	918	SHIP CONSTRUCTION	Kerry	Lixnaw	4	*N/A	""	""	""	""	""	Q4-2017
919	919	SHIP CONSTRUCTION	Kerry	The Park, Killarney	20	*N/A	""	""	""	""	""	Q1-2018
920	920	SHIP CONSTRUCTION	Kerry	Courthouse Lawn, Listowel	7	*N/A	""	""	""	""	""	Q4-2019
921	921	SHIP CONSTRUCTION	Kerry	Dreenagh, Ballyheigue (SRD)	1	*N/A	""	""	""	""	""	Q1-2017
922	922	SHIP CONSTRUCTION	Kerry	Glenach, Ballybunion	20	*N/A	""	""	""	""	Q4-2019	""
923	923	SHIP CONSTRUCTION	Kerry	Callinafercy, Milltown	1	*N/A	""	""	""	""	""	Q4-2018
924	924	SHIP CONSTRUCTION	Kerry	Cahernaboshina, Ventry	1	*N/A	""	""	""	""	""	Q4-2018
925	925	SHIP CONSTRUCTION	Kerry	An Carrigin, Tralee	28	*N/A	""	""	""	""	Q2-2019	""
926	926	SHIP CONSTRUCTION	Kerry	Pinewood Estate, Killarney	1	*N/A	""	""	""	""	""	Q4-2018
927	927	SHIP CONSTRUCTION	Kerry	Drom West, Glenbeigh	1	*N/A	""	""	""	""	Q1-2020	""
928	928	SHIP CONSTRUCTION	Kerry	Meanus, Killorglin	1	*N/A	""	""	""	""	""	Q3-2019
929	929	SHIP CONSTRUCTION	Kerry	Tullig Beg, Killorglin	1	*N/A	""	""	""	""	""	Q3-2019
930	930	SHIP CONSTRUCTION	Kerry	Owngarry, Killorglin	1	*N/A	""	""	""	""	""	Q4-2019
931	931	SHIP CONSTRUCTION	Kerry	Lohercannon, Tralee	61	*N/A	""	""	""	""	Q3-2020	""
932	932	SHIP CONSTRUCTION	Kerry	BallinaKilly Lower, Glenbeigh	1	*N/A	""	""	""	""	Q1-2020	""
933	933	SHIP CONSTRUCTION	Kerry	Ashgrove, Listowel	1	*N/A	""	""	""	""	""	Q3-2017
934	934	SHIP CONSTRUCTION	Kerry	Cullenagh Upper, Beaufort	1	*N/A	""	""	""	""	Q1-2020	""
935	935	SHIP CONSTRUCTION	Kerry	Farranwilliam, Ardfert	22	*N/A	""	""	""	""	Q3-2019	""
936	936	SHIP CONSTRUCTION	Kerry	Ballyrickard, Tralee	21	*N/A	""	""	""	""	Q3-2020	""
937	937	SHIP CONSTRUCTION	Kerry	Croogorts, Tralee	30	*N/A	""	""	""	""	Q3-2020	""
938	938	SHIP CONSTRUCTION	Kerry	Rock Rd., Killarney	10	*N/A	""	""	""	""	Q3-2020	""
939	939	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase4)	14	*N/A	""	""	""	""	Q4-2019	""
940	940	SHIP CONSTRUCTION	Kerry	Baile an Gharra, Lixnaw (PHASE 2)	10	*N/A	""	""	""	""	Q1-2020	""
941	941	SHIP CONSTRUCTION	Kerry	Woodview Place, Tarbert	22	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
942	942	SHIP CONSTRUCTION	Kerry	Marconi South, Ballybunion	14	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
943	943	SHIP CONSTRUCTION	Kerry	Rahoonane - New Site, Tralee	8	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
944	944	SHIP CONSTRUCTION	Kerry	Rusheen, Ballylongford	7	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
945	945	SHIP CONSTRUCTION	Kerry	Gortamullin, Kenmare (Phase 5)	14	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
946	946	REGENERATION	Kerry	Croilar Na Mistaelach, Tralee	11	*N/A	""	""	""	""	""	Q4-2018
947	947	REGENERATION	Kerry	Urban Terrace, Tralee	2	*N/A	""	""	""	""	""	Q4-2016
948	948	REGENERATION	Kerry	Clonmore Road, Tralee	3	*N/A	""	""	""	""	""	Q4-2016
949	949	REGENERATION	Kerry	St Martin's Park, Tralee	4	*N/A	""	""	""	""	""	Q4-2018
950	950	REGENERATION	Kerry	Dingle Road, Tralee	1	*N/A	""	""	""	""	""	Q2-2018
951	951	CAS CONSTRUCTION	Kerry	Armagh House, Killarney	6	Cluid Housing Association	""	""	""	""	Q4-2019	""
952	952	CAS CONSTRUCTION	Kerry	22 College Road, Castleisland	4	Kerry Emigrant Support Housing Association Ltd	""	""	""	""	""	Q4-2018
953	953	CAS CONSTRUCTION	Kerry	Chamfers Place (Mitchels road, Tralee)	18	Cluid Housing Association	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
954	954	CAS CONSTRUCTION	Kerry	The Parsonage, Caherciveen	5	Caherciveen Social Services (Housing) Ltd	""	""	""	""	""	Q4-2018
955	955	CAS CONSTRUCTION	Kerry	The Presentation Convent, Rathmore	4	Social Action Group Rathmore	""	""	""	""	""	Q3-2020
956	956	CALF TURNKEY	Kerry	Ard Na Greine, Knockavota, Milltown, Co. Kerry (Phase 1)*	54	Cluid Housing	""	""	""	Q2-2020	""	""
957	957	CALF TURNKEY	Kerry	Barraduff, Killarney, Co. Kerry (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
958	958	CALF TURNKEY	Kerry	Barraduff, Killarney, Co. Kerry (Phase 2)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
959	959	CALF TURNKEY	Kerry	Barraduff, Killarney, Co. Kerry (Phase 3)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
960	960	CALF TURNKEY	Kerry	Barraduff, Killarney, Co. Kerry (Phase 4)*	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q4-2019	""
961	961	CALF TURNKEY	Kerry	Cathair Lakes Farrantoreen Road, Killorglin, Co Kerry (Phase 1)	5	Cluid Housing	""	""	""	""	""	Q2-2016
962	962	CALF TURNKEY	Kerry	Commons East, Ardfert, Co. Kerry (Phase 1)*	30	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
963	963	CALF TURNKEY	Kerry	Deerpark Avenue, Tralee, Co. Kerry (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
964	964	CALF TURNKEY	Kerry	Derreen, Killarney, Co Kerry  (Phase 1)*	61	Cluid Housing	""	""	""	""	""	Q3-2020
965	965	CALF TURNKEY	Kerry	Doon Road, Lisloose, Tralee, Co. Kerry (Phase 1)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2020
966	966	CALF TURNKEY	Kerry	Dromcairn, Tralee, Co. Kerry (Phase 1)	12	Cluid Housing	""	""	""	""	Q1-2019	""
967	967	CALF TURNKEY	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 1)	14	Respond	""	""	""	""	""	Q4-2018
968	968	CALF TURNKEY	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 2)	2	Respond	""	""	""	""	""	Q4-2019
969	969	CALF TURNKEY	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 3)	5	Respond	""	""	""	""	""	Q2-2020
970	970	CALF TURNKEY	Kerry	 Dun Ard, Doon Road, Ballybunnion, Co Kerry (Phase 4)	1	Respond	""	""	""	""	Q3-2018	""
971	971	CALF TURNKEY	Kerry	Fortfield, Tralee, Co. Kerry (Phase 1)*	15	Cluid Housing	""	""	""	""	""	Q4-2019
972	972	CALF TURNKEY	Kerry	Hunters Lodge, Hunters Wood, Ballyseedy, Tralee, Co. Kerry (Phase 1)	10	Cluid Housing	""	""	""	Q2-2020	""	""
973	973	CALF TURNKEY	Kerry	Killeen, Abbeydorney Road, Tralee, Co. Kerry (Phase 1)*	17	Cluid Housing	""	""	""	""	""	Q4-2019
974	974	CALF TURNKEY	Kerry	Lios Ard, Lisloose, Tralee, Co. Kerry (Phase 1)	28	Cluid Housing	""	""	""	""	Q4-2019	""
975	975	CALF TURNKEY	Kerry	Moanmore, Pound Road, Castleisland, Co. Kerry (Phase 1)*	14	Cluid Housing	""	""	""	""	Q2-2020	""
976	976	CALF TURNKEY	Kerry	Oakwood, Coolegrean, Killarney, Co. Kerry (Phase 1)	59	Cluid Housing	""	""	""	""	""	Q3-2019
977	977	CALF TURNKEY	Kerry	Sruthan na Saili, Derreen, Co. Kerry (Phase 1)*	22	Cluid Housing	""	""	""	""	Q1-2020	""
978	978	CALF TURNKEY	Kerry	The Grove, Dingle, Co. Kerry (Phase 1)*	20	Cluid Housing	""	""	""	""	""	Q3-2020
979	979	SHIP CONSTRUCTION TURNKEY	Kildare	Bodkin Place, Kilmeague	16	*N/A	""	""	""	""	""	Q4-2017
980	980	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin	6	*N/A	""	""	""	""	""	Q4-2017
981	981	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	8	*N/A	""	""	""	""	""	Q3-2018
982	982	SHIP CONSTRUCTION TURNKEY	Kildare	Moore Abbey Court, Monasterevin	2	*N/A	""	""	""	""	""	Q1-2018
983	983	SHIP CONSTRUCTION TURNKEY	Kildare	Drogheda Street, Monasterevin (Phase 2)	7	*N/A	""	""	""	""	""	Q1-2018
984	984	SHIP CONSTRUCTION TURNKEY	Kildare	Moss Brook, Prosperous	2	*N/A	""	""	""	""	""	Q1-2018
985	985	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	2	*N/A	""	""	""	""	""	Q4-2018
986	986	SHIP CONSTRUCTION TURNKEY	Kildare	Whitethorn Park, Allenwood	2	*N/A	""	""	""	""	""	Q3-2018
987	987	SHIP CONSTRUCTION TURNKEY	Kildare	The Pike, Castledermot	6	*N/A	""	""	""	""	""	Q4-2018
988	988	SHIP CONSTRUCTION TURNKEY	Kildare	Grove Lane, Robertstown	3	*N/A	""	""	""	""	""	Q1-2020
989	989	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill, Prosperous	5	*N/A	""	""	""	""	""	Q4-2018
990	990	SHIP CONSTRUCTION TURNKEY	Kildare	The Green, Elsmore Naas	5	*N/A	""	""	""	""	""	Q4-2018
991	991	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	10	*N/A	""	""	""	""	""	Q1-2019
992	992	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	16	*N/A	""	""	""	""	""	Q3-2020
993	993	SHIP CONSTRUCTION TURNKEY	Kildare	Beech Park Wood, Leixlip	4	*N/A	""	""	""	""	""	Q3-2019
994	994	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town	18	*N/A	""	""	""	""	""	Q2-2019
995	995	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturn 	10	*N/A	""	""	""	""	""	Q3-2019
996	996	SHIP CONSTRUCTION TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)	20	*N/A	""	""	""	""	""	Q3-2019
997	997	SHIP CONSTRUCTION TURNKEY	Kildare	Cluain Dara, Derrinturn, Kildare	1	*N/A	""	""	""	""	""	Q2-2019
998	998	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	3	*N/A	""	""	""	""	""	Q4-2019
999	999	SHIP CONSTRUCTION TURNKEY	Kildare	School Walk, Allenwood	4	*N/A	""	""	""	""	""	Q4-2019
1000	1000	SHIP CONSTRUCTION TURNKEY	Kildare	Stoneleigh, Naas	6	*N/A	""	""	""	""	""	Q4-2019
1001	1001	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q1-2020
1002	1002	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	1	*N/A	""	""	""	""	""	Q3-2020
1003	1003	SHIP CONSTRUCTION TURNKEY	Kildare	Barrack Close, Ballymore Eustace	2	*N/A	""	""	""	""	""	Q2-2020
1004	1004	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	6	*N/A	""	""	""	""	""	Q2-2020
1005	1005	SHIP CONSTRUCTION TURNKEY	Kildare	Brookes Mill Prosperous	1	*N/A	""	""	""	""	""	Q4-2019
1006	1006	SHIP CONSTRUCTION TURNKEY	Kildare	Greenfield House, Maynooth	1	*N/A	""	""	""	""	""	Q4-2019
1007	1007	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	10	*N/A	""	""	""	""	Q3-2019	""
1008	1008	SHIP CONSTRUCTION TURNKEY	Kildare	Railway House, Dublin Road, Naas 	3	*N/A	""	""	""	""	""	Q3-2020
1009	1009	SHIP CONSTRUCTION TURNKEY	Kildare	Loughminane Green, Kildare Town 	2	*N/A	""	""	""	""	Q1-2020	""
1010	1010	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh	26	*N/A	""	""	""	""	Q3-2019	""
1011	1011	SHIP CONSTRUCTION TURNKEY	Kildare	Crockaun Way, Brownstown Manor, The Curragh 	9	*N/A	""	""	""	""	Q3-2019	""
1012	1012	SHIP CONSTRUCTION TURNKEY	Kildare	Barrack Close, Ballymore Eustace	2	*N/A	""	""	""	""	""	Q3-2020
1013	1013	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	9	*N/A	""	""	""	""	""	Q3-2020
1014	1014	SHIP CONSTRUCTION TURNKEY	Kildare	Temple Mills, Rathangan	2	*N/A	""	""	""	""	Q1-2020	""
1015	1015	SHIP CONSTRUCTION TURNKEY	Kildare	Longstone, Craddockstown, Naas	5	*N/A	""	""	""	""	Q1-2020	""
1016	1016	SHIP CONSTRUCTION TURNKEY	Kildare	Coonnaghknock Green	8	*N/A	""	""	""	""	Q1-2020	""
1017	1017	SHIP CONSTRUCTION TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh	6	*N/A	""	""	""	""	Q2-2019	""
1018	1018	SHIP CONSTRUCTION TURNKEY	Kildare	Oakwood Park, Derrinturm	3	*N/A	""	""	""	""	Q4-2018	""
1019	1019	SHIP CONSTRUCTION TURNKEY	Kildare	The Willows, Allenwood	2	*N/A	""	""	""	""	Q4-2019	""
1020	1020	SHIP CONSTRUCTION TURNKEY	Kildare	The Wiloows, Allenwood	2	*N/A	""	""	""	""	Q4-2019	""
1021	1021	SHIP CONSTRUCTION	Kildare	Hillview Terrace, Narraghmore	4	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1022	1022	SHIP CONSTRUCTION	Kildare	Athgarvan Village	18	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1023	1023	SHIP CONSTRUCTION	Kildare	Rathasker Road, Naas	48	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
1024	1024	SHIP CONSTRUCTION	Kildare	Dunmurry Rise, Bishopsland, Kildare Town	32	*N/A	""	""	""	""	""	Q3-2019
1025	1025	SHIP CONSTRUCTION	Kildare	Anne Street, Prosperous	12	*N/A	""	""	""	""	""	Q3-2020
1026	1026	SHIP CONSTRUCTION	Kildare	Beechgrove, Rathangan	18	*N/A	""	""	""	""	""	Q4-2019
1027	1027	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.1)	6	*N/A	""	""	""	""	""	Q4-2017
1028	1028	SHIP CONSTRUCTION	Kildare	Athgarvan Road, Newbridge	13	*N/A	""	""	""	""	""	Q3-2018
1029	1029	SHIP CONSTRUCTION	Kildare	Newtown House, Leixlip	4	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1030	1030	SHIP CONSTRUCTION	Kildare	Coill Dubh	10	*N/A	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1031	1031	SHIP CONSTRUCTION	Kildare	Old Greenfield Road, Maynooth	47	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1032	1032	SHIP CONSTRUCTION	Kildare	Kilcock (Phase 2.2)	13	*N/A	""	""	""	""	""	Q1-2018
1033	1033	SHIP CONSTRUCTION	Kildare	Ambassador Site, Kill	33	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1034	1034	SHIP CONSTRUCTION	Kildare	Carbury	5	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1035	1035	SHIP CONSTRUCTION	Kildare	St. Evins Park Monasterevin	16	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1036	1036	SHIP CONSTRUCTION	Kildare	Castle Park, Athy	4	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1037	1037	CAS CONSTRUCTION	Kildare	Craddockstown, Naas	3	KARE Promoting Inclusion for People with Intellectual Disabilities	""	Stage 2 approved Q2-2018, full design/tender being prepared.	""	""	""	""
1038	1038	CAS CONSTRUCTION	Kildare	Main St., Kilcullen	4	Camphill Communities of Ireland	""	Stage 2 approved Q4-2017, full design/tender being prepared.	""	""	""	""
1039	1039	CAS CONSTRUCTION	Kildare	El Kantara, Newbridge	2	KARE Promoting Inclusion for People with Intellectual Disabilities	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
1040	1040	CAS CONSTRUCTION	Kildare	Jigginstown House, Naas	12	Homeless Care Ltd	""	""	""	""	Q4-2019	""
1041	1041	CAS CONSTRUCTION	Kildare	St. John's Convent, New Street, Rathangan	28	Sophia Housing Association Ltd	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1042	1042	CAS CONSTRUCTION	Kildare	Dominican Lands, Athy	30	Cluid Housing Association	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1043	1043	CALF TURNKEY	Kildare	Bellingsfield, Naas, Kildare (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2018
1044	1044	CALF TURNKEY	Kildare	Carton Grove, Maynooth, Co. Kildare (Phase 1)*	5	Clanmil Housing Association Ireland	""	""	""	""	""	Q4-2018
1045	1045	CALF TURNKEY	Kildare	Castle Farm, Jigginstown, Naas, Co. Kildare (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2019
1046	1046	CALF TURNKEY	Kildare	Castle Farm, Naas, Co. Kildare (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q2-2019
1047	1047	CALF CONSTRUCTION	Kildare	Castlefen, Castlesize, Sallins, Co. Kildare (Phase 1)	29	Tath Housing Association	""	""	""	""	Q1-2020	""
1048	1048	CALF TURNKEY	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 1)*	6	Cill Dara Housing Association	""	""	""	""	""	Q4-2019
1049	1049	CALF TURNKEY	Kildare	Cathedral Apartments, Firecastle Lane, Kildare Town, Co. Kildare (Phase 2)*	11	Cill Dara Housing Association	""	""	""	""	""	Q4-2019
1050	1050	CALF TURNKEY	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 1)*	26	Tath Housing Association	""	""	""	""	""	Q4-2019
1051	1051	CALF TURNKEY	Kildare	Elsmore, Jigginstown and Oakpark, Craddockstown, Naas, Kildare (Phase 2)*	17	Tath Housing Association	""	""	""	""	Q2-2018	""
1052	1052	CALF TURNKEY	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q4-2018
1053	1053	CALF TURNKEY	Kildare	Elsmore, Jigginstown, Nass, Co. Kildare (Phase 2)*	3	Tath Housing Association	""	""	""	""	""	Q3-2019
1054	1054	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 1)	18	Tath Housing Association	""	""	""	""	""	Q1-2019
1055	1055	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 2)	6	Tath Housing Association	""	""	""	""	""	Q1-2019
1056	1056	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 3)	6	Tath Housing Association	""	""	""	""	""	Q1-2019
1057	1057	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 4)	6	Tath Housing Association	""	""	""	""	""	Q2-2019
1058	1058	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 5)	4	Tath Housing Association	""	""	""	""	""	Q2-2019
1059	1059	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 6)	5	Tath Housing Association	""	""	""	""	""	Q3-2019
1060	1060	CALF TURNKEY	Kildare	Fenton Green, Kilcock, Co Kildare  (Phase 7)*	18	Tath Housing Association	""	""	""	""	""	Q4-2019
1061	1061	CALF CONSTRUCTION	Kildare	Flinters Field (Phase 2), Athy, Co. Kildare (Phase 1)	35	Respond	""	""	""	Q2-2020	""	""
1062	1062	CALF TURNKEY	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 1)*	21	Cluid Housing	""	""	""	""	Q3-2018	""
1063	1063	CALF TURNKEY	Kildare	Grand Canal Wood, Allenwood, Co. Kildare (Phase 2)	19	Cluid Housing	""	""	""	""	Q3-2018	""
1064	1064	CALF TURNKEY	Kildare	Hawthorn Manor, Brockagh, Coill Dubh, Co. Kildare (Phase 1)*	5	Oaklee Housing	""	""	""	""	""	Q4-2019
1065	1065	CALF TURNKEY	Kildare	Kilbelin Abbey, Kildare, Phase 1 (Phase 1)*	4	Cluid Housing	""	""	""	""	Q2-2019	""
1066	1066	CALF TURNKEY	Kildare	Kilbelin Abbey, Kildare, Phase 2 (Phase 1)*	4	Cluid Housing	""	""	""	""	Q2-2019	""
1067	1067	CALF TURNKEY	Kildare	Ledwill Park, Kilcock, Co. Kildare (Phase 1)*	31	Cluid Housing	""	""	""	""	""	Q4-2019
1068	1068	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 1)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1069	1069	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 2)*	17	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1070	1070	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 3)	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1071	1071	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 4)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1072	1072	CALF TURNKEY	Kildare	Loughlion, Kildare Town, Kildare (Phase 5)*	16	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1073	1073	CALF TURNKEY	Kildare	Main Street, Prosperous, Clane, Co. Kildare (Phase 1)*	16	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
1074	1074	CALF TURNKEY	Kildare	Mariavilla and Elsmore, Kildare (Phase 1)*	15	Tath Housing Association	""	""	""	""	""	Q4-2019
1075	1075	CALF TURNKEY	Kildare	Millfield Manor, Newbridge, Co. Kildare (Phase 1)*	19	Cluid Housing	""	""	""	""	""	Q3-2018
1076	1076	CALF TURNKEY	Kildare	Morristown, Newbridge, Co Kildare (Phase 1)	14	Cluid Housing	""	""	""	""	""	Q1-2018
1077	1077	CALF TURNKEY	Kildare	Morristown, Newbridge, Co. Kildare (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2018
1078	1078	CALF TURNKEY	Kildare	Mullen Park, Straffan Road, Maynooth, Co. Kildare (Phase 1)	24	Tath Housing Association	""	""	""	""	Q2-2019	""
1079	1079	CALF TURNKEY	Kildare	Mullen Park, Straffan Road, Maynooth, Co. Kildare (Phase 2)*	24	Tath Housing Association	""	""	""	""	Q2-2019	""
1080	1080	CALF TURNKEY	Kildare	Mullen Park, Straffan Road, Maynooth, Co. Kildare (Phase 3)*	19	Tath Housing Association	""	""	""	""	Q2-2019	""
1081	1081	CALF TURNKEY	Kildare	Mullen Park, Straffan Road, Maynooth, Co. Kildare (Phase 4)*	28	Tath Housing Association	""	""	""	""	Q2-2019	""
1082	1082	CALF TURNKEY	Kildare	Oakpark, Craddockstown, Kildare (Phase 1)	6	Tath Housing Association	""	""	""	""	Q4-2018	""
1083	1083	CALF TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town (Phase 1)*	10	Tath Housing Association	""	""	""	""	""	Q2-2018
1084	1084	CALF TURNKEY	Kildare	Oaktree, Tully Road, Kildare Town (Phase 2)*	7	Tath Housing Association	""	""	""	""	""	Q3-2018
1085	1085	CALF TURNKEY	Kildare	Phase 2, White Oaks, Newbridge, Kildare (Phase 1)	36	Cluid Housing	""	""	""	""	""	Q4-2019
1086	1086	CALF TURNKEY	Kildare	Revised Rye Abbey, Kilcock, Co Kildare (apts)\n (Phase 1)	33	Cluid Housing	""	""	""	""	""	Q2-2017
1087	1087	CALF TURNKEY	Kildare	Robertstown, Naas , Co.Kildare (Phase 1)	5	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
1088	1088	CALF TURNKEY	Kildare	Roseberry Hill, Newbridge (Phase 1)	13	Tath Housing Association	""	""	""	""	""	Q2-2017
1089	1089	CALF TURNKEY	Kildare	Roseberry Hill, Newbridge (Phase 2)	16	Tath Housing Association	""	""	""	""	""	Q4-2017
1090	1090	CALF TURNKEY	Kildare	Roseberry Hill, Newbridge (Phase 3)	16	Tath Housing Association	""	""	""	""	""	Q1-2018
1091	1091	CALF TURNKEY	Kildare	Rye Abbey, Kilcock - revised (houses) (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q2-2017
1092	1092	CALF TURNKEY	Kildare	The Arches, Castlefarm, Naas, Co. Kildare (Phase 1)*	4	Tath Housing Association	""	""	""	""	Q3-2018	""
1093	1093	CALF TURNKEY	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 1)*	5	Cluid Housing	""	""	""	""	""	Q4-2019
1094	1094	CALF TURNKEY	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 2)*	3	Cluid Housing	""	""	""	""	Q4-2018	""
1095	1095	CALF TURNKEY	Kildare	The Paddocks, Morristown, Newbridge, Kildare (Phase 3)*	16	Cluid Housing	""	""	""	""	Q4-2018	""
1096	1096	CALF TURNKEY	Kildare	The Paddocks, Newbridge, Co Kildare (Phase 1)	18	Cluid Housing	""	""	""	""	Q1-2019	""
1097	1097	CALF TURNKEY	Kildare	The Paddocks, Newbridge, Kildare  (Phase 1)	26	Cluid Housing	""	""	""	""	Q2-2020	""
1098	1098	CALF TURNKEY	Kildare	The Paddocks, Newbridge, Kildare  (Phase 2)	33	Cluid Housing	""	""	""	""	Q2-2020	""
1099	1099	CALF TURNKEY	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)	18	Respond	""	""	""	""	""	Q4-2019
1100	1100	CALF TURNKEY	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 1)*	18	Respond	""	""	""	""	Q3-2019	""
1101	1101	CALF TURNKEY	Kildare	The Vestry, Glebelands, Athy, Co. Kildare (Phase 2)	32	Respond	""	""	""	""	""	Q2-2020
1102	1102	CALF TURNKEY	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 1)*	14	Cluid Housing	""	""	""	""	""	Q4-2018
1103	1103	CALF TURNKEY	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 2)	24	Cluid Housing	""	""	""	""	""	Q4-2018
1104	1104	CALF TURNKEY	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q1-2019
1105	1105	CALF TURNKEY	Kildare	White Oaks, Rickardstown, Newbridge, Co. Kildare (Phase 4)	2	Cluid Housing	""	""	""	""	""	Q4-2019
1106	1106	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas (Phase 1)	36	*N/A	""	""	""	""	""	Q2-2020
1107	1107	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Kildare	Craddockstown, Naas (Phase 2)	38	*N/A	""	""	""	""	""	Q3-2020
1108	1108	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Kildare	Butterstream, Clane	77	*N/A	""	""	""	""	Q1-2019	""
1109	1109	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	11	*N/A	""	""	""	""	""	Q2-2017
1110	1110	SHIP CONSTRUCTION TURNKEY	Kilkenny	Newpark, Castlecomer Road, Kilkenny	7	*N/A	""	""	""	""	""	Q1-2017
1111	1111	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank	8	*N/A	""	""	""	""	""	Q1-2018
1112	1112	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford	5	*N/A	""	""	""	""	""	Q4-2017
1113	1113	SHIP CONSTRUCTION TURNKEY	Kilkenny	Abbeygate, Ferrybank (Phase 2)	1	*N/A	""	""	""	""	""	Q3-2018
1114	1114	SHIP CONSTRUCTION TURNKEY	Kilkenny	Togher Way, Urlingford (Phase 3)	18	*N/A	""	""	""	""	""	Q4-2018
1115	1115	SHIP CONSTRUCTION TURNKEY	Kilkenny	New Road, Mooncoin	4	*N/A	""	""	""	""	Q3-2018	""
1116	1116	SHIP CONSTRUCTION TURNKEY	Kilkenny	Chapel Street, Mooncoin	2	*N/A	""	""	""	""	Q3-2018	""
1117	1117	SHIP CONSTRUCTION TURNKEY	Kilkenny	Ogenty, Gowran	12	*N/A	""	""	""	""	""	Q4-2018
1118	1118	SHIP CONSTRUCTION TURNKEY	Kilkenny	Lower Kilmacow	16	*N/A	""	""	""	""	Q3-2020	""
1119	1119	SHIP CONSTRUCTION TURNKEY	Kilkenny	Hebron Road, Kilkenny	8	*N/A	""	""	""	""	Q3-2020	""
1120	1120	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Oakridge, Ferrybank, Co. Kilkenny	4	*N/A	""	""	""	""	""	Q2-2020
1121	1121	SHIP CONSTRUCTION TURNKEY	Kilkenny	Hebron Road, Kilkenny	52	*N/A	""	""	""	""	Q3-2020	""
1122	1122	SHIP CONSTRUCTION TURNKEY	Kilkenny	Lower Kilmacow, Co. Kilkenny	16	*N/A	""	""	""	""	Q3-2020	""
1123	1123	SHIP CONSTRUCTION TURNKEY	Kilkenny	Limegrove, Ferrybank, Co. Kilkenny	15	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1124	1124	SHIP CONSTRUCTION	Kilkenny	Group Home Cloghabrody, Thomastown	4	*N/A	""	""	""	""	""	Q3-2020
1125	1125	SHIP CONSTRUCTION	Kilkenny	Inchacarron, Mullinavat	2	*N/A	""	""	""	""	Q3-2019	""
1126	1126	SHIP CONSTRUCTION	Kilkenny	Shanganny, Jenkinstown	2	*N/A	""	""	""	""	Q4-2019	""
1127	1127	SHIP CONSTRUCTION	Kilkenny	Old Fire Station, Graiguenamanagh, Co. Kilkenny	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1128	1128	SHIP CONSTRUCTION	Kilkenny	Blackstaff House, Callan	4	*N/A	""	""	""	""	""	Q4-2019
1129	1129	SHIP CONSTRUCTION	Kilkenny	Barna, Freshford	1	*N/A	""	""	""	""	""	Q2-2018
1130	1130	SHIP CONSTRUCTION	Kilkenny	10 Golf Links Road, Kilkenny	6	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1131	1131	SHIP CONSTRUCTION	Kilkenny	Crokers Hill (Phase 2) Kennyswell Road, Kilkenny	35	*N/A	Stage 1 approved Q2-2017, outline design and costs being prepared.	""	""	""	""	""
1132	1132	SHIP CONSTRUCTION	Kilkenny	Main Street, Piltown	17	*N/A	""	""	""	""	Q1-2019	""
1133	1133	SHIP CONSTRUCTION	Kilkenny	Station Road, Ballyragget	22	*N/A	""	""	""	""	Q3-2019	""
1134	1134	SHIP CONSTRUCTION	Kilkenny	Bolton, Callan	38	*N/A	""	""	""	""	""	Q3-2020
1135	1135	SHIP CONSTRUCTION	Kilkenny	Donaguile, Castlecomer	33	*N/A	""	""	""	""	Q1-2019	""
1136	1136	SHIP CONSTRUCTION	Kilkenny	Rosehill, Kells Road, Kilkenny	6	*N/A	""	""	""	""	""	Q1-2017
1137	1137	SHIP CONSTRUCTION	Kilkenny	Gaol Road, Kilkenny	10	*N/A	""	""	""	""	""	Q3-2016
1138	1138	SHIP CONSTRUCTION	Kilkenny	Greensbridge House	5	*N/A	""	""	""	""	""	Q4-2018
1139	1139	SHIP CONSTRUCTION	Kilkenny	The Broguemaker, Kilkenny	18	*N/A	""	""	""	""	Q2-2020	""
1140	1140	SHIP CONSTRUCTION	Kilkenny	Ladywell, Thomastown	25	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1141	1141	SHIP CONSTRUCTION	Kilkenny	Crokers Hill, Kennyswell Road, Kilkenny	51	*N/A	""	""	""	""	Q2-2020	""
1142	1142	SHIP CONSTRUCTION	Kilkenny	Ayrfield	9	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1143	1143	CAS CONSTRUCTION TURNKEY	Kilkenny	Golf Links Road, Kilkenny	15	Respond	""	""	""	""	""	Q3-2019
1144	1144	CAS CONSTRUCTION	Kilkenny	Kingsriver, Ennisnag	4	Kingsriver Housing Association Limited	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1145	1145	CAS CONSTRUCTION	Kilkenny	Garrin Green	6	SOS Kilkenny Housing Association Ltd	""	""	""	""	""	Q4-2018
1146	1146	CAS CONSTRUCTION	Kilkenny	Hazelbrook, Newrath	2	Waterford Dove Housing Association	""	""	""	""	""	Q1-2018
1147	1147	CAS CONSTRUCTION	Kilkenny	Good Shepherd Centre - Wing 1952	12	The Good Shepherd Centre (Kilkenny) Ltd	""	""	""	""	""	Q4-2018
1148	1148	CAS CONSTRUCTION	Kilkenny	Brooke House, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	""	Q3-2017
1149	1149	CAS CONSTRUCTION	Kilkenny	Friary Walk, Callan	12	Cluid Housing Association	""	""	""	""	""	Q3-2016
1150	1150	CAS CONSTRUCTION	Kilkenny	Garden Cottage, The Workhouse, Callan	1	Camphill Communities of Ireland	""	""	""	""	""	Q4-2017
1151	1151	CAS CONSTRUCTION	Kilkenny	Red Barn, Patrick Street, Ballyragget	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1152	1152	CAS CONSTRUCTION	Kilkenny	Smith's Road, Ballyraggett	4	Oaklee Housing Trust	""	""	""	""	""	Q4-2018
1153	1153	CAS CONSTRUCTION	Kilkenny	Fennelly's Lane Jerpoint	2	Camphill Communities of Ireland	Stage 1 approved Q3-2017, outline design and costs being prepared.	""	""	""	""	""
1154	1154	CAS CONSTRUCTION	Kilkenny	8/9 Kilkenny Street, Castlecomer	3	Good Shepherd Services Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1155	1155	CAS CONSTRUCTION	Kilkenny	19/21 Blackmill Street, Kilkenny	12	Good Shepherd Services Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1156	1156	CAS CONSTRUCTION	Kilkenny	Brother Thomas Place, Church Lane, Kilkenny	12	Good Shepherd Services Ltd	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
1157	1157	CAS CONSTRUCTION	Kilkenny	Bridge Street, Callan	6	Good Shepherd Services Ltd	""	""	""	""	""	Q4-2019
1158	1158	CAS CONSTRUCTION	Kilkenny	Grennan Villa, Thomastown	5	Camphill Communities of Ireland	""	""	""	""	Q3-2020	""
1159	1159	CAS CONSTRUCTION	Kilkenny	Fiennes Court, William Street, Kilkenny	7	Good Shepherd Services Ltd	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1160	1160	CAS CONSTRUCTION	Kilkenny	St. John of god Convent, College Road, Kilkenny	12	Sophia Housing Association Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1161	1161	CAS CONSTRUCTION	Kilkenny	The Round House, Kells, Co. Kilkenny	4	SOS Kilkenny Housing Association Ltd	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1162	1162	CAS CONSTRUCTION	Kilkenny	Ladywell Street, Thomastown, Co. Kilkenny	6	Good Shepherd Services Ltd	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1163	1163	CALF TURNKEY	Kilkenny	Castlehyde, Rosbercon (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
1164	1164	CALF TURNKEY	Kilkenny	Castlehyde, Rosbercon (Phase 2)	6	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
1165	1165	CALF TURNKEY	Kilkenny	Golf Links Road, Kilkenny (Phase 1)*	39	Respond	""	""	""	""	""	Q4-2019
1166	1166	CALF TURNKEY	Kilkenny	Logan Square, Thomastown, Co Kilkenny (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q2-2017
1167	1167	CALF TURNKEY	Kilkenny	Love Lane, Castlecomer, Co. Kilkenny (Phase 1)	4	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
1168	1168	CALF TURNKEY	Kilkenny	Margarets Field, Callan Road, Kilkenny City (Phase 1)	40	Respond	""	""	""	""	Q1-2019	""
1169	1169	CALF TURNKEY	Kilkenny	Nuncio Road, Kilkenny (Phase 1)	15	Respond	""	""	""	""	Q4-2018	""
1170	1170	CALF TURNKEY	Kilkenny	Nuncio Road, Kilkenny (Phase 2)	13	Respond	""	""	""	""	Q4-2018	""
1171	1171	CALF TURNKEY	Kilkenny	Nuncio Road, Kilkenny (Phase 3)*	22	Respond	""	""	""	""	Q4-2018	""
1172	1172	CALF TURNKEY	Kilkenny	OLoughlin Court, Kilkenny  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
1173	1173	CALF TURNKEY	Kilkenny	Orchard Close, Kilkenny (Phase 1)*	23	Cluid Housing	""	""	""	Q3-2020	""	""
1174	1174	CALF CONSTRUCTION	Kilkenny	Park Lane, Friary Walk, Callan, Co Kilkenny (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q2-2019
1175	1175	CALF TURNKEY	Kilkenny	Side Road, Moneenroe, Castlecomer, Co. Kilkenny (Phase 1)	9	Oaklee Housing	""	""	""	""	""	Q3-2018
1176	1176	CALF CONSTRUCTION	Kilkenny	Walkin St Kilkenny (Phase 1)	27	Oaklee Housing	""	""	""	""	""	Q4-2019
1177	1177	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	6	*N/A	""	""	""	""	Q1-2020	""
1178	1178	SHIP CONSTRUCTION TURNKEY	Laois	Priory, Borris in Ossory	5	*N/A	""	""	""	""	Q2-2020	""
1179	1179	SHIP CONSTRUCTION	Laois	Harpurs Lane, Portlaoise	1	*N/A	""	""	""	""	""	Q4-2019
1180	1180	SHIP CONSTRUCTION	Laois	Hillview, Portlaoise	2	*N/A	""	""	""	""	Q4-2019	""
1181	1181	SHIP CONSTRUCTION	Laois	Coolroe, Ballybrittas	1	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1182	1182	SHIP CONSTRUCTION	Laois	The Orchard, Stradbally	6	*N/A	""	""	""	""	""	Q1-2020
1183	1183	SHIP CONSTRUCTION	Laois	Moore Street, Rathdowney	6	*N/A	""	""	""	""	Q3-2020	""
1184	1184	SHIP CONSTRUCTION	Laois	Ballymorris Road, Portarlington	22	*N/A	""	""	""	""	Q3-2019	""
1185	1185	SHIP CONSTRUCTION	Laois	Gleann na Glaise, Ballyroan	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1186	1186	SHIP CONSTRUCTION	Laois	Pattison Est. Mountmellick	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1187	1187	SHIP CONSTRUCTION	Laois	Shannon Street, Mountrath	6	*N/A	""	""	""	""	Q1-2020	""
1188	1188	SHIP CONSTRUCTION	Laois	Conniberry Way, Old Knockmay Road, Portlaoise	33	*N/A	""	""	""	""	""	Q2-2018
1189	1189	SHIP CONSTRUCTION	Laois	Harbour Court, Mountmellick	6	*N/A	""	""	""	""	Q1-2020	""
1190	1190	SHIP CONSTRUCTION	Laois	Mooreville, Rathdowney	7	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1191	1191	SHIP CONSTRUCTION	Laois	Sean Doire, Cork Road, Durrow	22	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1192	1192	SHIP CONSTRUCTION	Laois	St Kieran's Park, Errill	14	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1193	1193	SHIP CONSTRUCTION	Laois	Clonrooske, Knockmay	11	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1194	1194	SHIP CONSTRUCTION	Laois	Carraig Glas, Stradbally	26	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1195	1195	SHIP CONSTRUCTION	Laois	Stradbally Road, Portlaoise	50	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1196	1196	SHIP CONSTRUCTION	Laois	Iona	9	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1197	1197	CAS CONSTRUCTION	Laois	Presentation Convent & Lands, Portlaoise, 	47	Sophia Housing Association Ltd	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1198	1198	CALF TURNKEY	Laois	Ballickmoyler, Graiguecullen, Laois (Phase 1)*	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1199	1199	CALF TURNKEY	Laois	Bellingham, Portlaoise\n (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q3-2019
1200	1200	CALF TURNKEY	Laois	Bellingham, Portlaoise\n (Phase 2)	6	Cluid Housing	""	""	""	""	""	Q4-2019
1201	1201	CALF TURNKEY	Laois	Bellingham, Portlaoise\n (Phase 3)	5	Cluid Housing	""	""	""	""	""	Q2-2020
1202	1202	CALF TURNKEY	Laois	Bellingham, Portlaoise\n (Phase 4)*	6	Cluid Housing	""	""	""	""	Q1-2017	""
1203	1203	CALF TURNKEY	Laois	Bellingham, Portlaoise\n (Phase 5)*	9	Cluid Housing	""	""	""	""	Q1-2017	""
1204	1204	CALF TURNKEY	Laois	Borris Road, Portlaoise, Co. Laois (Phase 1)*	9	Tath Housing Association	""	""	""	""	""	Q3-2020
1205	1205	CALF TURNKEY	Laois	Borris Road, Portlaoise, Co. Laois (Phase 2)*	8	Tath Housing Association	""	""	""	""	""	Q3-2020
1206	1206	CALF TURNKEY	Laois	Borris Road, Portlaoise, Co. Laois (Phase 3)	10	Tath Housing Association	""	""	""	""	Q3-2019	""
1207	1207	CALF TURNKEY	Laois	Borris Road, Portlaoise, Co. Laois (Phase 4)	9	Tath Housing Association	""	""	""	""	Q3-2019	""
1208	1208	CALF TURNKEY	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 1)	17	Tath Housing Association	""	""	""	""	""	Q3-2018
1209	1209	CALF TURNKEY	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 2)	9	Tath Housing Association	""	""	""	""	""	Q4-2018
1210	1210	CALF TURNKEY	Laois	Corrig Glen, Station Road, Portarlington, Co. Laois (Phase 3)	13	Tath Housing Association	""	""	""	""	""	Q4-2018
1211	1211	CALF TURNKEY	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1212	1212	CALF TURNKEY	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 2)	4	North & East Housing Association Ltd	""	""	""	""	Q1-2019	""
1213	1213	CALF TURNKEY	Laois	Doirinn Alainn, Ballylynan, Co. Laois (Phase 3)*	6	North & East Housing Association Ltd	""	""	""	""	Q1-2019	""
1214	1214	CALF TURNKEY	Laois	Droimnin, Stradbally, Co Laois  (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q3-2018
1215	1215	CALF TURNKEY	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 1)	10	Cluid Housing	""	""	""	""	Q3-2018	""
1216	1216	CALF TURNKEY	Laois	Holdbrook, Portlaoise, Co. Laois (Phase 2)	10	Cluid Housing	""	""	""	""	Q3-2018	""
1217	1217	CALF CONSTRUCTION	Laois	Kirwan Park, Mountmellick, Co Laois  (Phase 1)	2	Cluid Housing	""	""	""	""	""	Q2-2018
1218	1218	CALF TURNKEY	Laois	Knockmay Mews, Old Knockmay Road, Portlaoise, Co. Laois (Phase 1)	3	Tath Housing Association	""	""	""	""	""	Q3-2020
1219	1219	CALF TURNKEY	Laois	Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 1)	8	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1220	1220	CALF TURNKEY	Laois	Lake Drive, Kilminchy, Portlaoise, Co. Laois (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1221	1221	CALF TURNKEY	Laois	Main Street, Stradbally, Co. Laois (Phase 1)	16	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1222	1222	CALF TURNKEY	Laois	Phase 2 The Glen, Kilnacourt, Portarlington, Co Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	Q3-2020	""	""
1223	1223	CALF CONSTRUCTION	Laois	POST TENDER - Cluinin  Mountrath, Co. Laois (Phase 1)	11	Oaklee Housing	""	""	""	""	""	Q1-2018
1224	1224	CALF TURNKEY	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 1)	13	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1225	1225	CALF TURNKEY	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 2)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1226	1226	CALF TURNKEY	Laois	South Dublin Road, Portlaoise, Co. Laois (Phase 3)*	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2020	""
1227	1227	CALF TURNKEY	Laois	Spa Street, Droughill, Portarlington, Co. Laois (Phase 1)*	26	Oaklee Housing	""	""	""	Q3-2020	""	""
1228	1228	CALF TURNKEY	Laois	The Glen, Kilnacourt, Portarlington, Co. Laois (Phase 1)	18	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2020
1229	1229	CALF TURNKEY	Laois	Wilton Lawns, Portarlington, Co. Laois (Phase 1)	2	Respond	""	""	""	Q4-2019	""	""
1230	1230	SHIP CONSTRUCTION TURNKEY	Leitrim	Roosky	7	*N/A	""	""	""	""	""	Q4-2019
1231	1231	SHIP CONSTRUCTION TURNKEY	Leitrim	Drumshanbo	9	*N/A	""	""	""	""	""	Q3-2019
1232	1232	SHIP CONSTRUCTION TURNKEY	Leitrim	Church Lane, Ballinamore	9	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1233	1233	SHIP CONSTRUCTION TURNKEY	Leitrim	Druminshingore, Newtowngore	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1234	1234	SHIP CONSTRUCTION TURNKEY	Leitrim	Carraig Breac, Drumshanbo	5	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1235	1235	SHIP CONSTRUCTION TURNKEY	Leitrim	Oakgrove, Kinlough	5	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1236	1236	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Mohill	3	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1237	1237	SHIP CONSTRUCTION TURNKEY	Leitrim	Ard na Drise, Phase 2, Mohill	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1238	1238	SHIP CONSTRUCTION TURNKEY	Leitrim	Lough Meen Estate, Drumkeerin	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1239	1239	SHIP CONSTRUCTION	Leitrim	Autumn View, Summerhill, Carrick on Shannon	27	*N/A	""	""	""	""	Q4-2019	""
1240	1240	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 2)	7	*N/A	""	""	""	""	""	Q4-2018
1241	1241	SHIP CONSTRUCTION	Leitrim	Taobh Tire, Manorhamilton (Phase 3)	5	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1242	1242	SHIP CONSTRUCTION	Leitrim	Townparks, Carrick on Shannon	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1243	1243	SHIP CONSTRUCTION	Leitrim	Lahard, Ballinamore	10	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1244	1244	CAS CONSTRUCTION	Leitrim	Ballinamore	2	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2017
1245	1245	CALF TURNKEY	Leitrim	Cnoc an Luir, Drumshanbo, Co. Leitrim (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q4-2019
1246	1246	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park, Ballysimon Road, Limerick	9	*N/A	""	""	""	""	""	Q4-2019
1247	1247	SHIP CONSTRUCTION TURNKEY	Limerick	Woodlawn Park (Phase 2), Ballysimon Road, 	1	*N/A	""	""	""	""	""	Q4-2019
1248	1248	SHIP CONSTRUCTION TURNKEY	Limerick	Carraig Desmond, Newcastle West	8	*N/A	""	""	""	""	""	Q4-2019
1249	1249	SHIP CONSTRUCTION TURNKEY	Limerick	Knocklong	2	*N/A	""	""	""	""	Q1-2020	""
1250	1250	SHIP CONSTRUCTION TURNKEY	Limerick	Carraig Desmond	2	*N/A	""	""	""	""	""	Q4-2019
1251	1251	SHIP CONSTRUCTION TURNKEY	Limerick	Redgate Close, Old Cratloe Road, Limerick City	14	*N/A	""	""	""	""	Q1-2020	""
1252	1252	SHIP CONSTRUCTION TURNKEY	Limerick	The Orchard, Main Street, Pallaskenry	8	*N/A	""	""	""	""	Q1-2020	""
1253	1253	SHIP CONSTRUCTION TURNKEY	Limerick	Gortboy, Charleville Road, kIlmallock	33	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1254	1254	SHIP CONSTRUCTION TURNKEY	Limerick	The Orchard, Main Street, Pallaskenry	8	*N/A	""	""	""	""	Q1-2020	""
1255	1255	SHIP CONSTRUCTION RAPID	Limerick	Faha View, Patrickswell	16	*N/A	""	""	""	""	""	Q4-2019
1256	1256	SHIP CONSTRUCTION RAPID	Limerick	Old Christians Site, Rathbane	43	*N/A	""	""	""	""	Q2-2020	""
1257	1257	SHIP CONSTRUCTION	Limerick	Patricks Villas, Castleconnell	4	*N/A	""	""	""	""	Q3-2019	""
1258	1258	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhill Road 	14	*N/A	""	""	""	""	Q1-2020	""
1259	1259	SHIP CONSTRUCTION	Limerick	Gough Place, Rosbrien Road, Limerick	17	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1260	1260	SHIP CONSTRUCTION	Limerick	Burke Avenue, Limerick City	12	*N/A	""	""	""	""	""	Q4-2019
1261	1261	SHIP CONSTRUCTION	Limerick	Fannings Corner, Limerick City	3	*N/A	""	""	""	""	""	Q4-2019
1262	1262	SHIP CONSTRUCTION	Limerick	Wallers Well, Limerick City (Phase 2)	13	*N/A	""	""	""	""	Q2-2019	""
1263	1263	SHIP CONSTRUCTION	Limerick	Clonmacken, Limerick City	43	*N/A	""	""	""	""	Q3-2019	""
1264	1264	SHIP CONSTRUCTION	Limerick	Deerpark, Adare	30	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1265	1265	SHIP CONSTRUCTION	Limerick	Glenview Drive, Hospital	20	*N/A	""	""	""	""	Q3-2020	""
1266	1266	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	7	*N/A	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
1267	1267	SHIP CONSTRUCTION	Limerick	Hasset Villas, Thomondgate	3	*N/A	""	""	""	""	""	Q4-2018
1268	1268	SHIP CONSTRUCTION	Limerick	Kilmurry Court, Garryowen	7	*N/A	""	""	""	""	""	Q4-2019
1269	1269	SHIP CONSTRUCTION	Limerick	Rathbane Road, Limerick City	2	*N/A	""	""	""	""	""	Q1-2019
1270	1270	SHIP CONSTRUCTION	Limerick	Sycamore Avenue, Limerick City	5	*N/A	""	""	""	""	""	Q3-2019
1271	1271	SHIP CONSTRUCTION	Limerick	Lower Carey's Road, Limerick City	11	*N/A	""	""	""	""	Q1-2020	""
1272	1272	SHIP CONSTRUCTION	Limerick	Kileely Road, Moyross	5	*N/A	""	""	""	""	Q2-2020	""
1273	1273	SHIP CONSTRUCTION	Limerick	Clare Street, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
1274	1274	SHIP CONSTRUCTION	Limerick	Knocklong	12	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1275	1275	SHIP CONSTRUCTION	Limerick	Colbert Terrace, Abbeyfeale	3	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1276	1276	SHIP CONSTRUCTION	Limerick	St. Michael's Court, Watergate Flats, 	9	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
1277	1277	SHIP CONSTRUCTION	Limerick	Ballygrennan Road, Limerick City	2	*N/A	""	""	""	""	""	Q4-2017
1278	1278	SHIP CONSTRUCTION	Limerick	Ballysimon, Greenhills Road	3	*N/A	""	""	""	""	Q2-2020	""
1279	1279	SHIP CONSTRUCTION	Limerick	Broadford, Limerick	15	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1280	1280	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	79	*N/A	""	""	""	""	""	Q4-2017
1281	1281	REGENERATION	Limerick	Lord Edward Street, P2: Main Contract	2	*N/A	""	""	""	""	""	Q1-2017
1282	1282	REGENERATION	Limerick	Sheep / Athlunkards Street	8	Tath Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1283	1283	REGENERATION	Limerick	Churchfield	19	*N/A	""	""	""	""	""	Q1-2018
1284	1284	REGENERATION	Limerick	Churchfield (Phase 2)	38	Cluid Housing Association	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1285	1285	REGENERATION	Limerick	Cosgrave Park	9	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1286	1286	REGENERATION	Limerick	Orchard Site	26	Oaklee Housing Trust	""	Stage 2 approved Q3-2017, full design/tender being prepared.	""	""	""	""
1287	1287	REGENERATION	Limerick	176 & 177 Cliona Park	2	*N/A	""	""	""	""	""	Q2-2016
1288	1288	REGENERATION	Limerick	Cliona Park (Phase 2)	10	*N/A	""	""	""	""	""	Q2-2017
1289	1289	REGENERATION	Limerick	8-10 Gaol Lane	3	*N/A	""	""	""	""	""	Q4-2016
1290	1290	REGENERATION	Limerick	1 3 Weston Gardens	3	*N/A	""	""	""	""	""	Q2-2016
1291	1291	REGENERATION	Limerick	2016 Moyross Rebuild	6	*N/A	""	""	""	""	""	Q4-2016
1292	1292	REGENERATION	Limerick	2016 Southhill Rebuild	8	*N/A	""	""	""	""	""	Q4-2016
1293	1293	REGENERATION	Limerick	2016 St. Mary's Park Rebuild	9	*N/A	""	""	""	""	""	Q4-2016
1294	1294	REGENERATION	Limerick	BCW Vacant Refurbs, Lot 1 & 2**	14	*N/A	""	""	""	""	""	Q4-2016
1295	1295	REGENERATION	Limerick	St. Mary's Park Infills	15	*N/A	""	""	""	""	""	Q4-2018
1296	1296	REGENERATION	Limerick	Cliona Park (Phase 3)	18	Tath Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1297	1297	REGENERATION	Limerick	45A-46A Cliona Park	2	*N/A	""	""	""	""	Q2-2020	""
1298	1298	REGENERATION	Limerick	Dalgaish Park	27	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1299	1299	REGENERATION	Limerick	2017 St Mary's Park Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1300	1300	REGENERATION	Limerick	2017 Ballinacurra Weston Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1301	1301	REGENERATION	Limerick	2017 Southill Rebuilds	13	*N/A	""	""	""	""	""	Q4-2017
1302	1302	REGENERATION	Limerick	2017 Moyross Rebuild	1	*N/A	""	""	""	""	""	Q4-2017
1303	1303	REGENERATION	Limerick	Churchfield (Phase 1.1)	23	*N/A	""	""	""	""	""	Q2-2018
1304	1304	REGENERATION	Limerick	St. Mary's Park Infills (Phase 2)	4	*N/A	""	""	""	""	""	Q1-2019
1305	1305	REGENERATION	Limerick	Infill developments at Carew Park and Moyross	38	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1306	1306	REGENERATION	Limerick	2019 Rebuilds (Southill, Moyross, St Mary's Park and Ballinacurra Weston)	8	*N/A	""	""	""	""	""	Q4-2019
1307	1307	CAS CONSTRUCTION TURNKEY	Limerick	Carebright Community, Ardykeohane, Bruff	6	Carebright Ltd	""	""	""	""	""	Q1-2019
1308	1308	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral Place	2	Arlington Novas Ireland Ltd	""	""	""	""	""	Q4-2019
1309	1309	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral place	3	Arlington Novas Ireland Ltd	""	""	""	""	""	Q1-2020
1310	1310	CAS CONSTRUCTION TURNKEY	Limerick	Barrack Mews, Brennan's Row, Cathedral place	1	Arlington Novas Ireland Ltd	""	""	""	""	""	Q2-2020
1311	1311	CAS CONSTRUCTION	Limerick	Towerfield Crescent, Croom	16	Croom Voluntary Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1312	1312	CAS CONSTRUCTION	Limerick	Cappamore	10	Cappamore Housing Association Ltd	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1313	1313	CAS CONSTRUCTION	Limerick	Speakers Corner, Limerick City	4	Simon Community : Midwest Simon	""	""	""	""	""	Q3-2018
1314	1314	CAS CONSTRUCTION	Limerick	Cuan Mhuire, Bruree	6	Cuan Mhuire Teoranta	""	""	""	""	""	Q3-2018
1315	1315	CAS CONSTRUCTION	Limerick	Mirth, Thomondgate	18	Associated Charities Trust Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1316	1316	CAS CONSTRUCTION	Limerick	Cois na Feile, Abbeyfeale 	12	Cluid Housing Association	""	""	""	""	""	Q4-2016
1317	1317	CAS CONSTRUCTION	Limerick	2/3 Mallow Street	12	Peter McVerry Trust Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1318	1318	CAS CONSTRUCTION	Limerick	St. Pauls Convent, Kilfinane	9	Sophia Housing Association Ltd	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1319	1319	CAS CONSTRUCTION	Limerick	McGarry House, 7 Alphonsus Street	8	Arlington Novas Ireland Ltd	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1320	1320	CAS CONSTRUCTION	Limerick	47 & 48 Main Street, Croom, Limerick	4	Croom Voluntary Housing Association Ltd	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1321	1321	CAS CONSTRUCTION	Limerick	58 Henry Street	5	Simon Community : Midwest Simon	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1322	1322	CAS CONSTRUCTION	Limerick	Presentation Convent, Castlefarm, Hospital	8	Sophia Housing Association Ltd	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1323	1323	CALF TURNKEY	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 1)	2	Respond	""	""	""	""	""	Q4-2018
1324	1324	CALF TURNKEY	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 2)	2	Respond	""	""	""	""	""	Q4-2018
1325	1325	CALF TURNKEY	Limerick	Ballygrennan Close, Moyross, Limerick  (Phase 3)	2	Respond	""	""	""	""	""	Q4-2018
1326	1326	CALF TURNKEY	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 1)	46	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
1327	1327	CALF TURNKEY	Limerick	Baunacloka Heights, Mungret Gate, Mungret, Co. Limerick (Phase 2)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
1328	1328	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 1)*	25	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1329	1329	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 2)	27	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1330	1330	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 3)*	35	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1331	1331	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 4)*	33	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1332	1332	CALF TURNKEY	Limerick	Bloodmill Road, Singland, Limerick (Phase 5)	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1333	1333	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 1)*	24	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1334	1334	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 2)*	23	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1335	1335	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 3)*	21	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1336	1336	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 4)*	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1337	1337	CALF TURNKEY	Limerick	Clonmacken, Condell Road, Limerick (Phase 5)*	22	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1338	1338	CALF TURNKEY	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 1)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2018
1339	1339	CALF TURNKEY	Limerick	Cluain Ard, Fedamore, Co Limerick  (Phase 2)	2	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2018
1340	1340	CALF TURNKEY	Limerick	Drominbeg, Rhebogue, Limerick (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	Q1-2020	""	""
1341	1341	CALF TURNKEY	Limerick	Drominbeg, Rhebogue, Limerick (Phase 2)	10	Co - Operative Housing Ireland Society Limited	""	""	""	Q1-2020	""	""
1342	1342	CALF TURNKEY	Limerick	Dromsally Woods, Cappamore, Co. Limerick (Phase 1)	5	Focus Housing Association CLG	""	""	""	""	Q3-2020	""
1343	1343	CALF TURNKEY	Limerick	Glendale Lawn, Bloodmill Road, Limerick (Phase 1)	4	Cluid Housing	""	""	""	""	Q3-2020	""
1344	1344	CALF CONSTRUCTION	Limerick	Hyde Road, Limerick City (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q1-2018
1345	1345	CALF TURNKEY	Limerick	Revised - Ard Aulin, Mungret, Co Limerick (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2017
1346	1346	CALF TURNKEY	Limerick	Toormore, Main Street, Bruree, Co. Limerick (Phase 1)	16	Cluid Housing	""	""	""	""	Q3-2020	""
1347	1347	CALF TURNKEY	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 1)*	19	Cluid Housing	""	""	""	Q2-2020	""	""
1348	1348	CALF TURNKEY	Limerick	Woodfield Manor, Cloonyscrehane, Newcastle West (Phase 2)	11	Cluid Housing	""	""	""	Q2-2020	""	""
1349	1349	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	14	*N/A	""	""	""	""	""	Q4-2017
1350	1350	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough	4	*N/A	""	""	""	""	""	Q3-2018
1351	1351	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 2)	2	*N/A	""	""	""	""	""	Q1-2018
1352	1352	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck	7	*N/A	""	""	""	""	""	Q4-2018
1353	1353	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2019
1354	1354	SHIP CONSTRUCTION TURNKEY	Longford	Ballinamuck (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2019
1355	1355	SHIP CONSTRUCTION TURNKEY	Longford	Rock View, Cloondara	5	*N/A	""	""	""	""	""	Q4-2018
1356	1356	SHIP CONSTRUCTION TURNKEY	Longford	Greville Court, Granard	14	*N/A	""	""	""	""	""	Q4-2019
1357	1357	SHIP CONSTRUCTION TURNKEY	Longford	Knock, Lanesborough (Phase 2)	29	*N/A	""	""	""	""	""	Q4-2018
1358	1358	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q4-2019
1359	1359	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	4	*N/A	""	""	""	""	""	Q3-2019
1360	1360	SHIP CONSTRUCTION TURNKEY	Longford	Church Street, Edgeworthstown	5	*N/A	""	""	""	""	""	Q3-2020
1361	1361	SHIP CONSTRUCTION TURNKEY	Longford	Smithfield, Legan	18	*N/A	""	""	""	""	""	Q3-2020
1362	1362	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q4-2019
1363	1363	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	4	*N/A	""	""	""	""	""	Q2-2019
1364	1364	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 4)	6	*N/A	""	""	""	""	""	Q4-2019
1365	1365	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1366	1366	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2019
1367	1367	SHIP CONSTRUCTION TURNKEY	Longford	 Abhainn Glas, Edgeworthstown	4	*N/A	""	""	""	""	""	Q4-2019
1368	1368	SHIP CONSTRUCTION TURNKEY	Longford	Caislean Breac, Newtownforbes	2	*N/A	""	""	""	""	""	Q4-2019
1369	1369	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town, Phase 1	4	*N/A	""	""	""	""	""	Q1-2020
1370	1370	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard(Phase 3)	4	*N/A	""	""	""	""	""	Q4-2019
1371	1371	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	2	*N/A	""	""	""	""	""	Q4-2019
1372	1372	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town, Phase 2	6	*N/A	""	""	""	""	Q4-2019	""
1373	1373	SHIP CONSTRUCTION TURNKEY	Longford	Carragh, Granard	7	*N/A	""	""	""	""	""	Q4-2019
1374	1374	SHIP CONSTRUCTION TURNKEY	Longford	Radharc Na Muileann, Knock, Lanesborough	2	*N/A	""	""	""	""	""	Q4-2019
1375	1375	SHIP CONSTRUCTION TURNKEY	Longford	Pearse Drive, Longford Town	1	*N/A	""	""	""	""	""	Q4-2019
1376	1376	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford Town, Phase 3	4	*N/A	""	""	""	""	""	Q3-2020
1377	1377	SHIP CONSTRUCTION TURNKEY	Longford	Mill Race Park, Drumlish	1	*N/A	""	""	""	""	Q4-2019	""
1378	1378	SHIP CONSTRUCTION TURNKEY	Longford	Farnagh Hill, Longford	2	*N/A	""	""	""	""	Q4-2019	""
1379	1379	SHIP CONSTRUCTION	Longford	Rathcline Road, Lanesborough	4	*N/A	""	""	""	""	""	Q3-2019
1380	1380	SHIP CONSTRUCTION	Longford	Edgeworthstown Road, Ballymahon	4	*N/A	""	""	""	""	""	Q1-2018
1381	1381	SHIP CONSTRUCTION	Longford	Daroge, Ballymahon	1	*N/A	""	""	""	""	""	Q4-2019
1382	1382	SHIP CONSTRUCTION	Longford	'Rose Cottage', Ballinalee	6	*N/A	""	""	""	""	Q3-2020	""
1383	1383	SHIP CONSTRUCTION	Longford	St.Rita's, Park Road, Longford	14	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1384	1384	SHIP CONSTRUCTION	Longford	Fairgreen View, Longford Town	1	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1385	1385	SHIP CONSTRUCTION	Longford	Cranleymore, Abbeylara	3	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1386	1386	SHIP CONSTRUCTION	Longford	Cloonahard, Edgeworthstown	1	*N/A	""	""	""	""	Q3-2020	""
1387	1387	CALF TURNKEY	Longford	Cartrun Breac, Lisbrack Rd, Longford (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q1-2017
1388	1388	CALF CONSTRUCTION	Longford	Colmcille Terrace, Granard, Co. Longford. (Phase 1)	21	Tath Housing Association	""	""	""	Q2-2018	""	""
1389	1389	SHIP CONSTRUCTION TURNKEY	Louth	Brabazon Hall, Termonfeckin, Drogheda	5	*N/A	""	""	""	""	""	Q4-2019
1390	1390	SHIP CONSTRUCTION TURNKEY	Louth	Castletown Road, Dundalk 	6	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1391	1391	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 1	13	*N/A	""	""	""	""	Q4-2019	""
1392	1392	SHIP CONSTRUCTION TURNKEY	Louth	Green Gates Manor, Haynestown, Dundalk, Co. Louth 	44	*N/A	""	""	""	""	""	Q2-2020
1393	1393	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk - Phase 1	16	*N/A	""	""	""	""	""	Q3-2020
1394	1394	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 2	9	*N/A	""	""	""	""	Q4-2019	""
1395	1395	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 3	10	*N/A	""	""	""	""	Q4-2019	""
1396	1396	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 4	9	*N/A	""	""	""	""	Q4-2019	""
1397	1397	SHIP CONSTRUCTION TURNKEY	Louth	Gort Bui, Ballymakenny Road, Drogheda - Phase 5	8	*N/A	""	""	""	""	Q4-2019	""
1398	1398	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk, Co. Louth - Phase 2	17	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1399	1399	SHIP CONSTRUCTION TURNKEY	Louth	5 Bridgegate Close, Bridgegate, Ardee, Co. Louth	1	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1400	1400	SHIP CONSTRUCTION TURNKEY	Louth	Termon River, Termonfeckin, Co. Louth 	3	*N/A	""	""	""	""	Q1-2018	""
1401	1401	SHIP CONSTRUCTION TURNKEY	Louth	Glyde View, Tallanstown	2	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1402	1402	SHIP CONSTRUCTION TURNKEY	Louth	Wadman Park, Haynestown, Dundalk, Co. Louth - Phase 3	29	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1403	1403	SHIP CONSTRUCTION	Louth	55/57 Bothar Brugha, Drogheda	3	*N/A	""	""	""	""	""	Q4-2017
1404	1404	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 1	4	*N/A	""	""	""	""	""	Q1-2018
1405	1405	SHIP CONSTRUCTION	Louth	CPO Bundle 1	7	*N/A	""	""	""	""	""	Q4-2016
1406	1406	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 2	5	*N/A	""	""	""	""	""	Q2-2017
1407	1407	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 3	3	*N/A	""	""	""	""	""	Q3-2017
1408	1408	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 4	7	*N/A	""	""	""	""	""	Q4-2017
1409	1409	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2018
1410	1410	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2018
1411	1411	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 6	2	*N/A	""	""	""	""	""	Q4-2019
1412	1412	SHIP CONSTRUCTION	Louth	CPO Bundle 3	2	*N/A	""	""	""	""	""	Q2-2017
1413	1413	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 2	1	*N/A	""	""	""	""	""	Q3-2017
1414	1414	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 3	4	*N/A	""	""	""	""	""	Q4-2017
1415	1415	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 7	2	*N/A	""	""	""	""	""	Q1-2019
1416	1416	SHIP CONSTRUCTION	Louth	CPO Bundle 4	1	*N/A	""	""	""	""	""	Q3-2018
1417	1417	SHIP CONSTRUCTION	Louth	CPO Bundle 1 - Phase 6	1	*N/A	""	""	""	""	""	Q1-2020
1418	1418	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 3	5	*N/A	""	""	""	""	""	Q1-2019
1419	1419	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 4	1	*N/A	""	""	""	""	""	Q2-2018
1420	1420	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 5	4	*N/A	""	""	""	""	""	Q3-2018
1421	1421	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 3	1	*N/A	""	""	""	""	""	Q1-2019
1422	1422	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
1423	1423	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 2	4	*N/A	""	""	""	""	""	Q4-2018
1424	1424	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 6	5	*N/A	""	""	""	""	""	Q4-2018
1425	1425	SHIP CONSTRUCTION	Louth	CPO Bundle 4 - Phase 4	1	*N/A	""	""	""	""	""	Q4-2018
1426	1426	SHIP CONSTRUCTION	Louth	CPO Bundle 3 - Phase 8	2	*N/A	""	""	""	""	""	Q2-2019
1427	1427	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 2	2	*N/A	""	""	""	""	""	Q2-2019
1428	1428	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 1	1	*N/A	""	""	""	""	""	Q1-2019
1429	1429	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 4	3	*N/A	""	""	""	""	""	Q4-2019
1430	1430	SHIP CONSTRUCTION	Louth	Moneymore, Drogheda, Co. Louth	1	*N/A	""	""	""	""	Q2-2020	""
1431	1431	SHIP CONSTRUCTION	Louth	Rathmullen, Drogheda, Co. Louth	4	*N/A	""	""	""	""	Q2-2020	""
1432	1432	SHIP CONSTRUCTION	Louth	Infill Housing Construction, Gort Uaine, Clogherhead, Co. Louth	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1433	1433	SHIP CONSTRUCTION	Louth	Infill Housing Construction, School Lane, Dunleer, Co. Louth	1	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
1434	1434	SHIP CONSTRUCTION	Louth	CPO Bundle 6 - 2 Willow Brook, Dromiskin	1	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1435	1435	SHIP CONSTRUCTION	Louth	CPO Bundle 2 - Phase 5	1	*N/A	""	""	""	""	""	Q3-2019
1436	1436	SHIP CONSTRUCTION	Louth	CPO Bundle 6 - Phase 1	1	*N/A	""	""	""	""	""	Q3-2019
1437	1437	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - Phase 3	4	*N/A	""	""	""	""	""	Q3-2019
1438	1438	SHIP CONSTRUCTION	Louth	CPO Bundle 6 - Phase 2	2	*N/A	""	""	""	""	""	Q4-2019
1439	1439	SHIP CONSTRUCTION	Louth	CPO Bundle 6 - 1 Willow Brook, Dromiskin	1	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1440	1440	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 33 Hazelwood Ave., Bay Estate, Dundalk	1	*N/A	""	""	""	""	""	Q1-2020
1441	1441	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 27 Mary St. North, Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1442	1442	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 8 Bridge Crescent, Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1443	1443	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 27 Legion Ave., Dundalk	1	*N/A	""	""	""	""	""	Q2-2020
1444	1444	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 26 Castle Road, Dundalk	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1445	1445	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 30 St. Clements Park, Dundalk	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1446	1446	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 26 Culhane Street, Dundalk	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1447	1447	SHIP CONSTRUCTION	Louth	CPO Bundle 5 - 81 Dublin Street, Dundalk	1	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1448	1448	SHIP CONSTRUCTION	Louth	CPO Bundle 6 - 3 Bolton Square, Drogheda	1	*N/A	""	""	""	""	""	Q3-2020
1449	1449	SHIP CONSTRUCTION	Louth	CPO Bundle 6 - 6 Moorehall, Ardee	1	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1450	1450	SHIP CONSTRUCTION	Louth	Woodlands, Dunleer	4	*N/A	""	""	""	""	""	Q4-2016
1451	1451	SHIP CONSTRUCTION	Louth	Boice Court (Phase 2), Drogheda, Co. Louth	72	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1452	1452	SHIP CONSTRUCTION	Louth	Father Finn Park (Phase 2)	17	*N/A	""	""	""	""	Q1-2020	""
1453	1453	SHIP CONSTRUCTION	Louth	Mount Avenue, Dundalk	93	*N/A	Stage 1 approved Q4-2017, outline design and costs being prepared.	""	""	""	""	""
1454	1454	SHIP CONSTRUCTION	Louth	Muirhevnamor, Dundalk (Phase 1)	18	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1455	1455	REGENERATION	Louth	Cox's Demesne Phase 2a	14	*N/A	""	""	""	""	""	Q4-2016
1456	1456	REGENERATION	Louth	Cox's Demesne Phase 2b	22	*N/A	""	""	""	""	Q1-2020	""
1457	1457	CAS CONSTRUCTION TURNKEY	Louth	Liscorrie, Bog Road, Drogheda, Co. Louth	12	Tath Housing Association Ltd	""	""	""	""	Q1-2020	""
1458	1458	CAS CONSTRUCTION	Louth	5 Slieveroe Crescent, Dundalk	1	Cluid Housing Association	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1459	1459	CAS CONSTRUCTION	Louth	Barrack Street, Dundalk	21	Simon Community : Dundalk Simon	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
1460	1460	CAS CONSTRUCTION	Louth	McArdle Green (Moneymore), Drogheda	1	North ? East Housing Association Ltd	""	""	""	""	""	Q4-2018
1461	1461	CAS CONSTRUCTION	Louth	Tierney Street, Ardee	7	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2018, the scheme is now approved to proceed to tender.	""	""	""
1462	1462	CAS CONSTRUCTION	Louth	Tredagh View, Drogheda	1	Respond	""	""	""	""	""	Q1-2017
1463	1463	CAS CONSTRUCTION	Louth	Coulter Park, Dundalk	7	Tath Housing Association Ltd	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1464	1464	CAS CONSTRUCTION	Louth	St. John's Home, Peter's Hill, Drogheda	4	North ? East Housing Association Ltd	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1465	1465	CAS CONSTRUCTION	Louth	Riverwell Close, Dundalk	1	Respond	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1466	1466	CAS CONSTRUCTION	Louth	Highfield, Newry Road, Dundalk (Domestic Violence Refuge)	12	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1467	1467	CAS CONSTRUCTION	Louth	10-16 The Alleys, St. Peter's Place, Drogheda, Co. Louth	14	Peter McVerry Trust Ltd	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1468	1468	CALF TURNKEY	Louth	2 units An Rian, Termonfeckin Rd., Drogheda, Co. Louth (Phase 1)	2	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1469	1469	CALF TURNKEY	Louth	Aston Village, Drogheda (Phase 1)*	8	Respond	""	""	""	""	""	Q3-2018
1470	1470	CALF CONSTRUCTION	Louth	Bishops Court, Dundalk, Co Louth  (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q3-2020
1471	1471	CALF TURNKEY	Louth	Castle Court, Castlebellingham, Louth (Phase 1)	4	Cluid Housing	""	""	""	""	""	Q1-2017
1472	1472	CALF TURNKEY	Louth	Castle Court, Castlebellingham, Louth (Phase 2)	10	Cluid Housing	""	""	""	""	""	Q1-2017
1473	1473	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q1-2018
1474	1474	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 2)*	20	Tath Housing Association	""	""	""	""	""	Q1-2018
1475	1475	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 3)	8	Tath Housing Association	""	""	""	""	""	Q3-2018
1476	1476	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 4)	15	Tath Housing Association	""	""	""	""	""	Q3-2018
1477	1477	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 5)	6	Tath Housing Association	""	""	""	""	""	Q4-2018
1478	1478	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 6)*	22	Tath Housing Association	""	""	""	""	""	Q4-2018
1479	1479	CALF TURNKEY	Louth	Castleguard, Ardee, Co. Louth (Phase 7)	22	Tath Housing Association	""	""	""	""	""	Q2-2019
1480	1480	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 1)*	16	Tath Housing Association	""	""	""	""	Q1-2020	""
1481	1481	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 2)	4	Tath Housing Association	""	""	""	""	Q1-2020	""
1482	1482	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 3)	6	Tath Housing Association	""	""	""	""	Q1-2020	""
1483	1483	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 4)	16	Tath Housing Association	""	""	""	""	Q1-2020	""
1484	1484	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 5)	5	Tath Housing Association	""	""	""	""	Q1-2020	""
1485	1485	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 6)	6	Tath Housing Association	""	""	""	""	Q1-2020	""
1486	1486	CALF TURNKEY	Louth	Cathedral View, Ramparts, Dundalk, Co. Louth (Phase 7)	12	Tath Housing Association	""	""	""	""	Q1-2020	""
1487	1487	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 1)	12	Cluid Housing	""	""	""	""	Q3-2019	""
1488	1488	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 2)*	15	Cluid Housing	""	""	""	""	Q3-2019	""
1489	1489	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 3)	15	Cluid Housing	""	""	""	""	Q3-2019	""
1490	1490	CALF TURNKEY	Louth	Clonmore Close, Ardee, Co. Louth (Phase 4)	13	Cluid Housing	""	""	""	""	Q3-2019	""
1491	1491	CALF TURNKEY	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 1)*	13	Tath Housing Association	""	""	""	""	""	Q4-2018
1492	1492	CALF TURNKEY	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 2)	8	Tath Housing Association	""	""	""	""	""	Q1-2019
1493	1493	CALF TURNKEY	Louth	Cois Cuain, Upper Point Road, Dundalk, Co. Louth (Phase 3)	7	Tath Housing Association	""	""	""	""	""	Q2-2019
1494	1494	CALF TURNKEY	Louth	Coulter Place Armagh Road (Phase 1)	10	Cluid Housing	""	""	""	""	""	Q1-2017
1495	1495	CALF TURNKEY	Louth	Coulter Place Armagh Road (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q3-2017
1496	1496	CALF TURNKEY	Louth	Dowdallshill, Dundalk, Co. Louth (Phase 1)*	13	North & East Housing Association Ltd	""	""	""	""	""	Q3-2020
1497	1497	CALF TURNKEY	Louth	Dublin Road, Dundalk, Co. Louth (Phase 1)*	65	Respond	""	""	""	Q3-2020	""	""
1498	1498	CALF TURNKEY	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 1)*	14	Respond	""	""	""	""	""	Q1-2019
1499	1499	CALF TURNKEY	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 2)*	14	Respond	""	""	""	""	""	Q4-2019
1500	1500	CALF TURNKEY	Louth	Dublin Road, Dundalk, Co. Louth(Glenview) (Phase 3)	3	Respond	""	""	""	""	Q3-2017	""
1501	1501	CALF TURNKEY	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 1)*	11	Tath Housing Association	""	""	""	""	""	Q2-2019
1502	1502	CALF TURNKEY	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 2)*	14	Tath Housing Association	""	""	""	""	""	Q2-2019
1503	1503	CALF TURNKEY	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 3)*	15	Tath Housing Association	""	""	""	""	""	Q2-2019
1504	1504	CALF TURNKEY	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 4)*	47	Tath Housing Association	""	""	""	""	""	Q3-2019
1505	1505	CALF TURNKEY	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 5)*	24	Tath Housing Association	""	""	""	""	""	Q4-2019
1506	1506	CALF TURNKEY	Louth	Dundoogan, Haynestown, Dundalk, Co. Louth (Phase 6)*	1	Tath Housing Association	""	""	""	""	Q2-2018	""
1507	1507	CALF CONSTRUCTION	Louth	Fire Station Site, Scarlett St, Drogheda (Phase 1)	15	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1508	1508	CALF TURNKEY	Louth	Halliday Mills, Quay Street, Dundalk, Co. Louth (Phase 1)*	85	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2020	""
1509	1509	CALF TURNKEY	Louth	Harbour Grove, Dundalk, Co. Louth (Phase 1)	8	North & East Housing Association Ltd	""	""	""	""	""	Q2-2020
1510	1510	CALF TURNKEY	Louth	Harbour View, Coulter Place, Dundalk (Phase 1)	12	Cluid Housing	""	""	""	""	Q1-2020	""
1511	1511	CALF TURNKEY	Louth	Harbour View, Coulter Place, Dundalk (Phase 2)	12	Cluid Housing	""	""	""	""	Q1-2020	""
1512	1512	CALF TURNKEY	Louth	Knock Shee Close, Blackrock, Co. Louth (Phase 1)	1	Cluid Housing	""	""	""	""	Q3-2019	""
1513	1513	CALF TURNKEY	Louth	Knock Shee, Old Golf Links Road, Blackrock, Co Louth  (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q4-2017
1514	1514	CALF TURNKEY	Louth	Knockshee Close, Blackrock, Co. Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q2-2020
1515	1515	CALF TURNKEY	Louth	Liscorrie, Bog Lane, Drogheda (Phase 1)	41	Tath Housing Association	""	""	""	""	""	Q4-2017
1516	1516	CALF TURNKEY	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 1)*	8	Tath Housing Association	""	""	""	""	Q4-2019	""
1517	1517	CALF TURNKEY	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 2)*	7	Tath Housing Association	""	""	""	""	Q4-2019	""
1518	1518	CALF TURNKEY	Louth	Lismullen Grove, Dundalk, Co. Louth (Phase 3)	8	Tath Housing Association	""	""	""	""	Q4-2019	""
1519	1519	CALF TURNKEY	Louth	Mount Hamilton, Dundalk, Co. Louth (Phase 1)	20	Cluid Housing	""	""	""	""	""	Q4-2019
1520	1520	CALF TURNKEY	Louth	Newtown, Marsh Road, Drogheda, Co. Louth (Phase 1)*	133	Respond	""	""	""	Q2-2020	""	""
1521	1521	CALF CONSTRUCTION	Louth	Post Tender - Clos na Manach, Carlingford, Co Louth (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q2-2018
1522	1522	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 1)	20	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1523	1523	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Clanmil (Phase 2)*	25	Clanmil Housing Association Ireland	""	""	""	""	Q1-2019	""
1524	1524	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q4-2019
1525	1525	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 2)*	22	Tath Housing Association	""	""	""	""	Q1-2019	""
1526	1526	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 3)*	6	Tath Housing Association	""	""	""	""	Q1-2019	""
1527	1527	CALF TURNKEY	Louth	Racecourse Meadows, Dundalk, Co. Louth - Tuath (Phase 4)*	7	Tath Housing Association	""	""	""	""	Q1-2019	""
1528	1528	CALF TURNKEY	Louth	Rath na Gloine, Commons Road, Louth (Phase 1)	3	Cluid Housing	""	""	""	""	""	Q3-2016
1529	1529	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 1)	3	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1530	1530	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 2)	6	North & East Housing Association Ltd	""	""	""	""	""	Q2-2019
1531	1531	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 3)	3	North & East Housing Association Ltd	""	""	""	""	""	Q3-2019
1532	1532	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 4)	14	North & East Housing Association Ltd	""	""	""	""	""	Q3-2019
1533	1533	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 5)	12	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1534	1534	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Phase 6)	16	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1535	1535	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q2-2018
1536	1536	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 2)	6	Tath Housing Association	""	""	""	""	""	Q3-2018
1537	1537	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 3)	4	Tath Housing Association	""	""	""	""	""	Q3-2018
1538	1538	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 4)	15	Tath Housing Association	""	""	""	""	""	Q4-2018
1539	1539	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 5)	6	Tath Housing Association	""	""	""	""	""	Q2-2019
1540	1540	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 6)	4	Tath Housing Association	""	""	""	""	""	Q4-2019
1541	1541	CALF TURNKEY	Louth	Rathmullen Road, Drogheda, Co. Louth (Tuath) (Phase 7)	12	Tath Housing Association	""	""	""	""	""	Q3-2020
1542	1542	CALF TURNKEY	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q4-2017
1543	1543	CALF TURNKEY	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2019
1544	1544	CALF TURNKEY	Louth	Revised - 43 Units at Mount Hamilton, Dundalk, Co Louth (Phase 3)	16	Cluid Housing	""	""	""	""	""	Q4-2019
1545	1545	CALF CONSTRUCTION	Louth	Slieve Row Crescent, Dundalk (Phase 1)	1	Cluid Housing	""	""	""	""	""	Q2-2016
1546	1546	CALF TURNKEY	Louth	Termon River, Baltray Road, Termonfeckin, Co. Louth (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1547	1547	CALF TURNKEY	Louth	Termon River, Baltray Road, Termonfeckin, Drogheda, Co.Louth (Phase 1)*	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1548	1548	CALF TURNKEY	Louth	The Kitchen Garden, Desmesne Road, Dundalk, Co. Louth (Phase 1)*	65	Cluid Housing	""	""	""	Q2-2020	""	""
1549	1549	CALF TURNKEY	Louth	The Kitchen Garden, Desmesne Road, Dundalk, Co. Louth (Phase 2)	65	Cluid Housing	""	""	""	Q2-2020	""	""
1550	1550	CALF TURNKEY	Louth	Trinity Street, Drogheda, Co. Louth (Phase 1)	3	Foscadh Housing Association Ltd	""	""	""	""	Q3-2018	""
1551	1551	CALF TURNKEY	Louth	Tullybrook, Slane Road, Drogheda, Co. Louth (Phase 1)	4	Cluid Housing	""	""	""	""	Q4-2018	""
1552	1552	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Louth	Ravel Ardee Road, Dunleer	80	*N/A	""	""	""	""	""	Q2-2020
1553	1553	SHIP CONSTRUCTION TURNKEY	Mayo	Carrabeg, Newport Road, Castlebar	2	*N/A	""	""	""	""	""	Q4-2018
1554	1554	SHIP CONSTRUCTION TURNKEY	Mayo	Cois Abhainn, Bonniconlon	2	*N/A	""	""	""	""	""	Q2-2019
1555	1555	SHIP CONSTRUCTION TURNKEY	Mayo	Chapel Street, Louisburgh	3	*N/A	""	""	""	""	""	Q4-2019
1556	1556	SHIP CONSTRUCTION TURNKEY	Mayo	Bunree, Ballina	3	*N/A	""	""	""	""	Q4-2019	""
1557	1557	SHIP CONSTRUCTION TURNKEY	Mayo	Heathervale, Castlebar - Phase 2	9	*N/A	""	""	""	""	Q1-2020	""
1558	1558	SHIP CONSTRUCTION TURNKEY	Mayo	Friars Court, Ballina	2	*N/A	""	""	""	""	""	Q4-2019
1559	1559	SHIP CONSTRUCTION TURNKEY	Mayo	Riverside Drive, Ballina	3	*N/A	""	""	""	""	""	Q4-2019
1560	1560	SHIP CONSTRUCTION TURNKEY	Mayo	Davitt Terrace, Castlebar	4	*N/A	""	""	""	""	""	Q4-2019
1561	1561	SHIP CONSTRUCTION TURNKEY	Mayo	Chapel St., Louisburgh	2	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
1562	1562	SHIP CONSTRUCTION TURNKEY	Mayo	Ard Rua, Claremorris	7	*N/A	""	""	""	""	""	Q4-2019
1563	1563	SHIP CONSTRUCTION TURNKEY	Mayo	Silver Springs, Claremorris	20	*N/A	""	""	""	""	Q3-2020	""
1564	1564	SHIP CONSTRUCTION TURNKEY	Mayo	Barley Hill, Bohola	3	*N/A	""	""	""	""	Q3-2020	""
1565	1565	SHIP CONSTRUCTION	Mayo	Pound Road, Castlebar	6	*N/A	""	""	""	""	""	Q4-2019
1566	1566	SHIP CONSTRUCTION	Mayo	The Boreen, Crossmolina	3	*N/A	""	""	""	""	Q1-2020	""
1567	1567	SHIP CONSTRUCTION	Mayo	Deel Court, Crossmolina	3	*N/A	""	""	""	""	Q1-2020	""
1568	1568	SHIP CONSTRUCTION	Mayo	Kilmaine	6	*N/A	""	""	""	""	""	Q4-2019
1569	1569	SHIP CONSTRUCTION	Mayo	Knockroe, Moygownagh	3	*N/A	""	""	""	""	Q1-2020	""
1570	1570	SHIP CONSTRUCTION	Mayo	Liskilleen, Ballinrobe,	1	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1571	1571	SHIP CONSTRUCTION	Mayo	Low Park, Charlestown	3	*N/A	""	""	""	""	Q3-2020	""
1572	1572	SHIP CONSTRUCTION	Mayo	Knocknageeha, Newport	1	*N/A	""	""	""	""	""	Q2-2019
1573	1573	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Knock (Phase 3)	4	*N/A	""	""	""	""	""	Q3-2018
1574	1574	SHIP CONSTRUCTION	Mayo	Kilmeena (Phase 2)	4	*N/A	""	""	""	""	""	Q3-2018
1575	1575	SHIP CONSTRUCTION	Mayo	Knockmore, Ballina	8	*N/A	""	""	""	""	""	Q1-2019
1576	1576	SHIP CONSTRUCTION	Mayo	Radharc an tSaillin, Binghamstown, Belmullet (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1577	1577	SHIP CONSTRUCTION	Mayo	Sliabh Rua, Foxford (Phase 3)	10	*N/A	""	""	""	""	""	Q4-2019
1578	1578	SHIP CONSTRUCTION	Mayo	Woodlands, Balla (Phase 3)	4	*N/A	""	""	""	""	""	Q4-2019
1579	1579	SHIP CONSTRUCTION	Mayo	Slinaunroe, Clogher (SRD)	1	*N/A	""	""	""	""	""	Q2-2017
1580	1580	SHIP CONSTRUCTION	Mayo	Abbeyquarter, Ballyhaunis	18	*N/A	""	""	""	""	Q1-2019	""
1581	1581	SHIP CONSTRUCTION	Mayo	Tonragee West, Achill (Phase 2)	5	*N/A	""	""	""	""	""	Q4-2019
1582	1582	SHIP CONSTRUCTION	Mayo	Sli na Roba, Friarsquarter, Ballinrobe	16	*N/A	""	""	""	""	Q4-2018	""
1583	1583	SHIP CONSTRUCTION	Mayo	Marian Crescent, Ballina	4	*N/A	""	""	""	""	""	Q2-2018
1584	1584	SHIP CONSTRUCTION	Mayo	Tubberhill, Westport (Phase 3)	21	*N/A	""	""	""	""	""	Q1-2018
1585	1585	SHIP CONSTRUCTION	Mayo	Parke, Castlebar	8	*N/A	""	""	""	""	""	Q4-2019
1586	1586	SHIP CONSTRUCTION	Mayo	Killavally	10	*N/A	""	""	""	""	""	Q4-2019
1587	1587	SHIP CONSTRUCTION	Mayo	Lios na Circa, Saleen, Castlebar - Phase 2	22	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1588	1588	SHIP CONSTRUCTION	Mayo	Kilkelly Road, Swinford	27	*N/A	""	""	""	""	Q1-2019	""
1589	1589	SHIP CONSTRUCTION	Mayo	Barhauve, Rossport (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1590	1590	SHIP CONSTRUCTION	Mayo	Glaggaun, Ballycroy (SRD)	1	*N/A	""	""	""	""	""	Q4-2017
1591	1591	SHIP CONSTRUCTION	Mayo	Glengad, Pollatomish (SRD)	1	*N/A	""	""	""	""	""	Q2-2018
1592	1592	SHIP CONSTRUCTION	Mayo	Gorthbrack, Inver (SRD)	1	*N/A	""	""	""	""	""	Q1-2018
1593	1593	SHIP CONSTRUCTION	Mayo	Cross	8	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1594	1594	SHIP CONSTRUCTION	Mayo	Bonniconlon	5	*N/A	""	""	""	""	Q2-2020	""
1595	1595	SHIP CONSTRUCTION	Mayo	Cloonkeadagh Road, Kiltimagh	21	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1596	1596	SHIP CONSTRUCTION	Mayo	Rehins Fort, Ballina	50	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1597	1597	SHIP CONSTRUCTION	Mayo	Murrevagh, Mulranney	14	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1598	1598	SHIP CONSTRUCTION	Mayo	50 Units @ Golf Course Rd., Westport	50	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1599	1599	SHIP CONSTRUCTION	Mayo	Ballyglass, Carnacon, Claremorris	6	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1600	1600	SHIP CONSTRUCTION	Mayo	Lios na Circe, Saleen, Castlebar - Phase 3	14	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1601	1601	SHIP CONSTRUCTION	Mayo	7 St. Patrick's Terrace, Westport	1	*N/A	""	""	""	""	""	Q3-2017
1602	1602	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford (Phase 2)	4	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2018
1603	1603	CAS CONSTRUCTION	Mayo	Killosheehan, Ballinrobe	6	Society of Saint Vincent de Paul	""	""	""	""	""	Q4-2018
1604	1604	CAS CONSTRUCTION	Mayo	Admiral Browne Road, Foxford	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2016
1605	1605	CAS CONSTRUCTION	Mayo	Logmore, Belmullet	7	Irish Wheelchair Association Ltd	""	""	""	""	""	Q2-2017
1606	1606	CALF TURNKEY	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 1)	4	Tath Housing Association	""	""	""	""	Q3-2020	""
1607	1607	CALF TURNKEY	Mayo	Chestnut Grove, Castlebar, Co. Mayo (Phase 2)	4	Tath Housing Association	""	""	""	""	Q3-2020	""
1608	1608	CALF TURNKEY	Mayo	Glenlara, Westport, Co Mayo  (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
1609	1609	CALF TURNKEY	Mayo	Humbert Way, Castlebar, Co. Mayo (Phase 1)	20	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2020	""
1610	1610	CALF TURNKEY	Mayo	Monamore, Lodge Road, Westport, Co. Mayo (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q4-2019
1611	1611	CALF TURNKEY	Mayo	The Sycamores, Ballina (Phase 1)	11	Cluid Housing	""	""	""	""	Q2-2019	""
1612	1612	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	19	*N/A	""	""	""	""	""	Q4-2018
1613	1613	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	16	*N/A	""	""	""	""	""	Q4-2018
1614	1614	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	8	*N/A	""	""	""	""	""	Q3-2019
1615	1615	SHIP CONSTRUCTION TURNKEY	Meath	Bracken Hill, Kilmessan	3	*N/A	""	""	""	""	""	Q4-2019
1616	1616	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	4	*N/A	""	""	""	""	""	Q3-2019
1617	1617	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	5	*N/A	""	""	""	""	""	Q4-2018
1618	1618	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin Walk, Johnstown, Navan	4	*N/A	""	""	""	""	""	Q3-2019
1619	1619	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan 	8	*N/A	""	""	""	""	""	Q2-2019
1620	1620	SHIP CONSTRUCTION TURNKEY	Meath	Cois na Mara, Bettystown	2	*N/A	""	""	""	""	""	Q3-2019
1621	1621	SHIP CONSTRUCTION TURNKEY	Meath	Dun Eimear, Bettystown	14	*N/A	""	""	""	""	""	Q4-2019
1622	1622	SHIP CONSTRUCTION TURNKEY	Meath	Cherry Hill Court, Kells	2	*N/A	""	""	""	""	""	Q4-2019
1623	1623	SHIP CONSTRUCTION TURNKEY	Meath	Broadmeadow Vale, Rathoath	2	*N/A	""	""	""	""	""	Q4-2019
1624	1624	SHIP CONSTRUCTION TURNKEY	Meath	Cois Glaisin, Johnstown, Navan	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1625	1625	SHIP CONSTRUCTION TURNKEY	Meath	Cluain Adain, Clonmagadden, Navan	15	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1626	1626	SHIP CONSTRUCTION TURNKEY	Meath	The Brambles, Longford rd., Duleek	16	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1627	1627	SHIP CONSTRUCTION TURNKEY	Meath	Willow Green, Dunshaughlin	1	*N/A	""	""	""	""	""	Q3-2020
1628	1628	SHIP CONSTRUCTION TURNKEY	Meath	Seoid na Tra, Bettytown	2	*N/A	""	""	""	""	""	Q3-2020
1629	1629	SHIP CONSTRUCTION	Meath	Proudstown Road, Navan	4	*N/A	""	""	""	""	""	Q4-2018
1630	1630	SHIP CONSTRUCTION	Meath	The Belfry, Trim	3	*N/A	""	""	""	""	""	Q4-2019
1631	1631	SHIP CONSTRUCTION RAPID	Meath	Kilmainhamwood	4	*N/A	""	""	""	""	""	Q4-2019
1632	1632	SHIP CONSTRUCTION RAPID	Meath	Cortown	10	*N/A	""	""	""	""	""	Q4-2019
1633	1633	SHIP CONSTRUCTION RAPID	Meath	Oldcastle	16	*N/A	""	""	""	""	""	Q4-2019
1634	1634	SHIP CONSTRUCTION	Meath	Bettystown (Phase 2)	15	*N/A	""	""	""	""	Q1-2019	""
1635	1635	SHIP CONSTRUCTION	Meath	St. Oliver's, Ratoath	17	*N/A	""	""	""	""	""	Q4-2019
1636	1636	SHIP CONSTRUCTION	Meath	Riverside (Townparks), Kells	40	*N/A	""	""	""	""	Q1-2019	""
1637	1637	SHIP CONSTRUCTION	Meath	Cherry Court, Summerhill	19	*N/A	""	""	""	""	""	Q1-2019
1638	1638	SHIP CONSTRUCTION	Meath	Connaught Grove, Athboy	32	*N/A	""	""	""	""	""	Q2-2018
1639	1639	SHIP CONSTRUCTION	Meath	Nobber	18	*N/A	""	Stage 2 approved Q4-2018, full design/tender being prepared.	""	""	""	""
1640	1640	SHIP CONSTRUCTION	Meath	Carlanstown	13	*N/A	""	""	""	""	Q2-2019	""
1641	1641	SHIP CONSTRUCTION	Meath	Donore	21	*N/A	""	""	Stage 3 approved Q4-2019, the scheme is now approved to proceed to tender.	""	""	""
1642	1642	SHIP CONSTRUCTION	Meath	Dunshaughlin	26	*N/A	""	""	""	""	Q1-2020	""
1643	1643	SHIP CONSTRUCTION	Meath	Bettystown (Phase 1)	16	*N/A	""	""	""	""	""	Q3-2017
1644	1644	SHIP CONSTRUCTION	Meath	Farganstown	84	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1645	1645	SHIP CONSTRUCTION	Meath	Blackhill Crescent, Donacarney	2	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1646	1646	SHIP CONSTRUCTION	Meath	Archdeaconary Glebe, Kells	20	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1647	1647	SHIP CONSTRUCTION	Meath	Nangle Court, Navan	6	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1648	1648	SHIP CONSTRUCTION	Meath	Castle Street, Ashbourne	74	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1649	1649	SHIP CONSTRUCTION	Meath	Church View, Rathmolyon	9	*N/A	Stage 1 approved Q3-2018, outline design and costs being prepared.	""	""	""	""	""
1650	1650	SHIP CONSTRUCTION	Meath	Church Street, Kells, Co. Meath	3	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1651	1651	SHIP CONSTRUCTION	Meath	Haggard Street, Trim, Co. Meath	4	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1652	1652	SHIP CONSTRUCTION	Meath	Pitcher Lane, Kells, Co. Meath	4	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1653	1653	SHIP CONSTRUCTION	Meath	Swan Lane, Balreask	6	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1654	1654	SHIP CONSTRUCTION	Meath	Carrick St., Kells	30	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1655	1655	SHIP CONSTRUCTION	Meath	Lagore, Dunshaughlin	34	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
1656	1656	SHIP CONSTRUCTION	Meath	Convent Lands, Kildalkey, Athboy, Meath	20	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1657	1657	CAS CONSTRUCTION TURNKEY	Meath	Bridge Street, Ashbourne, Co Meath  	20	Peter McVerry Trust Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1658	1658	CAS CONSTRUCTION	Meath	Blackcastle, Slane Road, Navan	17	Tath Housing Association Ltd	""	""	""	""	""	Q4-2018
1659	1659	CAS CONSTRUCTION	Meath	Women's Refuge, Tailteann Drive, Windtown, Navan	8	Meath Womens Housing Association CLG	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1660	1660	CALF TURNKEY	Meath	18 units Churchfields, Ashbourne, Co. Meath (Phase 1)	18	Tath Housing Association	""	""	""	""	""	Q4-2018
1661	1661	CALF TURNKEY	Meath	5 units Dunville, Athlumney, Navan, Co. Meath (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q1-2019
1662	1662	CALF TURNKEY	Meath	6 Units Seabury Lawns, Mornington, Co Meath (Phase 1)	6	Cluid Housing	""	""	""	""	""	Q1-2018
1663	1663	CALF TURNKEY	Meath	Ardmore Rise, Bettystown, Co Meath  (Phase 1)	1	North & East Housing Association Ltd	""	""	""	""	""	Q4-2018
1664	1664	CALF TURNKEY	Meath	Ashewood, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	Q3-2020	""	""
1665	1665	CALF TURNKEY	Meath	Athboy Road, Navan, Co. Meath (Phase 1)*	63	Respond	""	""	""	Q4-2019	""	""
1666	1666	CALF TURNKEY	Meath	Blackcastle, Slane Road, Navan, Co. Meath (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q4-2018
1667	1667	CALF TURNKEY	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 1)*	1	Tath Housing Association	""	""	""	""	""	Q2-2019
1668	1668	CALF TURNKEY	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 2)*	1	Tath Housing Association	""	""	""	""	""	Q2-2019
1669	1669	CALF TURNKEY	Meath	Broadmeadow Vale, Ratoath, Meath (Phase 3)*	10	Tath Housing Association	""	""	""	""	""	Q4-2019
1670	1670	CALF TURNKEY	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 1)	7	Cluid Housing	""	""	""	""	""	Q2-2018
1671	1671	CALF TURNKEY	Meath	Ceamach Close, Donacarney, Co Meath  (Phase 2)*	9	Cluid Housing	""	""	""	""	""	Q3-2018
1672	1672	CALF TURNKEY	Meath	Cherryvalley, Rathmoylan, Co Meath (Phase 1)	9	Cluid Housing	""	""	""	""	""	Q4-2017
1673	1673	CALF TURNKEY	Meath	Churchfields, Ashbourne, Co Meath (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q2-2017
1674	1674	CALF TURNKEY	Meath	Churchfields, Ashbourne, Meath (Phase 1)*	10	Tath Housing Association	""	""	""	""	""	Q4-2018
1675	1675	CALF TURNKEY	Meath	Churchfields, Ashbourne, Meath (Phase 2)*	3	Tath Housing Association	""	""	""	""	""	Q2-2019
1676	1676	CALF TURNKEY	Meath	Churchfields, Ashbourne, Meath (Phase 3)*	12	Tath Housing Association	""	""	""	""	""	Q4-2019
1677	1677	CALF TURNKEY	Meath	Commons Road, Navan, Co Meath  (Phase 1)	12	North & East Housing Association Ltd	""	""	""	""	""	Q4-2019
1678	1678	CALF TURNKEY	Meath	Dun Eimear, Bettystown, Co. Meath (Phase 1)*	12	Cluid Housing	""	""	""	""	""	Q4-2019
1679	1679	CALF TURNKEY	Meath	Dun Eimear, Bettystown, Co. Meath (Phase 2)*	11	Cluid Housing	""	""	""	""	""	Q4-2019
1680	1680	CALF TURNKEY	Meath	Dunville, Athlumney, Co Meath  (Phase 1)	10	Tath Housing Association	""	""	""	""	""	Q1-2018
1681	1681	CALF TURNKEY	Meath	Dunville, Athlumney, Co Meath  (Phase 2)*	8	Tath Housing Association	""	""	""	""	""	Q1-2018
1682	1682	CALF TURNKEY	Meath	Dunville, Athlumney, Co Meath  (Phase 3)*	10	Tath Housing Association	""	""	""	""	""	Q2-2018
1683	1683	CALF TURNKEY	Meath	Dunville, Athlumney, Co Meath  (Phase 4)*	6	Tath Housing Association	""	""	""	""	""	Q2-2018
1684	1684	CALF TURNKEY	Meath	Dunville, Athlumney, Co Meath  (Phase 5)*	18	Tath Housing Association	""	""	""	""	""	Q2-2018
1685	1685	CALF TURNKEY	Meath	Dunville, Athlumney, Co Meath  (Phase 6)	12	Tath Housing Association	""	""	""	""	""	Q3-2018
1686	1686	CALF TURNKEY	Meath	Eastham Square, Bettystown, Meath (Phase 1)*	5	Cluid Housing	""	""	""	""	""	Q1-2019
1687	1687	CALF TURNKEY	Meath	Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)*	1	Tath Housing Association	""	""	""	""	""	Q3-2018
1688	1688	CALF TURNKEY	Meath	Frederick Manor, Ashbourne, Co. Meath (Phase 1)*	11	Cluid Housing	""	""	""	""	Q4-2017	""
1689	1689	CALF TURNKEY	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 1)	20	Tath Housing Association	""	""	""	""	""	Q4-2019
1690	1690	CALF TURNKEY	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 2)	18	Tath Housing Association	""	""	""	""	Q3-2018	""
1691	1691	CALF TURNKEY	Meath	Gainsfield, Commons Road, Navan, Co. Meath (Phase 3)	16	Tath Housing Association	""	""	""	""	Q3-2018	""
1692	1692	CALF TURNKEY	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 1)	20	Tath Housing Association	""	""	""	Q2-2020	""	""
1693	1693	CALF TURNKEY	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 2)	15	Tath Housing Association	""	""	""	Q2-2020	""	""
1694	1694	CALF TURNKEY	Meath	Gort Fionnbarra (Gainsfield Phase 2), Commons Road, Navan, Co. Meath (Phase 3)	14	Tath Housing Association	""	""	""	Q2-2020	""	""
1695	1695	CALF TURNKEY	Meath	Grangehall, Dunshaughlin (Phase 1)	7	Tath Housing Association	""	""	""	""	""	Q2-2018
1696	1696	CALF TURNKEY	Meath	Kellets Grove, Dunshauglin, Co Meath  (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q1-2018
1697	1697	CALF TURNKEY	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 1)*	6	Oaklee Housing	""	""	""	Q4-2019	""	""
1698	1698	CALF TURNKEY	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 2)	6	Oaklee Housing	""	""	""	Q4-2019	""	""
1699	1699	CALF TURNKEY	Meath	Ledwidge Hall Green, Drogheda Road, Slane, Co. Meath (Phase 3)*	16	Oaklee Housing	""	""	""	Q4-2019	""	""
1700	1700	CALF TURNKEY	Meath	Maudelins Brook, Duleek, Co.Meath (Phase 1)*	20	Respond	""	""	""	""	""	Q4-2019
1701	1701	CALF TURNKEY	Meath	Mill Lane, Flower Hill, Navan, Co Meath (Phase 1)	20	Oaklee Housing	""	""	""	""	""	Q4-2016
1702	1702	CALF TURNKEY	Meath	Millrace Court, Emmet Street, Trim, Co Meath  (Phase 1)	11	North & East Housing Association Ltd	""	""	""	""	""	Q2-2018
1703	1703	CALF TURNKEY	Meath	Millteog, Athboy Road, Trim, Co. Meath (Phase 1)*	16	Oaklee Housing	""	""	""	""	""	Q4-2019
1704	1704	CALF TURNKEY	Meath	Millteog, Athboy Road, Trim, Co. Meath (Phase 2)*	9	Oaklee Housing	""	""	""	""	""	Q2-2020
1705	1705	CALF TURNKEY	Meath	Milltown, Ashbourne, Co Meath (Phase 1)	11	Cluid Housing	""	""	""	""	""	Q1-2017
1706	1706	CALF TURNKEY	Meath	Milltown, Ashbourne, Co Meath (Phase 2)	36	Cluid Housing	""	""	""	""	""	Q4-2017
1707	1707	CALF TURNKEY	Meath	Milltown, Ashbourne, Co Meath (Phase 3)	20	Cluid Housing	""	""	""	""	""	Q4-2017
1708	1708	CALF TURNKEY	Meath	Moydervey Manor, Longwood, Trim, Co. Meath (Phase 1)*	13	Tath Housing Association	""	""	""	""	Q4-2018	""
1709	1709	CALF TURNKEY	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 1)	6	Tath Housing Association	""	""	""	Q3-2020	""	""
1710	1710	CALF TURNKEY	Meath	Narrow Ways, Bettystown, Co. Meath (Phase 2)	6	Tath Housing Association	""	""	""	Q3-2020	""	""
1711	1711	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 1)	3	Tath Housing Association	""	""	""	""	""	Q4-2018
1712	1712	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 10)	5	Tath Housing Association	""	""	""	""	Q2-2018	""
1713	1713	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 2)	6	Tath Housing Association	""	""	""	""	""	Q2-2019
1714	1714	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 3)	2	Tath Housing Association	""	""	""	""	""	Q3-2019
1715	1715	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 4)	5	Tath Housing Association	""	""	""	""	""	Q3-2019
1716	1716	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 5)	4	Tath Housing Association	""	""	""	""	""	Q4-2019
1717	1717	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 6)	6	Tath Housing Association	""	""	""	""	""	Q1-2020
1718	1718	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 7)	3	Tath Housing Association	""	""	""	""	""	Q1-2020
1719	1719	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 8)	4	Tath Housing Association	""	""	""	""	""	Q3-2020
1720	1720	CALF TURNKEY	Meath	Revised - Fitzherbert Wood, Slane Road, Navan, Co Meath  (Phase 9)	6	Tath Housing Association	""	""	""	""	""	Q3-2020
1721	1721	CALF TURNKEY	Meath	Royal Oaks, Enfield, Co Meath (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2017
1722	1722	CALF TURNKEY	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 1)*	4	Cluid Housing	""	""	""	""	Q4-2019	""
1723	1723	CALF TURNKEY	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 2)*	14	Cluid Housing	""	""	""	""	Q4-2019	""
1724	1724	CALF TURNKEY	Meath	Royal Oaks, Enfield, Co. Meath (Phase 2) (Phase 3)	16	Cluid Housing	""	""	""	""	Q4-2019	""
1725	1725	CALF TURNKEY	Meath	Seabury Lawns, Mornington, Co. Meath (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q3-2017
1726	1726	CALF TURNKEY	Meath	Sln Duff, Kentstown, Co. Meath (Phase 1)	2	Cluid Housing	""	""	""	""	Q1-2018	""
1727	1727	CALF TURNKEY	Meath	Station Road, Dunboyne, Co. Meath (Phase 1)	24	Respond	""	""	""	""	""	Q4-2018
1728	1728	CALF TURNKEY	Meath	The Bungalows, Dunshauglin, Co. Meath (Phase 1)*	8	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2019	""
1729	1729	CALF TURNKEY	Meath	The Maudlins, Trim, Co. Meath (Phase 1)	9	Cluid Housing	""	""	""	""	Q1-2020	""
1730	1730	CALF TURNKEY	Meath	The Way, Broadmeadow Vale, Ratoath, Co. Meath (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q4-2019
1731	1731	CALF TURNKEY	Meath	Tubberclaire, Navan, Co Meath (Phase 1)	8	Cluid Housing	""	""	""	""	""	Q2-2016
1732	1732	CALF TURNKEY	Meath	Tubberclaire, Navan, Co Meath (Phase 2)	7	Cluid Housing	""	""	""	""	""	Q3-2016
1733	1733	CALF TURNKEY	Meath	Tubberclaire, Navan, Co Meath (Phase 3)	8	Cluid Housing	""	""	""	""	""	Q4-2016
1734	1734	CALF TURNKEY	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 1)	14	Tath Housing Association	""	""	""	""	""	Q2-2020
1735	1735	CALF TURNKEY	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 2)	13	Tath Housing Association	""	""	""	""	""	Q3-2020
1736	1736	CALF TURNKEY	Meath	Whitefield Hall, Bettystown, Co. Meath (Phase 3)	2	Tath Housing Association	""	""	""	""	Q2-2019	""
1737	1737	SHIP CONSTRUCTION TURNKEY	Monaghan	Drumbear Wood, Monaghan Town	12	*N/A	""	""	""	""	""	Q4-2017
1738	1738	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town	6	*N/A	""	""	""	""	""	Q4-2017
1739	1739	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 2)	8	*N/A	""	""	""	""	""	Q2-2017
1740	1740	SHIP CONSTRUCTION TURNKEY	Monaghan	Knockroe Glen, Monaghan Town (Phase 1)	8	*N/A	""	""	""	""	""	Q2-2017
1741	1741	SHIP CONSTRUCTION TURNKEY	Monaghan	Killycard, Bree, Castleblaney	4	*N/A	""	""	""	""	""	Q2-2019
1742	1742	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q4-2017
1743	1743	SHIP CONSTRUCTION TURNKEY	Monaghan	Maple Grove, Smithborough	11	*N/A	""	""	""	""	""	Q4-2018
1744	1744	SHIP CONSTRUCTION TURNKEY	Monaghan	Pls an Bhr, Rosevale, Bree, Castleblayney	26	*N/A	""	""	""	""	Q2-2019	""
1745	1745	SHIP CONSTRUCTION TURNKEY	Monaghan	Ard na Radhairc, Carrickmacross, Co. Monaghan	41	*N/A	""	""	""	""	Q3-2019	""
1746	1746	SHIP CONSTRUCTION TURNKEY	Monaghan	Coill an Ri, Carrickmacross	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
1747	1747	SHIP CONSTRUCTION TURNKEY	Monaghan	The Meadows, Smithborough	5	*N/A	""	""	""	""	""	Q3-2019
1748	1748	SHIP CONSTRUCTION TURNKEY	Monaghan	Drummond Radhairc, Carrickmacross	1	*N/A	""	""	""	""	""	Q3-2019
1749	1749	SHIP CONSTRUCTION	Monaghan	Folly Court, Ballybay	6	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1750	1750	SHIP CONSTRUCTION	Monaghan	Bree, Castleblayney	8	*N/A	""	""	""	""	""	Q2-2019
1751	1751	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan Town	43	*N/A	""	""	""	""	""	Q4-2019
1752	1752	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q3-2019	""
1753	1753	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q3-2019	""
1754	1754	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q3-2019	""
1755	1755	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	6	*N/A	""	""	""	""	Q3-2019	""
1756	1756	SHIP CONSTRUCTION	Monaghan	2a & 3 Analore St., Clones	2	*N/A	""	""	""	""	Q3-2019	""
1757	1757	SHIP CONSTRUCTION	Monaghan	Abbey Gatehouse, Analore St., Clones	4	*N/A	""	""	""	""	Q3-2019	""
1758	1758	SHIP CONSTRUCTION	Monaghan	Lui Na Greine, Scotstown	32	*N/A	""	""	""	""	Q2-2020	""
1759	1759	SHIP CONSTRUCTION	Monaghan	Latlorcan, Monaghan	16	*N/A	""	""	""	""	""	Q4-2018
1760	1760	SHIP CONSTRUCTION	Monaghan	12 Church St., Ballybay	2	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1761	1761	SHIP CONSTRUCTION	Monaghan	Fermanagh St., Clones	3	*N/A	""	""	""	""	Q1-2020	""
1762	1762	SHIP CONSTRUCTION	Monaghan	Church Hill, Clones	2	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1763	1763	CAS CONSTRUCTION	Monaghan	Drumillard, Castleblayney (Phase 2)	2	Castleblayney Care Housing Association Ltd	""	""	Stage 3 approved Q4-2019, the scheme is now approved to proceed to tender.	""	""	""
1764	1764	CAS CONSTRUCTION	Monaghan	Liseggerton, Clones	19	Oaklee Housing Trust	""	""	""	""	Q1-2020	""
1765	1765	CAS CONSTRUCTION	Monaghan	Convent Lands, Carrickmacross	7	Respond	""	""	""	""	""	Q2-2017
1766	1766	CAS CONSTRUCTION	Monaghan	Birch Court Apts., 34 Main Street, Ballybay	4	North ? East Housing Association Ltd	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1767	1767	CALF TURNKEY	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 1)	11	Tath Housing Association	""	""	""	""	Q2-2019	""
1768	1768	CALF TURNKEY	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 2)	6	Tath Housing Association	""	""	""	""	Q2-2019	""
1769	1769	CALF TURNKEY	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 3)	8	Tath Housing Association	""	""	""	""	Q2-2019	""
1770	1770	CALF TURNKEY	Monaghan	Bree, Castleblayney, Co. Monaghan (Phase 4)	13	Tath Housing Association	""	""	""	""	Q2-2019	""
1771	1771	CALF TURNKEY	Monaghan	Kingscourt Road, Carrickmacross, Co Monaghan  (Phase 1)	50	Respond	""	""	""	""	""	Q4-2019
1772	1772	CALF TURNKEY	Monaghan	Lakeview Apartments, Drummond Radhairc, Carrickmacross, Co Monaghan (Phase 1)*	12	North & East Housing Association Ltd	""	""	""	""	Q3-2019	""
1773	1773	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 1)	7	Tath Housing Association	""	""	""	""	Q3-2019	""
1774	1774	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 2)	4	Tath Housing Association	""	""	""	""	Q3-2019	""
1775	1775	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 3)	4	Tath Housing Association	""	""	""	""	Q3-2019	""
1776	1776	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 4)	4	Tath Housing Association	""	""	""	""	Q3-2019	""
1777	1777	CALF TURNKEY	Monaghan	Magheross, Carrickmacross, Co Monaghan (Phase 5)	14	Tath Housing Association	""	""	""	""	Q3-2019	""
1778	1778	CALF CONSTRUCTION	Monaghan	Post Tender - Liseggerton Road, Clones (Phase 1)	6	Oaklee Housing	""	""	""	""	""	Q4-2018
1779	1779	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr (Phase 2.1)	2	*N/A	""	""	""	""	""	Q3-2020
1780	1780	SHIP CONSTRUCTION TURNKEY	Offaly	Mill Race, Ferbane	5	*N/A	""	""	""	""	""	Q4-2017
1781	1781	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Spideoga, Cloghan	6	*N/A	""	""	""	""	""	Q2-2019
1782	1782	SHIP CONSTRUCTION TURNKEY	Offaly	Frankford, Kilcormac	12	*N/A	""	""	""	""	""	Q4-2018
1783	1783	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr (Phase 1)	4	*N/A	""	""	""	""	""	Q4-2019
1784	1784	SHIP CONSTRUCTION TURNKEY	Offaly	Cluain na Greine, Cloneygowan	4	*N/A	""	""	""	""	""	Q4-2019
1785	1785	SHIP CONSTRUCTION TURNKEY	Offaly	Main Street, Daingean	8	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1786	1786	SHIP CONSTRUCTION TURNKEY	Offaly	McGregol, Birr (Phase 2.2)	6	*N/A	""	""	""	""	Q1-2019	""
1787	1787	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore	14	*N/A	""	""	""	""	""	Q3-2020
1788	1788	SHIP CONSTRUCTION	Offaly	Circular Road, Daingean	7	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1789	1789	SHIP CONSTRUCTION	Offaly	Kylebeg, Banagher (Phase 2)	18	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
1790	1790	SHIP CONSTRUCTION	Offaly	Blundell Wood, Edenderry	33	*N/A	""	""	""	""	""	Q4-2019
1791	1791	SHIP CONSTRUCTION	Offaly	Church Street, Clara	3	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1792	1792	SHIP CONSTRUCTION	Offaly	Beechgrove, Belmont	7	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1793	1793	SHIP CONSTRUCTION	Offaly	Raheen ,Clara	38	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1794	1794	SHIP CONSTRUCTION	Offaly	Elderberry Drive, Moneygall	4	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1795	1795	SHIP CONSTRUCTION	Offaly	Sr. Senan Avenue, Edenderry	4	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
1796	1796	SHIP CONSTRUCTION	Offaly	Chancery Lane, Tullamore (Phase 2)	20	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
1797	1797	CAS CONSTRUCTION	Offaly	Mountbolus	4	Mid Offaly Housing Association Ltd	""	""	""	""	""	Q4-2019
1798	1798	CAS CONSTRUCTION	Offaly	Killane Court, Edenderry	2	Tath Housing Association Ltd	""	""	""	""	Q3-2019	""
1799	1799	CAS CONSTRUCTION	Offaly	Scurragh, Birr (AKA Camcor Green)	6	Cluid Housing Association	""	""	""	""	""	Q4-2019
1800	1800	CAS CONSTRUCTION	Offaly	Clonminch, Tullamore	19	Oaklee Housing Trust	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1801	1801	CAS CONSTRUCTION	Offaly	Presentation Convent, Portarlington	39	Sophia Housing Association Ltd	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
1802	1802	CAS CONSTRUCTION	Offaly	Clonamore Hotel, Tullamore	17	Sophia Housing Association Ltd	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1803	1803	CALF TURNKEY	Offaly	3 units, An Corran, Crinkle, Birr, Co. Offaly (Phase 1)	3	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2019	""
1804	1804	CALF CONSTRUCTION	Offaly	Kearneys Field, Tullamore, Co. Offaly (Phase 1)	41	Oaklee Housing	""	""	""	Q2-2019	""	""
1805	1805	CALF CONSTRUCTION	Offaly	Killane Drive, Edenderry, Co Offaly (Phase 1)	25	Tath Housing Association	""	""	""	""	Q3-2019	""
1806	1806	CALF TURNKEY	Offaly	Rahan Road, Tullamore, Co. Offaly (Phase 1)*	26	Cluid Housing	""	""	""	Q3-2020	""	""
1807	1807	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksland, Athlone	10	*N/A	""	""	""	""	""	Q3-2018
1808	1808	SHIP CONSTRUCTION TURNKEY	Roscommon	Station Road, Termon, Boyle	10	*N/A	""	""	""	""	""	Q1-2019
1809	1809	SHIP CONSTRUCTION TURNKEY	Roscommon	Lisroyne Court, Strokestown	10	*N/A	""	""	""	""	""	Q4-2019
1810	1810	SHIP CONSTRUCTION TURNKEY	Roscommon	Warren Grove, Boyle	4	*N/A	""	""	""	""	""	Q4-2018
1811	1811	SHIP CONSTRUCTION TURNKEY	Roscommon	Monksfield, Monksland, Co. Roscommon	2	*N/A	""	""	""	""	Q3-2019	""
1812	1812	SHIP CONSTRUCTION	Roscommon	Cloonfad	3	*N/A	""	""	""	""	Q4-2019	""
1813	1813	SHIP CONSTRUCTION	Roscommon	Greenfields, Blackstick Road, Roscommon Town	6	*N/A	""	""	""	""	""	Q3-2017
1814	1814	SHIP CONSTRUCTION	Roscommon	River Oaks, Ballaghaderreen	10	*N/A	""	""	""	""	""	Q4-2017
1815	1815	SHIP CONSTRUCTION	Roscommon	Silveroe Meadows, Boyle	12	*N/A	""	""	""	""	Q1-2020	""
1816	1816	SHIP CONSTRUCTION	Roscommon	Cluain Fraoigh, Cloonbeirne	7	*N/A	""	""	""	""	Q4-2019	""
1817	1817	SHIP CONSTRUCTION	Roscommon	Old Tuam Road,  Monksland, Athlone	2	*N/A	""	""	""	""	Q1-2020	""
1818	1818	SHIP CONSTRUCTION	Roscommon	Meadowbrook, Ballyclare Td., Ballyleague, Co. Roscommon	18	*N/A	""	""	""	""	Q3-2020	""
1819	1819	SHIP CONSTRUCTION	Roscommon	Lisroyne Td., Strokestown	10	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
1820	1820	CALF TURNKEY	Roscommon	Castle View Apartments, Block A, Roscommon Town (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q2-2019	""
1821	1821	CALF TURNKEY	Roscommon	Castle View Apartments, Block B, Roscommon Town (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
1822	1822	CALF TURNKEY	Roscommon	Monksland, Athlone, Co. Roscommon (Phase 1)*	35	Tath Housing Association	""	""	""	""	Q4-2019	""
1823	1823	CALF TURNKEY	Roscommon	Revised - Monksfield Park, Bealnamulla, Athlone (Phase 1)	13	Cluid Housing	""	""	""	""	""	Q3-2018
1824	1824	CALF TURNKEY	Roscommon	River Oaks, Kilcolman, Ballaghaderreen, Co. Roscommon (Phase 1)	12	Respond	""	""	""	""	""	Q1-2018
1825	1825	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Roscommon	The Walk, Roscommon Town	53	*N/A	""	""	""	""	Q4-2019	""
1826	1826	SHIP CONSTRUCTION TURNKEY	Sligo	Fairgreen Square, Ballisodare	2	*N/A	""	""	""	""	""	Q4-2019
1827	1827	SHIP CONSTRUCTION	Sligo	St. Joseph's Terrace, Sligo	1	*N/A	""	""	""	""	""	Q4-2019
1828	1828	SHIP CONSTRUCTION	Sligo	Collooney	18	*N/A	""	""	""	""	""	Q4-2019
1829	1829	SHIP CONSTRUCTION	Sligo	Knappagh Road	28	*N/A	""	""	""	""	Q4-2018	""
1830	1830	SHIP CONSTRUCTION	Sligo	Caltragh, Culleens	1	*N/A	""	""	""	""	""	Q4-2018
1831	1831	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	14	*N/A	""	""	""	""	""	Q3-2018
1832	1832	SHIP CONSTRUCTION	Sligo	Daghloonagh, Keash - SRD	1	*N/A	""	""	""	""	""	Q4-2016
1833	1833	SHIP CONSTRUCTION	Sligo	Rosses Point	14	*N/A	""	""	""	""	""	Q4-2019
1834	1834	SHIP CONSTRUCTION	Sligo	Fr. Flanagan Terrace	8	*N/A	""	""	""	""	""	Q4-2017
1835	1835	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	10	*N/A	""	""	""	""	Q3-2020	""
1836	1836	SHIP CONSTRUCTION	Sligo	Dromore West	10	*N/A	""	""	""	""	Q4-2019	""
1837	1837	SHIP CONSTRUCTION	Sligo	Robbers' Lane, Maugheraboy, Sligo	62	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
1838	1838	SHIP CONSTRUCTION	Sligo	House at Ballinode	1	*N/A	""	""	""	""	""	Q4-2018
1839	1839	SHIP CONSTRUCTION	Sligo	SRD at Crowagh, Dromore West	1	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1840	1840	SHIP CONSTRUCTION	Sligo	Gormley Park, Bunnanadden	6	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1841	1841	SHIP CONSTRUCTION	Sligo	Connolly Park, Tubbercurry	15	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1842	1842	CAS CONSTRUCTION	Sligo	Cuan Iosa, Ballymote	8	Society of Saint Vincent de Paul	""	""	""	""	""	Q3-2020
1843	1843	CAS CONSTRUCTION	Sligo	Killeshin, First Sea Road, Sligo	4	Newgrove Housing Association Ltd	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1844	1844	SHIP CONSTRUCTION TURNKEY	South Dublin	Ardsolus, Kingswood, Dublin 24	2	*N/A	""	""	""	""	""	Q4-2018
1845	1845	SHIP CONSTRUCTION TURNKEY	South Dublin	White Pines, Stocking Avenue, Rathfarnham, Dublin 16	26	*N/A	""	""	""	""	""	Q4-2018
1846	1846	SHIP CONSTRUCTION TURNKEY	South Dublin	Shackleton Park / Gandon Park, Adamstown	22	*N/A	""	""	""	""	""	Q4-2019
1847	1847	SHIP CONSTRUCTION TURNKEY	South Dublin	Gandon Park, Adamstown, Lucan	12	*N/A	""	""	""	""	""	Q4-2019
1848	1848	SHIP CONSTRUCTION	South Dublin	37 Greenfort Gardens, Clondalkin	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1849	1849	SHIP CONSTRUCTION RAPID	South Dublin	Killininny Road, Firhouse (Old Mill, Old Bawn)	24	*N/A	""	""	""	""	""	Q4-2018
1850	1850	SHIP CONSTRUCTION RAPID	South Dublin	St Cuthbert's, Clondalkin (Phase 1)	63	*N/A	""	""	""	""	""	Q3-2019
1851	1851	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght	47	*N/A	""	""	""	""	""	Q2-2018
1852	1852	SHIP CONSTRUCTION RAPID	South Dublin	St. Marks Avenue, Clondalkin	41	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
1853	1853	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght	22	*N/A	""	""	""	""	""	Q3-2018
1854	1854	SHIP CONSTRUCTION RAPID	South Dublin	St. Aidan's Brookfield, Tallaght	21	*N/A	""	""	""	""	""	Q4-2018
1855	1855	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale, Clondalkin, Dublin 22	22	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1856	1856	SHIP CONSTRUCTION RAPID	South Dublin	Riverside Cottages, Templeogue	11	*N/A	""	Stage 2 approved Q1-2019, full design/tender being prepared.	""	""	""	""
1857	1857	SHIP CONSTRUCTION RAPID	South Dublin	Riversdale Clondalkin Dublin 22	21	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1858	1858	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	17	*N/A	""	""	""	""	""	Q4-2018
1859	1859	SHIP CONSTRUCTION	South Dublin	Letts Field, Neilstown, Clondalkin	37	*N/A	""	""	""	""	""	Q4-2018
1860	1860	SHIP CONSTRUCTION	South Dublin	Owendoher, Ballyboden,  Rathfarnham	40	*N/A	""	""	""	""	""	Q1-2019
1861	1861	SHIP CONSTRUCTION	South Dublin	Dromcarra, Tallaght	14	*N/A	""	""	""	""	""	Q4-2018
1862	1862	SHIP CONSTRUCTION	South Dublin	Fortunestown (MacUilliam)	28	*N/A	""	""	""	""	""	Q4-2018
1863	1863	SHIP CONSTRUCTION	South Dublin	Mayfield Estate, Clondalkin	17	*N/A	""	""	""	""	""	Q2-2018
1864	1864	SHIP CONSTRUCTION	South Dublin	St Marks Green, Clondalkin	11	*N/A	""	""	""	""	""	Q3-2018
1865	1865	SHIP CONSTRUCTION	South Dublin	Balgaddy F, Griffeen Avenue, Lucan Co. Dublin	69	*N/A	Stage 1 approved Q2-2020, outline design and costs being prepared.	""	""	""	""	""
1866	1866	SHIP CONSTRUCTION	South Dublin	St Finians	2	*N/A	""	""	""	""	""	Q3-2016
1867	1867	SHIP CONSTRUCTION	South Dublin	Suncroft, Tallaght	10	*N/A	""	""	""	""	""	Q4-2016
1868	1868	SHIP CONSTRUCTION	South Dublin	Belgard Road	3	*N/A	""	""	""	""	""	Q1-2016
1869	1869	SHIP CONSTRUCTION	South Dublin	St. Catherines, Knockmore Avenue, Killinarden, Tallaght	12	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1870	1870	SHIP CONSTRUCTION	South Dublin	Homeville, Knocklyon, Dublin 16	16	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
1871	1871	SHIP CONSTRUCTION	South Dublin	Killinarden, Tallaght	9	*N/A	""	""	""	""	""	Q1-2019
1872	1872	SHIP CONSTRUCTION	South Dublin	Nangor Road, Clondalkin, Dublin 22	93	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
1873	1873	CAS CONSTRUCTION	South Dublin	Collinstown Grove, Clondalkin	4	Tath Housing Association Ltd	""	""	""	""	""	Q1-2020
1874	1874	CAS CONSTRUCTION	South Dublin	Old Nangor Road, Clondalkin	10	Simon Community : Dublin Simon	""	""	""	""	Q4-2019	""
1875	1875	CALF TURNKEY	South Dublin	2 properties Tullyhall, Lucan, County Dublin (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q2-2019
1876	1876	CALF TURNKEY	South Dublin	6 units Elder Heath, Kiltipper Road, Tallaght, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q4-2019
1877	1877	CALF TURNKEY	South Dublin	Ardsolus, Old Naas Road, Dublin 22 (Phase 1)	10	Respond	""	""	""	""	""	Q3-2019
1878	1878	CALF TURNKEY	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q4-2018
1879	1879	CALF TURNKEY	South Dublin	Ballynakelly, Newcastle, Co. Dublin (Phase 2)	4	Tath Housing Association	""	""	""	""	""	Q1-2019
1880	1880	CALF TURNKEY	South Dublin	Balrothery, Castletymon Road, Dublin Road (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q4-2019
1881	1881	CALF TURNKEY	South Dublin	Broadfield Grove, Rathcoole, Co. Dublin (Phase 1)*	14	Oaklee Housing	""	""	""	""	""	Q3-2017
1882	1882	CALF TURNKEY	South Dublin	Burgage Gardens, Newcastle, Co. Dublin (Phase 1)*	4	Respond	""	""	""	""	""	Q2-2020
1883	1883	CALF TURNKEY	South Dublin	Burgage, Newcastle, Co. Dublin (Phase 1)	10	Respond	""	""	""	""	""	Q4-2019
1884	1884	CALF TURNKEY	South Dublin	Burgage, Newcastle, Co. Dublin (Phase 2)	26	Respond	""	""	""	""	""	Q2-2020
1885	1885	CALF TURNKEY	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 1)	45	Tath Housing Association	""	""	""	""	Q3-2019	""
1886	1886	CALF TURNKEY	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 2)	15	Tath Housing Association	""	""	""	""	Q3-2019	""
1887	1887	CALF TURNKEY	South Dublin	Cloverhill Road, Raheen, Clondalkin, Dublin 22 (Phase 3)*	23	Tath Housing Association	""	""	""	""	Q3-2019	""
1888	1888	CALF TURNKEY	South Dublin	Cuil Duin Green, Cuil Duin, Citywest, Dublin 24 (Phase 1)*	24	Fold Housing Association Ireland Ltd	""	""	""	""	Q4-2018	""
1889	1889	CALF TURNKEY	South Dublin	De Selby Heights, Tallaght, Dublin 24 (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q4-2019
1890	1890	CALF TURNKEY	South Dublin	Dodderbrook (Apartments), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	6	Cluid Housing	""	""	""	""	""	Q1-2018
1891	1891	CALF TURNKEY	South Dublin	Dodderbrook (Houses), Oldcourt Road, Ballycullen, Dublin 24 (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q1-2018
1892	1892	CALF TURNKEY	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q4-2019
1893	1893	CALF TURNKEY	South Dublin	Dodderbrook, Old Court Rd, Ballycullen, Dublin 24 (Phase 2)*	9	Cluid Housing	""	""	""	""	Q1-2019	""
1894	1894	CALF TURNKEY	South Dublin	Dodderbrook, Oldcourt Road, Ballycllen, Dublin 24 (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q3-2018
1895	1895	CALF TURNKEY	South Dublin	Edenbrook, Citywest, Dublin 24 (Phase 1)	17	Tath Housing Association	""	""	""	""	""	Q4-2019
1896	1896	CALF TURNKEY	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 1)*	18	Cluid Housing	""	""	""	""	""	Q1-2018
1897	1897	CALF TURNKEY	South Dublin	Elder Heath, Kiltipper Road, Tallaght, Dublin 24  (Phase 2)*	10	Cluid Housing	""	""	""	""	""	Q2-2018
1898	1898	CALF CONSTRUCTION	South Dublin	Fernwood Green and Maplewood Heights, Tallaght, Dublin  (Phase 1)	40	Cluid Housing	""	""	""	""	Q3-2020	""
1899	1899	CALF TURNKEY	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 1)	32	Respond	""	""	""	""	Q4-2018	""
1900	1900	CALF TURNKEY	South Dublin	Finnstown, Lucan, Co. Dublin (Phase 2)*	62	Respond	""	""	""	""	Q4-2018	""
1901	1901	CALF TURNKEY	South Dublin	Green Lane, Rathcoole, Co. Dublin (Phase 1)*	12	Tath Housing Association	""	""	""	""	Q2-2019	""
1902	1902	CALF TURNKEY	South Dublin	Green Lane, Rathcoole, Co. Dublin (Phase 2)*	9	Tath Housing Association	""	""	""	""	Q2-2019	""
1903	1903	CALF TURNKEY	South Dublin	Kingswood, Old Ballymount Road, Tallaght, Dublin 24 (Phase 1)*	24	Respond	""	""	""	""	Q4-2018	""
1904	1904	CALF TURNKEY	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 1)*	13	Cluid Housing	""	""	""	""	""	Q2-2018
1905	1905	CALF TURNKEY	South Dublin	Millford Manor, Clondalkin - Apartments (Phase 2)	12	Cluid Housing	""	""	""	""	""	Q4-2018
1906	1906	CALF TURNKEY	South Dublin	Millford Manor, Clondalkin - Houses (Phase 1)	25	Cluid Housing	""	""	""	""	""	Q1-2017
1907	1907	CALF TURNKEY	South Dublin	Millford Manor, Clondalkin - Houses (Phase 2)	15	Cluid Housing	""	""	""	""	""	Q3-2017
1908	1908	CALF TURNKEY	South Dublin	Millford Manor, Cloverhill Road, Clondalkin, Dublin 22 (Phase 1)*	2	Cluid Housing	""	""	""	""	""	Q4-2018
1909	1909	CALF TURNKEY	South Dublin	New Bancroft, Tallaght, Dublin 24 (Phase 1)*	16	Cluid Housing	""	""	""	""	""	Q3-2017
1910	1910	CALF TURNKEY	South Dublin	Palmerstown Avenue, Dublin 20 (Phase 1)	7	Respond	""	""	""	""	Q2-2019	""
1911	1911	CALF TURNKEY	South Dublin	Palmerstown Way, Clondalkin, Dublin 22 (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q3-2018
1912	1912	CALF TURNKEY	South Dublin	Raheen House, Old Nangor Road, Clondalkin, Dublin 22 (Phase 1)	9	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
1913	1913	CALF TURNKEY	South Dublin	Rathmill Meadows and Green, Rathcoole, Co. Dublin (Phase 1)*	11	Oaklee Housing	""	""	""	""	""	Q4-2019
1914	1914	CALF TURNKEY	South Dublin	Scholarstown Wood (Apartments), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1915	1915	CALF TURNKEY	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2017
1916	1916	CALF TURNKEY	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 2)*	4	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1917	1917	CALF TURNKEY	South Dublin	Scholarstown Wood (Houses), Scholarstown Road, Rathfarnham, Dublin 16  (Phase 3)*	1	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
1918	1918	CALF TURNKEY	South Dublin	Shackleton Park, Lucan, Co. Dublin (Phase 1)*	8	Cluid Housing	""	""	""	""	""	Q2-2019
1919	1919	CALF TURNKEY	South Dublin	Somerton, Lucan, Co. Dublin (Phase 1)*	32	Respond	""	""	""	""	""	Q4-2019
1920	1920	CALF CONSTRUCTION	South Dublin	St. Catherines, Killinarden, Tallaght, Dublin 24 (Phase 1)	2	Sophia Housing Association Ltd	""	""	""	Q2-2019	""	""
1921	1921	CALF TURNKEY	South Dublin	St. Johns, Firhouse, Dublin 24 (Phase 1)*	10	Respond	""	""	""	""	""	Q4-2019
1922	1922	CALF TURNKEY	South Dublin	Station Road, Clondalkin, Co. Dublin (Phase 1)	5	Respond	""	""	""	""	""	Q3-2017
1923	1923	CALF TURNKEY	South Dublin	Stone Masons Court, Fortunestown Lane, Citywest Dublin (Phase 1)*	12	Cluid Housing	""	""	""	""	""	Q2-2019
1924	1924	CALF TURNKEY	South Dublin	Temple Court, Temple Woods, Greenhills Road, Dublin 12 (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q4-2018
1925	1925	CALF TURNKEY	South Dublin	The Mews, Citywest Village, Citywest, Dublin 24 (Phase 1)*	22	Fold Housing Association Ireland Ltd	""	""	""	""	Q3-2019	""
1926	1926	CALF TURNKEY	South Dublin	The Rise, Citywest Village, Citywest, Dublin 24 (Phase 1)*	13	Fold Housing Association Ireland Ltd	""	""	""	""	""	Q4-2019
1927	1927	CALF CONSTRUCTION	South Dublin	The Weir, Whitestown Way, Tallaght, Dublin 24 (Phase 1)	81	Cluid Housing	""	""	""	Q3-2020	""	""
1928	1928	CALF TURNKEY	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 1)*	2	Tath Housing Association	""	""	""	""	""	Q3-2017
1929	1929	CALF TURNKEY	South Dublin	Tullyhall, Lucan, Co Dublin (Phase 2)*	2	Tath Housing Association	""	""	""	""	""	Q4-2018
1930	1930	CALF TURNKEY	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 1)	28	Cluid Housing	""	""	""	""	""	Q4-2018
1931	1931	CALF TURNKEY	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 2)	28	Cluid Housing	""	""	""	""	""	Q2-2019
1932	1932	CALF TURNKEY	South Dublin	Westpark, Garters Lane, Saggert, Co Dublin  (Phase 3)	28	Cluid Housing	""	""	""	""	""	Q4-2019
1933	1933	CALF TURNKEY	South Dublin	Wilkins Court, Limekiln Lane, Dublin 12 (Phase 1)*	6	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2019
1934	1934	CALF TURNKEY	South Dublin	Wilkins View, Greenhills, Dublin 12 (Phase 1)*	3	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q2-2018
1935	1935	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	South Dublin	Corkage Grange (part of Kilcarbery)	109	*N/A	""	""	""	""	Q1-2019	""
1936	1936	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard	6	*N/A	""	""	""	""	""	Q2-2019
1937	1937	SHIP CONSTRUCTION TURNKEY	Tipperary	Strylea, Fethard	3	*N/A	""	""	""	""	Q4-2018	""
1938	1938	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane	9	*N/A	""	""	""	""	""	Q4-2018
1939	1939	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles	4	*N/A	""	""	""	""	""	Q4-2018
1940	1940	SHIP CONSTRUCTION TURNKEY	Tipperary	Ardan, Borrisokane (Phase 2)	4	*N/A	""	""	""	""	""	Q2-2019
1941	1941	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 2)	5	*N/A	""	""	""	""	""	Q4-2019
1942	1942	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	20	*N/A	""	""	""	""	Q3-2020	""
1943	1943	SHIP CONSTRUCTION TURNKEY	Tipperary	Ma Charoin, Manna South, Templemore	13	*N/A	""	""	""	""	Q3-2020	""
1944	1944	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 2)	5	*N/A	""	""	""	""	""	Q3-2019
1945	1945	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 3)	6	*N/A	""	""	""	""	""	Q4-2019
1946	1946	SHIP CONSTRUCTION TURNKEY	Tipperary	Glencree, Newport	3	*N/A	""	""	""	""	""	Q4-2019
1947	1947	SHIP CONSTRUCTION TURNKEY	Tipperary	Cloneen Road, Fethard (Phase 4)	4	*N/A	""	""	""	""	""	Q4-2019
1948	1948	SHIP CONSTRUCTION TURNKEY	Tipperary	An Grianan, Killenaule, Thurles (Phase 3)	5	*N/A	""	""	""	""	""	Q4-2019
1949	1949	SHIP CONSTRUCTION TURNKEY	Tipperary	Prior Park, Clonmel	21	*N/A	""	""	""	""	Q3-2020	""
1950	1950	SHIP CONSTRUCTION TURNKEY	Tipperary	Rosanna Close, Tipperary Town	19	*N/A	""	""	""	""	Q3-2020	""
1951	1951	SHIP CONSTRUCTION TURNKEY	Tipperary	Glenconnor Road, Clonmel	21	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1952	1952	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport, Tipperary	3	*N/A	""	""	""	""	""	Q4-2018
1953	1953	SHIP CONSTRUCTION	Tipperary	Grange Road, Ballina	4	*N/A	""	""	""	""	Q3-2020	""
1954	1954	SHIP CONSTRUCTION	Tipperary	Ard na Greine, Clonmel	2	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1955	1955	SHIP CONSTRUCTION	Tipperary	Knockanrawley	28	*N/A	""	""	""	""	Q4-2019	""
1956	1956	SHIP CONSTRUCTION	Tipperary	Mill Road, Thurles	28	*N/A	""	""	""	""	Q2-2020	""
1957	1957	SHIP CONSTRUCTION	Tipperary	Mulkear View, Newport	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1958	1958	SHIP CONSTRUCTION	Tipperary	Treacy Park, Carrick on Suir	1	*N/A	""	""	""	""	""	Q3-2018
1959	1959	SHIP CONSTRUCTION	Tipperary	Templetouhy	10	*N/A	""	""	""	""	Q4-2019	""
1960	1960	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	12	*N/A	Stage 1 approved Q1-2016, outline design and costs being prepared.	""	""	""	""	""
1961	1961	SHIP CONSTRUCTION	Tipperary	Abbey Street, Cahir	10	*N/A	""	""	""	""	Q3-2020	""
1962	1962	SHIP CONSTRUCTION	Tipperary	Borrisokane	16	*N/A	""	""	""	""	Q3-2020	""
1963	1963	SHIP CONSTRUCTION	Tipperary	Portroe, Nenagh	14	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
1964	1964	SHIP CONSTRUCTION	Tipperary	Cloughjordan	2	*N/A	""	""	""	""	Q3-2019	""
1965	1965	SHIP CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	26	*N/A	""	""	""	""	""	Q3-2020
1966	1966	SHIP CONSTRUCTION	Tipperary	Gortataggart, Thurles	2	*N/A	""	""	""	""	""	Q4-2018
1967	1967	SHIP CONSTRUCTION	Tipperary	Kilcooly Way, Gortnahoe	5	*N/A	""	""	""	""	""	Q3-2020
1968	1968	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	3	*N/A	""	""	""	""	""	Q3-2016
1969	1969	SHIP CONSTRUCTION	Tipperary	Mitchel St., Thurles	1	*N/A	""	""	""	""	Q4-2019	""
1970	1970	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2016
1971	1971	SHIP CONSTRUCTION	Tipperary	Lower Ballingarry	1	*N/A	""	""	""	""	""	Q2-2016
1972	1972	SHIP CONSTRUCTION	Tipperary	Poulamaleen, Faugheen	1	*N/A	""	""	""	""	""	Q2-2016
1973	1973	SHIP CONSTRUCTION	Tipperary	Cormack Drive, Nenagh	12	*N/A	""	""	""	""	Q3-2020	""
1974	1974	SHIP CONSTRUCTION	Tipperary	Lacey Avenue, Templemore	1	*N/A	""	""	""	""	""	Q3-2017
1975	1975	SHIP CONSTRUCTION	Tipperary	Borrisoleigh	1	*N/A	""	""	""	""	""	Q4-2018
1976	1976	SHIP CONSTRUCTION	Tipperary	Bansha	14	*N/A	""	Stage 2 approved Q2-2019, full design/tender being prepared.	""	""	""	""
1977	1977	SHIP CONSTRUCTION	Tipperary	Ned Hayes Drive, Twomileborris, Thurles	22	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1978	1978	SHIP CONSTRUCTION	Tipperary	Donohill, 	4	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1979	1979	SHIP CONSTRUCTION	Tipperary	Mullinahone	10	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
1980	1980	SHIP CONSTRUCTION	Tipperary	Clerihan	14	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1981	1981	SHIP CONSTRUCTION	Tipperary	Ard Alainn, Moyne	9	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1982	1982	SHIP CONSTRUCTION	Tipperary	Ardcroney	4	*N/A	""	Stage 2 approved Q1-2020, full design/tender being prepared.	""	""	""	""
1983	1983	SHIP CONSTRUCTION	Tipperary	Comeragh Drive, Clonmel	2	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1984	1984	SHIP CONSTRUCTION	Tipperary	Church Street, Templemore	2	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1985	1985	SHIP CONSTRUCTION	Tipperary	Castle Crescent, Nenagh	8	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1986	1986	SHIP CONSTRUCTION	Tipperary	Boherclough Street, Cashel	12	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1987	1987	SHIP CONSTRUCTION	Tipperary	Grove Street. Roscrea	9	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
1988	1988	CAS CONSTRUCTION TURNKEY	Tipperary	Monastery Close, Templemore Road, Thurles	15	Thurles Lions Trust Housing Assoc.	""	""	""	""	""	Q2-2019
1989	1989	CAS CONSTRUCTION TURNKEY	Tipperary	Drummin Village, Nenagh	8	Nenagh Voluntary Housing Association	""	""	""	""	Q2-2020	""
1990	1990	CAS CONSTRUCTION	Tipperary	Ballinagrana, Carrick on Suir	3	Camphill Communities of Ireland	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1991	1991	CAS CONSTRUCTION	Tipperary	Castle Street, Carrick on Suir	1	Camphill Communities of Ireland	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1992	1992	CAS CONSTRUCTION	Tipperary	The Strand, Carrick on Suir	3	Camphill Communities of Ireland	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
1993	1993	CAS CONSTRUCTION	Tipperary	Glenconnor Road, Clonmel	9	Cluid Housing Association	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
1994	1994	CAS CONSTRUCTION	Tipperary	Stanwix House, Kickham Street, Thurles	19	Thurles Lions Trust Housing Assoc.	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
1995	1995	CAS CONSTRUCTION	Tipperary	Main Street, Templemore	14	Templemore Voluntary Housing Association	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
1996	1996	CALF TURNKEY	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 1)	41	Respond	""	""	""	""	""	Q4-2019
1997	1997	CALF TURNKEY	Tipperary	An Duiche, Tipperary Town, Co. Tipperary (Phase 2)	2	Respond	""	""	""	""	""	Q4-2019
1998	1998	CALF TURNKEY	Tipperary	Ashbury, Roscrea, Co Tipperary (Phase 1)	12	Cluid Housing	""	""	""	""	""	Q2-2017
1999	1999	CALF TURNKEY	Tipperary	Ashgrove, Monadreen, Thurles, Co Tipperary  (Phase 1)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2000	2000	CALF TURNKEY	Tipperary	Ashgrove, Monadreen, Thurles, Co. Tipperary (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2001	2001	CALF TURNKEY	Tipperary	Ashgrove, Monadreen, Thurles, Co. Tipperary (Phase 2)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q1-2019	""
2002	2002	CALF TURNKEY	Tipperary	Mill Street, Carrick on Suir, Co. Tipperary (Phase 1)	22	Tath Housing Association	""	""	""	""	""	Q3-2020
2003	2003	CALF TURNKEY	Tipperary	The Avenue, Drummin Village, Nenagh, Co. Tipperary (Phase 1)	13	Focus Housing Association CLG	""	""	""	""	Q2-2020	""
2004	2004	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan	8	*N/A	""	""	""	""	""	Q3-2018
2005	2005	SHIP CONSTRUCTION TURNKEY	Waterford	Gibbethill, Gracedieu	5	*N/A	""	""	""	""	""	Q3-2018
2006	2006	SHIP CONSTRUCTION TURNKEY	Waterford	Carrickphierish, Gracedieu, Waterford	31	*N/A	""	""	""	""	""	Q4-2018
2007	2007	SHIP CONSTRUCTION TURNKEY	Waterford	Shandon, Dungarvan	5	*N/A	""	""	""	""	""	Q3-2018
2008	2008	SHIP CONSTRUCTION TURNKEY	Waterford	Airport Road, Waterford City	33	*N/A	""	""	""	""	""	Q4-2018
2009	2009	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan - Phase 2	10	*N/A	""	""	""	""	""	Q4-2018
2010	2010	SHIP CONSTRUCTION TURNKEY	Waterford	Kilrush, Dungarvan - Phase 3	21	*N/A	""	""	""	""	""	Q4-2018
2011	2011	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford	20	*N/A	""	""	""	""	""	Q3-2019
2012	2012	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 2	14	*N/A	""	""	""	""	""	Q4-2019
2013	2013	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 3	6	*N/A	""	""	""	""	""	Q2-2020
2014	2014	SHIP CONSTRUCTION TURNKEY	Waterford	Lacken Road, Waterford - Phase 4	15	*N/A	""	""	""	""	""	Q3-2020
2015	2015	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	6	*N/A	""	""	""	""	""	Q3-2019
2016	2016	SHIP CONSTRUCTION TURNKEY	Waterford	Railway Gardens, Lismore	17	*N/A	""	""	""	""	Q3-2019	""
2017	2017	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	8	*N/A	""	""	""	""	""	Q4-2019
2018	2018	SHIP CONSTRUCTION TURNKEY	Waterford	Estuary Heights, Shandon, Dungarvan	6	*N/A	""	""	""	""	""	Q4-2019
2019	2019	SHIP CONSTRUCTION TURNKEY	Waterford	Mount Suir, Gracedieu, Carrickphierish	18	*N/A	""	""	""	""	""	Q4-2019
2020	2020	SHIP CONSTRUCTION TURNKEY	Waterford	19 & 20 Bride View Close, Tallow	2	*N/A	""	""	""	""	""	Q3-2020
2021	2021	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	20	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2022	2022	SHIP CONSTRUCTION TURNKEY	Waterford	7A and 8A Barnes Lane, The Glen, Waterford	2	*N/A	""	""	""	""	""	Q4-2019
2023	2023	SHIP CONSTRUCTION TURNKEY	Waterford	4 and 12 Ard Alainn, Sherlock Walk, Gracedieu, Waterford	2	*N/A	""	""	""	""	""	Q2-2020
2024	2024	SHIP CONSTRUCTION TURNKEY	Waterford	Mount William, Williamstown, Waterford City	45	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2025	2025	SHIP CONSTRUCTION RAPID	Waterford	Ballygunner, Waterford City	49	*N/A	""	Stage 2 approved Q3-2019, full design/tender being prepared.	""	""	""	""
2026	2026	SHIP CONSTRUCTION RAPID	Waterford	Ballynaneashagh, Waterford City	22	*N/A	""	Stage 2 approved Q2-2020, full design/tender being prepared.	""	""	""	""
2027	2027	SHIP CONSTRUCTION	Waterford	An Garran, Crobally Upper, Tramore	50	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
2028	2028	SHIP CONSTRUCTION	Waterford	Alms Houses, Tallow	4	*N/A	""	""	""	""	""	Q4-2018
2029	2029	SHIP CONSTRUCTION	Waterford	Ardmore Park/Priory Lawn, Waterford City (also referred to as Saviours Green, Ballybeg)	5	*N/A	""	""	""	""	""	Q3-2020
2030	2030	SHIP CONSTRUCTION	Waterford	Ballinroad, Dungarvan	21	*N/A	""	""	""	""	""	Q2-2020
2031	2031	SHIP CONSTRUCTION	Waterford	Barrack Street, Cappoquin	4	*N/A	""	""	""	""	""	Q4-2017
2032	2032	SHIP CONSTRUCTION	Waterford	Coolfin Woods, Portlaw	12	*N/A	""	""	""	""	""	Q2-2019
2033	2033	SHIP CONSTRUCTION	Waterford	Larchville, Waterford City	5	*N/A	""	""	""	""	Q1-2020	""
2034	2034	SHIP CONSTRUCTION	Waterford	Patrick Street, Tramore	2	*N/A	""	""	""	""	""	Q3-2018
2035	2035	SHIP CONSTRUCTION	Waterford	Doyle Street, Waterford City	4	*N/A	""	""	""	""	Q2-2020	""
2036	2036	SHIP CONSTRUCTION	Waterford	Old Cinema Site, Dungarvan	15	*N/A	""	""	""	""	""	Q4-2016
2037	2037	SHIP CONSTRUCTION	Waterford	The Glen, Bridge St, Waterford	17	*N/A	""	Stage 2 approved Q3-2018, full design/tender being prepared.	""	""	""	""
2038	2038	SHIP CONSTRUCTION	Waterford	Clarendon Court, Penrose Lane, Waterford	24	*N/A	Stage 1 approved Q1-2018, outline design and costs being prepared.	""	""	""	""	""
2039	2039	SHIP CONSTRUCTION	Waterford	Summerland Square, Waterford	12	*N/A	""	""	Stage 3 approved Q1-2019, the scheme is now approved to proceed to tender.	""	""	""
2040	2040	SHIP CONSTRUCTION	Waterford	Bath St, Waterford City	4	*N/A	""	""	""	""	""	Q4-2019
2041	2041	SHIP CONSTRUCTION	Waterford	Graigueshoneen, Kilmacthomas, Co Waterford	16	*N/A	""	""	Stage 3 approved Q2-2020, the scheme is now approved to proceed to tender.	""	""	""
2042	2042	SHIP CONSTRUCTION	Waterford	Mount Esker, Ballytruckle Road, Waterford City	14	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
2043	2043	SHIP CONSTRUCTION	Waterford	Newgate Street, Waterford City	36	*N/A	Stage 1 approved Q3-2020, outline design and costs being prepared.	""	""	""	""	""
2044	2044	CAS CONSTRUCTION	Waterford	Convent Hill, Tramore	10	Society of Saint Vincent de Paul	""	""	""	""	""	Q1-2017
2045	2045	CAS CONSTRUCTION	Waterford	Powersfield, Hennessys Road, Waterford	3	Focus Ireland	""	Stage 2 approved Q2-2016, full design/tender being prepared.	""	""	""	""
2046	2046	CAS CONSTRUCTION	Waterford	Wadding Manor, Ferrybank	10	Respond	""	""	""	""	Q4-2019	""
2047	2047	CAS CONSTRUCTION	Waterford	The Paddocks, Williamstown Rd. Waterford Phase 1	9	Anvers Housing Association Ltd	""	""	Stage 3 approved Q2-2018, the scheme is now approved to proceed to tender.	""	""	""
2048	2048	CALF TURNKEY	Waterford	Kilbarry, Waterford (Phase 1)	69	Respond	""	""	""	""	""	Q3-2020
2049	2049	CALF CONSTRUCTION	Waterford	St Johns College, Waterford (Phase 1)	36	Respond	""	""	""	""	""	Q1-2016
2050	2050	CALF TURNKEY	Waterford	The Walk, Fairfield Park, Kilcohan, Waterford (Phase 1)	40	Circle Voluntary Housing Association Ltd	""	""	""	""	""	Q4-2019
2051	2051	PUBLIC PRIVATE PARTNERSHIP (Bundle 2)	Waterford	Slievekeale, Waterford City	58	*N/A	""	""	""	""	Q4-2019	""
2052	2052	SHIP CONSTRUCTION TURNKEY	Westmeath	Lissywollen, Athlone	55	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
2053	2053	SHIP CONSTRUCTION TURNKEY	Westmeath	Lissywollen, Athlone (Phase 2A and 2B)	55	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
2054	2054	SHIP CONSTRUCTION TURNKEY	Westmeath	Lissywollen, Athlone (Phase 3A)	38	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
2055	2055	SHIP CONSTRUCTION TURNKEY	Westmeath	Lissywollen, Athlone (Phase 3B)	22	*N/A	Stage 1 approved Q1-2020, outline design and costs being prepared.	""	""	""	""	""
2056	2056	SHIP CONSTRUCTION TURNKEY	Westmeath	Belvedere Hills, Mullingar	21	*N/A	""	""	""	""	""	Q4-2017
2057	2057	SHIP CONSTRUCTION TURNKEY	Westmeath	Cloon Lara, Mullingar	12	*N/A	""	""	""	""	""	Q2-2019
2058	2058	SHIP CONSTRUCTION TURNKEY	Westmeath	Abbeybrook, Kilbeggan	7	*N/A	""	""	""	""	""	Q1-2019
2059	2059	SHIP CONSTRUCTION TURNKEY	Westmeath	Lakepoint, Mullingar	24	*N/A	""	""	""	""	Q4-2019	""
2060	2060	SHIP CONSTRUCTION TURNKEY	Westmeath	Coill Rua, Mullingar	6	*N/A	""	""	""	""	""	Q4-2019
2061	2061	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	3	*N/A	""	""	""	""	""	Q1-2020
2062	2062	SHIP CONSTRUCTION TURNKEY	Westmeath	Valley Cottages, Mullingar	3	*N/A	""	""	""	""	Q3-2020	""
2063	2063	SHIP CONSTRUCTION TURNKEY	Westmeath	Austin Friars Street, Mullingar	4	*N/A	""	""	""	""	Q3-2020	""
2064	2064	SHIP CONSTRUCTION TURNKEY	Westmeath	Rathgarve Green, Castlepollard	6	*N/A	""	""	""	""	Q1-2020	""
2065	2065	SHIP CONSTRUCTION TURNKEY	Westmeath	Oakcrest, Ballinderry, Mullingar	8	*N/A	""	""	""	""	Q3-2020	""
2066	2066	SHIP CONSTRUCTION TURNKEY	Westmeath	St. Marys Place, Athlone	9	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2067	2067	SHIP CONSTRUCTION RAPID	Westmeath	O'Growney Green, Mullingar	26	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2068	2068	SHIP CONSTRUCTION RAPID	Westmeath	Dalton Park, Mullingar	15	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
2069	2069	SHIP CONSTRUCTION RAPID	Westmeath	Water Street, Castlepollard	7	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2070	2070	SHIP CONSTRUCTION RAPID	Westmeath	Ennell Court, Mullingar (Phase 1)	15	*N/A	Stage 1 approved Q3-2019, outline design and costs being prepared.	""	""	""	""	""
2071	2071	SHIP CONSTRUCTION	Westmeath	Bun Daire, Kinnegad (Phase 3)	12	*N/A	""	""	""	""	Q3-2019	""
2072	2072	SHIP CONSTRUCTION	Westmeath	St. Laurence's Terrace, Mullingar	9	*N/A	""	""	""	""	""	Q4-2018
2073	2073	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	1	*N/A	""	""	""	""	""	Q1-2018
2074	2074	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 1.1)	21	*N/A	""	""	""	""	""	Q2-2020
2075	2075	SHIP CONSTRUCTION	Westmeath	Ennell Court (Phase 2)	3	*N/A	""	""	""	""	""	Q2-2016
2076	2076	SHIP CONSTRUCTION	Westmeath	Grange Crescent, Mullingar	2	*N/A	""	""	""	""	""	Q1-2016
2077	2077	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar	20	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2078	2078	SHIP CONSTRUCTION	Westmeath	Cloghanboy, Athlone	10	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
2079	2079	SHIP CONSTRUCTION	Westmeath	Bishopsgate, Mullingar	4	*N/A	""	""	""	""	Q3-2019	""
2080	2080	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 2)	24	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2081	2081	SHIP CONSTRUCTION	Westmeath	Canal Avenue, Mullingar	32	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
2082	2082	SHIP CONSTRUCTION	Westmeath	Arcadia, Athlone (Phase 1.2)	12	*N/A	""	""	""	""	""	Q3-2020
2083	2083	SHIP CONSTRUCTION	Westmeath	Ennell Court, Mullingar (Phase 2)	11	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2084	2084	CAS CONSTRUCTION TURNKEY	Westmeath	Ardmore Road, Mullingar	10	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2085	2085	CAS CONSTRUCTION TURNKEY	Westmeath	Ardmore Road, Mullingar	17	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2086	2086	CAS CONSTRUCTION TURNKEY	Westmeath	Ardmore Road, Mullingar	9	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2087	2087	CAS CONSTRUCTION	Westmeath	Farran, Mullingar	4	Tath Housing Association Ltd	""	""	""	""	Q4-2019	""
2088	2088	CALF TURNKEY	Westmeath	Athlone Road, Moate, Co. Westmeath (Phase 1)*	14	Oaklee Housing	""	""	""	""	Q1-2020	""
2089	2089	CALF TURNKEY	Westmeath	Cluain Mullen, Castlepollard, Co. Westmeath (Phase 1)	8	Tath Housing Association	""	""	""	""	Q2-2019	""
2090	2090	CALF TURNKEY	Westmeath	Cluain Mullen, Castlepollard, Westmeath (Phase 1)	2	Tath Housing Association	""	""	""	""	""	Q2-2017
2091	2091	CALF TURNKEY	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 1)*	13	Cluid Housing	""	""	""	""	Q4-2018	""
2092	2092	CALF TURNKEY	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 2)*	23	Cluid Housing	""	""	""	""	Q4-2018	""
2093	2093	CALF TURNKEY	Westmeath	Coill Rua, Mullingar, Co. Westmeath (Phase 3)	8	Cluid Housing	""	""	""	""	Q4-2018	""
2094	2094	CALF CONSTRUCTION	Westmeath	Farran, Mullingar, Co. Westmeath (Phase 1)	10	Tath Housing Association	""	""	""	""	Q4-2019	""
2095	2095	CALF TURNKEY	Westmeath	Ghairdin Beag, Main Street, Rathwire, Killucan, Co. Westmeath (Phase 1)	6	Tath Housing Association	""	""	""	""	Q1-2019	""
2096	2096	CALF TURNKEY	Westmeath	Rahanine, Rochfortbridge, Co Westmeath (Phase 1)	12	Tath Housing Association	""	""	""	""	Q4-2018	""
2097	2097	CALF TURNKEY	Westmeath	Rathwire, Killucan, Co. Westmeath (Phase 1)	4	Tath Housing Association	""	""	""	""	Q4-2019	""
2098	2098	CALF TURNKEY	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 1)	4	Tath Housing Association	""	""	""	""	Q3-2019	""
2099	2099	CALF TURNKEY	Westmeath	Royal Canal, Ardmore Road, Mullingar, Co. Westmeath (Phase 2)	4	Tath Housing Association	""	""	""	""	Q3-2019	""
2100	2100	CALF TURNKEY	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q4-2019
2101	2101	CALF TURNKEY	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 2)*	14	Tath Housing Association	""	""	""	""	""	Q2-2020
2102	2102	CALF TURNKEY	Westmeath	The Orchard, Athlone, Co. Westmeath (Phase 3)	10	Tath Housing Association	""	""	""	""	""	Q2-2020
2103	2103	SHIP CONSTRUCTION TURNKEY	Wexford	Madeira Oaks, Wexford	8	*N/A	""	""	""	""	""	Q3-2017
2104	2104	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey	8	*N/A	""	""	""	""	""	Q1-2018
2105	2105	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	11	*N/A	""	""	""	""	""	Q4-2018
2106	2106	SHIP CONSTRUCTION TURNKEY	Wexford	Rath an Duin, Castlebridge	3	*N/A	""	""	""	""	""	Q3-2018
2107	2107	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2a)	2	*N/A	""	""	""	""	""	Q2-2019
2108	2108	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford - Phase 2	10	*N/A	""	""	""	""	""	Q1-2019
2109	2109	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 1b)	10	*N/A	""	""	""	""	""	Q4-2018
2110	2110	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey	5	*N/A	""	""	""	""	""	Q4-2018
2111	2111	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 2	2	*N/A	""	""	""	""	""	Q1-2019
2112	2112	SHIP CONSTRUCTION TURNKEY	Wexford	Whitewater Estuary, Ballyhack	3	*N/A	""	""	""	""	""	Q3-2020
2113	2113	SHIP CONSTRUCTION TURNKEY	Wexford	Riverchapel Lane, Gorey	4	*N/A	""	""	""	""	""	Q4-2019
2114	2114	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford-Phase 3	4	*N/A	""	""	""	""	""	Q2-2019
2115	2115	SHIP CONSTRUCTION TURNKEY	Wexford	Glen Aoibhinn, Ardamine, Gorey - Phase 3	3	*N/A	""	""	""	""	""	Q4-2019
2116	2116	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford Phase 4	10	*N/A	""	""	""	""	""	Q3-2019
2117	2117	SHIP CONSTRUCTION TURNKEY	Wexford	St. Martin's Road, Rosslare Harbour	4	*N/A	""	""	""	""	""	Q4-2019
2118	2118	SHIP CONSTRUCTION TURNKEY	Wexford	Clonattin Upper, Gorey	8	*N/A	""	""	""	Stage 4 approved Q2-2019, the scheme is fully approved.	""	""
2119	2119	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2b)	2	*N/A	""	""	""	""	""	Q4-2019
2120	2120	SHIP CONSTRUCTION TURNKEY	Wexford	Michael Street, New Ross 	3	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2121	2121	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	18	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2122	2122	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin, Ballytegan Road, Gorey (Phase 2 C)	1	*N/A	""	""	""	""	""	Q3-2019
2123	2123	SHIP CONSTRUCTION TURNKEY	Wexford	Ballynaglough, Blackwater	16	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2124	2124	SHIP CONSTRUCTION TURNKEY	Wexford	Clonhasten, Enniscorthy	50	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
2125	2125	SHIP CONSTRUCTION TURNKEY	Wexford	No.'s 64 & 74 Chapelwood, Kilmuckridge	2	*N/A	""	""	""	""	""	Q1-2020
2126	2126	SHIP CONSTRUCTION TURNKEY	Wexford	5 The Break Ayelsbridge, Riverchapel	1	*N/A	""	""	""	""	""	Q1-2020
2127	2127	SHIP CONSTRUCTION TURNKEY	Wexford	Creagh, Gorey	39	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2128	2128	SHIP CONSTRUCTION TURNKEY	Wexford	Bridgetown	12	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2129	2129	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford	1	*N/A	""	""	""	""	""	Q1-2020
2130	2130	SHIP CONSTRUCTION TURNKEY	Wexford	Gleann an Ghairdin,&nbsp; Gorey - Phase 2	4	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2131	2131	SHIP CONSTRUCTION TURNKEY	Wexford	Ard Uisce, Whiterock Hill, Wexford	5	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2132	2132	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2133	2133	SHIP CONSTRUCTION TURNKEY	Wexford	Cluain Beag, Clonard, Wexford	10	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2134	2134	SHIP CONSTRUCTION	Wexford	SN Castlemoyle, New Ross	1	*N/A	""	""	""	""	""	Q4-2019
2135	2135	SHIP CONSTRUCTION	Wexford	Cloghulatagh, Taghmon	18	*N/A	""	""	""	""	Q2-2019	""
2136	2136	SHIP CONSTRUCTION	Wexford	Coolcotts, Clonard	7	*N/A	""	""	""	""	""	Q4-2019
2137	2137	SHIP CONSTRUCTION	Wexford	Creagh, Gorey	10	*N/A	""	""	""	""	""	Q1-2019
2138	2138	SHIP CONSTRUCTION	Wexford	Danescastle	10	*N/A	""	""	""	""	""	Q1-2019
2139	2139	SHIP CONSTRUCTION	Wexford	Slippery Green, Wexford	10	*N/A	""	""	""	""	""	Q3-2019
2140	2140	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford (Phase 1)	20	*N/A	""	""	""	""	Q3-2020	""
2141	2141	SHIP CONSTRUCTION	Wexford	Cois Mara	2	*N/A	""	""	""	""	""	Q3-2018
2142	2142	SHIP CONSTRUCTION	Wexford	Killeens, Wexford	40	*N/A	""	""	""	""	Q2-2020	""
2143	2143	SHIP CONSTRUCTION	Wexford	Oilgate, Enniscorthy	2	*N/A	""	""	""	""	""	Q2-2018
2144	2144	SHIP CONSTRUCTION	Wexford	Cherryorchard, Enniscorthy	8	*N/A	""	""	""	""	""	Q3-2018
2145	2145	SHIP CONSTRUCTION	Wexford	Ross Road, Enniscorthy	1	*N/A	""	""	""	""	Q3-2018	""
2146	2146	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey	5	*N/A	""	""	""	""	""	Q4-2018
2147	2147	SHIP CONSTRUCTION	Wexford	Baile an Tr, Riverchapel (Courtown Ardamine)	10	*N/A	""	""	""	""	""	Q2-2016
2148	2148	SHIP CONSTRUCTION	Wexford	Shanna Court, Coolcotts	8	*N/A	""	""	""	""	""	Q1-2016
2149	2149	SHIP CONSTRUCTION	Wexford	Francis Street, Wexford	1	*N/A	""	""	""	""	""	Q1-2017
2150	2150	SHIP CONSTRUCTION	Wexford	Commodore Barry	1	*N/A	""	""	""	""	""	Q2-2016
2151	2151	SHIP CONSTRUCTION	Wexford	Glentire, The Ballagh, Enniscorthy	7	*N/A	""	""	""	""	Q2-2019	""
2152	2152	SHIP CONSTRUCTION	Wexford	Rosetown, Rosslare, Co Wexford, Phase 1	23	*N/A	""	""	Stage 3 approved Q3-2020, the scheme is now approved to proceed to tender.	""	""	""
2153	2153	SHIP CONSTRUCTION	Wexford	Carley's Bridge, Enniscorthy	17	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2154	2154	SHIP CONSTRUCTION	Wexford	Creagh (East), Gorey	4	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2155	2155	SHIP CONSTRUCTION	Wexford	Rosbercon, New Ross	28	*N/A	Stage 1 approved Q4-2018, outline design and costs being prepared.	""	""	""	""	""
2156	2156	SHIP CONSTRUCTION	Wexford	Baile Eoghain, Gorey (Phase 2)	4	*N/A	""	""	""	""	""	Q4-2018
2157	2157	SHIP CONSTRUCTION	Wexford	Wexford Street, Gorey	20	*N/A	Stage 1 approved Q1-2019, outline design and costs being prepared.	""	""	""	""	""
2158	2158	SHIP CONSTRUCTION	Wexford	Rosemary Heights, Ferns	8	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
2159	2159	SHIP CONSTRUCTION	Wexford	Bullawn, Irishtown, New Ross	2	*N/A	Stage 1 approved Q2-2019, outline design and costs being prepared.	""	""	""	""	""
2160	2160	SHIP CONSTRUCTION	Wexford	Ballyhine, Barntown	6	*N/A	""	""	""	""	Q3-2020	""
2161	2161	SHIP CONSTRUCTION	Wexford	Whiterock Hill, Wexford (Phase 2)	24	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
2162	2162	SHIP CONSTRUCTION	Wexford	Creagh (West), Gorey	8	*N/A	Stage 1 approved Q2-2018, outline design and costs being prepared.	""	""	""	""	""
2163	2163	CAS CONSTRUCTION	Wexford	Barrystown	16	Grantstown Voluntary Housing Association Ltd	""	Stage 2 approved Q1-2018, full design/tender being prepared.	""	""	""	""
2164	2164	CAS CONSTRUCTION	Wexford	Rathangan	7	Rathangan Senior Citizens Housing Association Ltd	""	""	""	""	""	Q3-2017
2165	2165	CAS CONSTRUCTION	Wexford	Wexford Women's Refuge, Maudlintown	12	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2166	2166	CALF TURNKEY	Wexford	24 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	8	Tath Housing Association	""	""	""	""	""	Q3-2020
2167	2167	CALF TURNKEY	Wexford	24 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 2)	16	Tath Housing Association	""	""	""	""	Q3-2018	""
2168	2168	CALF TURNKEY	Wexford	67 units, Coolcotts, Wexford (Phase 1)*	67	Cluid Housing	""	""	""	""	Q3-2020	""
2169	2169	CALF TURNKEY	Wexford	9 Units, Gleann an Ghairdin, Gorey, Co. Wexford (Phase 1)	9	Tath Housing Association	""	""	""	""	Q4-2019	""
2170	2170	CALF TURNKEY	Wexford	 Ard Uisce, Wexford Town (Phase 1)	5	Tath Housing Association	""	""	""	""	""	Q4-2017
2171	2171	CALF TURNKEY	Wexford	 Ard Uisce, Whiterock, Wexford  (Phase 1)	1	Tath Housing Association	""	""	""	""	""	Q1-2018
2172	2172	CALF TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q1-2018
2173	2173	CALF TURNKEY	Wexford	Ard Uisce, Whiterock, Wexford (Phase 1)*	6	Tath Housing Association	""	""	""	""	""	Q1-2017
2174	2174	CALF TURNKEY	Wexford	Ballyboggan, Castlebridge, Co Wexford (Phase 1)	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2175	2175	CALF TURNKEY	Wexford	Clonard, Wexford (Phase 1)*	10	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2176	2176	CALF TURNKEY	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 1)	34	Oaklee Housing	""	""	""	""	""	Q4-2018
2177	2177	CALF TURNKEY	Wexford	Fearach Cnoic, Greenville, The Moyne, Enniscorthy (Phase 2)	6	Oaklee Housing	""	""	""	""	""	Q2-2019
2178	2178	CALF TURNKEY	Wexford	Fort Road, Ramsfort Park, Gorey, Co. Wexford (Phase 1)*	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	Q3-2018	""
2179	2179	CALF TURNKEY	Wexford	Gleann an Ghairdin, Gorey (Phase 1)	9	Tath Housing Association	""	""	""	""	""	Q4-2019
2180	2180	CALF TURNKEY	Wexford	Gleann an Ghairdin, Gorey (Phase 2)	9	Tath Housing Association	""	""	""	""	""	Q1-2020
2181	2181	CALF TURNKEY	Wexford	Greenville, Enniscorthy, Co. Wexford (Phase 1)*	6	Oaklee Housing	""	""	""	""	""	Q2-2019
2182	2182	CALF TURNKEY	Wexford	Hunters Green, Gorey (Phase 1)	7	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2016
2183	2183	CALF TURNKEY	Wexford	Hunters Green, Gorey (Phase 2)	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2016
2184	2184	CALF TURNKEY	Wexford	Hunters Green, Gorey (Phase 3)	11	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q1-2017
2185	2185	CALF TURNKEY	Wexford	Hunters Green, Gorey (Phase 4)	9	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2017
2186	2186	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 1)	14	Tath Housing Association	""	""	""	""	Q3-2019	""
2187	2187	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 2)	14	Tath Housing Association	""	""	""	""	Q3-2019	""
2188	2188	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 3)	16	Tath Housing Association	""	""	""	""	Q3-2019	""
2189	2189	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 4)*	18	Tath Housing Association	""	""	""	""	Q3-2019	""
2190	2190	CALF TURNKEY	Wexford	Kerlogue Manor, Roxborough, Drinagh, Wexford (Phase 5)	9	Tath Housing Association	""	""	""	""	Q3-2019	""
2191	2191	CALF TURNKEY	Wexford	Meadowfields Enniscorthy, Co. Wexford (Phase 1)	12	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2016
2192	2192	CALF TURNKEY	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 1)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q2-2019
2193	2193	CALF TURNKEY	Wexford	Meadowfields Phase 3, Enniscorthy, Co. Wexford (Phase 2)*	14	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2194	2194	CALF TURNKEY	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 1)	11	Tath Housing Association	""	""	""	""	Q4-2019	""
2195	2195	CALF TURNKEY	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 2)*	9	Tath Housing Association	""	""	""	""	Q4-2019	""
2196	2196	CALF TURNKEY	Wexford	Old Forge Road, Milehouse Road, Enniscorthy, Co. Wexford (Phase 3)*	21	Tath Housing Association	""	""	""	""	Q4-2019	""
2197	2197	CALF TURNKEY	Wexford	Pirc na gCon, Greenville Lane, Enniscorthy, Co. Wexford (Phase 1)*	52	Cluid Housing	""	""	""	""	Q3-2019	""
2198	2198	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	2	*N/A	""	""	""	""	""	Q2-2018
2199	2199	SHIP CONSTRUCTION TURNKEY	Wicklow	No. 7 Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q4-2018
2200	2200	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	10	*N/A	""	""	""	""	""	Q2-2019
2201	2201	SHIP CONSTRUCTION TURNKEY	Wicklow	Fernhill, Arklow	1	*N/A	""	""	""	""	""	Q3-2018
2202	2202	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q1-2019
2203	2203	SHIP CONSTRUCTION TURNKEY	Wicklow	Woodview Cottages, Rathnew	2	*N/A	""	""	""	""	""	Q4-2019
2204	2204	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	10	*N/A	""	""	""	""	""	Q3-2019
2205	2205	SHIP CONSTRUCTION TURNKEY	Wicklow	Mill Court, Tinahely 	1	*N/A	""	""	""	""	""	Q2-2019
2206	2206	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	15	*N/A	""	""	""	""	""	Q3-2019
2207	2207	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	4	*N/A	""	""	""	""	""	Q4-2019
2208	2208	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	2	*N/A	""	""	""	""	""	Q4-2019
2209	2209	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	14	*N/A	""	""	""	""	""	Q4-2019
2210	2210	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods, Wicklow Town	6	*N/A	""	""	""	""	""	Q2-2020
2211	2211	SHIP CONSTRUCTION TURNKEY	Wicklow	Heatherside, Vale Road, Arklow	9	*N/A	""	""	""	""	""	Q4-2019
2212	2212	SHIP CONSTRUCTION TURNKEY	Wicklow	Kirvin Hill, Broomhall, Rathnew	2	*N/A	""	""	""	""	""	Q2-2019
2213	2213	SHIP CONSTRUCTION TURNKEY	Wicklow	Weaver Square, Baltinglass, Co. Wicklow	2	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2214	2214	SHIP CONSTRUCTION TURNKEY	Wicklow	Carrig Beag, WicklowTown	5	*N/A	""	""	""	""	""	Q3-2020
2215	2215	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugdugff, Tinahely, Co. Wicklow	2	*N/A	""	""	""	""	Q2-2020	""
2216	2216	SHIP CONSTRUCTION TURNKEY	Wicklow	The Birches, Ballinaclash, Co. Wicklow	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2217	2217	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods Phase 2	2	*N/A	""	""	""	""	""	Q2-2020
2218	2218	SHIP CONSTRUCTION TURNKEY	Wicklow	Bollarney Woods Phase 2	1	*N/A	""	""	""	Stage 4 approved Q4-2019, the scheme is fully approved.	""	""
2219	2219	SHIP CONSTRUCTION TURNKEY	Wicklow	Bramble Hill, Lugduff, Tinahely, Co. Wicklow	3	*N/A	""	""	""	Stage 4 approved Q2-2020, the scheme is fully approved.	""	""
2220	2220	SHIP CONSTRUCTION RAPID	Wicklow	Sli na Slainte, Whitehall, Baltinglass	7	*N/A	""	""	""	""	""	Q4-2019
2221	2221	SHIP CONSTRUCTION RAPID	Wicklow	Merrymeeting View, Rathnew	46	*N/A	""	""	""	""	Q2-2019	""
2222	2222	SHIP CONSTRUCTION RAPID	Wicklow	Coolattin Oaks (Ph4), Carnew	22	*N/A	""	""	""	""	Q3-2019	""
2223	2223	SHIP CONSTRUCTION RAPID	Wicklow	Shillelagh Phase 4	20	*N/A	""	""	""	Stage 4 approved Q1-2020, the scheme is fully approved.	""	""
2224	2224	SHIP CONSTRUCTION RAPID	Wicklow	Ashtown Lane, Wicklow Town	40	*N/A	""	""	""	""	Q3-2020	""
2225	2225	SHIP CONSTRUCTION RAPID	Wicklow	Ard na Greine, West Ward, Bray	31	*N/A	""	""	""	""	Q2-2020	""
2226	2226	SHIP CONSTRUCTION RAPID	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	Q3-2020	""
2227	2227	SHIP CONSTRUCTION RAPID	Wicklow	Mountainview, NTMK	22	*N/A	""	""	Stage 3 approved Q1-2020, the scheme is now approved to proceed to tender.	""	""	""
2228	2228	SHIP CONSTRUCTION RAPID	Wicklow	Sli na Slainte, Whitehall, Baltinglass - Phase 2	27	*N/A	""	""	""	""	""	Q1-2020
2229	2229	SHIP CONSTRUCTION RAPID	Wicklow	Three Trouts, Greystones	40	*N/A	Stage 1 approved Q4-2019, outline design and costs being prepared.	""	""	""	""	""
2230	2230	SHIP CONSTRUCTION RAPID	Wicklow	Greenhills Road, Wicklow Town	36	*N/A	""	Stage 2 approved Q4-2019, full design/tender being prepared.	""	""	""	""
2231	2231	SHIP CONSTRUCTION RAPID	Wicklow	Cedar Court, Schools Road, Bray	14	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2232	2232	SHIP CONSTRUCTION RAPID	Wicklow	Coolattin Oaks (Ph 4) Carnew	8	*N/A	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2233	2233	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 3)	21	*N/A	""	""	""	""	Q4-2019	""
2234	2234	SHIP CONSTRUCTION	Wicklow	Druids Brook, Kilcoole	2	*N/A	""	""	""	""	""	Q3-2019
2235	2235	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow	17	*N/A	""	""	""	""	""	Q3-2019
2236	2236	SHIP CONSTRUCTION	Wicklow	Delaney Park, Emoclew Road, Arklow (Phase 2)	26	*N/A	""	""	""	""	Q4-2019	""
2237	2237	SHIP CONSTRUCTION	Wicklow	FCA Hall, Wicklow Town	8	*N/A	""	""	""	""	Q3-2018	""
2238	2238	SHIP CONSTRUCTION	Wicklow	Kilmantain Place, Bray	4	*N/A	""	""	""	""	Q2-2019	""
2239	2239	SHIP CONSTRUCTION	Wicklow	O'Byrne Road, Bray	1	*N/A	""	""	""	""	""	Q4-2018
2240	2240	SHIP CONSTRUCTION	Wicklow	St Mary's Rd., Arklow (Old Library Site)	7	*N/A	""	""	""	""	""	Q4-2018
2241	2241	SHIP CONSTRUCTION	Wicklow	Jameson Heights,  Kilmacanogue	20	*N/A	""	""	""	""	Q2-2019	""
2242	2242	SHIP CONSTRUCTION	Wicklow	Avondale Heights, Rathdrum	20	*N/A	""	""	""	""	""	Q4-2018
2243	2243	SHIP CONSTRUCTION	Wicklow	Kilbride Lane, Bray (Murphy's Lands)	42	*N/A	""	""	""	""	Q1-2019	""
2244	2244	SHIP CONSTRUCTION	Wicklow	16A Oak Drive, Blessington	1	*N/A	""	""	""	""	""	Q3-2019
2245	2245	SHIP CONSTRUCTION	Wicklow	Carrig Eden,1 Marine Road, Greystones	35	*N/A	""	""	""	""	Q4-2019	""
2246	2246	SHIP CONSTRUCTION	Wicklow	Farrankelly, Greystones (Phase 2)	24	*N/A	""	""	""	""	""	Q2-2020
2247	2247	SHIP CONSTRUCTION	Wicklow	Sheehan Court, Back Street, Arklow	7	*N/A	""	Stage 2 approved Q3-2020, full design/tender being prepared.	""	""	""	""
2248	2248	SHIP CONSTRUCTION	Wicklow	Blackhills, Glenealy, Co. Wicklow	2	*N/A	""	""	""	Stage 4 approved Q3-2020, the scheme is fully approved.	""	""
2249	2249	CAS CONSTRUCTION SINGLE STAGE	Wicklow	Hollybrook Park, Bray, Co. Wicklow	4	St. John of God Housing Association Ltd	""	""	""	Stage 4 approved Q3-2019, the scheme is fully approved.	""	""
2250	2250	CALF TURNKEY	Wicklow	1 - 14 Wentworth Place, Wicklow Town (Phase 1)	14	Tath Housing Association	""	""	""	Q4-2018	""	""
2251	2251	CALF TURNKEY	Wicklow	Abbey St, Wicklow  (Phase 1)	6	Tath Housing Association	""	""	""	""	""	Q4-2018
2252	2252	CALF TURNKEY	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 1)*	9	Cluid Housing	""	""	""	""	""	Q4-2019
2253	2253	CALF TURNKEY	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 2)*	8	Cluid Housing	""	""	""	""	""	Q3-2020
2254	2254	CALF TURNKEY	Wicklow	Ballinahinch Woods, Ashford, Co. Wicklow (Phase 3)*	4	Cluid Housing	""	""	""	""	Q1-2018	""
2255	2255	CALF TURNKEY	Wicklow	Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 1)	26	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2018	""
2256	2256	CALF TURNKEY	Wicklow	Fairgreen Manor, Dunlavin, Co. Wicklow (Phase 2)*	14	Circle Voluntary Housing Association Ltd	""	""	""	""	Q3-2018	""
2257	2257	CALF TURNKEY	Wicklow	Glenheron, Greystones, Co Wicklow  (Phase 1)*	5	Tath Housing Association	""	""	""	""	""	Q2-2018
2258	2258	CALF TURNKEY	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 1)*	8	Tath Housing Association	""	""	""	""	""	Q4-2018
2259	2259	CALF TURNKEY	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 2)*	7	Tath Housing Association	""	""	""	""	""	Q2-2019
2260	2260	CALF TURNKEY	Wicklow	Glenheron, Greystones, Co. Wicklow (Phase 3)*	4	Tath Housing Association	""	""	""	""	""	Q4-2019
2261	2261	CALF TURNKEY	Wicklow	Glenheron, Greystones, County Wicklow (Phase 1)	2	Tath Housing Association	""	""	""	""	Q2-2018	""
2262	2262	CALF TURNKEY	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 1)*	15	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2018
2263	2263	CALF TURNKEY	Wicklow	Hazelbrook Rise, Ballybeg, Rathnew, Co. Wicklow (Phase 2)	73	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q3-2019
2264	2264	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 1)	11	Tath Housing Association	""	""	""	""	""	Q3-2020
2265	2265	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 2)	14	Tath Housing Association	""	""	""	""	""	Q3-2020
2266	2266	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 3)	5	Tath Housing Association	""	""	""	""	Q4-2018	""
2267	2267	CALF TURNKEY	Wicklow	Heatherside, Vale Road, Arklow, Co. Wicklow (Phase 4)	8	Tath Housing Association	""	""	""	""	Q4-2018	""
2268	2268	CALF TURNKEY	Wicklow	Lower Main Street, Arklow, Co. Wicklow (Phase 1)	4	Clanmil Housing Association Ireland	""	""	""	Q3-2020	""	""
2269	2269	CALF TURNKEY	Wicklow	Meadow Gate, Marlton Road, Wicklow Town (Phase 1)*	4	Tath Housing Association	""	""	""	""	Q3-2018	""
2270	2270	CALF TURNKEY	Wicklow	Phase 2, Hazelbrook, Rathnew, Co. Wicklow (Phase 1)	56	Co - Operative Housing Ireland Society Limited	""	""	""	""	""	Q4-2019
2271	2271	CALF TURNKEY	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 1)*	16	Respond	""	""	""	""	Q3-2019	""
2272	2272	CALF TURNKEY	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 2)*	24	Respond	""	""	""	""	Q3-2019	""
2273	2273	CALF TURNKEY	Wicklow	Rathcoran House, Baltinglass, Co. Wicklow (Phase 3)	16	Respond	""	""	""	""	Q3-2019	""
2274	2274	CALF TURNKEY	Wicklow	Ternlee, Coldross Lane, Kilcoole, Co. Wicklow (Phase 1)*	4	Cluid Housing	""	""	""	""	""	Q2-2019
2275	2275	CALF TURNKEY	Wicklow	Ternlee, Coldross Lane, Kilcoole, Co. Wicklow (Phase 2)*	2	Cluid Housing	""	""	""	""	""	Q4-2019
2276	2276	CALF TURNKEY	Wicklow	The Meadows, Ballynerrin, Wicklow Town (Phase 1)*	7	Tath Housing Association	""	""	""	""	""	Q4-2018
2277	2277	CALF TURNKEY	Wicklow	Viewmount, Rathdrum, County Wicklow (Phase 1)	4	Tath Housing Association	""	""	""	""	""	Q2-2020
2278	2278	CALF TURNKEY	Wicklow	Waverley Meadow, Rathnew, Co. Wicklow (Phase 1)*	9	Tath Housing Association	""	""	""	Q3-2020	""	""
2279	2279	CALF TURNKEY	Wicklow	Waverley Meadow, Rathnew, Co. Wicklow (Phase 2)	11	Tath Housing Association	""	""	""	Q3-2020	""	""
2280	2280	CALF TURNKEY	Wicklow	Waverley Meadow, Rathnew, Co. Wicklow (Phase 3)*	11	Tath Housing Association	""	""	""	Q3-2020	""	""
2281	2281	CALF TURNKEY	Wicklow	Woodpark, Rathdrum, Co. Wicklow (Phase 1)*	4	Tath Housing Association	""	""	""	""	""	Q3-2019
2282	2282	PUBLIC PRIVATE PARTNERSHIP (Bundle 1)	Wicklow	Convent Lands (Phase 1)	23	*N/A	""	""	""	""	""	Q2-2020